Excavation Work in Hard Soil In layer of 150 mm thickness with 95% MDD value
Qty 120 50
Resource Excavator (bucket type) Rock breaker 1 Skilled, 4 Unskilled, 1 shovel,1 Roller compactor
150
m2/day
Concrete Protection Works Bitumen Priming Works Bitustic works Protection works (torch applied) Concrete Blinding Works Screed Works
Including surface preparation Horizontal/Vertical surface Horizontal/Vertical Surface 75/100 mm thick Blinding works 40/50 mm thick C/S Screed 75/100 mm thick screed with welded steel fabric
1 skilled + 1 unskilled 1 skilled + 1 unskilled 1 skilled + 1 unskilled 1 Mason + 2 Helper 1 Mason + 2 Helper 1 Mason + 2 Helper
kg kg kg kg kg
1 SF + 1 SF + 1 SF + 1 SF + 1 SF +
Shuttering Footing Column/Core Wall/Staircase Slab Concrete Pumping Works Placing with concrete Pump Boom Placer Concrete Works Footings Staircase Slab Placing Precast/Hollow Core Slab
8 6 12
60 40
m3/hr m3/hr
Concrete Placing and Trowel Finishing " " Placing in line and level
10/15/20 cm thick Block works 15 mm thick Plaster Works with Acc. 20 mm thick Plaster Works with Acc.
10 12 10
Including Surface preparation works First Coat Second Coat Surface Prep + Priming Painting Frame + Gypsum Partition Installation Frame + False Ceiling Fixing On Floor On Walls on Floor
m2/day m2/day m2/day m2/day m2/day m2/day m2/day m2/day m2/day m2/day m2/day
1 Painter + 1 Helper 1 Painter + 1 Helper 1 painter 1 Painter 1 Painter + 1 Helper 1 Painter + 1 Helper 1 Mason + 1 Helper 1 Mason + 1 Helper 1 Mason + 1 Helper 1 Mason + 1 Helper 2 Mason + 1 Helper
Epoxy Paint
Marble/Granite Works
Qty
Rate
Resource