Welcome to The Presentation on Erection Engineering of Steel Structures

EVERSENDAI
1

Venue : Abu Dhabi Mens College, Abu Dhabi, UAE. UAE. Date D : 22.02.12 22.02. Presented : R. Anandaraj, M.E.(Struct.), PGDIM, PMP Engineering Manager, Eversendai Engineering LLC, Dubai

EVERSENDAI

TOPICS COVERED

1. IntroductiontoErectionengineering 2. ImportanceofErectionEngineering 3. E Examplesofsteelcollapseduringconstructionanditsreason l f t l ll d i t ti dit 4. Variousmethodsoferection 5. ErectionMethodStatement 6. Analysisanddesignrequirementsfrompermanentanderection g gp p engineeringperspective 7. CasestudyonBurjkhalifa(SpireandPinnacle)

THE INFORMATION CONTAINED HEREIN IS THE SOLE PROPRIETARY RIGHT OF EVERSENDAI ENGINEERING AND THE POSSESSOR AGREES TO MAINTAIN THIS INFORMATION IN THE STRICTEST CONFIDENCE. THE CONTENTS SHALL NOT BE REPRODUCED, COPIED NOR DIVULGED TO ANY THIRD PARTY, IN WHOLE OR IN PART, WITHOUT THE WRITTEN CONSENT AND CONFIRMATION OF EVERSENDAI ENGINEERING.

EVERSENDAI

1. INTRODUCTION TO ERECTION ENGINEERING

ErectionEngineeringistheprocessofworkingoutasimple,safeand ErectionEngineeringistheprocessofworkingoutasimple safeand economicalwayoferectingsteelstructureswithgivensiteconditions, resources,timeandquality. , q y TheChallengingpartofthisprocessistosatisfystability,strengthand g gp p y y, g serviceabilityrequirementsofbothpermanentandtemporarystructures includingsupportingconcretefrompartialtofinalbuiltstagewithbuilding envelopes. Thisprocessneedtorespectconstructionspecificcodalrequirements, tolerances,lockinforces,safetymarginswithoutexceedinganyofpermanent andtemporarymemberandconnectioncapacities. dt b d ti iti

THE INFORMATION CONTAINED HEREIN IS THE SOLE PROPRIETARY RIGHT OF EVERSENDAI ENGINEERING AND THE POSSESSOR AGREES TO MAINTAIN THIS INFORMATION IN THE STRICTEST CONFIDENCE. THE CONTENTS SHALL NOT BE REPRODUCED, COPIED NOR DIVULGED TO ANY THIRD PARTY, IN WHOLE OR IN PART, WITHOUT THE WRITTEN CONSENT AND CONFIRMATION OF EVERSENDAI ENGINEERING.

EVERSENDAI
4

2. IMPORTANCE OF ERECTION ENGINEERING

THE INFORMATION CONTAINED HEREIN IS THE SOLE PROPRIETARY RIGHT OF EVERSENDAI ENGINEERING AND THE POSSESSOR AGREES TO MAINTAIN THIS INFORMATION IN THE STRICTEST CONFIDENCE. THE CONTENTS SHALL NOT BE REPRODUCED, COPIED NOR DIVULGED TO ANY THIRD PARTY, IN WHOLE OR IN PART, WITHOUT THE WRITTEN CONSENT AND CONFIRMATION OF EVERSENDAI ENGINEERING.

EVERSENDAI

Structures are Unique and complex

THE INFORMATION CONTAINED HEREIN IS THE SOLE PROPRIETARY RIGHT OF EVERSENDAI ENGINEERING AND THE POSSESSOR AGREES TO MAINTAIN THIS INFORMATION IN THE STRICTEST CONFIDENCE. THE CONTENTS SHALL NOT BE REPRODUCED, COPIED NOR DIVULGED TO ANY THIRD PARTY, IN WHOLE OR IN PART, WITHOUT THE WRITTEN CONSENT AND CONFIRMATION OF EVERSENDAI ENGINEERING.

EVERSENDAI

Structures are Unique and complex

THE INFORMATION CONTAINED HEREIN IS THE SOLE PROPRIETARY RIGHT OF EVERSENDAI ENGINEERING AND THE POSSESSOR AGREES TO MAINTAIN THIS INFORMATION IN THE STRICTEST CONFIDENCE. THE CONTENTS SHALL NOT BE REPRODUCED, COPIED NOR DIVULGED TO ANY THIRD PARTY, IN WHOLE OR IN PART, WITHOUT THE WRITTEN CONSENT AND CONFIRMATION OF EVERSENDAI ENGINEERING.

EVERSENDAI

Stability
Lateralstabilityinpermanentconditionisachieved byprovidingmomentresistingframes,braced frames,connectingtocorewalls,concrete diaphragmsetc.

Absenceoftheseelementsleadtostructural instability.

Oneofmainaimduringerectionistomaintainthe stabilityofstructureatalltimes.Moststructures whichcollapsedosoduetoinstabilityduring erection.

THE INFORMATION CONTAINED HEREIN IS THE SOLE PROPRIETARY RIGHT OF EVERSENDAI ENGINEERING AND THE POSSESSOR AGREES TO MAINTAIN THIS INFORMATION IN THE STRICTEST CONFIDENCE. THE CONTENTS SHALL NOT BE REPRODUCED, COPIED NOR DIVULGED TO ANY THIRD PARTY, IN WHOLE OR IN PART, WITHOUT THE WRITTEN CONSENT AND CONFIRMATION OF EVERSENDAI ENGINEERING.

EVERSENDAI

Stability LateralArrestorframes TemporaryMembers

Temporarytowers

Lateralstabilityintemporaryconditionis achievedbyprovidingtemporarybracings, hi db idi t b i supportingontemporarytowers,guywires etc., etc


THE INFORMATION CONTAINED HEREIN IS THE SOLE PROPRIETARY RIGHT OF EVERSENDAI ENGINEERING AND THE POSSESSOR AGREES TO MAINTAIN THIS INFORMATION IN THE STRICTEST CONFIDENCE. THE CONTENTS SHALL NOT BE REPRODUCED, COPIED NOR DIVULGED TO ANY THIRD PARTY, IN WHOLE OR IN PART, WITHOUT THE WRITTEN CONSENT AND CONFIRMATION OF EVERSENDAI ENGINEERING.

Guywires

EVERSENDAI

Excessive Deflection

Verticaldeflection 13mm Verticaldeflection=13mm Hzldef.=10mm


PERMANENTCONDITION

TEMPORARYCONDITION

Hzldeflection=37mm

Verticaldeflection=47mm
THE INFORMATION CONTAINED HEREIN IS THE SOLE PROPRIETARY RIGHT OF EVERSENDAI ENGINEERING AND THE POSSESSOR AGREES TO MAINTAIN THIS INFORMATION IN THE STRICTEST CONFIDENCE. THE CONTENTS SHALL NOT BE REPRODUCED, COPIED NOR DIVULGED TO ANY THIRD PARTY, IN WHOLE OR IN PART, WITHOUT THE WRITTEN CONSENT AND CONFIRMATION OF EVERSENDAI ENGINEERING.

EVERSENDAI

Loadings are different during erection Erectionstage Self weight for different stage. Construction Load (1.0 kN/m2) Impact Load (15% of Self weight) Wind Loads Reduced probability factor Different solidity, shielding factor y, g Temperature Load (+/ 35 degree) Moving loads Temperature Load (+/ 25 degree) Earthquake Load Finishedstage Self Weight of complete structure Super Imposed Dead Load Live Load Wind Load (45 m/sec) d d (Full Cladding)

10

THE INFORMATION CONTAINED HEREIN IS THE SOLE PROPRIETARY RIGHT OF EVERSENDAI ENGINEERING AND THE POSSESSOR AGREES TO MAINTAIN THIS INFORMATION IN THE STRICTEST CONFIDENCE. THE CONTENTS SHALL NOT BE REPRODUCED, COPIED NOR DIVULGED TO ANY THIRD PARTY, IN WHOLE OR IN PART, WITHOUT THE WRITTEN CONSENT AND CONFIRMATION OF EVERSENDAI ENGINEERING.

EVERSENDAI

Support condition

11

Trussesare Continuous over supportsin design g

Trusses are discontinuous and Simply supported

THE INFORMATION CONTAINED HEREIN IS THE SOLE PROPRIETARY RIGHT OF EVERSENDAI ENGINEERING AND THE POSSESSOR AGREES TO MAINTAIN THIS INFORMATION IN THE STRICTEST CONFIDENCE. THE CONTENTS SHALL NOT BE REPRODUCED, COPIED NOR DIVULGED TO ANY THIRD PARTY, IN WHOLE OR IN PART, WITHOUT THE WRITTEN CONSENT AND CONFIRMATION OF EVERSENDAI ENGINEERING.

