HOJA DE CONTROL DE COSTOS CERRO LINDO 15K

Pptos 15 K

ITEM

CONTRATISTA

DESCRIPCION

ESPECIALIDAD

PPTO CONTRACTUAL
(SIN IGV)

Mayores
Metrados

Partida Nueva

Tiempo y
Materiales

Deductivos

Reclamos

Costos
PPTO PROYECTADO
Indirectos
(SIN IGV)
(Amp. De plazo)

VARIACIN (USD)

% DE VARIACIN

JJC CONTRATISTAS GENERALES S.A.

BOTADERO 100 (PRESA DE


RELAVES)

CIVIL

$4,281,766.00

$1,176,007.40

$251,557.68

$0.00

-$520,627.14

$0.00

$0.00

$5,188,703.94

$906,937.95

21.18%

JJC CONTRATISTAS GENERALES S.A.

INTERIOR MINA

CIVIL

$1,687,404.77

$600,029.09

$7,626.90

$0.00

-$404,011.18

$0.00

$129,472.50

$2,020,522.08

$333,117.31

19.74%

JJC CONTRATISTAS GENERALES S.A.

OOCC 15 K

CIVIL

$12,177,448.88

$1,271,392.28

$2,733,543.17

$181,266.29

-$1,201,961.19

$199,797.41

$0.00

$15,361,486.84

$3,184,037.96

26.15%

COSAPI

LINEA DE TRANSMISION

ELECTROMECANICO

$7,555,526.96

$531,344.24

$90,855.96

$0.00

-$819,695.43

$869,873.83

$0.00

$8,227,905.56

$672,378.60

8.90%

HLC

TANQUES

MECANICO

$3,895,775.78

$45,816.35

$128,815.05

$0.00

$0.00

$0.00

$932,759.52

$5,003,166.70

$1,107,390.92

28.43%

IMECON

Montaje Electromecanico Area


Flotacion

ELECTROMECANICO

$2,210,830.65

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$2,210,830.65

$0.00

0.00%

IMECON

Obras civiles y de montaje en la


estacin de bombeo N 03

CIVIL

$411,966.65

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$411,966.65

$0.00

0.00%

IMECON

Nuevo Edificio de Zaranda de Alta


Frecuencia

ELECTROMECANICO

$1,031,317.10

$0.00

$130,814.36

$0.00

$0.00

$0.00

$0.00

$1,162,131.46

$130,814.36

12.68%

IMECON

Trabajos
Electricos/Instrumentacin

ELECTRICO/INSTRUMENT
AL

$473,469.18

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$473,469.18

$0.00

0.00%

SC

BOMBAS BOOSTER

CIVIL/MECANICO

$1,623,661.53

$835,741.41

$348,221.00

$0.00

-$328,362.81

$0.00

$0.00

$2,479,261.13

$855,599.60

52.70%

JJC-SC

ELECTROMECANICO

$17,993,961.52

$224,940.56

$1,536,586.95

$251,472.63

-$2,682,758.38

$0.00

$0.00

$17,324,203.28

-$669,758.24

-3.72%

EMSUNIR

MECANICO

$410,780.00

$0.00

$129,658.29

$0.00

$0.00

$0.00

$0.00

$540,438.29

$129,658.29

31.56%

10

VyP ICE

ELECTROMECANICO

$217,072.63

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$217,072.63

$0.00

0.00%

11

SANTO DOMINGO

TRABAJOS ELECCTRICOS

ELECTRICO

$267,494.47

$80,771.76

$0.00

$0.00

$0.00

$0.00

$0.00

$348,266.23

$80,771.76

30.20%

12

FUNDICIN Y MAESTRANZA

TRABAJOS VARIOS MECANICOS

MECANICO

$471,540.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$471,540.00

$0.00

0.00%

Total

$54,710,016.12

$61,440,964.63

$6,730,948.52

12.30%

Nota:
Neto Presupuesto 15k
Contingencia
Total Presupuesto 15k
Total Presupuesto Proyectado 15k
Variacin
% de Variacin

MONTAJE ELECTROMECNICO
FASE III AMPLIACION A 15TPD
REFORZAMIENTO DE FAJAS
TRANSPORTADORAS F3, F4 Y F5
TRABAJOS VARIOS ELECTRO/
MECANICOS

$46,109,153.40
$9,390,846.60
$55,500,000.00
$61,440,964.63
-$5,940,964.63
-10.70%

ESTATUS TOTAL DE COSTOS


CONTRATISTA
CONTRATO
O/C
MONTO CONTRACTUAL

JJC Contratistas Generales


Obras Civiles y Sistemas de Puesta a Tierra 15,000 TMD
LMC1-0000006544
$12,177,448.88

ESTADOS DE PAGOS (CONTRACTUAL)


Nro. Val.
1
2
3
4
5
6
7 (Add por mayores metrados
N 02)
8
9 (Add por mayores metrados
N 03)
10
11

Fecha de
Aprobacin
1/31/2012
3/5/2012
3/26/2012
4/20/2012
5/15/2012
6/28/2012

Monto Total
(CD Acum Monto Total
+ CI)
(CD + CI)
$855,369.86
$855,369.86
$1,198,012.96
$2,053,382.82
$1,053,883.65
$3,107,266.47
$1,607,311.38
$4,714,577.85
$1,392,278.56
$6,106,856.41
$1,584,775.64
$7,691,632.05

7/11/2012

$160,733.43

7/23/2012

$1,185,351.75

8/15/2012

$921,300.90

8/21/2012
Pendiente

$974,317.25
$281,104.99

Saldo
$11,322,079.02
$10,124,066.06
$9,070,182.41
$7,462,871.03
$6,070,592.47
$4,485,816.83

$7,852,365.48
$9,037,717.23

$4,325,083.40
$3,139,731.65

$9,959,018.13
$10,933,335.38
$11,214,440.37

$2,218,430.75
$1,244,113.50
$963,008.51

ESTADOS DE PAGOS (ADICIONAL)


MONTO ADICIONAL
MONTO ADD. VALORIZADO
SALDO POR VALORIZAR

$3,184,037.96
$848,099.29
$2,335,938.67

TIPO TIEMPO & MATERIALES


N

DESCRIPCIN

Administracin de Recursos Enero a mayo del 2012, servicio de cisterna y suministro de


1 concreto.

OT

RQ

O/C

MONTO

CMC20000002517

LMC2-0000004764

$181,266.29

ESTADO
Aprobado

$181,266.29

MONTO
VALORIZADO

SALDO

$0.00

$181,266.29

$0.00

$181,266.29

TIPO PARTIDA NUEVA

DESCRIPCIN
1
2
3
4
5
6
7
8

Construccin de dos losas de concreto para campamento de JJC-SC

OT

Muro de Contencin acceso a Planta Concentradora

3.1

Muros de acceso colindantes al Espesador, Clarificador y Plataforma SSEE 23

3.2

Pedestales Faja 4 y 5 SSEE 26, Tanque 3,600 y tanque de 7,200.

Fabricacin de Insertos Stock Pile de Gruesos y Finos

RQ

CMC10000001805
CMC20000002138
CMC20000002274
CMC20000002272
CMC20000002537

O/C

MONTO

ESTADO

MONTO
VALORIZADO

SALDO

LMC1-0000002707

$19,082.35

Aprobado

$15,055.60

$4,026.75

LMC2-0000004006

$126,666.75

Aprobado

$126,666.75

$0.00

LMC2-0000004148

$380,448.20

Aprobado

$363,153.48

$17,294.72

LMC2-0000004017

$321,242.57

Aprobado

$273,792.37

$47,450.20

LMC2-0000004925

$6,332.32

Aprobado

$0.00

$6,332.32

Partidad Nuevas areas diversas

Pendiente

$132,775.20

Ppto sin aprobar

$0.00

$132,775.20

Sub Estacin S.E. N 23

Pendiente

$120,464.18

Ppto sin aprobar

$0.00

$120,464.18

Equipos para reparacin de cable de 10 KV en Sopladores

Pendiente

$46,669.57

Ppto sin aprobar

$0.00

$46,669.57

Montaje de estructuras metlicas en alimentadores de Stock Pile de Gruesos

Pendiente

$68,328.81

Ppto sin aprobar

$0.00

$68,328.81

Pendiente

$1,511,533.22

En aprobacin

$0.00
$778,668.20

$1,511,533.22
$1,954,874.97

MONTO
VALORIZADO

SALDO

$281,938.27

$0.00

9
10 Adenda N 01 Losa de Tunel, Stock Pile de Finos, Muro en Chancado Sec. y Terc.

