Perumahan
Developer
:
:
No
Jenis Pekerjaan
A
B
C
D
E
F
G
H
I
PEKERJAAN PERSIAPAN
PEKERJAAN TANAH
PEKERJAAN BETON DAN PASANGAN
PEKERJAAN SANITAIR
PEKERJAAN PLAFOND
PEKERJAAN LISTRIK
PEKERJAAN KUSEN, PINTU & JENDELA
PEKERJAAN ATAP
PEKERJAAN FINISHING
TOTAL
Dibulatkan
Terbilang :
### Seratus enam puluh juta rupiah ###
Catatan :
- Harga sudah termasuk Pajak, Keuntungan dan Pungutan Resmi lainnya.
Jumlah Harga
(Rp)
c
4,440,940.52
1,178,327.50
75,500,974.75
2,375,000.00
8,707,732.90
8,722,000.00
10,091,801.14
44,175,514.05
4,808,160.05
160,000,450.91
160,000,000.00
:
:
No
Jenis Pekerjaan
Satuan
Volume
Harga Satuan
(Rp)
e
PEKERJAAN PERSIAPAN
1 Pembersihan lokasi
2 Pemasangan Bouwplank
3 IMB (1%)
m2
m'
Ls
50.00
55.50
1.00
7,750.00
47,847.80
1,397,887.62
sub total
387,500.00
2,655,552.90
1,397,887.62
4,440,940.52
PEKERJAAN TANAH
1 Galian tanah pondasi
2 Urugan kembali
3 Urugan pasir di bawah lantai
m3
m3
m3
18.04
6.94
4.98
35,375.00
11,791.67
92,150.00
638,076.56
81,804.69
458,446.25
1,178,327.50
sub total
C
m3
10.41
386,495.00
4,021,963.59
m3
m3
m3
m3
m3
m3
m2
m2
m2
m2
m2
m2
m2
m'
Unit
0.79
1.25
0.86
1.10
0.13
0.05
208.96
417.91
47.50
2.25
7.05
3.56
13.49
11.50
16.00
2,696,158.35
7,228,491.68
2,696,158.35
12,518,427.03
12,600,970.22
519,748.21
57,724.54
50,876.20
119,886.11
117,361.00
121,072.00
121,228.60
121,228.60
10,662.15
10,662.15
sub total
2,135,357.41
9,037,555.30
2,327,539.58
13,792,176.98
1,663,328.07
27,286.78
12,061,903.42
21,261,799.93
5,694,590.28
264,062.25
853,557.60
431,573.82
1,635,070.74
122,614.67
170,594.32
75,500,974.75
PEKERJAAN SANITAIR
Bak mandi lapis keramik
Kloset Jongkok
Soap holder
Floor Drain
Septictank
Sumur Gali
Unit
Unit
Unit
Unit
Unit
Unit
1.00
1.00
1.00
1.00
1.00
1.00
600,000.00
245,000.00
15,000.00
35,000.00
950,000.00
500,000.00
sub total
600,000.00
245,000.00
15,000.00
35,000.00
980,000.00
500,000.00
2,375,000.00
PEKERJAAN PLAFOND
1 Pekerjaan Rangka Plafond
2 Pekerjaan Penutup Plafond
m2
m2
76.07
76.07
78,400.00
36,070.00
5,963,888.00
2,743,844.90
8,707,732.90
1
2
3
4
5
6
7
8
9
10
11
D
1
2
3
4
5
6
E
Jumlah Harga
(Rp)
f
sub total
No
Jenis Pekerjaan
Satuan
Volume
a
F
1
2
3
4
5
6
7
8
G
1
2
3
4
5
6
7
8
9
10
11
12
H
1
2
3
4
5
I
Harga Satuan
(Rp)
e
Jumlah Harga
(Rp)
f
PEKERJAAN LISTRIK
Ijin Penyambungan Daya
Pemasangan Zakering Case
Instalasi Titik Lampu
Instalasi Stop Kontak
Sakelar Tunggal
Sakelar Ganda
Lampu Pijar
Lampu TL
Ls
Unit
Titik
