Pptos 15 K
ITEM
CONTRATISTA
DESCRIPCION
ESPECIALIDAD
PPTO CONTRACTUAL
(SIN IGV)
Mayores
Metrados
Partida Nueva
Tiempo y
Materiales
Deductivos
Reclamos
Costos
PPTO PROYECTADO
Indirectos
(SIN IGV)
(Amp. De plazo)
VARIACIN (USD)
% DE VARIACIN
CIVIL
$4,281,766.00
$1,176,007.40
$251,557.68
$0.00
-$520,627.14
$0.00
$0.00
$5,188,703.94
$906,937.95
21.18%
INTERIOR MINA
CIVIL
$1,687,404.77
$600,029.09
$7,626.90
$0.00
-$404,011.18
$0.00
$129,472.50
$2,020,522.08
$333,117.31
19.74%
OOCC 15 K
CIVIL
$12,177,448.88
$1,271,392.28
$2,733,543.17
$181,266.29
-$1,201,961.19
$199,797.41
$0.00
$15,361,486.84
$3,184,037.96
26.15%
COSAPI
LINEA DE TRANSMISION
ELECTROMECANICO
$7,555,526.96
$531,344.24
$90,855.96
$0.00
-$819,695.43
$869,873.83
$0.00
$8,227,905.56
$672,378.60
8.90%
HLC
TANQUES
MECANICO
$3,895,775.78
$45,816.35
$128,815.05
$0.00
$0.00
$0.00
$932,759.52
$5,003,166.70
$1,107,390.92
28.43%
IMECON
ELECTROMECANICO
$2,210,830.65
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$2,210,830.65
$0.00
0.00%
IMECON
CIVIL
$411,966.65
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$411,966.65
$0.00
0.00%
IMECON
ELECTROMECANICO
$1,031,317.10
$0.00
$130,814.36
$0.00
$0.00
$0.00
$0.00
$1,162,131.46
$130,814.36
12.68%
IMECON
Trabajos
Electricos/Instrumentacin
ELECTRICO/INSTRUMENT
AL
$473,469.18
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$473,469.18
$0.00
0.00%
SC
BOMBAS BOOSTER
CIVIL/MECANICO
$1,623,661.53
$835,741.41
$348,221.00
$0.00
-$328,362.81
$0.00
$0.00
$2,479,261.13
$855,599.60
52.70%
JJC-SC
ELECTROMECANICO
$17,993,961.52
$224,940.56
$1,536,586.95
$251,472.63
-$2,682,758.38
$0.00
$0.00
$17,324,203.28
-$669,758.24
-3.72%
EMSUNIR
MECANICO
$410,780.00
$0.00
$129,658.29
$0.00
$0.00
$0.00
$0.00
$540,438.29
$129,658.29
31.56%
10
VyP ICE
ELECTROMECANICO
$217,072.63
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$217,072.63
$0.00
0.00%
11
SANTO DOMINGO
TRABAJOS ELECCTRICOS
ELECTRICO
$267,494.47
$80,771.76
$0.00
$0.00
$0.00
$0.00
$0.00
$348,266.23
$80,771.76
30.20%
12
FUNDICIN Y MAESTRANZA
MECANICO
$471,540.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$471,540.00
$0.00
0.00%
Total
$54,710,016.12
$61,440,964.63
$6,730,948.52
12.30%
Nota:
Neto Presupuesto 15k
Contingencia
Total Presupuesto 15k
Total Presupuesto Proyectado 15k
Variacin
% de Variacin
MONTAJE ELECTROMECNICO
FASE III AMPLIACION A 15TPD
REFORZAMIENTO DE FAJAS
TRANSPORTADORAS F3, F4 Y F5
TRABAJOS VARIOS ELECTRO/
MECANICOS
$46,109,153.40
$9,390,846.60
$55,500,000.00
$61,440,964.63
-$5,940,964.63
-10.70%
Fecha de
Aprobacin
1/31/2012
3/5/2012
3/26/2012
4/20/2012
5/15/2012
6/28/2012
Monto Total
(CD Acum Monto Total
+ CI)
(CD + CI)
