Anda di halaman 1dari 6

BHARAT HEAVY ELECTRICALS LIMITED

A TRAINING REPORT FOR THE PARTIAL FULFILLMENT OF VOCATIONAL TRAINING

UNDER THE GUIDANCE OF Sr. Er. Anil Kumar Pandey SUBMITTED BY Pallavi sanghvi VT/867/12 ELECTRONICS & COMMUNICATION ENGINEERING Mandsaur Institute of Technology MANDSAUR

SUBMITTED TO Mr. Anil Kumar Pandey SENIOR ENGINEER


WTM DIVISION BHEL, BHOPAL

DECLARATION
I hereby declare that the work which is being presented in the report submitted in partial fulfillment of the requirement of the industrial training report. The work has been carried out at BHARAT HEAVY ELECTRICALS LIMITED, Bhopal. This is an authentic record of my own carried out under the guidance of Sr. Er. ANIL KUMAR PANDEY (WTM, BLOCK:1),BHEL, Bhopal. The matter embodied in the training report has not been submitted by me for any other degree or diploma. PALLAVI SANGHVI TOKEN NO. - VT/867/12

CERTIFICATE

This is to certify that the above statement made by the candidate is correct to the best of my knowledge and belief.

GUIDED BY: Sr. Er. ANIL KUMAR PANDEY


COUNTERSIGNED BY:

SUBMITTED BY: PALLAVI SANGHVI TOKEN NO.:VT/867/12

Mr. ANIL KUMAR PANDEY (SENIOR ENGINEER,


WTM DIVISION BHEL, BHOPAL)

ACKNOWLEDGMENT
This training report is a testimony of Almightys faithfulness in our life, and I ascribe all the glory and unstinted to Thee. At the outset, I have all pleasure in monitoring that I feel myself lucky to have obtained my major training in BHARAT HEAVY ELECTRICALS LIMITED, Bhopal. It gives immense pleasure to present a training report on WATER TURBINE & SWITCHGEAR, CONTROLGEAR & RECTIFIER MANUFACTURING which had been cumulative venture from all of me. I thank our Indian government for giving exposure to the platform of the prestigious industry. The euphoria of being in the group of selected scholar overwhelmed me. We worked under the SENIOR ENGINEER Mr.ANIL KUMAR PANDEY. I am thankfull to him for his constant encouragement. I also thanks to operators of all blocks for their support in providing the adequate working knowledge of machines for completion of this report. Lastly; I owe a lot to my parent and my friends for being a source of encouragement and inspiration to build up our educational career.

INDEX

TOPIC

PAGE NO.

1. BHEL BHOPAL PROFILE 2. PRODUCTS OF BHEL BHOPAL

1 2

SCR DIVISION :
3. INTRODUCTION 4. AC & DC DIFFERENCES 5. AC LOCOMOTIVES WITH DC DRIVES 6. THE DIODE 7. THE THYRISTOR 8. SEPEX 9. DC CHOPPERS 10. DYNAMIC BRAKING 11. THE GTO THYRISTOR 12. AC MOTORS 13. THE ASYNCHRONOUS MOTOR 14. AC DRI 15. IGBT 16. PERMANENT MAGNET MOTOR 3 3 4 5 5 7 7 8 9 9 10 10 12 12

WTM DIVISION:
17. WATER TURBINE PRINCIPLE OF OPERATION 18. WORKING PRINCIPLE 19. LAYOUT OF HYDRO POWER PLANT 20. CLASSIFICATION OF HYDRO POWER PLANT 21. HYDRO POWER PLANT IN INDIA 22. PELTON TURBINE 13 14 14 18 19 20

23. FRANCIS TURBINE 24. KAPLAN TURBINE 25. COMPONENTS OF TURBINES 26. DISTRIBUTOR/GUIDE APPARATUS SYSTEM 27. SERVOMOTOR 28. GUIDE VANES LINKS, LEVER & BUSH HOUSING 29. CAVITATION IN HYDRAULIC TURBINES 30. TYPES OF WELDING USED 31. WATER TURBINE MANUFACTURING DIVISION, BHEL 32. SPECIFICATIONS OF IMPORTANT MACHINES IN WTM 33. ASSEMBLY SECTION 34. GOVERNOR TESTING, BHEL BHOPAL 35. BHEL CONTRIBUTION TO INDIAN POWER SECTOR 36. BHEL CONTRIBUTION TO HYDRO POWER IN INDIA CONCLUSION

21 23 24 24 26 27 28 29 29 30 34 35 36 37 38

Anda mungkin juga menyukai