Titik
Bh
Bh
Bh
Bh
1.00
1.00
9.00
4.00
5.00
2.00
1.00
8.00
4,500,000.00
63,000.00
250,000.00
275,000.00
72,000.00
90,000.00
7,000.00
32,750.00
sub total
4,500,000.00
63,000.00
2,250,000.00
1,100,000.00
360,000.00
180,000.00
7,000.00
262,000.00
8,722,000.00
m3
m2
m2
m2
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Unit
0.36
8.00
6.38
3.57
5.00
18.00
18.00
18.00
18.00
9.00
2.00
1.00
6,958,250.00
397,900.00
280,940.00
91,773.75
125,000.00
15,000.00
7,500.00
15,000.00
10,000.00
15,000.00
32,000.00
600,000.00
sub total
2,511,928.25
3,181,210.50
1,792,397.20
327,265.19
625,000.00
270,000.00
135,000.00
270,000.00
180,000.00
135,000.00
64,000.00
600,000.00
10,091,801.14
PEKERJAAN ATAP
Pekerjaan Rangka Kuda-Kuda
Pekerjaan Gording
Pekerjaan Kasau Reng
Pemasangan Listplank 2/20
Pemasangan Atap Genteng Metal
m3
m3
m2
m'
m2
6.10
0.72
94.75
38.80
94.75
4,381,100.00
4,001,700.00
69,280.00
73,403.00
54,515.00
sub total
26,727,752.43
2,869,994.23
6,564,366.60
2,848,036.40
5,165,364.39
44,175,514.05
m2
m2
m2
128.15
307.10
76.07
9,481.50
9,377.50
9,377.50
1,215,006.82
2,879,806.81
713,346.43
4,808,160.05
160,000,450.91
PEKERJAAN FINISHING
1 Cat tembok luar
2 Cat tembok dalam
3 Cat Plafond
sub total
TOTAL
:
:
No
Satuan
Uraian
I
1
2
3
4
5
6
7
OH
OH
OH
OH
OH
OH
OH
UPAH
Kepala Tukang
Mandor
Pekerja
Tukang Batu
Tukang Besi
Tukang Cat
Tukang Kayu
Harga Satuan
(Rp)
d
70,000.00
65,000.00
45,000.00
50,000.00
50,000.00
50,000.00
50,000.00
:
:
No
Satuan
a
II
b
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
ltr
m3
Buah
m3
Kg
Kg
Kg
Kg
Kg
Btg
m2
Kg
m3
m3
m3
m3
m3
Kg
kg
Ltr
Kg
kg
Kg
Kg
m3
m3
Kg
Lbr
Kg
Lbr
Kg
Lbr
Dos
Dos
Harga Satuan
(Rp)
d
8.50
3,000,000.00
1,500.00
95,000.00
9,750.00
9,500.00
6,000.00
12,800.00
12,400.00
14,000.00
75,000.00
12,000.00
81,900.00
5,000,000.00
5,160,000.00
775,000.00
5,160,000.00
140.74
15,000.00
18,000.00
15,000.00
11,000.00
30,000.00
85.71
95,000.00
65,000.00
9,000.00
135,000.00
840.00
26,000.00
7,500.00
65,000.00
40,000.00
35,000.00
DAFTAR ANALISA
Perumahan
Developer
:
:
NO
KOEFISIEN
SATUAN
URAIAN
1.0000 m2
0.1000 OH
0.0500 OH
1.0000
0.0120
0.0200
0.0070
0.1000
0.1000
0.0100
0.0050
m'
m3
Kg
m3
OH
OH
OH
OH
HARGA SATUAN
(Rp)
e
JUMLAH
(Rp)
f
45,000.00
65,000.00
7,750.00
4,500.00
3,250.00
81,900.00
11,000.00
5,160,000.00
50,000.00
45,000.00
70,000.00
65,000.00
47,847.80
982.80
220.00
36,120.00
5,000.00
4,500.00
700.00
325.00
1.0000 m3
0.7500 OH
0.0250 OH
