Hamilton West-Harbour Re-development

Designer:_D.Huang, M.Morco_Date:___Jan16th ,2012 Verify:____J. Xing, Y,Liu__ Date:__Feb 23rd,2012

Appendix A: Sample Calculations


Design of Slab: Floor finish 0.08 kPa Ceiling 0.20 kPa Ducts/pipes/wiring 0.25 kPa Non-structural partition 1.10 kPa ---------------------------------------------------------Dead Load 1.63 kPa Live Load (Office) Specified load = LL + 2.40 kPa * 1.63 = 3.8 kPa

Reference

DL = 2.40 +

Agwaymetal INC. Technical data sheet of composite decks www.agway metals.com

The selected composite deck is CD75 - 200 (Galvanneal) Base Steel = 0.914 mm Depth = 130 mm, Maximum specified load = 7.2 kPa> 3.8 kPa Okay Check deflection: DP DC L (beam spacing) Wd =

= 155 kN*m = 360 = 3,200 mm

= 13.14 kPa > 3.8 kPa Okay

Self weight of composite slab = 1.98 kPa

A-1

Hamilton West-Harbour Re-development


Designer:_D.Huang, M.Morco_Date:___Jan16th ,2012 Verify:____J. Xing, Y,Liu__ Date:__Feb 23rd,2012

Snow load Assume flat roof without penthouse S = Is * [Ss(CbCwCsCa) + Sr] Is = 1.0 (Importance factor for snow load) Ss = 0.9 (Ground Snow Load) Sr = 0.4 (1-in-50 year associated rain load) Cb = 0.8 (basic roof snow load factor) Cw = 1.0 (wind exposure factor) Cs = 1.0 (slope factor) Ca = 1.0 (shape factor) S = 1 * (0.9*0.8*1*1*1+0.4) = 1.12kPa Wind uplift Use dead load factor = 0.85 for wind uplift Cpi =0 (For roof) Design roof height = 12.0 m Dead load on the roof, Roof finish 0.15 kPa Steel concrete composite slab 1.98 kPa Insulation 0.10 kPa Steel deck 0.10 kPa Ceiling 0.20 kPa Mechnical system 0.20 kPa Green roof 0.68 kPa ---------------------------------------------------------Dead Load 3.41 kPa NBCC 2010 Clause 4.1.7.1 NBCC 2010 Clause 4.1.6.2 NBCC 2010 Appendix C

Iw q1/50 Ce Cg

= 1.0 (important factor for wind load) = 0.46 KPa = 0.9 * (h/10)0.2 = 0.93 > 0.9 open terrain ( exposure factor) = 2.0 Building as a whole ( gust effect factor) Interior Zone : Cp = -0.5 ; End Zone: Cp = -1.0

H/D = 12/19.8 = 0.606 < 1 Wind Pressure P = Iw (q Ce CgCp) 0.46 [ 1.04 * 2 * (-1) ] = 0.46 [ 1.04 * 2 * (-0.5) ] =

-0.9542 -0.4771

kPa kPa
A-2

Exterior Interior

Hamilton West-Harbour Re-development


Designer:_D.Huang, M.Morco_Date:___Jan16th ,2012 Verify:____J. Xing, Y,Liu__ Date:__Feb 23rd,2012

Beam 1 detail design Location: on Axis A from Axis 3 to Axis 6 on the roof Beam spacing = 3.2 m Beam Length = 6.6 m Elasticity of steel = 2.00 E +08 kPa Tributary area = 3.2/2*6.6 = 10.56 m2 Live Load = 1*3.2/2 = 1.6 kN/m Assumed self weight of beam = 0.207 kN/m ( trails done by Excel ) Dead Load = 3.41 * 3.2 /2 +0.207 = 5.66 kN/m Snow Load = 1.12 * 3.2 /2 = 1.79 kN/m Load Combination = 1.25 D + 1.5 S + 0.5 L = 1.25 * 5.66 + 1.5 * 1.79 + 0.5 * 1.6 = 10.56 kN/m Max shear = 10.56 * 6.6 /2 = 34.9 kN Max moment = 10.56 * 6.6 2/8 = 57.5 kN.m Selection (moment governing ): W310 X 21 Mr = 89.1 kN.m Vr = 303 kN Self weight = 0.207 kN/m Ix = 3.7E+07 mm4 Max deflection due to Live Load : = 5wl4/(384 E Ix) = 5 * 1.6 * 66004 / (384 * 2.00 E +08 * 3.7E+07) *1000 = 5.34 mm < 22 mm ok CISC Steel Handbook Pg 5-98

CISC Steel Handbook Pg 5-146

A-3

Hamilton West-Harbour Re-development


Designer:_D.Huang, M.Morco_Date:___Jan16th ,2012 Verify:____J. Xing, Y,Liu__ Date:__Feb 23rd,2012

Beam 2 detail design Location: on Axis D from Axis 6 to Axis 8 on the roof Beam spacing = 3.2 m Beam Length = 6.6 m Elasticity of steel = 2.00 E +08 kPa Tributary area = 3.2*6.6 = 21.12 m2 LLRF = 0.3 + = 0.981 Live Load = 1*3.2 *0.981= 3.14 kN/m Assumed self weight of beam = 0.278 kN/m ( trails done by Excel ) Dead Load = 3.41 * 3.2 +0.278 = 11.19 kN/m Snow Load = 1.12 * 3.2 = 3.58 kN/m Load Combination = 1.25 D + 1.5 S + 0.5 L = 1.25 * 11.19 + 1.5 * 3.58 + 0.5 * 3.14 = 20.93 kN/m Max shear = 20.93* 6.6 /2 = 69.1 kN Max moment = 20.93 * 6.6 2/8 = 114 kN.m Selection (moment governing ): W310 X 28 Mr = 126 kN.m Vr = 380 kN Self weight = 0.278 kN/m Ix = 5.43E+07 mm4 Max deflection due to Live Load : = 5wl4/(384 E Ix) = 5 * 3.14 * 66004 / (384 * 2.00 E +08 *5.43E+07) *1000 = 7.1 mm < 22 mm ok CISC Steel Handbook Pg 5-146 CISC Steel Handbook Pg 5-98

A-4

Hamilton West-Harbour Re-development


Designer:_D.Huang, M.Morco_Date:___Jan16th ,2012 Verify:____J. Xing, Y,Liu__ Date:__Feb 23rd,2012

Beam 3 detail design Location: on Axis D from Axis 6 to Axis 8 on the 3rd floor slab Beam spacing = 3.2 m Beam Length = 6.6 m Elasticity of steel = 2.00 E +08 kPa Tributary area = 3.2*6.6 = 21.12 m2 LLRF = 0.3 + = 0.981 Live Load = 1.9 *3.2 *0.981= 5.97 kN/m Assumed self weight of beam = 0.321 kN/m ( trails done by Excel ) Dead Load = 3.61 * 3.2 +0.321 = 11.87 kN/m Load Combination = 1.25 D + 1.5 L = 1.25 * 11.87 + 1.5 * 5.97 = 23.79 kN/m Max shear = 23.79* 6.6 /2 = 78.5 kN Max moment = 23.79 * 6.6 2/8 = 129.5 kN.m Selection (moment governing ): W360 X33 Mr = 168 kN.m Vr = 396 kN Self weight = 0.321 kN/m Ix = 8.27E+07 mm4 Max deflection due to Live Load : = 5wl4/(384 E Ix) = 5 * 5.97 * 66004 / (384 * 2.00 E +08 *8.27E+07) *1000 = 8.91 mm < 22 mm ok

CISC Steel Handbook Pg 5-98

CISC Steel Handbook Pg 5-146

A-5

Hamilton West-Harbour Re-development


Designer:_D.Huang, M.Morco_Date:___Jan16th ,2012 Verify:____J. Xing, Y,Liu__ Date:__Feb 23rd,2012

