ANALISA BIAYA KONSTRUKSI (ABK) BANGUNAN GEDUNG DAN PERUMAHAN PEKERJAAN PERSIAPAN

A 1 1.1 1 M1 Pagar Sementara Dari Kayu Tinggi 2 m Bahan 1.250 Btg Dolken Kayu F 8-10/400cm 2.500 Kg Semen Portland 0.005 M3 Pasir Beton 0.009 M3 Koral Beton 0.072 M3 Kayu 5/7 0.060 Kg Paku biasa 2" - 5" 0.400 Lt Residu Tenaga 0.200 Oh Tukang Kayu 0.400 Oh Pekerja 0.020 Oh Kepala Tukang 0.020 Oh Mandor

@ @ @ @ @ @ @ @ @ @ @

#REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!

#REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!

1.2

2 2.1

2.2

1 M1 Pagar Sementara Dari Seng Gelombang Tinggi 2 m Bahan @ 1.250 Btg Dolken Kayu F 8-10/400cm @ 2.500 Kg Semen Portland @ 1.200 Lbr Seng Gelombang 3" - 5" 0.005 @ M3 Pasir Beton 0.009 @ M3 Koral Beton 0.072 @ M3 Kayu 5/7 @ 0.060 Kg Paku biasa 2" - 5" @ 0.450 Kg Meni Besi Tenaga @ 0.200 Oh Tukang Kayu @ 0.400 Oh Pekerja @ 0.020 Oh Kepala Tukang @ 0.020 Oh Mandor 1 M1 Pagar Sementara Dari Kawat Duri Tinggi 1.8 m Bahan @ 1.000 Btg Dolken Kayu F 8-10/400cm @ 2.000 Kg Semen Portland @ 25.000 Kg Kawat duri 0.005 @ M3 Pasir Beton 0.009 @ M3 Koral Beton @ 0.060 Kg Paku biasa 2" - 5" Tenaga @ 0.200 Oh Tukang Kayu @ 0.300 Oh Pekerja @ 0.020 Oh Kepala Tukang @ 0.020 Oh Mandor 1 M1 Pengukuran dan Pemasangan Bouwplank Bahan 0.012 M3 Kayu 5/7 0.020 Kg Paku biasa 2" - 5" 0.007 M3 Papan 3/20 Tenaga 0.100 Oh Tukang Kayu 0.100 Oh Pekerja 0.010 Oh Kepala Tukang 0.005 Oh Mandor

#REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!

#REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!

3 3.1

#REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!

#REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!

3.2

4 4.1

@ @ @ @ @ @ @

#REF! #REF! #REF! #REF! #REF! #REF! #REF!

#REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!

4.2

5 5.1

1 M2 Pemb. Kantor Sementara, dengan Lantai Plesteran Bahan @ 1.250 Btg Dolken Kayu F 8-10/400cm 0.180 @ M3 Kayu @ 0.850 Kg Kayu Biasa @ 1.100 Kg Besi strip

#REF! #REF! #REF! #REF!

#REF! #REF! #REF! #REF!

5.2

35.000 0.150 0.100 0.150 30.000 0.250 2.000 0.080 0.150 0.060 Tenaga 2.000 1.000 2.000 0.300 0.050

Kg M3 M3 M3 Bh Lbr Bh M2 Bh Lmb Oh Oh Oh Oh Oh

Semen portland Pasir pasang Pasir beton Koral beton Bata merah Seng plat Jendela nako Kaca polos Kunci tanam Plywood 4 mm Tukang Kayu Tukang Batu Pekerja Kepala Tukang Mandor

@ @ @ @ @ @ @ @ @ @ @ @ @ @ @

#REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!

#REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!

6 6.1

6.2

1 M2 Pemb. Gudang Semen dan Alat-alat Bahan 1.700 Btg Dolken Kayu F 8-10/400cm 0.210 M3 Kayu 0.300 Kg Paku biasa 10.500 Kg Semen Portland 0.030 M3 Pasir beton 0.050 M3 Koral beton 1.500 Lbr Seng gelombang bljs 32 Tenaga 2.000 Oh Tukang Kayu 1.000 Oh Pekerja 0.200 Oh Kepala Tukang 0.050 Oh Mandor 1 M2 Pemb. Rumah Jaga/Konstruksi Kayu Bahan 3.000 Btg Dolken Kayu F 8-10/400cm 0.276 M3 Kayu 0.700 Kg Paku biasa 1.500 Lbr Seng gelombang bljs 32 Tenaga 1.500 Oh Tukang Kayu 1.000 Oh Pekerja 0.150 Oh Kepala Tukang 0.050 Oh Mandor 1 M2 Membersihkan Lapangan dan Perataan Tenaga 0.100 Oh Pekerja 0.050 OH Mandor 1 M2 Pemb. Bedeng Buruh Bahan 1.250 Btg Dolken Kayu F 8-10/400cm 0.186 M3 Kayu 0.300 Kg Paku biasa 18.000 Kg Semen Portland 0.030 M3 Pasir beton 0.050 M3 Koral beton 1.500 Lbr Seng gelombang bljs 32 1.350 Lbr Plywood 4 mm Tenaga 2.000 Oh Tukang Kayu 1.000 Oh Pekerja 0.200 Oh Kepala Tukang 0.050 Oh Mandor

@ @ @ @ @ @ @ @ @ @ @

#REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!

#REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!

7 7.1

@ @ @ @ @ @ @ @

#REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!

#REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!

7.2

8 8.1

@ @

#REF! #REF!

#REF! #REF! #REF!

9 9.1

@ @ @ @ @ @ @

#REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!

#REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!

9.2

@ @ @ @

10 1 M2 Pemb. Bak Adukan Ukuran (40 x 50 x 20) cm 10.1 Bahan

0.036 0.080 1.000 10.2 Tenaga 0.300 0.002 K

M3 Kg Btg Oh Oh

Kayu terentang Paku biasa Kaso 5/7 Tukang Kayu Mandor

@ @ @ @ @

#REF! #REF! #REF! #REF! #REF!

#REF! #REF! #REF! #REF! #REF! #REF!

11 1 M2 Pemb. Stegger dari Bambu, Ukuran (40 x 50 x 20) cm 11.1 Bahan @ 1.000 Btg Bambu F 6 - 8 /600cm @ 0.250 Kg Tali ijuk 11.2 Tenaga @ 0.017 Oh Tukang Kayu @ 0.250 Oh Pekerja @ 0.002 Oh Kepala Tukang @ 0.013 Oh Mandor 12 1 M2 Pembuatan Jalan Sementara 12.1 Bahan 0.150 M3 Batu belah 15/20 0.090 M3 Batu pecah 5/7 0.010 M3 Pasi pasang 12.2 Tenaga 1.000 Oh Pekerja 0.050 Oh Mandor 13 1 M3 Bongkaran Beton Bertulang 13.1 Tenaga 6.667 Oh Pekerja 0.333 Oh Mandor 14 1 M3 Bongkaran Dinding Tembok Batu Merah 14.1 Tenaga 6.667 Oh Pekerja 0.033 Oh Mandor

#REF! #REF! #REF! #REF! #REF! #REF!

#REF! #REF! #REF! #REF! #REF! #REF! #REF!

@ @ @ @ @

#REF! #REF! #REF! #REF! #REF!

#REF! #REF! #REF! #REF! #REF! #REF!

@ @

#REF! #REF!

#REF! #REF! #REF!

@ @

#REF! #REF!

#REF! #REF! #REF!

15 1 M1 Pasang Pagar Kawat Jaring Galvanis, Tinggi 1.00 m 15.1 Bahan @ 0.434 Lbr Pagar kawat jaring 15.2 Tenaga @ 0.042 Oh Tukang Kayu @ 0.042 Oh Pekerja @ 0.004 Oh Kepala Tukang @ 0.002 Oh Mandor 16 1 M1 Pasang Pagar Beton Pracetak (5 x 50 x 213) cm 16.1 Bahan @ 0.986 Lbr Panel beton pracetak @ 0.525 Btg Kolom beton pracetak 0.074 @ M3 Pasir Beton 0.146 @ M3 Koral 2/3 @ 45.000 Kg Semen abu-abu 16.2 Tenaga @ 0.125 Oh Tukang Kayu @ 0.375 Oh Pekerja @ 0.012 Oh Kepala Tukang @ 0.019 Oh Mandor

#REF! #REF! #REF! #REF! #REF!

#REF! #REF! #REF! #REF! #REF! #REF!

#REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!

#REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!

ANALISA BIAYA KONSTRUKSI (ABK) BANGUNAN GEDUNG DAN PERUMAHAN PEKERJAAN TANAH
A 1 1.1 1 M3 Galian Tanah Biasa Sedalam 1 Meter Tenaga 0.400 Oh Pekerja Oh Tukang Gali Oh Kepala Tukang 0.040 Oh Mandor 1 M3 Galian Tanah Biasa Sedalam 2 Meter Tenaga 0.526 Oh Pekerja Oh Tukang Gali Oh Kepala Tukang 0.052 Oh Mandor 1 M3 Galian Tanah Biasa Sedalam 3 Meter Tenaga 0.735 Oh Pekerja Oh Tukang Gali Oh Kepala Tukang 0.073 Oh Mandor 1 M3 Galian Tanah Keras Sedalam 1 Meter Tenaga 0.625 Oh Pekerja Oh Tukang Gali Oh Kepala Tukang 0.062 Oh Mandor 1 M3 Galian Tanah Cadas Sedalam 1 Meter Tenaga 1.250 Oh Pekerja Oh Tukang Gali Oh Kepala Tukang 0.125 Oh Mandor 1 M3 Galian Tanah Lumpur Sedalam 1 Meter Tenaga 0.823 Oh Pekerja Oh Tukang Kayu Oh Kepala Tukang 0.083 Oh Mandor 1 M2 Pekerjaan Stripping Setinggi 1 Meter Tenaga 0.050 Oh Pekerja Oh Tukang Kayu Oh Kepala Tukang 0.005 Oh Mandor 1 M3 Pembuangan Tanah Sejauh 150 Meter Tenaga 0.516 Oh Pekerja Oh Tukang Kayu Oh Kepala Tukang 0.050 Oh Mandor 1 M3 Urugan Kembali Tenaga 0.192 Oh Pekerja Oh Tukang Kayu Oh Kepala Tukang 0.019 Oh Mandor

@ @ @ @

#REF! Rp Rp #REF!

#REF! #REF! #REF!

2 2.1

@ @ @ @

#REF! Rp Rp #REF!

#REF! #REF! #REF!

3 3.1

@ @ @ @

#REF! Rp Rp #REF!

#REF! #REF! #REF!

4 4.1

@ @ @ @

#REF! Rp Rp #REF!

#REF! #REF! #REF!

5 5.1

@ @ @ @

#REF! Rp Rp #REF!

#REF! #REF! #REF!

6 6.1

@ @ @ @

#REF! Rp Rp #REF!

#REF! #REF! #REF!

7 7.1

@ @ @ @

#REF! Rp Rp #REF!

#REF! #REF! #REF!

8 8.1

@ @ @ @

#REF! Rp Rp #REF!

#REF! #REF! #REF!

9 9.1

@ @ @ @

#REF! Rp Rp #REF!

#REF! #REF! #REF!

10 1 M3 Pemadatan Tanah 10.1 Tenaga 0.500 Oh Pekerja Oh Tukang Kayu Oh Kepala Tukang 0.050 Oh Mandor 11 1 M3 Urugan Pasir 11.1 Bahan 1.200 M3 Pasir Urug 11.2 Tenaga 0.300 Oh Pekerja Oh Tukang Kayu Oh Kepala Tukang 0.010 Oh Mandor 12 1 M3 Lapisan Pudel Campuran 1 Kp : 3Ps : 7 Tl 12.1 Bahan 0.330 M3 Pasir Urug 0.109 M3 Kapur Padam 0.763 M3 Tanah Liat 12.2 Tenaga 0.833 Oh Pekerja 0.416 Oh Tukang Batu 0.040 Oh Kepala Tukang 0.083 Oh Mandor 13 1 M3 Lapisan Pudel Campuran 1 Kp : 5 Tl 13.1 Bahan 0.200 M3 Kapur Padam 1.000 M3 Tanah Liat 13.2 Tenaga 0.833 Oh Pekerja 0.416 Oh Tukang Batu 0.041 Oh Kepala Tukang 0.081 Oh Mandor 14 1 M3 Pemasangan Lapisan Ijuk 14.1 Bahan 1.200 M3 Ijuk 14.2 Tenaga 0.150 Oh Pekerja Oh Tukang Gali Oh Kepala Tukang 0.015 Oh Mandor

@ @ @ @

#REF! Rp Rp #REF!

#REF! #REF! #REF!

@ @ @ @ @

#REF! #REF! Rp Rp #REF!

#REF! #REF! #REF! #REF!

@ @ @ @ @ @ @

#REF! #REF! #REF! #REF! #REF! #REF! #REF!

#REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!

@ @ @ @ @ @

#REF! #REF! #REF! #REF! #REF! #REF!

#REF! #REF! #REF! #REF! #REF! #REF! #REF!

@ @ @ @ @

#REF! #REF! Rp Rp #REF!

#REF! #REF! #REF! #REF!

15 1 M1 Pasang Pagar Kawat Jaring Galvanis, Tinggi 1.00 m 15.1 Bahan 1.200 @ M3 Sirtu 15.2 Tenaga @ 0.250 Oh Pekerja @ Oh Tukang Gali @ Oh Kepala Tukang @ 0.025 Oh Mandor 16 1 M2 Pembuatan Jalan Sementara, Tebal 25 cm 16.1 Bahan 0.275 M3 Batu belah 0.030 M3 Kerikil 0.050 M3 Pasir 16.2 Tenaga 1.000 Oh Pekerja Oh Tukang Gali Oh Kepala Tukang 0.100 Oh Mandor

#REF! #REF! Rp Rp #REF!

#REF! #REF! #REF! #REF!

@ @ @ @ @ @ @

#REF! #REF! #REF! #REF! Rp Rp #REF!

#REF! #REF! #REF! #REF! #REF! #REF!

ANALISA BIAYA KONSTRUKSI (ABK) BANGUNAN GEDUNG DAN PERUMAHAN PEKERJAAN PONDASI
A 1 1.1 1 M3 Pasang Pondasi Batu Kali 1 Pc : 1 Ps Bahan 1.100 M3 Batu Belah 15/20 cm 392.000 Kg Semen Portland 0.314 M3 Pasir Pasang Tenaga 1.500 Oh Pekerja 0.600 Oh Tukang Batu 0.060 Oh Kepala Tukang 0.075 Oh Mandor 1 M3 Pasang Pondasi Batu Kali 1 Pc : 2 Ps Bahan 1.100 M3 Batu Belah 15/20 cm 267.000 Kg Semen Portland 0.427 M3 Pasir Pasang Tenaga 1.500 Oh Pekerja 0.600 Oh Tukang Batu 0.060 Oh Kepala Tukang 0.075 Oh Mandor 1 M3 Pasang Pondasi Batu Kali 1 Pc : 2.5 Ps Bahan 1.100 M3 Batu Belah 15/20 cm 392.000 Kg Semen Portland 0.314 M3 Pasir Pasang Tenaga 1.500 Oh Pekerja 0.600 Oh Tukang Batu 0.060 Oh Kepala Tukang 0.075 Oh Mandor 1 M3 Pasang Pondasi Batu Kali 1 Pc : 3 Ps Bahan 1.100 M3 Batu Belah 15/20 cm 202.000 Kg Semen Portland 0.485 M3 Pasir Pasang Tenaga 1.500 Oh Pekerja 0.600 Oh Tukang Batu 0.060 Oh Kepala Tukang 0.075 Oh Mandor 1 M3 Pasang Pondasi Batu Kali 1 Pc : 4 Ps Bahan 1.100 M3 Batu Belah 15/20 cm 163.000 Kg Semen Portland 0.520 M3 Pasir Pasang Tenaga 1.500 Oh Pekerja 0.600 Oh Tukang Batu 0.060 Oh Kepala Tukang 0.075 Oh Mandor 1 M3 Pasang Pondasi Batu Kali 1 Pc : 5 Ps Bahan 1.100 M3 Batu Belah 15/20 cm 136.000 Kg Semen Portland 0.544 M3 Pasir Pasang Tenaga 1.500 Oh Pekerja

@ @ @ @ @ @ @

#REF! #REF! #REF! #REF! #REF! #REF! #REF!

#REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!

1.2

2 2.1

@ @ @ @ @ @ @

#REF! #REF! #REF! #REF! #REF! #REF! #REF!

#REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!

2.2

3 3.1

@ @ @ @ @ @ @

#REF! #REF! #REF! #REF! #REF! #REF! #REF!

#REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!

3.2

4 4.1

@ @ @ @ @ @ @

#REF! #REF! #REF! #REF! #REF! #REF! #REF!

#REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!

4.2

5 5.1

@ @ @ @ @ @ @

#REF! #REF! #REF! #REF! #REF! #REF! #REF!

#REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!

5.2

6 6.1

@ @ @ @

#REF! #REF! #REF! #REF!

#REF! #REF! #REF! #REF!

6.2

0.600 0.060 0.075 G 7 7.1

Oh Oh Oh

Tukang Batu Kepala Tukang Mandor

@ @ @

#REF! #REF! #REF!

#REF! #REF! #REF! #REF!

7.2

1 M3 Pasang Pondasi Batu Kali 1 Pc : 6 Ps Bahan 1.100 M3 Batu Belah 15/20 cm 117.000 Kg Semen Portland 0.561 M3 Pasir Pasang Tenaga 1.500 Oh Pekerja 0.600 Oh Tukang Batu 0.060 Oh Kepala Tukang 0.075 Oh Mandor 1 M3 Pasang Pondasi Batu Kali 1 Pc : 8 Ps Bahan 1.100 M3 Batu Belah 15/20 cm 91.000 Kg Semen Portland 0.561 M3 Pasir Pasang Tenaga 1.500 Oh Pekerja 0.600 Oh Tukang Batu 0.060 Oh Kepala Tukang 0.075 Oh Mandor 1 M3 Pasang Pondasi Batu Kali 1 Kp : 1 SM : 1 Ps Bahan 1.100 M3 Batu Belah 15/20 cm 0.229 Kg Kapur pasang 0.229 Kg Semen Merah 0.544 M3 Pasir Pasang Tenaga 1.500 Oh Pekerja 0.600 Oh Tukang Batu 0.060 Oh Kepala Tukang 0.075 Oh Mandor

@ @ @ @ @ @ @

#REF! #REF! #REF! #REF! #REF! #REF! #REF!

#REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!

8 8.1

@ @ @ @ @ @ @

#REF! #REF! #REF! #REF! #REF! #REF! #REF!

#REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!

8.2

9 9.1

@ @ @ @ @ @ @ @

#REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!

#REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!

9.2

10 1 M3 Pasang Pondasi Batu Kali 1 Kp : 1 SM : 2 Ps 10.1 Bahan 1.100 M3 Batu Belah 15/20 cm 0.170 Kg Kapur pasang 0.170 Kg Semen Merah 0.340 M3 Pasir Pasang 10.2 Tenaga 1.500 Oh Pekerja 0.600 Oh Tukang Batu 0.060 Oh Kepala Tukang 0.075 Oh Mandor 11 1 M3 Pasang Pondasi Batu Kali 1 Cp : 1/4 Kp : 4 Ps 11.1 Bahan 1.100 M3 Batu Belah 15/20 cm 156.000 Kg Semen Portland 0.032 Kg Kapur pasang 0.584 M3 Pasir Pasang 11.2 Tenaga 1.500 Oh Pekerja 0.600 Oh Tukang Batu 0.060 Oh Kepala Tukang 0.075 Oh Mandor

@ @ @ @ @ @ @ @

#REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!

#REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!

@ @ @ @ @ @ @ @

#REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!

#REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!

12 1 M3 Pasang Pondasi Batu Kali 1 Cp : 3 Kp : 10 Ps 12.1 Bahan 1.100 @ M3 Batu Belah 15/20 cm @ 61.000 Kg Semen Portland @ 0.147 Kg Kapur pasang

#REF! #REF! #REF!

#REF! #REF! #REF!

0.492 12.2 Tenaga 1.500 0.600 0.060 0.075 M

M3 Oh Oh Oh Oh

Pasir Pasang Pekerja Tukang Batu Kepala Tukang Mandor

@ @ @ @ @

#REF! #REF! #REF! #REF! #REF!

#REF! #REF! #REF! #REF! #REF! #REF!

13 1 M3 Pasang Pondasi Batu Kali 1/4 Cp : 1 Kp : 4 Ps 13.1 Bahan 1.100 M3 Batu Belah 15/20 cm 41.000 Kg Semen Portland 0.131 Kg Kapur pasang 0.523 M3 Pasir Pasang 13.2 Tenaga 1.500 Oh Pekerja 0.600 Oh Tukang Batu 0.060 Oh Kepala Tukang 0.075 Oh Mandor 14 1 M3 Pasang Pondasi Batu Kosong 14.1 Bahan 1.200 M3 Batu Belah 15/20 cm 0.300 M3 Pasir Urug 14.2 Tenaga 0.780 Oh Pekerja 0.390 Oh Tukang Batu 0.039 Oh Kepala Tukang 0.039 Oh Mandor 15 1 M3 Pasang Pondasi Siklop 40% Batu Kali 15.1 Bahan 75.000 Kg Besi Beton 202.000 Kg Semen Portland 0.320 M3 Pasir Beton 0.490 M3 Koral Beton 0.800 Kg Kawat Beton 15.2 Tenaga 3.000 Oh Pekerja 0.850 Oh Tukang Batu 0.085 Oh Kepala Tukang 0.150 Oh Mandor 16 1 M3 Pasang Pondasi Sumuran Diameter 100 cm 16.1 Bahan 0.450 M3 Batu Belah 15/20 cm 280.000 Kg Semen Portland 0.450 M3 Pasir Beton 0.670 M3 Koral Beton 16.2 Tenaga 2.380 Oh Pekerja 0.300 Oh Tukang Batu 0.030 Oh Kepala Tukang 0.080 Oh Mandor

@ @ @ @ @ @ @ @

#REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!

#REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!

@ @ @ @ @ @

#REF! #REF! #REF! #REF! #REF! #REF!

#REF! #REF! #REF! #REF! #REF! #REF! #REF!

@ @ @ @ @ @ @ @ @

#REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!

#REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!

@ @ @ @ @ @ @ @

#REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!

#REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!

17 1 M3 Pembuatan Tiang Pancang (40 x 40) Cm, Beton Bertulang 17.1 Bahan 0.019 @ #REF! M3 Pasir Urug Darat 0.094 @ #REF! M3 Pasir Beton 0.150 @ #REF! M3 Koral Beton @ #REF! 60.500 Kg Semen Portland @ #REF! 45.000 Kg Besi Beton @ #REF! 0.900 Kg Kawat Beton 0.032 @ #REF! M3 Kayu Kaso 5/7 @ #REF! 0.120 Kg Paku @ #REF! 0.090 Lt Minyak Bekisting @ #REF! 0.240 Kg Plamur Tembok 17.2 Tenaga

#REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!

1.000 0.670 0.067 0.050 R

Oh Oh Oh Oh

Pekerja Tukang Batu Kepala Tukang Mandor

@ @ @ @

#REF! #REF! #REF! #REF!

#REF! #REF! #REF! #REF! #REF!

18 1 M3 Pembuatan Tiang Pancang (35 x 35) Cm, Beton Bertulang 18.1 Bahan 0.016 @ #REF! M3 Pasir Urug Darat 0.080 @ #REF! M3 Pasir Beton 0.125 @ #REF! M3 Koral Beton @ #REF! 49.000 Kg Semen Portland @ #REF! 34.500 Kg Besi Beton @ #REF! 0.700 Kg Kawat Beton 0.027 @ #REF! M3 Kayu Kaso 5/7 @ #REF! 0.120 Kg Paku @ #REF! 0.090 Lt Minyak Bekisting @ #REF! 0.200 Kg Plamur Tembok 18.2 Tenaga @ #REF! 0.800 Oh Pekerja @ #REF! 0.500 Oh Tukang Batu @ #REF! 0.050 Oh Kepala Tukang @ #REF! 0.040 Oh Mandor

#REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!

ANALISA BIAYA KONSTRUKSI (ABK) BANGUNAN GEDUNG DAN PERUMAHAN PEKERJAAN DINDING
A 1 1.1 1 M2 Pasangan Bata Merah Tebal 1 Bata, 1 Pc : 1 Ps Bahan @ 140.000 Bh Batu Merah 5 x 11 x 22 cm @ 64.030 Kg Semen Portland 0.059 @ M3 Pasir Pasang Tenaga @ 0.650 Oh Pekerja @ 0.200 Oh Tukang Batu @ 0.020 Oh Kepala Tukang @ 0.030 Oh Mandor 1 M2 Pasangan Bata Merah Tebal 1 Bata, 1 Pc : 2 Ps Bahan @ 140.000 Bh Batu Merah 5 x 11 x 22 cm @ 43.500 Kg Semen Portland 0.080 @ M3 Pasir Pasang Tenaga @ 0.650 Oh Pekerja @ 0.200 Oh Tukang Batu @ 0.020 Oh Kepala Tukang @ 0.030 Oh Mandor 1 M2 Pasangan Bata Merah Tebal 1 Bata, 1 Pc : 3 Ps Bahan @ 140.000 Bh Batu Merah 5 x 11 x 22 cm @ 32.950 Kg Semen Portland 0.091 @ M3 Pasir Pasang Tenaga @ 0.650 Oh Pekerja @ 0.200 Oh Tukang Batu @ 0.020 Oh Kepala Tukang @ 0.030 Oh Mandor 1 M2 Pasangan Bata Merah Tebal 1 Bata, 1 Pc : 4 Ps Bahan @ 140.000 Bh Batu Merah 5 x 11 x 22 cm @ 26.550 Kg Semen Portland 0.093 @ M3 Pasir Pasang Tenaga @ 0.650 Oh Pekerja @ 0.200 Oh Tukang Batu @ 0.020 Oh Kepala Tukang @ 0.030 Oh Mandor 1 M2 Pasangan Bata Merah Tebal 1 Bata, 1 Pc : 5 Ps Bahan @ 140.000 Bh Batu Merah 5 x 11 x 22 cm @ 22.200 Kg Semen Portland 0.102 @ M3 Pasir Pasang Tenaga @ 0.650 Oh Pekerja @ 0.200 Oh Tukang Batu @ 0.020 Oh Kepala Tukang @ 0.030 Oh Mandor 1 M2 Pasangan Bata Merah Tebal 1 Bata, 1 Pc : 6 Ps Bahan @ 140.000 Bh Batu Merah 5 x 11 x 22 cm @ 22.200 Kg Semen Portland 0.102 @ M3 Pasir Pasang Tenaga @ 0.650 Oh Pekerja @ 0.200 Oh Tukang Batu

#REF! #REF! #REF! #REF! #REF! #REF! #REF!

#REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!

1.2

2 2.1

#REF! #REF! #REF! #REF! #REF! #REF! #REF!

#REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!

2.2

3 3.1

#REF! #REF! #REF! #REF! #REF! #REF! #REF!

#REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!

3.2

4 4.1

#REF! #REF! #REF! #REF! #REF! #REF! #REF!

#REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!

4.2

5 5.1

#REF! #REF! #REF! #REF! #REF! #REF! #REF!

#REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!

5.2

6 6.1

#REF! #REF! #REF! #REF! #REF!

#REF! #REF! #REF! #REF! #REF!

6.2

0.020 0.030 G 7 7.1

Oh Oh

Kepala Tukang Mandor

@ @

#REF! #REF!

#REF! #REF! #REF!

7.2

1 M2 Pasangan Bata Merah Tebal 1 Bata, 1 Pc : 3 Kp : 10 Ps Bahan @ 140.000 Bh Batu Merah 5 x 11 x 22 cm @ 10.080 Kg Semen Portland 0.093 @ M3 Pasir Pasang 0.028 @ M3 Kapur Pasang Tenaga @ 0.650 Oh Pekerja @ 0.200 Oh Tukang Batu @ 0.020 Oh Kepala Tukang @ 0.030 Oh Mandor 1 M2 Pasangan Bata Merah Tebal 1/2 Bata, 1 Pc : 1 Ps Bahan @ 70.000 Bh Batu Merah 5 x 11 x 22 cm @ 27.800 Kg Semen Portland 0.028 @ M3 Pasir Pasang Tenaga @ 0.320 Oh Pekerja @ 0.100 Oh Tukang Batu @ 0.010 Oh Kepala Tukang @ 0.015 Oh Mandor 1 M2 Pasangan Bata Merah Tebal 1/2 Bata, 1 Pc : 2 Ps Bahan @ 70.000 Bh Batu Merah 5 x 11 x 22 cm @ 18.950 Kg Semen Portland 0.038 @ M3 Pasir Pasang Tenaga @ 0.320 Oh Pekerja @ 0.100 Oh Tukang Batu @ 0.010 Oh Kepala Tukang @ 0.015 Oh Mandor

#REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!

#REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!

8 8.1

#REF! #REF! #REF! #REF! #REF! #REF! #REF!

#REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!

8.2

9 9.1

#REF! #REF! #REF! #REF! #REF! #REF! #REF!

#REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!

9.2

10 1 M2 Pasangan Bata Merah Tebal 1/2 Bata, 1 Pc : 3 Ps 10.1 Bahan @ 70.000 Bh Batu Merah 5 x 11 x 22 cm @ 14.370 Kg Semen Portland 0.040 @ M3 Pasir Pasang 10.2 Tenaga @ 0.320 Oh Pekerja @ 0.100 Oh Tukang Batu @ 0.010 Oh Kepala Tukang @ 0.015 Oh Mandor 11 1 M2 Pasangan Bata Merah Tebal 1/2 Bata, 1 Pc : 4 Ps 11.1 Bahan @ 70.000 Bh Batu Merah 5 x 11 x 22 cm @ 11.500 Kg Semen Portland 0.043 @ M3 Pasir Pasang 11.2 Tenaga @ 0.320 Oh Pekerja @ 0.100 Oh Tukang Batu @ 0.010 Oh Kepala Tukang @ 0.015 Oh Mandor 12 1 M2 Pasangan Bata Merah Tebal 1/2 Bata, 1 Pc : 5 Ps 12.1 Bahan @ 70.000 Bh Batu Merah 5 x 11 x 22 cm @ 9.680 Kg Semen Portland 0.045 @ M3 Pasir Pasang 12.2 Tenaga @ 0.320 Oh Pekerja @ 0.100 Oh Tukang Batu

#REF! #REF! #REF! #REF! #REF! #REF! #REF!

#REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!

#REF! #REF! #REF! #REF! #REF! #REF! #REF!

#REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!

#REF! #REF! #REF! #REF! #REF!

#REF! #REF! #REF! #REF! #REF!

0.010 0.015 M

Oh Oh

Kepala Tukang Mandor

@ @

#REF! #REF!

#REF! #REF! #REF!

13 1 M2 Pasangan Bata Merah Tebal 1/2 Bata, 1 Pc : 6 Ps 13.1 Bahan @ 70.000 Bh Batu Merah 5 x 11 x 22 cm @ 8.320 Kg Semen Portland 0.049 @ M3 Pasir Pasang 13.2 Tenaga @ 0.320 Oh Pekerja @ 0.100 Oh Tukang Batu @ 0.010 Oh Kepala Tukang @ 0.015 Oh Mandor 14 1 M2 Pasangan Bata Merah Tebal 1/2 Bata, 1 Pc : 8 Ps 14.1 Bahan @ 70.000 Bh Batu Merah 5 x 11 x 22 cm @ 6.500 Kg Semen Portland 0.050 @ M3 Pasir Pasang 14.2 Tenaga @ 0.320 Oh Pekerja @ 0.100 Oh Tukang Batu @ 0.010 Oh Kepala Tukang @ 0.015 Oh Mandor 15 1 M2 Pasangan Bata Merah Tebal 1/2 Bata, 1 Pc : 3 Kp : 10 Ps 15.1 Bahan @ 70.000 Bh Batu Merah 5 x 11 x 22 cm @ 4.500 Kg Semen Portland 0.050 @ M3 Pasir Pasang 0.015 @ M3 Kapur Padam 15.2 Tenaga @ 0.320 Oh Pekerja @ 0.100 Oh Tukang Batu @ 0.010 Oh Kepala Tukang @ 0.015 Oh Mandor 16 1 M2 Pasangan Bata Merah Tebal 1/2 Bata, 1 Kp : 1 Sm : 1 Ps 16.1 Bahan @ 70.000 Bh Batu Merah 5 x 11 x 22 cm 0.018 M3 Semen Merah/Batu Merah Tumbuk @ 0.018 @ M3 Pasir Pasang 0.018 @ M3 Kapur Padam 16.2 Tenaga @ 0.320 Oh Pekerja @ 0.100 Oh Tukang Batu @ 0.010 Oh Kepala Tukang @ 0.015 Oh Mandor 17 1 M2 Pasangan Bata Merah Tebal 1/2 Bata, 1 Kp : 1 Sm : 2 Ps 17.1 Bahan @ 70.000 Bh Batu Merah 5 x 11 x 22 cm 0.014 M3 Semen Merah/Batu Merah Tumbuk @ 0.028 @ M3 Pasir Pasang 0.014 @ M3 Kapur Padam 17.2 Tenaga @ 0.320 Oh Pekerja @ 0.100 Oh Tukang Batu @ 0.010 Oh Kepala Tukang @ 0.015 Oh Mandor 18 1 M2 Pasangan Dinding Hollowblock (HB : 20) 18.1 Bahan 12.500 Bh Hollow Block (HB : 20) 13.500 Kg Semen Portland 0.048 M3 Pasir Pasang 1.950 Kg Besi Beton Polos

#REF! #REF! #REF! #REF! #REF! #REF! #REF!

#REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!

#REF! #REF! #REF! #REF! #REF! #REF! #REF!

#REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!

#REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!

#REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!

#REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!

#REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!

#REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!

#REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!

@ @ @ @

#REF! #REF! #REF! #REF!

#REF! #REF! #REF! #REF!

18.2 Tenaga 0.350 0.150 0.015 0.017 S

Oh Oh Oh Oh

Pekerja Tukang Batu Kepala Tukang Mandor

@ @ @ @

#REF! #REF! #REF! #REF!

#REF! #REF! #REF! #REF! #REF!

19 1 M2 Pasangan Dinding Hollowblock (HB : 15) 19.1 Bahan 12.500 Bh Hollow Block (HB : 15) 10.450 Kg Semen Portland 0.038 M3 Pasir Pasang 1.950 Kg Besi Beton Polos 19.2 Tenaga 0.320 Oh Pekerja 0.120 Oh Tukang Batu 0.012 Oh Kepala Tukang 0.015 Oh Mandor 20 1 M2 Pasangan Dinding Hollowblock (HB : 10) 20.1 Bahan 12.500 Bh Hollow Block (HB : 10) 7.500 Kg Semen Portland 0.027 M3 Pasir Pasang 1.950 Kg Besi Beton Polos 20.2 Tenaga 0.320 Oh Pekerja 0.100 Oh Tukang Batu 0.010 Oh Kepala Tukang 0.015 Oh Mandor 21 1 M2 Pasangan Dinding Conblock (HB : 20) 21.1 Bahan 12.500 Bh Concrete Block (CB : 20) 14.050 Kg Semen Portland 0.004 M3 Pasir Beton 0.042 M3 Pasir Pasang 3.870 Kg Besi Beton Polos 0.006 Kg Paku Biasa 2" - 5" 0.001 Kg Kayu Terentang 0.030 Kg Kawat Beton 0.005 Kg Koral Beton 21.2 Tenaga 0.370 Oh Pekerja 0.157 Oh Tukang Batu 0.007 Oh Tukang Besi 0.016 Oh Kepala Tukang 0.019 Oh Mandor 22 1 M2 Pasangan Dinding Conblock (HB : 15) 22.1 Bahan 12.500 Bh Concrete Block (CB : 15) 10.460 Kg Semen Portland 0.003 M3 Pasir Beton 0.032 M3 Pasir Pasang 0.870 Kg Besi Beton Polos 0.004 Kg Paku Biasa 2" - 5" 0.001 Kg Kayu Terentang 0.020 Kg Kawat Beton 0.004 Kg Koral Beton 22.2 Tenaga 0.340 Oh Pekerja 0.130 Oh Tukang Batu 0.007 Oh Tukang Besi 0.014 Oh Kepala Tukang 0.017 Oh Mandor 23 1 M2 Pasangan Dinding Conblock (HB : 10) 23.1 Bahan

@ @ @ @ @ @ @ @

#REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!

#REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!

@ @ @ @ @ @ @ @

#REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!

#REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!

@ @ @ @ @ @ @ @ @ @ @ @ @ @

#REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!

#REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!

@ @ @ @ @ @ @ @ @ @ @ @ @ @

#REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!

#REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!

12.500 7.200 0.002 0.021 2.540 0.003 0.001 0.015 0.003 23.2 Tenaga 0.340 0.107 0.007 0.011 0.017 X

Bh Kg M3 M3 Kg Kg Kg Kg Kg Oh Oh Oh Oh Oh

Concrete Block (CB : 10) Semen Portland Pasir Beton Pasir Pasang Besi Beton Polos Paku Biasa 2" - 5" Kayu Terentang Kawat Beton Koral Beton Pekerja Tukang Batu Tukang Besi Kepala Tukang Mandor

@ @ @ @ @ @ @ @ @ @ @ @ @ @

#REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!

#REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!

24 1 M2 Pasangan Dinding Latai 24.1 Bahan 2.500 Bh Bondbeam 40 x 20 x 20 cm 5.100 Kg Semen Portland 0.080 M3 Pasir Beton 1.500 Kg Besi Beton Polos 0.150 M3 Koral Beton 24.2 Tenaga 0.100 Oh Pekerja 0.030 Oh Tukang Batu 0.030 Oh Tukang Besi 0.006 Oh Kepala Tukang 0.005 Oh Mandor

@ @ @ @ @ @ @ @ @ @

#REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!

#REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!

25 1 M2 Pasang Dinding Rooster/Terawang (12 x 11 x 24) cm 25.1 Bahan @ 36.000 Bh Rosster/Terawang @ 12.800 Kg Semen Portland 0.035 @ M3 Pasir Pasang 25.2 Tenaga @ 0.300 Oh Pekerja @ 0.100 Oh Tukang Batu @ 0.010 Oh Kepala Tukang @ 0.015 Oh Mandor 26 1 M2 Pasang Bata Berongga (5 x 11 x 24) cm 26.1 Bahan 80.000 Bh Bata Berongga 23.650 Kg Semen Portland 0.570 M3 Pasir Pasang 26.2 Tenaga 0.320 Oh Pekerja 0.150 Oh Tukang Batu 0.015 Oh Kepala Tukang 0.015 Oh Mandor

#REF! #REF! #REF! #REF! #REF! #REF! #REF!

#REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!

@ @ @ @ @ @ @

#REF! #REF! #REF! #REF! #REF! #REF! #REF!

#REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!

AB 27 1 M2 Pasang Dinding Anyaman Bambu, Rangka Kayu 27.1 Bahan 1.500 @ M2 Bilik Bambu 0.014 @ M3 Kayu 5/7 @ 0.012 Kg Paku 0.003 @ M3 List Kayu 2/4 27.2 Tenaga @ 0.100 Oh Pekerja @ 0.050 Oh Tukang Batu @ 0.005 Oh Kepala Tukang @ 0.002 Oh Mandor

#REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!

#REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!

ANALISA BIAYA KONSTRUKSI (ABK) BANGUNAN GEDUNG DAN PERUMAHAN PEKERJAAN PLESTERAN
A 1 1.1 1 M2 Plesteran 1 Pc : 1 Ps Tebal 15 mm Bahan 12.920 Kg Semen Portland 0.013 M3 Pasir Pasang Tenaga 0.200 Oh Pekerja 0.150 Oh Tukang Batu 0.015 Oh Kepala Tukang 0.010 Oh Mandor 1 M2 Plesteran 1 Pc : 2 Ps Tebal 15 mm Bahan 8.520 Kg Semen Portland 0.017 M3 Pasir Pasang Tenaga 0.200 Oh Pekerja 0.150 Oh Tukang Batu 0.015 Oh Kepala Tukang 0.010 Oh Mandor 1 M2 Plesteran 1 Pc : 3 Ps Tebal 15 mm Bahan 6.480 Kg Semen Portland 0.019 M3 Pasir Pasang Tenaga 0.200 Oh Pekerja 0.150 Oh Tukang Batu 0.015 Oh Kepala Tukang 0.010 Oh Mandor 1 M2 Plesteran 1 Pc : 4 Ps Tebal 15 mm Bahan 5.200 Kg Semen Portland 0.020 M3 Pasir Pasang Tenaga 0.200 Oh Pekerja 0.150 Oh Tukang Batu 0.015 Oh Kepala Tukang 0.010 Oh Mandor 1 M2 Plesteran 1 Pc : 5 Ps Tebal 15 mm Bahan 4.320 Kg Semen Portland 0.022 M3 Pasir Pasang Tenaga 0.200 Oh Pekerja 0.150 Oh Tukang Batu 0.015 Oh Kepala Tukang 0.010 Oh Mandor 1 M2 Plesteran 1 Pc : 6 Ps Tebal 15 mm Bahan 3.680 Kg Semen Portland 0.023 M3 Pasir Pasang Tenaga 0.200 Oh Pekerja 0.150 Oh Tukang Batu 0.015 Oh Kepala Tukang 0.010 Oh Mandor 1 M2 Plesteran 1 Pc : 8 Ps Tebal 15 mm Bahan 2.880 Kg Semen Portland

@ @ @ @ @ @

#REF! #REF! #REF! #REF! #REF! #REF!

#REF! #REF! #REF! #REF! #REF! #REF! #REF!

1.2

2 2.1

@ @ @ @ @ @

#REF! #REF! #REF! #REF! #REF! #REF!

#REF! #REF! #REF! #REF! #REF! #REF! #REF!

2.2

3 3.1

@ @ @ @ @ @

#REF! #REF! #REF! #REF! #REF! #REF!

#REF! #REF! #REF! #REF! #REF! #REF! #REF!

3.2

4 4.1

@ @ @ @ @ @

#REF! #REF! #REF! #REF! #REF! #REF!

#REF! #REF! #REF! #REF! #REF! #REF! #REF!

4.2

5 5.1

@ @ @ @ @ @

#REF! #REF! #REF! #REF! #REF! #REF!

#REF! #REF! #REF! #REF! #REF! #REF! #REF!

5.2

6 6.1

@ @ @ @ @ @

#REF! #REF! #REF! #REF! #REF! #REF!

#REF! #REF! #REF! #REF! #REF! #REF! #REF!

6.2

7 7.1

#REF!

#REF!

7.2

0.024 Tenaga 0.200 0.150 0.015 0.010

M3 Oh Oh Oh Oh

Pasir Pasang Pekerja Tukang Batu Kepala Tukang Mandor

@ @ @ @ @

#REF! #REF! #REF! #REF! #REF!

#REF! #REF! #REF! #REF! #REF! #REF!

8 8.1

8.2

1 M2 Plesteran 1 Pc : 0.5 Kp : 3 Ps Tebal 15 mm Bahan 5.760 Kg Semen Portland 0.003 M3 Kapur Padam 0.013 M3 Pasir Pasang Tenaga 0.200 Oh Pekerja 0.150 Oh Tukang Batu 0.015 Oh Kepala Tukang 0.010 Oh Mandor 1 M2 Plesteran 1 Pc : 3Kp : 10 Ps Tebal 15 mm Bahan 1.840 Kg Semen Portland 0.006 M3 Kapur Padam 0.014 M3 Pasir Pasang Tenaga 0.200 Oh Pekerja 0.150 Oh Tukang Batu 0.015 Oh Kepala Tukang 0.010 Oh Mandor

@ @ @ @ @ @ @

#REF! #REF! #REF! #REF! #REF! #REF! #REF!

#REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!

9 9.1

@ @ @ @ @ @ @

#REF! #REF! #REF! #REF! #REF! #REF! #REF!

#REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!

9.2

10 1 M2 Plesteran 0.5 Pc : 1 Kp : 4 Ps, Tebal 15 mm 10.1 Bahan 3.000 Kg Semen Portland 0.005 M3 Kapur Padam 0.019 M3 Pasir Pasang 10.2 Tenaga 0.200 Oh Pekerja 0.150 Oh Tukang Batu 0.015 Oh Kepala Tukang 0.010 Oh Mandor 11 1 M2 Plesteran 1 Kp : 1 Sm : 1 Ps, Tebal 15 mm 11.1 Bahan 0.009 M3 Semen Merah 0.009 M3 Kapur Padam 0.009 M3 Pasir Pasang 11.2 Tenaga 0.200 Oh Pekerja 0.150 Oh Tukang Batu 0.015 Oh Kepala Tukang 0.010 Oh Mandor 12 1 M2 Plesteran 1 Kp : 1 Sm : 2 Ps, Tebal 15 mm 12.1 Bahan 0.007 M3 Semen Merah 0.007 M3 Kapur Padam 0.015 M3 Pasir Pasang 12.2 Tenaga 0.200 Oh Pekerja 0.150 Oh Tukang Batu 0.015 Oh Kepala Tukang 0.010 Oh Mandor 13 1 M2 Plesteran 1 Pc : 2 Ps, Tebal 20 mm 13.1 Bahan 14.280 Kg Semen Portland 0.023 M3 Pasir Pasang 13.2 Tenaga

@ @ @ @ @ @ @

#REF! #REF! #REF! #REF! #REF! #REF! #REF!

#REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!

@ @ @ @ @ @ @

#REF! #REF! #REF! #REF! #REF! #REF! #REF!

#REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!

@ @ @ @ @ @ @

#REF! #REF! #REF! #REF! #REF! #REF! #REF!

#REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!

@ @

#REF! #REF!

#REF! #REF!

0.250 0.200 0.020 0.013 N

Oh Oh Oh Oh

Pekerja Tukang Batu Kepala Tukang Mandor

@ @ @ @

#REF! #REF! #REF! #REF!

#REF! #REF! #REF! #REF! #REF!

14 1 M2 Plesteran 1 Pc : 3 Ps Tebal 20 mm 14.1 Bahan 10.800 Kg Semen Portland 0.026 M3 Pasir Pasang 14.2 Tenaga 0.250 Oh Pekerja 0.200 Oh Tukang Batu 0.020 Oh Kepala Tukang 0.013 Oh Mandor 15 1 M2 Plesteran 1 Pc : 4 Ps Tebal 20 mm 15.1 Bahan 8.680 Kg Semen Portland 0.028 M3 Pasir Pasang 15.2 Tenaga 0.250 Oh Pekerja 0.200 Oh Tukang Batu 0.020 Oh Kepala Tukang 0.013 Oh Mandor 16 1 M2 Plesteran 1 Pc : 5 Ps Tebal 20 mm 16.1 Bahan 7.290 Kg Semen Portland 0.028 M3 Pasir Pasang 16.2 Tenaga 0.250 Oh Pekerja 0.200 Oh Tukang Batu 0.020 Oh Kepala Tukang 0.013 Oh Mandor 17 1 M2 Plesteran 1 Pc : 6 Ps Tebal 20 mm 17.1 Bahan 6.240 Kg Semen Portland 0.030 M3 Pasir Pasang 17.2 Tenaga 0.250 Oh Pekerja 0.200 Oh Tukang Batu 0.020 Oh Kepala Tukang 0.013 Oh Mandor 18 1 M2 Plesteran 1 Kp : 1 Sm : 2 Ps, Tebal 20 mm 18.1 Bahan 0.009 M3 Semen Merah 0.009 M3 Kapur Padam 0.018 M3 Pasir Pasang 18.2 Tenaga 0.250 Oh Pekerja 0.200 Oh Tukang Batu 0.020 Oh Kepala Tukang 0.013 Oh Mandor 19 1 M2 Plesteran 1 Pc : 2 Ps, Tebal 25 mm 19.1 Bahan 15.500 Kg Semen Portland 0.013 M3 Pasir Pasang 19.2 Tenaga 0.300 Oh Pekerja 0.200 Oh Tukang Batu 0.020 Oh Kepala Tukang 0.013 Oh Mandor 20 1 M2 Plesteran 1 Pc : 3 Ps, Tebal 25 mm

@ @ @ @ @ @

#REF! #REF! #REF! #REF! #REF! #REF!

#REF! #REF! #REF! #REF! #REF! #REF! #REF!

@ @ @ @ @ @

#REF! #REF! #REF! #REF! #REF! #REF!

#REF! #REF! #REF! #REF! #REF! #REF! #REF!

@ @ @ @ @ @

#REF! #REF! #REF! #REF! #REF! #REF!

#REF! #REF! #REF! #REF! #REF! #REF! #REF!

@ @ @ @ @ @

#REF! #REF! #REF! #REF! #REF! #REF!

#REF! #REF! #REF! #REF! #REF! #REF! #REF!

@ @ @ @ @ @ @

#REF! #REF! #REF! #REF! #REF! #REF! #REF!

#REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!

@ @ @ @ @ @

#REF! #REF! #REF! #REF! #REF! #REF!

#REF! #REF! #REF! #REF! #REF! #REF! #REF!

20.1 Bahan 11.750 0.035 20.2 Tenaga 0.300 0.200 0.020 0.013 U

Kg M3 Oh Oh Oh Oh

Semen Portland Pasir Pasang Pekerja Tukang Batu Kepala Tukang Mandor

@ @ @ @ @ @

#REF! #REF! #REF! #REF! #REF! #REF!

#REF! #REF! #REF! #REF! #REF! #REF! #REF!

21 1 M2 Plesteran 1 Pc : 4 Ps, Tebal 25 mm 21.1 Bahan 9.480 Kg Semen Portland 0.038 M3 Pasir Pasang 21.2 Tenaga 0.300 Oh Pekerja 0.200 Oh Tukang Batu 0.020 Oh Kepala Tukang 0.013 Oh Mandor 22 1 M2 Plesteran 1 Pc : 5 Ps, Tebal 25 mm 22.1 Bahan 7.940 Kg Semen Portland 0.039 M3 Pasir Pasang 22.2 Tenaga 0.300 Oh Pekerja 0.200 Oh Tukang Batu 0.020 Oh Kepala Tukang 0.013 Oh Mandor 23 1 M2 Plesteran 1 Pc : 2 Ps, Tebal 30 mm 23.1 Bahan 18.650 Kg Semen Portland 0.035 M3 Pasir Pasang 23.2 Tenaga 0.320 Oh Pekerja 0.250 Oh Tukang Batu 0.025 Oh Kepala Tukang 0.015 Oh Mandor 24 1 M2 Plesteran 1 Pc : 3 Ps, Tebal 30 mm 24.1 Bahan 14.150 Kg Semen Portland 0.039 M3 Pasir Pasang 24.2 Tenaga 0.320 Oh Pekerja 0.250 Oh Tukang Batu 0.025 Oh Kepala Tukang 0.015 Oh Mandor 25 1 M2 Plesteran 1 Pc : 4 Ps, Tebal 30 mm 25.1 Bahan 11.380 Kg Semen Portland 0.042 M3 Pasir Pasang 25.2 Tenaga 0.320 Oh Pekerja 0.250 Oh Tukang Batu 0.025 Oh Kepala Tukang 0.015 Oh Mandor 26 1 M2 Plesteran 1 Pc : 5 Ps, Tebal 30 mm 26.1 Bahan 8.190 Kg Semen Portland 0.045 M3 Pasir Pasang 26.2 Tenaga 0.320 Oh Pekerja 0.250 Oh Tukang Batu 0.025 Oh Kepala Tukang

@ @ @ @ @ @

#REF! #REF! #REF! #REF! #REF! #REF!

#REF! #REF! #REF! #REF! #REF! #REF! #REF!

@ @ @ @ @ @

#REF! #REF! #REF! #REF! #REF! #REF!

#REF! #REF! #REF! #REF! #REF! #REF! #REF!

@ @ @ @ @ @

#REF! #REF! #REF! #REF! #REF! #REF!

#REF! #REF! #REF! #REF! #REF! #REF! #REF!

@ @ @ @ @ @

#REF! #REF! #REF! #REF! #REF! #REF!

#REF! #REF! #REF! #REF! #REF! #REF! #REF!

@ @ @ @ @ @

#REF! #REF! #REF! #REF! #REF! #REF!

#REF! #REF! #REF! #REF! #REF! #REF! #REF!

@ @ @ @ @

#REF! #REF! #REF! #REF! #REF!

#REF! #REF! #REF! #REF! #REF!

0.015

Oh

Mandor

#REF!

#REF! #REF!

AA 27 1 M2 Berapen 1 Pc : 3 Ps, Tebal 30 mm 27.1 Bahan 7.070 Kg Semen Portland 0.021 M3 Pasir Pasang 27.2 Tenaga 0.150 Oh Pekerja 0.070 Oh Tukang Batu 0.007 Oh Kepala Tukang 0.008 Oh Mandor AB 28 1 M2 Berapen 1 Pc : 5 Ps, Tebal 15 mm 28.1 Bahan 5.670 Kg Semen Portland 0.023 M3 Pasir Pasang 28.2 Tenaga 0.150 Oh Pekerja 0.070 Oh Tukang Batu 0.007 Oh Kepala Tukang 0.008 Oh Mandor AC 29 1 M2 Plesteran Beton 1 Pc : 2 Ps, Tebal 15 mm 29.1 Bahan 9.300 Kg Semen Portland 0.018 M3 Pasir Pasang 29.2 Tenaga 0.260 Oh Pekerja 0.200 Oh Tukang Batu 0.020 Oh Kepala Tukang 0.013 Oh Mandor AD 30 1 M2 Plesteran Beton 1 Pc : 3 Ps, Tebal 15 mm 30.1 Bahan 7.070 Kg Semen Portland 0.021 M3 Pasir Pasang 30.2 Tenaga 0.260 Oh Pekerja 0.200 Oh Tukang Batu 0.020 Oh Kepala Tukang 0.013 Oh Mandor AE 31 1 M2 Plesteran Skoning 1 Pc : 2 Ps 31.1 Bahan 0.500 Kg Semen Portland 0.002 M3 Pasir Pasang 31.2 Tenaga 0.057 Oh Pekerja 0.038 Oh Tukang Batu 0.038 Oh Kepala Tukang 0.002 Oh Mandor AF

@ @ @ @ @ @

#REF! #REF! #REF! #REF! #REF! #REF!