45,000.00
65,000.00
35,375.00
33,750.00
1,625.00
1.0000 m3
0.2500 OH
0.0083 OH
45,000.00
65,000.00
11,791.67
11,250.00
541.67
1.0000
1.2000
0.3000
0.0100
m3
m3
OH
OH
URUGAN PASIR
Pasir Urug
Pekerja
Mandor
65,000.00
45,000.00
65,000.00
92,150.00
78,000.00
13,500.00
650.00
1.0000
1.2000
136.0000
0.5440
1.5000
0.6000
0.0600
0.0750
m3
m3
Kg
m3
OH
OH
OH
OH
95,000.00
840.00
95,000.00
45,000.00
50,000.00
70,000.00
65,000.00
386,495.00
114,000.00
114,240.00
51,680.00
67,500.00
30,000.00
4,200.00
4,875.00
1.0000
247.0000
869.0000
999.0000
215.0000
1.6500
0.2750
0.0280
0.0830
m3
Kg
Kg
Kg
ltr
OH
OH
OH
OH
BETON K 100
Portland Semen
Pasir Beton
Kerikil (maksimum 30 mm)
Air
Pekerja
Tukang Batu
Kepala Tukang
Mandor
840.00
85.71
140.74
8.50
45,000.00
50,000.00
70,000.00
65,000.00
519,748.21
207,480.00
74,485.71
140,600.00
1,827.50
74,250.00
13,750.00
1,960.00
5,395.00
DAFTAR ANALISA
Perumahan
Developer
NO
a
8
10
10
11
:
:
KOEFISIEN
9,750.00
12,000.00
45,000.00
50,000.00
70,000.00
65,000.00
JUMLAH
(Rp)
f
111,575.00
102,375.00
1,800.00
3,150.00
3,500.00
490.00
260.00
775,000.00
11,000.00
18,000.00
45,000.00
50,000.00
70,000.00
65,000.00
79,885.00
34,875.00
3,300.00
1,800.00
23,400.00
13,000.00
1,820.00
1,690.00
BEKISTING KOLOM
Kayu Lanan (Papan)
Paku Biasa 2" - 5 "
Minyak Bekisting
Kayu Meranti (Balok)
Plywood tebal 9mm
Dolken Kayu Galam diameter 8 - 10 cm / 4 m
Pekerja
Tukang Kayu
Kepala Tukang
Mandor
775,000.00
11,000.00
18,000.00
3,000,000.00
135,000.00
14,000.00
45,000.00
50,000.00
70,000.00
65,000.00
209,905.00
31,000.00
4,400.00
3,600.00
45,000.00
47,250.00
28,000.00
29,700.00
16,500.00
2,310.00
2,145.00
m2
m3
Kg
Ltr
m3
Lbr
Btg
OH
OH
OH
OH
BEKISTING PLAT
Kayu Lanan (Papan)
Paku Biasa 2" - 5 "
Minyak Bekisting
Kayu Meranti (Balok)
Plywood tebal 9mm
Dolken Kayu Galam diameter 8 - 10 cm / 4 m
Pekerja
Tukang Kayu
Kepala Tukang
Mandor
775,000.00
11,000.00
18,000.00
3,000,000.00
135,000.00
14,000.00
45,000.00
50,000.00
70,000.00
65,000.00
265,905.00
31,000.00
4,400.00
3,600.00
45,000.00
47,250.00
84,000.00
29,700.00
16,500.00
2,310.00
2,145.00
m3
m3
Kg
m2
Sloof
Beton K 100
Pembesian
Bekisting
519,748.21
11,157.50
79,885.00
2,696,158.35
535,340.66
1,095,684.35
1,065,133.33
SATUAN
URAIAN
b
10.0000
10.5000
0.1500
0.0700
0.0700
0.0070
0.0040
kg
Kg
Kg
OH
OH
OH
OH
c
PEMBESIAN
Besi Beton (polos/ulir)
Kawat Beton
Pekerja
Tukang Besi
Kepala Tukang
Mandor
1.0000
0.0450
0.3000
0.1000
0.5200
