AFTER REBATE SL. NO. Bill No. -1 : Site Clearance BRIEF DESCRIPTION OF ITEMS UNIT
RATE

1.01 1.02 1.03

1.04

Clearing and Grubbing Co-ordinating with Respective Service Providers / Authorities Dismantling of Structures & Pavement : a) Brick and Stone Structures b) Plain Cement Concrete c) Reinforced Cement Concrete d) Flexible Pavement e) Guard Stone & KM Stone f) Road kerbs , Gutters & Pipes g) Railing and Fencings h) Temporary Structures ( Pucca / Semi Pucca ) Cutting of Trees including Removal of Stumps Complete a) Above 300 mm girth to 600 mm Girths b) Above 600 mm girth to 900 mm Girths c) Above 900 mm girth to 1800 mm Girths d) Above 1800 mm girth Total : Bill No.-1

Hct KM Cum Cum Cum Cum Nr. Lm Lm Sqm No. No. No. No.

15066 10230 148.8 213.9 213.9 186 167 167 111.6 399.99 0 790.5 1906.5 3106 3178.71

Bill No. -2 : Earth Works

2.01 a) b) 2.02 2.03 2.04 2.05 2.06 2.07 2.08 2.09 2.10 2.11 2.12

RoadWay Excavations necessary for Construction In all types of Soil Ordinary Rock Embankment with Approved Materials from Borrow Pits Embankment with Materials from Roadway Excav. Subgrade / Shoulder with approved Materials from Roadway & Drainage Excavation ->10% CBR Subgrade / Shoulder with approved Materials from Borrowpit ->10% CBR Loosening and Recompacting Subgrade as per TS 305 Furrow Cutting on Existing Bituminous Surface Preparation of Road Surface True to Line & Grade as per T.S.305 Earthwork in Filling of Median and Island with Selected Earth as Per TS 407 Filling top 300 mm of Median Island with approved material. As per TS 407. Stripping , Storing and Reapplication of Top Soil as per TS 301. Removal ,Replacement of Unsuitable Materials at Embankment. Total : Bill No.-2 Constructing Granular Sub-Base -Grading -I of Table 400-1 Constructing Wet Mix Macadem -as per Table 406 Constructing Profile Regulating Course-with WMM as per TS-406 Total : Bill No.-3 Bituminous Prime Coat with MC-30 ( @ 6.0 - 9.0 Kg /10 Sqm ) as per TS 502. Bituminous Tack Coat with Emulsion as per TS 502. ( @ 2.5 - 3.0 Kg /10 Sqm )-Over Granular Surface ( @ 2.0 - 2.5 Kg /10 Sqm )-Over Bituminous Surface Profile Corrective Course with DBM as per 501 & 507 Provide & Lay DBM Course with 60 / 70 Gr.as per TS 507 Provide & Lay BCCourse with 60 / 70 Gr.as per TS 512 Provide & Lay 20 mm Th. Open Graded Premix Carpet as per TS 509 Provide & Lay A-Type Seal Coat .as per TS 513. Total : Bill No.-4

Cum Cum Cum Cum Cum Cum Cum Sqm Sqm Cum Cum Cum Cum

32.55 65 55.8 48.4 48.36 62.31 42.8 37.2 43.7 65 65 32.55 32.55

Bill No. -3 : Sub-Base and Base Courses

3.01 3.02 3.03

Cum Cum Cum

381 456 456

Bill No. -4 : Bituminous Courses

4.01 4.02 a) b) 4.03 4.04 4.05 4.06 4.07

Kg Kg Kg Cum Cum Cum Sqm Sqm

19.5 0 14 14 1860 1860 2101.8 37 28

Bill No. -5A : Widening of Slab Culverts including Service Roads

AA014 / CTC - Rev. 09 dated 01.04.04

5A.01 5A.02 5A.03 5A.04 5A.05 5A.06 5A.07 5A.08 5A.09 5A.10 5A.11 5A.12 5A.13 5A.14 5A.15 5A.16 5A.17 5A.18 5A.19 (a) (b) (c) (d) 5A.20 5A.21 5A.22