#REF! #REF! #REF! #REF! #REF! #REF! #REF!

@ @ @ @ @ @

#REF! #REF! #REF! #REF! #REF! #REF!

#REF! #REF! #REF! #REF! #REF! #REF! #REF!

@ @ @ @ @ @

#REF! #REF! #REF! #REF! #REF! #REF!

#REF! #REF! #REF! #REF! #REF! #REF! #REF!

@ @ @ @ @ @

#REF! #REF! #REF! #REF! #REF! #REF!

#REF! #REF! #REF! #REF! #REF! #REF! #REF!

@ @ @ @ @ @

#REF! #REF! #REF! #REF! #REF! #REF!

#REF! #REF! #REF! #REF! #REF! #REF! #REF!

32 1 M2 Plesteran Granito 1 Pc Warna : 2 Granito, Tebal 10 mm 32.1 Bahan @ 0.144 Kg PC Warna @ 15.000 Kg Batu Granito 32.2 Tenaga @ 0.050 Oh Pekerja @ 0.020 Oh Tukang Batu @ 0.002 Oh Kepala Tukang @ 0.005 Oh Mandor

#REF! #REF! #REF! #REF! #REF! #REF!

#REF! #REF! #REF! #REF! #REF! #REF! #REF!

AG 33 1 M2 Plesteran Teraso, 1 Pc Warna : 2 Batu Teraso, Tebal 10 mm 33.1 Bahan @ #REF! 0.440 Kg PC Warna @ #REF! 11.500 Kg Batu Teraso 33.2 Tenaga @ #REF! 0.450 Oh Pekerja

#REF! #REF! #REF!

0.200 0.020 0.025

Oh Oh Oh

Tukang Batu Kepala Tukang Mandor

@ @ @

#REF! #REF! #REF!

#REF! #REF! #REF! #REF!

AH 34 1 M2 Plesteran Ciprat 1 Pc : 2 Ps 34.1 Bahan 4.320 Kg Semen Portland 0.016 M3 Pasir Pasang 34.2 Tenaga 0.250 Oh Pekerja 0.100 Oh Tukang Batu 0.010 Oh Kepala Tukang 0.015 Oh Mandor AI 35 1 M2 Plesteran Siar Adukan 1 Pc : 2 Ps 35.1 Bahan 4.320 Kg Semen Portland 0.016 M3 Pasir Pasang 35.2 Tenaga 0.150 Oh Pekerja 0.070 Oh Tukang Batu 0.007 Oh Kepala Tukang 0.008 Oh Mandor 36 1 M2 Plesteran Waterproof Batacote 3 Lapis 36.1 Bahan 0.500 Kg Semen Portland 2.900 Kg Batacote 0.006 M3 Pasir Pasang 36.2 Tenaga 0.300 Oh Pekerja 0.200 Oh Tukang Batu 0.020 Oh Kepala Tukang 0.015 Oh Mandor

@ @ @ @ @ @

#REF! #REF! #REF! #REF! #REF! #REF!

#REF! #REF! #REF! #REF! #REF! #REF! #REF!

@ @ @ @ @ @

#REF! #REF! #REF! #REF! #REF! #REF!

#REF! #REF! #REF! #REF! #REF! #REF! #REF!

AJ

@ @ @ @ @ @ @

#REF! #REF! #REF! #REF! #REF! #REF! #REF!

#REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!

ANALISA BIAYA KONSTRUKSI (ABK) BANGUNAN GEDUNG DAN PERUMAHAN PEKERJAAN KAYU
A 1 1.1 1.2 1 M3 Pasang Kusen Pintu dan Jendela Kayu Jati Bahan 1.100 M3 Kayu Jati, Balok Tenaga 6.000 Oh Pekerja 20.000 Oh Tukang Kayu 2.000 Oh Kepala Tukang 0.300 Oh Mandor

@ @ @ @ @

#REF! #REF! #REF! #REF! #REF!

#REF! #REF! #REF! #REF! #REF! #REF!

2 2.1 2.2

1 M3 Pasang Kusen Pintu dan Jendela Kayu Kamper Bahan 1.200 @ M3 Kayu Kamper, Balok Tenaga @ 6.000 Oh Pekerja @ 18.000 Oh Tukang Kayu @ 2.000 Oh Kepala Tukang @ 0.300 Oh Mandor 1 M3 Pasang Kusen Pintu dan Jendela Kayu Borneo Bahan 1.200 @ M3 Kayu Kamper, Balok Tenaga @ 6.000 Oh Pekerja @ 18.000 Oh Tukang Kayu @ 2.000 Oh Kepala Tukang @ 0.300 Oh Mandor 1 M3 Pasang Kusen Pintu dan Jendela Kayu Damar Laut Bahan 1.200 @ M3 Kayu Damar Laut, Balok Tenaga @ 6.000 Oh Pekerja @ 18.000 Oh Tukang Kayu @ 2.000 Oh Kepala Tukang @ 0.300 Oh Mandor 1 M2 Pasang Pintu Klamp Kayu Kamper Bahan 0.036 M3 Kayu Kamper, Papan 0.050 Kg Paku Biasa 2" - 5" Tenaga 0.350 Oh Pekerja 1.050 Oh Tukang Kayu 0.105 Oh Kepala Tukang 0.018 Oh Mandor 1 M2 Pasang Pintu Klamp Kayu Borneo Bahan 0.036 M3 Kayu Borneo, Papan 0.050 Kg Paku Biasa 2" - 5" Tenaga 0.350 Oh Pekerja 1.050 Oh Tukang Kayu 0.105 Oh Kepala Tukang 0.018 Oh Mandor 1 M2 Pasang Pintu Panel Kayu Jati Bahan 0.040 M3 Kayu Jati, Papan Tenaga 1.000 Oh Pekerja 2.500 Oh Tukang Kayu

#REF! #REF! #REF! #REF! #REF!

#REF! #REF! #REF! #REF! #REF! #REF!

3 3.1 3.2

#REF! #REF! #REF! #REF! #REF!

#REF! #REF! #REF! #REF! #REF! #REF!

4 4.1 4.2

#REF! #REF! #REF! #REF! #REF!

#REF! #REF! #REF! #REF! #REF! #REF!

5 5.1

@ @ @ @ @ @

#REF! #REF! #REF! #REF! #REF! #REF!

#REF! #REF! #REF! #REF! #REF! #REF! #REF!

5.2

6 6.1

@ @ @ @ @ @

#REF! #REF! #REF! #REF! #REF! #REF!

#REF! #REF! #REF! #REF! #REF! #REF! #REF!

6.2

7 7.1 7.2

@ @ @

#REF! #REF! #REF!

#REF! #REF! #REF!

0.250 0.050 H 8 8.1 8.2

Oh Oh

Kepala Tukang Mandor

@ @

#REF! #REF!

#REF! #REF! #REF!

1 M2 Pasang Pintu Panel Kayu Kamper Bahan 0.040 M3 Kayu Kamper, Papan Tenaga 1.000 Oh Pekerja 2.500 Oh Tukang Kayu 0.250 Oh Kepala Tukang 0.050 Oh Mandor 1 M2 Pasang Pintu dan Jendela Kaca Kayu Jati Bahan 0.035 M3 Kayu Jati, Papan Tenaga 0.800 Oh Pekerja 2.000 Oh Tukang Kayu 0.200 Oh Kepala Tukang 0.040 Oh Mandor

@ @ @ @ @

#REF! #REF! #REF! #REF! #REF!

#REF! #REF! #REF! #REF! #REF! #REF!

9 9.1 9.2

@ @ @ @ @

#REF! #REF! #REF! #REF! #REF!

#REF! #REF! #REF! #REF! #REF! #REF!

10 1 M2 Pasang Pintu dan Jendela Kaca Kayu Kamper 10.1 Bahan 0.035 M3 Kayu Kamper, Papan 10.2 Tenaga 0.800 Oh Pekerja 2.000 Oh Tukang Kayu 0.200 Oh Kepala Tukang 0.040 Oh Mandor 11 1 M2 Pasang Pintu dan Jendela Kaca Kayu Borneo 11.1 Bahan 0.035 M3 Kayu Borneo, Papan 11.2 Tenaga 0.800 Oh Pekerja 2.000 Oh Tukang Kayu 0.200 Oh Kepala Tukang 0.040 Oh Mandor 12 1 M2 Pasang Pintu dan Jendela Jalusi Kayu Jati 12.1 Bahan 0.064 M3 Kayu Jati, Papan 12.2 Tenaga 1.000 Oh Pekerja 3.000 Oh Tukang Kayu 0.300 Oh Kepala Tukang 0.300 Oh Mandor

@ @ @ @ @

#REF! #REF! #REF! #REF! #REF!

#REF! #REF! #REF! #REF! #REF! #REF!

@ @ @ @ @

#REF! #REF! #REF! #REF! #REF!

#REF! #REF! #REF! #REF! #REF! #REF!

@ @ @ @ @

#REF! #REF! #REF! #REF! #REF!

#REF! #REF! #REF! #REF! #REF! #REF!

13 1 M2 Pasang Pintu dan Jendela Jalusi Kayu Kamper 13.1 Bahan 0.064 @ M3 Kayu Kamper, Papan 13.2 Tenaga @ 1.000 Oh Pekerja @ 3.000 Oh Tukang Kayu @ 0.300 Oh Kepala Tukang @ 0.300 Oh Mandor 14 1 M2 Pasang Pintu Plywood Rangkap, Rangka Kayu Jati 14.1 Bahan 0.020 @ M3 Kayu Jati, Papan @ 0.030 Kg Paku Biasa 1/2" - 1" @ 0.300 Lt Lem Kayu @ 1.000 Lbr Plywood 4' x 3' x 4 mm 14.2 Tenaga @ 0.600 Oh Pekerja @ 2.000 Oh Tukang Kayu @ 0.200 Oh Kepala Tukang

#REF! #REF! #REF! #REF! #REF!

#REF! #REF! #REF! #REF! #REF! #REF!

#REF! #REF! #REF! #REF! #REF! #REF! #REF!

#REF! #REF! #REF! #REF! #REF! #REF! #REF!

0.030 O

Oh

Mandor

#REF!

#REF! #REF!

15 1 M2 Pasang Pintu Plywood Rangkap, Rangka Kayu Kamper 15.1 Bahan 0.020 @ M3 Kayu Kamper, Papan @ 0.030 Kg Paku Biasa 1/2" - 1" @ 0.300 Lt Lem Kayu @ 1.000 Lbr Plywood 4' x 3' x 4 mm 15.2 Tenaga @ 0.600 Oh Pekerja @ 2.000 Oh Tukang Kayu @ 0.200 Oh Kepala Tukang @ 0.030 Oh Mandor 16 1 M2 Pasang Jalusi Mati Kusen Kayu Jati 16.1 Bahan 0.060 M3 Kayu Jati, Papan 0.150 Kg Paku Biasa 1/2" - 1" 16.2 Tenaga 0.500 Oh Pekerja 2.000 Oh Tukang Kayu 0.200 Oh Kepala Tukang 0.025 Oh Mandor 17 1 M2 Pasang Jalusi Mati Kusen Kayu Kamper 17.1 Bahan 0.060 M3 Kayu Kamper, Papan 0.150 Kg Paku Biasa 1/2" - 1" 17.2 Tenaga 0.500 Oh Pekerja 2.000 Oh Tukang Kayu 0.200 Oh Kepala Tukang 0.025 Oh Mandor

#REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!

#REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!

@ @ @ @ @ @

#REF! #REF! #REF! #REF! #REF! #REF!

#REF! #REF! #REF! #REF! #REF! #REF! #REF!

@ @ @ @ @ @

#REF! #REF! #REF! #REF! #REF! #REF!

#REF! #REF! #REF! #REF! #REF! #REF! #REF!

18 1 M2 Pasang Pintu Plywood Rangkap, Rangka Kayu Borneo 18.1 Bahan 0.020 @ M3 Kayu Borneo, Papan @ 0.030 Kg Paku Biasa 1/2" - 1" @ 0.300 Lt Lem Kayu @ 1.000 Lbr Plywood 4' x 3' x 4 mm 18.2 Tenaga @ 0.600 Oh Pekerja @ 2.000 Oh Tukang Kayu @ 0.200 Oh Kepala Tukang @ 0.030 Oh Mandor 19 1 M2 Pasang Pintu Teakwood Rangkap, Rangka Kayu Jati 19.1 Bahan 0.020 @ M3 Kayu Jati, Papan @ 0.300 Kg Paku Biasa 1/2" - 1" @ 0.300 Lt Lem Kayu @ 1.000 Lbr Teakwood 4' x 8' x 4 mm 19.2 Tenaga @ 0.600 Oh Pekerja @ 2.000 Oh Tukang Kayu @ 0.200 Oh Kepala Tukang @ 0.030 Oh Mandor

#REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!

#REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!

#REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!

#REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!

20 1 M2 Pasang Pintu Teakwood Rangkap, Rangka Kayu Kamper 20.1 Bahan 0.020 @ #REF! M3 Kayu Kamper, Papan @ #REF! 0.300 Kg Paku Biasa 1/2" - 1" @ #REF! 0.300 Lt Lem Kayu @ #REF! 1.000 Lbr Teakwood 4' x 8' x 4 mm 20.2 Tenaga @ #REF! 0.600 Oh Pekerja @ #REF! 2.000 Oh Tukang Kayu @ #REF! 0.200 Oh Kepala Tukang

#REF! #REF! #REF! #REF! #REF! #REF! #REF!

0.030 U

Oh

Mandor

#REF!

#REF! #REF!

21 1 M2 Pasang Pintu Plywood dan Formika, Rangka Kayu Jati 21.1 Bahan 0.020 @ M3 Kayu Jati, Papan @ 0.300 Kg Paku Biasa 1/2" - 1" @ 0.800 Lt Lem Kayu @ 1.000 Lbr Plywood 4' x 8' x 4 mm @ 0.500 Lbr Formika 21.2 Tenaga @ 0.800 Oh Pekerja @ 2.500 Oh Tukang Kayu @ 0.250 Oh Kepala Tukang @ 0.040 Oh Mandor

#REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!

#REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!

22 1 M2 Pasang Pintu Plywood dan Formika, Rangka Kayu Kamper 22.1 Bahan 0.020 @ #REF! M3 Kayu Kamper, Papan @ #REF! 0.300 Kg Paku Biasa 1/2" - 1" @ #REF! 0.800 Lt Lem Kayu @ #REF! 1.000 Lbr Plywood 4' x 8' x 4 mm @ #REF! 0.500 Lbr Formika 4' x 3' 22.2 Tenaga @ #REF! 0.800 Oh Pekerja @ #REF! 2.500 Oh Tukang Kayu @ #REF! 0.250 Oh Kepala Tukang @ #REF! 0.040 Oh Mandor 23 1 M2 Pasang Pintu Teakwood dan Formika, Rangka Kayu Jati 23.1 Bahan 0.020 @ #REF! M3 Kayu Jati, Papan @ #REF! 0.300 Kg Paku Biasa 1/2" - 1" @ #REF! 0.800 Lt Lem Kayu @ #REF! 0.500 Lbr Teakwood 4' x 8' x 4 mm @ #REF! 0.500 Lbr Formika 4' x 3' 23.2 Tenaga @ #REF! 0.800 Oh Pekerja @ #REF! 2.500 Oh Tukang Kayu @ #REF! 0.250 Oh Kepala Tukang @ #REF! 0.040 Oh Mandor 24 1 M2 Pasang Pintu Teakwood dan Formika, Rangka Kayu Kamper 24.1 Bahan 0.020 @ #REF! M3 Kayu Kamper, Papan @ #REF! 0.300 Kg Paku Biasa 1/2" - 1" @ #REF! 0.800 Lt Lem Kayu @ #REF! 0.500 Lbr Teakwood 4' x 8' x 4 mm @ #REF! 0.500 Lt Vernis @ #REF! 0.500 Lbr Formika 4' x 3' 24.2 Tenaga @ #REF! 0.800 Oh Pekerja @ #REF! 2.500 Oh Tukang Kayu @ #REF! 0.250 Oh Kepala Tukang @ #REF! 0.040 Oh Mandor 25 1 M2 Pasang Pintu Formika Double, Rangka Kayu Jati 25.1 Bahan 0.020 @ M3 Kayu Jati, Papan @ 0.300 Kg Paku Biasa 1/2" - 1" @ 1.200 Lt Lem Kayu @ 1.000 Lbr Plywood 4' x 8' x 4 mm @ 1.000 Lbr Formika 4' x 3' 25.2 Tenaga @ 1.000 Oh Pekerja @ 2.600 Oh Tukang Kayu @ 0.260 Oh Kepala Tukang @ 0.050 Oh Mandor

#REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!

#REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!

#REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!

#REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!

#REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!

26 1 M2 Pasang Pintu Formika Double, Rangka Kayu Kamper 26.1 Bahan 0.020 @ M3 Kayu Kamper, Papan @ 0.300 Kg Paku Biasa 1/2" - 1" @ 1.200 Lt Lem Kayu @ 1.000 Lbr Plywood 4' x 8' x 4 mm @ 1.000 Lbr Formika 4' x 3' 26.2 Tenaga @ 1.000 Oh Pekerja @ 2.600 Oh Tukang Kayu @ 0.260 Oh Kepala Tukang @ 0.050 Oh Mandor

#REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!

#REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!

AA 27 1 M3 Pasang Konstruksi Kuda-kuda Kayu Jati 27.1 Bahan 1.100 M3 Kayu Jati, Balok 15.000 Kg Besi Strip 0.800 Kg Paku Biasa 2" - 5" 27.2 Tenaga 4.000 Oh Pekerja 12.000 Oh Tukang Kayu 1.200 Oh Kepala Tukang 0.200 Oh Mandor AB 28 1 M3 Pasang Konstruksi Kuda-kuda Kayu Kamper 28.1 Bahan 1.100 M3 Kayu Kamper, Balok 15.000 Kg Besi Strip 0.800 Kg Paku Biasa 2" - 5" 28.2 Tenaga 4.000 Oh Pekerja 12.000 Oh Tukang Kayu 1.200 Oh Kepala Tukang 0.200 Oh Mandor AC 29 1 M3 Pasang Konstruksi Kuda-kuda Kayu Borneo 29.1 Bahan 1.100 M3 Kayu Borneo, Balok 15.000 Kg Besi Strip 0.800 Kg Paku Biasa 2" - 5" 29.2 Tenaga 4.000 Oh Pekerja 12.000 Oh Tukang Kayu 1.200 Oh Kepala Tukang 0.200 Oh Mandor AD 30 1 M3 Pasang Konstruksi Kuda-kuda Kayu Kruing 30.1 Bahan 1.100 M3 Kayu Kruing, Balok 15.000 Kg Besi Strip 0.800 Kg Paku Biasa 2" - 5" 30.2 Tenaga 4.000 Oh Pekerja 12.000 Oh Tukang Kayu 1.200 Oh Kepala Tukang 0.200 Oh Mandor AE 31 1 M2 Pasang Kaso + Reng Kodok Kayu Kamper 31.1 Bahan 0.012 M3 Kayu Kamper, Balok 0.150 Kg Paku Biasa 2" - 5" 31.2 Tenaga 0.100 Oh Pekerja 0.100 Oh Tukang Kayu 0.010 Oh Kepala Tukang 0.005 Oh Mandor

@ @ @ @ @ @ @

#REF! #REF! #REF! #REF! #REF! #REF! #REF!

#REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!

@ @ @ @ @ @ @

#REF! #REF! #REF! #REF! #REF! #REF! #REF!

#REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!

@ @ @ @ @ @ @

#REF! #REF! #REF! #REF! #REF! #REF! #REF!

#REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!

@ @ @ @ @ @ @

#REF! #REF! #REF! #REF! #REF! #REF! #REF!

#REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!

@ @ @ @ @ @

#REF! #REF! #REF! #REF! #REF! #REF!

#REF! #REF! #REF! #REF! #REF! #REF! #REF!

AF

32 1 M2 Pasang Kaso + Reng Kodok Kayu Borneo 32.1 Bahan 0.012 M3 Kayu Borneo, Balok 0.150 Kg Paku Biasa 2" - 5" 32.2 Tenaga 0.100 Oh Pekerja 0.100 Oh Tukang Kayu 0.010 Oh Kepala Tukang 0.005 Oh Mandor

@ @ @ @ @ @

#REF! #REF! #REF! #REF! #REF! #REF!

#REF! #REF! #REF! #REF! #REF! #REF! #REF!

AG 33 1 M2 Pasang Kaso + Reng Kodok Kayu Jati 33.1 Bahan 0.014 M3 Kayu Jati, Balok 0.150 Kg Paku Biasa 2" - 5" 33.2 Tenaga 0.100 Oh Pekerja 0.100 Oh Tukang Kayu 0.010 Oh Kepala Tukang 0.005 Oh Mandor

@ @ @ @ @ @

#REF! #REF! #REF! #REF! #REF! #REF!

#REF! #REF! #REF! #REF! #REF! #REF! #REF!

AH 34 1 M2 Pasang Kaso + Reng Genteng Monier Kayu Kamper 34.1 Bahan 0.014 @ M3 Kayu Kamper, Balok @ 0.150 Kg Paku Biasa 2" - 5" 34.2 Tenaga @ 0.100 Oh Pekerja @ 0.100 Oh Tukang Kayu @ 0.010 Oh Kepala Tukang @ 0.005 Oh Mandor AI 35 1 M2 Pasang Kaso + Reng Genteng BetonKayu Borneo 35.1 Bahan 0.014 @ M3 Kayu Borneo, Balok @ 0.150 Kg Paku Biasa 2" - 5" 35.2 Tenaga @ 0.100 Oh Pekerja @ 0.100 Oh Tukang Kayu @ 0.010 Oh Kepala Tukang @ 0.005 Oh Mandor 36 1 M2 Pasang Kaso + Reng Atap Sirap Kayu Kamper 36.1 Bahan 0.165 @ M3 Kayu Kamper, Balok @ 0.200 Kg Paku Biasa 2" - 5" 36.2 Tenaga @ 0.120 Oh Pekerja @ 0.120 Oh Tukang Kayu @ 0.012 Oh Kepala Tukang @ 0.006 Oh Mandor

#REF! #REF! #REF! #REF! #REF! #REF!

#REF! #REF! #REF! #REF! #REF! #REF! #REF!

#REF! #REF! #REF! #REF! #REF! #REF!

#REF! #REF! #REF! #REF! #REF! #REF! #REF!

AJ

#REF! #REF! #REF! #REF! #REF! #REF!

#REF! #REF! #REF! #REF! #REF! #REF! #REF!

AK 37 1 M2 Pasang Kaso + Reng Atap Sirap Kayu Borneo 37.1 Bahan 0.165 M3 Kayu Borneo, Balok 0.200 Kg Paku Biasa 2" - 5" 37.2 Tenaga 0.120 Oh Pekerja 0.120 Oh Tukang Kayu 0.012 Oh Kepala Tukang 0.006 Oh Mandor AL

@ @ @ @ @ @

#REF! #REF! #REF! #REF! #REF! #REF!

#REF! #REF! #REF! #REF! #REF! #REF! #REF!

38 1 M2 Pasang Rangka Langit-langit (1 x 1) m, Kayu Jati 38.1 Bahan 0.012 @ M3 Kayu Jati, Balok @ 0.100 Kg Paku Biasa 2" - 5" 38.2 Tenaga @ 0.150 Oh Pekerja @ 0.250 Oh Tukang Kayu

#REF! #REF! #REF! #REF!

#REF! #REF! #REF! #REF!

0.025 0.075

Oh Oh

Kepala Tukang Mandor

@ @

#REF! #REF!

#REF! #REF! #REF!

A M 39 1 M2 Pasang Rangka Langit-langit (1 x 1) m, Kayu Kamper 39.1 Bahan 0.012 @ M3 Kayu Kamper, Balok @ 0.100 Kg Paku Biasa 2" - 5" 39.2 Tenaga @ 0.150 Oh Pekerja @ 0.250 Oh Tukang Kayu @ 0.025 Oh Kepala Tukang @ 0.075 Oh Mandor AN 40 1 M2 Pasang Rangka Langit-langit (1 x 1) m, Kayu Borneo 40.1 Bahan 0.012 @ M3 Kayu Borneo, Balok @ 0.100 Kg Paku Biasa 2" - 5" 40.2 Tenaga @ 0.150 Oh Pekerja @ 0.250 Oh Tukang Kayu @ 0.025 Oh Kepala Tukang @ 0.075 Oh Mandor AO 41 1 M2 Pasang Rangka Langit-langit (30 x 60) cm, Kayu Jati 41.1 Bahan 0.023 @ M3 Kayu Jati, Balok @ 0.150 Kg Paku Biasa 2" - 5" 41.2 Tenaga @ 0.200 Oh Pekerja @ 0.300 Oh Tukang Kayu @ 0.030 Oh Kepala Tukang @ 0.010 Oh Mandor

#REF! #REF! #REF! #REF! #REF! #REF!

#REF! #REF! #REF! #REF! #REF! #REF! #REF!

#REF! #REF! #REF! #REF! #REF! #REF!

#REF! #REF! #REF! #REF! #REF! #REF! #REF!

#REF! #REF! #REF! #REF! #REF! #REF!

#REF! #REF! #REF! #REF! #REF! #REF! #REF!

AP 42 1 M2 Pasang Rangka Langit-langit (30 x 60) cm, Kayu Kamper 42.1 Bahan 0.023 @ #REF! M3 Kayu Kamper, Balok @ #REF! 0.150 Kg Paku Biasa 2" - 5" 42.2 Tenaga @ #REF! 0.200 Oh Pekerja @ #REF! 0.300 Oh Tukang Kayu @ #REF! 0.030 Oh Kepala Tukang @ #REF! 0.010 Oh Mandor AQ 43 1 M2 Pasang Rangka Langit-langit (30 x 60) cm, Kayu Borneo 43.1 Bahan 0.023 @ M3 Kayu Borneo, Balok @ 0.150 Kg Paku Biasa 2" - 5" 43.2 Tenaga @ 0.200 Oh Pekerja @ 0.300 Oh Tukang Kayu @ 0.030 Oh Kepala Tukang @ 0.010 Oh Mandor AR 44 1 M2 Pasang Rangka Langit-langit (30 x 30) cm, Kayu Jati 44.1 Bahan 0.027 @ M3 Kayu Jati, Balok @ 0.200 Kg Paku Biasa 2" - 5" 44.2 Tenaga @ 0.250 Oh Pekerja @ 0.350 Oh Tukang Kayu @ 0.035 Oh Kepala Tukang @ 0.013 Oh Mandor

#REF! #REF! #REF! #REF! #REF! #REF! #REF!

#REF! #REF! #REF! #REF! #REF! #REF!

#REF! #REF! #REF! #REF! #REF! #REF! #REF!