0.2600
0.0260
0.0260
m2
m3
Kg
Ltr
OH
OH
OH
OH
1.0000
0.0400
0.4000
0.2000
0.0150
0.3500
2.0000
0.6600
0.3300
0.0330
0.0330
m2
m3
Kg
Ltr
m3
Lbr
Btg
OH
OH
OH
OH
1.0000
0.0400
0.4000
0.2000
0.0150
0.3500
6.0000
0.6600
0.3300
0.0330
0.0330
1.0000
1.0300
98.2016
13.3333
HARGA SATUAN
(Rp)
e
DAFTAR ANALISA
Perumahan
Developer
NO
a
12
13
14
15
16
17
18
19
:
:
b
1.0000
1.0300
98.2016
26.6667
m3
m3
Kg
m2
Kolom
Beton K 100
Pembesian
Bekisting
519,748.21
11,157.50
209,905.00
JUMLAH
(Rp)
f
7,228,491.68
535,340.66
1,095,684.35
5,597,466.67
1.0000
1.0300
98.2016
13.3333
m3
m3
Kg
m2
Balok
Beton K 100
Pembesian
Bekisting
519,748.21
11,157.50
79,885.00
2,696,158.35
535,340.66
1,095,684.35
1,065,133.33
1.0000
1.0300
14.7960
44.4444
m3
m3
Kg
m2
Plat 12 cm
Beton K 100
Pembesian
Bekisting
519,748.21
11,157.50
265,905.00
12,518,427.03
535,340.66
165,086.37
11,818,000.00
1.0000
1.0300
22.1940
44.4444
m3
m3
Kg
m2
Plat 8 cm
Beton K 100
Pembesian
Bekisting
519,748.21
11,157.50
265,905.00
12,600,970.22
535,340.66
247,629.56
11,818,000.00
1.0000
12.6566
13.0000
0.0793
0.2500
0.1250
0.0250
0.0125
m2
Kg
Buah
m3
OH
OH
OH
OH
840.00
1,500.00
95,000.00
45,000.00
50,000.00
70,000.00
65,000.00
57,724.54
10,631.52
19,500.00
7,530.52
11,250.00
6,250.00
1,750.00
812.50
1.0000
3.6800
0.0230
0.4400
0.1550
0.0150
0.0200
m2
Kg
m3
OH
OH
OH
OH
PLESTERAN 1 : 3 TEBAl 15 mm
Portland Semen
Pasir Pasang
Pekerja
Tukang Batu
Kepala Tukang
Mandor
840.00
95,000.00
45,000.00
50,000.00
70,000.00
65,000.00
35,176.20
3,091.20
2,185.00
19,800.00
7,750.00
1,050.00
1,300.00
1.0000
3.2500
0.1500
0.1000
0.0100
0.0080
m2
Kg
OH
OH
OH
OH
ACIAN
Portland Semen
Pekerja
Tukang Batu
Kepala Tukang
Mandor
840.00
45,000.00
50,000.00
70,000.00
65,000.00
15,700.00
2,730.00
6,750.00
5,000.00
700.00
520.00
PLESTERAN + ACIAN
Plesteran
Acian
35,176.20
15,700.00
50,876.20
35,176.20
15,700.00
KOEFISIEN
SATUAN
URAIAN
1.0000 m2
1.0000 m2
1.0000 m2
HARGA SATUAN
(Rp)
e
DAFTAR ANALISA
Perumahan
Developer
NO
a
20
21
22
23
24
25
:
:
KOEFISIEN
35,176.20
15,700.00
JUMLAH
(Rp)
f
121,228.60
105,528.60
15,700.00
BANBANAN
Plesteran
Acian
35,176.20
15,700.00
10,662.15
7,914.65
2,747.50
ORNAMEN ANGIN-ANGIN
Plesteran
Acian
35,176.20
15,700.00
10,662.15
7,914.65
2,747.50
SATUAN
URAIAN
b
c
1.0000 m2
3.0000 m2
1.0000 m2
d
ORNAMEN KOLOM & ENTRANCE
Plesteran
Acian
1.0000 m'
0.2250 m2
0.1750 m2
1.0000 Unit
0.2250 m2
0.1750 m2
HARGA SATUAN
(Rp)
e
1.0000
11.8700
10.0000