Beam 4 detail design Location: on Axis G from Axis 6 to Axis 8 on the 3rd floor slab Beam spacing = 3.2 m Beam Length = 6.6 m Elasticity of steel = 2.00 E +08 kPa Tributary area = 3.2*6.6 = 21.12 m2 LLRF = 0.3 + = 0.981 Live Load = (1.9+4.8)/2 *3.2 *0.981= 10.52 kN/m Assumed self weight of beam = 0.321 kN/m ( trails done by Excel ) Dead Load = 3.61 * 3.2 +0.321 = 11.87 kN/m Load Combination = 1.25 D + 1.5 L = 1.25 * 11.87 + 1.5 * 10.52 = 30.62 kN/m Max shear = 30.62* 6.6 /2 = 101 kN Max moment = 30.62 * 6.6 2/8 = 167 kN.m Selection (moment governing ): W360 X33 Mr = 168 kN.m Vr = 396 kN Self weight = 0.321 kN/m Ix = 8.27E+07 mm4 Max deflection due to Live Load : = 5wl4/(384 E Ix) = 5 * 10.52 * 66004 / (384 * 2.00 E +08 *8.27E+07) *1000 = 15.71 mm < 22 mm ok

CISC Steel Handbook Pg 5-98

CISC Steel Handbook Pg 5-146

A-6

Hamilton West-Harbour Re-development


Designer:_D.Huang, M.Morco_Date:___Jan16th ,2012 Verify:____J. Xing, Y,Liu__ Date:__Feb 23rd,2012

Beam 5 detail design Location: on Axis I from Axis 6 to Axis 8 on the 3rd floor slab Beam spacing = 3.2 m Beam Length = 6.6 m Elasticity of steel = 2.00 E +08 kPa Tributary area = 3.2*6.6 = 21.12 m2 LLRF = 0.3 + = 0.981 Live Load = 4.8 *3.2 *0.981= 15.07 kN/m Assumed self weight of beam = 0.385 kN/m ( trails done by Excel ) Dead Load = 3.61 * 3.2 +0.385 = 11.94 kN/m Load Combination = 1.25 D + 1.5 L = 1.25 * 11.94 + 1.5 * 15.07 = 37.53 kN/m Max shear = 37.53* 6.6 /2 = 124 kN Max moment = 37.53 * 6.6 2/8 = 204 kN.m Selection (moment governing ): W410 X39 Mr = 227 kN.m Vr = 480 kN Self weight = 0.385 kN/m Ix = 1.27E+08 mm4 Max deflection due to Live Load : = 5wl4/(384 E Ix) = 5 * 15.07 * 66004 / (384 * 2.00 E +08 *1.27E+08) *1000 = 14.66 mm < 22 mm ok CISC Steel Handbook Pg 5-146

CISC Steel Handbook Pg 5-98

A-7

Hamilton West-Harbour Re-development


Designer:_D.Huang, M.Morco_Date:___Jan16th ,2012 Verify:____J. Xing, Y,Liu__ Date:__Feb 23rd,2012

Beam 6 detail design Location: on Axis A from Axis 3 to Axis 6 on the 3rd floor slab Beam spacing = 3.2 m Beam Length = 6.6 m Elasticity of steel = 2.00 E +08 kPa Tributary area = 3.2*6.6/2 = 10.56 Live Load = 4.8 *3.2 /2= 7.68 kN/m m2

Assumed self weight of beam = 0.278 kN/m ( trails done by Excel ) Dead Load = 3.61 * 3.2/2 +0.278 = 6.05 kN/m Load Combination = 1.25 D + 1.5 L = 1.25 * 6.05 + 1.5 * 7.68 = 19.09 kN/m Max shear = 19.09* 6.6 /2 = 63 kN Max moment = 19.09 * 6.6 2/8 = 104 kN.m Selection (moment governing ): W310 X28 Mr = 126 kN.m Vr = 380 kN Self weight = 0.278 kN/m Ix = 5.43E+07 mm4 Max deflection due to Live Load : = 5wl4/(384 E Ix) = 5 * 7.68 * 66004 / (384 * 2.00 E +08 *5.43E+07) *1000 = 17.47 mm < 22 mm ok CISC Steel Handbook Pg 5-98

CISC Steel Handbook Pg 5-146

A-8

Hamilton West-Harbour Re-development


Designer:_D.Huang, M.Morco_Date:___Jan16th ,2012 Verify:____J. Xing, Y,Liu__ Date:__Feb 23rd,2012

Beam 7 detail design Location: on Axis D from Axis 6 to Axis 8 on the 2nd floor slab Beam spacing = 3.2 m Beam Length = 6.6 m Elasticity of steel = 2.00 E +08 kPa Tributary area = 3.2*6.6 = 21.12 m2 LLRF = 0.3 + = 0.981 Live Load = 2.4 *3.2 *0.981= 7.54 kN/m Assumed self weight of beam = 0.321 kN/m ( trails done by Excel ) Dead Load = 3.61 * 3.2 +0.321 = 11.87 kN/m Load Combination = 1.25 D + 1.5 L = 1.25 * 11.87 + 1.5 *7.54 = 26.14 kN/m Max shear = 26.14* 6.6 /2 = 86.3 kN Max moment = 26.14 * 6.6 2/8 = 142.4 kN.m Selection (moment governing ): W360 X33 Mr = 168 kN.m Vr = 396 kN Self weight = 0.321 kN/m Ix = 8.27E+07 mm4 Max deflection due to Live Load : = 5wl4/(384 E Ix) = 5 * 7.54 * 66004 / (384 * 2.00 E +08 *8.27E+07) *1000 = 11.26 mm < 22 mm ok CISC Steel Handbook Pg 5-146 CISC Steel Handbook Pg 5-98

A-9

Hamilton West-Harbour Re-development


Designer:_D.Huang, M.Morco_Date:___Jan16th ,2012 Verify:____J. Xing, Y,Liu__ Date:__Feb 23rd,2012

Beam 8 detail design Location: on Axis G from Axis 6 to Axis 8 on the 2nd floor slab Beam spacing = 3.2 m Beam Length = 6.6 m Elasticity of steel = 2.00 E +08 kPa Tributary area = 3.2*6.6 = 21.12 m2 LLRF = 0.3 + = 0.981 Live Load = (2.4+4.8)/2 *3.2 *0.981= 11.3 kN/m Assumed self weight of beam = 0.385 kN/m ( trails done by Excel ) Dead Load = 3.61 * 3.2 +0.385 = 11.94 kN/m Load Combination = 1.25 D + 1.5 L = 1.25 * 11.94 + 1.5 * 11.3 =31.88 kN/m Max shear = 31.88* 6.6 /2 = 105 kN Max moment = 31.88 * 6.6 2/8 = 174 kN.m Selection (moment governing ): W410 X39 Mr = 227 kN.m Vr = 480 kN Self weight = 0.385 kN/m Ix = 1.27E+08 mm4 Max deflection due to Live Load : = 5wl4/(384 E Ix) = 5 * 11.3 * 66004 / (384 * 2.00 E +08 *1.27E+08) *1000 = 10.99 mm < 22 mm ok CISC Steel Handbook Pg 5-146 CISC Steel Handbook Pg 5-98

A-10

Hamilton West-Harbour Re-development


Designer:_D.Huang, M.Morco_Date:___Jan16th ,2012 Verify:____J. Xing, Y,Liu__ Date:__Feb 23rd,2012

Beam9 detail design Location: on Axis I from Axis 6 to Axis 8 on the 2nd floor slab Tributary area = 6.6 * 1.6 + 6.6 * 1.6 = 21.12 m2 LLRF = 0.3 + = 0.981 Live Load = 0.981 * 4.8 * 3.2 = 15.07 kN/m Assume self-weight = 0.385 kN/m ( trails done by excel) Dead Load = 3.2 * 3.5 + 0.385 = 11.94 kN/m Load combination = 1.25 * 11.94 + 1.5 * 15.07 = 37.53 Vmax = (wL)/2 = 6.6 * 37.53 / 2 = 124 kN Mmax = (wL2)/2 = 37.53 * 6.62 / 8 = 204 kN*m Selection (moment governing ): W410 X39 Mr = 227 kN.m Vr = 480 kN Self weight = 0.385 kN/m Ix = 1.27E+08 mm4 Deflection: Acceptable deflection = Span / 300 = 6,600 / 300 = 22 mm Maximum deflection = = 5 * 15.07 * 6,6004 / (384 * 200,000 * 1.27 * 108) = 14.66 mm ok CISC Steel Handbook Pg 5-146 kN/m