Earthwork in Excav. for Foundations of Str.-All Type of Soil Ditto 5A.01 above but in Rock BackFilling in Abutment & Wing Wall as per TS 305 Ditto 5A.03 above but With Selected Excavated Materials Filter Medium Behind Abutment as per TS 2504 Plain Cement Concrete for Foundation & Sub-StructureM-25 Grade Plain Cement Conc. M-15 in Foundation Levelling Course Structural C.C. for RCC in Sub-Structure / Super Structure Complete. HYSD Reinforcement Bar as per TS 1600 Provide & Lay 40 mm Thick AC on top of Deck Slab as per TS 500 Provide & Lay a layer of 25 mm Thick Mastic Asphalt as per TS 500 & 2700 Provide Weep Holes in abutment and Wing Walls Providing and Laying Stone Pitching as per TS 2500 Provide and Lay Boulder Appron Complete as per TS 2500 Provide and Lay Filter Material Below Stone Pitching as per TS 2500 Provide and Lay 20 mm th.Compression Fibre Board Expansion Joint Provide and Fix Tar Paper Bearing as per TS 2000 Repair of Cracks : Chip Off, Clean & Grout with Epoxy Mortar Repair of Honey comb , Spalling and Soft /Spongy Conc. Surface Chipping Out and Cleaning the Surface Complete Provide and Apply Well Mixed Polymer Cement Slurry Provide and Apply C : S Mortar 1 : 3 Provide and Apply Polymer Modified C : S Mortar 1 : 2 : 6 Repair of Corroded Reinforcement & Providing New Dismantling of Concrete Masonry & Cement Concrete Plaster Painting if Culvert No. and Span as per TS 800 Total : Bill No.-5A Earthwork in Excav. for Foundations of Str.-All Type of Soil Ditto 5A.01 above but in Rock BackFilling in Abutment & Wing Wall as per TS 305 Ditto 5A.03 above but With Selected Excavated Materials Plain Cement Concrete M-15 in Pipe Bedding as per TS 2100 Plain Cement Concrete for Foundation & Sub-StructureM-25 Grade Plain Cement Conc. M-15 in Foundation Levelling Course HYSD Reinforcement Bar as per TS 1600 Providing , Laying & Jointing NP4 -Hume Pipes Diameter 900 mm Diameter 1000 mm Cleaning and Clearing Fully or Partially Chocked Pipes Dismantling of Concrete, Masonry, Damaged Pipes & Cement Concrete Plaster Providing and Laying Stone Pitching as per TS 2500 Provide and Lay Boulder Appron Complete as per TS 2500 Provide and Lay Filter Material Below Stone Pitching as per TS 2500 Painting if Culvert No. and Span as per TS 800 Total : Bill No.-5B Earthwork in Excav. for Foundations of Str.-All Type of Soil Ditto 6A.01 above but in Soft Disintegrated Rock Provide and Lay Coarse Sand Below Open Foundation Structural Cement Concrete in Open Foundations Complete M-25 Grade Concrete M-30 Grade Concrete M-35 Grade Concrete Carrying Out Load Test on Piles -800mm Dia.incl.Piles Initial Load Test 170 MT x 2.50 = 425 MT

Cum Cum Cum Cum Cum Cum Cum Cum MT Cum Sqm Nr. Cum Cum Cum Lm Sqm Lm Sqm Sqm Sqm Sqm Kg. Cum Nr.

38.13 151 98 186 177 2120 1395 2948 25575 2418 288 158 251 251 233 186 19 2864 698 3069 1218 6557 205 1395 3488

Bill No. -5B : Widening Of RCC Pipe Culvert including Service Road

5B.01 5B.02 5B.03 5B.04 5B.05 5B.06 5B.07 5B.08 5B.09 a) b) 5B.10 5B.11 5B.12 5B.13 5B.14 5B.15

Cum Cum Cum Cum Cum Cum Cum MT Lm Lm Lm Cum Cum Cum Cum Nr.