0.0450
1.5000
0.6200
0.3500
0.0350
0.0300
m2
Buah
Kg
m3
Kg
OH
OH
OH
OH
KERAMIK LANTAI 30 x 30
Ubin Keramik 30 x 30 cm
Portland Semen
Pasir Pasang
Semen Warna
Pekerja
Tukang Batu
Kepala Tukang
Mandor
3,888.89
840.00
95,000.00
7,500.00
45,000.00
50,000.00
70,000.00
65,000.00
119,886.11
46,161.11
8,400.00
4,275.00
11,250.00
27,900.00
17,500.00
2,450.00
1,950.00
1.0000
26.5000
10.4000
0.0450
1.6200
0.6200
0.3500
0.0350
0.0300
m2
Buah
Kg
m3
Kg
OH
OH
OH
OH
KERAMIK LANTAI 20 x 20
Ubin Keramik 20 x 20 cm
Portland Semen
Pasir Pasang
Semen Warna
Pekerja
Tukang Batu
Kepala Tukang
Mandor
1,600.00
840.00
95,000.00
7,500.00
45,000.00
50,000.00
70,000.00
65,000.00
117,361.00
42,400.00
8,736.00
4,275.00
12,150.00
27,900.00
17,500.00
2,450.00
1,950.00
1.0000
26.5000
9.3000
0.0180
1.9400
0.6000
0.4500
0.0450
0.0300
m2
Buah
Kg
m3
Kg
OH
OH
OH
OH
KERAMIK DINDING 20 x 20
Ubin Keramik 20 x 20 cm
Portland Semen
Pasir Pasang
Semen Warna
Pekerja
Tukang Batu
Kepala Tukang
Mandor
1,600.00
840.00
95,000.00
7,500.00
45,000.00
50,000.00
70,000.00
65,000.00
121,072.00
42,400.00
7,812.00
1,710.00
14,550.00
27,000.00
22,500.00
3,150.00
1,950.00
DAFTAR ANALISA
Perumahan
Developer
NO
a
27
28
29
30
31
32
:
:
3,000,000.00
11,000.00
45,000.00
50,000.00
70,000.00
65,000.00
JUMLAH
(Rp)
f
78,400.00
48,900.00
2,750.00
9,000.00
15,000.00
2,100.00
650.00
65,000.00
30,000.00
45,000.00
50,000.00
70,000.00
65,000.00
36,070.00
23,660.00
3,300.00
3,150.00
5,000.00
700.00
260.00
PEKERJAAN KUSEN
Kayu Klas I (Ulin) , Balok
Paku Biasa 2" - 5 "
Lem Kayu
Pekerja
Tukang Kayu
Kepala Tukang
Mandor
5,000,000.00
11,000.00
15,000.00
45,000.00
50,000.00
70,000.00
65,000.00
6,958,250.00
5,500,000.00
13,750.00
15,000.00
270,000.00
1,000,000.00
140,000.00
19,500.00
m2
m3
kg
OH
OH
OH
OH
5,160,000.00
15,000.00
45,000.00
50,000.00
70,000.00
65,000.00
397,900.00
206,400.00
750.00
45,000.00
125,000.00
17,500.00
3,250.00
1.0000
0.0240
0.3000
0.8000
2.0000
0.2000
0.0400
m2
m3
kg
OH
OH
OH
OH
5,160,000.00
15,000.00
45,000.00
50,000.00
70,000.00
65,000.00
280,940.00
123,840.00
4,500.00
36,000.00
100,000.00
14,000.00
2,600.00
1.0000
1.1000
0.0150
0.1500
0.0150
0.0008
m2
m2
OH
OH
OH
OH
75,000.00
45,000.00
50,000.00
70,000.00
65,000.00
91,773.75
82,500.00
675.00
7,500.00
1,050.00
48.75
KOEFISIEN
SATUAN
URAIAN
b
1.0000
0.0163
0.2500
0.2000
0.3000
0.0300
0.0100
m2
m3
Kg
OH
OH
OH
OH
c
RANGKA PLAFOND
Kayu Meranti (Balok)
Paku Biasa 2" - 5 "
