PRECAST STEEL
DETAIL OF THE BUILDING SPECIFICATIONS OFFERED. ACCORDING TO THE CLIENT CHOICES OUT OF THE PRODUCT BROCHURE ATTACHED BUILDING TY PE SITE LOCATION CLIENT SOURCE OF CONTACT BUILDING STY LE COMBINATION. RSG / TRUSS / PRECAST SCIPS COM POSITE PANELS FOUNDATION FOOTING CONCRETE SLAB ANCHOR PLATES W ITH BOLTS, CONCRETE EM BEDED. PANEL THICK NESS M AIN FRAME 1/25"" APPROX RSG CHANNEL GIRDERS, 3 / 1 6 INCHES X 2 X 2 INCHES. REINFORCEM ENT EX TERNAL SHEETHING INTERNAL SHEETHING THERM AL INSULATION ROOF STY LE STANDARD DOUBLE SLOPE 9 DEGREE APPROX . FASTENERS STEEL NUTS AND BOLTS. NUTS PRE- FIX ED W ITHIN THE FRAM E, BOLTS TO BE SCREW ED IN DURING ERECTION.
SEALANT
M AIN DOOR
BATHROOM DOOR
2X7 APPROX .
W INDOW
GLAZ ING 5 M M A CLASS OR OPTIONAL W INDOE SIZ ES
BUILDING SIZ E
BUILDING HEIGHT
EX ACT 8 FEET
CAPITAL SPECIAL SLIDE IN COV ERED J OINT, W ITH 2 INCHES OV ERLAP, RESULTING A SM OOTH FLAT W ALL, AND ROOF, BOLTED RIGHT IN PLACE INTO THE PREW ELDED NUT INSIDE THE FRAM E, THROUGH THE PRE- DRILLED HOLES.
ELECTRIC
CONNECTIONS
SAFE RECTANGULAR PV C DUCTING, W ITH POINT TO POINT APPROACH, INFRA- STRUCTURE ROUTE, AND
SANITARY
ALL ABSIC NECESSARY POINTS CONNECTIONS PROV IDED READY FOR INFRA-STRUCTURE CONNECTIONS AND FITTINGS.
SAM E AS ABOV E
POINTS
IN THE LEFT CORNER TO FORM A BATHROOM . SIZ E AND FLOOR PLAN CAN BE SPECIFIED BY THE CLIENT BEFORE FABRICATION. AIR- CONDITIONING ALL REQUIRED POINTS SPOTS FOR
SPLIT- TY PE AC SUPPLIED. W ALL HANGINGS NUTS 1 / 4 INCH ARE PRE- W ELDED IN EACH PANEL- POST FOR FUTURE M ODIFICATIONS, AD- ONs , AND W ALL HANGINGS FACILITIES.
FINISHING
PACK ING
CARRIAGE
CHARGES
TRANSPORTATION CHARGES, EX -
FACTORY ,BHARA KAHU, ISLAM ABAD, TO THE SITE WILL BE PAID BY THE CLIENT, W HATSOEV ER COM M UNICATED AT THE TIM E OF CONSIGNM ENT DELIV ERY .
INSTALLATION CHARGES
LOCAL LABOUR FROM OTHER CITIES W ILL BE HIRED BY THE COM PANY , AND PAID- OFF ON THE SPOT, W ITHOUT ANY LIABILITY UPON THE CLIENT. PRICE QUOTED PK R . . . . PER SQUARE FOOT COV ERED AREA, EX - FACTORY ISLAM ABAD
PRICE M UTUALLY
DECIDED UNDER THE PRESENT SPECIFICATIONS ISLAM ABAD,
TOTAL PRICE
ISLAM ABAD,
PK R . . . . . o n l y , EX - FACTORY
DEAL
ON RECEIV ING THE BELOW M ENTIONED ADV ANCE M ONEY , CAPITAL PREFAB W ILL START FABRICATION OF THE CABIN AT ISLAM ABAD, AND W ILL COM PLETE THE FABRICATION W ITHIN 3 0 DAY S. THEN W ITH M UTUAL CONSENT, THE PANELS W ILL BE LOADED ONTO A V EHICLE FOR, . . . . . . LEAV ING 1 0 PERCENT OF THE TOTAL PRICE BEHIND. W HICH W ILL BE RECEIV ED AFTER INSTALLATION.
DAY 1 = 2 0 PERCENT. DAY 4 = 6 0 PERCENT DAY 3 0 OR BEFORE= 1 0 PERCENT, AFTER INSTALLATION= 1 0 PERCENT.
ADD ONs