CISC Steel Handbook Pg 5-98

A-11

Hamilton West-Harbour Re-development


Designer:_D.Huang, M.Morco_Date:___Jan16th ,2012 Verify:____J. Xing, Y,Liu__ Date:__Feb 23rd,2012

Beam 10 detail design Location: on Axis A from Axis 3 to Axis 6 on the 2nd floor slab Beam spacing = 3.2 m Beam Length = 6.6 m Elasticity of steel = 2.00 E +08 kPa Tributary area = 3.2*6.6/2 = 10.56 Live Load = 4.8 *3.2 /2= 7.68 kN/m m2

Assumed self weight of beam = 0.278 kN/m ( trails done by Excel ) Dead Load = 3.61 * 3.2/2 +0.278 = 6.05 kN/m Load Combination = 1.25 D + 1.5 L = 1.25 * 6.05 + 1.5 * 7.68 = 19.09 kN/m Max shear = 19.09* 6.6 /2 = 63 kN Max moment = 19.09 * 6.6 2/8 = 104 kN.m Selection (moment governing ): W310 X28 Mr = 126 kN.m Vr = 380 kN Self weight = 0.278 kN/m Ix = 5.43E+07 mm4 Max deflection due to Live Load : = 5wl4/(384 E Ix) = 5 * 7.68 * 66004 / (384 * 2.00 E +08 *5.43E+07) *1000 = 17.47 mm < 22 mm ok CISC Steel Handbook Pg 5-98

CISC Steel Handbook Pg 5-146

A-12

Hamilton West-Harbour Re-development


Designer:_D.Huang, M.Morco_Date:___Jan16th ,2012 Verify:____J. Xing, Y,Liu__ Date:__Feb 23rd,2012

Girder 1 detail design Location: on Axis 8 from Axis G to Axis J on the roof Girder Length = 3.2 *3 =9.6 m Elasticity of steel = 2.00 E +08 kPa Tributary area = 9.6 *6.6 /2 = 31.68 m2 Transferred Load from Beam to Girder: Concentrated Live Load = 1* 3.2 /2 * 6.6 =10.6 kN Concentrated Dead Load= 3.41 * 3.2 /2 *6.6= 36 kN Concentrated Snow Load = 1.12 * 3.2 /2 *6.6 = 11.83 kN Due to Live Load: Max shear = 10.6 kN Max moment = 10.6 * 3.2 = 33.8 kN.m Due to Dead Load: Assume self weight of girder = 0.454 kN/m ( trails done by excel ) Max shear = ( 0.454 *9.6 + 36 +36)/2 = 38.2 kN Max moment = 0.454*9.62/8+36 * 3.2 = 120.5 kN.m Due to Snow Load: Max shear = 11.83 kN Max moment = 11.83 * 3.2 = 37.8 kN.m Load combination : Max shear = 1.25 D + 1.5 S + 0.5 L = 1.25 * 38.2 + 1.5 * 11.83 + 0.5 * 10.6 = 70.76 kN Max moment = 1.25 D + 1.5 S + 0.5 L = 1.25 * 120.5 + 1.5 * 37.8 + 0.5 * 33.8 = 224.2 kN.m Selection (moment governing ): W410 X 46 Mr= 275 kN.m, Vr= 578 kN, Self weight = 0.454 kN/m Ix = 1.56E+08 mm4 Maximum deflection =12.24 mm < 32 mm ok = + a= 3.2 m , L= 9.6m

A-13

Hamilton West-Harbour Re-development


Designer:_D.Huang, M.Morco_Date:___Jan16th ,2012 Verify:____J. Xing, Y,Liu__ Date:__Feb 23rd,2012

Girder 2 detail design Location: on Axis 6 from Axis G to Axis J on the roof Girder Length = 3.2 *3 =9.6 m Elasticity of steel = 2.00 E +08 kPa Tributary area = 9.6 *6.6 = 63.36 m2 Transferred Load from Beam to Girder: Concentrated Live Load = 1* 3.2 * 6.6 =21.1 kN Concentrated Dead Load= 3.41 * 3.2 *6.6= 72 kN Concentrated Snow Load = 1.12 * 3.2 *6.6 = 23.7 kN Due to Live Load: Max shear = 21.1 kN Max moment = 21.1* 3.2 = 67.6 kN.m Due to Dead Load: Assume self weight of girder = 0.645 kN/m ( trails done by excel ) Max shear = ( 0.645 *9.6 + 72 +72)/2 = 75.1 kN Max moment = 0.645*9.62/8+72* 3.2 = 237.9 kN.m Due to Snow Load: Max shear = 23.7 kN Max moment = 23.7 * 3.2 =75.7 kN.m Load combination : Max shear = 1.25 D + 1.5 S + 0.5 L = 1.25 * 75.1 + 1.5 * 23.7 + 0.5 * 21.1 = 140 kN Max moment = 1.25 D + 1.5 S + 0.5 L = 1.25 * 237.9 + 1.5 * 75.7 + 0.5 * 67.6 = 445 kN.m Selection (moment governing ): W530 X 66 Mr= 484 kN.m, Vr= 928 kN, Self weight = 0.645 kN/m Ix = 3.51E+08 mm4 Maximum deflection =10.46 mm < 32 mm ok = + a= 3.2 m , L= 9.6m

A-14

Hamilton West-Harbour Re-development


Designer:_D.Huang, M.Morco_Date:___Jan16th ,2012 Verify:____J. Xing, Y,Liu__ Date:__Feb 23rd,2012

Girder 3 detail design Location: on Axis 6 from Axis G to Axis J on the 3rd floor slab Girder Length = 3.2 *3 =9.6 m Elasticity of steel = 2.00 E +08 kPa Tributary area = 9.6 *6.6 = 63.36 m2 Transferred Load from Beam to Girder: Concentrated Live Load = 4.8* 3.2 * 6.6 =101.4 kN Concentrated Dead Load= (3.61*3.2+0.385)*6.6= 78.8 kN Due to Live Load: Max shear = 101.4 kN Max moment = 101.4* 3.2 = 324.4 kN.m Due to Dead Load: Assume self weight of girder = 0.997 kN/m ( trails done by excel ) Max shear = ( 0.997 *9.6 + 78.8 +78.8)/2 = 83.6 kN Max moment = 0.997*9.62/8+78.8* 3.2 = 263.6 kN.m Load combination : Max shear = 1.25 D + 1.5 L = 1.25 * 83.6 + 1.5 * 101.4 = 257 kN Max moment = 1.25 D + 1.5 L = 1.25 * 263.6 + 1.5 *324.4 = 816 kN.m Selection (moment governing ): W610 X 101 Mr= 900 kN.m, Vr= 1300 kN, Self weight = 0.997 kN/m Ix = 7.64E+08 mm4 Maximum deflection =21.56 mm < 32 mm ok = + a= 3.2 m , L= 9.6m

A-15

Hamilton West-Harbour Re-development


Designer:_D.Huang, M.Morco_Date:___Jan16th ,2012 Verify:____J. Xing, Y,Liu__ Date:__Feb 23rd,2012

Girder 4 detail design Location: on Axis 8 from Axis G to Axis J on the 3rd floor slab Girder Length = 3.2 *3 =9.6 m Elasticity of steel = 2.00 E +08 kPa Tributary area = 9.6 *6.6 /2 = 31.68 m2 Transferred Load from Beam to Girder: Concentrated Live Load = (4.8* 3.2 /2 * 6.6/2)+ (1.9* 3.2 /2 * 6.6/2)=35.4 kN Concentrated Dead Load= (3.61*3.2+0.321) *6.6/2 = 39.2 kN Due to Live Load: Max shear = 35.4 kN Max moment = 35.4 * 3.2 = 113.2 kN.m Due to Dead Load: Assume self weight of girder = 0.510 kN/m ( trails done by excel ) Max shear = ( 0.510 *9.6 + 39.2 +39.2)/2 = 41.6 kN Max moment = 0.510*9.62/8+39.2 * 3.2 = 131.3kN.m Load combination : Max shear = 1.25 D + 1.5 L = 1.25 * 41.6 + 1.5 * 35.4 = 105 kN Max moment = 1.25 D + 1.5 L = 1.25 * 131.3 + 1.5 * 113.2 = 334 kN.m Selection (moment governing ): W460 X 52 Mr= 338 kN.m, Vr= 680 kN, Self weight = 0.51 kN/m Ix = 2.12E+08 mm4 Maximum deflection =27.53 mm < 32 mm ok = + a= 3.2 m , L= 9.6m