$2,733,543.17
TIPO MAYORES METRADOS
N

DESCRIPCIN
1
2
3

Mayores Metrados-1
Mayores Metrados-2
Mayores Metrados-3

OT

1
Valorizado con
O/C Contractual
Valorizado con
O/C Contractual

RQ

CMC20000001298
LMC10000000286
LMC10000000286

O/C

MONTO

LMC2-0000002396

$281,938.27

LMC1-0000006544

$160,733.43

LMC1-0000006544

$828,720.58

ESTADO
Aprobado
Aprobado
Aprobado

$1,271,392.28

$160,733.43
$828,720.58

$0.00

$1,271,392.28

$0.00

MONTO
VALORIZADO

SALDO

-$508,928.87

$0.00

-$693,032.32

$0.00

-$1,201,961.19

$0.00

TIPO DEDUCTIVOS
N

DESCRIPCIN
1
2

Deductivo N 01
Deductivo N 02

OT

RQ

Valorizado con
O/C Contractual
Valorizado con
O/C Contractual

LMC10000000286
LMC10000000286

O/C

MONTO

LMC1-0000006544

-$508,928.87

LMC1-0000006544

-$693,032.32

ESTADO
Aprobado
Aprobado

-$1,201,961.19

TIPO RECLAMOS
N

DESCRIPCIN
1
2
3
4
5

Encofrados y Andamios perdidos en derrumbe de Stock Pile de Gruesos


Transporte de agregados entre acopio temporal y Planta de Concreto
Reajuste por Tipo de Cambio
Reajuste por Alza de Combustible
Reconocimiento de mayores costos por mayores das de induccin

OT

RQ

O/C

MONTO

ESTADO

Pendiente
Pendiente
Pendiente
Pendiente
Pendiente

$50,881.82
$4,842.46
$41,334.52
$76,090.40
$26,648.21
$199,797.41

Ppto sin aprobar


Ppto sin aprobar
Ppto sin aprobar
Ppto sin aprobar
Ppto sin aprobar

MONTO
VALORIZADO
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00

SALDO
$50,881.82
$4,842.46
$41,334.52
$76,090.40
$26,648.21
$199,797.41

RESUMEN CONSOLIDADO

DESCRIPCIN

OT

RQ

# O/C

MONTO
CONTRACTUAL

MONTO ADICIONAL MONTO DEDUCTIVO

$12,177,448.88

MONTO
VALORIZADO

SALDO

$11,214,440.37

$963,008.51

$989,454.01

$0.00

-$1,201,961.19

$0.00

NA

LMC1-0000000286 LMC1-0000006544

CONTRACTUAL (Adicionales)

Valorizado con O/C


Contractual

LMC1-0000000286 LMC1-0000006544

CONTRACTUAL (Deductivos)

Valorizado con O/C


Contractual

LMC1-0000000286 LMC1-0000006544

Administracin de Recursos Enero a mayo del 2012,


servicio de cisterna y suministro de concreto.
Construccin de dos losas de concreto para
campamento de JJC-SC

CMC2-0000002517 LMC2-0000004764

$181,266.29

$0.00

$181,266.29

CMC1-0000001805 LMC1-0000002707

$19,082.35

$15,055.60

$4,026.75

Muro de Contencin acceso a Planta Concentradora

3.1

CMC2-0000002138 LMC2-0000004006

$126,666.75

$126,666.75

$0.00

3.2

CMC2-0000002274 LMC2-0000004148

$380,448.20

$363,153.48

$17,294.72

CMC2-0000002272 LMC2-0000004017

$321,242.57

$273,792.37

$47,450.20

Fabricacin de Insertos Stock Pile de Gruesos y Finos

CMC2-0000002537 LMC2-0000004925

$6,332.32

$0.00

$6,332.32

Partidad Nuevas areas diversas


Sub Estacin S.E. N 23
Equipos para reparacin de cable de 10 KV en
Sopladores
Montaje de estructuras metlicas en alimentadores
de Stock Pile de Gruesos

Pendiente
Pendiente

$132,775.20
$120,464.18

$0.00
$0.00

$132,775.20
$120,464.18

Pendiente

$46,669.57

$0.00

$46,669.57

Pendiente

$68,328.81

$0.00

$68,328.81

$281,938.27

$281,938.27

$0.00

CONTRACTUAL

Muros de acceso colindantes al Espesador,


Clarificador y Plataforma SSEE 23
Pedestales Faja 4 y 5 SSEE 26, Tanque 3,600 y tanque
de 7,200.

Mayores Metrados-1
Encofrados y Andamios perdidos en derrumbe de
Stock Pile de Gruesos
Transporte de agregados entre acopio temporal y
Planta de Concreto
Reajuste por Tipo de Cambio
Reajuste por Alza de Combustible
Reconocimiento de mayores costos por mayores
das de induccin
Adenda N 01 Losa de Tunel, Stock Pile de Finos,
Muro en Chancado Sec. y Terc.
TOTAL
TOTAL PROYECTADO

$989,454.01
-$1,201,961.19

CMC2-0000001298 LMC2-0000002396

Pendiente

$50,881.82

$0.00

$50,881.82

Pendiente

$4,842.46

$0.00

$4,842.46

Pendiente
Pendiente

$41,334.52
$76,090.40

$0.00
$0.00

$41,334.52
$76,090.40

Pendiente

$26,648.21

$0.00

$26,648.21

Pendiente

$1,511,533.22

$0.00

$1,511,533.22

$12,062,539.66
79%

$3,298,947.18
(% Valorizado)

$12,177,448.88

$4,385,999.15
$15,361,486.84

-$1,201,961.19

ESTATUS TOTAL DE COSTOS


CONTRATISTA
CONTRATO
O/C
MONTO CONTRACTUAL

Cosapi S.A.
Montaje Electromecnico_SSEE Desierto &LT60kV
LMC2-0000000078
$7,555,526.96

ESTADOS DE PAGOS (CONTRACTUAL)

Nro. Val.

Fecha de
Aprobacin

Monto Total
(CD + CI)

Acum Monto Total


(CD + CI)

Saldo

1
2
3
4
5
6
7
8

(en blanco)
(en blanco)
(en blanco)
5/15/2012
6/18/2012
7/17/2012
8/21/2012
9/10/2012

$151,709.41
$154,213.91
$283,771.49
$492,260.79
$922,494.22
$1,291,952.32
$1,063,460.25
$810,154.40

$151,709.41
$305,923.32
$589,694.81
$1,081,955.60
$2,004,449.82
$3,296,402.14
$4,359,862.39
$5,170,016.79

$7,403,817.55
$7,249,603.64
$6,965,832.15
$6,473,571.36
$5,551,077.14
$4,259,124.82
$3,195,664.57
$2,385,510.17

OT

RQ

O/C

MONTO

ESTADO

Pendiente

Pendiente

Pendiente

$531,344.24
$531,344.24

En Revisin

OT

RQ

O/C

MONTO

ESTADO

Pendiente

Pendiente

Pendiente

$90,855.96
$90,855.96

En Revisin

OT

RQ

O/C

MONTO

ESTADO

Pendiente

Pendiente

Pendiente

-$819,695.43
-$819,695.43

En Revisin

OT

RQ

O/C

MONTO

ESTADO

ESTADOS DE PAGOS (Adicional)


MONTO ADICIONAL
MONTO ADD. VALORIZADO
SALDO POR VALORIZAR

$672,378.60
$270,372.66
$402,005.94

TIPO MAYOR METRADO


N

DESCRIPCIN
1 Mayores Metrados

MONTO
VALORIZADO
$0.00
$0.00

SALDO
$531,344.24
$531,344.24

TIPO PARTIDA NUEVA


N

DESCRIPCIN
1 Partidas Nuevas

MONTO
VALORIZADO
$0.00
$0.00

SALDO
$90,855.96
$90,855.96

TIPO DEDUCTIVOS
N

DESCRIPCIN
1 Deductivos del Ppto contractual

MONTO
VALORIZADO
$0.00
$0.00

SALDO
-$819,695.43
-$819,695.43

TIPO RECLAMOS
N

DESCRIPCIN

Aceleramiento del Frente II de la Lnea de


1 Transmisin
2
3
4
5

Mayores Costos por Improductividad y


Reconocimiento de Bonos por Aceleramiento
Stand By 26 de Junio
Stand By 28 de Junio
Stand By de personal y equipos