$855,369.86
$855,369.86
$1,198,012.96
$2,053,382.82
$1,053,883.65
$3,107,266.47
$1,607,311.38
$4,714,577.85
$1,392,278.56
$6,106,856.41
$1,584,775.64
$7,691,632.05
7/11/2012
$160,733.43
7/23/2012
$1,185,351.75
8/15/2012
$921,300.90
8/21/2012
Pendiente
$974,317.25
$281,104.99
Saldo
$11,322,079.02
$10,124,066.06
$9,070,182.41
$7,462,871.03
$6,070,592.47
$4,485,816.83
$7,852,365.48
$9,037,717.23
$4,325,083.40
$3,139,731.65
$9,959,018.13
$10,933,335.38
$11,214,440.37
$2,218,430.75
$1,244,113.50
$963,008.51
$3,184,037.96
$848,099.29
$2,335,938.67
DESCRIPCIN
OT
RQ
O/C
MONTO
CMC20000002517
LMC2-0000004764
$181,266.29
ESTADO
Aprobado
$181,266.29
MONTO
VALORIZADO
SALDO
$0.00
$181,266.29
$0.00
$181,266.29
DESCRIPCIN
1
2
3
4
5
6
7
8
OT
3.1
3.2
RQ
CMC10000001805
CMC20000002138
CMC20000002274
CMC20000002272
CMC20000002537
O/C
MONTO
ESTADO
MONTO
VALORIZADO
SALDO
LMC1-0000002707
$19,082.35
Aprobado
$15,055.60
$4,026.75
LMC2-0000004006
$126,666.75
Aprobado
$126,666.75
$0.00
LMC2-0000004148
$380,448.20
Aprobado
$363,153.48
$17,294.72
LMC2-0000004017
$321,242.57
Aprobado
$273,792.37
$47,450.20
LMC2-0000004925
$6,332.32
Aprobado
$0.00
$6,332.32
Pendiente
$132,775.20
$0.00
$132,775.20
Pendiente
$120,464.18
$0.00
$120,464.18
Pendiente
$46,669.57
$0.00
$46,669.57
Pendiente
$68,328.81
$0.00
$68,328.81
Pendiente
$1,511,533.22
En aprobacin
$0.00
$778,668.20
$1,511,533.22
$1,954,874.97
MONTO
VALORIZADO
SALDO
$281,938.27
$0.00
9
10 Adenda N 01 Losa de Tunel, Stock Pile de Finos, Muro en Chancado Sec. y Terc.
$2,733,543.17
TIPO MAYORES METRADOS
N
DESCRIPCIN
1
2
3
Mayores Metrados-1
Mayores Metrados-2
Mayores Metrados-3
OT
1
Valorizado con
O/C Contractual
Valorizado con
O/C Contractual
RQ
CMC20000001298
LMC10000000286
LMC10000000286
O/C
MONTO
LMC2-0000002396
$281,938.27
LMC1-0000006544
$160,733.43
LMC1-0000006544
$828,720.58
ESTADO
Aprobado
Aprobado
Aprobado
$1,271,392.28
$160,733.43
$828,720.58
$0.00
$1,271,392.28
$0.00
MONTO
VALORIZADO
SALDO
-$508,928.87
$0.00
-$693,032.32
$0.00
-$1,201,961.19
$0.00
TIPO DEDUCTIVOS
N
DESCRIPCIN
1
2
Deductivo N 01
Deductivo N 02
OT
RQ
Valorizado con
O/C Contractual
Valorizado con
O/C Contractual
LMC10000000286
LMC10000000286
O/C
MONTO
LMC1-0000006544
-$508,928.87
LMC1-0000006544
-$693,032.32
ESTADO
Aprobado
Aprobado
-$1,201,961.19
TIPO RECLAMOS
N
DESCRIPCIN
1
2
3
4
5
OT
RQ
O/C
MONTO
ESTADO
Pendiente
Pendiente
Pendiente
Pendiente
Pendiente
$50,881.82
$4,842.46
$41,334.52
$76,090.40
$26,648.21
$199,797.41
MONTO
VALORIZADO
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
SALDO
$50,881.82
$4,842.46
$41,334.52
$76,090.40
$26,648.21
$199,797.41
RESUMEN CONSOLIDADO
DESCRIPCIN
OT
RQ
# O/C
MONTO
CONTRACTUAL
$12,177,448.88
MONTO
VALORIZADO
SALDO
$11,214,440.37
$963,008.51
$989,454.01
$0.00
-$1,201,961.19
$0.00
NA
LMC1-0000000286 LMC1-0000006544
CONTRACTUAL (Adicionales)
LMC1-0000000286 LMC1-0000006544
CONTRACTUAL (Deductivos)
LMC1-0000000286 LMC1-0000006544
CMC2-0000002517 LMC2-0000004764
$181,266.29
$0.00
$181,266.29
CMC1-0000001805 LMC1-0000002707
$19,082.35
$15,055.60
$4,026.75
3.1
CMC2-0000002138 LMC2-0000004006
$126,666.75
$126,666.75
$0.00
3.2
CMC2-0000002274 LMC2-0000004148
$380,448.20
$363,153.48
$17,294.72
CMC2-0000002272 LMC2-0000004017
$321,242.57
$273,792.37
$47,450.20
CMC2-0000002537 LMC2-0000004925
$6,332.32
$0.00
$6,332.32
Pendiente
Pendiente
$132,775.20
$120,464.18
$0.00
$0.00
$132,775.20
$120,464.18
Pendiente
$46,669.57
$0.00
$46,669.57
Pendiente
$68,328.81
$0.00
$68,328.81
$281,938.27
$281,938.27
$0.00
CONTRACTUAL
Mayores Metrados-1
Encofrados y Andamios perdidos en derrumbe de
Stock Pile de Gruesos
Transporte de agregados entre acopio temporal y
Planta de Concreto
Reajuste por Tipo de Cambio
Reajuste por Alza de Combustible
Reconocimiento de mayores costos por mayores
das de induccin
Adenda N 01 Losa de Tunel, Stock Pile de Finos,
Muro en Chancado Sec. y Terc.
TOTAL
TOTAL PROYECTADO
$989,454.01
-$1,201,961.19
CMC2-0000001298 LMC2-0000002396
Pendiente
$50,881.82
$0.00
$50,881.82
Pendiente
$4,842.46
$0.00
$4,842.46
Pendiente
Pendiente
$41,334.52
$76,090.40
$0.00
$0.00
$41,334.52
$76,090.40
Pendiente
$26,648.21
$0.00
$26,648.21
Pendiente
$1,511,533.22
$0.00
$1,511,533.22
$12,062,539.66
79%
$3,298,947.18
(% Valorizado)
$12,177,448.88
$4,385,999.15
$15,361,486.84
-$1,201,961.19
Cosapi S.A.
Montaje Electromecnico_SSEE Desierto <60kV
LMC2-0000000078
$7,555,526.96
Nro. Val.