EVERSENDAI
13

3. COLLPASE OF BUILDINGS DURING CONSTRUCTION

EVERSENDAI

BUILDING COLLAPSE - 1
Building configuration
Area = 70m x 85m

14

Four floors having composite deck Roof floor is an unfilled steel deck Rigid frames running across the entire width and length of building 1.25m cantilever projection on periphery of each floors CantileverBeams Boundarycolumn

Five storey office building

EVERSENDAI

BUILDING COLLAPSE - 1

15

CantileverMemberFailure

CollapsedBuilding

SchematicPlan

EVERSENDAI

BUILDING COLLAPSE - 1

16

Technicalcauseofcollapse:
Thepermanent,fullpenetration,weldedconnectionsoftheends ofthecantileverstothefaceoftheflangesofcolumn,whichwere designedtoresistmoment,werenotmade.Therefore,moment andshearduetotheweightofthedeckbundlesandsteelframing hadtoberesistedbytheerectionanglesandtheweldconnecting themtothefacesofthecolumnflanges. h h f f h l fl

EVERSENDAI

BUILDING COLLAPSE - 1

17

Proceduralcauseofcollapse:
Whenthefabricatorrevisedhisshopdetailstochangethecantileverconnectionsfromshopwelds tofieldwelds,hedidnotissueanyreviseddrawings totheerectorortothegeneralcontractor.

Healsodidnotprovidethemwithanyotherwritteninstructionsonerectionprocedureor limitationsontheloadthatcouldbeimposedonthecantileverspriortomakingthepermanent weldedconnectionstothecolumns.

EVERSENDAI

BUILDING COLLAPSE - 2
Complexconsistsmany independentstructurelinked togethertoformanshapeof g p L AtoneendoftheL,there isahighbaylibrarybuilding g y y g Buildingis113feetwideand 120feetdeep Roofheightis28feet

18

TieJoistsarelocatedonthe
columncentrelinesandit preventsrelativemovements betweenthelinesofcolumn Andnecessaryforsafe erection
TieJoist Ti J i t

Joist

Largeschoolcomplexbuilding

EVERSENDAI

BUILDING COLLAPSE - 2

19

Joistsarebracedagainstbuckling duringerectionby5rowscross bracingscalledcross bridging

Topofajoistisbracedtothe bottomoftheadjacentjoistsand thebottomofthejoistsare bracedtothetopoftheadjacent joists

EVERSENDAI

BUILDING COLLAPSE - 2

20

Collapseof112FootLongDeepspanSteelJoists

EVERSENDAI

BUILDING COLLAPSE - 2

21

CollapsedJoists Framesrunningfromleftforegroundtotherightbackground

EVERSENDAI

BUILDING COLLAPSE - 2

22

CauseofCollapse
Theloadsimposedonthejoistsduringtheirerectionweretheweightofthejoists, Approximately45lbs/ftofjoistincludingbridgingandtheweightof3ironworkers (connectors),say170lbseach.Thesearegravityloads,allactingdownward.Inaddition therearesmallincidentalhorizontaldynamicloadsfromthemovementoftheconnectors; theseloadsareinsignificantwithregardstostructuralsafety. Therearetwopossiblemodesoffailureofthejoistsaserected,duetotheabovementioned gravityloads: 1) Thetopchordofan individualjoistbucklinglaterally accompaniedbythetwistingofthe ) h h d f d d l b kl l ll i db h i i f h joistsbetweenlateralsupports(e.g.betweenthebridging) 2) Overallhorizontalbucklingoftheentirejoist/bridgingsystem Thelatermodeinvolvesbendingofthecrossbridgingandoveralltwistingofthe individualjoistsbetweentheirendsupports.

EVERSENDAI

BUILDING COLLAPSE - 3 Rooftrussescollapseduringconstruction


L Longsingle storeyindustrialbuilding i l i d i lb ildi of200mlongand60mwide

23

Long spanPitchedRoofanditcomprised 29numbersofsteeltrusses

Trusses59mspanandmidheight10.8m

IndustrialBuilding
ErectionoftheTrussesdidnotcommencefromoneendofthegableendwall,andasa resultthefirst3adjacenttrussesthatwereerectedwerebracedagainsteachotherinstead ofbeingbracedagainstarigidgableendwall. Temporarysupportingtowerswereusedasintermediatesupportstofacilitateerection. Temporar s pportingto ers ere sedasintermediates pportstofacilitateerection

EVERSENDAI

BUILDING COLLAPSE - 3

24

CollapsedTrusses

EVERSENDAI

BUILDING COLLAPSE - 3 CauseofCollapse


Afterthefirst3trusseswereerected,thecontractorremovedthetemporarysupporting towerssituatedatmid spanofthetrusses.The3trussescollapsed shortly i d id f h Th ll d h l Oncompletionoferectionprocess,someofthepurlinandtiebeamsneartemporarytowers werenotinstalled soastoprovideaclearspaceforlifting. ti t ll d t id l f lifti Temporarydiagonalbracingswerealsonotusedtoprovideeffectivelateralstabilityand torsionalrigiditytothetrusses. torsionalrigiditytothetrusses

25

LearningPoints
Alltemporarysupportsandbracingsshouldalsobedesignedforanyincidentallateralforces duringtheconstruction Lateralanddiagonalrestraintsforerectionoftrussesshouldbeconnectedtosufficientlyrigid supports. Supervisionisveryimportantduringtheconstruction.Thebuilder,QPandsitesupervisor shouldbevigilanttoensurethattherearenomissingelements

EVERSENDAI
26

4. VARIOUS METHODS OF ERECTION

THE INFORMATION CONTAINED HEREIN IS THE SOLE PROPRIETARY RIGHT OF EVERSENDAI ENGINEERING AND THE POSSESSOR AGREES TO MAINTAIN THIS INFORMATION IN THE STRICTEST CONFIDENCE. THE CONTENTS SHALL NOT BE REPRODUCED, COPIED NOR DIVULGED TO ANY THIRD PARTY, IN WHOLE OR IN PART, WITHOUT THE WRITTEN CONSENT AND CONFIRMATION OF EVERSENDAI ENGINEERING.

EVERSENDAI

CONVENTIONAL

METHOD

27

Erectionofstructuredirectlyinfinalpositionusingtowercranesandtemporary structuresuchasTemporarytowerandscaffoldings UsingTemporaryTower Components


Spreaderbeams StandardModules NonStandardModules TopModule Trusssupportingbeam Jacksupportingbeam LateralTies

THE INFORMATION CONTAINED HEREIN IS THE SOLE PROPRIETARY RIGHT OF EVERSENDAI ENGINEERING AND THE POSSESSOR AGREES TO MAINTAIN THIS INFORMATION IN THE STRICTEST CONFIDENCE. THE CONTENTS SHALL NOT BE REPRODUCED, COPIED NOR DIVULGED TO ANY THIRD PARTY, IN WHOLE OR IN PART, WITHOUT THE WRITTEN CONSENT AND CONFIRMATION OF EVERSENDAI ENGINEERING.

EVERSENDAI

CONVENTIONAL Components
Pipes Alshores Megashores

METHOD

28

UsingScaffolding

Sequence
Erectionofspreaderbeamand E ti f d b d scaffoldingcomponents Erectionofpermanentmembers Fromoneend Frombothend Stabilizing Aligning/surveying Erectinginfillmembers E i i fill b Welding/boltingofmain andinfillmembers p pp g Depropping

SalientPoints
Morestable&willcarrylesserloads Bettercontrolonalignmentofpermanentstructure Occupieslotofspaceobstructingworkbelow

THE INFORMATION CONTAINED HEREIN IS THE SOLE PROPRIETARY RIGHT OF EVERSENDAI ENGINEERING AND THE POSSESSOR AGREES TO MAINTAIN THIS INFORMATION IN THE STRICTEST CONFIDENCE. THE CONTENTS SHALL NOT BE REPRODUCED, COPIED NOR DIVULGED TO ANY THIRD PARTY, IN WHOLE OR IN PART, WITHOUT THE WRITTEN CONSENT AND CONFIRMATION OF EVERSENDAI ENGINEERING.

EVERSENDAI

STRAND JACKING

METHOD

29

Assemblingthestructureinremoteplaceontemporarystructureand g p p y movingtofinalpositionusingstrandjacks,winches,chainblocksorany Mechanicalequipment.

Variousmethodsarehorizontalstraightsliding,Horizontalcurvedsliding, Verticallifting,Verticalliftingandhorizontalsliding,tilting V ti llifti V ti llifti dh i t l lidi tilti

THE INFORMATION CONTAINED HEREIN IS THE SOLE PROPRIETARY RIGHT OF EVERSENDAI ENGINEERING AND THE POSSESSOR AGREES TO MAINTAIN THIS INFORMATION IN THE STRICTEST CONFIDENCE. THE CONTENTS SHALL NOT BE REPRODUCED, COPIED NOR DIVULGED TO ANY THIRD PARTY, IN WHOLE OR IN PART, WITHOUT THE WRITTEN CONSENT AND CONFIRMATION OF EVERSENDAI ENGINEERING.

