Blow Room Card A/C Plant & Filter


CMM, Air Changes & Load Study
Executive Summary
In order to maintain waste suction pressure in card machines, especially the takerin waste pipe motor pulley (335 mm) & machine pulley (355 mm) of the 2 radial
fans have been interchanged with (355 mm) being the motor pulley & (335 mm)
the machine pulley. Following report concludes the impact on CMM, Air Changes
& Load after the adjustments.

Compiled By: Umer Farooq


Riaz Textile Mills Limited 1 | P a g e
7/15/2012

Card Machine Pressure Before & After Adjustment:


Pressure
Machine
#

Taker-In (Pa) Set 650 50

Fly (Pa) Set 400 50

Coiler (Pa) Set 120 30

Before
760

After
840

Before
600

After
600

Before
120

After
120

700

840

600

600

120

120

700

840

600

640

120

120

660

840

600

640

120

110

620

840

600

600

120

120

600

840

600

600

120

110

520

800

480

580

120

120

760

860

600

600

120

120

700

860

600

640

120

110

10

700

860

600

600

120

120

11

760

800

600

600

120

120

12

760

860

600

620

120

120

13

740

800

600

640

120

120

14

760

800

600

620

120

110

15

760

720

600

620

120

120

16

660

740

560

600

120

130

17

580

740

480

600

120

120

18

740

820

600

620

120

130

19

720

860

600

660

120

140

20

700

860

600

600

120

120

Drastic increase in pressure was observed after the interchange of radial fan motor & fan pulley was done.
Radial Fan Pulley Dia = 355mm

Motor Pulley Dia = 335 mm

There still are certain cards which still need to be fine tuned (e.g 15, 16 & 17) in order to ensure constant
pressure throughout the cards ensuring consistent waste suction.

2|Page

Blow Room Card Pre-Filter Pressure:


Pipe #

Machine

Pre-Filter # 1
Before

After

Pipe #

Machine

Pre-Filter # 2
Before

After

Coiler Waste 1 3

1760

1800

B-60 Dust

240

300

Fly Waste 1 3

1800

1800

Licker-in Fiber Comp

1640

1760

SPF # 2 Dust

1280

1300

Ring Dust Fiber Sep

1720

1800

B-11 Dust

1300

1360

MXI-10 # 1 Dust

800

880

B-70 Dust

80

120

MXI-10 # 2 Dust

280

350

Fly Fiber Sep # 2

1720

1800

SPF # 1 Dust

1760

1800

Chute Feed Dust 11 15

260

300

Chute Feed Dust 16 20

1800

1840

Fly Waste 11 13

1750

1800

Fly Waste 4 7

1680

1800

Fly Waste 14 17

1720

1820

Fly Waste 8 10

1680

1820

10

Fly Waste 18 20

1700

1840

10

Coiler Waste 7 10

1760

1800

11

Coiler Waste 14 17

1720

1800

11

Coiler Waste 4 - 6

1740

1840

12

Coiler Waste 11 13

1720

1800

12

13

Coiler Waste 18 - 20

1760

1820

13

18570

19360

Total Pressure (Pa)

15100

15990

Total Pressure (Pa)

Pipe #

Machine

Pre-Filter # 3
Before

After

Pipe #

Machine

Pre-Filter # 4
Before

After

B-60 Waste

680

840

CLC-3 # 2 Waste

840

900

Licker-in Waste 1 3

1360

1000

B-11 Waste

1140

1600

CLC-3 # 1 Waste

1340

1500

Licker-in Waste 18 20

1280

1800

Licker-in Waste 11 13

1280

1780

Chute Feed Dust 4 7

1200

1720

Licker-in Waste 14 - 17

1280

1800

Licker-in Waste 4 7

1160

1740

Licker-in Waste 8 - 10

1200

1740

10

10

11

11

12

12

13

13
6820

9500

Total Pressure (Pa)

5940

6920

Total Pressure (Pa)

3|Page

Blow Room & Card A/C Plant Fan CMM & Department Air Changes:
Blow room card A/c change in fan degrees & impact on CMM & air changes after filter pressure adjustments.
Return & Supply Fans CMM Calculation:
Blow Room / Card A/c Plant CMM Calculation

Fan
Return # 1
Return # 2
Supply # 1
Supply # 2

Air Velocity (m/s)


22.6
20.5
16.1
17.5

20.8 22
23.5 23.1
14.5 16.5
19.4 16.9

22.5
21.4
17.4

Average
Velocity
(m/s)
21.98
22.13
16.13
17.93

Fan Dia
(mm)

Degree

CMM
(m3/min)

1600
1600
1600
1400

17
17
14
20

3375.36
3398.40
2476.80
2108.96

6773.76
4585.76

4|Page

Air Changes Calculation:


Showering
Left

Velocity
(m/s)

2.3
2.5
3
5

3.1
3.1
3.5
4.4

Right
2.9
3.4
3.2
3.3

3.5
3
4.2
36

3.1
4.3
3.8
3.6

5.4

3.8
4
3.2
3.1

3.6
3.5
3.3
3.2

3.1
3.5
3.4
3.1

3.475
4.4375

Height (mm)
Length (mm)

2438.4
3048

2438.4
3048

Showering Area
(mtr2)

14.86

Summary
Showering CMH =
Department Volume =
Air Changes =

237460.17
13761.98
17.25

5|Page

Impact on Electricity Consumption:

Fans
Return # 1
Return # 2
Supply # 1
Supply # 2
Total

Blow Room / Card A/c Plant Load Calculation


Before
After
Degree
Amp
KW
Degree
Amp
KW
14
33.5
20.63
17
41.8
25.74
14
32
19.71
17
40
24.64
11
18
11.09
14
20.4
12.56
17
18.6
11.46
20
22.8
14.04
62.88
76.99

Summary
Total Load of Fans Before
Total Load of Fans After
Increase in Load
Rs / Unit of Electricity
*Daily Operating Hrs
Daily Increase in Electric Consumption (Rs)
Monthly Increase in Electric Consumption (Rs)
Yearly Increase in Electric Consumption (Rs)

% Increase in Load
19.86%
20.00%
11.76%
18.42%
18.32%

62.9
77.0
14.1
5.0
21.9
1540.8
46224.7
554696.6

* Note: Daily Operating Hours are Concidered Keeping in Veiw Weekly 15 Hours Shutdown of Blow Room
& Card Dept:

Fans
Radial Fan # 1
Radial Fan # 2
Radial Fan # 3
Radial Fan # 4
Total

Front C

Blow Room / Card Filter Plant Load Calculation


Before
After
Back C
Amp
KW
Front C Back C
32.5
20.02
54
47
54.2
33.38
58
49
50.6
31.16
80
59
52.6
32.40
85
68
116.96

Summary
Total Load of Fans Before
Total Load of Fans After
Increase in Load
Rs / Unit of Electricity
*Daily Operating Hrs
Daily Increase in Electric Consumption (Rs)
Monthly Increase in Electric Consumption (Rs)
Yearly Increase in Electric Consumption (Rs)

Amp
31.2
50.3
63.8
65.4

KW
19.22
30.98
39.29
40.28
129.77

% Increase
in Load
-4.17%
-7.75%
20.69%
19.57%
9.87%

117.0
129.8
12.8
5.0
21.9
1399.5
41985.8
503829.3
6|Page

Anda mungkin juga menyukai