#REF! #REF! #REF! #REF! #REF! #REF!

#REF! #REF! #REF! #REF! #REF! #REF! #REF!

AS 45 1 M2 Pasang Rangka Langit-langit (30 x 30) cm, Kayu Kamper 45.1 Bahan 0.027 @ #REF! M3 Kayu Kamper, Balok @ #REF! 0.200 Kg Paku Biasa 2" - 5"

#REF! #REF!

45.2 Tenaga 0.250 0.350 0.035 0.013 AT

Oh Oh Oh Oh

Pekerja Tukang Kayu Kepala Tukang Mandor

@ @ @ @

#REF! #REF! #REF! #REF!

#REF! #REF! #REF! #REF! #REF!

46 1 M2 Pasang Rangka Langit-langit (30 x 30) cm, Kayu Borneo 46.1 Bahan 0.027 @ M3 Kayu Borneo, Balok @ 0.200 Kg Paku Biasa 2" - 5" 46.2 Tenaga @ 0.250 Oh Pekerja @ 0.350 Oh Tukang Kayu @ 0.035 Oh Kepala Tukang @ 0.013 Oh Mandor

#REF! #REF! #REF! #REF! #REF! #REF!

#REF! #REF! #REF! #REF! #REF! #REF! #REF!

AU 47 1 M1 Pasang Lisplang Ukuran (3 x 20) cm, Kayu Jati 47.1 Bahan 0.007 @ M3 Kayu Jati, Papan @ 0.050 Kg Paku Biasa 2" - 5" 47.2 Tenaga @ 0.100 Oh Pekerja @ 0.200 Oh Tukang Kayu @ 0.025 Oh Kepala Tukang @ 0.005 Oh Mandor AV 48 1 M1 Pasang Lisplang Ukuran (3 x 20) cm, Kayu Kamper 48.1 Bahan 0.007 @ M3 Kayu Kamper, Papan @ 0.050 Kg Paku Biasa 2" - 5" 48.2 Tenaga @ 0.100 Oh Pekerja @ 0.200 Oh Tukang Kayu @ 0.025 Oh Kepala Tukang @ 0.005 Oh Mandor AW 49 1 M1 Pasang Lisplang Ukuran (3 x 30) cm, Kayu Jati 49.1 Bahan 0.011 @ M3 Kayu Jati, Papan @ 0.050 Kg Paku Biasa 2" - 5" 49.2 Tenaga @ 0.110 Oh Pekerja @ 0.220 Oh Tukang Kayu @ 0.022 Oh Kepala Tukang @ 0.005 Oh Mandor AX 50 1 M1 Pasang Lisplang Ukuran (3 x 30) cm, Kayu Kamper 50.1 Bahan 0.011 @ M3 Kayu Kamper, Papan @ 0.050 Kg Paku Biasa 2" - 5" 50.2 Tenaga @ 0.110 Oh Pekerja @ 0.220 Oh Tukang Kayu @ 0.022 Oh Kepala Tukang @ 0.005 Oh Mandor AY 51 1 M1 Pasang Lisplang Ukuran 2 x (3 x 20) cm, Kayu Kamper 51.1 Bahan 0.015 @ M3 Kayu Kamper, Papan @ 0.060 Kg Paku Biasa 2" - 5" 51.2 Tenaga @ 0.150 Oh Pekerja @ 0.250 Oh Tukang Kayu @ 0.025 Oh Kepala Tukang @ 0.075 Oh Mandor AZ 52 1 M1 Pasang Lisplang Ukuran 2 x (2 x 20) cm, Kayu Kamper

#REF! #REF! #REF! #REF! #REF! #REF!

#REF! #REF! #REF! #REF! #REF! #REF! #REF!

#REF! #REF! #REF! #REF! #REF! #REF!

#REF! #REF! #REF! #REF! #REF! #REF! #REF!

#REF! #REF! #REF! #REF! #REF! #REF!

#REF! #REF! #REF! #REF! #REF! #REF! #REF!

#REF! #REF! #REF! #REF! #REF! #REF!

#REF! #REF! #REF! #REF! #REF! #REF! #REF!

#REF! #REF! #REF! #REF! #REF! #REF!

#REF! #REF! #REF! #REF! #REF! #REF! #REF!

52.1 Bahan 0.009 0.060 52.2 Tenaga 0.100 0.100 0.010 0.050

M3 Kg Oh Oh Oh Oh

Kayu Kamper, Papan Paku Biasa 2" - 5" Pekerja Tukang Kayu Kepala Tukang Mandor

@ @ @ @ @ @

#REF! #REF! #REF! #REF! #REF! #REF!

#REF! #REF! #REF! #REF! #REF! #REF! #REF!

BA 53 1 M1 Pasang Lisplang Ukuran 2 x (2 x 20) cm, Kayu Borneo 53.1 Bahan 0.009 @ M3 Kayu Borneo, Papan @ 0.060 Kg Paku Biasa 2" - 5" 53.2 Tenaga @ 0.100 Oh Pekerja @ 0.100 Oh Tukang Kayu @ 0.010 Oh Kepala Tukang @ 0.050 Oh Mandor BB 54 1 M2 Pasang Rangka Dinding Pemisah Kayu Kamper 54.1 Bahan 0.020 @ M3 Kayu Kamper, Balok 0.007 @ M3 Kayu Kamper, Papan @ 0.100 Kg Paku Biasa 2" - 5" 54.2 Tenaga @ 0.150 Oh Pekerja @ 0.450 Oh Tukang Kayu @ 0.045 Oh Kepala Tukang @ 0.075 Oh Mandor BC 55 1 M2 Pasang Rangka Dinding Pemisah Kayu Borneo 55.1 Bahan 0.020 @ M3 Kayu Borneo, Balok 0.007 @ M3 Kayu Borneo, Papan @ 0.100 Kg Paku Biasa 2" - 5" 55.2 Tenaga @ 0.150 Oh Pekerja @ 0.450 Oh Tukang Kayu @ 0.045 Oh Kepala Tukang @ 0.075 Oh Mandor

#REF! #REF! #REF! #REF! #REF! #REF!

#REF! #REF! #REF! #REF! #REF! #REF! #REF!

#REF! #REF! #REF! #REF! #REF! #REF! #REF!

#REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!

#REF! #REF! #REF! #REF! #REF! #REF! #REF!

#REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!

BD 56 1 M2 Pasang Rangka Dinding Pemisah Teakwood Rangkap, Rangka Kayu Kamper 56.1 Bahan 0.020 @ #REF! M3 Kayu Kamper, Balok 0.007 @ #REF! M3 Kayu Kamper, Papan @ #REF! 0.100 Kg Paku Biasa 2" - 5" 56.2 Tenaga @ #REF! 0.150 Oh Pekerja @ #REF! 0.450 Oh Tukang Kayu @ #REF! 0.045 Oh Kepala Tukang @ #REF! 0.075 Oh Mandor BE 57 1 M2 Pasang Rangka Dinding Pemisah Plywood Rangkap, Rangka Kayu Kamper 57.1 Bahan 0.020 @ #REF! M3 Kayu Kamper, Balok 0.007 @ #REF! M3 Kayu Kamper, Papan @ #REF! 0.100 Kg Paku Biasa 2" - 5" @ #REF! 0.560 Lt Lem Kayu @ #REF! 1.000 Lbr Plywood 4' x 8' x 4mm 57.2 Tenaga @ #REF! 0.200 Oh Pekerja @ #REF! 0.600 Oh Tukang Kayu @ #REF! 0.060 Oh Kepala Tukang @ #REF! 0.010 Oh Mandor BF 58 1 M2 Pasang Dinding Lambriziring dari Papan Jati 58.1 Bahan

#REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!

#REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!

0.007 0.100 0.150 58.2 Tenaga 0.600 1.800 0.180 0.030

M3 Kg Kg Oh Oh Oh Oh

Kayu Jati, Balok Paku Biasa 2" - 5" Paku Skrup 3,5" Pekerja Tukang Kayu Kepala Tukang Mandor

@ @ @ @ @ @ @

#REF! #REF! #REF! #REF! #REF! #REF! #REF!

#REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!

BG 59 1 M2 Pasang Plywood Tebal 4 mm, Untuk Dinding 59.1 Bahan 0.400 Lbr Plywood 4' x 8' x 4mm 0.050 Kg Paku Biasa 1/2" - 1" 59.2 Tenaga 0.025 Oh Pekerja 0.075 Oh Tukang Kayu 0.008 Oh Kepala Tukang 0.001 Oh Mandor BH 60 1 M1 Pasang List Palfon Kayu Profil 60.1 Bahan 1.050 M1 Kayu Profil 60.2 Tenaga 0.021 Oh Pekerja 0.021 Oh Tukang Kayu 0.002 Oh Kepala Tukang 0.001 Oh Mandor

@ @ @ @ @ @

#REF! #REF! #REF! #REF! #REF! #REF!

#REF! #REF! #REF! #REF! #REF! #REF! #REF!

@ @ @ @ @

#REF! #REF! #REF! #REF! #REF!

#REF! #REF! #REF! #REF! #REF! #REF!

ANALISA BIAYA KONSTRUKSI (ABK) BANGUNAN GEDUNG DAN PERUMAHAN PEKERJAAN BETON
A 1 1.1 1 M3 Membuat Beton Tumbuk, 1 Pc : 3 Ps : 5 Kr Bahan 218.000 Kg Semen Portland 0.520 M3 Pasir Beton 0.870 M3 Koral Beton Tenaga 1.650 Oh Pekerja 0.250 Oh Tukang Batu 0.025 Oh Kepala Tukang 0.080 Oh Mandor 1 M3 Membuat Beton Tumbuk, 1 Pc : 3 Ps : 6 Kr Bahan 197.000 Kg Semen Portland 0.470 M3 Pasir Beton 0.940 M3 Koral Beton Tenaga 1.650 Oh Pekerja 0.250 Oh Tukang Batu 0.025 Oh Kepala Tukang 0.080 Oh Mandor 1 M3 Membuat Beton Tumbuk, 1 Pc : 4 Ps : 6 Kr Bahan 173.000 Kg Semen Portland 0.570 M3 Pasir Beton 0.870 M3 Koral Beton Tenaga 1.650 Oh Pekerja 0.250 Oh Tukang Batu 0.025 Oh Kepala Tukang 0.080 Oh Mandor

@ @ @ @ @ @ @

#REF! #REF! #REF! #REF! #REF! #REF! #REF!

#REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!

1.2

2 2.1

@ @ @ @ @ @ @

#REF! #REF! #REF! #REF! #REF! #REF! #REF!

#REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!

2.2

3 3.1

@ @ @ @ @ @ @

#REF! #REF! #REF! #REF! #REF! #REF! #REF!

#REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!

3.2

4 4.1

4.2

1 M3 Membuat Beton Tumbuk, 1 Pc : 3 Ps : 5 Kr, Tebal 5 cm Bahan @ 10.000 Kg Semen Portland 0.026 @ M3 Pasir Beton 0.044 @ M3 Koral Beton Tenaga @ 1.150 Oh Pekerja @ 0.020 Oh Tukang Batu @ 0.002 Oh Kepala Tukang @ 0.006 Oh Mandor 1 M3 Membuat Beton Bertulang, 1 Pc : 2 Ps : 3Kr Bahan 232.000 Kg Semen Portland 0.520 M3 Pasir Beton 0.780 M3 Koral Beton Tenaga 1.650 Oh Pekerja 0.250 Oh Tukang Batu 0.025 Oh Kepala Tukang 0.080 Oh Mandor 1 M3 Membuat Beton Bertulang, 1 Pc : 2 Ps : 4 Kr Bahan 280.000 Kg Semen Portland 0.450 M3 Pasir Beton 0.900 M3 Koral Beton Tenaga 1.650 Oh Pekerja

#REF! #REF! #REF! #REF! #REF! #REF! #REF!

#REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!

5 5.1

@ @ @ @ @ @ @

#REF! #REF! #REF! #REF! #REF! #REF! #REF!

#REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!

5.2

6 6.1

@ @ @ @

#REF! #REF! #REF! #REF!

#REF! #REF! #REF! #REF!

6.2

0.250 0.025 0.080 G 7 7.1

Oh Oh Oh

Tukang Batu Kepala Tukang Mandor

@ @ @

#REF! #REF! #REF!

#REF! #REF! #REF! #REF!

7.2

1 M3 Membuat Beton Bertulang, 1 Pc : 2 Ps : 2.5 Kr Bahan 352.000 Kg Semen Portland 0.560 M3 Pasir Beton 0.700 M3 Koral Beton Tenaga 1.650 Oh Pekerja 0.250 Oh Tukang Batu 0.025 Oh Kepala Tukang 0.080 Oh Mandor 1 M3 Membuat Beton Bertulang, 1 Pc : 1.5 Ps : 3 Kr Bahan 357.000 Kg Semen Portland 0.420 M3 Pasir Beton 0.540 M3 Koral Beton Tenaga 1.650 Oh Pekerja 0.250 Oh Tukang Batu 0.025 Oh Kepala Tukang 0.080 Oh Mandor

@ @ @ @ @ @ @

#REF! #REF! #REF! #REF! #REF! #REF! #REF!

#REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!

8 8.1

@ @ @ @ @ @ @

#REF! #REF! #REF! #REF! #REF! #REF! #REF!

#REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!

8.2

9 9.1

9.2

1 M3 Membuat Beton Bertulang, 1 Pc : 1.5 Ps : 2.5 Kr Bahan @ 386.000 Kg Semen Portland 0.470 @ M3 Pasir Beton 0.780 @ M3 Koral Beton Tenaga @ 1.650 Oh Pekerja @ 0.250 Oh Tukang Batu @ 0.025 Oh Kepala Tukang @ 0.080 Oh Mandor

#REF! #REF! #REF! #REF! #REF! #REF! #REF!

#REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!

10 1 M3 Membuat Beton Bertulang, 1 Pc : 1 Ps : 2 Kr 10.1 Bahan 479.000 Kg Semen Portland 0.370 M3 Pasir Beton 0.740 M3 Koral Beton 10.2 Tenaga 1.650 Oh Pekerja 0.250 Oh Tukang Batu 0.025 Oh Kepala Tukang 0.080 Oh Mandor 11 1 M3 Membuat Tiang Pancang Prestressed Beton 11.1 Bahan 440.000 Kg Semen Portland 0.500 M3 Pasir Beton 0.800 M3 Koral Beton 2.460 Gln Rapidrant 11.2 Tenaga 1.650 Oh Pekerja 0.250 Oh Tukang Batu 0.025 Oh Kepala Tukang 0.080 Oh Mandor 12 1 M3 Membuat Beton dengan Puzzdith-100 XR 12.1 Bahan 336.000 Kg Semen Portland 0.540 M3 Pasir Beton 0.810 M3 Koral Beton 1.000 Ltr Puzzdith - 100 XR 12.2 Tenaga

@ @ @ @ @ @ @

#REF! #REF! #REF! #REF! #REF! #REF! #REF!

#REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!

@ @ @ @ @ @ @ @

#REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!

#REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!

@ @ @ @

#REF! #REF! #REF! #REF!

#REF! #REF! #REF! #REF!

1.650 0.250 0.025 0.080 M

Oh Oh Oh Oh

Pekerja Tukang Batu Kepala Tukang Mandor

@ @ @ @

#REF! #REF! #REF! #REF!

#REF! #REF! #REF! #REF! #REF!

13 1 M3 Membuat Beton Bertulang, 1 Pc : 2 Ps : 3Kr 13.1 Bahan 336.000 Kg Semen Portland 0.540 M3 Pasir Beton 0.810 M3 Koral Beton 13.2 Tenaga 2.000 Oh Pekerja 0.350 Oh Tukang Batu 0.035 Oh Kepala Tukang 1.000 Oh Mandor 14 1 M3 Membuat Beton Bertulang, 1 Pc : 2 Ps : 4 Kr 14.1 Bahan 291.000 Kg Semen Portland 0.470 M3 Pasir Beton 0.930 M3 Koral Beton 14.2 Tenaga 2.000 Oh Pekerja 0.350 Oh Tukang Batu 0.035 Oh Kepala Tukang 1.000 Oh Mandor 15 1 M3 Membuat Beton Bertulang, 1 Pc : 1.5 Ps : 3 Kr 15.1 Bahan 367.000 Kg Semen Portland 0.440 M3 Pasir Beton 0.880 M3 Koral Beton 15.2 Tenaga 2.000 Oh Pekerja 0.350 Oh Tukang Batu 0.035 Oh Kepala Tukang 1.000 Oh Mandor

@ @ @ @ @ @ @

#REF! #REF! #REF! #REF! #REF! #REF! #REF!

#REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!

@ @ @ @ @ @ @

#REF! #REF! #REF! #REF! #REF! #REF! #REF!

#REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!

@ @ @ @ @ @ @

#REF! #REF! #REF! #REF! #REF! #REF! #REF!

#REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!

16 1 M3 Membuat Beton Bertulang, 1 Pc : 1.5 Ps : 2.5 Kr 16.1 Bahan @ 400.000 Kg Semen Portland 0.480 @ M3 Pasir Beton 0.800 @ M3 Koral Beton 16.2 Tenaga @ 2.000 Oh Pekerja @ 0.350 Oh Tukang Batu @ 0.035 Oh Kepala Tukang @ 1.000 Oh Mandor 17 1 M3 Membuat Beton Bertulang, 1 Pc : 1 Ps : 1 Kr 17.1 Bahan 615.000 Kg Semen Portland 0.520 M3 Pasir Beton 0.520 M3 Koral Beton 17.2 Tenaga 2.000 Oh Pekerja 0.350 Oh Tukang Batu 0.035 Oh Kepala Tukang 1.000 Oh Mandor

#REF! #REF! #REF! #REF! #REF! #REF! #REF!

#REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!

@ @ @ @ @ @ @

#REF! #REF! #REF! #REF! #REF! #REF! #REF!

#REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!

18 1 M3 Membuat Beton Kedap Air dengan Strotox - 100 18.1 Bahan @ 400.000 Kg Semen Portland 0.480 @ M3 Pasir Beton 0.800 @ M3 Koral Beton @ 1.200 Ltr Puzzdith - 100 XR 18.2 Tenaga

#REF! #REF! #REF! #REF!

#REF! #REF! #REF! #REF!

2.000 0.350 0.035 1.000 S

Oh Oh Oh Oh

Pekerja Tukang Batu Kepala Tukang Mandor

@ @ @ @

#REF! #REF! #REF! #REF!

#REF! #REF! #REF! #REF! #REF!

19 1 M1 Memasang PVC Waterstop Lebar 150 mm 19.1 Bahan 1.050 M1 Waterstop Lebar 150 mm 19.2 Tenaga 0.050 Oh Pekerja 0.030 Oh Tukang Batu 0.003 Oh Kepala Tukang 0.002 Oh Mandor 20 1 M1 Memasang PVC Waterstop Lebar 200 mm 20.1 Bahan 1.050 M1 Waterstop Lebar 200 mm 20.2 Tenaga 0.050 Oh Pekerja 0.030 Oh Tukang Batu 0.003 Oh Kepala Tukang 0.002 Oh Mandor 21 1 M1 Memasang PVC Waterstop Lebar 230 mm 21.1 Bahan 1.050 M1 Waterstop Lebar 230 mm 21.2 Tenaga 0.550 Oh Pekerja 0.035 Oh Tukang Batu 0.003 Oh Mandor 22 1 M1 Memasang PVC Waterstop Lebar 250 mm 22.1 Bahan 1.050 M1 Waterstop Lebar 250 mm 22.2 Tenaga 0.550 Oh Pekerja 0.035 Oh Tukang Batu 0.003 Oh Mandor 23 1 M1 Memasang PVC Waterstop Lebar 300 mm 23.1 Bahan 1.050 M1 Waterstop Lebar 300 mm 23.2 Tenaga 0.550 Oh Pekerja 0.035 Oh Tukang Batu 0.003 Oh Mandor 24 1 M1 Memasang PVC Waterstop Lebar 320 mm 24.1 Bahan 1.050 M1 Waterstop Lebar 320 mm 24.2 Tenaga 0.550 Oh Pekerja 0.035 Oh Tukang Batu 0.003 Oh Mandor 25 1 Kg Pembesian dengan Besi Polos atau Besi Ulir 25.1 Bahan 1.050 Kg Besi Beton (Polos/ulir) 0.015 Kg Kawat Beton 25.2 Tenaga 0.007 Oh Pekerja 0.007 Oh Tukang Besi 0.001 Oh Kepala Tukang 0.000 Oh Mandor 26 1 Kg Kabel Presstressed Polos/strands 26.1 Bahan 1.050 Kg Besi Presstressed Polos

@ @ @ @ @

#REF! #REF! #REF! #REF! #REF!

#REF! #REF! #REF! #REF! #REF! #REF!

@ @ @ @ @

#REF! #REF! #REF! #REF! #REF!

#REF! #REF! #REF! #REF! #REF! #REF!

@ @ @ @

#REF! #REF! #REF! #REF!

#REF! #REF! #REF! #REF! #REF!

@ @ @ @

#REF! #REF! #REF! #REF!

#REF! #REF! #REF! #REF! #REF!

@ @ @ @

#REF! #REF! #REF! #REF!

#REF! #REF! #REF! #REF! #REF!

@ @ @ @

#REF! #REF! #REF! #REF!

#REF! #REF! #REF! #REF! #REF!

@ @ @ @ @ @

#REF! #REF! #REF! #REF! #REF! #REF!

#REF! #REF! #REF! #REF! #REF! #REF! #REF!

#REF!

#REF!

0.010 26.2 Tenaga 0.005 0.005 0.001 0.000

Kg Oh Oh Oh Oh

Kawat Beton Pekerja Tukang Besi Kepala Tukang Mandor

@ @ @ @ @

#REF! #REF! #REF! #REF! #REF!

#REF! #REF! #REF! #REF! #REF! #REF!

AA 27 1 Kg Jaring Kawat Baja 27.1 Bahan 1.020 Kg Besi Jaring Kawat Baja 0.805 Kg Kawat Beton 27.2 Tenaga 0.025 Oh Pekerja 0.025 Oh Tukang Besi 0.003 Oh Kepala Tukang 0.002 Oh Mandor AB 28 1 M2 Pasang Bekisting untuk Pondasi 28.1 Bahan 0.040 M3 Kayu Terentang 0.300 Kg Paku Biasa 2' - 5' 0.100 Lt Minyak Bekisting 28.2 Tenaga 0.300 Oh Pekerja 0.260 Oh Tukang Kayu 0.026 Oh Kepala Tukang 0.005 Oh Mandor AC 29 1 M2 Pasang Bekisting untuk Sloof 29.1 Bahan 0.045 M3 Kayu Terentang 0.300 Kg Paku Biasa 2' - 5' 0.100 Lt Minyak Bekisting 29.2 Tenaga 0.300 Oh Pekerja 0.260 Oh Tukang Kayu 0.026 Oh Kepala Tukang 0.005 Oh Mandor AD 30 1 M2 Pasang Bekisting untuk Kolom 30.1 Bahan 0.040 M3 Kayu Terentang 0.400 Kg Paku Biasa 2' - 5' 0.200 Lt Minyak Bekisting 0.015 M3 Balok Kayu Borneo 0.350 Lbr Plywood Tebal 9 mm 2.000 Btg Dolken Kayu Galam F-8-10/4 m 30.2 Tenaga 0.300 Oh Pekerja 0.330 Oh Tukang Kayu 0.033 Oh Kepala Tukang 0.006 Oh Mandor AE 31 1 M2 Pasang Bekisting untuk Balok 31.1 Bahan 0.040 M3 Kayu Terentang 0.400 Kg Paku Biasa 2' - 5' 0.200 Lt Minyak Bekisting 0.018 M3 Balok Kayu Borneo 0.350 Lbr Plywood Tebal 9 mm 2.000 Btg Dolken Kayu Galam F-8-10/4 m 31.2 Tenaga 0.320 Oh Pekerja 0.330 Oh Tukang Kayu 0.033 Oh Kepala Tukang 0.006 Oh Mandor AF 32 1 M2 Pasang Bekisting untuk Lantai

@ @ @ @ @ @

#REF! #REF! #REF! #REF! #REF! #REF!

#REF! #REF! #REF! #REF! #REF! #REF! #REF!

@ @ @ @ @ @ @

#REF! #REF! #REF! #REF! #REF! #REF! #REF!

#REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!

@ @ @ @ @ @ @

#REF! #REF! #REF! #REF! #REF! #REF! #REF!

#REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!

@ @ @ @ @ @ @ @ @ @

#REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!

#REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!

@ @ @ @ @ @ @ @ @ @

#REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!

#REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!

32.1 Bahan 0.040 0.400 0.200 0.015 0.350 6.000 32.2 Tenaga 0.320 0.330 0.033 0.006

M3 Kg Lt M3 Lbr Btg Oh Oh Oh Oh

Kayu Terentang Paku Biasa 2' - 5' Minyak Bekisting Balok Kayu Borneo Plywood Tebal 9 mm Dolken Kayu Galam F-8-10/4 m Pekerja Tukang Kayu Kepala Tukang Mandor

@ @ @ @ @ @ @ @ @ @

#REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!

#REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!

AG 33 1 M2 Pasang Bekisting untuk Dinding 33.1 Bahan 0.030 @ M3 Kayu Terentang @ 0.400 Kg Paku Biasa 2' - 5' @ 0.200 Lt Minyak Bekisting 0.020 @ M3 Balok Kayu Borneo @ 0.350 Lbr Plywood Tebal 9 mm @ 3.000 Btg Dolken Kayu Galam F-8-10/4 m @ 4.000 Bh Formite/Penjaga Jarak Bekisting/Spacer 33.2 Tenaga @ 0.320 Oh Pekerja @ 0.330 Oh Tukang Kayu @ 0.033 Oh Kepala Tukang @ 0.006 Oh Mandor AH 34 1 M2 Pasang Bekisting untuk Tangga 34.1 Bahan 0.030 M3 Kayu Terentang 0.400 Kg Paku Biasa 2' - 5' 0.150 Lt Minyak Bekisting 0.015 M3 Balok Kayu Borneo 0.350 Lbr Plywood Tebal 9 mm 2.000 Btg Dolken Kayu Galam F-8-10/4 m 34.2 Tenaga 0.320 Oh Pekerja 0.330 Oh Tukang Kayu 0.033 Oh Kepala Tukang 0.006 Oh Mandor AI 35 1 M3 Membuat Beton dengan Mutu K 225 35.1 Bahan 388.000 Kg Semen Portland 0.650 M3 Pasir Beton 0.650 M3 Korol Beton 35.2 Tenaga 6.000 Oh Pekerja 1.000 Oh Tukang Batu 0.100 Oh Kepala Tukang 0.300 Oh Mandor 36 1 M3 Membuat Beton dengan Mutu K 275 36.1 Bahan 400.000 Kg Semen Portland 0.400 M3 Pasir Beton 0.820 M3 Korol Beton 36.2 Tenaga 6.000 Oh Pekerja 1.000 Oh Tukang Batu 0.100 Oh Kepala Tukang 0.300 Oh Mandor

#REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!

#REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!

@ @ @ @ @ @ @ @ @ @

#REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!

#REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!

@ @ @ @ @ @ @

#REF! #REF! #REF! #REF! #REF! #REF! #REF!

#REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!

AJ

@ @ @ @ @ @ @

#REF! #REF! #REF! #REF! #REF! #REF! #REF!

#REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!

AK 37 1 M2 Pasang Jembatan Cor 37.1 Bahan 0.026 M3 Kayu Terentang

#REF!

#REF!

0.600 0.500 37.2 Tenaga 0.150 0.050 0.005 0.007 AL

Kg Btg Oh Oh Oh Oh

Paku Biasa 2' - 5' Dolken Kayu Galam F-8-10/4 m Pekerja Tukang Kayu Kepala Tukang Mandor

@ @ @ @ @ @

#REF! #REF! #REF! #REF! #REF! #REF!

#REF! #REF! #REF! #REF! #REF! #REF! #REF!

38 1 M3 Membuat Pondasi Beton Bertulang (150 kg Besi + Bekisting) 38.1 Bahan 0.200 @ #REF! M3 Kayu Terentang @ #REF! 1.500 Kg Paku Biasa 2' - 5' @ #REF! 0.400 Lt Minyak Bekisting @ #REF! 150.000 Kg Besi Beton Polos @ #REF! 2.250 Kg Kawat Beton @ #REF! 323.000 Kg Semen Portland 0.520 @ #REF! M3 Pasir Beton 0.780 @ #REF! M3 Koral Beton 38.2 Tenaga @ #REF! 3.900 Oh Pekerja @ #REF! 0.350 Oh Tukang Batu @ #REF! 1.040 Oh Tukang Kayu @ #REF! 1.050 Oh Tukang Besi @ #REF! 0.245 Oh Kepala Tukang @ #REF! 0.165 Oh Mandor

#REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!

A M 39 1 M3 Membuat Sloof Beton Bertulang (200 kg Besi + Bekisting) 39.1 Bahan 0.270 @ #REF! M3 Kayu Terentang @ #REF! 2.000 Kg Paku Biasa 2' - 5' @ #REF! 0.600 Lt Minyak Bekisting @ #REF! 200.000 Kg Besi Beton Polos @ #REF! 3.000 Kg Kawat Beton @ #REF! 323.000 Kg Semen Portland 0.520 @ #REF! M3 Pasir Beton 0.780 @ #REF! M3 Koral Beton 39.2 Tenaga @ #REF! 4.850 Oh Pekerja @ #REF! 0.350 Oh Tukang Batu @ #REF! 1.560 Oh Tukang Kayu @ #REF! 1.400 Oh Tukang Besi @ #REF! 0.331 Oh Kepala Tukang @ #REF! 0.170 Oh Mandor AN 40 1 M3 Membuat Kolom Beton Bertulang (300 kg Besi + Bekisting) 40.1 Bahan 0.400 @ #REF! M3 Kayu Terentang @ #REF! 4.000 Kg Paku Biasa 2' - 5' @ #REF! 2.000 Lt Minyak Bekisting @ #REF! 300.000 Kg Besi Beton Polos @ #REF! 4.500 Kg Kawat Beton @ #REF! 323.000 Kg Semen Portland 0.520 @ #REF! M3 Pasir Beton 0.780 @ #REF! M3 Koral Beton 0.150 @ #REF! M3 Kayu Borneo Balok @ #REF! 3.500 Lbr Plywood 9 mm @ #REF! 20.000 Btg Dolken F-8 cm/4 m 40.2 Tenaga @ #REF! 7.300 Oh Pekerja @ #REF! 0.350 Oh Tukang Batu @ #REF! 3.300 Oh Tukang Kayu @ #REF! 2.100 Oh Tukang Besi @ #REF! 0.570 Oh Kepala Tukang @ #REF! 0.250 Oh Mandor AO 41 1 M3 Membuat Balok Beton Bertulang (200 kg Besi + Bekisting) 41.1 Bahan

#REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!

#REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!

0.320 3.200 1.600 200.000 3.000 323.000 0.520 0.780 0.140 2.800 16.000 41.2 Tenaga 5.960 0.350 2.800 1.400 0.455 0.208

M3 Kg Lt Kg Kg Kg M3 M3 M3 Lbr Btg Oh Oh Oh Oh Oh Oh

Kayu Terentang Paku Biasa 2' - 5' Minyak Bekisting Besi Beton Polos Kawat Beton Semen Portland Pasir Beton Koral Beton Kayu Borneo Balok Plywood 9 mm Dolken F-8 cm/4 m Pekerja Tukang Batu Tukang Kayu Tukang Besi Kepala Tukang Mandor

@ @ @ @ @ @ @ @ @ @ @ @ @ @ @ @ @

#REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!

#REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!

AP 42 1 M3 Membuat Balok Beton Bertulang (150 kg Besi + Bekisting) 42.1 Bahan 0.320 @ #REF! M3 Kayu Terentang @ #REF! 3.200 Kg Paku Biasa 2' - 5' @ #REF! 1.600 Lt Minyak Bekisting @ #REF! 150.000 Kg Besi Beton Polos @ #REF! 2.250 Kg Kawat Beton @ #REF! 323.000 Kg Semen Portland 0.520 @ #REF! M3 Pasir Beton 0.780 @ #REF! M3 Koral Beton 0.120 @ #REF! M3 Kayu Borneo Balok @ #REF! 2.800 Lbr Plywood 9 mm @ #REF! 32.000 Btg Dolken F-8 cm/4 m 42.2 Tenaga @ #REF! 5.800 Oh Pekerja @ #REF! 0.350 Oh Tukang Batu @ #REF! 2.800 Oh Tukang Kayu @ #REF! 1.050 Oh Tukang Besi @ #REF! 0.420 Oh Kepala Tukang @ #REF! 0.185 Oh Mandor AQ 43 1 M3 Membuat Dinding Beton Bertulang (150 kg Besi + Bekisting) 43.1 Bahan 0.240 @ #REF! M3 Kayu Terentang @ #REF! 3.200 Kg Paku Biasa 2' - 5' @ #REF! 1.600 Lt Minyak Bekisting @ #REF! 150.000 Kg Besi Beton Polos @ #REF! 2.250 Kg Kawat Beton @ #REF! 323.000 Kg Semen Portland 0.520 @ #REF! M3 Pasir Beton 0.780 @ #REF! M3 Koral Beton 0.160 @ #REF! M3 Kayu Borneo Balok @ #REF! 2.800 Lbr Plywood 9 mm @ #REF! 24.000 Btg Dolken F-8 cm/4 m 43.2 Tenaga @ #REF! 5.600 Oh Pekerja @ #REF! 0.350 Oh Tukang Batu @ #REF! 2.640 Oh Tukang Kayu @ #REF! 1.050 Oh Tukang Besi @ #REF! 0.400 Oh Kepala Tukang @ #REF! 0.193 Oh Mandor AR 44 1 M3 Membuat Tangga Beton Bertulang (200 kg Besi + Bekisting) 44.1 Bahan 0.250 @ #REF! M3 Kayu Terentang @ #REF! 3.000 Kg Paku Biasa 2' - 5' @ #REF! 1.200 Lt Minyak Bekisting @ #REF! 200.000 Kg Besi Beton Polos

#REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!

#REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!

#REF! #REF! #REF! #REF!

3.000 323.000 0.520 0.780 0.105 2.500 14.000 44.2 Tenaga 5.600 0.350 2.300 1.400 0.405 0.202

Kg Kg M3 M3 M3 Lbr Btg Oh Oh Oh Oh Oh Oh

Kawat Beton Semen Portland Pasir Beton Koral Beton Kayu Borneo Balok Plywood 9 mm Dolken F-8 cm/4 m Pekerja Tukang Batu Tukang Kayu Tukang Besi Kepala Tukang Mandor

@ @ @ @ @ @ @ @ @ @ @ @ @

#REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!

#REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!

AS 45 1 M1 Membuat Kolom Penguat Beton Bertulang (11 x 11) cm 45.1 Bahan 0.002 @ M3 Kayu Terentang @ 0.010 Kg Paku Biasa 2' - 5' @ 3.000 Kg Besi Beton Polos @ 0.450 Kg Kawat Beton @ 0.400 Kg Semen Portland 0.006 @ M3 Pasir Beton 0.009 @ M3 Koral Beton 45.2 Tenaga @ 0.060 Oh Pekerja @ 0.020 Oh Tukang Batu @ 0.020 Oh Tukang Kayu @ 0.020 Oh Tukang Besi @ 0.006 Oh Kepala Tukang @ 0.003 Oh Mandor AT 46 1 M1 Membuat Kolom Penguat Beton Bertulang (10 x 15) cm 46.1 Bahan 0.003 @ M3 Kayu Albasiah @ 0.020 Kg Paku Biasa 2' - 5' @ 3.600 Kg Besi Beton Polos @ 0.050 Kg Kawat Beton @ 5.500 Kg Semen Portland 0.009 @ M3 Pasir Beton 0.015 @ M3 Koral Beton 46.2 Tenaga @ 0.100 Oh Pekerja @ 0.033 Oh Tukang Batu @ 0.033 Oh Tukang Kayu @ 0.033 Oh Tukang Besi @ 0.010 Oh Kepala Tukang @ 0.005 Oh Mandor

#REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!

#REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!

#REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!

#REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!

ANALISA BIAYA KONSTRUKSI (ABK) BANGUNAN GEDUNG DAN PERUMAHAN PEKERJAAN PENUTUP ATAP
A 1 1.1 1.2 1 M2 Pasang Atap Genteng Palentong Kecil Bahan 25.000 Bh Genteng Palentong Tenaga 0.150 Oh Pekerja 0.075 Oh Tukang Kayu 0.008 Oh Kepala Tukang 0.008 Oh Mandor 1 M2 Pasang Atap Genteng Kodok / Glazzur Bahan 25.000 Bh Genteng Kodok Tenaga 0.150 Oh Pekerja 0.075 Oh Tukang Kayu 0.008 Oh Kepala Tukang 0.008 Oh Mandor

@ @ @ @ @

#REF! #REF! #REF! #REF! #REF!

#REF! #REF! #REF! #REF! #REF! #REF!

2 2.1 2.2

@ @ @ @ @

#REF! #REF! #REF! #REF! #REF!

#REF! #REF! #REF! #REF! #REF! #REF!

3 3.1 3.2

1 M2 Pasang Atap Genteng Palentong Super/ Besar Bahan @ 12.000 Bh Genteng Palentong Super Tenaga @ 0.150 Oh Pekerja @ 0.060 Oh Tukang Kayu @ 0.006 Oh Kepala Tukang @ 0.008 Oh Mandor 1 M2 Pasang Atap Genteng Bubung Palentong Bahan 5.000 Bh Genteng Bubung Palentong 8.000 Kg Semen Portland 0.032 M3 Pasir Pasang Tenaga 0.400 Oh Pekerja 0.200 Oh Tukang Kayu 0.020 Oh Kepala Tukang 0.002 Oh Mandor 1 M2 Pasang Bubung Genteng Kodok Glazzur Bahan 5.000 Bh Genteng Bubung Kodok 8.000 Kg Semen Portland 0.032 M3 Pasir Pasang Tenaga 0.400 Oh Pekerja 0.200 Oh Tukang Kayu 0.020 Oh Kepala Tukang 0.002 Oh Mandor 1 M2 Pasang Bubung Genteng Palentong Besar Bahan 4.000 Bh Genteng Bubung Palentong 8.000 Kg Semen Portland 0.032 M3 Pasir Pasang Tenaga 0.400 Oh Pekerja 0.200 Oh Tukang Kayu 0.020 Oh Kepala Tukang 0.002 Oh Mandor 1 M2 Pasang Roof light fiberglass (180 x 90) cm Bahan 0.600 Lbr Roof Light Fiberglass

#REF! #REF! #REF! #REF! #REF!

#REF! #REF! #REF! #REF! #REF! #REF!

4 4.1

@ @ @ @ @ @ @

#REF! #REF! #REF! #REF! #REF! #REF! #REF!

#REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!

4.2

5 5.1

@ @ @ @ @ @ @

#REF! #REF! #REF! #REF! #REF! #REF! #REF!

#REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!

5.2

6 6.1

@ @ @ @ @ @ @

#REF! #REF! #REF! #REF! #REF! #REF! #REF!

#REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!

6.2

7 7.1

#REF!

#REF!

7.2

0.050 Tenaga 0.140 0.067 0.007 0.007

Kg Oh Oh Oh Oh

Paku Biasa 1/2' - 1' Pekerja Tukang Kayu Kepala Tukang Mandor

@ @ @ @ @

#REF! #REF! #REF! #REF! #REF!

#REF! #REF! #REF! #REF! #REF! #REF!

8 8.1

8.2

1 M2 Pasang Atap Asbes Gelombang (2.50 x 0.92 m) x 5 mm Bahan @ 0.500 Lbr Asbes Gelombang @ 0.120 Kg Paku Pancing 60 x 230 Tenaga @ 0.140 Oh Pekerja @ 0.075 Oh Tukang Kayu @ 0.008 Oh Kepala Tukang @ 0.008 Oh Mandor 1 M2 Pasang Atap Asbes Gelombang (2.25 x 0.92 m) x 5 mm Bahan @ 0.600 Lbr Asbes Gelombang @ 0.120 Kg Paku Pancing 60 x 230 Tenaga @ 0.140 Oh Pekerja @ 0.075 Oh Tukang Kayu @ 0.008 Oh Kepala Tukang @ 0.008 Oh Mandor

#REF! #REF! #REF! #REF! #REF! #REF!

#REF! #REF! #REF! #REF! #REF! #REF! #REF!

9 9.1

#REF! #REF! #REF! #REF! #REF! #REF!

#REF! #REF! #REF! #REF! #REF! #REF! #REF!

9.2

10 1 M2 Pasang Atap Asbes Gelombang (2.00 x 0.92 m) x 5 mm 10.1 Bahan @ 0.600 Lbr Asbes Gelombang @ 0.120 Kg Paku Pancing 60 x 230 10.2 Tenaga @ 0.140 Oh Pekerja @ 0.070 Oh Tukang Kayu @ 0.007 Oh Kepala Tukang @ 0.007 Oh Mandor 11 1 M2 Pasang Atap Asbes Gelombang (1.80 x 0.92 m) x 5 mm 11.1 Bahan @ 0.750 Lbr Asbes Gelombang @ 0.120 Kg Paku Pancing 60 x 230 11.2 Tenaga @ 0.140 Oh Pekerja @ 0.070 Oh Tukang Kayu @ 0.007 Oh Kepala Tukang @ 0.007 Oh Mandor 12 1 M2 Pasang Atap Asbes Gelombang (3.00 x 1.05 m) x 4 mm 12.1 Bahan @ 0.350 Lbr Asbes Gelombang @ 0.120 Kg Paku Pancing 12.2 Tenaga @ 0.140 Oh Pekerja @ 0.070 Oh Tukang Kayu @ 0.007 Oh Kepala Tukang @ 0.007 Oh Mandor 13 1 M2 Pasang Atap Asbes Gelombang (2.70 x 1.05 m) x 4 mm 13.1 Bahan @ 0.420 Lbr Asbes Gelombang @ 0.120 Kg Paku Pancing 13.2 Tenaga @ 0.140 Oh Pekerja @ 0.070 Oh Tukang Kayu @ 0.007 Oh Kepala Tukang @ 0.007 Oh Mandor 14 1 M2 Pasang Atap Asbes Gelombang (2.40 x 1.05 m) x 4 mm 14.1 Bahan

#REF! #REF! #REF! #REF! #REF! #REF!

#REF! #REF! #REF! #REF! #REF! #REF! #REF!

#REF! #REF! #REF! #REF! #REF! #REF!

#REF! #REF! #REF! #REF! #REF! #REF! #REF!

#REF! #REF! #REF! #REF! #REF! #REF!

#REF! #REF! #REF! #REF! #REF! #REF! #REF!

#REF! #REF! #REF! #REF! #REF! #REF!

#REF! #REF! #REF! #REF! #REF! #REF! #REF!

0.440 0.120 14.2 Tenaga 0.140 0.067 0.007 0.007 O

Lbr Kg Oh Oh Oh Oh

Asbes Gelombang Paku Pancing Pekerja Tukang Kayu Kepala Tukang Mandor

@ @ @ @ @ @

#REF! #REF! #REF! #REF! #REF! #REF!

#REF! #REF! #REF! #REF! #REF! #REF! #REF!

15 1 M2 Pasang Atap Asbes Gelombang (2.10 x 1.05 m) x 4 mm 15.1 Bahan @ 0.510 Lbr Asbes Gelombang @ 0.120 Kg Paku Pancing 15.2 Tenaga @ 0.140 Oh Pekerja @ 0.067 Oh Tukang Kayu @ 0.007 Oh Kepala Tukang @ 0.007 Oh Mandor 16 1 M2 Pasang Atap Asbes Gelombang (1.50 x 1.05 m) x 4 mm 16.1 Bahan @ 0.800 Lbr Asbes Gelombang @ 0.120 Kg Paku Pancing 16.2 Tenaga @ 0.140 Oh Pekerja @ 0.067 Oh Tukang Kayu @ 0.007 Oh Kepala Tukang @ 0.007 Oh Mandor 17 1 M2 Pasang Atap Asbes Gelombang (3.00 x 1.08 m) x 6 mm 17.1 Bahan @ 0.370 Lbr Asbes Gelombang @ 0.120 Kg Paku Pancing 17.2 Tenaga @ 0.140 Oh Pekerja @ 0.067 Oh Tukang Kayu @ 0.007 Oh Kepala Tukang @ 0.007 Oh Mandor 18 1 M2 Pasang Atap Asbes Gelombang (2.70 x 1.08 m) x 6 mm 18.1 Bahan @ 0.380 Lbr Asbes Gelombang @ 0.120 Kg Paku Pancing 18.2 Tenaga @ 0.140 Oh Pekerja @ 0.067 Oh Tukang Kayu @ 0.007 Oh Kepala Tukang @ 0.007 Oh Mandor 19 1 M2 Pasang Atap Asbes Gelombang (2.40 x 1.08 m) x 6 mm 19.1 Bahan @ 0.460 Lbr Asbes Gelombang @ 0.120 Kg Paku Pancing 19.2 Tenaga @ 0.140 Oh Pekerja @ 0.067 Oh Tukang Kayu @ 0.007 Oh Kepala Tukang @ 0.007 Oh Mandor 20 1 M2 Pasang Atap Asbes Gelombang (2.10 x 1.08 m) x 6 mm 20.1 Bahan @ 0.490 Lbr Asbes Gelombang @ 0.120 Kg Paku Pancing 20.2 Tenaga @ 0.140 Oh Pekerja @ 0.067 Oh Tukang Kayu @ 0.007 Oh Kepala Tukang @ 0.007 Oh Mandor 21 1 M2 Pasang Atap Asbes Gelombang (1.08 x 1.08 m) x 6 mm

#REF! #REF! #REF! #REF! #REF! #REF!

#REF! #REF! #REF! #REF! #REF! #REF! #REF!

#REF! #REF! #REF! #REF! #REF! #REF!

#REF! #REF! #REF! #REF! #REF! #REF! #REF!

#REF! #REF! #REF! #REF! #REF! #REF!

#REF! #REF! #REF! #REF! #REF! #REF! #REF!

#REF! #REF! #REF! #REF! #REF! #REF!

#REF! #REF! #REF! #REF! #REF! #REF! #REF!

#REF! #REF! #REF! #REF! #REF! #REF!

#REF! #REF! #REF! #REF! #REF! #REF! #REF!

#REF! #REF! #REF! #REF! #REF! #REF!

#REF! #REF! #REF! #REF! #REF! #REF! #REF!

21.1 Bahan 0.570 0.120 21.2 Tenaga 0.140 0.067 0.007 0.007 V

Lbr Kg Oh Oh Oh Oh

Asbes Gelombang Paku Pancing Pekerja Tukang Kayu Kepala Tukang Mandor

@ @ @ @ @ @

#REF! #REF! #REF! #REF! #REF! #REF!

#REF! #REF! #REF! #REF! #REF! #REF! #REF!

22 1 M1 Pasang Bubung Seng Gelombang 0.92 m 22.1 Bahan 2.400 Lbr Bubung Steel Gelombang 6.000 Bh Paku Sekrup 3,5" 22.2 Tenaga 0.084 Oh Pekerja 0.125 Oh Tukang Kayu 0.013 Oh Kepala Tukang 0.004 Oh Mandor 23 1 M1 Pasang Bubung Seng Gelombang 1.05 m 23.1 Bahan 2.100 Lbr Nok Steel Gelombang 6.000 Bh Paku Sekrup 3,5" 23.2 Tenaga 0.084 Oh Pekerja 0.125 Oh Tukang Kayu 0.013 Oh Kepala Tukang 0.004 Oh Mandor 24 1 M1 Pasang Nok Stel Gelombang 1.08 m 24.1 Bahan 2.050 Lbr Nok Steel Gelombang 6.000 Bh Paku Sekrup 3,5" 24.2 Tenaga 0.084 Oh Pekerja 0.125 Oh Tukang Kayu 0.013 Oh Kepala Tukang 0.004 Oh Mandor 25 1 M1 Pasang Nok Paten 0.92 m 25.1 Bahan 1.200 Lbr Nok Paten 6.000 Bh Paku Sekrup 3,5" 25.2 Tenaga 0.084 Oh Pekerja 0.125 Oh Tukang Kayu 0.013 Oh Kepala Tukang 0.004 Oh Mandor 26 1 M1 Pasang Nok Paten 1.05 m 26.1 Bahan 1.200 Lbr Nok Paten 6.000 Bh Paku Sekrup 3,5" 26.2 Tenaga 0.084 Oh Pekerja 0.125 Oh Tukang Kayu 0.013 Oh Kepala Tukang 0.004 Oh Mandor

@ @ @ @ @ @

#REF! #REF! #REF! #REF! #REF! #REF!

#REF! #REF! #REF! #REF! #REF! #REF! #REF!

@ @ @ @ @ @

#REF! #REF! #REF! #REF! #REF! #REF!

#REF! #REF! #REF! #REF! #REF! #REF! #REF!

@ @ @ @ @ @

#REF! #REF! #REF! #REF! #REF! #REF!

#REF! #REF! #REF! #REF! #REF! #REF! #REF!

@ @ @ @ @ @

#REF! #REF! #REF! #REF! #REF! #REF!

#REF! #REF! #REF! #REF! #REF! #REF! #REF!

@ @ @ @ @ @

#REF! #REF! #REF! #REF! #REF! #REF!

#REF! #REF! #REF! #REF! #REF! #REF! #REF!

AA 27 1 M1 Pasang Nok Paten 1.08 m 27.1 Bahan 1.200 Lbr Nok Paten 6.000 Bh Paku Sekrup 3,5" 27.2 Tenaga 0.084 Oh Pekerja 0.125 Oh Tukang Kayu 0.013 Oh Kepala Tukang 0.004 Oh Mandor

@ @ @ @ @ @

#REF! #REF! #REF! #REF! #REF! #REF!

#REF! #REF! #REF! #REF! #REF! #REF! #REF!

AB 28 1 M1 Pasang Nok Stel Rata 0.92 m 28.1 Bahan 1.100 Lbr Nok Stel Rata 6.000 Bh Paku Sekrup 3,5" 28.2 Tenaga 0.100 Oh Pekerja 0.150 Oh Tukang Kayu 0.013 Oh Kepala Tukang 0.004 Oh Mandor AC 29 1 M1 Pasang Nok Stel Rata 1.05 m 29.1 Bahan 1.100 Lbr Nok Stel Rata 6.000 Bh Paku Sekrup 3,5" 29.2 Tenaga 0.084 Oh Pekerja 0.125 Oh Tukang Kayu 0.013 Oh Kepala Tukang 0.004 Oh Mandor AD 30 1 M2 Pasang Atap Genteng Beton 30.1 Bahan 11.000 Bh Genteng Beton 0.030 Kg Paku Biasa 2' - 5' 30.2 Tenaga 0.200 Oh Pekerja 0.100 Oh Tukang Kayu 0.010 Oh Kepala Tukang 0.010 Oh Mandor AE 31 1 M2 Pasang Atap Genteng Aspal 31.1 Bahan 6.900 Lbr Genteng Aspal 0.350 Lbr Plywood 4' x 8' x 6 mm 0.030 Kg Paku Biasa 1/2' x 1' 0.500 Bh Plastic Aerator 31.2 Tenaga 0.200 Oh Pekerja 0.300 Oh Tukang Kayu 0.003 Oh Kepala Tukang 0.010 Oh Mandor AF 32 1 M2 Pasang Atap Genteng Metal 32.1 Bahan 1.020 Lbr Genteng Metal 0.200 Kg Paku Biasa 2' - 5' 32.2 Tenaga 0.200 Oh Pekerja 0.100 Oh Tukang Kayu 0.010 Oh Kepala Tukang 0.001 Oh Mandor

@ @ @ @ @ @

#REF! #REF! #REF! #REF! #REF! #REF!

#REF! #REF! #REF! #REF! #REF! #REF! #REF!

@ @ @ @ @ @

#REF! #REF! #REF! #REF! #REF! #REF!

#REF! #REF! #REF! #REF! #REF! #REF! #REF!

@ @ @ @ @ @

#REF! #REF! #REF! #REF! #REF! #REF!

#REF! #REF! #REF! #REF! #REF! #REF! #REF!

@ @ @ @ @ @ @ @

#REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!

#REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!

@ @ @ @ @ @

#REF! #REF! #REF! #REF! #REF! #REF!

#REF! #REF! #REF! #REF! #REF! #REF! #REF!

AG 33 1 M2 Pasang Atap Sirap 33.1 Bahan 60.000 Bh Genteng Sirap 0.200 Kg Paku Biasa 1/2' x 1' 33.2 Tenaga 0.166 Oh Pekerja 0.250 Oh Tukang Kayu 0.025 Oh Kepala Tukang 0.008 Oh Mandor AH 34 1 M1 Pasang Nok Genteng Beton 34.1 Bahan 3.500 Bh Nok Genteng Beton 0.050 Kg Paku Biasa 2' - 5' 10.800 Kg Semen Abu-abu 0.032 M3 Pasir Pasang

@ @ @ @ @ @

#REF! #REF! #REF! #REF! #REF! #REF!

#REF! #REF! #REF! #REF! #REF! #REF! #REF!

@ @ @ @

#REF! #REF! #REF! #REF!

#REF! #REF! #REF! #REF!

1.000 34.2 Tenaga 0.400 0.200 0.020 0.020 AI

Kg Oh Oh Oh Oh

Semen Warna Pekerja Tukang Kayu Kepala Tukang Mandor

@ @ @ @ @

#REF! #REF! #REF! #REF! #REF!

#REF! #REF! #REF! #REF! #REF! #REF!