CMC20000001808

LMC20000003901

Pendiente

Pendiente

Pendiente

Pendiente
Pendiente
Pendiente

Pendiente
Pendiente
Pendiente

Pendiente
Pendiente
Pendiente

OT

RQ

$337,965.83
$450,000.00
$19,793.00
$23,055.00
$39,060.00
$869,873.83

Aprobado
En Revisin

MONTO
VALORIZADO
$270,372.66

En Revisin
En Revisin
En Revisin

$0.00
$0.00
$0.00
$0.00
$270,372.66

MONTO
ADICIONAL

MONTO
DEDUCTIVO

SALDO
$67,593.17
$450,000.00
$19,793.00
$23,055.00
$39,060.00
$599,501.17

RESUMEN CONSOLIDADO

DESCRIPCIN
Montaje Electromecnico_SSEE Desierto &LT60kV
Mayores Metrados
Partidas Nuevas
Deductivos del Ppto contractual
Aceleramiento del Frente II de la Lnea de
Mayores Costos por Improductividad y
Stand By 26 de Junio
Stand By 28 de Junio
Stand By de personal y equipos
TOTAL

Pendiente
Pendiente
Pendiente
Pendiente
Pendiente
Pendiente
Pendiente

# O/C
LMC2-0000000078
Pendiente
Pendiente
Pendiente
Pendiente
Pendiente
Pendiente
1 CMC2-0000001808 LMC2-0000003901
Pendiente
Pendiente
Pendiente
Pendiente
Pendiente
Pendiente
Pendiente

MONTO
CONTRACTUAL
$7,555,526.96

$337,965.83
$450,000.00
$19,793.00
$23,055.00

MONTO
VALORIZADO
$5,170,016.79
$0.00
$0.00
-$819,695.43
$270,372.66
$0.00
$0.00
$0.00

$2,385,510.17
$531,344.24
$90,855.96
$0.00
$67,593.17
$450,000.00
$19,793.00
$23,055.00

$39,060.00

$0.00

$39,060.00

$4,620,694.02

$3,607,211.54

$531,344.24
$90,855.96
-$819,695.43

Pendiente
$7,555,526.96

$1,492,074.03
$8,227,905.56

-$819,695.43

SALDO

ESTATUS TOTAL DE COSTOS


CONTRATISTA
CONTRATO
O/C
MONTO CONTRACTUAL

JJC-SC
Montaje Mecnico Elctrico Fase III Ampliacin a 15000 TMD
LMC2-0000001589
$17,993,961.52

ESTADOS DE PAGOS (CONTRACTUAL)


Nro. Val.

Fecha de Aprobacin

1
2
3
4
4-1
5

5/21/2012
6/26/2012
7/24/2012
7/26/2012
8/22/2012
Pendiente

Monto Total (CD +


CI)
$673,275.54
$1,001,226.18
$707,435.31
$1,250,000.00
$572,840.61
$1,303,547.06

Acum Monto Total


(CD +
CI)
$673,275.54
$1,674,501.72
$2,381,937.03
$3,631,937.03
$4,204,777.64
$5,508,324.70

Saldo
$17,320,685.98
$16,319,459.80
$15,612,024.49
$14,362,024.49
$13,789,183.88
$12,485,636.82

ESTADOS DE PAGOS (ADICIONAL)


MONTO ADICIONAL
MONTO ADD. VALORIZADO
SALDO POR VALORIZAR

$2,013,000.14
$1,200,000.00
$813,000.14

(Pago a cuenta)

TIPO TIEMPO & MATERIALES


N

DESCRIPCIN
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25

Instalacin de maniobras para Facilidad de izaje de cargas en el mantenimiento de la Chancadora Primaria


Alquiler de Camin Gra de 6 Tn para Interior Mina
Alquiler de 8 cuerpos de andamios ubicados en los soportes de la Viga Carrilera del Puente Gra de 30 Tn
Reforzamiento de Estructura de la Chancacora Primaria
Transporte de Faja del Almacn 1 a Bocamina
Modificacin de vigas por la ubicacin de un tubo de 12". Cambio de pernos en estructura soporte de celdas
Modificaciones en estructuras de Chancado Secundario Terciario y soportes de contrapesos de Fajas 7-1 y 7Fabricacin de cartelas, clips, soportes de escaleras, modificaciones en barandas y modificacin de grating
Fabricacin de estructuras para mantenimiento de vlvulas
Suministros, Fabricacin y montaje de cartelas y bases de estructuras.
En fajas 2, 3, 4 y 5 desmontaje de soportes, desconeccin y desmontaje de instrumentos y tubera flexible.
Desacoples, mandrilados, picado de muro, solucion de interferencias, soldeo y reubicaciones
Retiro de planchas, armado de andamios, modificacion y soldeo de soportes
Fabricacion agujeros, perforacion de vigas, soldeo interior, traslado de planchas, reforzamientos
Reconocimiento por paralizacion por marcha comunal en frente 4 - Chincha 28/06/2012
Refuerzo de viga cortada por interferencia en el montaje de chancadora primaria segn instruccin adjunta,
Realizacion de cortes en bafle y cartelas para acoplarlo al Grizzly en chute 4, Completar portico SM4 segn
Desmontaje de bomba 05-810-4151-22D; perforacion para mayor profundidad en orificios de pernos de
Desmontaje y remontaje de plataforma y columnas 117-F9-2PT1; 115-F9-2W-A/B mas vigas de amarre y
Conexionado de aire acondicionado, armado de extractor de aire y conexionado de iluminaria, Armado de
Perforacin de agujeros a base de fundacin de los equipos TAG: 05-810-4151-022 C/D
Modificacin de barandas, modificacin de grating para plataforma de la faja F9, Limpieza mecnica y
Armado y soldeo de mnsula para base de la columna 51, Armado y soldadura de mnsula de zaranda
Alquiler de Grua de 60 tn y Grua de 30 tn
Fabricacin de soporte de Base Stop de la Faja 7-1. Polea Motriz de descarga, Refuerzo de soporte polea

OT

RQ

O/C

3
3
3
3
3
3
3
3
3
3
3
3
3
3
Pendiente
Pendiente
Pendiente
Pendiente
Pendiente
Pendiente
Pendiente
Pendiente
Pendiente
Pendiente
Pendiente

CONTRACTUAL
CONTRACTUAL
CONTRACTUAL
CONTRACTUAL
CONTRACTUAL
CONTRACTUAL
CONTRACTUAL
CONTRACTUAL
CONTRACTUAL
CONTRACTUAL
CONTRACTUAL
CONTRACTUAL
CONTRACTUAL
CONTRACTUAL
-

CONTRACTUAL
CONTRACTUAL
CONTRACTUAL
CONTRACTUAL
CONTRACTUAL
CONTRACTUAL
CONTRACTUAL
CONTRACTUAL
CONTRACTUAL
CONTRACTUAL
CONTRACTUAL
CONTRACTUAL
CONTRACTUAL
CONTRACTUAL
-

MONTO
$5,975.26
$988.81
$391.96
$5,568.51
$11,851.24
$5,437.60
$7,598.52
$2,089.38
$3,859.31
$10,543.41
$42,717.48
$24,640.21
$9,462.51
$5,913.75
$11,186.52
$26,478.01
$9,610.07
$9,659.76
$35,567.10
$1,108.16
$1,021.09
$6,510.55
$5,613.58
$5,091.81
$2,588.03
$251,472.63

ESTADO
Aprobado
Aprobado
Aprobado
Aprobado
Aprobado
Aprobado
Aprobado
Aprobado
Aprobado
Aprobado
Aprobado
Aprobado
Aprobado
Aprobado
En Revisin
En Revisin
En Revisin
En Revisin
En Revisin
En Revisin
En Revisin
En Revisin
En Revisin
En Revisin
En Revisin

MONTO VALORIZADO
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00

SALDO
$5,975.26
$988.81
$391.96
$5,568.51
$11,851.24
$5,437.60
$7,598.52
$2,089.38
$3,859.31
$10,543.41
$42,717.48
$24,640.21
$9,462.51
$5,913.75
$11,186.52
$26,478.01
$9,610.07
$9,659.76
$35,567.10
$1,108.16
$1,021.09
$6,510.55
$5,613.58
$5,091.81
$2,588.03
$251,472.63