38.13 151 93 233 1683.3 3143.4 1683.3 25575 0 2241 5580 251 381 251 251 233 939

Bill No. -6A : New Bridge

6A.01 6A.02 6A.03 6A.04 (a) (b) ( c) 6A.05 (a)


2

Cum Cum Cum Cum Cum Cum Nos.

38.13 100 158 0 2371.5 2445.9 2557.5 0 426870


AA014 / CTC - Rev. 09 dated 01.04.04

(b) ( c) 6A.06 (a) (b) 6A.07 6A.08 6A.09 6A.10 6A.11 (i) a) b) c) (ii) a) b) (iii) a) b) 6A.12 6A.13 6A.14 6A.15 6A.16 (a) (b) (c) (d) 6A.17 (a) (b) (c) 6A.18 6A.19 6A.20 6A.21 6A.22 6A.23 6A.24 6A.25 6A.26 (a) (b) (c) (i)a (i)b (i)c (ii)a (ii)b (ii)c 6A.27 6A.28 (i) (ii) 6A.29
3

Lateral Load Test On Piles at Set ( a) Routine Load test on Working Piles 255 Tons Structural Cement Concrete M-35 in Piles Excl.Rebars 0 to 10 M Depth 10 to 20 M Depth Structural Cement Concrete M-35 in Pile Caps -Grade Separators Provide M.S. Cutting Edge for Well Foundation Provide M-35 in Well kerbs Complete Excl. Rebars Provide M-25 in Well Stening Complete Excl. Rebars Sinking of Well Foundations -Complete as per T.S. 6 Mtr. Dia Wells 0-10 Mtr. in Soils 10-20 Mtr. in Soils 10-20 Mtr. in Soft Disintegrated Rocks 7 Mtr. Dia Wells 0-10 Mtr. in Soils 10-20 Mtr. in Disintegrated Rock 8 Mtr. Dia Wells 0-10 Mtr. in Soils 10-20 Mtr. in Disintegrated Rock M-25 Grade Concrete in Bottom Plug with 10% Extra Cement Sand Filling in Well- Clean , Seived Sand as per T.S.1209 M-25 Grade Concrete inTop / Intermediate Plug M-35 Grade Concrete in Well Cap Complete Structural Cement Concrete in Pier, Pier Caps, Pedestal & Abutments Etc. M-25 Grade ( PCC ) M-25 Grade ( RCC ) M-30 Grade M-35 Grade Structural Cement Concrete in Super-Structures Etc. M-25 Grade M-30 Grade M-35 Grade Controlled RCC M-30 Grade in Kerbs excl.Rebars HYSD Reinforcement Bar as per TS 1600 Prestressed Concrete in Box Girders M-45 Grade Complete Provide HT Strand in Girders Complete Provide & Lay 40 mm Thick AC on top of Deck Slab as per TS 500 Provide & Lay a layer of 25 mm Thick Mastic Asphalt as per TS 500 & 2700 Drainage Spouts Complete as per TS 2705 Provide & lay 150 mm Dia PVC Diwn Take & Runner Pipes Providing and Fixing in Position true to Line the followings Elastomeric Bearings Tar Paper Bearings POT Cum PTFE Bearings Fixed Bearings-325 T Capacity Fixed Bearings-225 T Capacity Fixed Bearings-275 T Capacity Free Bearings-325 T Capacity Free Bearings-225 T Capacity Free Bearings-275 T Capacity Provide and Lay Buried Type Expansion Joint Provide & Lay Elastomeric Strip Seal Type Expansion Joint For a movement of 20 mm For a movement of 40 mm Reinforced Cement Concrete Railing M-30 Grade

Nos. Nos. Rm Rm Cum MT Cum Cum

Rm Rm Rm Rm Rm Rm Rm Cum Cum Cum Cum Cum Cum Cum Cum Cum Cum Cum Cum MT Cum MT Cum Sqm Nr. Lm CuCm Sqm Nr. Nr. Nr. Nr. Nr. Nr. M M M M