35 1 M1 Pasang Nok Genteng Aspal 35.1 Bahan 2.000 Bh Genteng Aspal 0.050 Kg Paku Biasa 1/2' x 1' 0.004 M3 Kayu Borneo Balok 35.2 Tenaga 0.125 Oh Pekerja 0.250 Oh Tukang Kayu 0.025 Oh Kepala Tukang 0.006 Oh Mandor 36 1 M1 Pasang Nok Genteng Metal 36.1 Bahan 1.100 Bh Genteng Decra Bond 0.050 Kg Paku Biasa 1/2' x 1' 36.2 Tenaga 0.250 Oh Pekerja 0.150 Oh Tukang Kayu 0.015 Oh Kepala Tukang 0.013 Oh Mandor

@ @ @ @ @ @ @

#REF! #REF! Rp #REF! #REF! #REF! #REF!

#REF! #REF! #REF! #REF! #REF! #REF! #REF!

AJ

@ @ @ @ @ @

#REF! #REF! #REF! #REF! #REF! #REF!

#REF! #REF! #REF! #REF! #REF! #REF! #REF!

AK 37 1 M1 Pasang Nok Sirap 37.1 Bahan 0.400 Lbr Seng Plat 3' x 6' bjls 28 0.060 Kg Paku Biasa 1/2' x 1' 0.050 Kg Paku Biasa 2' - 5' 0.004 M3 Kayu Borneo, Papan tebal 3 cm 37.2 Tenaga 0.125 Oh Pekerja 0.250 Oh Tukang Kayu 0.025 Oh Kepala Tukang 0.006 Oh Mandor AL 38 1 M2 Pasang Atap Seng Gelombang 38.1 Bahan 0.700 Lbr Seng Gelombang 3' x 6' bkls 28 0.020 Kg Paku Biasa 1/2' x 1' 38.2 Tenaga 0.120 Oh Pekerja 0.060 Oh Tukang Kayu 0.006 Oh Kepala Tukang 0.006 Oh Mandor

@ @ @ @ @ @ @ @

#REF! #REF! #REF! Rp #REF! #REF! #REF! #REF!

#REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!

@ @ @ @ @ @

#REF! #REF! #REF! #REF! #REF! #REF!

#REF! #REF! #REF! #REF! #REF! #REF! #REF!

A M 39 1 M2 Pasang Atap Nok Seng 39.1 Bahan 0.300 Lbr Seng Plat 3' x 6' bkls 28 0.040 Kg Paku Biasa 1/2' x 1' 39.2 Tenaga 0.150 Oh Pekerja 0.070 Oh Tukang Kayu 0.008 Oh Kepala Tukang 0.006 Oh Mandor

@ @ @ @ @ @

#REF! #REF! #REF! #REF! #REF! #REF!

#REF! #REF! #REF! #REF! #REF! #REF! #REF!

AN 40 1 M2 Pasang Atap Aluminium 40.1 Bahan 1.050 @ M2 Atap Aluminium Gelombang Tebal 0.55 @ 0.020 Kg Paku Hak Panjang 15 cm 40.2 Tenaga @ 0.150 Oh Pekerja @ 0.750 Oh Tukang Kayu @ 0.008 Oh Kepala Tukang

#REF! #REF! #REF! #REF! #REF!

#REF! #REF! #REF! #REF! #REF!

0.006

Oh

Mandor

#REF!

#REF! #REF!

AO 41 1 M2 Pasang Nok Aluminium 41.1 Bahan 1.200 M2 Nok Standar 40 cm 18, swg 22 0.040 Kg Paku Hak Panjang 15 cm 41.2 Tenaga 0.100 Oh Pekerja 1.000 Oh Tukang Kayu 0.010 Oh Kepala Tukang 0.010 Oh Mandor AP 42 1 M2 Pasang Aluminium Foil/Sisalation 42.1 Bahan 1.050 M2 Sisalaton/Aluminium Foil 42.2 Tenaga 0.150 Oh Pekerja 0.050 Oh Tukang Kayu 0.005 Oh Kepala Tukang 0.008 Oh Mandor

@ @ @ @ @ @

#REF! #REF! #REF! #REF! #REF! #REF!

#REF! #REF! #REF! #REF! #REF! #REF! #REF!

@ @ @ @ @

#REF! #REF! #REF! #REF! #REF!

#REF! #REF! #REF! #REF! #REF! #REF!

ANALISA BIAYA KONSTRUKSI (ABK) BANGUNAN GEDUNG DAN PERUMAHAN PEKERJAAN LANGIT-LANGIT
A 1 1.1 1 M2 Langit-langit asbes (1.00 x 1.00) m, tebal 6 mm Bahan @ 1.100 Lbr Pelat Asbes tebal 6 mm @ 0.010 Kg Paku Tenaga @ 0.030 Oh Pekerja @ 0.070 Oh Tukang Kayu @ 0.007 Oh Kepala Tukang @ 0.002 Oh Mandor 1 M2 Langit-langit asbes (1.00 x 1.00) m, tebal 5 mm Bahan @ 1.100 Lbr Pelat Asbes tebal 5 mm @ 0.010 Kg Paku Tenaga @ 0.030 Oh Pekerja @ 0.070 Oh Tukang Kayu @ 0.007 Oh Kepala Tukang @ 0.002 Oh Mandor 1 M2 Langit-langit asbes (1.00 x 1.00) m, tebal 4 mm Bahan @ 1.100 Lbr Pelat Asbes tebal 4 mm @ 0.010 Kg Paku Tenaga @ 0.030 Oh Pekerja @ 0.070 Oh Tukang Kayu @ 0.007 Oh Kepala Tukang @ 0.002 Oh Mandor 1 M2 Langit-langit asbes (1.00 x 1.00) m, tebal 3.5 mm Bahan @ 1.100 Lbr Pelat Asbes tebal 3.5 mm @ 0.010 Kg Paku Tenaga @ 0.030 Oh Pekerja @ 0.070 Oh Tukang Kayu @ 0.007 Oh Kepala Tukang @ 0.002 Oh Mandor 1 M2 Langit-langit Akustk (30 x 30) cm Bahan 11.500 Lbr Akustik Ukuran 30 x 30 cm 0.050 Kg Paku Tenaga 0.060 Oh Pekerja 0.120 Oh Tukang Kayu 0.012 Oh Kepala Tukang 0.003 Oh Mandor 1 M2 Langit-langit Akustk (30 x 60) cm Bahan 5.800 Lbr Akustik Ukuran 30 x 60 cm 0.050 Kg Paku Tenaga 0.060 Oh Pekerja 0.100 Oh Tukang Kayu 0.010 Oh Kepala Tukang 0.003 Oh Mandor 1 M2 Langit-langit Akustk (60 x 120) cm Bahan 1.500 Lbr Akustik Ukuran 60 x 120 cm

#REF! #REF! #REF! #REF! #REF! #REF!

#REF! #REF! #REF! #REF! #REF! #REF! #REF!

1.2

2 2.1

#REF! #REF! #REF! #REF! #REF! #REF!

#REF! #REF! #REF! #REF! #REF! #REF! #REF!

2.2

3 3.1

#REF! #REF! #REF! #REF! #REF! #REF!

#REF! #REF! #REF! #REF! #REF! #REF! #REF!

3.2

4 4.1

#REF! #REF! #REF! #REF! #REF! #REF!

#REF! #REF! #REF! #REF! #REF! #REF! #REF!

4.2

5 5.1

@ @ @ @ @ @

#REF! #REF! #REF! #REF! #REF! #REF!

#REF! #REF! #REF! #REF! #REF! #REF! #REF!

5.2

6 6.1

@ @ @ @ @ @

#REF! #REF! #REF! #REF! #REF! #REF!

#REF! #REF! #REF! #REF! #REF! #REF! #REF!

6.2

7 7.1

#REF!

#REF!

7.2

0.050 Tenaga 0.060 0.100 0.010 0.003

Kg Oh Oh Oh Oh

Paku Pekerja Tukang Kayu Kepala Tukang Mandor

@ @ @ @ @

#REF! #REF! #REF! #REF! #REF!

#REF! #REF! #REF! #REF! #REF! #REF!

8 8.1

8.2

1 M2 Langit-langit Plywood (30 x 60) cm, tebal 4 mm Bahan @ 0.360 Lbr Plywood 4' x 8' x 6 mm @ 0.030 Kg Paku Tenaga @ 0.070 Oh Pekerja @ 0.100 Oh Tukang Kayu @ 0.010 Oh Kepala Tukang @ 0.004 Oh Mandor 1 M2 Langit-langit Plywood (30 x 60) cm, tebal 6 mm Bahan @ 0.360 Lbr Plywood 4' x 8' x 6 mm @ 0.030 Kg Paku Tenaga @ 0.070 Oh Pekerja @ 0.100 Oh Tukang Kayu @ 0.010 Oh Kepala Tukang @ 0.004 Oh Mandor

#REF! #REF! #REF! #REF! #REF! #REF!

#REF! #REF! #REF! #REF! #REF! #REF! #REF!

9 9.1

#REF! #REF! #REF! #REF! #REF! #REF!

#REF! #REF! #REF! #REF! #REF! #REF! #REF!

9.2

10 1 M2 Langit-langit Plywood (60 x 120) cm, tebal 4 mm 10.1 Bahan @ 0.375 Lbr Plywood 4' x 8' x 6 mm @ 0.030 Kg Paku 10.2 Tenaga @ 0.070 Oh Pekerja @ 0.100 Oh Tukang Kayu @ 0.010 Oh Kepala Tukang @ 0.004 Oh Mandor 11 1 M2 Langit-langit Plywood (60 x 120) cm, tebal 6 mm 11.1 Bahan @ 0.375 Lbr Plywood 4' x 8' x 6 mm @ 0.030 Kg Paku 11.2 Tenaga @ 0.070 Oh Pekerja @ 0.100 Oh Tukang Kayu @ 0.010 Oh Kepala Tukang @ 0.004 Oh Mandor 12 1 M2 Langit-langit Teakwood (30 x 60) cm, tebal 4 mm 12.1 Bahan @ 0.360 Lbr Teakwood 4' x 8' x 4 mm @ 0.030 Kg Paku 12.2 Tenaga @ 0.070 Oh Pekerja @ 0.100 Oh Tukang Kayu @ 0.010 Oh Kepala Tukang @ 0.004 Oh Mandor 13 1 M2 Langit-langit Teakwood (60 x 120) cm, tebal 4 mm 13.1 Bahan @ 0.375 Lbr Teakwood 4' x 8' x 4 mm @ 0.030 Kg Paku 13.2 Tenaga @ 0.070 Oh Pekerja @ 0.100 Oh Tukang Kayu @ 0.010 Oh Kepala Tukang @ 0.004 Oh Mandor 14 1 M2 Langit-langit Lat Kayu Jati

#REF! #REF! #REF! #REF! #REF! #REF!

#REF! #REF! #REF! #REF! #REF! #REF! #REF!

#REF! #REF! #REF! #REF! #REF! #REF!

#REF! #REF! #REF! #REF! #REF! #REF! #REF!

#REF! #REF! #REF! #REF! #REF! #REF!

#REF! #REF! #REF! #REF! #REF! #REF! #REF!

#REF! #REF! #REF! #REF! #REF! #REF!

#REF! #REF! #REF! #REF! #REF! #REF! #REF!

14.1 Bahan 0.024 0.010 0.050 14.2 Tenaga 0.200 0.600 0.060 0.010 O

M3 Kg Kg Oh Oh Oh Oh

Kayu Jati, Papan Paku Paku Sekrup Pekerja Tukang Kayu Kepala Tukang Mandor

@ @ @ @ @ @ @

#REF! #REF! #REF! #REF! #REF! #REF! #REF!

#REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!

15 1 M2 Langit-langit Lat Kayu Ramin 15.1 Bahan 0.024 M3 Kayu Ramin 0.010 Kg Paku 0.050 Kg Paku Sekrup 15.2 Tenaga 0.200 Oh Pekerja 0.600 Oh Tukang Kayu 0.060 Oh Kepala Tukang 0.010 Oh Mandor 16 1 M2 Langit-langit Lat Kayu Kamper 16.1 Bahan 0.024 M3 Kayu Kamper, Papan 0.010 Kg Paku 0.050 Kg Paku Sekrup 16.2 Tenaga 0.200 Oh Pekerja 0.600 Oh Tukang Kayu 0.060 Oh Kepala Tukang 0.010 Oh Mandor 17 1 M2 Langit-langit Soft Board 17.1 Bahan 0.350 Lbr Soft board 4' x 8' x 4 mm 0.030 Kg Paku Biasa 17.2 Tenaga 0.600 Oh Pekerja 0.100 Oh Tukang Kayu 0.010 Oh Kepala Tukang 0.003 Oh Mandor

@ @ @ @ @ @ @

#REF! #REF! #REF! #REF! #REF! #REF! #REF!

#REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!

@ @ @ @ @ @ @

#REF! #REF! #REF! #REF! #REF! #REF! #REF!

#REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!

@ @ @ @ @ @

#REF! #REF! #REF! #REF! #REF! #REF!

#REF! #REF! #REF! #REF! #REF! #REF! #REF!

18 1 M2 Langit-langit Akustik 60 x 120 cm + Rangka Aluminium 18.1 Bahan 3.600 @ M1 Profil Aluminium 'T' @ 0.150 Kg Kawat Seng Polos @ 1.000 Bh Ramset/Dina Bolt @ 1.500 Lbr Akustik Arm Strong 60 x 120 cm 18.2 Tenaga @ 0.150 Oh Pekerja @ 0.500 Oh Tukang Kayu @ 0.050 Oh Kepala Tukang @ 0.008 Oh Mandor 19 1 M2 List Langit-langit Kayu Profil 19.1 Bahan 1.100 M List Kayu Profil 0.010 Kg Paku 19.2 Tenaga 0.050 Oh Pekerja 0.050 Oh Tukang Kayu 0.005 Oh Kepala Tukang 0.003 Oh Mandor

#REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!

#REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!

@ @ @ @ @ @

Rp #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!

20 1 M2 Langit-langit Asbes (1 x 1) m, Tebal 3.4 mm, rangka Borneo 20.1 Bahan @ #REF! 0.012 M Kayu Borneo, Balok @ #REF! 0.060 Kg Paku Biasa

#REF! #REF!

1.100 20.2 Tenaga 0.180 0.320 0.032 0.009 U

Lbr Oh Oh Oh Oh

Asbes 1 x 1 m Pekerja Tukang Kayu Kepala Tukang Mandor

@ @ @ @ @

#REF! #REF! #REF! #REF! #REF!

#REF! #REF! #REF! #REF! #REF! #REF!

21 1 M2 Langit-langit Plywood 4 mm + Rangka Kayu Borneo 21.1 Bahan 0.023 @ M3 Kayu Borneo @ 0.060 Kg Paku Biasa 2" - 5" @ 0.390 Lbr Plywood 4' x 8' x 4 mm 21.2 Tenaga @ 0.270 Oh Pekerja @ 0.400 Oh Tukang Kayu @ 0.040 Oh Kepala Tukang @ 0.014 Oh Mandor

#REF! #REF! #REF! #REF! #REF! #REF! #REF!

#REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!

22 1 M2 Langit-langit Akustik (30 x 60) cm + Rangka Kayu Borneo 22.1 Bahan 0.023 @ #REF! M3 Kayu Borneo @ #REF! 0.060 Kg Paku @ #REF! 5.800 Lbr Akustik 30 x 60 cm 22.2 Tenaga @ #REF! 0.260 Oh Pekerja @ #REF! 0.400 Oh Tukang Kayu @ #REF! 0.040 Oh Kepala Tukang @ #REF! 0.013 Oh Mandor 23 1 M2 Langit-langit Akustik (30 x 30) cm + Rangka Kayu Borneo 23.1 Bahan 0.027 @ #REF! M3 Kayu Borneo @ #REF! 0.060 Kg Paku @ #REF! 11.500 Lbr Akustik 30 x 60 cm 23.2 Tenaga @ #REF! 0.310 Oh Pekerja @ #REF! 0.470 Oh Tukang Kayu @ #REF! 0.047 Oh Kepala Tukang @ #REF! 0.016 Oh Mandor 24 1 M2 Langit-langit Gypsum Board, Tebal 9 mm 23.1 Bahan 0.364 Lbr Gypsum Board (120x240x9) mm 0.110 Kg Paku Sekrup 23.2 Tenaga 0.100 Oh Pekerja 0.050 Oh Tukang Kayu 0.005 Oh Kepala Tukang 0.005 Oh Mandor

#REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!

#REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!

@ @ @ @ @ @

#REF! #REF! #REF! #REF! #REF! #REF!

#REF! #REF! #REF! #REF! #REF! #REF! #REF!

ANALISA BIAYA KONSTRUKSI (ABK) BANGUNAN GEDUNG DAN PERUMAHAN PEKERJAAN SANITASI
A 1 1.1 1 Bh Kloset Duduk/Monoblok Bahan 1.000 Bh Kloset Duduk/Monoblok 1.000 Ls Perlengkapan Tenaga 3.300 Oh Pekerja 1.100 Oh Tukang Batu 0.001 Oh Kepala Tukang 0.160 Oh Mandor 1 Bh Kloset Jongkok Porselen Bahan 1.000 Bh Kloset Jongkok Porselen 6.000 Kg Semen Portland 0.010 M3 Pasir Pasang Tenaga 1.000 Oh Pekerja 1.500 Oh Tukang Batu 1.500 Oh Kepala Tukang 0.160 Oh Mandor 1 Bh Kloset Jongkok Teraso Bahan 1.000 Bh Kloset Jongkok Teraso 7.000 Bh Bata Merah 6.000 Kg Semen Portland 0.010 M3 Pasir Pasang Tenaga 1.000 Oh Pekerja 1.500 Oh Tukang Batu 0.300 Oh Kepala Tukang 0.110 Oh Mandor 1 Bh Urinoir Bahan 1.000 Bh 1.000 Ls 6.000 Kg 0.010 M3 Tenaga 1.000 Oh 1.000 Oh 0.100 Oh 0.100 Oh 1 Bh Wastafel Bahan 1.000 Bh 1.000 Ls 6.000 Kg 0.010 M3 Tenaga 1.200 Oh 1.450 Oh 0.150 Oh 0.100 Oh

@ @ @ @ @ @

#REF! #REF! #REF! #REF! #REF! #REF!

#REF! #REF! #REF! #REF! #REF! #REF! #REF!

1.2

2 1.1

@ @ @ @ @ @ @

#REF! #REF! #REF! #REF! #REF! #REF! #REF!

#REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!

1.2

3 1.1

@ @ @ @ @ @ @ @

#REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!

#REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!

1.2

4 1.1

Urinoir Perlengkapan Semen Portland Pasir Pasang Pekerja Tukang Batu Kepala Tukang Mandor

@ @ @ @ @ @ @ @

#REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!

#REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!

1.2

5 1.1

Wastafel Perlengkapan Semen Abu-abu Pasir Pasang Pekerja Tukang Batu Kepala Tukang Mandor

@ @ @ @ @ @ @ @

#REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!

#REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!

1.2

6 1.1

1.2

1 Bh Bak Mandi Terasso Volume 0,30 m3 Bahan 1.000 Bh Bak Teraso 6.000 Kg Semen Port land 0.010 M3 Pasir Pasang Tenaga

@ @ @

#REF! #REF! #REF!

#REF! #REF! #REF!

2.100 0.750 0.070 0.110 G 7 1.1

Oh Oh Oh Oh

Pekerja Tukang Batu Kepala Tukang Mandor

@ @ @ @

#REF! #REF! #REF! #REF!

#REF! #REF! #REF! #REF! #REF!

1.2

1 Bh Bak Mandi Fiber Glass Volume 0,30 m3 Bahan 1.000 Bh Bak Fiber glass 1.000 Ls Perlengkapan Tenaga 1.800 Oh Pekerja 2.700 Oh Tukang Batu 0.540 Oh Kepala Tukang 0.110 Oh Mandor 1 Bh Bak Mandi Batu Bata Volume 0,30 m3 Bahan 0.400 M3 Batu Bata 120.000 Kg Semen Port Land 0.300 M3 Pasir Pasang 360.000 Bh Porselen (11 x 11) cm 6.000 Kg Semen Nat Tenaga 6.000 Oh Pekerja 3.000 Oh Tukang Batu 0.300 Oh Kepala Tukang 0.300 Oh Mandor 1 Bh Badkip Porselen Bahan 1.000 Bh Badkip 1.000 Ls Perlengkapan Tenaga - Oh Pekerja 0.075 Oh Tukang Batu 0.750 Oh Kepala Tukang 0.250 Oh Mandor 1 Bh Bak Beton Volume 1m3 air Bahan 0.900 M3 Beton 1 : 1 1/2 : 2 1/2 180.000 Kg Besi Beton 8.000 M3 Kayu Cetakan 5.000 M2 Ubin Porselen 1.000 Ls Perlengkapan Tenaga 3.500 Oh Pekerja 4.500 Oh Tukang Batu 0.900 Oh Kepala Tukang 0.900 Oh Mandor 1 Bh Bak Fiber Glass Volume 1 m3 air Bahan 1.000 Bh Bak Fiber Glass 1.000 Ls Perlengkapan Tenaga 3.000 Oh Pekerja 4.500 Oh Tukang Batu 0.900 Oh Kepala Tukang 0.900 Oh Mandor

@ @ @ @ @ @

#REF! #REF! #REF! #REF! #REF! #REF!

#REF! #REF! #REF! #REF! #REF! #REF! #REF!

8 1.1

@ @ @ @ @ @ @ @ @

#REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!

#REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!

1.2

9 1.1

@ @

#REF! #REF! #REF! #REF! #REF! #REF!

#REF! #REF!

1.2

@ @ @

#REF! #REF! #REF! #REF!

10 1.1

@ @ @ @ @ @ @ @ @

#REF! #REF! Rp #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!

#REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!

1.2

11 1.1

@ @ @ @ @ @

#REF! #REF! #REF! #REF! #REF! #REF!

#REF! #REF! #REF! #REF! #REF! #REF! #REF!

1.2

12 1.1

1.2

1 m1 Pipa Penyalur Air Limbah Jenis Pipa Tanah, Diameter 15 cm Bahan @ #REF! 1.600 Bh Pipa Tanah @ #REF! 0.680 Kg Semen Portland 0.013 @ #REF! M3 Pasir Pasang 0.011 @ #REF! M3 Pasir Urug Tenaga

#REF! #REF! #REF! #REF!

0.060 0.030 0.003 0.003 M 13 1.1

Oh Oh Oh Oh

Pekerja Tukang Batu Kepala Tukang Mandor

@ @ @ @

#REF! #REF! #REF! #REF!

#REF! #REF! #REF! #REF! #REF!

1.2

1 m1 Pipa Penyalur Air Limbah Jenis Pipa Tanah, Diameter 20 cm Bahan @ #REF! 1.600 Bh Pipa Tanah @ #REF! 0.870 Kg Semen Portland 0.014 @ #REF! M3 Pasir Pasang 0.014 @ #REF! M3 Pasir Urug Tenaga @ #REF! 0.080 Oh Pekerja @ #REF! 0.040 Oh Tukang Batu @ #REF! 0.004 Oh Kepala Tukang @ #REF! 0.007 Oh Mandor 1 m1 Pipa Beton, Diameter 15 cm - 20cm Bahan 1.100 Bh Pipa Beton 0.027 M3 Batu Bata 3.920 Kg Semen Portland 0.056 M3 Pasir Pasang 0.024 M3 Pasir Urug Tenaga 0.140 Oh Pekerja 0.070 Oh Tukang Batu 0.007 Oh Kepala Tukang 0.007 Oh Mandor 1 m1 Pipa Beton, Diameter 30 cm - 100cm Bahan 1.100 Bh Pipa Beton 0.550 M3 Batu Bata 10.300 Kg Semen Portland 0.061 M3 Pasir Pasang 0.069 M3 Pasir Urug Tenaga 0.380 Oh Pekerja 0.190 Oh Tukang Batu 0.019 Oh Kepala Tukang 0.019 Oh Mandor

#REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!

14 1.1

@ @ @ @ @ @ @ @ @

#REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!

#REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!

1.2

15 1.1

@ @ @ @ @ @ @ @ @

#REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!

#REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!

1.2

16 1.1

1.2

1 Bh Bak Kontrol Pasangan Batu Bata Ukuran (30 x 30) cm, Tinggi 35 cm Bahan 0.145 @ #REF! M3 Batu Bata @ #REF! 44.000 Kg Semen Portland 0.070 @ #REF! M3 Pasir Pasang 0.070 @ #REF! M3 Batu Kerikil @ #REF! 1.600 Kg Besi Beton 0.060 @ #REF! M3 Pasir Urug Tenaga @ #REF! 3.200 Oh Pekerja @ #REF! 1.015 Oh Tukang Batu @ #REF! 0.002 Oh Kepala Tukang @ #REF! 0.016 Oh Mandor 1 Bh Bak Kontrol Pasangan Batu Bata Ukuran (45 x 45) cm, Tinggi 50 cm Bahan 0.250 @ #REF! M3 Batu Bata @ #REF! 77.000 Kg Semen Portland 0.130 @ #REF! M3 Pasir Pasang 0.020 @ #REF! M3 Batu Kerikil @ #REF! 2.600 Kg Besi Beton 0.090 @ #REF! M3 Pasir Urug Tenaga @ #REF! 1.420 Oh Pekerja

#REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!

17 1.1

#REF! #REF! #REF! #REF! #REF! #REF! #REF!

1.2

0.473 0.047 0.071 R 18 1.1

Oh Oh Oh

Tukang Batu Kepala Tukang Mandor

@ @ @

#REF! #REF! #REF!

#REF! #REF! #REF! #REF!

1.2

1 Bh Bak Kontrol Pasangan Batu Bata Ukuran (60 x 60) cm, Tinggi 65 cm Bahan 0.371 @ #REF! M3 Batu Bata @ #REF! 114.000 Kg Semen Portland 0.184 @ #REF! M3 Pasir Pasang 0.033 @ #REF! M3 Batu Kerikil @ #REF! 4.850 Kg Besi Beton 0.120 @ #REF! M3 Pasir Urug Tenaga @ #REF! 2.160 Oh Pekerja @ #REF! 0.720 Oh Tukang Batu @ #REF! 0.072 Oh Kepala Tukang @ #REF! 0.108 Oh Mandor @ #REF! 0.100 Oh Tukang Gali 1 m1 Pipa Galvanis F 1/2" Bahan 1.200 M1 Pipa Galvanis 1.000 Ls Perlengkapan Tenaga 0.054 Oh Pekerja 0.090 Oh Tukang Batu 0.009 Oh Kepala Tukang 0.027 Oh Mandor 1 m1 Pipa Galvanis F 3/4" Bahan 1.200 M1 Pipa Galvanis 1.000 Ls Perlengkapan Tenaga 0.054 Oh Pekerja 0.090 Oh Tukang Batu 0.009 Oh Kepala Tukang 0.027 Oh Mandor 1 m1 Pipa Galvanis F 1" Bahan 1.200 M1 Pipa Galvanis 1.000 Ls Perlengkapan Tenaga 0.054 Oh Pekerja 0.090 Oh Tukang Batu 0.009 Oh Kepala Tukang 0.027 Oh Mandor 1 m1 Pipa Galvanis F 1 1/2" Bahan 1.200 M1 Pipa Galvanis 1.000 Ls Perlengkapan Tenaga 0.108 Oh Pekerja 0.180 Oh Tukang Batu 0.018 Oh Kepala Tukang 0.005 Oh Mandor 1 m1 Pipa Galvanis F 3" Bahan 1.200 M1 Pipa Galvanis 1.000 Ls Perlengkapan Tenaga 0.108 Oh Pekerja 0.180 Oh Tukang Batu 0.018 Oh Kepala Tukang

#REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!