MONTO
$35,033.85
$442,575.94
$297,079.17
$38,104.09
$179,882.67
$3,856.05
$4,578.51
$1,189.36
$175.91
$1,563.34
$1,213.73
$611.48
$634.06
$21,606.74
$13,590.62
$3,009.40
$8,131.96
$7,681.28
$1,057.19
$2,635.50
$1,562.83
$3,925.82
$3,218.02
$96,802.00
$83,967.14
$160,826.88
$116,659.66
$1,063.77
$4,350.00
$1,536,586.95

ESTADO
Aprobado
Aprobado
Aprobado
En Revisin
En Revisin
Aprobado
Aprobado
Aprobado
Aprobado
Aprobado
Aprobado
Aprobado
Aprobado
En Revisin
En Revisin
En Revisin
En Revisin
En Revisin
En Revisin
En Revisin
En Revisin
En Revisin
En Revisin
En Revisin
En Revisin
En Revisin
En Revisin
En Revisin
En Revisin

MONTO VALORIZADO
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00

SALDO
$35,033.85
$442,575.94
$297,079.17
$38,104.09
$179,882.67
$3,856.05
$4,578.51
$1,189.36
$175.91
$1,563.34
$1,213.73
$611.48
$634.06
$21,606.74
$13,590.62
$3,009.40
$8,131.96
$7,681.28
$1,057.19
$2,635.50
$1,562.83
$3,925.82
$3,218.02
$96,802.00
$83,967.14
$160,826.88
$116,659.66
$1,063.77
$4,350.00
$1,536,586.95

TIPO PARTIDA NUEVA


N

DESCRIPCIN
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29

Adicional por montaje de sala elctrica N 3 y 4


Adicional por cambio de SCH (de 40 a 120) en tubera de 8"
Adicional Civil en planta desalinizadora Frente 4 -Chincha
Trabajos en rea 210 - Chancadora Primaria: Desmontaje y Montaje de Chute N 5, Desmontaje de Tanque
NUEVO APU PARA COLOCACION DE GROUT EPOXICO POR LITRO A $15.5 (METRADO AL 07/07/2012 15M3)
Montaje de soportes para Chutes 3 y 3A en interior mina segn plano 1517-CHFG-AG-001 rev0
Cambio de vigas y diagonales para soporte de chancadora primaria en interior mina
Giro de placas base y montaje de niples para alargar vigas guias de torres trensora de faja n3
Rebaja del Chute de descarga para permitir el montaje de la polea motriz en torre de transferencia de faja
Reforzamiento de plataforma con viga en torre de transferencia n3
Preparacion de suples con plancha para corregir diferencias de medidas por incorrecta definicion en plano
Demolicion de 02 pedestales, achinado de agujeros para permitir montaje de polea motriz en torre de faja
Demolicion de 02 pedestales, retiro de escombros para posterior montaje de guias en torre trensora de faja
Montaje de Tanque Pulmn de 30 m3. rea 930 (rea de Sopladores)
Modificacion en estructuras soporte de chancado primario segn plano 347-C2-002-Rev1
Montaje e instalacion de 05 equipos de aire acondicionado en sala electrica de faja n4
Montaje e instalacion de 05 equipos de aire acondicionado en sala electrica de faja n3
Modificaciones por interferencia en Chute de Descarga de Faja N4 a Faja N5
Montaje de Niples y giro de placas base en guias de torre tensora en faja n5
Colocacin y corte de jebe, realizacion de 32 agujeros de 5/8" para proteccion de equipo en torre de faja
Fabricacion de 22 arandelas de 5/8" para pernos de amarre de motor reductor en torre de faja n4
Modificaciones en plataforma de descarga de faja n5 para facilidad de montaje de chute
Montaje de Niples y giro de placas base en guias de torre tensora en faja n4
Lista electrica a valorizar (RM por preparacion)
Ejecucion de TIE-INS
DESMONTAJE, MONTAJE Y NIVELACION DE POLINES EN FAJAS 3,4 Y 5
DESMONTAJE Y MONTAJE CHUTES Y ACTIVIDADES NO VALORIZADAS EN TORRES TENSORAS N 3,4 Y 5
Improductivo de 5 Horas por falta de energia electrica en interior mina segn carta JJCSC-117-2012-DE-357
APU Grout Cementicio mas Gravilla

OT

RQ

O/C

2
1
Pendiente
Pendiente
Pendiente
3
3
3
3
3
3
3
3
Pendiente
Pendiente
Pendiente
Pendiente
Pendiente
Pendiente
Pendiente
Pendiente
Pendiente
Pendiente
Pendiente
Pendiente
Pendiente
Pendiente
Pendiente
Pendiente

CMC2-0000002269
CMC2-0000002268
CONTRACTUAL
CONTRACTUAL
CONTRACTUAL
CONTRACTUAL
CONTRACTUAL
CONTRACTUAL
CONTRACTUAL
CONTRACTUAL
-

LMC2-0000004279
LMC2-0000004036
CONTRACTUAL
CONTRACTUAL
CONTRACTUAL
CONTRACTUAL
CONTRACTUAL
CONTRACTUAL
CONTRACTUAL
CONTRACTUAL
-

OT

RQ

O/C

MONTO

ESTADO

MONTO VALORIZADO

SALDO

Pendiente

$224,940.56

Aprobado

$0.00

$224,940.56

$0.00

$224,940.56

TIPO MAYORES METRADOS


N

DESCRIPCIN

Tuberias de descarga de HDPE del manifold del TK 7200 SDR 13, diam (4", 12", 14")
1

$224,940.56

RESUMEN CONSOLIDADO

DESCRIPCIN
Montaje Mecnico Elctrico Fase III Ampliacin a 15000 TMD
Instalacin de maniobras para Facilidad de izaje de cargas en
el mantenimiento de la Chancadora Primaria
Alquiler de Camin Gra de 6 Tn para Interior Mina
Alquiler de 8 cuerpos de andamios ubicados en los soportes
de la Viga Carrilera del Puente Gra de 30 Tn
Reforzamiento de Estructura de la Chancacora Primaria