EVERSENDAI

STRAND JACKING VERTICALLIFTINGMETHOD Components


Temporarytowers/jigs Slidingbeams J k Jacks Strands Lifting/slidingframes

METHOD

30

THE INFORMATION CONTAINED HEREIN IS THE SOLE PROPRIETARY RIGHT OF EVERSENDAI ENGINEERING AND THE POSSESSOR AGREES TO MAINTAIN THIS INFORMATION IN THE STRICTEST CONFIDENCE. THE CONTENTS SHALL NOT BE REPRODUCED, COPIED NOR DIVULGED TO ANY THIRD PARTY, IN WHOLE OR IN PART, WITHOUT THE WRITTEN CONSENT AND CONFIRMATION OF EVERSENDAI ENGINEERING.

EVERSENDAI

STRAND JACKING

METHOD

31

Operationofstrandjack O ti f t dj k

EVERSENDAI

Operation of Strand Jack


Strand cable g p y Safe lifting capacity 15.5 MT per strand Top anchor

32

Hydraulic cylinder Hollow centre

Bottom anchor

Generalviewofstrandjack

Courtesy by DLT

EVERSENDAI

Operation of Strand Jack

33

Strand wedges Grip strand when closed Grip opening jack

Grip opening Plate. Connected to grip release tubes

Anchor block, with machined cones for strand wedges

Cutawayofbottomanchor

Courtesy by DLT

EVERSENDAI

Operation of Strand Jack

34

Cutawayoftopanchor

Courtesy by DLT

EVERSENDAI
35

STRANDJACK LOADLIFTINGSEQUENCE

EVERSENDAI

Strand jack load lifting sequence

36

Top anchor status Green = closed Top anchor closed Red = open

120% 100%
Expected load

Closed

Jack load indicator Bottom anchor status B tt h t t

0%

Load in bottom anchor

Jack No. Load Pre-set

3 0 1600 0 kN kN mm

Bottom anchor closed

Closed

Stroke

Readyforstrandliftingstroke

Courtesy by DLT

EVERSENDAI

Strand jack load lifting sequence

37

120%

Closed

100%

Jack stroke indicator

0%

Jack No. Load Pre-set

3 1580 1600 15 kN kN mm
Courtesy by DLT

Closed

Stroke

2 Extendramtotransferloadtotopanchor

EVERSENDAI

Strand jack load lifting sequence

38

120%

Closed

100%

0%

Jack No. Load Pre-set

3 1580 1600 250 kN kN mm

Closed

Stroke

3 Strandliftingstroke

Courtesy by DLT

EVERSENDAI

Strand jack load lifting sequence

39

Closed
120% 100%

0%

Jack No. Load Pre-set

3 1580 1600 500 kN kN mm

Closed

Stroke

4 Topofstrandliftingstroke

Courtesy by DLT

EVERSENDAI

Strand jack load lifting sequence

40

Closed
120% 100%

0%

Jack No. Load Pre-set

3 1580 1600 480 kN kN mm

Closed

Stroke

5 Retractramtotransferloadtobottomanchor

Courtesy by DLT

EVERSENDAI

Strand jack load lifting sequence

41

Open
120% 100%

0%

Jack No. Load Pre-set

3 1580 1600 480 kN kN mm

Closed

Stroke

6 Readyforramretractstroke

Courtesy by DLT

EVERSENDAI

Strand jack load lifting sequence

42

Open

120% 100%

0%

Jack No. Load Pre-set

3 1580 1600 250 kN kN mm

Closed Retractstroke

Stroke

Courtesy by DLT

EVERSENDAI

Strand jack load lifting sequence

43

120%

Open

100%

0%

Jack No. Load Pre-set

3 1580 1600 0 kN kN mm

Closed

Stroke

8 Bottomofretractstroke

Courtesy by DLT

EVERSENDAI

Strand jack load lifting sequence

44

120%

Closed

100%

0%

Jack No. Load L d Pre-set

3 1580 1600 0 kN kN mm

Closed

Stroke

9 Readyfornextliftingcycle

Courtesy by DLT

EVERSENDAI

STRAND JACKING Sliding Method

45

THE INFORMATION CONTAINED HEREIN IS THE SOLE PROPRIETARY RIGHT OF EVERSENDAI ENGINEERING AND THE POSSESSOR AGREES TO MAINTAIN THIS INFORMATION IN THE STRICTEST CONFIDENCE. THE CONTENTS SHALL NOT BE REPRODUCED, COPIED NOR DIVULGED TO ANY THIRD PARTY, IN WHOLE OR IN PART, WITHOUT THE WRITTEN CONSENT AND CONFIRMATION OF EVERSENDAI ENGINEERING.

EVERSENDAI

STRAND JACKING

Vertical & Sliding method

46

Temporary rail truss

Temporary rail truss

THE INFORMATION CONTAINED HEREIN IS THE SOLE PROPRIETARY RIGHT OF EVERSENDAI ENGINEERING AND THE POSSESSOR AGREES TO MAINTAIN THIS INFORMATION IN THE STRICTEST CONFIDENCE. THE CONTENTS SHALL NOT BE REPRODUCED, COPIED NOR DIVULGED TO ANY THIRD PARTY, IN WHOLE OR IN PART, WITHOUT THE WRITTEN CONSENT AND CONFIRMATION OF EVERSENDAI ENGINEERING.

EVERSENDAI

STRAND JACKING

Vertical & Sliding Method

47

ASSEMBLY UNDER PROGRESS

THE INFORMATION CONTAINED HEREIN IS THE SOLE PROPRIETARY RIGHT OF EVERSENDAI ENGINEERING AND THE POSSESSOR AGREES TO MAINTAIN THIS INFORMATION IN THE STRICTEST CONFIDENCE. THE CONTENTS SHALL NOT BE REPRODUCED, COPIED NOR DIVULGED TO ANY THIRD PARTY, IN WHOLE OR IN PART, WITHOUT THE WRITTEN CONSENT AND CONFIRMATION OF EVERSENDAI ENGINEERING.

EVERSENDAI

STRAND JACKING

Vertical & Sliding Method

48

LIFTING UNDER PROGRESS

THE INFORMATION CONTAINED HEREIN IS THE SOLE PROPRIETARY RIGHT OF EVERSENDAI ENGINEERING AND THE POSSESSOR AGREES TO MAINTAIN THIS INFORMATION IN THE STRICTEST CONFIDENCE. THE CONTENTS SHALL NOT BE REPRODUCED, COPIED NOR DIVULGED TO ANY THIRD PARTY, IN WHOLE OR IN PART, WITHOUT THE WRITTEN CONSENT AND CONFIRMATION OF EVERSENDAI ENGINEERING.

EVERSENDAI

STRAND JACKING

Vertical & Sliding Method

49

SLIDING DIRECTION

LIFTING DIRECTION

HORIZONTAL SLIDING UNDER PROGRESS OVER RAIL TRUSS

THE INFORMATION CONTAINED HEREIN IS THE SOLE PROPRIETARY RIGHT OF EVERSENDAI ENGINEERING AND THE POSSESSOR AGREES TO MAINTAIN THIS INFORMATION IN THE STRICTEST CONFIDENCE. THE CONTENTS SHALL NOT BE REPRODUCED, COPIED NOR DIVULGED TO ANY THIRD PARTY, IN WHOLE OR IN PART, WITHOUT THE WRITTEN CONSENT AND CONFIRMATION OF EVERSENDAI ENGINEERING.

EVERSENDAI

STRAND JACKING

Tilting Method

50

Arch - View at Permanent Condition

Arch Length - 315 A hL th 315m Arch Height - 133m Arch Diameter - 7m Arch Weight - 1750T Tilting Angle - 30 to 112degrees

EVERSENDAI

STRAND JACKING

Tilting Method

51

Arch - View at Permanent Condition

Courtesy by DLT

EVERSENDAI

STRAND JACKING Photo 1

Tilting Method Photo 2

52

Photo 3

Photo 4

Courtesy by DLT

EVERSENDAI

STRAND JACKING

Tilting Method

53

EVERSENDAI

STRAND JACKING

Tilting Method

54

EVERSENDAI

CAT HEADS Components


Embedmentforcatheads Temporarykneetruss

55

Sequence
Erectionofcatheadcomponents Erectionofpermanentmembers Stabilizing Aligning/surveying Erectinginfillmembers Welding/boltingofmainandinfillmembers Depropping

THE INFORMATION CONTAINED HEREIN IS THE SOLE PROPRIETARY RIGHT OF EVERSENDAI ENGINEERING AND THE POSSESSOR AGREES TO MAINTAIN THIS INFORMATION IN THE STRICTEST CONFIDENCE. THE CONTENTS SHALL NOT BE REPRODUCED, COPIED NOR DIVULGED TO ANY THIRD PARTY, IN WHOLE OR IN PART, WITHOUT THE WRITTEN CONSENT AND CONFIRMATION OF EVERSENDAI ENGINEERING.