Pekerja
Tukang Kayu
Kepala Tukang
Mandor
1.0000
0.3640
0.1100
0.0700
0.1000
0.0100
0.0040
m2
Lbr
Kg
OH
OH
OH
OH
1.0000
1.1000
1.2500
1.0000
6.0000
20.0000
2.0000
0.3000
m3
m3
kg
kg
OH
OH
OH
OH
1.0000
0.0400
0.0500
1.0000
2.5000
0.2500
0.0500
HARGA SATUAN
(Rp)
e
DAFTAR ANALISA
Perumahan
Developer
NO
a
33
34
35
36
37
:
:
b
1.0000
1.1000
15.0000
5.6000
4.0000
12.0000
1.2000
0.2000
m3
m3
Kg
Kg
OH
OH
OH
OH
KUDA-KUDA KAYU
Kayu Meranti (Balok)
Besi Strip
Paku Biasa 2" - 5 "
Pekerja
Tukang Kayu
Kepala Tukang
Mandor
3,000,000.00
9,500.00
11,000.00
45,000.00
50,000.00
70,000.00
65,000.00
JUMLAH
(Rp)
f
4,381,100.00
3,300,000.00
142,500.00
61,600.00
180,000.00
600,000.00
84,000.00
13,000.00
1.0000
1.1000
15.0000
3.0000
2.4000
7.2000
0.7200
0.1200
m3
m3
Kg
Kg
OH
OH
OH
OH
PEKERJAAN GORDING
Kayu Meranti (Balok)
Besi Strip
Paku Biasa 2" - 5 "
Pekerja
Tukang Kayu
Kepala Tukang
Mandor
3,000,000.00
9,500.00
11,000.00
45,000.00
50,000.00
70,000.00
65,000.00
4,001,700.00
3,300,000.00
142,500.00
33,000.00
108,000.00
360,000.00
50,400.00
7,800.00
1.0000
0.0182
0.2000
0.1200
0.1200
0.0120
0.0060
m2
m3
Kg
OH
OH
OH
OH
3,000,000.00
11,000.00
45,000.00
50,000.00
70,000.00
65,000.00
69,280.00
54,450.00
2,200.00
5,400.00
6,000.00
840.00
390.00
1.0000
0.0108
0.1000
0.1000
0.2000
0.0250
0.0050
m'
m3
Kg
OH
OH
OH
OH
PEKERJAAN LISTPLANK
Kayu klas I (Kruing), papan
Paku Biasa 2" - 5 "
Pekerja
Tukang Kayu
Kepala Tukang
Mandor
5,160,000.00
11,000.00
45,000.00
50,000.00
70,000.00
65,000.00
73,403.00
55,728.00
1,100.00
4,500.00
10,000.00
1,750.00
325.00
1.0000
1.6200
0.1200
0.1400
0.0670
0.0070
0.0070
m2
Lbr
Kg
OH
OH
OH
OH
26,000.00
15,000.00
45,000.00
50,000.00
70,000.00
65,000.00
54,515.00
42,120.00
1,800.00
6,300.00
3,350.00
490.00
455.00
KOEFISIEN
SATUAN
URAIAN
HARGA SATUAN
(Rp)
e
DAFTAR ANALISA
Perumahan
Developer
NO
a
38
39
:
:
KOEFISIEN
SATUAN
c
b
1.0000
0.1000
0.1000
0.2600
0.0200
0.0630
0.0063
0.0025
m2
Kg
Kg
Kg
OH
OH
OH
OH
d
CAT TEMBOK LUAR
Plamir
Cat Dasar
Cat Penutup 2 kali (Exterior)
Pekerja
Tukang Cat
Kepala Tukang
Mandor
1.0000
0.1000
0.1000
0.2600
0.0200
0.0630
0.0063
0.0025
m2
Kg
Kg
Kg
OH
OH
OH
OH
HARGA SATUAN
(Rp)
e
9,000.00
6,000.00
12,800.00
45,000.00
50,000.00
70,000.00
65,000.00
JUMLAH
(Rp)
f
9,481.50
900.00
600.00
3,328.00
900.00
3,150.00
441.00
162.50
9,000.00
6,000.00
12,400.00
45,000.00
50,000.00
70,000.00
65,000.00
9,377.50
900.00
600.00
3,224.00
900.00
3,150.00
441.00
162.50