Fecha de
Aprobacin
Monto Total
(CD + CI)
Saldo
1
2
3
4
5
6
7
8
(en blanco)
(en blanco)
(en blanco)
5/15/2012
6/18/2012
7/17/2012
8/21/2012
9/10/2012
$151,709.41
$154,213.91
$283,771.49
$492,260.79
$922,494.22
$1,291,952.32
$1,063,460.25
$810,154.40
$151,709.41
$305,923.32
$589,694.81
$1,081,955.60
$2,004,449.82
$3,296,402.14
$4,359,862.39
$5,170,016.79
$7,403,817.55
$7,249,603.64
$6,965,832.15
$6,473,571.36
$5,551,077.14
$4,259,124.82
$3,195,664.57
$2,385,510.17
OT
RQ
O/C
MONTO
ESTADO
Pendiente
Pendiente
Pendiente
$531,344.24
$531,344.24
En Revisin
OT
RQ
O/C
MONTO
ESTADO
Pendiente
Pendiente
Pendiente
$90,855.96
$90,855.96
En Revisin
OT
RQ
O/C
MONTO
ESTADO
Pendiente
Pendiente
Pendiente
-$819,695.43
-$819,695.43
En Revisin
OT
RQ
O/C
MONTO
ESTADO
$672,378.60
$270,372.66
$402,005.94
DESCRIPCIN
1 Mayores Metrados
MONTO
VALORIZADO
$0.00
$0.00
SALDO
$531,344.24
$531,344.24
DESCRIPCIN
1 Partidas Nuevas
MONTO
VALORIZADO
$0.00
$0.00
SALDO
$90,855.96
$90,855.96
TIPO DEDUCTIVOS
N
DESCRIPCIN
1 Deductivos del Ppto contractual
MONTO
VALORIZADO
$0.00
$0.00
SALDO
-$819,695.43
-$819,695.43
TIPO RECLAMOS
N
DESCRIPCIN
CMC20000001808
LMC20000003901
Pendiente
Pendiente
Pendiente
Pendiente
Pendiente
Pendiente
Pendiente
Pendiente
Pendiente
Pendiente
Pendiente
Pendiente
OT
RQ
$337,965.83
$450,000.00
$19,793.00
$23,055.00
$39,060.00
$869,873.83
Aprobado
En Revisin
MONTO
VALORIZADO
$270,372.66
En Revisin
En Revisin
En Revisin
$0.00
$0.00
$0.00
$0.00
$270,372.66
MONTO
ADICIONAL
MONTO
DEDUCTIVO
SALDO
$67,593.17
$450,000.00
$19,793.00
$23,055.00
$39,060.00
$599,501.17
RESUMEN CONSOLIDADO
DESCRIPCIN
Montaje Electromecnico_SSEE Desierto <60kV
Mayores Metrados
Partidas Nuevas
Deductivos del Ppto contractual
Aceleramiento del Frente II de la Lnea de
Mayores Costos por Improductividad y
Stand By 26 de Junio
Stand By 28 de Junio
Stand By de personal y equipos
TOTAL
Pendiente
Pendiente
Pendiente
Pendiente
Pendiente
Pendiente
Pendiente
# O/C
LMC2-0000000078
Pendiente
Pendiente
Pendiente
Pendiente
Pendiente
Pendiente
1 CMC2-0000001808 LMC2-0000003901
Pendiente
Pendiente
Pendiente
Pendiente
Pendiente
Pendiente
Pendiente
MONTO
CONTRACTUAL
$7,555,526.96
$337,965.83
$450,000.00
$19,793.00
$23,055.00
MONTO
VALORIZADO
$5,170,016.79
$0.00
$0.00
-$819,695.43
$270,372.66
$0.00
$0.00
$0.00
$2,385,510.17
$531,344.24
$90,855.96
$0.00
$67,593.17
$450,000.00
$19,793.00
$23,055.00
$39,060.00
$0.00
$39,060.00
$4,620,694.02
$3,607,211.54
$531,344.24
$90,855.96
-$819,695.43
Pendiente
$7,555,526.96
$1,492,074.03
$8,227,905.56
-$819,695.43
SALDO
JJC-SC
Montaje Mecnico Elctrico Fase III Ampliacin a 15000 TMD
LMC2-0000001589
$17,993,961.52
Fecha de Aprobacin
1
2
3
4
4-1
5
5/21/2012
6/26/2012
7/24/2012
7/26/2012
8/22/2012
Pendiente
Saldo
$17,320,685.98
$16,319,459.80
$15,612,024.49
$14,362,024.49
$13,789,183.88
$12,485,636.82
$2,013,000.14
$1,200,000.00
$813,000.14
(Pago a cuenta)
DESCRIPCIN
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
OT
RQ
O/C
3
3
3
3
3
3
3
3
3
3
3
3
3
3
Pendiente
Pendiente
Pendiente
Pendiente
Pendiente
Pendiente
Pendiente
Pendiente
Pendiente
Pendiente
Pendiente
CONTRACTUAL
CONTRACTUAL
CONTRACTUAL
CONTRACTUAL
CONTRACTUAL
CONTRACTUAL
CONTRACTUAL
CONTRACTUAL
CONTRACTUAL
CONTRACTUAL
CONTRACTUAL
CONTRACTUAL
CONTRACTUAL
CONTRACTUAL
-
CONTRACTUAL
CONTRACTUAL
CONTRACTUAL
CONTRACTUAL
CONTRACTUAL
CONTRACTUAL
CONTRACTUAL
CONTRACTUAL
CONTRACTUAL
CONTRACTUAL
CONTRACTUAL
CONTRACTUAL
CONTRACTUAL
CONTRACTUAL
-
MONTO
$5,975.26
$988.81
$391.96
$5,568.51
$11,851.24
$5,437.60
$7,598.52
$2,089.38
$3,859.31
$10,543.41
$42,717.48
$24,640.21
$9,462.51
$5,913.75
$11,186.52
$26,478.01
$9,610.07
$9,659.76
$35,567.10
$1,108.16
$1,021.09
$6,510.55
$5,613.58
$5,091.81
$2,588.03