A-16

Hamilton West-Harbour Re-development


Designer:_D.Huang, M.Morco_Date:___Jan16th ,2012 Verify:____J. Xing, Y,Liu__ Date:__Feb 23rd,2012

Girder 5 detail design Location: on Axis 6 from Axis G to Axis J on the 2nd floor slab Girder Length = 3.2 *3 =9.6 m Elasticity of steel = 2.00 E +08 kPa Tributary area = 9.6 *6.6 = 63.36 m2 Transferred Load from Beam to Girder: Concentrated Live Load = 4.8* 3.2 * 6.6 =101.4 kN Concentrated Dead Load= (3.61*3.2+0.385)*6.6= 78.8 kN Due to Live Load: Max shear = 101.4 kN Max moment = 101.4* 3.2 = 324.4 kN.m Due to Dead Load: Assume self weight of girder = 0.997 kN/m ( trails done by excel ) Max shear = ( 0.997 *9.6 + 78.8 +78.8)/2 = 83.6 kN Max moment = 0.997*9.62/8+78.8* 3.2 = 263.6 kN.m Load combination : Max shear = 1.25 D + 1.5 L = 1.25 * 83.6 + 1.5 * 101.4 = 257 kN Max moment = 1.25 D + 1.5 L = 1.25 * 263.6 + 1.5 *324.4 = 816 kN.m Selection (moment governing ): W610 X 101 Mr= 900 kN.m, Vr= 1300 kN, Self weight = 0.997 kN/m Ix = 7.64E+08 mm4 Maximum deflection =21.56 mm < 32 mm ok = + a= 3.2 m , L= 9.6m Steel Handbook CISC Table D1 Pg 1-134 Steel Handbook CISC section 6 Pg6-48

A-17

Hamilton West-Harbour Re-development


Designer:_D.Huang, M.Morco_Date:___Jan16th ,2012 Verify:____J. Xing, Y,Liu__ Date:__Feb 23rd,2012

Girder 6 detail design Location: on Axis 8 from Axis G to Axis J on the 2nd floor slab Girder Length = 3.2 *3 =9.6 m Elasticity of steel = 2.00 E +08 kPa Tributary area = 9.6 *6.6 /2 = 31.68 m2 Transferred Load from Beam to Girder: Concentrated Live Load = 2.4* 3.2 * 6.6/2=25.3 kN Concentrated Dead Load= (3.61*3.2+0.321) *6.6/2 = 39.2 kN Due to Live Load: Max shear = 25.3 kN Max moment = 25.3 * 3.2 = 81.1 kN.m Due to Dead Load: Assume self weight of girder = 0.510 kN/m ( trails done by excel ) Max shear = ( 0.510 *9.6 + 39.2 +39.2)/2 = 41.6 kN Max moment = 0.510*9.62/8+39.2 * 3.2 = 131.3kN.m Load combination : Max shear = 1.25 D + 1.5 L = 1.25 * 41.6 + 1.5 * 25.3 = 90.1 kN Max moment = 1.25 D + 1.5 L = 1.25 * 131.3 + 1.5 * 81.1 = 286 kN.m Selection (moment governing ): W460 X 52 Mr= 338 kN.m, Vr= 680 kN, Self weight = 0.51 kN/m Ix = 2.12E+08 mm4 Maximum deflection =20.1 mm < 32 mm ok = + a= 3.2 m , L= 9.6m

A-18

Hamilton West-Harbour Re-development


Designer:_D.Huang, M.Morco_Date:___Jan16th ,2012 Verify:____J. Xing, Y,Liu__ Date:__Feb 23rd,2012

Column 1 detail design Location: at intersection of Axis G and Axis 6 On each floor, two girders and two beams are sitting on , but only half of each member bearing load are transferred to the column Tributary Area = 63.36 m2 LLRF = 0.693 Roof: LL= 43.9 kN DL = 224.1 kN SL= 71 kN Load combination =1.25 D+1.5 S + 0.5 L= 408.5 kN 3rd Floor: LL= 189.6 kN DL= 240.6 kN Load combination =1.25 D+1.5 L=585.2 kN 2nd Floor LL= 184.5 kN DL= 240.8 kN Load combination =1.25 D+1.5 L= 577.79 kN Total Cf = 408.5+ 585.2 + 577.79= 1570 kN Selection: W250X73 KL = 5000 mm Cr = 1680 kN > Cf ok

Steel Handbook CISC pg 426

A-19

Hamilton West-Harbour Re-development


Designer:_D.Huang, M.Morco_Date:___Jan16th ,2012 Verify:____J. Xing, Y,Liu__ Date:__Feb 23rd,2012

Column 2 detail design Location: at intersection of Axis G and Axis 8 On each floor, two girders and one beam are sitting on , but only half of each member bearing load are transferred to the column Tributary Area = 31.68 m2 LLRF = 0.856 Roof: LL= 27.1 kN DL = 113.3 kN SL= 35.5 kN Load combination =1.25 D+1.5 S +0.5 L= 208.42 kN 3rd Floor: LL= 104 kN DL= 121 kN Load combination =1.25 D+1.5 L=307.2 kN 2nd Floor LL= 97.6 kN DL= 121.2 kN Load combination =1.25 D+1.5 L= 297.94 kN Total Cf = 208.42+ 307.2 +297.94 = 813 kN Selection: W200X52 KL = 5000 mm Cr = 928 kN > Cf ok

Steel Handbook CISC pg 426

A-20

Hamilton West-Harbour Re-development


Designer:_D.Huang, M.Morco_Date:___Jan16th ,2012 Verify:____J. Xing, Y,Liu__ Date:__Feb 23rd,2012

Wind Load Height = 12 m, Width = 48 m p = IwqCeCgCp where Iw= 1, q1/50= 0.46 kPa, q1/10 = 0.36, Ce = (H/10)0.2 = 1.037 Cpi = -1 (End Zone) or -0.5 (Interior Zone) CgCp = 1.15 (-1) = 2.15 (End Zone) CgCp = 0.75 (-0.5) = 1.25 (Interior Zone) Wind Pressure (1) Ultimate Limit State End Zone: p = 10.46 1.0372.15= 1.026 kPa Interior Zone: p = 10.461.0371.25 = 0.596 kPa (2) Serviceability Limit State End Zone: p = 10.36 1.0372.15 = 0.803 kPa Interior Zone: p = 10.36 1.0371.25 = 0.467 kPa Wind Surface y = End Zone Width = 0.248 = 9.6 m Eccentricity = 48/2 9.6/2 = 19.2 m Factored Wind Load End Zone Height of 2nd floor, 3rd floor, and roof 2nd Floor: (5 + 3.5)/2 = 4.25 m 3rd Floor: (3.5 + 3.5)/2 =3.5 m Roof: 3.5 / 2 = 1.75 m Distribution of Lateral Forces (w = 1.4, load factor for wind load) wP1/50 = 1.5 1.026 = 1.436 kPa (End Zone) wP1/50 = 1.5 0.596 = 0.835 kPa (Interior Zone) Sample Calculation for Table 12 wind load summary: At Roof level, At = Total Wind Surface Area = 48 1.75 = 84 (m2) Ae = End Zone Surface Area = 9.6 1.75 = 16.8 (m2) 0.895 * At = Force in the entire area = 0.835 84 = 70.1 (m2) (1.539 0.895) * Ae = Additional Force in End Zone = 0.601 16.8 =10.1 (m2) Factored Wind Load = 70.1 + 10.1 = 80.2 (kN) Factored Torsion = 10.1 19.2 = 193.9 (kN) NBCC Commentary I Figure I-7

NBCC 2010 Cl4.1.7.1 Table 4.1.7.1 Appendix C NBCC Commentary I Figure I-7

A-21

Hamilton West-Harbour Re-development


Designer:_D.Huang, M.Morco_Date:___Jan16th ,2012 Verify:____J. Xing, Y,Liu__ Date:__Feb 23rd,2012