MONTO
VALORIZADO

SALDO

$5,508,324.70

$12,485,636.82

$5,975.26

$0.00

$0.00

CONTRACTUAL

$988.81

$0.00

$0.00

CONTRACTUAL

CONTRACTUAL

$391.96

$0.00

$0.00

CONTRACTUAL

CONTRACTUAL

$5,568.51

$0.00

$0.00

$0.00

$0.00

OT

RQ

# O/C

NA

LMC1-000000560

LMC2-0000001589

CONTRACTUAL

CONTRACTUAL

CONTRACTUAL

3
3

MONTO CONTRACTUAL

MONTO ADICIONAL

MONTO DEDUCTIVO

$17,993,961.52

CONTRACTUAL

CONTRACTUAL

$11,851.24

CONTRACTUAL

CONTRACTUAL

$5,437.60

$0.00

$0.00

CONTRACTUAL

CONTRACTUAL

$7,598.52

$0.00

$0.00

CONTRACTUAL

CONTRACTUAL

$2,089.38

$0.00

$0.00

CONTRACTUAL

CONTRACTUAL

$3,859.31

$0.00

$0.00

CONTRACTUAL

CONTRACTUAL

$10,543.41

$0.00

$0.00

CONTRACTUAL

CONTRACTUAL

$42,717.48

$0.00

$0.00

CONTRACTUAL

CONTRACTUAL

$24,640.21

$0.00

$0.00

CONTRACTUAL

CONTRACTUAL

$9,462.51

$0.00

$0.00

CONTRACTUAL

CONTRACTUAL

$5,913.75

$0.00

$0.00

Pendiente

$11,186.52

$0.00

$0.00

Pendiente

$26,478.01

$0.00

$0.00

Pendiente

$9,610.07

$0.00

$0.00

Pendiente

$9,659.76

$0.00

$0.00

Pendiente

$35,567.10

$0.00

$0.00

Pendiente

$1,108.16

$0.00

$0.00

Pendiente

$1,021.09

$0.00

$0.00

Pendiente

$6,510.55

$0.00

$0.00

Pendiente

$5,613.58

$0.00

$0.00

Pendiente

$5,091.81

$0.00

$0.00

Pendiente

$2,588.03

$0.00

$0.00

CMC2-0000002269

LMC2-0000004279

$35,033.85

$0.00

$0.00

CMC2-0000002268

LMC2-0000004036

$442,575.94

$0.00

$0.00

Pendiente

$297,079.17

$0.00

$0.00

Pendiente

$38,104.09

$0.00

$0.00

Pendiente

$179,882.67

$0.00

$0.00

CONTRACTUAL

CONTRACTUAL

$3,856.05

$0.00

$0.00

CONTRACTUAL

CONTRACTUAL

$4,578.51

$0.00

$0.00

CONTRACTUAL

CONTRACTUAL

$1,189.36

$0.00

$0.00

CONTRACTUAL

CONTRACTUAL

$175.91

$0.00

$0.00

CONTRACTUAL

CONTRACTUAL

$1,563.34

$0.00

$0.00

CONTRACTUAL

CONTRACTUAL

$1,213.73

$0.00

$0.00

CONTRACTUAL

CONTRACTUAL

$611.48

$0.00

$0.00

CONTRACTUAL

CONTRACTUAL

$634.06

$0.00

$0.00

Pendiente

$21,606.74

$0.00

$0.00

Pendiente

$13,590.62

$0.00

$0.00

Pendiente

$3,009.40

$0.00

$0.00

Pendiente

$8,131.96

$0.00

$0.00

Pendiente

$7,681.28

$0.00

$0.00

Pendiente

$1,057.19

$0.00

$0.00

Pendiente

$2,635.50

$0.00

$0.00

Pendiente

$1,562.83

$0.00

$0.00

Pendiente

$3,925.82

$0.00

$0.00

Pendiente

$3,218.02

$0.00

$0.00

Lista electrica a valorizar (RM por preparacion)

Pendiente

$96,802.00

$0.00

$0.00

Ejecucion de TIE-INS
DESMONTAJE, MONTAJE Y NIVELACION DE POLINES EN
FAJAS 3,4 Y 5
DESMONTAJE Y MONTAJE CHUTES Y ACTIVIDADES NO
VALORIZADAS EN TORRES TENSORAS N 3,4 Y 5
Improductivo de 5 Horas por falta de energia electrica en
interior mina segn carta JJCSC-117-2012-DE-357
APU Grout Cementicio mas Gravilla

Pendiente

$83,967.14

$0.00

$0.00

$0.00

$0.00

Tuberias de descarga de HDPE del manifold del TK 7200 SDR


TOTAL
TOTAL PROYECTADO

Transporte de Faja del Almacn 1 a Bocamina


Modificacin de vigas por la ubicacin de un tubo de 12".
Cambio de pernos en estructura soporte de celdas de 30m3
Modificaciones en estructuras de Chancado Secundario
Terciario y soportes de contrapesos de Fajas 7-1 y 7-2
Fabricacin de cartelas, clips, soportes de escaleras,
modificaciones en barandas y modificacin de grating en Faja
Fabricacin de estructuras para mantenimiento de vlvulas
Suministros, Fabricacin y montaje de cartelas y bases de
estructuras.
En fajas 2, 3, 4 y 5 desmontaje de soportes, desconeccin y
desmontaje de instrumentos y tubera flexible. Modificacin
Desacoples, mandrilados, picado de muro, solucion de
interferencias, soldeo y reubicaciones
Retiro de planchas, armado de andamios, modificacion y
soldeo de soportes
Fabricacion agujeros, perforacion de vigas, soldeo interior,
traslado de planchas, reforzamientos
Reconocimiento por paralizacion por marcha comunal en
frente 4 - Chincha 28/06/2012
Refuerzo de viga cortada por interferencia en el montaje de
chancadora primaria segn instruccin adjunta, Fabricacion
Realizacion de cortes en bafle y cartelas para acoplarlo al
Grizzly en chute 4, Completar portico SM4 segn plano 03-05Desmontaje de bomba 05-810-4151-22D; perforacion para
mayor profundidad en orificios de pernos de anclaje de 8" a
Desmontaje y remontaje de plataforma y columnas 117-F92PT1; 115-F9-2W-A/B mas vigas de amarre y todo accesorio
Conexionado de aire acondicionado, armado de extractor de
aire y conexionado de iluminaria, Armado de andamios
Perforacin de agujeros a base de fundacin de los equipos
TAG: 05-810-4151-022 C/D
Modificacin de barandas, modificacin de grating para
plataforma de la faja F9, Limpieza mecnica y apuntalado y
Armado y soldeo de mnsula para base de la columna 51,
Armado y soldadura de mnsula de zaranda terciaria,
Alquiler de Grua de 60 tn y Grua de 30 tn
Fabricacin de soporte de Base Stop de la Faja 7-1. Polea
Motriz de descarga, Refuerzo de soporte polea motriz faja 8 y
Adicional por montaje de sala elctrica N 3 y 4
Adicional por cambio de SCH (de 40 a 120) en tubera de 8"
Adicional Civil en planta desalinizadora Frente 4 -Chincha
Trabajos en rea 210 - Chancadora Primaria: Desmontaje y
Montaje de Chute N 5, Desmontaje de Tanque Pulmn,
NUEVO APU PARA COLOCACION DE GROUT EPOXICO POR
LITRO A $15.5 (METRADO AL 07/07/2012 15M3)
Montaje de soportes para Chutes 3 y 3A en interior mina
segn plano 1517-CHFG-AG-001 rev0
Cambio de vigas y diagonales para soporte de chancadora
primaria en interior mina
Giro de placas base y montaje de niples para alargar vigas
guias de torres trensora de faja n3
Rebaja del Chute de descarga para permitir el montaje de la
polea motriz en torre de transferencia de faja n3
Reforzamiento de plataforma con viga en torre de
transferencia n3
Preparacion de suples con plancha para corregir diferencias
de medidas por incorrecta definicion en plano 03-05-03-210Demolicion de 02 pedestales, achinado de agujeros para
permitir montaje de polea motriz en torre de faja n5
Demolicion de 02 pedestales, retiro de escombros para
posterior montaje de guias en torre trensora de faja n4
Montaje de Tanque Pulmn de 30 m3. rea 930 (rea de
Sopladores)
Modificacion en estructuras soporte de chancado primario
segn plano 347-C2-002-Rev1
Montaje e instalacion de 05 equipos de aire acondicionado en
sala electrica de faja n4
Montaje e instalacion de 05 equipos de aire acondicionado en
sala electrica de faja n3
Modificaciones por interferencia en Chute de Descarga de
Faja N4 a Faja N5
Montaje de Niples y giro de placas base en guias de torre
tensora en faja n5
Colocacin y corte de jebe, realizacion de 32 agujeros de 5/8"
para proteccion de equipo en torre de faja n3, 4 y 5
Fabricacion de 22 arandelas de 5/8" para pernos de amarre
de motor reductor en torre de faja n4
Modificaciones en plataforma de descarga de faja n5 para
facilidad de montaje de chute
Montaje de Niples y giro de placas base en guias de torre
tensora en faja n4

Pendiente

$160,826.88

Pendiente

$116,659.66

$0.00

$0.00

Pendiente

$1,063.77

$0.00

$0.00

Pendiente

$4,350.00

$0.00

$0.00

Pendiente

$0.00
$5,508,324.70
31%

$0.00
$12,485,636.82
(% Valorizado)

$17,993,961.52

$224,940.56
$2,013,000.14
$20,006,961.66

$0.00

ESTATUS TOTAL DE COSTOS


CONTRATISTA
CONTRATO
O/C
MONTO CONTRACTUAL

JJC Contratistas Generales


DESQUINCHES, EX. Y O.C. INFR. MINA (Adenda 1 de botadero 100)
LMC1-0000005318
$1,687,404.77

ESTADOS DE PAGOS (CONTRACTUAL)


Nro. Val.

