1. Approaching the site / En approchant du site 2. New Gate from outside / Nouvelle barrire vue de lextrieur 3. New Gate from inside / Nouvelle barrire vue de lintrieur 4. Southwest corner / Coin Sud-Ouest 5. Northeast corner / Coin Nord-Est 6. Temporary classrooms (3) / 3 salles de classe temporaires
CRO I X-D E S-B OUQUE TS | P RE L IM IN A RY DESIGN R EP O RT D E CE M B E R 2 9 , 2 0 1 2
O BJEC T I FS PR I N C I PAU X D E L A C ON C E P T I ON
Make the School Beautiful and Inspiring Construire une cole belle et inspirante
CRO I X-D E S-B OUQUE TS | P RE L IM IN A RY DESIGN R EP O RT D E CE M B E R 2 9 , 2 0 1 2
STRUCTURAL INTEGRITY
INTG R I T S T RU C T U R AL E
Hurricanes / Wind Ouragans / Vent Earthquakes Tremblements de terre Flooding and Drainage Inondations et canalisation Durability of Materials Matriaux durables Best Practices Construction Bonnes pratiques de construction
Handwashing Stations Stations de lavage des mains Composting Toilets Toilettes sches Harvested Rainwater Rcuperation des eaux de pluie Nutrition (one daily meal) Nutrition (un repas quotidien) Water Quality Qualit de leau
ENVIRONMENT
ENVIRO N N E M E N T
PREVAILING WINDS
PREVAILING WINDS
BIG TREE
SOLAR PHOTOVOLTAICS
LN ER G I E S O L A I R E P H OTOVOLTA QU E
Haiti climate is ideal for solar harvesting Le climat hatien est idal pour produire de lnergie solaire Cost is a barrier Le cot est un obstacle Security of equipment is a concern La scurit des quipements peut tre problmatique
10
RAINWATER HARVESTING
COL L E C T E D E S E AU X P L U V I AL E S
Rainwater harvesting has the potential to contribute to a substantive portion of the school water usage needs with additional water coming from an on site well. La rcupration des eaux pluviales a le potentiel de subvenir une partie importante des besoins en consommation deau de lcole. Un apport supplmentaire deau proviendra dun puits.
11
12
COMMUNITY SPACES
ESPAC E S C O M M U N AU TA I R E S
Entry gate that welcomes and protects Porte dentre qui accueille et protge Inside and outside gathering spaces for collaboration Des lieux de rassemblement intrieurs et extrieurs pour la XYZ (voir le sens du mot collaboration) Afterhours / Evening Facility Use Permet la tenue dactivits dans le btiment la tombe de la noirceur.
CRO I X-D E S-B OUQUE TS | P RE L IM IN A RY DESIGN R EP O RT D E CE M B E R 2 9 , 2 0 1 2
13
Color & Light to inspire Couleur et lumire inspirantes Gardens for learning Jardins pour lapprentissage Landscape for tranquility Paysage pour la tranquilit Public Art to galvanize interest Art public pour susciter lintrt Creating Pride Crer un sentiment de fiert
14
PRECEDENTS
Two-story school design Conception dune cole deux (2) tages Local Materials Matriaux locaux Job Training Formation professionnelle Natural Ventilation Ventilation naturelle Daylighting clairage naturel Inspiring color and light Des couleurs et une lumire qui inspirent
CRO I X-D E S-B OUQUE TS | P RE L IM IN A RY DESIGN R EP O RT D E CE M B E R 2 9 , 2 0 1 2
15
PRECEDENTS
Design meetings with the neighborhood community Runion et discussion avec la communaut sur la conception du projet Subgrade rainwater cisterns Citernes deau de pluie souterraines Composting toilets Toilettes sches Flexible classroom design Les salles de classe flexibles Community spaces Espaces communautaires
CRO I X-D E S-B OUQUE TS | P RE L IM IN A RY DESIGN R EP O RT D E CE M B E R 2 9 , 2 0 1 2
COMMUNITY
16
PROGRAMMING
PRO G R A M M AT I O N
3 classrooms for preschool (2.5-5yrs) 6 classrooms for primary grade 1-6 (5-11 yrs old) Minimum ceiling height 10-0 that allows for natural ventilation Classroom requirements: Teacher desk, student de, caulk boards and storage
Prep & cooking for two cooks and washing area Serving Area adjacent to cafeteria Secure food & utensil storage Service Entrance for deliveries and trash pick up
17
PROGRAMMING
PRO G R A M M AT I O N
Principal Office with desk, 2-3 chairs and storage - 172 ft2 / 16 m2 Administration office -TBD 1 Parking Space Gatekeeper Station - 36 ft2 / 3.5 m2 Gatekeeper Living Quarter - 80 ft2 / 7.5 m2
Restroom Toilettes
Pedagogical Supply Storage - 172 ft2 / 16 m2 Janitorial and Sport Storage - 172 ft2 / 16 m2 Solar Battery Storage for Photovoltaics System - TBD Cistern and Well
18
DESIGN CO NCEPTS
CONC E PT S D U D E SI G N
19
DESIGN CO NCEPTS
CONC E PT S D U D E SI G N
ACTIVITY ACTIVITS
20
DESIGN CO NCEPTS
CONC E PT S D U D E SI G N
ACTIVITY ACTIVIT
CIRCULATION CIRCULATION
21
EXISTING SITE