18879 93930 0 3069 3069 3413 34596 3860 3590 0 0 23250 27063 33294 0 23245 26778 0 0 0 2269 130 2269 2594.7 0 3208.5 3209 3292 3292 0 3525 3627 3776 2511 25436 4696.5 94860 2446 279 437 316 0 0.93 19 0 34503 30783 0 34503 30783 0 856 0 8184 8370 1386
AA014 / CTC - Rev. 09 dated 01.04.04

6A.30 6A.31 a) b) 6A.32 6A.33 6A.34 6A.35 6A.36 6A.37 6A.38 6A.39 (a) (b) (c) 6A.39 6A.40 6A.41

Structural Cement Concrete in Approach Slabs-M30 Reinforced Cement Concrete Crash Barriers M-30 Grade incl Rebars For Bridges and Grade Separators For Approaches of ROB's PCC M-15 in Levellings Course Below Foundations PCC M-25 in Filling above Deck Slab in Footpaths Provide Weep Holes in Retaining Wall & Abutments Painting Bridge No. and Span Arrangement Etc. BackFilling in Abutment & Wing Wall as per TS 305 Filter Medium Behind Abutment as per TS 2500 Hand Packed Boulder Pitching on Slopes Design and Construction of Reinforced Soil Structures Facing Elelments -M35 and Reinforcing Elements Filling and Compaction of the Backfill Material Ground Improvement Measures incl. Soil Stabilisation Providing Boulder Pitching in Wire Crates Providing & Fixing Heavy Duty C.I. Man Hole Covers Carrying Out Confirmatory Bore Holes Total : Bill No.-6A Dismantling of Masonry and Pitching of Existing Bridge Dismantling / Breaking of PCC , RCC Foundations Etc. Earthwork in All Type of Soils excluding Rocks Earthwork in Disintegrated Rocks Backfilling with Selected Granular Material Providing and laying Filter Media behind Abutment Etc Structural Cement Concrete M-25 in Open Foundation beside Existing Foundations. Structural Cement Concrete in Sub-Structures beside Existing Sub-Structures. Grade M-25 ( PCC )in abutment Wing wall & Piers Grade M-25 ( RCC )in Piers / Abutments , Dirt Walls Etc. Structural Cement Concrete in Super-Structures beside Existing Super-Structures. M-25 Grade M-30 Grade Providing and Fixing Rebar HYSD as per TS 1600 RCC In Crash Barrier M-30 Grade incl.Rebars 100 mm Dia AC Pipes for weep Holes Complete Provide and Fix Tar Paper bearings Complete Provide and Fix Buried Type Expansion Joints Complete Provide and lay Asphaltic Plug Type Expansion Joint RCC M30 in Appraoch Slabs Excluding Rebars PCC M-15 in Levellings Course Below Foundations PCC M-25 in Filling above Deck Slab in Footpaths Drainage Spouts Complete as per 2705 Dismantling and Removal of Wearing Coat PCC M-15 Filling above the Existing Deck Slab Provide & Lay 40 mm Thick AC on top of Deck Slab as per TS 500 Provide & Lay a layer of 25 mm Thick Mastic Asphalt as per TS 500 & 2700 Reinforced Cement Concrete railing M-30 Complete Hand Packed Boulder Pitching on Slopes Boulder Pitching in Wire Crates Complete PCC M-25 in Curtain Wall for Bed Protection Works PCC M-25 in Bed Protection Works in Flooring Painting Bridge No. and Span Arrangement Etc. Total : Bill No.-6B

Cum M M Cum Cum Nr. Nr. Cum Cum Cum Sqm Cum Cum Cum No. RM

3478 0 1386 1386 1683 2120 158 939 93 177 241.8 0 3343.4 130 456

Bill No. -6B : Widening of Existing Bridges

6B.01 6B.02 6B.03 6B.04 6B.05 6B.06 6B.07 6B.08 (a) (b) 6B.09 (a) (b) 6B.10 6B.11 6B.12 6B.13 6B.14 6B.15 6B.16 6B.17 6B.18 6B.19 6B.20 6B.21 6B.22 6B.23 6B.24 6B.25 6B.26 6B.27 6B.28 6B.29

Cum Cum Cum Cum Cum Cum Cum Cum Cum Cum Cum MT M Nr. Sqm M M Cum Cum Cum Nr. Sqm Cum Cum Sqm M Cum Cum Cum Cum Nr.