EVERSENDAI

CAT HEADS

56

THE INFORMATION CONTAINED HEREIN IS THE SOLE PROPRIETARY RIGHT OF EVERSENDAI ENGINEERING AND THE POSSESSOR AGREES TO MAINTAIN THIS INFORMATION IN THE STRICTEST CONFIDENCE. THE CONTENTS SHALL NOT BE REPRODUCED, COPIED NOR DIVULGED TO ANY THIRD PARTY, IN WHOLE OR IN PART, WITHOUT THE WRITTEN CONSENT AND CONFIRMATION OF EVERSENDAI ENGINEERING.

EVERSENDAI

CAT HEADS

57

Assembly over catheads

THE INFORMATION CONTAINED HEREIN IS THE SOLE PROPRIETARY RIGHT OF EVERSENDAI ENGINEERING AND THE POSSESSOR AGREES TO MAINTAIN THIS INFORMATION IN THE STRICTEST CONFIDENCE. THE CONTENTS SHALL NOT BE REPRODUCED, COPIED NOR DIVULGED TO ANY THIRD PARTY, IN WHOLE OR IN PART, WITHOUT THE WRITTEN CONSENT AND CONFIRMATION OF EVERSENDAI ENGINEERING.

EVERSENDAI

CAT HEADS Main structure completed over catheads

58

THE INFORMATION CONTAINED HEREIN IS THE SOLE PROPRIETARY RIGHT OF EVERSENDAI ENGINEERING AND THE POSSESSOR AGREES TO MAINTAIN THIS INFORMATION IN THE STRICTEST CONFIDENCE. THE CONTENTS SHALL NOT BE REPRODUCED, COPIED NOR DIVULGED TO ANY THIRD PARTY, IN WHOLE OR IN PART, WITHOUT THE WRITTEN CONSENT AND CONFIRMATION OF EVERSENDAI ENGINEERING.

EVERSENDAI

TEMPORARY

BRIDGE

59

Embedmentfortemporarybridge Temporarytrussbridge Effectiveforspansbetween2540m Usedforlighttomediumtrussweights g g

THE INFORMATION CONTAINED HEREIN IS THE SOLE PROPRIETARY RIGHT OF EVERSENDAI ENGINEERING AND THE POSSESSOR AGREES TO MAINTAIN THIS INFORMATION IN THE STRICTEST CONFIDENCE. THE CONTENTS SHALL NOT BE REPRODUCED, COPIED NOR DIVULGED TO ANY THIRD PARTY, IN WHOLE OR IN PART, WITHOUT THE WRITTEN CONSENT AND CONFIRMATION OF EVERSENDAI ENGINEERING.

EVERSENDAI

LAUNCHING IMPORTANTPOINTSTOBECONSIDERED
Usestheconceptofstrandjacking Usedforerectionofcantileverstructures,bridgesoverriverwhereaccessisnoteasy. pp Method1:MovableJacksupports.
Erectiondonefrommainbuildingtowardsfreeendprogressively.

60

Unlikeinnormalstrandjackingwherethetemporarystructurearefixed,inthismethodthetemporary structuresmovesalongwitherectedstructure

Method2:FixedJacksupports.
Erectiondonefromoneendofstructureandslidetowardsotherendwhilesegmentsareadded progressivelyattailwhilesliding. Herethepushingjacksarefixedatsupportsanditscapacityincreasedasslidingassemblyincrease. Herethepushingjacksarefixedatsupportsanditscapacityincreasedasslidingassemblyincrease

ExtensiveEngineeringandsupervisionisinvolved.

THE INFORMATION CONTAINED HEREIN IS THE SOLE PROPRIETARY RIGHT OF EVERSENDAI ENGINEERING AND THE POSSESSOR AGREES TO MAINTAIN THIS INFORMATION IN THE STRICTEST CONFIDENCE. THE CONTENTS SHALL NOT BE REPRODUCED, COPIED NOR DIVULGED TO ANY THIRD PARTY, IN WHOLE OR IN PART, WITHOUT THE WRITTEN CONSENT AND CONFIRMATION OF EVERSENDAI ENGINEERING.

EVERSENDAI

LAUNCHING Fixed jack supports


Photo - 1

61

Photo 1 Closer shot

Photo - 2

Photo 2 Closer shot

EVERSENDAI

LAUNCHING
Photo - 3

62

Photo 3 Closer shot

Photo - 4

Photo 4 Closer shot

EVERSENDAI

SLIDING ALONG CURVE


Sameprocedureasthelinearslidingexceptinsteadofstrand jacks,electromechanicalsystemtobeused.

63

Complete structure erected by sliding along curved shape p y g g p

THE INFORMATION CONTAINED HEREIN IS THE SOLE PROPRIETARY RIGHT OF EVERSENDAI ENGINEERING AND THE POSSESSOR AGREES TO MAINTAIN THIS INFORMATION IN THE STRICTEST CONFIDENCE. THE CONTENTS SHALL NOT BE REPRODUCED, COPIED NOR DIVULGED TO ANY THIRD PARTY, IN WHOLE OR IN PART, WITHOUT THE WRITTEN CONSENT AND CONFIRMATION OF EVERSENDAI ENGINEERING.

EVERSENDAI

SLIDING ALONG CURVE

70

THE INFORMATION CONTAINED HEREIN IS THE SOLE PROPRIETARY RIGHT OF EVERSENDAI ENGINEERING AND THE POSSESSOR AGREES TO MAINTAIN THIS INFORMATION IN THE STRICTEST CONFIDENCE. THE CONTENTS SHALL NOT BE REPRODUCED, COPIED NOR DIVULGED TO ANY THIRD PARTY, IN WHOLE OR IN PART, WITHOUT THE WRITTEN CONSENT AND CONFIRMATION OF EVERSENDAI ENGINEERING.

EVERSENDAI

SLIDING ALONG CURVE

65

Assembly of pair of arch on temporary towers

THE INFORMATION CONTAINED HEREIN IS THE SOLE PROPRIETARY RIGHT OF EVERSENDAI ENGINEERING AND THE POSSESSOR AGREES TO MAINTAIN THIS INFORMATION IN THE STRICTEST CONFIDENCE. THE CONTENTS SHALL NOT BE REPRODUCED, COPIED NOR DIVULGED TO ANY THIRD PARTY, IN WHOLE OR IN PART, WITHOUT THE WRITTEN CONSENT AND CONFIRMATION OF EVERSENDAI ENGINEERING.

EVERSENDAI

SLIDING ALONG CURVE

66

Installation of curved rails beams p g under progress

THE INFORMATION CONTAINED HEREIN IS THE SOLE PROPRIETARY RIGHT OF EVERSENDAI ENGINEERING AND THE POSSESSOR AGREES TO MAINTAIN THIS INFORMATION IN THE STRICTEST CONFIDENCE. THE CONTENTS SHALL NOT BE REPRODUCED, COPIED NOR DIVULGED TO ANY THIRD PARTY, IN WHOLE OR IN PART, WITHOUT THE WRITTEN CONSENT AND CONFIRMATION OF EVERSENDAI ENGINEERING.

EVERSENDAI

SLIDING ALONG CURVE

67

THE INFORMATION CONTAINED HEREIN IS THE SOLE PROPRIETARY RIGHT OF EVERSENDAI ENGINEERING AND THE POSSESSOR AGREES TO MAINTAIN THIS INFORMATION IN THE STRICTEST CONFIDENCE. THE CONTENTS SHALL NOT BE REPRODUCED, COPIED NOR DIVULGED TO ANY THIRD PARTY, IN WHOLE OR IN PART, WITHOUT THE WRITTEN CONSENT AND CONFIRMATION OF EVERSENDAI ENGINEERING.

EVERSENDAI

SLIDING ALONG CURVE

68

THE INFORMATION CONTAINED HEREIN IS THE SOLE PROPRIETARY RIGHT OF EVERSENDAI ENGINEERING AND THE POSSESSOR AGREES TO MAINTAIN THIS INFORMATION IN THE STRICTEST CONFIDENCE. THE CONTENTS SHALL NOT BE REPRODUCED, COPIED NOR DIVULGED TO ANY THIRD PARTY, IN WHOLE OR IN PART, WITHOUT THE WRITTEN CONSENT AND CONFIRMATION OF EVERSENDAI ENGINEERING.

EVERSENDAI

Influencing Factors for choice of Erection methodology

69

Cranelocationandcapacity Siteaccessandstorage Structuresuitability Schedule C Cost

THE INFORMATION CONTAINED HEREIN IS THE SOLE PROPRIETARY RIGHT OF EVERSENDAI ENGINEERING AND THE POSSESSOR AGREES TO MAINTAIN THIS INFORMATION IN THE STRICTEST CONFIDENCE. THE CONTENTS SHALL NOT BE REPRODUCED, COPIED NOR DIVULGED TO ANY THIRD PARTY, IN WHOLE OR IN PART, WITHOUT THE WRITTEN CONSENT AND CONFIRMATION OF EVERSENDAI ENGINEERING.