Fecha de Aprobacin

1
2
3
4
5

12/27/2011
1/23/2012
3/5/2012
3/13/2012
4/15/2012

Monto Total
(CD + CI)
$297,942.33
$139,886.03
$194,254.86
$408,001.71
$243,308.66

Acum Monto Total


CI)
$297,942.33
$437,828.36
$632,083.22
$1,040,084.93
$1,283,393.59

(CD +

Saldo
$1,389,462.44
$1,249,576.41
$1,055,321.55
$647,319.84
$404,011.18

El Saldo corresponde a deductivos del Ppto contractual

ESTADOS DE PAGOS (ADICIONAL)


MONTO ADICIONAL
MONTO ADD. VALORIZADO
SALDO POR VALORIZAR

Nota:

$737,128.49
$666,427.04
$70,701.46

Los saldos corresponden a partidas no ejecutadas las cuales ya no se realizaran pues este contrato esta cerrado

TIPO PARTIDA NUEVA


N

DESCRIPCIN
1 Alquiler de Andamios

O/C

MONTO
$7,626.90
$7,626.90

ESTADO
Aprobado

MONTO VALORIZADO
$7,626.90
$7,626.90

SALDO
$0.00
$0.00

MONTO
$446,588.48
$153,440.61
$600,029.09

ESTADO
Aprobado
Aprobado

MONTO VALORIZADO
$413,967.17
$153,440.61
$567,407.78

SALDO
$32,621.31
$0.00
$32,621.31

MONTO
-$404,011.18
-$404,011.18

ESTADO
Aprobado

MONTO VALORIZADO

SALDO
-$404,011.18
-$404,011.18

MONTO
$91,392.35
$38,080.15
$129,472.50

ESTADO
Aprobado
Pendiente

MONTO
$1,687,404.77
-$404,011.18
$7,626.90
$446,588.48
$153,440.61
$91,392.35
$38,080.15
$2,020,522.08

MONTO VALORIZADO
$1,283,393.59

LMC2-0000003999

TIPO MAYORES METRADOS


N

DESCRIPCIN
1 Adicional por mayores metrados N 01
2 Adicional por mayores metrados N 02

LMC2-0000001678

LMC2-0000003688

TIPO DEDUCTIVOS
N

DESCRIPCIN
1 Menores Metrados (O/C Contractual)

LMC1-0000005318

$0.00

TIPO RECLAMOS
N

DESCRIPCIN
1 Ampliacin de Plazo (24 dias)
2 Ampliacin de Plazo (10 dias) Contingencia

LMC2-0000001678
LMC1-0000005318

MONTO VALORIZADO
$91,392.35
$91,392.35

RESUMEN CONSOLIDADO
DESCRIPCIN
CONTRACTUAL
CONTRACTUAL (Deductivos)
Alquiler de Andamios
Adicional por mayores metrados N 01
Adicional por mayores metrados N 02
Ampliacin de Plazo (24 dias)
Ampliacin de Plazo (10 dias) Contingencia
TOTAL

PRESUPUESTO FINAL
MONTO VALORIZADO
SALDO
DEVOLUCION DE FONDO DE
GARANTIA
NETO A LIQUIDAR

# O/C
LMC1-0000005318
LMC1-0000005318
LMC2-0000003999
LMC2-0000001678
LMC2-0000003688
LMC2-0000001678
LMC1-0000005318

$1,882,369.05
$1,942,193.72 *No incluye el alquiler del andamio.
-$59,824.68

$21,891.42
-$37,933.26

RESUMEN DE O/C GENERADAS


CONTRACTUAL
Alquiler de Andamios
Adicional por mayores metrados N 01
Adicional por mayores metrados N 02
TOTAL

LMC1-0000005318
LMC2-0000003999
LMC2-0000001678
LMC2-0000003688

$1,687,404.77
$7,626.90
$446,588.48
$153,440.61
$2,295,060.76

$7,626.90
$413,967.17
$153,440.61
$91,392.35
$0.00
$1,949,820.63

SALDO
$404,011.18
-$404,011.18
$0.00
$32,621.31
$0.00
$0.00
$38,080.15
$70,701.46

SALDO
$0.00
$38,080.15
$38,080.15

ESTATUS TOTAL DE COSTOS


CONTRATISTA
CONTRATO
O/C
MONTO CONTRACTUAL

SC Ingeniera y Construccin
Obras Civiles y Montaje Electromecnico de Bombas Booster para Impulsin de Agua de Mar UM Cerro Lindo
LMC2-0000001059
$1,623,661.53

ESTADOS DE PAGOS (CONTRACTUAL)

$245,894.07
$314,709.31
$361,510.08
$373,185.26

Acum Monto
Total
(CD + CI)
$245,894.07
$560,603.38
$922,113.46
$1,295,298.72

$1,377,767.46
$1,063,058.15
$701,548.07
$328,362.81

OT

RQ

O/C

Nro. Val.

Fecha de
Aprobacin

Monto Total
(CD + CI)

1
2
3
4

5/15/2012
6/11/2012
6/28/2012
9/17/2012

Saldo

ESTADOS DE PAGOS (Adicional)


MONTO ADICIONAL
MONTO ADD. VALORIZADO
SALDO POR VALORIZAR

$855,599.60
$0.00
$855,599.60

TIPO MAYORES METRADOS


N

DESCRIPCIN
1

Adicionales por Mayor Metrado

Pendiente

Pendiente

Pendiente

MONTO
$835,741.41
$835,741.41

ESTADO
En Revisin

MONTO VALORIZADO

SALDO
$835,741.41

$0.00
$0.00

$835,741.41

MONTO VALORIZADO

SALDO

TIPO PARTIDA NUEVA


N

DESCRIPCIN
1

Adicionales por Partidas nuevas

OT

Pendiente

RQ

Pendiente

O/C

Pendiente

MONTO
$348,221.00
$348,221.00

ESTADO
En Revisin

$348,221.00

$0.00
$0.00

$348,221.00

MONTO VALORIZADO

SALDO

TIPO DEDUCTIVOS
N

DESCRIPCIN
1

Deductivos del Ppto contractual

OT

Pendiente

RQ

Pendiente

O/C

Pendiente

MONTO
-$328,362.81
-$328,362.81

ESTADO
En Revisin

$0.00
$0.00

-$328,362.81
-$328,362.81

RESUMEN CONSOLIDADO

DESCRIPCIN
OT
Obras Civiles y Montaje Electromecnico de
Bombas Booster para Impulsin de Agua de Mar NA
UM Cerro Lindo
Adicionales por Mayor Metrado
Pendiente
Adicionales por Partidas nuevas
Deductivos del Ppto contractual
TOTAL

RQ

# O/C

MONTO CONTRACTUAL

MONTO
VALORIZADO

SALDO

$1,295,298.72

$328,362.81

$835,741.41

$0.00

$835,741.41

$348,221.00

$0.00

$348,221.00

-$328,362.81

$0.00

-$328,362.81

-$328,362.81

$1,295,298.72

$1,183,962.41

MONTO ADICIONAL

MONTO DEDUCTIVO

$1,623,661.53

NA
Pendiente

LMC2-0000001059
Pendiente

Pendiente

Pendiente

Pendiente

Pendiente

Pendiente

Pendiente
$1,623,661.53

$1,183,962.41
$2,479,261.13

ESTATUS TOTAL DE COSTOS


CONTRATISTA
CONTRATO
O/C
MONTO CONTRACTUAL

IMECON
Montaje Electromecanico Area Flotacion
LMC2-0000003852
$2,210,830.65

ESTADOS DE PAGOS (CONTRACTUAL)


Nro. Val.

Fecha de Aprobacin

1
2
3

8/20/2012
9/17/2012
Pendiente

Monto Total (CD +


CI)
$419,104.21
$332,434.74
$228,980.69

Acum Monto Total


(CD + CI)
$419,104.21
$751,538.95
$980,519.64

$1,791,726.44
$1,459,291.70
$1,230,311.01

O/C

MONTO

ESTADO

Saldo

Nota: Avance Fisico al 85%

ESTADOS DE PAGOS (Adicional)


MONTO ADICIONAL
MONTO ADD. VALORIZADO
SALDO POR VALORIZAR

$0.00
$0.00
$0.00

TIPO PARTIDA NUEVA


N

DESCRIPCIN

$0.00

MONTO VALORIZADO

SALDO

$0.00

$0.00

RESUMEN CONSOLIDADO
DESCRIPCIN
Montaje Electromecanico Area Flotacion
TOTAL

# O/C
LMC2-0000003852

MONTO
$2,210,830.65
$2,210,830.65

MONTO VALORIZADO
$980,519.64
$980,519.64

SALDO
$1,230,311.01
$1,230,311.01

ESTATUS TOTAL DE COSTOS


CONTRATISTA
CONTRATO
O/C
MONTO CONTRACTUAL

IMECON
Obras civiles y de montaje en la estacin de bombeo N 03
LMC2-0000003544
$411,966.65

ESTADOS DE PAGOS (CONTRACTUAL)


Nro. Val.