186 251 37 102 47 177 3395 0 3395 3395 0 3682.8 3757 25575 2381 158 18.6 856 363 3348 1683 2120 437 28 1739 2418 279 1786 242 744 2520 2325 939

Bill No. -6C : Repair of Existing Bridges

6C.01 Repair of Cracks - Chip Off, Clean & Apply Epoxy Mortar
4

2558
AA014 / CTC - Rev. 09 dated 01.04.04

6C.02 Guniting of Damaged and Spalled Honeycombed Portion 6C.03 Repair of Damaged Masonry with CS Mortar 1 : 3 Complete Total : Bill No.-6C
Bill No. -7 : Toll Plaza 7.01 Construction of Subgrade / Shoulder aith Materials From Borrow Pits as per TS 305 7.02 Construction of Lower Granular Sub-Base as per TS 401 7.03 7.04 7.05 (a) (b) 7.06 7.07 7.08 7.09 7.10 7.11 7.12 7.13

Sqm Cum

1163 2455

Construction of Wet Mix Macadem as per TS 406 Bituminous Prime Coat with MC-30 ( @ 6.0 - 9.0 Kg /10 Sqm ) as per TS 502. Bituminous Tack Coat with Emulsion as per TS 503. ( @ 2.5 - 3.0 Kg /10 Sqm )-Over Granular Surface ( @ 2.0 - 2.5 Kg /10 Sqm )-Over Bituminous Surface Dense Bituminous Macadem Course as per 507 Provide Bituminous Concrete Wearing Course as per 512 Granular Sub-Base Filling With Selected Earth Supply and lay Concrete Kerb and Channels M-15 Grade Concrete in Median and Island Complete Supply and Fix 25 mm Thick Chequered Tiles Complete Construction of Dry Lean Concrete Sub-Base M-15 Construction of Pavement Quality Concrete M-35 Complete Total : Bill No.-7

Cum Cum Cum Kg Kg Kg Cum Cum Cum LM Cum Sqm Cum Cum

56 363 419 20 0 14 14 1860 2102 56 186 1414 112 1581 2604

Bill No. -8 : Junctions and Intersections 8.01 Construction of Subgrade / Shoulder aith Materials From Borrow Pits as per TS 305 8.02 Construction of Lower Granular Sub-Base as per TS 401 8.03 8.04 8.05 (a) (b) 8.06 8.07

Construction of Wet Mix Macadem as per TS 406 Bituminous Prime Coat with MC-30 ( @ 6.0 - 9.0 Kg /10 Sqm ) as per TS 502. Bituminous Tack Coat with Emulsion as per TS 502. ( @ 2.5 - 3.0 Kg /10 Sqm )-Over Granular Surface ( @ 2.0 - 2.5 Kg /10 Sqm )-Over Bituminous Surface Dense Bituminous Macadem Course as per 507 Provide Bituminous Concrete Wearing Course as per 512 Total : Bill No.-8

Cum Cum Cum Kg Kg Kg Cum Cum

56 363 419 20 0 14 14 1860 2102

Bill No. -9 : Road Appurtenances 9.01 Supplying and Fixing of Traffic Sign Board Complete (a) Informatory Signs (i) (ii) (iii) (b) i) (c) (i) (ii) (ii) 9.02 (a) (b) 9.03 (a) (b) 9.04 (a) (b) (c) 9.05 9.06 (a) (b)

