DRY FILM THICKNESS GAUGE REPORT


Name of Client Name of Project Date of Tested Equipment Brand Serial No. Sta. Clara International Corporation Proposed Food Manufacturing and Logistics Building March 23, 2012 Paint Thickness Gauge Elcometer DF054-5 No. of Coat 4 4 4 4 4 4 4 4 4 4 4 4 Surface Preparation Cap Brushing Cap Brushing Cap Brushing Cap Brushing Cap Brushing Cap Brushing Cap Brushing Cap Brushing Cap Brushing Cap Brushing Cap Brushing Cap Brushing

Area Treated / Identification Main Rapter Grid Line 12 E-H Main Rapter Grid Line 14 E-H Main Truss Grid Line 13 H-J Main Truss Grid Line 14 H-J Main Truss Grid Line 15 H-J Main Truss Grid Line 16 H-J Main Truss Grid Line 17 H-J Main Truss Grid Line 18 H-J Main Truss Grid Line 15 E-H Main Truss Grid Line 16 E-H Main Truss Grid Line 17 E-H Main Truss Grid Line 18 E-H

Method of Application Roller Roller Roller Roller Roller Roller Roller Roller Roller Roller Roller Roller

DFT Reading Min. (Micron) 94 91 90 102 100 104 91 91 88 90 91 90 Max. (Micron) 124 133 127 158 166 160 143 133 125 117 125 128

Remarks

Epoxy Primer/ Epoxy Primer Epoxy Primer/ Epoxy Primer Epoxy Primer/ Epoxy Primer Epoxy Primer/ Epoxy Primer Epoxy Primer/ Epoxy Primer Epoxy Primer/ Epoxy Primer Epoxy Primer/ Epoxy Primer Epoxy Primer/ Epoxy Primer Epoxy Primer/ Epoxy Primer Epoxy Primer/ Epoxy Primer Epoxy Primer/ Epoxy Primer Epoxy Primer/ Epoxy Primer

NOTHING FOLLOWS Note: Minimum Dry Film Thickness Requirements 75 microns

Inspected By:

Witnessed By:

Authorized Representative:

R.Ramos / R. Bergola NDT Technician / QC Engr. NDT Inspector SCIC / CEZA Konsult Inc Laboratory Manager/NDT Level II For On-Behalf of X'well Testing Services Inc.

Page 1 of 3

DRY FILM THICKNESS GAUGE REPORT


GRID LINE 12/E-H

Sketch Detail / Part / Point Location

GRID LINE 14/E-H

GRID LINE 13/E-H

GRID LINE 12/E-H

GRID LINE 15/E-H

GRID LINE 17/E-H

GRID LINE 16/E-H

GRID LINE 18/E-H GRID LINE 18/HJ

GRID LINE 15/HJ

GRID LINE 14/HJ

GRID LINE 17/HJ

LEGEND:

GRID LINE 16/HJ

Acceptable Rejectable

GRID LINE 13/ H-J

Inspected By:

Witnessed By:

Authorized Representative:

R.Ramos/R. Bergola QC Engr. /NDT SCIC / CEZA Konsult Inc Laboratory Manager/NDT Level II For On-Behalf of X'well Testing Services Inc.

Page 2 of 3

DRY FILM THICKNESS GAUGE REPORT


Sketch Detail / Part / Point Location

Points Location

Legend
Tested Point Location

Weld Joint

Inspected By:

Witnessed By:

Authorized Representative:

R.Ramos/R. Bergola QC Engr. /NDT SCIC / CEZA Konsult Inc Laboratory Manager/NDT Level II For On-Behalf of X'well Testing Services Inc.

Page 3 of 3

Anda mungkin juga menyukai