$251,472.63
ESTADO
Aprobado
Aprobado
Aprobado
Aprobado
Aprobado
Aprobado
Aprobado
Aprobado
Aprobado
Aprobado
Aprobado
Aprobado
Aprobado
Aprobado
En Revisin
En Revisin
En Revisin
En Revisin
En Revisin
En Revisin
En Revisin
En Revisin
En Revisin
En Revisin
En Revisin
MONTO VALORIZADO
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
SALDO
$5,975.26
$988.81
$391.96
$5,568.51
$11,851.24
$5,437.60
$7,598.52
$2,089.38
$3,859.31
$10,543.41
$42,717.48
$24,640.21
$9,462.51
$5,913.75
$11,186.52
$26,478.01
$9,610.07
$9,659.76
$35,567.10
$1,108.16
$1,021.09
$6,510.55
$5,613.58
$5,091.81
$2,588.03
$251,472.63
MONTO
$35,033.85
$442,575.94
$297,079.17
$38,104.09
$179,882.67
$3,856.05
$4,578.51
$1,189.36
$175.91
$1,563.34
$1,213.73
$611.48
$634.06
$21,606.74
$13,590.62
$3,009.40
$8,131.96
$7,681.28
$1,057.19
$2,635.50
$1,562.83
$3,925.82
$3,218.02
$96,802.00
$83,967.14
$160,826.88
$116,659.66
$1,063.77
$4,350.00
$1,536,586.95
ESTADO
Aprobado
Aprobado
Aprobado
En Revisin
En Revisin
Aprobado
Aprobado
Aprobado
Aprobado
Aprobado
Aprobado
Aprobado
Aprobado
En Revisin
En Revisin
En Revisin
En Revisin
En Revisin
En Revisin
En Revisin
En Revisin
En Revisin
En Revisin
En Revisin
En Revisin
En Revisin
En Revisin
En Revisin
En Revisin
MONTO VALORIZADO
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
SALDO
$35,033.85
$442,575.94
$297,079.17
$38,104.09
$179,882.67
$3,856.05
$4,578.51
$1,189.36
$175.91
$1,563.34
$1,213.73
$611.48
$634.06
$21,606.74
$13,590.62
$3,009.40
$8,131.96
$7,681.28
$1,057.19
$2,635.50
$1,562.83
$3,925.82
$3,218.02
$96,802.00
$83,967.14
$160,826.88
$116,659.66
$1,063.77
$4,350.00
$1,536,586.95
DESCRIPCIN
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
OT
RQ
O/C
2
1
Pendiente
Pendiente
Pendiente
3
3
3
3
3
3
3
3
Pendiente
Pendiente
Pendiente
Pendiente
Pendiente
Pendiente
Pendiente
Pendiente
Pendiente
Pendiente
Pendiente
Pendiente
Pendiente
Pendiente
Pendiente
Pendiente
CMC2-0000002269
CMC2-0000002268
CONTRACTUAL
CONTRACTUAL
CONTRACTUAL
CONTRACTUAL
CONTRACTUAL
CONTRACTUAL
CONTRACTUAL
CONTRACTUAL
-
LMC2-0000004279
LMC2-0000004036
CONTRACTUAL
CONTRACTUAL
CONTRACTUAL
CONTRACTUAL
CONTRACTUAL
CONTRACTUAL
CONTRACTUAL
CONTRACTUAL
-
OT
RQ
O/C
MONTO
ESTADO
MONTO VALORIZADO
SALDO
Pendiente
$224,940.56
Aprobado
$0.00
$224,940.56
$0.00
$224,940.56
DESCRIPCIN
Tuberias de descarga de HDPE del manifold del TK 7200 SDR 13, diam (4", 12", 14")
1
$224,940.56
RESUMEN CONSOLIDADO
DESCRIPCIN
Montaje Mecnico Elctrico Fase III Ampliacin a 15000 TMD
Instalacin de maniobras para Facilidad de izaje de cargas en
el mantenimiento de la Chancadora Primaria
Alquiler de Camin Gra de 6 Tn para Interior Mina
Alquiler de 8 cuerpos de andamios ubicados en los soportes
de la Viga Carrilera del Puente Gra de 30 Tn
Reforzamiento de Estructura de la Chancacora Primaria
MONTO
VALORIZADO
SALDO
$5,508,324.70
$12,485,636.82
$5,975.26
$0.00
$0.00
CONTRACTUAL
$988.81
$0.00
$0.00
CONTRACTUAL
CONTRACTUAL
$391.96
$0.00
$0.00
CONTRACTUAL
CONTRACTUAL
$5,568.51
$0.00
$0.00
$0.00
$0.00
OT
RQ
# O/C
NA
LMC1-000000560
LMC2-0000001589
CONTRACTUAL
CONTRACTUAL
CONTRACTUAL
3
3
MONTO CONTRACTUAL
MONTO ADICIONAL
MONTO DEDUCTIVO
$17,993,961.52
CONTRACTUAL
CONTRACTUAL
$11,851.24
CONTRACTUAL
CONTRACTUAL
$5,437.60
$0.00
$0.00
CONTRACTUAL
CONTRACTUAL
$7,598.52
$0.00
$0.00
CONTRACTUAL
CONTRACTUAL
$2,089.38
$0.00
$0.00
CONTRACTUAL
CONTRACTUAL
$3,859.31
$0.00
$0.00
CONTRACTUAL
CONTRACTUAL
$10,543.41
$0.00
$0.00
CONTRACTUAL
CONTRACTUAL
$42,717.48
$0.00
$0.00
CONTRACTUAL
CONTRACTUAL
$24,640.21
$0.00
$0.00
CONTRACTUAL
CONTRACTUAL
$9,462.51
$0.00
$0.00
CONTRACTUAL
CONTRACTUAL
$5,913.75
$0.00
$0.00
Pendiente
$11,186.52
$0.00
$0.00
Pendiente
$26,478.01
$0.00
$0.00
Pendiente
$9,610.07