EVERSENDAI

Influence of crane location and capacity

70

THE INFORMATION CONTAINED HEREIN IS THE SOLE PROPRIETARY RIGHT OF EVERSENDAI ENGINEERING AND THE POSSESSOR AGREES TO MAINTAIN THIS INFORMATION IN THE STRICTEST CONFIDENCE. THE CONTENTS SHALL NOT BE REPRODUCED, COPIED NOR DIVULGED TO ANY THIRD PARTY, IN WHOLE OR IN PART, WITHOUT THE WRITTEN CONSENT AND CONFIRMATION OF EVERSENDAI ENGINEERING.

EVERSENDAI

Influence of crane location and capacity

71

THE INFORMATION CONTAINED HEREIN IS THE SOLE PROPRIETARY RIGHT OF EVERSENDAI ENGINEERING AND THE POSSESSOR AGREES TO MAINTAIN THIS INFORMATION IN THE STRICTEST CONFIDENCE. THE CONTENTS SHALL NOT BE REPRODUCED, COPIED NOR DIVULGED TO ANY THIRD PARTY, IN WHOLE OR IN PART, WITHOUT THE WRITTEN CONSENT AND CONFIRMATION OF EVERSENDAI ENGINEERING.

EVERSENDAI

Influence of site access and storage on erection methodology

72

THE INFORMATION CONTAINED HEREIN IS THE SOLE PROPRIETARY RIGHT OF EVERSENDAI ENGINEERING AND THE POSSESSOR AGREES TO MAINTAIN THIS INFORMATION IN THE STRICTEST CONFIDENCE. THE CONTENTS SHALL NOT BE REPRODUCED, COPIED NOR DIVULGED TO ANY THIRD PARTY, IN WHOLE OR IN PART, WITHOUT THE WRITTEN CONSENT AND CONFIRMATION OF EVERSENDAI ENGINEERING.

EVERSENDAI

Influence of structural configuration

73

Courtesy by VSL

EVERSENDAI

Other points that influence the methodology SCHEDULE Strandjackingmethodwilltakelessertimeinoveralltocompletethestructure duetoparallelactivitiesofsteelerectionandclearancetoothertrades d ll l f l d l h d Conventionalmethodwillrelativelytakemoretimethanstrandjackingmethod duetosequentialactivities andoccupyingspacebelowsteelfortemp.towers andscaffolding COST Conventionalmethodoferectionwillgenerallybeeconomicalasitdoesnot requireextensiveengineering,highsupervisionandspecialequipments. Butthesavingsincostwillgenerallybemeagerwhencomparedtotheoverall g g y g p advantageoftheothermethodwithrespecttocrane,accesstoerectionand clearanceforothertrades. Butthetimeandcostinvolvedineachofthesemethodswillvarybasedonmany siterelatedfactorsandhenceneedstobeworkedouteachprojectinsteadof generalapproach

74

THE INFORMATION CONTAINED HEREIN IS THE SOLE PROPRIETARY RIGHT OF EVERSENDAI ENGINEERING AND THE POSSESSOR AGREES TO MAINTAIN THIS INFORMATION IN THE STRICTEST CONFIDENCE. THE CONTENTS SHALL NOT BE REPRODUCED, COPIED NOR DIVULGED TO ANY THIRD PARTY, IN WHOLE OR IN PART, WITHOUT THE WRITTEN CONSENT AND CONFIRMATION OF EVERSENDAI ENGINEERING.

EVERSENDAI
75

5. ERECTION METHOD STATEMENT Erectionmethodstatementisaverycrucialdocumentasithelpsalltheparties rightfromclienttofrontendengineeringandapprovalteamtositeexecutionteam tovisualizetheactualconstructionpriortobeginningoftheproject. Methodstatementcoordinatedwellintermsofsiteconstraints,resources, scheduleandsafetyisalmosthalfworkdone. Anystageshowninmethodstatementshouldbeengineeredinordertosatisfy y, y g stability,serviceabilityandstrengthcriteria.
THE INFORMATION CONTAINED HEREIN IS THE SOLE PROPRIETARY RIGHT OF EVERSENDAI ENGINEERING AND THE POSSESSOR AGREES TO MAINTAIN THIS INFORMATION IN THE STRICTEST CONFIDENCE. THE CONTENTS SHALL NOT BE REPRODUCED, COPIED NOR DIVULGED TO ANY THIRD PARTY, IN WHOLE OR IN PART, WITHOUT THE WRITTEN CONSENT AND CONFIRMATION OF EVERSENDAI ENGINEERING.

EVERSENDAI

Erection method statement - Contents GeneralIntroduction Layouts Structuralgeometryofpermanent structure Plantandequipment


*Crane *Tools&Tackles

76

PrecamberingofTrusses De proppingprocedure Deproppingprocedure LevelingandAlignment Tolerances BoltingandWelding


*Boltingmethodology g gy *Weldingmethodology

PrinciplesofErection
*Conventionalmethod *Slidingmethod

RequirementsofScaffolding RiskanalysisandSafetymeasures Logistics OrganizationChart EngineeringdrawingsofTemporary structures

Erectionsequences
*Conventionalmethod *Slidingmethod *StrandJack OperationalManual

THE INFORMATION CONTAINED HEREIN IS THE SOLE PROPRIETARY RIGHT OF EVERSENDAI ENGINEERING AND THE POSSESSOR AGREES TO MAINTAIN THIS INFORMATION IN THE STRICTEST CONFIDENCE. THE CONTENTS SHALL NOT BE REPRODUCED, COPIED NOR DIVULGED TO ANY THIRD PARTY, IN WHOLE OR IN PART, WITHOUT THE WRITTEN CONSENT AND CONFIRMATION OF EVERSENDAI ENGINEERING.

EVERSENDAI
77

6. SOME OF ANALYSIS AND DESIGN CONSIDERATION

THE INFORMATION CONTAINED HEREIN IS THE SOLE PROPRIETARY RIGHT OF EVERSENDAI ENGINEERING AND THE POSSESSOR AGREES TO MAINTAIN THIS INFORMATION IN THE STRICTEST CONFIDENCE. THE CONTENTS SHALL NOT BE REPRODUCED, COPIED NOR DIVULGED TO ANY THIRD PARTY, IN WHOLE OR IN PART, WITHOUT THE WRITTEN CONSENT AND CONFIRMATION OF EVERSENDAI ENGINEERING.

EVERSENDAI

6.1 Lock in Forces

78

FINAL DESIGN

PERMANENT CONDITION FORCE

PERMANENT LOCK IN FORCE CREATED DURING ERECTION Special attention t b given f structures unstable under gravity loads S i l tt ti to be i for t t t bl d it l d
THE INFORMATION CONTAINED HEREIN IS THE SOLE PROPRIETARY RIGHT OF EVERSENDAI ENGINEERING AND THE POSSESSOR AGREES TO MAINTAIN THIS INFORMATION IN THE STRICTEST CONFIDENCE. THE CONTENTS SHALL NOT BE REPRODUCED, COPIED NOR DIVULGED TO ANY THIRD PARTY, IN WHOLE OR IN PART, WITHOUT THE WRITTEN CONSENT AND CONFIRMATION OF EVERSENDAI ENGINEERING.

EVERSENDAI

6.1 Lock in Force Contd..

79

Periphery columns inclined to suit the building shape Lateral stability is through concrete core wall and diaphragm action of floor slabs Majority of floor beams provided with horizontal slot holes and designed to take only gravity loads Stability to be provided by floor beams during erection prior to concreting If over looked may result in strengthening of floor beams and connections

THE INFORMATION CONTAINED HEREIN IS THE SOLE PROPRIETARY RIGHT OF EVERSENDAI ENGINEERING AND THE POSSESSOR AGREES TO MAINTAIN THIS INFORMATION IN THE STRICTEST CONFIDENCE. THE CONTENTS SHALL NOT BE REPRODUCED, COPIED NOR DIVULGED TO ANY THIRD PARTY, IN WHOLE OR IN PART, WITHOUT THE WRITTEN CONSENT AND CONFIRMATION OF EVERSENDAI ENGINEERING.

EVERSENDAI

7.1 ANALYSIS AND DESIGN CONSIDERATION

80

Lateral stability is fully dependent on concrete slab Floor beams at slab level is designed for gravity loads only g q y p yp g Resulted in huge quantity of temporary plan bracing Beams subjected to axial force plus gravity resulted in huge strengthening Lock in force study resulted in strengthening of permanent steel
THE INFORMATION CONTAINED HEREIN IS THE SOLE PROPRIETARY RIGHT OF EVERSENDAI ENGINEERING AND THE POSSESSOR AGREES TO MAINTAIN THIS INFORMATION IN THE STRICTEST CONFIDENCE. THE CONTENTS SHALL NOT BE REPRODUCED, COPIED NOR DIVULGED TO ANY THIRD PARTY, IN WHOLE OR IN PART, WITHOUT THE WRITTEN CONSENT AND CONFIRMATION OF EVERSENDAI ENGINEERING.