Fecha de Aprobacin

1
2

7/18/2012
7/19/2012

Monto Total (CD +


CI)
$224,969.51
$38,850.46

Acum Monto Total


(CD + CI)
$224,969.51
$263,819.97

$186,997.14
$148,146.68

O/C

MONTO

ESTADO

Saldo

Nota: Avance Fisico al 100%

ESTADOS DE PAGOS (Adicional)


MONTO ADICIONAL
MONTO ADD. VALORIZADO
SALDO POR VALORIZAR

$0.00
$0.00
$0.00

TIPO PARTIDA NUEVA


N

DESCRIPCIN

$0.00

MONTO VALORIZADO

SALDO

$0.00

$0.00

RESUMEN CONSOLIDADO
DESCRIPCIN
Obras civiles y de montaje en la estacin de bombeo N 03
TOTAL

# O/C
LMC2-0000003544

MONTO
$411,966.65
$411,966.65

MONTO VALORIZADO
$263,819.97
$263,819.97

SALDO
$148,146.68
$148,146.68

ESTATUS TOTAL DE COSTOS


CONTRATISTA
CONTRATO
O/C
MONTO CONTRACTUAL

IMECON
Nuevo Edificio de Zaranda de Alta Frecuencia
LMC2-0000001149
$1,031,317.10

ESTADOS DE PAGOS (CONTRACTUAL)


Nro. Val.

Fecha de Aprobacin

1
2
3
4
5
6

4/10/2012
5/2/2012
6/14/2012
7/26/2012
9/4/2012
9/17/2012

Monto Total (CD +


CI)
$328,820.57
$231,232.21
$144,223.48
$127,392.14
$25,493.51
$9,352.92

Acum Monto Total


(CD + CI)
$328,820.57
$560,052.78
$704,276.26
$831,668.40
$857,161.91
$866,514.83

O/C

MONTO
$130,814.36
$130,814.36

ESTADO
Aprobado

MONTO VALORIZADO
$0.00
$0.00

MONTO
$1,031,317.10
$130,814.36
$1,162,131.46

MONTO VALORIZADO
$866,514.83
$0.00
$866,514.83

SALDO
$164,802.27
$130,814.36
$295,616.63

Saldo

Nota: Avance Fisico al 95%

$702,496.53
$471,264.32
$327,040.84
$199,648.70
$174,155.19
$164,802.27

ESTADOS DE PAGOS (Adicional)


MONTO ADICIONAL
MONTO ADD. VALORIZADO
SALDO POR VALORIZAR

$130,814.36
$0.00
$130,814.36

TIPO PARTIDA NUEVA


N

DESCRIPCIN
1 Montaje de Tuberas en el rea 300 Molienda

LMC2-0000004826

RESUMEN CONSOLIDADO
DESCRIPCIN
Nuevo Edificio de Zaranda de Alta Frecuencia
Montaje de Tuberas en el rea 300 Molienda
TOTAL

# O/C
LMC2-0000001149
LMC2-0000004826

SALDO
$130,814.36
$130,814.36

ESTATUS TOTAL DE COSTOS


CONTRATISTA
CONTRATO
O/C
MONTO CONTRACTUAL

IMECON
Trabajos Electricos & Instrumentacion

DESCRIPCIN

$473,469.18

O/C

Trabajos Adicionales Electricos e Instrumentacion Varios CMC2-0000000020

1
2 Trabajos Adicionales Varios (Bolsa 2)

(RQ) CMC2-0000002724

MONTO
$311,677.86
$161,791.32
$473,469.18

ESTADO
Aprobado
En Aprobacin

MONTO VALORIZADO
$309,035.56
$0.00
$309,035.56

SALDO
$2,642.30
$161,791.32
$164,433.62

ESTATUS TOTAL DE COSTOS


CONTRATISTA
CONTRATO
O/C
MONTO CONTRACTUAL

HLC
Suministro de Tanques de Acero para la Ampliacin de UM Cerro Lindo Fase III
LMC1-0000005824
$3,895,775.78

ESTADOS DE PAGOS (CONTRACTUAL)


Nro. Val.

Fecha de Aprobacin

1
2

4/18/2012
Pendiente

$1,785,602.72
$1,987,103.04

Acum Monto Total


(CD + CI)
$1,785,602.72
$3,772,705.76

$2,110,173.06
$123,070.02

O/C

MONTO

ESTADO

Monto Total

(CD + CI)

Saldo

ESTADOS DE PAGOS (Adicional)


MONTO ADICIONAL
MONTO ADD. VALORIZADO
SALDO POR VALORIZAR

$1,107,390.92
$0.00
$1,107,390.92

TIPO PARTIDA NUEVA


N

DESCRIPCIN

Trabajos varios de 15K (Plataforma Tk 3,600; Tub. De 8";


LMC2-0000005112
1 Tub. Agua Fresca)
Trabajos varios de 15K (Fabricaciones, Montajes,Parada
LMC2-0000005482
2 de Planta, Alquileres de EQ.)
3

Partidas Nuevas (contractuales)

Pendiente

$63,040.52
$65,774.53
$42,479.37
$128,815.05

En Aprobacin
En Aprobacin
En Revisin

MONTO VALORIZADO
$0.00
$0.00

SALDO
$63,040.52
$65,774.53
$42,479.37

$0.00
$0.00

$128,815.05

MONTO VALORIZADO

SALDO

TIPO MAYORES METRADOS


N

O/C

DESCRIPCIN
1
2

Mayores Metrados (contractuales)

Pendiente

Menores Metrados (contractuales)

Pendiente

MONTO

ESTADO

$365,566.92

En Revisin

(319,750.57)

En Revisin

$45,816.35

$0.00

$365,566.92
(319,750.57)

$0.00
$0.00

$365,566.92

MONTO VALORIZADO

SALDO

TIPO RECLAMOS
N

O/C

DESCRIPCIN
1

Reclamo por Gastos Generales

Pendiente

MONTO
$932,759.52

ESTADO
En Revisin

$932,759.52

$0.00
$0.00

RESUMEN CONSOLIDADO
DESCRIPCIN
Suministro de Tanques de Acero para la Ampliacin de UM
Trabajos varios de 15K (Plataforma Tk 3,600; Tub. De 8"; Tub.
Agua Fresca)
Trabajos varios de 15K (Fabricaciones, Montajes,Parada de
Planta, Alquileres de EQ.)
Partidas Nuevas (contractuales)
Mayores Metrados (contractuales)
Menores Metrados (contractuales)
Reclamo por Gastos Generales
TOTAL

# O/C
LMC1-0000005824
LMC2-0000005112
LMC2-0000005482
Pendiente
Pendiente
Pendiente
Pendiente

MONTO
$3,895,775.78

MONTO VALORIZADO
$3,772,705.76

SALDO
$123,070.02

$63,040.52

$0.00

$63,040.52

$65,774.53

$0.00

$65,774.53

$42,479.37

$0.00

$42,479.37

$365,566.92

$0.00

$365,566.92

-$319,750.57

$0.00

-$319,750.57

$932,759.52

$0.00

$932,759.52

$5,045,646.07

$3,772,705.76

$1,272,940.31

$932,759.52
$932,759.52

ESTATUS TOTAL DE COSTOS


CONTRATISTA
CONTRATO
O/C
MONTO CONTRACTUAL

EMSUNIR
Reforzamiento de Fajas Transportadoras F3, F4 y F5 de 36 Pulg.
LMC2-0000004015
$410,780.00

ESTADOS DE PAGOS (CONTRACTUAL)


Nro. Val.