Sample Calculation for Table 13 and Table 14: d = distance between bracing frame to center of rigidity F = Floor force in x or y-direction e = Eccentricity T = Torsion K = relative frame stiffness m = number of frames parallel to F n = number of frames perpendicular to F

i) Bracing frame 3, along grid G3-4, 3rd floor, Wind in South-North Direction The bracing frame is taking both lateral force and torsional force since it is in the same direction as wind load in this case. P = 160.51/(1+1) + 387.80.095/4.8 = 87.92 kN ii) Bracing frame 3, along G3-4, 3rd floor, Wind in West-East Direction The bracing frame is taking torsional force since it is perpendicular to the direction of wind load in this case. P = 387.8 0.095/4.8 = 7.69 kN

A-22

Hamilton West-Harbour Re-development


Designer:_D.Huang, M.Morco_Date:___Jan16th ,2012 Verify:____J. Xing, Y,Liu__ Date:__Feb 23rd,2012

Mass of each floor Ground level(retails) Interior wall(100 mm hollow block, 5m high) Total horizontal wall length = 70.2 m Total vertical wall length = 97 m Exterior wall(100 mm hollow block, 5m high) Total horizontal wall length = 47.7 m Total vertical wall length = 24 m

*Note that half of weights from walls in ground level are counted as mass of 2nd level. 2nd level(Office) Slab dead load Floor Finish concrete cover slab and steel deck drop ceiling ducts/pipes/wiring Total Beams: Grade W310X28 W360X33 W410X39 Total Girders: Grade W460X52 W610X101 Total Columns: Grade W250X73 Total kPa 0.08 1.98 0.2 0.25 2.51 Weight(KN) 76 1881 190 237.5 2384.5

Quantity(#) Self Weight(kN/m) 6 0.278 24 0.321 18 0.385 48

Length(m) Weight(kN) 6.6 11.01 6.6 50.84 6.6 45.738 108

Quantity(#) Self Weight(kN/m) 9 0.510 11 0.997 20

Length(m) Weight(kN) 9.6 44.064 9.6 105.28 149

Quantity(#) Self Weight(kN/m) 24 0.715 24


A-23

Length(m) Weight(kN) 3.5 72.93 72.93

Hamilton West-Harbour Re-development


Designer:_D.Huang, M.Morco_Date:___Jan16th ,2012 Verify:____J. Xing, Y,Liu__ Date:__Feb 23rd,2012

Interior walls: 100mm Hollow block Length(m) Thickness(m) Height(m) 3.5 3.5 weight( kN) 436.75 600.54 1037

Horizontal wall 126.6 0.1 Vertical wall 173.4 0.1 Total 300 Wall density = 1.1 Kpa ( CISC steel handbook pg 7-41) (126.6m*3.5m*1.1kPa)/2+(70.2m*5m*1.1kPa)/2=436.75 kN Exterior walls: 100mm Hollow block Horizontal wall Vertical wall Total Doors: Quantity(#) Hinged Door 33 Sliding Door 6 Total 39 Assumed door density =0.3 kPa Windows: North-south side East-west side Total Quantity(#) 28 10 38 Length(m) 1.5 1.5 Length(m) 0.9 1

Length(m) 54 24.6 78.6

Thickness(m) 0.1 0.1

Height(m) Weight(kN) 3.5 235.13 3.5 113.36 348

Height(m) Weight(kN) 2 17.82 2 3.6 21.42

Height(m) Weight(KN) 2 29.4 2 10.5 39.9

Total Dead load =2384.5 + 108 +149 + 72.93 + 1037 +348 + 21.42+39.9 =4161 kN Live Load: kPa 2.4 4.8 Total Tributary Area m2 ) 570.24 380.16 950 kN 1368.57 1824.76 3193

Total Live Load= 2.4*570.24+4.8*380.16= 3193 kN Seismic weight(D+25%S) = 4161 +0 = 4161kN Total(1.25D+1.5L+0.5S) = 1.25 *4161+1.5*3191+0= 9992 kN
A-24

Hamilton West-Harbour Re-development


Designer:_D.Huang, M.Morco_Date:___Jan16th ,2012 Verify:____J. Xing, Y,Liu__ Date:__Feb 23rd,2012

Earthquake Load and Effects Equivalent Static Force Procedure IEFaS(0.2) < 0.35 IE = 1.0 (Importance Category - Normal) Fa = 1.0 Sa(0.2) = 0.32 Ta = 0.025hn = 0.30s Sa(0.2) = 0.32, Sa(0.5) = 0.17 By linear interpolation Sa(0.30) = 0.27 V = S(Ta)MvIEW/(RdRo) Mv = Higher mode factor (1.0) IE = 1.0 Rd = 3.0 (Moderately ductile concentrically braced frame) Ro = 1.3 W = Total lumped mass from each floor V = 0.27 * 1.0 * 1.0 * 12,997 / (3 * 1.3) = 900 kN

NBCC 2010 - Division B Section 4.1.8 Table 4.1.8.5 Table C-2 --Hamilton

Table 4.1.8.9

Distribute the base shear over the height of the structure Fx = (V-Ft)Wxhx/(Wihi)

Ft may be taken as zero when the fundamental period is less than 0.7s For instance, Froof = 900 * 4,537 * 12 / 111,788= 438 kN Accidental Torsion eX = distance between the centre of mass and the centre of rigidity DNX = plan dimension of building at level x perpendicular to the direction of seismic load i) TX = FX * (eX + 0.10 * DNX), and ii) TX = FX * (eX + 0.10 * DNX) For instance, level 3 T3 = Froof * (e3 + 0.10 * DN3) = 438 * ( 0 + 0.10 * 48) = 2,103 kN ii) T3 = FX * (eX - 0.10 * DNX) = 438 * ( 0 - 0.10 * 48) = -2,103 kN i)
A-25

NBCC 4.1.8.11 (10)

Hamilton West-Harbour Re-development


Designer:_D.Huang, M.Morco_Date:___Jan16th ,2012 Verify:____J. Xing, Y,Liu__ Date:__Feb 23rd,2012

Torsion Shear A 100kN force was applied at each different level of both the outside and the inside bracing frame on SAP2000.The deflections resulting from each simulation is presented in the table below.
100.00

5 L1

10 2X

2X

0 -1 19

W410X46 L1 52 X

10 2

X1 9-

10

W250X73

5 L1

10 2X

X1 9-

10

W460X52

10

9-

2X 1

10

52

W250X73

2X

W460X52 L1 0 52 -1 X 19

10 2

5 L1 2X 10 2X

19 0 -1

L1

BF1 & 4 Level Roof 3rd 2nd Force (kN) 100 100 100 u1 (mm) 2.0196 1.2671 0.7612

BF 2 & 3 u1 (mm) 2.6888 1.5762 0.9417

Ratios u1/u1 0.751 0.804 0.808

Ratios u1/u1 1.331 1.244 1.237

Since deflection is inversely proportional to rigidity, the ratios obtained from these simulations will be used in the torsion shear calculation. Sample torsion shear calculation for BF1 at roof level: Masonry Structures Behaviour and Design, P-474 Vyir = [xiRyi/(xi2Ryi+yi2Rxi)]exVy Vout = [youtRout/(2xin2Rin+2yout2Rout)]M Since Rin = 0.751 Rout Therfore, VBF1 = -[9.9Rout/(2*4.82*0.751*Rout+2*9.92.Rout)]*2103 VBF1 = -90.27 kN
A-26

Hamilton West-Harbour Re-development


Designer:_D.Huang, M.Morco_Date:___Jan16th ,2012 Verify:____J. Xing, Y,Liu__ Date:__Feb 23rd,2012

Beam to Girder Connection Girder: W610X101 w=10.5 mm d - 2t = 573 mm Beam 5: W410X39 w=6.4 mm d - 2t = 381 mm

Bolted to beam web and bolted to both sides of supporting member, supported beams not coped, bearing-type.