EVERSENDAI

6.2 Design Considerations


For complex/unique structures, considering construction methodology in discussion with specialist during design stage will save time and cost in construction phase Some of key points to be noted in design to avoid increase in construction cost Maximize Use of rolled section instead of built-ups Use of thick walled instead of thin walled sections to avoid complex connections g p p p Converting curved profile to multifaceted profile if possible Providing enough margins in members where curvature is needed since curving will result in change in shape, mismatch at joints Slotted hole length to be specified more than needed to allow for site Using bolted connection at site and welded connections at shop Use the hierarchy of fillet weld to PPBW to FPBW

81

THE INFORMATION CONTAINED HEREIN IS THE SOLE PROPRIETARY RIGHT OF EVERSENDAI ENGINEERING AND THE POSSESSOR AGREES TO MAINTAIN THIS INFORMATION IN THE STRICTEST CONFIDENCE. THE CONTENTS SHALL NOT BE REPRODUCED, COPIED NOR DIVULGED TO ANY THIRD PARTY, IN WHOLE OR IN PART, WITHOUT THE WRITTEN CONSENT AND CONFIRMATION OF EVERSENDAI ENGINEERING.

EVERSENDAI

6.2 Design Considerations Cont


Critical bearings need to be connected using anchor bolts instead of embedment to avoid any gap due to undulation in embedment during casting. Influence of excessive deflection on cladding/glazing and other finishing to be studied. studied Provisions for as-built condition to be considered considered. Simplification of framing and connection details with consideration of fabrication and erection process. Selection of splice location based on erection and transporting criteria. Consideration to accommodate distortion, temperature effects, elastic shortening and weld shrinkage shrinkage. Fixing of site access and storage yards Optimization of crane usage and location. Coordination with other trades with respect to sequence, tolerance and loadings.

82

THE INFORMATION CONTAINED HEREIN IS THE SOLE PROPRIETARY RIGHT OF EVERSENDAI ENGINEERING AND THE POSSESSOR AGREES TO MAINTAIN THIS INFORMATION IN THE STRICTEST CONFIDENCE. THE CONTENTS SHALL NOT BE REPRODUCED, COPIED NOR DIVULGED TO ANY THIRD PARTY, IN WHOLE OR IN PART, WITHOUT THE WRITTEN CONSENT AND CONFIRMATION OF EVERSENDAI ENGINEERING.

EVERSENDAI

6.3 Concrete structure to be checked for erection loads

83

6th Floor 5th Floor 4th Floor

Viewtakenfromthetopofbuilding

Viewtakenfromthesideofbuilding

Craneis supportingoverthe6th floorslabofthebuilding pp g g Concretefloorshouldbecheckedforthiscraneload

THE INFORMATION CONTAINED HEREIN IS THE SOLE PROPRIETARY RIGHT OF EVERSENDAI ENGINEERING AND THE POSSESSOR AGREES TO MAINTAIN THIS INFORMATION IN THE STRICTEST CONFIDENCE. THE CONTENTS SHALL NOT BE REPRODUCED, COPIED NOR DIVULGED TO ANY THIRD PARTY, IN WHOLE OR IN PART, WITHOUT THE WRITTEN CONSENT AND CONFIRMATION OF EVERSENDAI ENGINEERING.

EVERSENDAI

6.3 Concrete structure to be checked for erection loads

84

Collapseofcraneduetofailureofconcreteslab

CraneCapacity=250tonne

CranePrice=$4Mill

EVERSENDAI

6.3 Concrete structure to be checked for erection loads *Failureofbackproppingbeneaththe200mmthickconcretedeck

85

EVERSENDAI

6.3 Concrete structure to be checked for erection loads Cranesupportoutriggerpunchedthroughslabcausingcranetolosebalanceandcollapse acrossthesiteandontoadjoiningproperty j gp p y

86

EVERSENDAI

6.3 Concrete structure to be checked for erection loads


Thecranebalancedintheairforapprox1hourbeforeentirerig&boomcollapsedcompletelyacross siteandrigfallsthroughtothebasementlevel

87

EVERSENDAI
88

7. ERECTION OF STEEL STRUCTURE CASE STUDY

BURJKHALIFA SPIREANDPINNACLE

THE INFORMATION CONTAINED HEREIN IS THE SOLE PROPRIETARY RIGHT OF EVERSENDAI ENGINEERING AND THE POSSESSOR AGREES TO MAINTAIN THIS INFORMATION IN THE STRICTEST CONFIDENCE. THE CONTENTS SHALL NOT BE REPRODUCED, COPIED NOR DIVULGED TO ANY THIRD PARTY, IN WHOLE OR IN PART, WITHOUT THE WRITTEN CONSENT AND CONFIRMATION OF EVERSENDAI ENGINEERING.

EVERSENDAI

BURJ KHALIFA SPIRE


Client
Project Manager Design D i Emaar Properties PJSC Turner Construction Intl. Skidmore, O i Skid Owings & M ill Merill (SOM) Hyder Consulting E i H d C lti Engineers Samsung-Sixco-Arabtec JV
Concrete Structure Pinnacle

89

Steel structure Spire

Supervision S i i Main Contractor Steel Fabrication & Erection Specialist

Eversendai Engineering

THE INFORMATION CONTAINED HEREIN IS THE SOLE PROPRIETARY RIGHT OF EVERSENDAI ENGINEERING AND THE POSSESSOR AGREES TO MAINTAIN THIS INFORMATION IN THE STRICTEST CONFIDENCE. THE CONTENTS SHALL NOT BE REPRODUCED, COPIED NOR DIVULGED TO ANY THIRD PARTY, IN WHOLE OR IN PART, WITHOUT THE WRITTEN CONSENT AND CONFIRMATION OF EVERSENDAI ENGINEERING.

EVERSENDAI
90

EVERSENDAI

BURJ KHALIFA-ERECTION OF SPIRE KHALIFA-

91

THE INFORMATION CONTAINED HEREIN IS THE SOLE PROPRIETARY RIGHT OF EVERSENDAI ENGINEERING AND THE POSSESSOR AGREES TO MAINTAIN THIS INFORMATION IN THE STRICTEST CONFIDENCE. THE CONTENTS SHALL NOT BE REPRODUCED, COPIED NOR DIVULGED TO ANY THIRD PARTY, IN WHOLE OR IN PART, WITHOUT THE WRITTEN CONSENT AND CONFIRMATION OF EVERSENDAI ENGINEERING.

EVERSENDAI

BURJ KHALIFA SPIRE

92

THE INFORMATION CONTAINED HEREIN IS THE SOLE PROPRIETARY RIGHT OF EVERSENDAI ENGINEERING AND THE POSSESSOR AGREES TO MAINTAIN THIS INFORMATION IN THE STRICTEST CONFIDENCE. THE CONTENTS SHALL NOT BE REPRODUCED, COPIED NOR DIVULGED TO ANY THIRD PARTY, IN WHOLE OR IN PART, WITHOUT THE WRITTEN CONSENT AND CONFIRMATION OF EVERSENDAI ENGINEERING.

EVERSENDAI

BURJ KHALIFA SPIRE

93

EVERSENDAI

BURJ KHALIFA SPIRE

94

EVERSENDAI
95

THE INFORMATION CONTAINED HEREIN IS THE SOLE PROPRIETARY RIGHT OF EVERSENDAI ENGINEERING AND THE POSSESSOR AGREES TO MAINTAIN THIS INFORMATION IN THE STRICTEST CONFIDENCE. THE CONTENTS SHALL NOT BE REPRODUCED, COPIED NOR DIVULGED TO ANY THIRD PARTY, IN WHOLE OR IN PART, WITHOUT THE WRITTEN CONSENT AND CONFIRMATION OF EVERSENDAI ENGINEERING.

EVERSENDAI

BURJ KHALIFA SPIRE

96

EVERSENDAI

BURJ KHALIFA SPIRE

97

THE INFORMATION CONTAINED HEREIN IS THE SOLE PROPRIETARY RIGHT OF EVERSENDAI ENGINEERING AND THE POSSESSOR AGREES TO MAINTAIN THIS INFORMATION IN THE STRICTEST CONFIDENCE. THE CONTENTS SHALL NOT BE REPRODUCED, COPIED NOR DIVULGED TO ANY THIRD PARTY, IN WHOLE OR IN PART, WITHOUT THE WRITTEN CONSENT AND CONFIRMATION OF EVERSENDAI ENGINEERING.

EVERSENDAI

BURJ KHALIFA SPIRE

98

THE INFORMATION CONTAINED HEREIN IS THE SOLE PROPRIETARY RIGHT OF EVERSENDAI ENGINEERING AND THE POSSESSOR AGREES TO MAINTAIN THIS INFORMATION IN THE STRICTEST CONFIDENCE. THE CONTENTS SHALL NOT BE REPRODUCED, COPIED NOR DIVULGED TO ANY THIRD PARTY, IN WHOLE OR IN PART, WITHOUT THE WRITTEN CONSENT AND CONFIRMATION OF EVERSENDAI ENGINEERING.

EVERSENDAI

BURJ KHALIFA SPIRE

99

THE INFORMATION CONTAINED HEREIN IS THE SOLE PROPRIETARY RIGHT OF EVERSENDAI ENGINEERING AND THE POSSESSOR AGREES TO MAINTAIN THIS INFORMATION IN THE STRICTEST CONFIDENCE. THE CONTENTS SHALL NOT BE REPRODUCED, COPIED NOR DIVULGED TO ANY THIRD PARTY, IN WHOLE OR IN PART, WITHOUT THE WRITTEN CONSENT AND CONFIRMATION OF EVERSENDAI ENGINEERING.

