BUFFER HOPPER
NO.Capacity Volume of air lock tank Bag filters 16 in number(4 for each unit 2 working 2 standby) 35 cu. m up to high level 1.41 cu. m (2 no. below each buffer hopper) 81 in each hopper material- nomex 150 mm dia*2750mm long (each) The function of buffer hopper is to collect the dry ash from ESP & APH through vacuum line & separate the ash air mixture where ash accumulated in buffer hopper & air been discharges through vacuum pump discharge line & then transfers the ash to transport air through air lock tanks by vacuum to pressure equalizing method through equalizing valves, upper gates & lower gates.

INSTRUMENT AIR COMPRESSOR


NO.Flow rate.Discharge/pressure.Motor in air drying plant 3 in number(2 working , 1 standby) 14 cub. m/min(each) stage1:: 1.8 kg/sq.cm. capacity:: 1800 N cub. m/hr. stage 2:: 8 kg/sq.cm.

The function of instrument air compressor is to deliver 6 kg/sq. cm. air for pneumatic operated actuators operation, pulsating air for bag filters & fluidizing air for buffer hoppers.

DRY ASH SILO


NO.Capacity.5 (1-2-3 FOR UNIT 1 & 2 & 3-4-5 FOR UNIT 3 & 4) silo no. 3 is for saleable purpose. 2949 cu.m

The function is to store the dry ash coming from buffer hoppers through pneumatic conveying system through transport line. Two types of unloading system :: 1. unloading in belt conveyors through hydro mix dust conditioners in moist form 2. unloaded in closed tankers through rotary feeders in dry form.

INDUSTRIAL TRAINING REPORT BY SHISANU SEN Email Id- shisanu.sen@gmail.com

Page |

PIPELINES
NO.Length:8 LINES (2 in each unit) total 4 unit. 1 km each

The function of the pipelines is to transport ash air mixture from buffer hoppers to silo storage tanks.

BOTTOM ASH HANDLING SYSTEM


The bottom ash impounded into bottom ash hopper (194 cu. m.) & feed into clinker grinder through bottom ash hopper discharge gate. After clinker grinder the slurry line is evacuated by hydro ejector (inlet pressure 20 kg/sq.cm. & outlet pressure 4 kg/sq.cm) & sent to hydro bin (650 cu.m) through slurry line (1 km long). Fly ash collected in silos & bottom ash decanted in hydro bins transported to ash mound area by a series of belt conveyor system & ash is dumped in systematic manner. Normally ash is dumped in permanent ash mound area through spreader 1 & 2. During rainy season or system non availability, ash is being dumped in temporary stock yard through stacker from where it is reclaimed to the permanent ash mound through re claimer. When permanent & temporary stock yards are not available ash is being dumped in emergency stock yard, from where ash transported to permanent ash mounds through mobile equipments. Each silo is provided with 3 hydro mix dust conditioner, 2 operating 1 standby for removal & conditioning of fly ash in moist state. Each silo is provided with 3 more outlets for removal of fly ash as an alternative arrangement. Each outlet is having one manual isolating valve, one solenoid operating valve, one rotary feeder & one telescopic chute. Each silo have capacity 2500 MT whereas hydrobin capacity is 650 M CU.