Web-Framing Legs, Maximum shear for beam W410X39 = 123.8 kN Vertical line with two bolts provides a capacity of: 350 kN> 123.8 kN Okay Web thickness, based on bearing, required for steels with Fu=450 MPa = 8.1 * 123.8 / 350 = 2.87 mm < 6.4 mm Okay Angle thickness required: = 7.7 * 123.8 / 350 = 2.72 mm Minimum Angle length required = 150 mm < 381 mm Okay Table 3-37 CISC S16-09

Outstanding Legs, Total reaction on girder web is 2 * 123.8 = 247.6 kN For beams connected to both sides of supporting member, the bolt capacity is double: 2 * 350 = 700 > 247.6 kN Okay For angle L = 150 mm, W = 76 or 89 mm, two M20 A325M bolts (Bearing-type connections, threads included) per vertical line, the girder web thickness is: 10.5 mm > 8.1 mm Okay Use: 89x89x7.9 connection angles, 150 mm long, two M20 A325M bolts per vertical line in both web-framing and outstanding legs Table 3-37 CISC S16-09

A-27

Hamilton West-Harbour Re-development


Designer:_D.Huang, M.Morco_Date:___Jan16th ,2012 Verify:____J. Xing, Y,Liu__ Date:__Feb 23rd,2012

Check minimum number of bolts Beam: 2 shear planes 1) Shear Resistance of a single bolt. Vr = 0.60bnmAbFu = 0.6 0.8 1 2 261 = 250.56 kN 2) Bearing resistance Angle thickness 2t = 2 * 7.94 = 15.88 mm Beam web thickness = 6.4 Governs Br = 3brntdFu = 3 * 0.8 * 1 * 6.4 *20 * 450 = 138.24 kN 3) Number of bolts = 123.8 / 138.24 = 0.9 < 2 bolts Girder: 2 shear planes 4) Shear Resistance of a single bolt. Vr = 0.60bnmAbFu = 0.6 0.8 1 2 261 = 250.56 kN 5) Bearing resistance Angle thickness 2t = 2 * 7.94 = 15.88 mm Girder web thickness = 10.5 mm Governs Br = 3brntdFu = 3 * 0.8 * 1 * 10.5 *20 * 450 = 226.8 kN 6) Number of bolts = 247.6 / 226.8 = 1. 09 < 4 bolts = 2* Vf / smaller of Brand Vr Okay = Vf / smaller of Brand Vr Okay

Cl 13.12.1.2(c), Table 3-1

Cl 13.12.1.2(a)

Cl 13.12.1.2(c), Table 3-1

Cl 13.12.1.2(a)

Check tension and shear failure An = [(89 - 60) - 0.5 * (20 + 2) ] * 7.94 = 143 mm2 Agv = (80+35) * 7.94 = 913 mm2
A-28

Hamilton West-Harbour Re-development


Designer:_D.Huang, M.Morco_Date:___Jan16th ,2012 Verify:____J. Xing, Y,Liu__ Date:__Feb 23rd,2012

Tr

= u[UtAnFu + 0.6Agv(Fy + Fu) / 2] = 0.75(0.6 * 143 * 450 + 0.6 * 913(300 + 450) / 2) = 183 kN> 123.8 kN Okay = (80+35 * 2) * 7.94 = 1191 mm2 = u[0.6Agv(Fy + Fu) / 2] = 0.75(0.6 * 1191(300 + 450) / 2) = 201 kN> 123.8 kN For one angle

Agv Vr

Okay

Cl 13.11

Beam to Column Connection Column: W250X73 w=8.6 mm d - 2t = 225 mm Beam 9: W410X39 w=6.4 mm d - 2t = 381 mm

Bolted to beam web and bolted to both sides of supporting member, supported beams not coped, bearing-type. Web-Framing Legs, Maximum shear for beam W410X39 = 123.8 kN Vertical line with two bolts provides a capacity of: 350 kN> 123.8 kN Okay Web thickness, based on bearing, required for steels with Fu=450 MPa = 8.1 * 123.8 / 350 = 2.87 mm < 6.4 mm Okay Angle thickness required: = 7.7 * 123.8 / 350 = 2.72 mm Minimum Angle length required = 150 mm < 381 mm Okay Outstanding Legs, Total reaction on column web is 2 * 123.8 = 247.6 kN For beams connected to both sides of supporting member, the bolt capacity is double: 2 * 350 = 700 > 247.6 kN Okay
A-29

Table 3-37 CISC S16-09

Table 3-37 CISC S16-09

Hamilton West-Harbour Re-development


Designer:_D.Huang, M.Morco_Date:___Jan16th ,2012 Verify:____J. Xing, Y,Liu__ Date:__Feb 23rd,2012

For angle L = 150 mm, W = 76 or 89 mm, two M20 A325M bolts (Bearing-type connections, threads included) per vertical line, the girder web thickness is: 10.5 mm > 8.1 mm Okay Use: 89x89x7.9 connection angles, 150 mm long, two M20 A325M bolts per vertical line in both web-framing and outstanding legs 88.9 * 2 + 6.4 = 184.2 mm < 225 mm Okay

Checking, Beam: 2 shear planes 1) Shear Resistance of a single bolt. Vr = 0.60bnmAbFu = 0.6 0.8 1 2 261 = 250.56 kN 2) Bearing resistance Angle thickness 2t = 2 * 7.94 = 15.88 mm Beam web thickness = 6.4 Governs Br = 3brntdFu = 3 * 0.8 * 1 * 6.4 *20 * 450 = 138.24 kN 3) Number of bolts = 123.8 / 138.24 = 0.9 < 2 bolts Column: 2 shear planes 4) Shear Resistance of a single bolt. Vr = 0.60bnmAbFu = 0.6 0.8 1 2 261 = 250.56 kN 5) Bearing resistance Angle thickness 2t = 2 * 7.94 = 15.88 mm Column web thickness = 8.6 mm Governs
A-30

Cl 13.12.1.2(c), Table 3-1

Cl 13.12.1.2(a)

= Vf / smaller of Brand Vr Okay

Cl 13.12.1.2(c), Table 3-1

Hamilton West-Harbour Re-development


Designer:_D.Huang, M.Morco_Date:___Jan16th ,2012 Verify:____J. Xing, Y,Liu__ Date:__Feb 23rd,2012

Br = 3brntdFu = 3 * 0.8 * 1 * 8.6 *20 * 450 = 185.76 kN 6) Number of bolts = 247.6 / 185.76 = 1.33 < 4 bolts = 2* Vf / smaller of Brand Vr Okay

Cl 13.12.1.2(a)

Check tension and shear failure An = [(89 - 60) - 0.5 * (20 + 2) ] * 7.94 = 143 mm2 Agv = (80+35) * 7.94 = 913 mm2 Tr = u[UtAnFu + 0.6Agv(Fy + Fu) / 2] = 0.75(0.6 * 143 * 450 + 0.6 * 913(300 + 450) / 2) = 183 kN> 123.8 kN Okay = (80+35 * 2) * 7.94 = 1191 mm2 = u[0.6Agv(Fy + Fu) / 2] = 0.75(0.6 * 1191(300 + 450) / 2) = 201 kN> 123.8 kN For one angle Cl 13.11 Vr

Agv

Okay

Girder to Column Connection Column: W250X73 tf=14.2 mm d - 2t = 225 mm Girder 9: W610X101 w=10.5 mm d - 2t = 573 mm

Bolted to beam web and bolted to both sides of supporting member, supported beams not coped, bearing-type. Web-Framing Legs, Maximum shear for girder W610X101 = 256.5 kN Vertical line with two bolts provides a capacity of: 350 kN> 256.5 kN Okay Web thickness, based on bearing, required for steels with Fu=450 MPa = 8.1 * 256.5 / 350 = 5.94 mm < 10.5 mm Okay
A-31

Table 3-37 CISC S16-09

Hamilton West-Harbour Re-development


Designer:_D.Huang, M.Morco_Date:___Jan16th ,2012 Verify:____J. Xing, Y,Liu__ Date:__Feb 23rd,2012