EVERSENDAI
100

THE INFORMATION CONTAINED HEREIN IS THE SOLE PROPRIETARY RIGHT OF EVERSENDAI ENGINEERING AND THE POSSESSOR AGREES TO MAINTAIN THIS INFORMATION IN THE STRICTEST CONFIDENCE. THE CONTENTS SHALL NOT BE REPRODUCED, COPIED NOR DIVULGED TO ANY THIRD PARTY, IN WHOLE OR IN PART, WITHOUT THE WRITTEN CONSENT AND CONFIRMATION OF EVERSENDAI ENGINEERING.

EVERSENDAI

BURJ KHALIFA SPIRE

101

THE INFORMATION CONTAINED HEREIN IS THE SOLE PROPRIETARY RIGHT OF EVERSENDAI ENGINEERING AND THE POSSESSOR AGREES TO MAINTAIN THIS INFORMATION IN THE STRICTEST CONFIDENCE. THE CONTENTS SHALL NOT BE REPRODUCED, COPIED NOR DIVULGED TO ANY THIRD PARTY, IN WHOLE OR IN PART, WITHOUT THE WRITTEN CONSENT AND CONFIRMATION OF EVERSENDAI ENGINEERING.

EVERSENDAI

BURJ KHALIFA SPIRE

102

THE INFORMATION CONTAINED HEREIN IS THE SOLE PROPRIETARY RIGHT OF EVERSENDAI ENGINEERING AND THE POSSESSOR AGREES TO MAINTAIN THIS INFORMATION IN THE STRICTEST CONFIDENCE. THE CONTENTS SHALL NOT BE REPRODUCED, COPIED NOR DIVULGED TO ANY THIRD PARTY, IN WHOLE OR IN PART, WITHOUT THE WRITTEN CONSENT AND CONFIRMATION OF EVERSENDAI ENGINEERING.

EVERSENDAI
103

ERECTION OF PINNACLE

THE INFORMATION CONTAINED HEREIN IS THE SOLE PROPRIETARY RIGHT OF EVERSENDAI ENGINEERING AND THE POSSESSOR AGREES TO MAINTAIN THIS INFORMATION IN THE STRICTEST CONFIDENCE. THE CONTENTS SHALL NOT BE REPRODUCED, COPIED NOR DIVULGED TO ANY THIRD PARTY, IN WHOLE OR IN PART, WITHOUT THE WRITTEN CONSENT AND CONFIRMATION OF EVERSENDAI ENGINEERING.

EVERSENDAI
104

THE INFORMATION CONTAINED HEREIN IS THE SOLE PROPRIETARY RIGHT OF EVERSENDAI ENGINEERING AND THE POSSESSOR AGREES TO MAINTAIN THIS INFORMATION IN THE STRICTEST CONFIDENCE. THE CONTENTS SHALL NOT BE REPRODUCED, COPIED NOR DIVULGED TO ANY THIRD PARTY, IN WHOLE OR IN PART, WITHOUT THE WRITTEN CONSENT AND CONFIRMATION OF EVERSENDAI ENGINEERING.

EVERSENDAI

BURJ KHALIFA SPIRE

105

THE INFORMATION CONTAINED HEREIN IS THE SOLE PROPRIETARY RIGHT OF EVERSENDAI ENGINEERING AND THE POSSESSOR AGREES TO MAINTAIN THIS INFORMATION IN THE STRICTEST CONFIDENCE. THE CONTENTS SHALL NOT BE REPRODUCED, COPIED NOR DIVULGED TO ANY THIRD PARTY, IN WHOLE OR IN PART, WITHOUT THE WRITTEN CONSENT AND CONFIRMATION OF EVERSENDAI ENGINEERING.

EVERSENDAI

BURJ KHALIFA SPIRE

106

THE INFORMATION CONTAINED HEREIN IS THE SOLE PROPRIETARY RIGHT OF EVERSENDAI ENGINEERING AND THE POSSESSOR AGREES TO MAINTAIN THIS INFORMATION IN THE STRICTEST CONFIDENCE. THE CONTENTS SHALL NOT BE REPRODUCED, COPIED NOR DIVULGED TO ANY THIRD PARTY, IN WHOLE OR IN PART, WITHOUT THE WRITTEN CONSENT AND CONFIRMATION OF EVERSENDAI ENGINEERING.

EVERSENDAI

BURJ KHALIFA SPIRE

107

THE INFORMATION CONTAINED HEREIN IS THE SOLE PROPRIETARY RIGHT OF EVERSENDAI ENGINEERING AND THE POSSESSOR AGREES TO MAINTAIN THIS INFORMATION IN THE STRICTEST CONFIDENCE. THE CONTENTS SHALL NOT BE REPRODUCED, COPIED NOR DIVULGED TO ANY THIRD PARTY, IN WHOLE OR IN PART, WITHOUT THE WRITTEN CONSENT AND CONFIRMATION OF EVERSENDAI ENGINEERING.

EVERSENDAI

BURJ KHALIFA SPIRE

108

THE INFORMATION CONTAINED HEREIN IS THE SOLE PROPRIETARY RIGHT OF EVERSENDAI ENGINEERING AND THE POSSESSOR AGREES TO MAINTAIN THIS INFORMATION IN THE STRICTEST CONFIDENCE. THE CONTENTS SHALL NOT BE REPRODUCED, COPIED NOR DIVULGED TO ANY THIRD PARTY, IN WHOLE OR IN PART, WITHOUT THE WRITTEN CONSENT AND CONFIRMATION OF EVERSENDAI ENGINEERING.`

EVERSENDAI
109

THE INFORMATION CONTAINED HEREIN IS THE SOLE PROPRIETARY RIGHT OF EVERSENDAI ENGINEERING AND THE POSSESSOR AGREES TO MAINTAIN THIS INFORMATION IN THE STRICTEST CONFIDENCE. THE CONTENTS SHALL NOT BE REPRODUCED, COPIED NOR DIVULGED TO ANY THIRD PARTY, IN WHOLE OR IN PART, WITHOUT THE WRITTEN CONSENT AND CONFIRMATION OF EVERSENDAI ENGINEERING.

EVERSENDAI

BURJ KHALIFA SPIRE

110

THE INFORMATION CONTAINED HEREIN IS THE SOLE PROPRIETARY RIGHT OF EVERSENDAI ENGINEERING AND THE POSSESSOR AGREES TO MAINTAIN THIS INFORMATION IN THE STRICTEST CONFIDENCE. THE CONTENTS SHALL NOT BE REPRODUCED, COPIED NOR DIVULGED TO ANY THIRD PARTY, IN WHOLE OR IN PART, WITHOUT THE WRITTEN CONSENT AND CONFIRMATION OF EVERSENDAI ENGINEERING.

EVERSENDAI

BURJ KHALIFA SPIRE

111

THE INFORMATION CONTAINED HEREIN IS THE SOLE PROPRIETARY RIGHT OF EVERSENDAI ENGINEERING AND THE POSSESSOR AGREES TO MAINTAIN THIS INFORMATION IN THE STRICTEST CONFIDENCE. THE CONTENTS SHALL NOT BE REPRODUCED, COPIED NOR DIVULGED TO ANY THIRD PARTY, IN WHOLE OR IN PART, WITHOUT THE WRITTEN CONSENT AND CONFIRMATION OF EVERSENDAI ENGINEERING.

EVERSENDAI

BURJ KHALIFA SPIRE

112

THE INFORMATION CONTAINED HEREIN IS THE SOLE PROPRIETARY RIGHT OF EVERSENDAI ENGINEERING AND THE POSSESSOR AGREES TO MAINTAIN THIS INFORMATION IN THE STRICTEST CONFIDENCE. THE CONTENTS SHALL NOT BE REPRODUCED, COPIED NOR DIVULGED TO ANY THIRD PARTY, IN WHOLE OR IN PART, WITHOUT THE WRITTEN CONSENT AND CONFIRMATION OF EVERSENDAI ENGINEERING.

EVERSENDAI

BURJ KHALIFA SPIRE

113

THE INFORMATION CONTAINED HEREIN IS THE SOLE PROPRIETARY RIGHT OF EVERSENDAI ENGINEERING AND THE POSSESSOR AGREES TO MAINTAIN THIS INFORMATION IN THE STRICTEST CONFIDENCE. THE CONTENTS SHALL NOT BE REPRODUCED, COPIED NOR DIVULGED TO ANY THIRD PARTY, IN WHOLE OR IN PART, WITHOUT THE WRITTEN CONSENT AND CONFIRMATION OF EVERSENDAI ENGINEERING.