19 1.1

@ @ @ @ @ @

#REF! #REF! #REF! #REF! #REF! #REF!

#REF! #REF! #REF! #REF! #REF! #REF! #REF!

1.2

20 1.1

@ @ @ @ @ @

#REF! #REF! #REF! #REF! #REF! #REF!

#REF! #REF! #REF! #REF! #REF! #REF! #REF!

1.2

21 1.1

@ @ @ @ @ @

#REF! #REF! #REF! #REF! #REF! #REF!

#REF! #REF! #REF! #REF! #REF! #REF! #REF!

1.2

22 1.1

@ @ @ @ @ @

#REF! #REF! #REF! #REF! #REF! #REF!

#REF! #REF! #REF! #REF! #REF! #REF! #REF!

1.2

23 1.1

@ @ @ @ @

#REF! #REF! #REF! #REF! #REF!

#REF! #REF! #REF! #REF! #REF!

1.2

0.005 X 24 1.1

Oh

Mandor

#REF!

#REF! #REF!

1.2

1 m1 Pipa Galvanis F 4" Bahan 1.200 M1 Pipa Galvanis 1.000 Ls Perlengkapan Tenaga 0.135 Oh Pekerja 0.225 Oh Tukang Batu 0.023 Oh Kepala Tukang 0.007 Oh Mandor 1 m1 Pipa PVC tipe AW F 1/2" Bahan 1.200 M1 Pipa PVC 1.000 Ls Perlengkapan Tenaga 0.036 Oh Pekerja 0.060 Oh Tukang Batu 0.006 Oh Kepala Tukang 0.002 Oh Mandor . 1 m1 Pipa PVC tipe AW F 3/4" Bahan 1.200 M1 Pipa PVC 1.000 Ls Perlengkapan Tenaga 0.036 Oh Pekerja 0.060 Oh Tukang Batu 0.006 Oh Kepala Tukang 0.002 Oh Mandor . 1 m1 Pipa PVC tipe AW F 1" Bahan 1.200 M1 Pipa PVC 1.000 Ls Perlengkapan Tenaga 0.036 Oh Pekerja 0.060 Oh Tukang Batu 0.006 Oh Kepala Tukang 0.002 Oh Mandor . 1 m1 Pipa PVC tipe AW F 1 1/2" Bahan 1.200 M1 Pipa PVC 1.000 Ls Perlengkapan Tenaga 0.036 Oh Pekerja 0.060 Oh Tukang Batu 0.006 Oh Kepala Tukang 0.002 Oh Mandor . 1 m1 Pipa PVC tipe AW F 2" Bahan 1.200 M1 Pipa PVC 1.000 Ls Perlengkapan Tenaga 0.054 Oh Pekerja 0.090 Oh Tukang Batu 0.009 Oh Kepala Tukang 0.003 Oh Mandor . 1 m1 Pipa PVC tipe AW F 2 1/2" Bahan 1.200 M1 Pipa PVC 1.000 Ls Perlengkapan Tenaga

@ @ @ @ @ @

#REF! #REF! #REF! #REF! #REF! #REF!

#REF! #REF! #REF! #REF! #REF! #REF! #REF!

25 1.1

@ @ @ @ @ @

#REF! #REF! #REF! #REF! #REF! #REF!

#REF! #REF! #REF! #REF! #REF! #REF! #REF!

1.2

26 1.1

@ @ @ @ @ @

#REF! #REF! #REF! #REF! #REF! #REF!

#REF! #REF! #REF! #REF! #REF! #REF! #REF!

1.2

AA 27 1.1

@ @ @ @ @ @

#REF! #REF! #REF! #REF! #REF! #REF!

#REF! #REF! #REF! #REF! #REF! #REF! #REF!

1.2

AB 28 1.1

@ @ @ @ @ @

#REF! #REF! #REF! #REF! #REF! #REF!

#REF! #REF! #REF! #REF! #REF! #REF! #REF!

1.2

AC 29 1.1

@ @ @ @ @ @

#REF! #REF! #REF! #REF! #REF! #REF!

#REF! #REF! #REF! #REF! #REF! #REF! #REF!

1.2

AD 30 1.1

@ @

#REF! #REF!

#REF! #REF!

1.2

AE 31 1.1

1.2

AF

32 1.1

1.2

AG 33 1.1

1.2

AH 34 1.1

1.2

AI

35 1.1

1.2

AJ

36 1.1 1.2

0.036 Oh Pekerja 0.060 Oh Tukang Batu 0.006 Oh Kepala Tukang 0.002 Oh Mandor . 1 m1 Pipa PVC tipe AW F 3" Bahan 1.200 M1 Pipa PVC 1.000 Ls Perlengkapan Tenaga 0.081 Oh Pekerja 0.135 Oh Tukang Batu 0.014 Oh Kepala Tukang 0.004 Oh Mandor . 1 m1 Pipa PVC tipe AW F 4" Bahan 1.200 M1 Pipa PVC 1.000 Ls Perlengkapan Tenaga 0.081 Oh Pekerja 0.135 Oh Tukang Batu 0.014 Oh Kepala Tukang 0.004 Oh Mandor . 1 Bh Bak Cuci Piring Stainless Steel Bahan 1.000 Bh Bak Cuci Stainless Steel 1.000 Set Water Drain + Asesories Tenaga 0.030 Oh Pekerja 0.300 Oh Tukang Batu 0.030 Oh Kepala Tukang 0.002 Oh Mandor . 1 Bh Bak Cuci Piring Teraso Bahan 1.000 Bh Bak Cuci Teraso 1.000 Set Water Drain + Asesories 20.000 Kg Semen Portland 0.050 M3 Pasir Tenaga 0.050 Oh Pekerja 0.500 Oh Tukang Batu 0.050 Oh Kepala Tukang 0.003 Oh Mandor . 1 Bh Bak Kran Diameter 3/4" atau 1/2" Bahan 1.000 Bh Kran Air 0.025 Bh Seal Tape Tenaga 0.010 Oh Pekerja 0.100 Oh Tukang Batu 0.010 Oh Kepala Tukang 0.005 Oh Mandor . 1 Bh Floor Drain Bahan 1.000 Bh Floor Drain Tenaga 0.010 Oh Pekerja 0.100 Oh Tukang Batu 0.010 Oh Kepala Tukang 0.005 Oh Mandor .

@ @ @ @

#REF! #REF! #REF! #REF!

#REF! #REF! #REF! #REF! #REF!

@ @ @ @ @ @

#REF! #REF! #REF! #REF! #REF! #REF!

#REF! #REF! #REF! #REF! #REF! #REF! #REF!

@ @ @ @ @ @

#REF! #REF! #REF! #REF! #REF! #REF!

#REF! #REF! #REF! #REF! #REF! #REF! #REF!

@ @ @ @ @ @

#REF! #REF! #REF! #REF! #REF! #REF!

#REF! #REF! #REF! #REF! #REF! #REF! #REF!

@ @ @ @ @ @ @ @

#REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!

#REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!

@ @ @ @ @ @

#REF! #REF! #REF! #REF! #REF! #REF!

#REF! #REF! #REF! #REF! #REF! #REF! #REF!

@ @ @ @ @

#REF! #REF! #REF! #REF! #REF!

#REF! #REF! #REF! #REF! #REF! #REF!

ANALISA BIAYA KONSTRUKSI (ABK) BANGUNAN GEDUNG DAN PERUMAHAN PEKERJAAN BESI DAN ALUMINIUM
A 1 1.1 1 Kg Pasang Rangka Atap Baja Bahan 1.000 Kg Besi profil WF 1.000 Kg Meni Besi Tenaga 0.006 Oh Tukang Besi 0.060 Oh Pekerja 0.006 Oh Kepala Tukang 0.000 Oh Mandor 1 M2 Pasang Pintu Besi Baja Bahan 1.000 M2 Pintu Besi Baja Tenaga 0.650 Oh Tukang Besi 0.650 Oh Pekerja 0.065 Oh Kepala Tukang 0.032 Oh Mandor 1 M2 Pasang Jendela Besi Bahan 1.000 M2 Jendela Besi Tenaga 1.050 Oh Tukang Besi 1.050 Oh Pekerja 0.105 Oh Kepala Tukang 0.005 Oh Mandor 1 M2 Pasang Jendela Besi Tahan Api Bahan 1.000 M2 Jendela Besi Tahan Api Tenaga 1.200 Oh Tukang Besi 1.022 Oh Pekerja 0.120 Oh Kepala Tukang 0.006 Oh Mandor 1 M2 Pasang Pintu Gulung Besi Bahan 1.000 M2 Pintu Gulung Besi Tenaga 1.200 Oh Tukang Besi 1.200 Oh Pekerja 0.120 Oh Kepala Tukang 0.006 Oh Mandor 1 M2 Pasang Pintu Lipat Bahan 1.000 M2 Pintu Lipat Tenaga 1.050 Oh Tukang Besi 1.050 Oh Pekerja 0.105 Oh Kepala Tukang 0.005 Oh Mandor 1 M2 Pasang Pintu Sunscreem Aluminium Bahan 1.000 M2 Sunscreem Aluminium Tenaga 0.800 Oh Tukang Besi 0.080 Oh Pekerja 0.080 Oh Kepala Tukang 0.004 Oh Mandor

@ @ @ @ @ @

#REF! #REF! #REF! #REF! #REF! #REF!

#REF! #REF! #REF! #REF! #REF! #REF! #REF!

1.2

2 2.1 2.2

@ @ @ @ @

#REF! #REF! #REF! #REF! #REF!

#REF! #REF! #REF! #REF! #REF! #REF!

3 3.1 3.2

@ @ @ @ @

#REF! #REF! #REF! #REF! #REF!

#REF! #REF! #REF! #REF! #REF! #REF!

4 4.1 4.2

@ @ @ @ @

#REF! #REF! #REF! #REF! #REF!

#REF! #REF! #REF! #REF! #REF! #REF!

5 5.1 5.2

@ @ @ @ @

#REF! #REF! #REF! #REF! #REF!

#REF! #REF! #REF! #REF! #REF! #REF!

6 6.1 6.2

@ @ @ @ @

#REF! #REF! #REF! #REF! #REF!

#REF! #REF! #REF! #REF! #REF! #REF!

7 7.1 7.2

@ @ @ @ @

#REF! #REF! #REF! #REF! #REF!

#REF! #REF! #REF! #REF! #REF!

#REF! H 8 8.1 8.2 1 M2 Pasang Rolling Door Bahan 1.000 M2 Rool Dor Tenaga 1.500 Oh Tukang Besi 1.050 Oh Pekerja 0.105 Oh Kepala Tukang 0.005 Oh Mandor 1 M2 Pasang Pintu Aluminium Bahan 1.000 M2 Pintu Aluminium Tenaga 1.050 Oh Tukang Besi 1.050 Oh Pekerja 0.105 Oh Kepala Tukang 0.005 Oh Mandor

@ @ @ @ @

#REF! #REF! #REF! #REF! #REF!

#REF! #REF! #REF! #REF! #REF! #REF!

9 9.1 9.2

@ @ @ @ @

#REF! #REF! #REF! #REF! #REF!

#REF! #REF! #REF! #REF! #REF! #REF!

10 1 M2 Pasang Venetions Blinds 10.1 Bahan 1.000 M2 Venetions Blinds 10.2 Tenaga 0.350 Oh Tukang Besi 0.350 Oh Pekerja 0.035 Oh Kepala Tukang 0.002 Oh Mandor 11 1 M2 Pasang Vertikals Blinds 11.1 Bahan 1.000 M2 Vertikals Blinds 11.2 Tenaga 0.350 Oh Tukang Besi 0.350 Oh Pekerja 0.035 Oh Kepala Tukang 0.002 Oh Mandor 12 1 M2 Pasang Terali Besi 12.1 Bahan 11.500 M1 Besi Strip 2 x 3 12.2 Tenaga 1.200 Oh Tukang Las 1.200 Oh Pekerja 0.012 Oh Kepala Tukang 0.001 Oh Mandor 13 1 M2 Pasang Kawat Harmonika 13.1 Bahan 1.100 M2 Kawat Harmonika 0.020 Kg Paku Biasa 1/2" - 1" 0.002 M3 Kayu Kamper, Papan 13.2 Tenaga 0.100 Oh Pekerja 0.100 Oh Tukang Kayu 0.010 Oh Kepala Tukang 0.001 Oh Mandor 14 1 M2 Pasang Kawat Nyamuk 14.1 Bahan 1.100 M2 Kawat Nyamuk 0.020 Kg Paku Biassa 1/2" - 1" 0.002 M3 Kayu Kamper, Papan 14.2 Tenaga 0.100 Oh Pekerja 0.100 Oh Tukang Kayu 0.010 Oh Kepala Tukang 0.001 Oh Mandor

@ @ @ @ @

#REF! #REF! #REF! #REF! #REF!

#REF! #REF! #REF! #REF! #REF! #REF!

@ @ @ @ @

#REF! #REF! #REF! #REF! #REF!

#REF! #REF! #REF! #REF! #REF! #REF!

@ @ @ @ @

#REF! #REF! #REF! #REF! #REF!

#REF! #REF! #REF! #REF! #REF! #REF!

@ @ @ @ @ @ @

#REF! #REF! #REF! #REF! #REF! #REF! #REF!

#REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!

@ @ @ @ @ @ @

#REF! #REF! #REF! #REF! #REF! #REF! #REF!

#REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!

15 1 M2 Pasang Kawat Kassa 15.1 Bahan 1.100 M2 Kawat Kassa 0.020 Kg Paku Biassa 1/2" - 1" 0.002 M3 Kayu Kamper, Papan 15.2 Tenaga 0.100 Oh Pekerja 0.100 Oh Tukang Kayu 0.010 Oh Kepala Tukang 0.001 Oh Mandor 16 1 M2 Pasang Kawat Burung 16.1 Bahan 1.100 M2 Kawat Burung 0.020 Kg Paku Biasa 1/2" - 1" 0.002 M3 Kayu Kamper, Papan 16.2 Tenaga 0.100 Oh Pekerja 0.100 Oh Tukang Kayu 0.010 Oh Kepala Tukang 0.001 Oh Mandor 17 1 M2 Pasang Jendela Nako dan Tralis 17.1 Bahan 1.100 M2 Jendela Nako 0.020 Kg Paku Biasa 1/2" - 1" atau sekrup 0.025 M2 Besi Strip 17.2 Tenaga 0.200 Oh Pekerja 0.200 Oh Tukang Kayu 0.020 Oh Kepala Tukang 0.001 Oh Mandor 18 1 M2 Pasang Talang Datar, Seng BJLS 28 18.1 Bahan 0.500 Lbr Seng Plat 3' x 6' bjls 28 0.015 Kg Paku Biasa 1/2" - 1" 0.010 M3 Kayu Borneo, Papan 0.250 Kg Flincote / Meni Besi 18.2 Tenaga 0.150 Oh Pekerja 0.400 Oh Tukang Kayu 0.025 Oh Kepala Tukang 0.001 Oh Mandor 19 1 M2 Pasang Talang Miring, Seng BJLS 28 19.1 Bahan 0.500 Lbr Seng Plat 3' x 6' bjls 28 0.015 Kg Paku Biasa 1/2" - 1" 0.019 M3 Kayu Borneo, Papan 0.300 Kg Flincote / Meni Besi 19.2 Tenaga 0.040 Oh Pekerja 0.400 Oh Tukang Kayu 0.025 Oh Kepala Tukang 0.001 Oh Mandor

@ @ @ @ @ @ @

#REF! #REF! #REF! #REF! #REF! #REF! #REF!

#REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!

@ @ @ @ @ @ @

#REF! #REF! #REF! #REF! #REF! #REF! #REF!

#REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!

@ @ @ @ @ @ @

#REF! #REF! #REF! #REF! #REF! #REF! #REF!

#REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!

@ @ @ @ @ @ @ @

#REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!

#REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!

@ @ @ @ @ @ @ @

#REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!

#REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!

20 1 M2 Pasang Talang Lingkaran D-10 Cm, Seng BJLS 28 20.1 Bahan @ 0.300 Lbr Seng Plat 3' x 6' bjls 28 @ 0.100 Kg Paku Biasa 1/2" - 1" 0.019 @ M3 Kayu Borneo, Papan @ 0.500 Kg Besi Strip 20.2 Tenaga @ 0.150 Oh Pekerja @ 0.250 Oh Tukang Kayu @ 0.025 Oh Kepala Tukang @ 0.001 Oh Mandor

#REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!

#REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!

#REF! U 21 1 M2 Pasang Talang Lingkaran D-10 Cm, Seng BJLS 24 21.1 Bahan @ 0.300 Lbr Seng Plat 3' x 6' bjls 24 @ 0.100 Kg Paku Biasa 1/2" - 1" 0.019 @ M3 Kayu Borneo, Papan @ 0.500 Kg Besi Strip 21.2 Tenaga @ 0.150 Oh Pekerja @ 0.250 Oh Tukang Kayu @ 0.025 Oh Kepala Tukang @ 0.001 Oh Mandor

#REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!

#REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!

ANALISA BIAYA KONSTRUKSI (ABK) BANGUNAN GEDUNG DAN PERUMAHAN PEKERJAAN KUNCI DAN KACA
A 1 1.1 1.2 1 Bh Pasang Kunci Tanam Antik Bahan 1.000 Bh Kunci Tanam Antik Tenaga 0.060 Oh Pekerja 0.600 Oh Tukang Kayu 0.060 Oh Kepala Tukang 0.003 Oh Mandor 1 Bh Pasang Kunci Tanam Biasa Bahan 1.000 Bh Kunci Tanam Biasa Tenaga 0.010 Oh Pekerja 0.500 Oh Tukang Kayu 0.010 Oh Kepala Tukang 0.005 Oh Mandor 1 Bh Pasang Kunci Tanam Kamar Mandi Bahan 1.000 Bh Kunci Tanam Kamar Mandi Tenaga 0.005 Oh Pekerja 0.500 Oh Tukang Kayu 0.005 Oh Kepala Tukang 0.003 Oh Mandor 1 Bh Pasang Kunci Silinder Bahan 1.000 Bh Kunci Silinder Tenaga 0.005 Oh Pekerja 0.500 Oh Tukang Kayu 0.005 Oh Kepala Tukang 0.000 Oh Mandor 1 Bh Pasang Engsel Pintu Bahan 1.000 Bh Engsel Pintu Tenaga 0.015 Oh Pekerja 0.150 Oh Tukang Kayu 0.015 Oh Kepala Tukang 0.001 Oh Mandor 1 Bh Pasang Engsel Jendela Kupu-kupu Bahan 1.000 Bh Engsel Jendela Tenaga 0.010 Oh Pekerja 0.100 Oh Tukang Kayu 0.010 Oh Kepala Tukang 0.001 Oh Mandor 1 Bh Pasang Engsel Angin Bahan 1.000 Bh Engsel Angin Tenaga 0.020 Oh Pekerja 0.200 Oh Tukang Kayu 0.020 Oh Kepala Tukang 0.010 Oh Mandor 1 Bh Pasang Spring Knip

@ @ @ @ @

#REF! #REF! #REF! #REF! #REF!

#REF! #REF! #REF! #REF! #REF! #REF!

2 2.1 2.2

@ @ @ @ @

#REF! #REF! #REF! #REF! #REF!

#REF! #REF! #REF! #REF! #REF! #REF!

3 3.1 3.2

@ @ @ @ @

#REF! #REF! #REF! #REF! #REF!

#REF! #REF! #REF! #REF! #REF! #REF!

4 4.1 4.2

@ @ @ @ @

#REF! #REF! #REF! #REF! #REF!

#REF! #REF! #REF! #REF! #REF! #REF!

5 5.1 5.2

@ @ @ @ @

#REF! #REF! #REF! #REF! #REF!

#REF! #REF! #REF! #REF! #REF! #REF!

6 6.1 6.2

@ @ @ @ @

#REF! #REF! #REF! #REF! #REF!

#REF! #REF! #REF! #REF! #REF! #REF!

7 7.1 7.2

@ @ @ @ @

#REF! #REF! #REF! #REF! #REF!

#REF! #REF! #REF! #REF! #REF! #REF!

8.1 8.2

Bahan 1.000 Tenaga 0.015 0.150 0.015 0.001

Bh Oh Oh Oh Oh

Spring Knip Pekerja Tukang Kayu Kepala Tukang Mandor

@ @ @ @ @

#REF! #REF! #REF! #REF! #REF!

#REF! #REF! #REF! #REF! #REF! #REF!

9 9.1 9.2

1 Bh Pasang Kait Angin Bahan 1.000 Bh Kait Angin Tenaga 0.015 Oh Pekerja 0.150 Oh Tukang Kayu 0.015 Oh Kepala Tukang 0.001 Oh Mandor

@ @ @ @ @

#REF! #REF! #REF! #REF! #REF!

#REF! #REF! #REF! #REF! #REF! #REF!

10 1 Bh Pasang Door Closer 10.1 Bahan 1.000 Bh Door Closer 10.2 Tenaga 0.050 Oh Pekerja 0.500 Oh Tukang Kayu 0.050 Oh Kepala Tukang 0.003 Oh Mandor 11 1 Bh Pasang Kunci Selot 11.1 Bahan 1.000 Bh Kunci Selot 11.2 Tenaga 0.020 Oh Pekerja 0.200 Oh Tukang Kayu 0.020 Oh Kepala Tukang 0.001 Oh Mandor 12 1 Bh Pasang Pegangan Pintu / Door Holder 12.1 Bahan 1.000 Bh Door Holder 12.2 Tenaga 0.050 Oh Pekerja 0.500 Oh Tukang Kayu 0.050 Oh Kepala Tukang 0.003 Oh Mandor 13 1 Bh Pasang Door Stop 13.1 Bahan 1.000 Bh Door Stop 13.2 Tenaga 0.010 Oh Pekerja 0.100 Oh Tukang Kayu 0.010 Oh Kepala Tukang 0.001 Oh Mandor 14 1 Bh Pasang Rell Pintu Dorong 14.1 Bahan 1.000 Bh Rell Pintu dorong 14.2 Tenaga 0.060 Oh Pekerja 0.600 Oh Tukang Kayu 0.060 Oh Kepala Tukang 0.003 Oh Mandor 15 1 Bh Pasang Kunci Lemari 15.1 Bahan 1.000 Bh Kunci Lemari 15.2 Tenaga 0.025 Oh Pekerja 0.250 Oh Tukang Kayu 0.025 Oh Kepala Tukang

@ @ @ @ @

#REF! #REF! #REF! #REF! #REF!

#REF! #REF! #REF! #REF! #REF! #REF!

@ @ @ @ @

#REF! #REF! #REF! #REF! #REF!

#REF! #REF! #REF! #REF! #REF! #REF!

@ @ @ @ @

#REF! #REF! #REF! #REF! #REF!

#REF! #REF! #REF! #REF! #REF! #REF!

@ @ @ @ @

#REF! #REF! #REF! #REF! #REF!

#REF! #REF! #REF! #REF! #REF! #REF!

@ @ @ @ @

#REF! #REF! #REF! #REF! #REF!

#REF! #REF! #REF! #REF! #REF! #REF!

@ @ @ @

#REF! #REF! #REF! #REF!

#REF! #REF! #REF! #REF!

0.001 P

Oh

Mandor

#REF!

#REF! #REF!

16 1 M2 Pasang Kaca, Tebal 3 mm 16.1 Bahan 1.100 M2 Kaca 16.2 Tenaga 0.015 Oh Pekerja 0.150 Oh Tukang Kayu 0.015 Oh Kepala Tukang 0.001 Oh Mandor 17 1 M2 Pasang Kaca, Tebal 5 mm 17.1 Bahan 1.100 M2 Kaca 17.2 Tenaga 0.015 Oh Pekerja 0.150 Oh Tukang Kayu 0.015 Oh Kepala Tukang 0.001 Oh Mandor 18 1 M2 Pasang Kaca, Tebal 8 mm 18.1 Bahan 1.100 M2 Kaca 18.2 Tenaga 0.017 Oh Pekerja 0.165 Oh Tukang Kayu 0.017 Oh Kepala Tukang 0.001 Oh Mandor 19 1 M2 Pasang Kaca Buram, Tebal 12 mm 19.1 Bahan 1.100 M2 Kaca Buram 0.050 Kg Sealent 19.2 Tenaga 0.025 Oh Pekerja 0.250 Oh Tukang Kayu 0.025 Oh Kepala Tukang 0.001 Oh Mandor 20 1 M2 Pasang Kaca Cermin, Tebal 5 mm 20.1 Bahan 1.100 M2 Kaca Cermin 20.2 Tenaga 0.015 Oh Pekerja 0.150 Oh Tukang Kayu 0.015 Oh Kepala Tukang 0.001 Oh Mandor 21 1 M2 Pasang Kaca Cermin, Tebal 6 mm 21.1 Bahan 1.100 M2 Kaca Cermin 21.2 Tenaga 0.015 Oh Pekerja 0.150 Oh Tukang Kayu 0.015 Oh Kepala Tukang 0.001 Oh Mandor 22 1 M2 Pasang Kaca Cermin, Tebal 8 mm 22.1 Bahan 1.100 M2 Kaca Cermin 22.2 Tenaga 0.017 Oh Pekerja 0.165 Oh Tukang Kayu 0.017 Oh Kepala Tukang 0.001 Oh Mandor 23 1 M2 Pasang Kaca "Wireglass", Tebal 5 mm

@ @ @ @ @

#REF! #REF! #REF! #REF! #REF!

#REF! #REF! #REF! #REF! #REF! #REF!

@ @ @ @ @

#REF! #REF! #REF! #REF! #REF!

#REF! #REF! #REF! #REF! #REF! #REF!

@ @ @ @ @

#REF! #REF! #REF! #REF! #REF!

#REF! #REF! #REF! #REF! #REF! #REF!

@ @ @ @ @ @

#REF! #REF! #REF! #REF! #REF! #REF!

#REF! #REF! #REF! #REF! #REF! #REF! #REF!

@ @ @ @ @

#REF! #REF! #REF! #REF! #REF!

#REF! #REF! #REF! #REF! #REF! #REF!

@ @ @ @ @

#REF! #REF! #REF! #REF! #REF!

#REF! #REF! #REF! #REF! #REF! #REF!

@ @ @ @ @

#REF! #REF! #REF! #REF! #REF!

#REF! #REF! #REF! #REF! #REF! #REF!

23.1 Bahan 1.100 23.2 Tenaga 0.015 0.150 0.015 0.001 W

M2 Oh Oh Oh Oh

Kaca Wireglass Pekerja Tukang Kayu Kepala Tukang Mandor

@ @ @ @ @

#REF! #REF! #REF! #REF! #REF!

#REF! #REF! #REF! #REF! #REF! #REF!

24 1 M2 Pasang Kaca Patri, Tebal 5 mm 24.1 Bahan 1.100 M2 Kaca Patri 24.2 Tenaga 0.015 Oh Pekerja 0.150 Oh Tukang Kayu 0.015 Oh Kepala Tukang 0.001 Oh Mandor

@ @ @ @ @

#REF! #REF! #REF! #REF! #REF!