Angle thickness required: = 7.7 * 256.5 / 350 = 5.64 mm Minimum Angle length required = 150 mm < 573 mm Okay Outstanding Legs, For girders connected to column flange, the bolt capacity is: 350 > 256.5 kN Okay For angle L = 150 mm, W = 76 or 89 mm, two M20 A325M bolts (Bearing-type connections, threads included) per vertical line, the column flange thickness is: 14.2 mm > 8.1 mm Okay Use: 89x89x13 connection angles, 150 mm long, two M20 A325M bolts per vertical line in both web-framing and outstanding legs Table 3-37 CISC S16-09

Check minimum number of bolts Girder: 2 shear planes 1) Shear Resistance of a single bolt. Vr = 0.60bnmAbFu = 0.6 0.8 1 2 261 = 250.56 kN 2) Bearing resistance Angle thickness 2t = 2 * 12.7 = 25.4 mm Girder web thickness = 10.5 Governs Br = 3brntdFu = 3 * 0.8 * 1 * 10.5 *20 * 450 = 226.8 kN 3) Number of bolts = 256.5 / 226.8 = 1.13 < 2 bolts Column: 1 shear plane 4) Shear Resistance of a single bolt.
A-32

Cl 13.12.1.2(c), Table 3-1

Cl 13.12.1.2(a)

= Vf / smaller of Brand Vr Okay

Hamilton West-Harbour Re-development


Designer:_D.Huang, M.Morco_Date:___Jan16th ,2012 Verify:____J. Xing, Y,Liu__ Date:__Feb 23rd,2012

Vr = 0.60bnmAbFu = 0.6 0.8 1 1 261 = 125.28 kN Cl 13.12.1.2(c), Table 3-1

5) Bearing resistance Angle thickness t = 12.7 mm Governs Column flange thickness = 14.2 mm Br = 3brntdFu = 3 * 0.8 * 1 * 12.7 *20 * 450 = 274 kN 6) Number of bolts = 256.5 / 125.28 = 2.05 < 4 bolts = Vf / smaller of Brand Vr Okay

Cl 13.12.1.2(a)

Check tension and shear failure An = [(89 - 60) - 0.5 * (20 + 2)] * 12.7 = 228.6 mm2 Agv = (80+35) * 12.7 = 1460.5 mm2 Tr = u[UtAnFu + 0.6Agv(Fy + Fu) / 2] = 0.75(0.6 * 228.6 * 450 + 0.6 * 1460.5(300 + 450) / 2) = 292.8 kN> 256.5 kN Okay = (80+35 * 2) * 12.7 = 1905 mm2 = u[0.6Agv(Fy + Fu) / 2] = 0.75(0.6 * 1905(300 + 450) / 2) = 321.5 kN> 256.5 kN For one angle

Agv Vr

Cl 13.11 Okay

A-33

Hamilton West-Harbour Re-development


Designer:_D.Huang, M.Morco_Date:___Jan16th ,2012 Verify:____J. Xing, Y,Liu__ Date:__Feb 23rd,2012

Slab to Beam Connection Composite Slab Selection: CD75-200(Galvanneal)1 Base steel = 0.914 mm, slab depth= 130mm. be yc = 0.25 * 6600 = 1650 mm = (s Asfy) / (0.85 cfc be) s = 0.85 As = 4990 mm2 fy = 350 MPa c = 0.65 fc = 25 MPa yc = (0.9 * 4990 * 350) / 0.85 * 0.65 * 25 * 1650 = 69.0 mm CISC, Cl.17.4.1

CISC P6-48

Ycis less than the depth of the concrete 130 mm, therefore the neutral axis lies in concrete Qr = Nqrs N = (0.85 cfc b yc * 40%) / qrs qrs N = 32.3 kN - ( 12.7 mm) CISC TABLE 5-2

= (0.85 * 0.65 * 25 * 1650 * 69 *0.4) / 32300 = 20 studs S = 6600 / (20 / 2) = 660 mm ( Two studs per row )

Spacing:

Retrieved from Agway Metals Inc.http://www.agwaymetals.com/products_decking.asp

A-34

Hamilton West-Harbour Re-development


Designer:_D.Huang, M.Morco_Date:___Jan16th ,2012 Verify:____J. Xing, Y,Liu__ Date:__Feb 23rd,2012

Lateral Bracing System Connections Factored shear resistance of bolt: Vr = 0.60bnmAbFu Since Vf = 522kN 522,000N = 0.60 x 0.8 x 2 x2xAbx830MPa Ab = 328 mm2 Therefore, structural bolt M22 is chosen with an Ab of 380 mm2 Factored bearing resistance at bolt holes: Br = 3brntdFu Br = 3x0.8x2x10x22x450MPa = 475kN< 522kN Therefore, structural bolt M27 is chosen instead of M22. Br = 3x0.8x2x10x27x450MPa = 583 kN Factored tensile resistance: Double angle: Tr = uAneFu Tr = 0.75x[19x(152-(2x27))]x450 = 628kN 2 angles x 628kN = 1256 kN> 428kN Double angle: Tr = u[UtAnFu+0.6Agv(Fy+Fu)/2] Tr = 0.75[0.6x76x19x450+0.6x150x19(350+450)/2] = 805 kN 2 angles x 805 kN = 1610 kN> 428kN Plate: Tr = u[UtAnFu+0.6Agv(Fy+Fu)/2] Tr = 0.75[1x75x10x450+0.6x75x10(350+450)/2] = 388 kN> 428*0.707 =300 kN Therefore, double angle L152x102x16 with two structural bolts M27 at each beam or column connection is sufficient to resist the factored loads. CISC CSA S16-09, Cl.13.12.1.2 (c) CISC CSA S16-09, Table 3-1 CISC CSA S16-09, Cl.13.12.1.2 (a)

CISC CSA S16-09, Cl.13.2

CISC CSA S16-09, Cl.13.11

A-35

Hamilton West-Harbour Re-development


Designer:_D.Huang, M.Morco_Date:___Jan16th ,2012 Verify:____J. Xing, Y,Liu__ Date:__Feb 23rd,2012

Column to Column Connections Use 20M A325M bolts d = 20mm, Ab = 314mm2 Bearing Capacity Girder W610X101, Column 250X73 Br = 3bntdFu = 30.8214.920450 = 644 kN Shear Resistance of a single bolt Vr = 0.6bnmAbFu = 0.60.821261 = 250.56 kN (governs) Max axial load on Column = 585.2 kN ( page A-19 Column 1 design) # of bolts required = 585.2 / 250.56 = 2.3 bolts Use 4 bolts ( 2 per row) for construction purpose Spacing: Min. pitch (center to center) = 2.720 = 54 mm Min. edge distance = 34 mm Max. edge distance = 12 thickness of the outside connected part BUT LESS THAN 150mm Cl 22.3.1 Cl 22.3.2 Table 6 shared edge) Cl 13.12.1.2 (a) CL 13.12.1.2 (c)

CSA S16-09 Table 3-1

A-36

Hamilton West-Harbour Re-development


Designer:_D.Huang, M.Morco_Date:___Jan16th ,2012 Verify:____J. Xing, Y,Liu__ Date:__Feb 23rd,2012

Green Roof Load Calculation: Roof Area: Calculation uses loose soil, which has approximately 1000 kg/m3 Soil volume for green roof: 623.5 m2(0.3m) = 187.1 m3 Total soil weight: 187.1m3(1000kg/m3) =18710 kg. Expected yield of bell pepper per acre is approximately 12000 lb/acre, or 5443 kg/acre. With addition of roots and above soil plant material: 3500 kg/acre. Three storey total plant biomass: (3500kg/acre)*(623.5m2)/(4046.9m2/acre)=539.4 kg. Local Hamilton Solar Panel Supplier:Westinghouse Weight per panel: 20.7 kg Total weight of panels = 36 Panels x 20.7kg = 745.2 kg. Estimation of Roofing membrane, insulation, supporting structures, and filter membrane: 50 kg/m2 Estimate of uniform distributed load on roof (Solar panels are incorporated with total area). Total area = 811.1 m2 Total distributed load: 69.3 kg/m2 =0.68 kPa

Oklahoma State University, J.E. Motes , 2005, Pepper Production.