Fecha de Aprobacin

1
2

8/9/2012
9/17/2012

$211,845.00
$113,472.23

Acum Monto Total


(CD + CI)
$211,845.00
$325,317.23

$198,935.00
$85,462.77

O/C

MONTO

ESTADO

Monto Total

(CD + CI)

Saldo

ESTADOS DE PAGOS (Adicional)


MONTO ADICIONAL
MONTO ADD. VALORIZADO
SALDO POR VALORIZAR

$129,658.29
$0.00
$129,658.29

TIPO MAYORES METRADOS


DESCRIPCIN

$0.00

TIPO PARTIDA NUEVA


DESCRIPCIN
1 Personal para parada de planta Proyectos
2

Trabajos adicionales varios

TIPO DEDUCTIVOS
DESCRIPCIN

O/C
LMC2-0000005118

CMC2-0000002649

O/C

MONTO
$24,934.07
$104,724.22
$129,658.29

MONTO

ESTADO
En Aprobacin
En Revisin

ESTADO

$0.00

MONTO VALORIZADO

SALDO

$0.00

$0.00

MONTO VALORIZADO
$0.00

SALDO
$24,934.07

$129,658.29

MONTO VALORIZADO

SALDO

$0.00

$0.00

RESUMEN CONSOLIDADO
DESCRIPCIN
Reforzamiento de Fajas Transportadoras F3, F4 y F5 de 36
Personal para parada de planta Proyectos
Trabajos adicionales varios
TOTAL

# O/C
LMC2-0000004015
LMC2-0000005118
CMC2-0000002649

$104,724.22

$0.00
$0.00

MONTO
$410,780.00
$24,934.07

MONTO VALORIZADO
$325,317.23
$0.00

SALDO
$85,462.77
$24,934.07

$104,724.22

$0.00

$104,724.22

$540,438.29

$325,317.23

$215,121.06

ESTATUS TOTAL DE COSTOS


CONTRATISTA
CONTRATO
O/C
MONTO CONTRACTUAL

N
1
2
3
4

VyP ICE
Trabajos Adicionales Varios

RQ

Trabajos varios en planta de procesos


Culminacin de trabajos de instrumentacin para
implementacin de protecciones del sistema de control
Requisicin por trabajos adicionales de:
- Reubicacin de caseta elctrica e instrumentacin en
Trabajos diversos en campamento Las Lomas y

CMC2-0000001703

LMC2-0000002972

CMC2-0000001788

LMC2-0000003528

CMC2-0000001789

LMC2-0000003236

CMC2-0000001809

LMC2-0000003545

Trabajos Interferencias para Ampliacin a 15TPD

CMC2-0000002035

LMC2-0000003849

CMC2-0000002275

LMC2-0000004272

CMC2-0000002538

LMC2-0000004815

5
6 Fabricaciones
7

O/C

DESCRIPCIN

Trabajos de Ampliacin en la Planta de Procesos

RESUMEN CONSOLIDADO

MONTO

ESTADO

$31,077.56

Aprobado

$9,993.65
$29,757.70
$25,203.50
$34,786.81
$70,856.66
$15,396.75
$217,072.63

Aprobado
Aprobado
Aprobado
Aprobado

MONTO
VALORIZADO
$31,077.56
$9,993.65
$29,757.70
$25,203.50
$34,786.81

Aprobado
Aprobado

SALDO
$0.00
$0.00
$0.00
$0.00
$0.00
$70,856.66

$15,396.75
$146,215.97

$0.00
$70,856.66

ESTATUS TOTAL DE COSTOS


CONTRATISTA
CONTRATO
O/C
MONTO CONTRACTUAL

Fundicin y Maestranza
Trabajos Adicionales Varios

DESCRIPCIN

Trabajos Mecnicos varios para la Consolidacin de las


1 10K y preliminares para la ampliacin a 15K
Trabajos de ampliacin en reas 410 Reactivos y 300
2 Molienda
5 Trabajos de ampliacin en reas 220 Chancado, 410

RESUMEN CONSOLIDADO

RQ

O/C

CMC2-0000001022

LMC2-0000001766

CMC2-0000001998

LMC2-0000003691

CMC2-0000003167

Pendiente

MONTO
$161,008.00
$161,008.00
$149,524.00
$471,540.00

ESTADO
Aprobado
Aprobado
Pendiente

MONTO
VALORIZADO
$153,798.37
$144,562.10
$0.00
$298,360.47

SALDO
$7,209.63
$16,445.90
$149,524.00
$173,179.53

ESTATUS TOTAL DE COSTOS


CONTRATISTA
CONTRATO
O/C
MONTO CONTRACTUAL

Santo Domingo
Trabajos Electricos en Planta Concentradora y Estaciones de Bombeo
LMC2-0000004281
$267,494.47

DESCRIPCIN

Montaje electrico instrumental Planta concentradora


1 Periodp Junio-Julio
Montaje electrico instrumental Estaciones de Bombeo

2
3 Montaje electrico instrumental Planta concentradora

RESUMEN CONSOLIDADO

O/C

RQ
CMC2-0000002321
CMC2-0000002321
Pendiente

MONTO

LMC2-0000004281

$147,156.86

LMC2-0000004281

$109,835.45
$91,273.92
$348,266.23

Pendiente

ESTADO
Aprobado
Aprobado
Pendiente

MONTO
VALORIZADO
$153,798.37
$144,562.10
$0.00
$298,360.47

SALDO
-$6,641.51
-$34,726.65
$91,273.92
$49,905.76

ESTATUS TOTAL DE COSTOS


CONTRATISTA
CONTRATO
O/C
MONTO CONTRACTUAL

IMECON
Planta de Relleno en Pasta
LMC1-0000005193
$3,691,252.82

ESTADOS DE PAGOS (CONTRACTUAL)


Nro. Val.

Fecha de Aprobacin

1
2
3
4
5
6
7
8
9

11/9/2011
12/13/2011
1/9/2012
2/13/2012
3/13/2012
4/17/2012
6/14/2012
7/17/2012
9/7/2012

Monto Total

(CD + CI)

$134,646.68
$451,421.94
$399,628.85
$336,399.61
$503,133.00
$303,747.46
$367,780.74
$180,079.60
$76,458.96

Acum Monto Total


(CD + CI)
$134,646.68
$586,068.62
$985,697.47
$1,322,097.08
$1,825,230.08
$2,128,977.54
$2,496,758.28
$2,676,837.88
$2,753,296.84

$3,556,606.14
$3,105,184.20
$2,705,555.35
$2,369,155.74
$1,866,022.74
$1,562,275.28
$1,194,494.54
$1,014,414.94
$937,955.98

MONTO

ESTADO

Saldo

ESTADOS DE PAGOS (Adicional)


MONTO ADICIONAL
MONTO ADD. VALORIZADO
SALDO POR VALORIZAR

$393,259.12
$290,919.91
$102,339.21

TIPO PARTIDA NUEVA


N

O/C
DESCRIPCIN
Trabajos adicionales de Obras Civiles (Muro MC-1, base para
1 tanque M-9A, Alcantarilla de concreto)
LMC2-000918
Trabajos adicionales de obras mecnicas (Suministro e
2 instalacin de estructuras)
LMC2-001866
Trabajos adicionales de obras civiles (Construccin de
3 pedestales y reubicacin de columnas)
LMC2-002437
4
5
6

Mayores metrados con respecto al presupuesto contractual


Trabajos nuevos y de replanteo de estructuras existentes
Adicionales mecanicos en Interior Mina

$89,336.18
$88,103.41
$67,185.47

LMC2-004016

$68,185.85

LMC2-004995

$24,135.10

(RQ) CMC2-002844

$56,313.11
$393,259.12

Aprobado
Aprobado
Aprobado
Aprobado
En Aprobacin
En Aprobacin

MONTO VALORIZADO
$51,284.46
$63,328.65
$51,807.84
$68,185.85
$0.00
$56,313.11
$290,919.91

RESUMEN CONSOLIDADO
DESCRIPCIN
Planta de Relleno en Pasta
Trabajos adicionales de Obras Civiles (Muro MC-1, base para
tanque M-9A, Alcantarilla de concreto)
Trabajos adicionales de obras mecnicas (Suministro e
instalacin de estructuras)
Trabajos adicionales de obras civiles (Construccin de
pedestales y reubicacin de columnas)
Mayores metrados con respecto al presupuesto contractual
Trabajos nuevos y de replanteo de estructuras existentes
Adicionales mecanicos en Interior Mina
TOTAL

# O/C
LMC1-0000005193
LMC2-000918
LMC2-001866
LMC2-002437
LMC2-004016
LMC2-004995
(RQ) CMC2-002844

MONTO
$3,691,252.82

MONTO VALORIZADO
$2,753,296.84

SALDO
$937,955.98

$89,336.18

$51,284.46

$38,051.72

$88,103.41

$63,328.65

$24,774.76

$67,185.47

$51,807.84

$15,377.63

$68,185.85

$68,185.85

$0.00

$24,135.10

$0.00

$24,135.10

$56,313.11

$56,313.11

$0.00

$4,084,511.94

$3,044,216.75

$1,040,295.19

SALDO
$38,051.72
$24,774.76
$15,377.63
$0.00
$24,135.10
$0.00
$102,339.21