Parking Sign ( 600 mm X 600 mm ) Advance Direction , Destination Etc ( 1200 X 1500 mm ) Facility Information ( 800 mm X 600 mm ) Cautionary / Earning -Triangiular 900 mm Side Mandatory / Regulatory Signs Octagon ~ STOP ~ Sign 600 mm Dia Circular Signs GIVE WAY ' Signs -Triangiular 900 mm Side Supply and Fix Overhead and Overhead Gantry Sign Overhead Sign Overhead Gantry Sign Pavement Marking with Hot Applied Thermoplastic Paint Lane , Centre Line and Edge Marking Directional Arrows and Markings Hectometre , KM and 5th KM Stones Hectometre Stone Kilometre Stone 5 th KM Stone RCC Guard Posts Complete Provide Road Indicators and Hazard Markers Triangilar Red Reflectors Circular Red Reflectors

Nr. Sqm Nr. Nr. Nr. Nr. Nr. Nr. Nr. Sqm Nr. Nr. Nr. Nr. Nr. Nr. Nr.

0 0 10416 7998 3255 2790 0 4929 2790 4929 0 102300 106950 0 372 1023 0 270 270 381 1860 0 549 549
AA014 / CTC - Rev. 09 dated 01.04.04

(c) (d) (e) 9.07 9.08 (a) (b) 9.09 9.10 9.11 9.12 9.13 9.14

One Way Hazard Marker Two Way Hazard Marker Object Hazard Marker Providing and Erecting Boundary Stones Supply and Fix Guard Railing with Rolled Steel Sections For Pedestrians For Antiglare for Pedestrian having 1.20 Mtr Median Supplying , Fixing and Laying PCC Kerb -M20 Supplying , Fixing and Laying PCC Kerb Foundation -M15 Providing and Erecting Steel Beam Guide Rails Complete M-15 Structural Concrete in FootPaths Complete Supplying and Fixing 25 mmTh. Chequered Tiles Complete Turfing Side Slopes of Road Embankment Complete Total : Bill No.-9

Nr. Nr. Nr. Nr. Lm Lm LM LM LM Cum Sqm Sqm

549 549 549 270 0 595 502 139.5 93 1962 1721 102 19

Bill No. -10 : Drainage and Protective Works 10.01 Earthwotk in Excavation in All Types of Soils 10.02 PCC M-10 in Foundations of Drains Complete 10.03 10.04 10.04 10.05 10.06 10.07 10.08 10.09 10.10 10.11 10.12 (a) (b) (c) 10.13 10.14 10.15 10.16 10.17 10.18

M-20 RCC for Lined Covered Surface Drains Complete M-20 Precast Slab Units 1500 x 1000 x 100 mm incl Rebars M-20 Precast Slab Units 1500 x 1200 x 100 mm incl Rebars Supplying and Fixing Iron Gratings 250 mm x 125 mm Constructing Catchpits in Superelevated Sections Supply and Fix 1000 mm Dia NP-4 RCC Pipes Provide and Fix HYSD Rebars as per TS 1600 Median Cross Drains with M-20 Grade Concrete 75 mm Dia PVC Pipes for Drains 200 mm Dia PVC Pipes for Drain Entrance RCC M-15 Grade - Inlet Chambers & Catch Pits Size 600 mm x 600 mm x 1000 mm Size 1000 mm x 1000 mm x 1500 mm Size 1500 mm x 1500 mm x 1800 mm Construction of 300 mm Dia Semi-circular Drains -M20 Construction of Drainage Chutes on Embankment -M20 Supply and Lay Concrete Kerb and Channel Sections Energy Dissipation Basins at toe of Chutes -M15 Stone Pitching 300 mm Th. With Grouts M-10 on slopes Granular Material as Pipe bedding for RCC Pipes Total : Bill No.-10

Cum Cum Cum Nr. Nr. Nr. Nr. M MT Cum Lm Lm Nr. Nr. Nr. Lm Lm Lm Nr. Cum Cum

31 1172 1999.5 409 493 186 4650 2139 23250 2530 465 744 0 9300 11160 13950 139.5 139.5 149 1767 791 149

Bill No. -11 : Service Roads 11.01 Construction of Subgrade / Shoulder aith Materials From Borrow Pits as per TS 305 11.02 Construction of Lower Granular Sub-Base as per TS 401 11.03 11.04 11.05 (a) (b) 11.06 11.07 11.08