A-37

Hamilton West-Harbour Re-development


Designer:_D.Huang, M.Morco_Date:___Jan16th ,2012 Verify:____J. Xing, Y,Liu__ Date:__Feb 23rd,2012

Green Roof Water Capture: Assumption: Porosity of soil is 0.4 Height of soil: 30 cm. Annual rainfall: 764.8 mm Annual rainfall to storage tank: Vegetation (interception and evaporation are neglected): =623.5m2(0.85)(0.7648m) =405.3m2 Pervious Walk Path: =137.1m2(0.9)(0.7648m) =94.4m2 Solar Panels: Assume all rain dropped from solar panels surface fall into pervious pavement: =50.5m2(0.9)(0.7648m) =34.8m2 Total annual rainwater collection = 405.3m2 + 94.4m2 + 34.8m2 = 534,500 Litres

Toilet/Urinal Annual Consumption: Toilet water usage per flush: 6 Litres Urinal water usage per flush: 3.8 Litres Sample: Commercial floor 8 toilets 4 Urinals Number of flush per toilet per day: 30 Number of flush per Urinal per day: 200 Annual Water Consumption for toilet: (8 toilets)(6 Litres per flush)(30 Flushes per day)(365 days per year) = 525,600 Litres Annual Water Consumption for Urinals: (4 Urinals)(3.8 Litres per flush)(200 Flushes per day)(365 days per year) = 1,109,600 Litres Total Water Consumption for commercial floor = 525,600 + 1,109,600 = 1,635,200 Litres

A-38

Hamilton West-Harbour Re-development


Designer:_D.Huang, M.Morco_Date:___Jan16th ,2012 Verify:____J. Xing, Y,Liu__ Date:__Feb 23rd,2012

Porous pavements Calculations- Full Exfiltration Minimum Depth Method 1. Calculate Qc additional runoff from contributing areas Assuming no additional runoff from contributing areas: Qc = 0 m2 2. Calculate dp (Base Depth) dp = P f T Vr

= design storm rainfall depth (m) =1m = final infiltration rate (m/hr) = 30 mm/hr = 0.03 m/hr = effective filling time of base/sub bass (hr) According to our design, 15 cm sub bass = 5 hrs = void ratio (typically 0.4)

dp = 1 0.03 * 5 / 0.4 = 0.625 m 3. Calculate dmax dmax = fTs / Vr Ts = max allowable storage time (hr) (typically 24 - 48 hrs, assuming 24 for our case) dmax = 0.03 * 24 / 0.4 = 1.8 m > dp 4. If dp fails increase area of permeable pavement or add underdrains 5. Check structural thickness 6. Check the bottom of the subbase is at least 1 m above seasonal high groundwater table

A-39

Hamilton West-Harbour Re-development


Designer:_D.Huang, M.Morco_Date:___Jan16th ,2012 Verify:____J. Xing, Y,Liu__ Date:__Feb 23rd,2012

Foundation Design: Column Base Plate Design: For W250x73, b = 254 mm, d = 253 mm Maximum factored axial load = Cf = 1571 kN (obtained from previous calculations) f'c = 25 MPa Area of plate required = Cf/Br = Cf/(0.85cfc) A = 1571/(0.85x0.65x25/103) = 113738 mm2 B = C = A =338 mm B = C = 350 mm will be chosen, A = 122500 mm2 Determine m and n 0.95d = 0.95x253 = 240 mm, therefore, m = (350 - 240)/2 = 55 0.80b = 0.80x254 = 203 mm, therefore, n = (350 - 203)/2 = 73.5 Use n for design Plate thickness required = [(2xCfxn2)/(BCFy)] tp = [(2x1571x73.52)/(350x350x0.9x300/103) = 22.7 mm n/5 = 73.5/5 = 14.7 mm < 22.7 mm - OK Therefore, use 25 mm. CISC CSA S16 P 6-52

CISC CSA S16 P 4-148

Anchor Rod Design: Anchor rod tensile resistance: Tr = arAnFu Tf = 591 kN 4 Anchor rods will be used 591000/4 = 0.67xAnx450 An = 490 mm2 d = 2x(An/) = 25 mm Therefore, use 1 inch anchor rod with a hole diameter of 34 mm. Anchor rod shear resistance: Vr = 0.60arAarFu Vr = 0.60x0.67x x (25.4/2)2 x450 = 91.6 kN Vr = 91.7 kN x 4 = 366 kN > 362 kN

CISC CSA S16 Cl.25.3.2.1

CISC CSA S16 P-4-153

CISC CSA S1609 Cl.25.3.3.3

A-40

Hamilton West-Harbour Re-development


Designer:_D.Huang, M.Morco_Date:___Jan16th ,2012 Verify:____J. Xing, Y,Liu__ Date:__Feb 23rd,2012

Bearing Capacity: = 28.4o, sat = 18 kN/m3 (typical values are assumed; site related values are usually acquired from the geotechnical investigation report) Bearing capacity numbers, shape and depth factors: Assume, L/B = L/B = 1; that is, B/L = B/L= 1, and B = B = 2m. (p)ps = 9/8(p)tr = 9/8x28.4o = 32o Nq = etan32 tan2(45+32o/2) = 23.2 Nq-1 = 23.2-1 = 22.2 Assume rough footing. N = 0.1054exp(9.6`p) = 0.1054exp(9.6x32x/180) = 22.5 sq = 1 + B/Ltanp = 1 + tan32o = 1.62 s = 1 - 0.4B/L = 0.6 dq = 1+2tanp(1-sinp)2tan-1Df/B = 1+2tan32o(1-sin32o)2[tan-1(1.25/2x/180)] = 1. d = 1.17 qu = Df(Nq-1)sqdq+0.5BNsd =18x1.25x22.2x1.62x1.17+0.5x18x2x22.5x0.6x1=1190 kPa qa = qu/FS + Df = 1190/3 + 18x1.25 = 419 kPa max = Applied load/Area = 1571/2x2 = 393 kPa Allowable Bearing Capacity with an Inclined Load Calculate the inclination factors and depth factors B=B; =21o n=nB=(2+B/L)/(1+B/L)=(2+1)/(1+1)=1.5 iq = (1-H/Vn)n = (1-tan)n = (1-tan21)1.5 = 0.48 i = (1-H/Vn)n-1 = (1-tan)n+1 = (1-tan21o)1.5+1 = 0.30 Calculate the ultimate net bearing capacity qu = Df(Nq-1)iq+0.5BNi =18x1.25x22.2x0.48+0.5x18x2x22.5x0.30 = 361 kPa

Soil Mechanics and Foundations P-356

Concrete Design Handbook P-9-22

A-41

Hamilton West-Harbour Re-development


Designer:_D.Huang, M.Morco_Date:___Jan16th ,2012 Verify:____J. Xing, Y,Liu__ Date:__Feb 23rd,2012

Footing Design: 1. Compute factored reaction: qsf = 1571/22 = 393kPa 2. Minimum effective shear depth - one way shear: ab = (2-0.5)/2 = 0.75m From Table 9.1, dv = 275mm, thus d = dv/0.9 = 297mm 3. Minimum depth - two way shear: From Table 9.4 establish d/he based on Af/Ac Af/Ac = 22/0.52 = 16 From interpolation d/he = 0.7, resulting in dave = hc(0.7) = 350mm. Since 3dave = 3(0.350)= 1.05m > ab = 0.75m, Cl.13.3.4.4 is not applicable. Thus two-way shear governs. 4. Total footing depth assuming 20M bars in both directions: tf = 350+75+20 =445mm Use tf = 450mm (rounding it up to the next 25mm) Note that the dave will be used for calculating the flexural reinforcement in both directions. 5. Flexural reinforcement: Check deep beam action in accordance with Cl.10.7.1 ab/d = 0.75/(0.450-0.075-0.02) = 0.75/0.355 = 2.1 > 2, therefore no deep beam action qsfab2 = 221 kN, from table 9.7a As = 950mm2/m Thus the total reinforcement is: As = 2(950) = 1900 mm2 > As, min = 0.002(2000)(450) = 1800mm2 6. Find maximum bar size that can be developed in distance ab-0.075 = 0.675m From equation 9.7 max db = fc(ab-0.075)1000/(0.45k1k2k3k4fy) = 20M Number of bars = 1900/300 = 6.33 - 20M bars, thus Use: 7-20M bars BEW (bottom each way)

A-42