Anda di halaman 1dari 2

VPMP POLYTECHNIC, GANDHINAGAR 2012

SUBJECT: ELECTRICAL INSTALLATION AND MAINTENANCE SUBJECT CODE: 2350901


Chapter no: 1 electrical installation & maintance
1. State the electrical and mechanical tests perform before commissioning the electrical equipment and explain each in short. 2. List the commissioning test for the transformer. 3. Explain commissioning of switch gears. 4. State properties of good insulating oil. 5. Explain sludge test on transformer oil. 6. State the methods of filtering the insulating oil and explain one method in detail. 7. Explain how the insulation resistance of the electrical machine. 8. What is the necessity of drying the insulation? 9. Explain methods of drying out. 10. Explain the precautions necessary to be taken during the drying process. 11. Short note on megger. 12. Explain polarization index. 13. Explain temp. rise test on elect. Machines. 14. State the causes of production vibrations in machines. 15. State causes of production of noise in transformer. 16. Explain types of tests.

Chapter no: 2 Installation


1. State the lifting devices to transport the equipment and describe any one of them. 2. Describe the point to be considered while preparing foundation for the static and rotating electrical machines. 3. Explain the precaution to be taken in handling the induction motor for its installation. 4. State the main points for installation of electrical wiring.

hapter no: 3 maintenance of electrical machines; equipment


1. 2. 3. 4. 5. 6. 7. 8. What is preventive maintenance? Advantages of preventive maintenance. State activities performed during preventive maintance. State function of preventive maintance department. Explain frequency of maintenance. Explain maintenance schedule of transformer. Explain maintenance schedule of induction motor. Explain maintenance schedule of storage battery. Explain the importance of maintain records in maintenance.
SUB. :EIM VPMP POLY.

(EE DEPT.)

VPMP POLYTECHNIC, GANDHINAGAR 2012


Chapter no: 4 installation and maintance of domestic appliances
1. Explain tool/equipments required for maintenance of domestic appliances. 2. State the common faults occurring in domestic appliances. 3. Write a installation procedure of domestic appliances.

Chapter no: 5 trouble shooting


1. 2. 3. 4. 5. 6. 7. 8. 9. Explain causes of faults in electrical equipments. State the equipment required in trouble shooting. Explain the necessity of preparing the trouble shooting chart. Explain trouble shooting chart for transformer. Short note on growler. Discuss the external and internal reasons of failure of electrical equipments. Explain the need of fault finding in electrical equipments. Prepare the trouble shooting chart for alternators. Explain common troubles in D.C. machines.

Chapter no: 6 Earthing


1. 2. 3. 4. 5. 6. 7. 8. Explain advantages of earthing the neutral of generator in power station. Write short note on earth electrodes. Short note on plate earthing. Short note on pipe earthing. Explain methods of measuring earth resistance. Short note on earth loop tester. Write down difference and similarity between equipment earthing and system grounding. Explain the earthing of overhead lines.

Chapter no: 7 electrical accidents and safety


1. 2. 3. 4. 5. 6. 7. State the causes of electrical accident and explain one of them. Explain the factors controlling the electric shock. Explain the procedure of taking shut down of substation. List electrical safety devices. State the fire extinguishers and explain any one. Explain choice of fire extinguisher. Explain permit to work. Write important points.

(EE DEPT.)

SUB. :EIM

VPMP POLY.

Anda mungkin juga menyukai