Construction of Wet Mix Macadem as per TS 406 Bituminous Prime Coat with MC-30 ( @ 6.0 - 9.0 Kg /10 Sqm ) as per TS 502. Bituminous Tack Coat with RC-250 as per TS 502. ( @ 2.5 - 3.0 Kg /10 Sqm )-Over Granular Surface ( @ 2.0 - 2.5 Kg /10 Sqm )-Over Bituminous Surface Dense Bituminous Macadem Course as per 507 Provide Bituminous Concrete Wearing Course as per 512 Loosening and Recompacting of Subgrade Complete Total : Bill No.-11

Cum Cum Cum Kg Kg Kg Cum Cum Sqm

60.45 362.7 418.5 19.53 0 13.95 13.95 1860 2101.8 40.9

Bill No. -12 : Miscellaneous 12.01 Carrying Out Routine Maintenance along the ROW 12.02 Carrying Out Repair of Pot Holes and Any Patching Up Work 12.03 Bitumminous Tack Coat 2 to 2.50 kg / 10 M2 of Area 12.04

Renewal Coat with Mix Seal Surfacing ( Type -A )

KM -Mnth Sqm Kg. Sqm

2474 135 20 37
AA014 / CTC - Rev. 09 dated 01.04.04

12.05 12.06 (a) (b) 12.07 12.08 12.09 12.10 12.11

Providing, Commissioning and Maintaining of Cellular Phones Providing and Maintaining Vehicles for the Employer Etc Ambassadar Car A / C Tata Sumo Supply af Coloured Record Photographs-1 Neg+2 Prnts. Planting and Maintenance of Hedges along Median Planting and Maintenance of Tree Saplings Construct RCC Retaining wall with M-25 Grade Concrete Providing and Fixing in Position HYSD Rebar as per1600 Total : Bill No.-12

Inst-Mnth V-Mnth V-Mnth Print Lm Nr. Cum MT

17298 0 24738 29760 51 51 223 3339 25575

Extra Items

Filling of well Sinking of Well 6m dia 0-10m depth in soft dis. rock E. 03 Sinking of Well 7m dia 0-10m depth in soil E. 04 Sinking of Well 7m dia 10-20 m depth in soil E. 05 Sinking of Well 7m dia 0-10 m depth in soft dis. Rock. E. 06 Sinking of Well 7m dia 10-20 m depth in soft dis. Rock. Earthwork in excavation for foundation of Structure - All types of Soil Bill No. -13Ditto 13.01 above but in rock : Underpass 13.01 Providing compacted granular fill in soft & loose patches in bearing area 13.02 Plain Cement Concrete M15 in foundation levelling course 13.03 Providing & fixing reinforcement as per TS 1600 13.04 Structural Cement Concrete M25 for Retaining Wall 13.05 Providing Weep Holes in Retaining Wall 13.06 Structural Cement Concrete M30 for Approach Slab 13.07 Structural Cement Concrete M25 for RCC Box 13.08 Structural Cement Concrete M30 for Crash Barrier incl. Rebars 13.09 PCC M25 for Footpaths 13.10 Providing 20mm Asphaltic Plug Expansion Joint 13.11 Tar Paper Bearing 13.12 40 mm thick asphaltic concrete 13.13 25 mm thick mastic asphalt over asphaltic concrete 13.14 Drainage Spouts complete as per 2705 13.15 Back Filling 13.16 20 mm Filler With Bitumen 13.17 Concrete Wheel Guard Total : Bill No.-13 E. 07 Filling of well in submerged condition E. 08 Hard Rock in excavation by control blasting E. 09 Overhead Gantry Sign Board
E. 01 E. 02

Cum RM RM RM RM RM
Cum Cum Cum Cum Mt Cum Nr. Cum Cum m Cum Rm Sqm Cum sqm Nr. Cum m Cum

130 28,603 31,646 36,836 38,932 45,317 38 100 130 1683 25569 3339 158 3478 2372 1386 2120 363 18.6 2446 279 437 93 186 2120 158 416 870,000