$0.00
$0.00
Pendiente
$9,659.76
$0.00
$0.00
Pendiente
$35,567.10
$0.00
$0.00
Pendiente
$1,108.16
$0.00
$0.00
Pendiente
$1,021.09
$0.00
$0.00
Pendiente
$6,510.55
$0.00
$0.00
Pendiente
$5,613.58
$0.00
$0.00
Pendiente
$5,091.81
$0.00
$0.00
Pendiente
$2,588.03
$0.00
$0.00
CMC2-0000002269
LMC2-0000004279
$35,033.85
$0.00
$0.00
CMC2-0000002268
LMC2-0000004036
$442,575.94
$0.00
$0.00
Pendiente
$297,079.17
$0.00
$0.00
Pendiente
$38,104.09
$0.00
$0.00
Pendiente
$179,882.67
$0.00
$0.00
CONTRACTUAL
CONTRACTUAL
$3,856.05
$0.00
$0.00
CONTRACTUAL
CONTRACTUAL
$4,578.51
$0.00
$0.00
CONTRACTUAL
CONTRACTUAL
$1,189.36
$0.00
$0.00
CONTRACTUAL
CONTRACTUAL
$175.91
$0.00
$0.00
CONTRACTUAL
CONTRACTUAL
$1,563.34
$0.00
$0.00
CONTRACTUAL
CONTRACTUAL
$1,213.73
$0.00
$0.00
CONTRACTUAL
CONTRACTUAL
$611.48
$0.00
$0.00
CONTRACTUAL
CONTRACTUAL
$634.06
$0.00
$0.00
Pendiente
$21,606.74
$0.00
$0.00
Pendiente
$13,590.62
$0.00
$0.00
Pendiente
$3,009.40
$0.00
$0.00
Pendiente
$8,131.96
$0.00
$0.00
Pendiente
$7,681.28
$0.00
$0.00
Pendiente
$1,057.19
$0.00
$0.00
Pendiente
$2,635.50
$0.00
$0.00
Pendiente
$1,562.83
$0.00
$0.00
Pendiente
$3,925.82
$0.00
$0.00
Pendiente
$3,218.02
$0.00
$0.00
Pendiente
$96,802.00
$0.00
$0.00
Ejecucion de TIE-INS
DESMONTAJE, MONTAJE Y NIVELACION DE POLINES EN
FAJAS 3,4 Y 5
DESMONTAJE Y MONTAJE CHUTES Y ACTIVIDADES NO
VALORIZADAS EN TORRES TENSORAS N 3,4 Y 5
Improductivo de 5 Horas por falta de energia electrica en
interior mina segn carta JJCSC-117-2012-DE-357
APU Grout Cementicio mas Gravilla
Pendiente
$83,967.14
$0.00
$0.00
$0.00
$0.00
Pendiente
$160,826.88
Pendiente
$116,659.66
$0.00
$0.00
Pendiente
$1,063.77
$0.00
$0.00
Pendiente
$4,350.00
$0.00
$0.00
Pendiente
$0.00
$5,508,324.70
31%
$0.00
$12,485,636.82
(% Valorizado)
$17,993,961.52
$224,940.56
$2,013,000.14
$20,006,961.66
$0.00
Fecha de Aprobacin
1
2
3
4
5
12/27/2011
1/23/2012
3/5/2012
3/13/2012
4/15/2012
Monto Total
(CD + CI)
$297,942.33
$139,886.03
$194,254.86
$408,001.71
$243,308.66
(CD +
Saldo
$1,389,462.44
$1,249,576.41
$1,055,321.55
$647,319.84
$404,011.18
Nota:
$737,128.49
$666,427.04
$70,701.46
Los saldos corresponden a partidas no ejecutadas las cuales ya no se realizaran pues este contrato esta cerrado
DESCRIPCIN
1 Alquiler de Andamios
O/C
MONTO
$7,626.90
$7,626.90
ESTADO
Aprobado
MONTO VALORIZADO
$7,626.90
$7,626.90
SALDO
$0.00
$0.00
MONTO
$446,588.48
$153,440.61
$600,029.09
ESTADO
Aprobado
Aprobado
MONTO VALORIZADO
$413,967.17
$153,440.61
$567,407.78
SALDO
$32,621.31
$0.00
$32,621.31
MONTO
-$404,011.18
-$404,011.18
ESTADO
Aprobado
MONTO VALORIZADO
SALDO
-$404,011.18
-$404,011.18
MONTO
$91,392.35
$38,080.15
$129,472.50
ESTADO
Aprobado
Pendiente
MONTO
$1,687,404.77
-$404,011.18
$7,626.90
$446,588.48
$153,440.61
$91,392.35
$38,080.15
$2,020,522.08
MONTO VALORIZADO
$1,283,393.59
LMC2-0000003999
DESCRIPCIN
1 Adicional por mayores metrados N 01
2 Adicional por mayores metrados N 02
LMC2-0000001678
LMC2-0000003688
TIPO DEDUCTIVOS
N
DESCRIPCIN
1 Menores Metrados (O/C Contractual)
LMC1-0000005318
$0.00
TIPO RECLAMOS
N
DESCRIPCIN
1 Ampliacin de Plazo (24 dias)
2 Ampliacin de Plazo (10 dias) Contingencia
LMC2-0000001678
LMC1-0000005318
MONTO VALORIZADO
$91,392.35
$91,392.35
RESUMEN CONSOLIDADO
DESCRIPCIN
CONTRACTUAL
CONTRACTUAL (Deductivos)
Alquiler de Andamios
Adicional por mayores metrados N 01
Adicional por mayores metrados N 02
Ampliacin de Plazo (24 dias)
Ampliacin de Plazo (10 dias) Contingencia
TOTAL
PRESUPUESTO FINAL
MONTO VALORIZADO
SALDO
DEVOLUCION DE FONDO DE
GARANTIA
NETO A LIQUIDAR
# O/C
LMC1-0000005318
LMC1-0000005318
LMC2-0000003999
LMC2-0000001678
LMC2-0000003688
LMC2-0000001678
LMC1-0000005318
$1,882,369.05
$1,942,193.72 *No incluye el alquiler del andamio.