SITE AC T U E L
Programming: Ground Level Programmation: niveau du sol A Temporary Classroom (Salles de classe temporaires) B Existing Foundation (Fondation existante)
A B
C Existing Administrative Offices (Bureaux administratifs existants) D Tent (Tente) E Well (Puits)
E
0
CRO I X-D E S-B OUQUE TS | P RE L IM IN A RY DESIGN R EP O RT D E CE M B E R 2 9 , 2 0 1 2
16
32
48
22
PHASE 1 1
C l a s s r o o m B ui l d i ng / Ed ifice d es classes (1) C o mp o s ti n g To i l e t s / Toilettes sches (4) Ha nd w a s hi n g S t ati o n / St ati o n d e l avage d e s m ains (4) Programming: Ground Level Programmation: niveau du sol A Temporary Classroom (Salles de classe temporaires) C Existing Administrative Offices (Bureaux administratifs existants) D Tent (Tente) E 1 4 Well (Puits) Two-story classroom (de deux tages salle de classe) Restrooms (Toilettes)
E
0 4 16 32 48
23
2 3 6 7 5 8 (above/dessus) 9 12
12 Garden (Jardin)
24
1 1 12 1 1 10 2 11 3 6 7 5 8 (above/dessus) 9
32 48
12
16
25
ALTERNATE PLAN
PL AN A LT E R N AT I F
Programming: Ground Level Programmation: niveau du sol C Existing Administrative Office (Bureaux administratif existants) E 1 2 3 4 5 7 8 9 Well (Puits) Two-story classroom (Salles de classe deux (2) tages) Library (Bibliothque) Open Air Cafeteria (Caftria en plein air) Restrooms (Toilettes) Kitchen (Cuisine) Parking (Espace de stationnement) Caretakers Quarters (Locaux des gardiens) Gatekeeper (Gardien)
1 1 12 1 1 10
8 (above/dessus) 5 2 C E
4 16 32
11
7 9
48
12
26
P L A N D E C H O I X P RINC IPAL
PREFERRED PLAN
ALTERNATE PLAN
P LAN ALTERNATIF
PROS / Aspects positifs: Playground is away from classrooms / Sparation de la cour de rcration des salles de classe Toilets and Kitchen are easily accessible from the street / Les toilettes et la cuisine sont facilement accessibles Cafeteria opens to play court for community gatherings / La caftria offre un accs direct la cour de rcration facilitant les rassemblements communautaires. Alle forms clear circulation route / Voie facile de circulation travers le couloir Classroom buildings allow for expansion to the north of the site / Le btiment actuel pourra tre agrandi au Nord du site. Large tree remains / Conservation de larbre dans la cour CONS / Aspects ngatifs: Gate needs to be relocated / La barrire doit tre relocalise. Administrative building demolished / Dmolition du btiment administratif
PROS / Aspects positifs: Existing administration building and gate can remain / Conservation de la barrire actuelle. Cafeteria opens to play court for community gatherings / La caftria offre un accs direct la cour de rcration facilitant les rassemblements communautaires. Alle forms clear circulation route / Voie facile de circulation travers le couloir Classroom buildings allow for expansion to the north of the site / Le btiment actuel pourra tre agrandi au Nord du site. Large tree remains / Conservation de larbre dans la cour CONS / Aspects ngatifs: Noisy playground near classrooms / La cour de rcration est bruyante et trop prs des salles de classe. Kitchen is not easily accessible for supplies / La cuisine nest pas facile daccs. Well is close to road and bathrooms (easily contaminated) / Le puits, proximit de la route et des salles de bains, pourrait facilement tre contamin. First thing you see are the toilets (toilets may smell at entry) / Les toilettes, pouvant dgager de mauvaises odeurs, sont situes proximit des portes dentre et de sortie.
27
EN VIRONME N TA L R E S PO N S E
SOLAR READY ROOF
12n
4pm
9am
PORCH
CLASSROOM
CISTERN
28
NEXT STEPS
PROCHAINES TAPES
NOVEMBER (NOVEMBRE) DECEMBER (DECEMBRE) JANUARY (JANVIER) AWB Meeting 1 (1ere runion AWB) AWB delivers Schematic Design Report (AWB fournit le rapport de conception schmatique) AWB visits Croix Des Bouquets - Trip #1(Premier voyage de AWB) Precedent school visits (Visite des coles prcdentes) Site analysis (Analyse du site) Community design charette (Discussion sur la conception du projet avec la communaut) AWB delivers revised schematic design and fundraising boards (AWB fournit la version rvise du design schmatique et les panneaux pour la collecte de dons) AWB visits Croix-des-Bouquets - Trip #2 (AWB visite Croix-des-Bouquets- deuxime voyage) Schematic design presented to community (Prsentation du concept schmatique la communaut)
29
DESIGN TEAM
LQ U I PE D E D E S I G N
Buzz Tenenbom Julie Campbell Paul Wu Anne Morris Rachel Hedlof Crystal Ng Ruth Timmons Whitney Johnston Masaye Harrison Ratnar Sam