EVERSENDAI

BURJ KHALIFA SPIRE

114

THE INFORMATION CONTAINED HEREIN IS THE SOLE PROPRIETARY RIGHT OF EVERSENDAI ENGINEERING AND THE POSSESSOR AGREES TO MAINTAIN THIS INFORMATION IN THE STRICTEST CONFIDENCE. THE CONTENTS SHALL NOT BE REPRODUCED, COPIED NOR DIVULGED TO ANY THIRD PARTY, IN WHOLE OR IN PART, WITHOUT THE WRITTEN CONSENT AND CONFIRMATION OF EVERSENDAI ENGINEERING.

EVERSENDAI

BURJ KHALIFA SPIRE

115

THE INFORMATION CONTAINED HEREIN IS THE SOLE PROPRIETARY RIGHT OF EVERSENDAI ENGINEERING AND THE POSSESSOR AGREES TO MAINTAIN THIS INFORMATION IN THE STRICTEST CONFIDENCE. THE CONTENTS SHALL NOT BE REPRODUCED, COPIED NOR DIVULGED TO ANY THIRD PARTY, IN WHOLE OR IN PART, WITHOUT THE WRITTEN CONSENT AND CONFIRMATION OF EVERSENDAI ENGINEERING.

EVERSENDAI

BURJ KHALIFA SPIRE

116

THE INFORMATION CONTAINED HEREIN IS THE SOLE PROPRIETARY RIGHT OF EVERSENDAI ENGINEERING AND THE POSSESSOR AGREES TO MAINTAIN THIS INFORMATION IN THE STRICTEST CONFIDENCE. THE CONTENTS SHALL NOT BE REPRODUCED, COPIED NOR DIVULGED TO ANY THIRD PARTY, IN WHOLE OR IN PART, WITHOUT THE WRITTEN CONSENT AND CONFIRMATION OF EVERSENDAI ENGINEERING.

EVERSENDAI

BURJ KHALIFA SPIRE

117

THE INFORMATION CONTAINED HEREIN IS THE SOLE PROPRIETARY RIGHT OF EVERSENDAI ENGINEERING AND THE POSSESSOR AGREES TO MAINTAIN THIS INFORMATION IN THE STRICTEST CONFIDENCE. THE CONTENTS SHALL NOT BE REPRODUCED, COPIED NOR DIVULGED TO ANY THIRD PARTY, IN WHOLE OR IN PART, WITHOUT THE WRITTEN CONSENT AND CONFIRMATION OF EVERSENDAI ENGINEERING.

EVERSENDAI

BURJ KHALIFA SPIRE

118

THE INFORMATION CONTAINED HEREIN IS THE SOLE PROPRIETARY RIGHT OF EVERSENDAI ENGINEERING AND THE POSSESSOR AGREES TO MAINTAIN THIS INFORMATION IN THE STRICTEST CONFIDENCE. THE CONTENTS SHALL NOT BE REPRODUCED, COPIED NOR DIVULGED TO ANY THIRD PARTY, IN WHOLE OR IN PART, WITHOUT THE WRITTEN CONSENT AND CONFIRMATION OF EVERSENDAI ENGINEERING.

EVERSENDAI

BURJ KHALIFA SPIRE

119

THE INFORMATION CONTAINED HEREIN IS THE SOLE PROPRIETARY RIGHT OF EVERSENDAI ENGINEERING AND THE POSSESSOR AGREES TO MAINTAIN THIS INFORMATION IN THE STRICTEST CONFIDENCE. THE CONTENTS SHALL NOT BE REPRODUCED, COPIED NOR DIVULGED TO ANY THIRD PARTY, IN WHOLE OR IN PART, WITHOUT THE WRITTEN CONSENT AND CONFIRMATION OF EVERSENDAI ENGINEERING.

EVERSENDAI
120

THE INFORMATION CONTAINED HEREIN IS THE SOLE PROPRIETARY RIGHT OF EVERSENDAI ENGINEERING AND THE POSSESSOR AGREES TO MAINTAIN THIS INFORMATION IN THE STRICTEST CONFIDENCE. THE CONTENTS SHALL NOT BE REPRODUCED, COPIED NOR DIVULGED TO ANY THIRD PARTY, IN WHOLE OR IN PART, WITHOUT THE WRITTEN CONSENT AND CONFIRMATION OF EVERSENDAI ENGINEERING.

EVERSENDAI
121

THE INFORMATION CONTAINED HEREIN IS THE SOLE PROPRIETARY RIGHT OF EVERSENDAI ENGINEERING AND THE POSSESSOR AGREES TO MAINTAIN THIS INFORMATION IN THE STRICTEST CONFIDENCE. THE CONTENTS SHALL NOT BE REPRODUCED, COPIED NOR DIVULGED TO ANY THIRD PARTY, IN WHOLE OR IN PART, WITHOUT THE WRITTEN CONSENT AND CONFIRMATION OF EVERSENDAI ENGINEERING.

EVERSENDAI
122

THE INFORMATION CONTAINED HEREIN IS THE SOLE PROPRIETARY RIGHT OF EVERSENDAI ENGINEERING AND THE POSSESSOR AGREES TO MAINTAIN THIS INFORMATION IN THE STRICTEST CONFIDENCE. THE CONTENTS SHALL NOT BE REPRODUCED, COPIED NOR DIVULGED TO ANY THIRD PARTY, IN WHOLE OR IN PART, WITHOUT THE WRITTEN CONSENT AND CONFIRMATION OF EVERSENDAI ENGINEERING.

EVERSENDAI

BURJ KHALIFA SPIRE

123

THE INFORMATION CONTAINED HEREIN IS THE SOLE PROPRIETARY RIGHT OF EVERSENDAI ENGINEERING AND THE POSSESSOR AGREES TO MAINTAIN THIS INFORMATION IN THE STRICTEST CONFIDENCE. THE CONTENTS SHALL NOT BE REPRODUCED, COPIED NOR DIVULGED TO ANY THIRD PARTY, IN WHOLE OR IN PART, WITHOUT THE WRITTEN CONSENT AND CONFIRMATION OF EVERSENDAI ENGINEERING.

EVERSENDAI
124

THE INFORMATION CONTAINED HEREIN IS THE SOLE PROPRIETARY RIGHT OF EVERSENDAI ENGINEERING AND THE POSSESSOR AGREES TO MAINTAIN THIS INFORMATION IN THE STRICTEST CONFIDENCE. THE CONTENTS SHALL NOT BE REPRODUCED, COPIED NOR DIVULGED TO ANY THIRD PARTY, IN WHOLE OR IN PART, WITHOUT THE WRITTEN CONSENT AND CONFIRMATION OF EVERSENDAI ENGINEERING.

EVERSENDAI

BURJ KHALIFA SPIRE

125

THE INFORMATION CONTAINED HEREIN IS THE SOLE PROPRIETARY RIGHT OF EVERSENDAI ENGINEERING AND THE POSSESSOR AGREES TO MAINTAIN THIS INFORMATION IN THE STRICTEST CONFIDENCE. THE CONTENTS SHALL NOT BE REPRODUCED, COPIED NOR DIVULGED TO ANY THIRD PARTY, IN WHOLE OR IN PART, WITHOUT THE WRITTEN CONSENT AND CONFIRMATION OF EVERSENDAI ENGINEERING.

EVERSENDAI
126

THE INFORMATION CONTAINED HEREIN IS THE SOLE PROPRIETARY RIGHT OF EVERSENDAI ENGINEERING AND THE POSSESSOR AGREES TO MAINTAIN THIS INFORMATION IN THE STRICTEST CONFIDENCE. THE CONTENTS SHALL NOT BE REPRODUCED, COPIED NOR DIVULGED TO ANY THIRD PARTY, IN WHOLE OR IN PART, WITHOUT THE WRITTEN CONSENT AND CONFIRMATION OF EVERSENDAI ENGINEERING.

EVERSENDAI
127

THE INFORMATION CONTAINED HEREIN IS THE SOLE PROPRIETARY RIGHT OF EVERSENDAI ENGINEERING AND THE POSSESSOR AGREES TO MAINTAIN THIS INFORMATION IN THE STRICTEST CONFIDENCE. THE CONTENTS SHALL NOT BE REPRODUCED, COPIED NOR DIVULGED TO ANY THIRD PARTY, IN WHOLE OR IN PART, WITHOUT THE WRITTEN CONSENT AND CONFIRMATION OF EVERSENDAI ENGINEERING.

EVERSENDAI

BURJ KHALIFA SPIRE

128

EVERSENDAI

BURJ KHALIFA SPIRE

129

THE INFORMATION CONTAINED HEREIN IS THE SOLE PROPRIETARY RIGHT OF EVERSENDAI ENGINEERING AND THE POSSESSOR AGREES TO MAINTAIN THIS INFORMATION IN THE STRICTEST CONFIDENCE. THE CONTENTS SHALL NOT BE REPRODUCED, COPIED NOR DIVULGED TO ANY THIRD PARTY, IN WHOLE OR IN PART, WITHOUT THE WRITTEN CONSENT AND CONFIRMATION OF EVERSENDAI ENGINEERING.

EVERSENDAI
130

EVERSENDAI

THANK YOU