-$59,824.68
$21,891.42
-$37,933.26
LMC1-0000005318
LMC2-0000003999
LMC2-0000001678
LMC2-0000003688
$1,687,404.77
$7,626.90
$446,588.48
$153,440.61
$2,295,060.76
$7,626.90
$413,967.17
$153,440.61
$91,392.35
$0.00
$1,949,820.63
SALDO
$404,011.18
-$404,011.18
$0.00
$32,621.31
$0.00
$0.00
$38,080.15
$70,701.46
SALDO
$0.00
$38,080.15
$38,080.15
SC Ingeniera y Construccin
Obras Civiles y Montaje Electromecnico de Bombas Booster para Impulsin de Agua de Mar UM Cerro Lindo
LMC2-0000001059
$1,623,661.53
$245,894.07
$314,709.31
$361,510.08
$373,185.26
Acum Monto
Total
(CD + CI)
$245,894.07
$560,603.38
$922,113.46
$1,295,298.72
$1,377,767.46
$1,063,058.15
$701,548.07
$328,362.81
OT
RQ
O/C
Nro. Val.
Fecha de
Aprobacin
Monto Total
(CD + CI)
1
2
3
4
5/15/2012
6/11/2012
6/28/2012
9/17/2012
Saldo
$855,599.60
$0.00
$855,599.60
DESCRIPCIN
1
Pendiente
Pendiente
Pendiente
MONTO
$835,741.41
$835,741.41
ESTADO
En Revisin
MONTO VALORIZADO
SALDO
$835,741.41
$0.00
$0.00
$835,741.41
MONTO VALORIZADO
SALDO
DESCRIPCIN
1
OT
Pendiente
RQ
Pendiente
O/C
Pendiente
MONTO
$348,221.00
$348,221.00
ESTADO
En Revisin
$348,221.00
$0.00
$0.00
$348,221.00
MONTO VALORIZADO
SALDO
TIPO DEDUCTIVOS
N
DESCRIPCIN
1
OT
Pendiente
RQ
Pendiente
O/C
Pendiente
MONTO
-$328,362.81
-$328,362.81
ESTADO
En Revisin
$0.00
$0.00
-$328,362.81
-$328,362.81
RESUMEN CONSOLIDADO
DESCRIPCIN
OT
Obras Civiles y Montaje Electromecnico de
Bombas Booster para Impulsin de Agua de Mar NA
UM Cerro Lindo
Adicionales por Mayor Metrado
Pendiente
Adicionales por Partidas nuevas
Deductivos del Ppto contractual
TOTAL
RQ
# O/C
MONTO CONTRACTUAL
MONTO
VALORIZADO
SALDO
$1,295,298.72
$328,362.81
$835,741.41
$0.00
$835,741.41
$348,221.00
$0.00
$348,221.00
-$328,362.81
$0.00
-$328,362.81
-$328,362.81
$1,295,298.72
$1,183,962.41
MONTO ADICIONAL
MONTO DEDUCTIVO
$1,623,661.53
NA
Pendiente
LMC2-0000001059
Pendiente
Pendiente
Pendiente
Pendiente
Pendiente
Pendiente
Pendiente
$1,623,661.53
$1,183,962.41
$2,479,261.13
IMECON
Montaje Electromecanico Area Flotacion
LMC2-0000003852
$2,210,830.65
Fecha de Aprobacin
1
2
3
8/20/2012
9/17/2012
Pendiente
$1,791,726.44
$1,459,291.70
$1,230,311.01
O/C
MONTO
ESTADO
Saldo
$0.00
$0.00
$0.00
DESCRIPCIN
$0.00
MONTO VALORIZADO
SALDO
$0.00
$0.00
RESUMEN CONSOLIDADO
DESCRIPCIN
Montaje Electromecanico Area Flotacion
TOTAL
# O/C
LMC2-0000003852
MONTO
$2,210,830.65
$2,210,830.65
MONTO VALORIZADO
$980,519.64
$980,519.64
SALDO
$1,230,311.01
$1,230,311.01
IMECON
Obras civiles y de montaje en la estacin de bombeo N 03
LMC2-0000003544
$411,966.65
Fecha de Aprobacin
1
2
7/18/2012
7/19/2012
$186,997.14
$148,146.68
O/C
MONTO
ESTADO
Saldo
$0.00
$0.00
$0.00
DESCRIPCIN
$0.00
MONTO VALORIZADO
SALDO
$0.00
$0.00
RESUMEN CONSOLIDADO
DESCRIPCIN
Obras civiles y de montaje en la estacin de bombeo N 03
TOTAL
# O/C
LMC2-0000003544
MONTO
$411,966.65
$411,966.65
MONTO VALORIZADO
$263,819.97
$263,819.97
SALDO
$148,146.68
$148,146.68
IMECON
Nuevo Edificio de Zaranda de Alta Frecuencia
LMC2-0000001149
$1,031,317.10
Fecha de Aprobacin
1
2
3
4
5
6
4/10/2012
5/2/2012
6/14/2012
7/26/2012
9/4/2012
9/17/2012
O/C
MONTO
$130,814.36
$130,814.36
ESTADO
Aprobado
MONTO VALORIZADO
$0.00
$0.00
MONTO
$1,031,317.10
$130,814.36
$1,162,131.46
MONTO VALORIZADO
$866,514.83
$0.00
$866,514.83
SALDO
$164,802.27
$130,814.36
$295,616.63
Saldo
$702,496.53
$471,264.32
$327,040.84
$199,648.70
$174,155.19
$164,802.27
$130,814.36
$0.00
$130,814.36
DESCRIPCIN
1 Montaje de Tuberas en el rea 300 Molienda
LMC2-0000004826
RESUMEN CONSOLIDADO
DESCRIPCIN
Nuevo Edificio de Zaranda de Alta Frecuencia
Montaje de Tuberas en el rea 300 Molienda
TOTAL
# O/C
LMC2-0000001149
LMC2-0000004826
SALDO
$130,814.36
$130,814.36
IMECON
Trabajos Electricos & Instrumentacion
DESCRIPCIN
$473,469.18
O/C
1
2 Trabajos Adicionales Varios (Bolsa 2)
(RQ) CMC2-0000002724
MONTO
$311,677.86
$161,791.32
$473,469.18
ESTADO
Aprobado
En Aprobacin
MONTO VALORIZADO
$309,035.56
$0.00
$309,035.56
SALDO
$2,642.30
$161,791.32
$164,433.62
HLC
Suministro de Tanques de Acero para la Ampliacin de UM Cerro Lindo Fase III
LMC1-0000005824
$3,895,775.78
Fecha de Aprobacin
1
2
4/18/2012
Pendiente
$1,785,602.72
$1,987,103.04
$2,110,173.06
$123,070.02
O/C
MONTO
ESTADO
Monto Total
(CD + CI)
Saldo
$1,107,390.92
$0.00
$1,107,390.92
DESCRIPCIN
Pendiente
$63,040.52
$65,774.53
$42,479.37
$128,815.05
En Aprobacin
En Aprobacin
En Revisin
MONTO VALORIZADO
$0.00
$0.00
SALDO
$63,040.52
$65,774.53
$42,479.37
$0.00
$0.00
$128,815.05
MONTO VALORIZADO
SALDO
O/C
DESCRIPCIN
1
2
Pendiente
Pendiente
MONTO
ESTADO
$365,566.92
En Revisin
(319,750.57)
En Revisin
$45,816.35
$0.00
$365,566.92
(319,750.57)
$0.00
$0.00
$365,566.92
MONTO VALORIZADO
SALDO
TIPO RECLAMOS
N
O/C
DESCRIPCIN
1
Pendiente
MONTO
$932,759.52
ESTADO
En Revisin
$932,759.52
$0.00
$0.00
RESUMEN CONSOLIDADO
DESCRIPCIN
Suministro de Tanques de Acero para la Ampliacin de UM
Trabajos varios de 15K (Plataforma Tk 3,600; Tub. De 8"; Tub.
Agua Fresca)
Trabajos varios de 15K (Fabricaciones, Montajes,Parada de
Planta, Alquileres de EQ.)
Partidas Nuevas (contractuales)
Mayores Metrados (contractuales)
Menores Metrados (contractuales)
Reclamo por Gastos Generales
TOTAL
# O/C
LMC1-0000005824
LMC2-0000005112
LMC2-0000005482
Pendiente
Pendiente
Pendiente
Pendiente
MONTO
$3,895,775.78
MONTO VALORIZADO
$3,772,705.76
SALDO
$123,070.02
$63,040.52
$0.00
$63,040.52
$65,774.53
$0.00
$65,774.53
$42,479.37
$0.00
$42,479.37
$365,566.92
$0.00
$365,566.92
-$319,750.57
$0.00
-$319,750.57
$932,759.52
$0.00
$932,759.52
$5,045,646.07
$3,772,705.76
$1,272,940.31
$932,759.52
$932,759.52
EMSUNIR
Reforzamiento de Fajas Transportadoras F3, F4 y F5 de 36 Pulg.
LMC2-0000004015
$410,780.00
Fecha de Aprobacin
1
2
8/9/2012
9/17/2012
$211,845.00
$113,472.23
$198,935.00
$85,462.77
O/C
MONTO
ESTADO
Monto Total
(CD + CI)
Saldo
$129,658.29
$0.00
$129,658.29
$0.00
TIPO DEDUCTIVOS
DESCRIPCIN
O/C
LMC2-0000005118
CMC2-0000002649
O/C
MONTO
$24,934.07
$104,724.22
$129,658.29
MONTO
ESTADO
En Aprobacin
En Revisin
ESTADO
$0.00
MONTO VALORIZADO
SALDO
$0.00
$0.00
MONTO VALORIZADO
$0.00
SALDO
$24,934.07
$129,658.29
MONTO VALORIZADO
SALDO
$0.00
$0.00
RESUMEN CONSOLIDADO
DESCRIPCIN
Reforzamiento de Fajas Transportadoras F3, F4 y F5 de 36
Personal para parada de planta Proyectos
Trabajos adicionales varios
TOTAL
# O/C
LMC2-0000004015
LMC2-0000005118
CMC2-0000002649
$104,724.22
$0.00
$0.00
MONTO
$410,780.00
$24,934.07
MONTO VALORIZADO
$325,317.23
$0.00
SALDO
$85,462.77
$24,934.07
$104,724.22
$0.00
$104,724.22
$540,438.29
$325,317.23
$215,121.06
N
1
2
3
4
VyP ICE
Trabajos Adicionales Varios
RQ
CMC2-0000001703
LMC2-0000002972
CMC2-0000001788
LMC2-0000003528
CMC2-0000001789
LMC2-0000003236
CMC2-0000001809
LMC2-0000003545
CMC2-0000002035
LMC2-0000003849
CMC2-0000002275
LMC2-0000004272
CMC2-0000002538
LMC2-0000004815
5
6 Fabricaciones
7
O/C
DESCRIPCIN
RESUMEN CONSOLIDADO
MONTO
ESTADO
$31,077.56
Aprobado
$9,993.65
$29,757.70
$25,203.50
$34,786.81
$70,856.66
$15,396.75
$217,072.63
Aprobado
Aprobado
Aprobado
Aprobado
MONTO
VALORIZADO
$31,077.56
$9,993.65
$29,757.70
$25,203.50
$34,786.81
Aprobado
Aprobado
SALDO
$0.00
$0.00
$0.00
$0.00
$0.00
$70,856.66
$15,396.75
$146,215.97
$0.00
$70,856.66
Fundicin y Maestranza
Trabajos Adicionales Varios
DESCRIPCIN
RESUMEN CONSOLIDADO
RQ
O/C
CMC2-0000001022
LMC2-0000001766
CMC2-0000001998
LMC2-0000003691
CMC2-0000003167
Pendiente
MONTO
$161,008.00
$161,008.00
$149,524.00
$471,540.00
ESTADO
Aprobado
Aprobado
Pendiente
MONTO
VALORIZADO
$153,798.37
$144,562.10
$0.00
$298,360.47
SALDO
$7,209.63
$16,445.90
$149,524.00
$173,179.53
Santo Domingo
Trabajos Electricos en Planta Concentradora y Estaciones de Bombeo
LMC2-0000004281
$267,494.47
DESCRIPCIN
2
3 Montaje electrico instrumental Planta concentradora
RESUMEN CONSOLIDADO
O/C
RQ
CMC2-0000002321
CMC2-0000002321
Pendiente
MONTO
LMC2-0000004281
$147,156.86
LMC2-0000004281
$109,835.45
$91,273.92
$348,266.23
Pendiente
ESTADO
Aprobado
Aprobado
Pendiente
MONTO
VALORIZADO
$153,798.37
$144,562.10
$0.00
$298,360.47
SALDO
-$6,641.51
-$34,726.65
$91,273.92
$49,905.76
IMECON
Planta de Relleno en Pasta
LMC1-0000005193
$3,691,252.82
Fecha de Aprobacin
1
2
3
4
5
6
7
8
9
11/9/2011
12/13/2011
1/9/2012
2/13/2012
3/13/2012
4/17/2012
6/14/2012
7/17/2012
9/7/2012
Monto Total
(CD + CI)
$134,646.68
$451,421.94
$399,628.85
$336,399.61
$503,133.00
$303,747.46
$367,780.74
$180,079.60
$76,458.96
$3,556,606.14
$3,105,184.20
$2,705,555.35
$2,369,155.74
$1,866,022.74
$1,562,275.28
$1,194,494.54
$1,014,414.94
$937,955.98
MONTO
ESTADO
Saldo
$393,259.12
$290,919.91
$102,339.21
O/C
DESCRIPCIN
Trabajos adicionales de Obras Civiles (Muro MC-1, base para
1 tanque M-9A, Alcantarilla de concreto)
LMC2-000918
Trabajos adicionales de obras mecnicas (Suministro e
2 instalacin de estructuras)
LMC2-001866
Trabajos adicionales de obras civiles (Construccin de
3 pedestales y reubicacin de columnas)
LMC2-002437
4
5
6
$89,336.18
$88,103.41
$67,185.47
LMC2-004016
$68,185.85
LMC2-004995
$24,135.10
(RQ) CMC2-002844
$56,313.11
$393,259.12
Aprobado
Aprobado
Aprobado
Aprobado
En Aprobacin
En Aprobacin
MONTO VALORIZADO
$51,284.46
$63,328.65
$51,807.84
$68,185.85
$0.00
$56,313.11
$290,919.91
RESUMEN CONSOLIDADO
DESCRIPCIN
Planta de Relleno en Pasta
Trabajos adicionales de Obras Civiles (Muro MC-1, base para
tanque M-9A, Alcantarilla de concreto)
Trabajos adicionales de obras mecnicas (Suministro e
instalacin de estructuras)
Trabajos adicionales de obras civiles (Construccin de
pedestales y reubicacin de columnas)
Mayores metrados con respecto al presupuesto contractual
Trabajos nuevos y de replanteo de estructuras existentes
Adicionales mecanicos en Interior Mina
TOTAL
# O/C
LMC1-0000005193
LMC2-000918
LMC2-001866
LMC2-002437
LMC2-004016
LMC2-004995
(RQ) CMC2-002844
MONTO
$3,691,252.82
MONTO VALORIZADO
$2,753,296.84
SALDO
$937,955.98
$89,336.18
$51,284.46
$38,051.72
$88,103.41
$63,328.65
$24,774.76
$67,185.47
$51,807.84
$15,377.63
$68,185.85
$68,185.85
$0.00
$24,135.10
$0.00
$24,135.10
$56,313.11
$56,313.11
$0.00
$4,084,511.94
$3,044,216.75
$1,040,295.19
SALDO
$38,051.72
$24,774.76
$15,377.63
$0.00
$24,135.10
$0.00
$102,339.21