#REF! #REF! #REF! #REF! #REF! #REF!

ANALISA BIAYA KONSTRUKSI (ABK) BANGUNAN GEDUNG DAN PERUMAHAN PEKERJAAN PENUTUP LANTAI DAN DINDING
A 1 1.1 1 M2 Pasang Lantai Ubin PC Abu-abu Ukuran 40 x 40 cm Bahan @ 6.630 Bh Ubin Abu-abu 40 x 40 cm @ 9.800 Kg Semen Portland 0.022 @ M3 Pasir Pasang Tenaga @ 0.250 Oh Pekerja @ 0.120 Oh Tukang Batu @ 0.012 Oh Kepala Tukang @ 0.013 Oh Mandor 1 M2 Pasang Lantai Ubin PC Abu-abu Ukuran 30 x 30 cm Bahan @ 11.870 Bh Ubin Abu-abu 30 x 30 cm @ 10.000 Kg Semen Portland 0.022 @ M3 Pasir Pasang Tenaga @ 0.260 Oh Pekerja @ 0.125 Oh Tukang Batu @ 0.013 Oh Kepala Tukang @ 0.013 Oh Mandor 1 M2 Pasang Lantai Ubin PC Abu-abu Ukuran 20 x 20 cm Bahan @ 26.500 Bh Ubin Abu-abu 20 x 20 cm @ 10.400 Kg Semen Portland 0.014 @ M3 Pasir Pasang Tenaga @ 0.270 Oh Pekerja @ 0.130 Oh Tukang Batu @ 0.013 Oh Kepala Tukang @ 0.014 Oh Mandor 1 M2 Pasang Lantai Ubin Warna Ukuran 40 x 40 cm Bahan 6.630 Bh Ubin Warna 40 x 40 cm 8.160 Kg Semen Portland 0.023 M3 Pasir Pasang 0.900 Kg Semen Warna Tenaga 0.250 Oh Pekerja 0.120 Oh Tukang Batu 0.012 Oh Kepala Tukang 0.013 Oh Mandor 1 M2 Pasang Lantai Ubin Warna Ukuran 30 x 30 cm Bahan 11.870 Bh Ubin Warna 30 x 30 cm 8.360 Kg Semen Portland 0.023 M3 Pasir Pasang 0.900 Kg Semen Warna Tenaga 0.250 Oh Pekerja 0.120 Oh Tukang Batu 0.012 Oh Kepala Tukang 0.013 Oh Mandor 1 M2 Pasang Lantai Ubin Warna Ukuran 20 x 20 cm Bahan 26.500 Bh Ubin Warna 20 x 20 cm 8.760 Kg Semen Portland 0.023 M3 Pasir Pasang 0.900 Kg Semen Warna

#REF! #REF! #REF! #REF! #REF! #REF! #REF!

#REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!

1.2

2 2.1

#REF! #REF! #REF! #REF! #REF! #REF! #REF!

#REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!

2.2

3 3.1

#REF! #REF! #REF! #REF! #REF! #REF! #REF!

#REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!

3.2

4 4.1

@ @ @ @ @ @ @ @

#REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!

#REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!

4.2

5 5.1

@ @ @ @ @ @ @ @

#REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!

#REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!

5.2

6 6.1

@ @ @ @

#REF! #REF! #REF! #REF!

#REF! #REF! #REF! #REF!

6.2

Tenaga 0.270 0.130 0.013 0.014

Oh Oh Oh Oh

Pekerja Tukang Batu Kepala Tukang Mandor

@ @ @ @

#REF! #REF! #REF! #REF!

#REF! #REF! #REF! #REF! #REF!

7 7.1

7.2

1 M2 Pasang Lantai Ubin Teraso Ukuran 40 x 40 cm Bahan @ 6.250 Bh Ubin Teraso 40 x 40 cm @ 8.800 Kg Semen Portland 0.022 @ M3 Pasir Pasang @ 0.900 Kg Semen Warna Tenaga @ 0.250 Oh Pekerja @ 0.120 Oh Tukang Batu @ 0.012 Oh Kepala Tukang @ 0.013 Oh Mandor 1 M2 Pasang Lantai Ubin Teraso Ukuran 30 x 30 cm Bahan @ 11.870 Bh Ubin Teraso 30 x 30 cm @ 10.000 Kg Semen Portland 0.022 @ M3 Pasir Pasang @ 1.540 Kg Semen Warna Tenaga @ 0.260 Oh Pekerja @ 0.125 Oh Tukang Batu @ 0.013 Oh Kepala Tukang @ 0.013 Oh Mandor 1 M2 Pasang Lantai Ubin Granito Ukuran 40 x 40 cm Bahan @ 6.930 Bh Ubin Granito 40 x 40 cm @ 9.800 Kg Semen Portland 0.022 @ M3 Pasir Pasang @ 1.300 Kg Semen Warna Tenaga @ 0.250 Oh Pekerja @ 0.120 Oh Tukang Batu @ 0.012 Oh Kepala Tukang @ 0.013 Oh Mandor

#REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!

#REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!

8 8.1

#REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!

#REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!

8.2

9 9.1

#REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!

#REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!

9.2

10 1 M2 Pasang Lantai Ubin Granito Ukuran 30 x 30 cm 10.1 Bahan @ 11.870 Bh Ubin Granito 30 x 30 cm @ 10.000 Kg Semen Portland 0.022 @ M3 Pasir Pasang @ 1.500 Kg Semen Warna 10.2 Tenaga @ 0.260 Oh Pekerja @ 0.125 Oh Tukang Batu @ 0.013 Oh Kepala Tukang @ 0.013 Oh Mandor 11 1 M2 Pasang Lantai Ubin Teralux Kerang Ukuran 40 x 40 cm 11.1 Bahan @ 6.250 Bh Ubin Teralux Kerang 40 x 40 cm @ 8.800 Kg Semen Portland 0.022 @ M3 Pasir Pasang @ 1.300 Kg Semen Warna 11.2 Tenaga @ 0.250 Oh Pekerja @ 0.120 Oh Tukang Batu @ 0.012 Oh Kepala Tukang @ 0.013 Oh Mandor 12 1 M2 Pasang Lantai Ubin Teralux Kerang Ukuran 30 x 30 cm 12.1 Bahan

#REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!

#REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!

#REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!

#REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!

11.807 10.000 0.022 1.125 12.2 Tenaga 0.250 0.120 0.012 0.013 M

Bh Kg M3 Kg Oh Oh Oh Oh

Ubin Teralux Kerang 30 x 30 cm Semen Portland Pasir Pasang Semen Warna Pekerja Tukang Batu Kepala Tukang Mandor

@ @ @ @ @ @ @ @

#REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!

#REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!

13 1 M2 Pasang Lantai Ubin Teralux Marmer Ukuran 60 x 60 cm 13.1 Bahan @ 5.600 Bh Ubin Teralux Marmer 60 x 60 cm @ 8.190 Kg Semen Portland 0.045 @ M3 Pasir Pasang @ 1.000 Kg Semen Warna 13.2 Tenaga @ 0.250 Oh Pekerja @ 0.120 Oh Tukang Batu @ 0.012 Oh Kepala Tukang @ 0.013 Oh Mandor 14 1 M2 Pasang Lantai Ubin Teralux Marmer Ukuran 40 x 40 cm 14.1 Bahan @ 6.250 Bh Ubin Teralux Marmer 40 x 40 cm @ 8.800 Kg Semen Portland 0.022 @ M3 Pasir Pasang @ 1.300 Kg Semen Warna 14.2 Tenaga @ 0.672 Oh Pekerja @ 0.224 Oh Tukang Batu @ 0.022 Oh Kepala Tukang @ 0.034 Oh Mandor 15 1 M2 Pasang Lantai Ubin Teralux Marmer Ukuran 30 x 30 cm 15.1 Bahan @ 11.870 Bh Ubin Teralux Marmer 30 x 30 cm @ 10.000 Kg Semen Portland 0.022 @ M3 Pasir Pasang @ 1.500 Kg Semen Warna 15.2 Tenaga @ 0.700 Oh Pekerja @ 0.340 Oh Tukang Batu @ 0.034 Oh Kepala Tukang @ 0.035 Oh Mandor 16 1 M1 Pasang Plint Ubin PC Abu-abu Ukuran 15 x 20 cm 16.1 Bahan @ 5.300 Bh Plint Ubin 15 x 20 cm @ 1.560 Kg Semen Portland 0.004 @ M3 Pasir Pasang 16.2 Tenaga @ 0.060 Oh Pekerja @ 0.030 Oh Tukang Batu @ 0.003 Oh Kepala Tukang @ 0.003 Oh Mandor 17 1 M1 Pasang Plint Ubin PC Abu-abu Ukuran 10 x 30 cm 17.1 Bahan @ 3.530 Bh Plint Ubin 10 x 30 cm @ 1.560 Kg Semen Portland 0.003 @ M3 Pasir Pasang 17.2 Tenaga @ 0.060 Oh Pekerja @ 0.030 Oh Tukang Batu @ 0.003 Oh Kepala Tukang @ 0.003 Oh Mandor

#REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!

#REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!

#REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!

#REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!

#REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!

#REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!

#REF! #REF! #REF! #REF! #REF! #REF! #REF!

#REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!

#REF! #REF! #REF! #REF! #REF! #REF! #REF!

#REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!

18 1 M1 Pasang Plint Ubin PC Abu-abu Ukuran 10 x 40 cm 18.1 Bahan @ 2.650 Bh Plint Ubin 10 x 40 cm @ 1.560 Kg Semen Portland 0.003 @ M3 Pasir Pasang 18.2 Tenaga @ 0.060 Oh Pekerja @ 0.030 Oh Tukang Batu @ 0.003 Oh Kepala Tukang @ 0.003 Oh Mandor 19 1 M1 Pasang Plint Ubin PC Warna Ukuran 10 x 20 cm 19.1 Bahan @ 5.300 Bh Plint Ubin PC Warna 10 x 20 cm @ 1.200 Kg Semen Portland 0.003 @ M3 Pasir Pasang @ 0.190 Kg Semen Warna 19.2 Tenaga @ 0.060 Oh Pekerja @ 0.030 Oh Tukang Batu @ 0.003 Oh Kepala Tukang @ 0.003 Oh Mandor 20 1 M1 Pasang Plint Ubin PC Warna Ukuran 10 x 30 cm 20.1 Bahan @ 3.330 Bh Plint Ubin PC Warna 10 x 30 cm @ 1.650 Kg Semen Portland 0.003 @ M3 Pasir Pasang @ 0.100 Kg Semen Warna 20.2 Tenaga @ 0.060 Oh Pekerja @ 0.030 Oh Tukang Batu @ 0.003 Oh Kepala Tukang @ 0.003 Oh Mandor 21 1 M1 Pasang Plint Ubin PC Warna Ukuran 10 x 40 cm 21.1 Bahan @ 2.650 Bh Plint Ubin PC Warna 10 x 40 cm @ 1.200 Kg Semen Portland 0.003 @ M3 Pasir Pasang @ 0.100 Kg Semen Warna 21.2 Tenaga @ 0.080 Oh Pekerja @ 0.040 Oh Tukang Batu @ 0.004 Oh Kepala Tukang @ 0.004 Oh Mandor 22 1 M1 Pasang Plint Ubin Teraso Ukuran 10 x 30 cm 22.1 Bahan 3.530 Bh Plint Ubin Teraso 10 x 30 cm 1.560 Kg Semen Portland 0.003 M3 Pasir Pasang 0.190 Kg Semen Warna 22.2 Tenaga 0.080 Oh Pekerja 0.040 Oh Tukang Batu 0.004 Oh Kepala Tukang 0.004 Oh Mandor 23 1 M1 Pasang Plint Ubin Teraso Ukuran 10 x 40 cm 23.1 Bahan 2.650 Bh Plint Ubin Teraso 10 x 40 cm 1.200 Kg Semen Portland 0.003 M3 Pasir Pasang 0.100 Kg Semen Warna 23.2 Tenaga 0.080 Oh Pekerja 0.040 Oh Tukang Batu

#REF! #REF! #REF! #REF! #REF! #REF! #REF!

#REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!

#REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!

#REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!

#REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!

#REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!

#REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!

#REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!

@ @ @ @ @ @ @ @

#REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!

#REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!

@ @ @ @ @ @

#REF! #REF! #REF! #REF! #REF! #REF!

#REF! #REF! #REF! #REF! #REF! #REF!

0.004 0.004 X

Oh Oh

Kepala Tukang Mandor

@ @

#REF! #REF!

#REF! #REF! #REF!

24 1 M1 Pasang Plint Ubin Granito Ukuran 10 x 40 cm 24.1 Bahan 2.650 Bh Plint Ubin Granito 10 x 40 cm 1.200 Kg Semen Portland 0.003 M3 Pasir Pasang 0.100 Kg Semen Warna 24.2 Tenaga 0.060 Oh Pekerja 0.030 Oh Tukang Batu 0.003 Oh Kepala Tukang 0.003 Oh Mandor 25 1 M1 Pasang Plint Ubin Granito Ukuran 10 x 30 cm 25.1 Bahan 3.330 Bh Plint Ubin Granito 10 x 30 cm 1.650 Kg Semen Portland 0.003 M3 Pasir Pasang 0.100 Kg Semen Warna 25.2 Tenaga 0.900 Oh Pekerja 0.090 Oh Tukang Batu 0.009 Oh Kepala Tukang 0.005 Oh Mandor

@ @ @ @ @ @ @ @

#REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!

#REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!

@ @ @ @ @ @ @ @

#REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!

#REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!

26 1 M1 Pasang Plint Ubin Teralux Kerang Ukuran 10 x 40 cm 26.1 Bahan 2.500 Bh Plint Ubin Teralux Kerang 10x 40cm @ @ 1.650 Kg Semen Portland 0.003 @ M3 Pasir Pasang @ 0.100 Kg Semen Warna 26.2 Tenaga @ 0.900 Oh Pekerja @ 0.090 Oh Tukang Batu @ 0.009 Oh Kepala Tukang @ 0.005 Oh Mandor

#REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!

#REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!

AA 27 1 M1 Pasang Plint Ubin Teralux Kerang Ukuran 10 x 30 cm 27.1 Bahan 3.330 Bh Plint Ubin Teralux Kerang 10x 30cm @ @ 1.650 Kg Semen Portland 0.003 @ M3 Pasir Pasang @ 0.100 Kg Semen Warna 27.2 Tenaga @ 0.900 Oh Pekerja @ 0.090 Oh Tukang Batu @ 0.009 Oh Kepala Tukang @ 0.005 Oh Mandor AB 28 1 M1 Pasang Plint Ubin Teralux Marmer Ukuran 10 x 60 cm 28.1 Bahan 1.700 Bh Plint Ubin TeraluxMarmer 10x 60cm @ @ 1.650 Kg Semen Portland 0.003 @ M3 Pasir Pasang @ 0.100 Kg Semen Warna 28.2 Tenaga @ 0.900 Oh Pekerja @ 0.090 Oh Tukang Batu @ 0.009 Oh Kepala Tukang @ 0.005 Oh Mandor AC 29 1 M1 Pasang Plint Ubin Teralux Marmer Ukuran 10 x 40 cm 29.1 Bahan 2.500 Bh Plint Ubin TeraluxMarmer 10x 40cm @ @ 1.650 Kg Semen Portland 0.003 @ M3 Pasir Pasang

#REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!

#REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!

#REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!

#REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!

#REF! #REF! #REF!

#REF! #REF! #REF!

0.100 29.2 Tenaga 0.900 0.090 0.009 0.005

Kg Oh Oh Oh Oh

Semen Warna Pekerja Tukang Batu Kepala Tukang Mandor

@ @ @ @ @

#REF! #REF! #REF! #REF! #REF!

#REF! #REF! #REF! #REF! #REF! #REF!

AD 30 1 M1 Pasang Plint Ubin Teralux Marmer Ukuran 10 x 30 cm 30.1 Bahan 3.330 Bh Plint Ubin TeraluxMarmer 10x 30cm @ @ 1.650 Kg Semen Portland 0.003 @ M3 Pasir Pasang @ 0.100 Kg Semen Warna 30.2 Tenaga @ 0.900 Oh Pekerja @ 0.090 Oh Tukang Batu @ 0.009 Oh Kepala Tukang @ 0.005 Oh Mandor AE 31 1 M2 Pasang Teraso Cor ditempat 31.1 Bahan 0.004 M3 Bahan Teraso Cor 31.2 Tenaga 0.900 Oh Pekerja 0.090 Oh Tukang Batu 0.009 Oh Kepala Tukang 0.005 Oh Mandor AF 32 1 M2 Pasang Teralux Cor ditempat, Tebal 3 cm 32.1 Bahan 0.004 M3 Bahan Teralux Cor 32.2 Tenaga 0.900 Oh Pekerja 0.090 Oh Tukang Batu 0.009 Oh Kepala Tukang 0.005 Oh Mandor

#REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!

#REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!

@ @ @ @ @

#REF! #REF! #REF! #REF! #REF!

#REF! #REF! #REF! #REF! #REF! #REF!

@ @ @ @ @

#REF! #REF! #REF! #REF! #REF!

#REF! #REF! #REF! #REF! #REF! #REF!

AG 33 1 M2 Ubin Tahan Asam 33.1 Bahan 1.050 M2 Ubin Tahan Asam 14.140 Kg Semen Tahan Asam 0.040 M3 Pasir Pasang 33.2 Tenaga 0.270 Oh Pekerja 0.150 Oh Tukang Batu 0.015 Oh Kepala Tukang 0.014 Oh Mandor AH 34 1 M2 Ubin Lantai Keramik Artistik 10 x 20 cm 34.1 Bahan 50.000 Bh Lantai Keramik Artistik 10 x 20 cm 11.380 Kg Semen Pertland 0.042 M3 Pasir Pasang 1.500 Kg Semen Warna 34.2 Tenaga 0.620 Oh Pekerja 0.350 Oh Tukang Batu 0.035 Oh Kepala Tukang 0.030 Oh Mandor AI 35 1 M2 Ubin Lantai Keramik Artistik 10 x 10 cm 35.1 Bahan 50.000 Bh Lantai Keramik Artistik 10 x 10 cm 11.380 Kg Semen Pertland 0.042 M3 Pasir Pasang 2.000 Kg Semen Warna 35.2 Tenaga

@ @ @ @ @ @ @

#REF! #REF! #REF! #REF! #REF! #REF! #REF!

#REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!

@ @ @ @ @ @ @ @

#REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!

#REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!

@ @ @ @

#REF! #REF! #REF! #REF!

#REF! #REF! #REF! #REF!

0.620 0.350 0.035 0.030 AJ

Oh Oh Oh Oh

Pekerja Tukang Batu Kepala Tukang Mandor

@ @ @ @

#REF! #REF! #REF! #REF!

#REF! #REF! #REF! #REF! #REF!

36 1 M2 Ubin Lantai Keramik Artistik 5 x 20 cm 36.1 Bahan 100.000 Bh Lantai Keramik Artistik 5 x 20 cm 11.380 Kg Semen Pertland 0.042 M3 Pasir Pasang 1.500 Kg Semen Warna 36.2 Tenaga 0.620 Oh Pekerja 0.350 Oh Tukang Batu 0.035 Oh Kepala Tukang 0.030 Oh Mandor

@ @ @ @ @ @ @ @

#REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!

#REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!

AK 37 1 M2 Plint Keramik Artistik 10 x 20 cm 37.1 Bahan 5.000 Bh Plint Keramik Artistik 10 x 20 cm 1.650 Kg Semen Pertland 0.003 M3 Pasir Pasang 0.100 Kg Semen Warna 37.2 Tenaga 0.090 Oh Pekerja 0.090 Oh Tukang Batu 0.009 Oh Kepala Tukang 0.005 Oh Mandor AL 38 1 M2 Plint Keramik Artistik 10 x 10 cm 38.1 Bahan 10.000 Bh Plint Keramik Artistik 10 x 10 cm 1.650 Kg Semen Pertland 0.003 M3 Pasir Pasang 0.120 Kg Semen Warna 38.2 Tenaga 0.090 Oh Pekerja 0.090 Oh Tukang Batu 0.009 Oh Kepala Tukang 0.005 Oh Mandor

@ @ @ @ @ @ @ @

#REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!

#REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!

@ @ @ @ @ @ @ @

#REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!

#REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!

A M 39 1 M2 Plint Keramik Artistik 5 x 20 cm 39.1 Bahan 5.000 Bh Plint Keramik Artistik 5 x 20 cm 0.850 Kg Semen Pertland 0.002 M3 Pasir Pasang 0.080 Kg Semen Warna 39.2 Tenaga 0.090 Oh Pekerja 0.090 Oh Tukang Batu 0.009 Oh Kepala Tukang 0.005 Oh Mandor AN 40 1 M2 Internal Cove Artistik (5 x 5 x 20) cm 40.1 Bahan 10.000 Bh Internal Cove (5 x 5 x 20) cm 1.415 Kg Semen Pertland 0.039 M3 Pasir Pasang 1.200 Kg Semen Warna 40.2 Tenaga 0.750 Oh Pekerja 0.450 Oh Tukang Batu 0.045 Oh Kepala Tukang 0.038 Oh Mandor AO 41 1 M2 Pasang Plint Vinyl Tanpa Adukan 41.1 Bahan 3.500 Bh Lt Vinyl Karet 30 x 30 kwl I

@ @ @ @ @ @ @ @

#REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!

#REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!

@ @ @ @ @ @ @ @

#REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!

#REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!

#REF!

#REF!

0.080 41.2 Tenaga 0.080 0.080 0.008 0.004

Kg Oh Oh Oh Oh

Lem Vinyl Pekerja Tukang Batu Kepala Tukang Mandor

@ @ @ @ @

#REF! #REF! #REF! #REF! #REF!

#REF! #REF! #REF! #REF! #REF! #REF!

AP 42 1 M2 Pasang Lantai Keramik 10 x 20 cm 42.1 Bahan 50.000 Bh Ubin Keramik Artistik 10 x 20 cm 11.380 Kg Semen Portland 0.042 M3 Pasir Pasang 1.500 Kg Semen Warna 42.2 Tenaga 0.620 Oh Pekerja 0.350 Oh Tukang Batu 0.035 Oh Kepala Tukang 0.030 Oh Mandor AQ 43 1 M2 Pasang Lantai Keramik 15 x 15 cm 43.1 Bahan 44.000 Bh Ubin Keramik 15 x 15 cm 11.380 Kg Semen Portland 0.042 M3 Pasir Pasang 1.500 Kg Semen Warna 43.2 Tenaga 0.620 Oh Pekerja 0.350 Oh Tukang Batu 0.035 Oh Kepala Tukang 0.030 Oh Mandor AR 44 1 M2 Pasang Lantai Keramik 20 x 20 cm 44.1 Bahan 25.000 Bh Ubin Keramik 20 x 20 cm 11.380 Kg Semen Portland 0.042 M3 Pasir Pasang 1.500 Kg Semen Warna 44.2 Tenaga 0.620 Oh Pekerja 0.350 Oh Tukang Batu 0.035 Oh Kepala Tukang 0.030 Oh Mandor AS 45 1 M2 Pasang Lantai Keramik 25 x 25 cm 45.1 Bahan 16.000 Bh Ubin Keramik 25 x 25 cm 11.380 Kg Semen Portland 0.042 M3 Pasir Pasang 1.500 Kg Semen Warna 45.2 Tenaga 0.620 Oh Pekerja 0.350 Oh Tukang Batu 0.035 Oh Kepala Tukang 0.030 Oh Mandor AT 46 1 M2 Pasang Lantai Keramik 15 x 20 cm 46.1 Bahan 35.000 Bh Ubin Keramik 15 x 20 cm 11.380 Kg Semen Portland 0.042 M3 Pasir Pasang 1.500 Kg Semen Warna 46.2 Tenaga 0.620 Oh Pekerja 0.350 Oh Tukang Batu 0.035 Oh Kepala Tukang 0.030 Oh Mandor 1 M2 Pasang Lantai Keramik 33 x 33 cm

@ @ @ @ @ @ @ @

#REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!

#REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!

@ @ @ @ @ @ @ @

#REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!

#REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!

@ @ @ @ @ @ @ @

#REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!

#REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!

@ @ @ @ @ @ @ @

#REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!

#REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!

@ @ @ @ @ @ @ @

#REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!

#REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!

AU 47

47.1 Bahan 10.000 11.380 0.042 1.500 47.2 Tenaga 0.620 0.350 0.035 0.030

Bh Kg M3 Kg Oh Oh Oh Oh

Ubin Keramik 33 x 33 cm Semen Portland Pasir Pasang Semen Warna Pekerja Tukang Batu Kepala Tukang Mandor

@ @ @ @ @ @ @ @

#REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!

#REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!

AV 48 1 M2 Pasang Lantai Keramik 33 x 33 cm, Anti Slip 48.1 Bahan 10.000 Bh Ubun Keramik 33 x 33 cm Anti Slip 11.380 Kg Semen Portland 0.042 M3 Pasir Pasang 1.500 Kg Semen Warna 48.2 Tenaga 0.620 Oh Pekerja 0.350 Oh Tukang Batu 0.035 Oh Kepala Tukang 0.030 Oh Mandor AW 49 1 M2 Pasang Lantai Keramik 10 x 33 cm 49.1 Bahan 33.000 Bh Ubin Keramik 10 x 33 cm 11.380 Kg Semen Portland 0.042 M3 Pasir Pasang 1.500 Kg Semen Warna 49.2 Tenaga 0.620 Oh Pekerja 0.350 Oh Tukang Batu 0.035 Oh Kepala Tukang 0.030 Oh Mandor AX 50 1 M2 Pasang Lantai Mosaik 30 x 33 cm, Ex Lokal 50.1 Bahan 12.000 Bh Mosaik 30 x 30 cm 14.150 Kg Semen Portland 0.039 M3 Pasir Pasang 2.000 Kg Semen Warna 50.2 Tenaga 0.620 Oh Pekerja 0.350 Oh Tukang Batu 0.035 Oh Kepala Tukang 0.030 Oh Mandor AY 51 1 M2 Pasang Lantai Marmer 51.1 Bahan 1.052 Bh Marmer 14.150 Kg Semen Portland 0.039 M3 Pasir Pasang 2.000 Kg Semen Warna 51.2 Tenaga 0.620 Oh Pekerja 0.350 Oh Tukang Batu 0.035 Oh Kepala Tukang 0.030 Oh Mandor AZ 52 1 M2 Pasang Lantai Karpet 100% Wool 52.1 Bahan 1.050 M2 Feltex Carpet 100% Wool-T-21 0.350 Kg Lem Vinyl 52.2 Tenaga 0.170 Oh Pekerja 0.170 Oh Tukang Batu 0.017 Oh Kepala Tukang 0.009 Oh Mandor

@ @ @ @ @ @ @ @

#REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!

#REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!

@ @ @ @ @ @ @ @

#REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!

#REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!

@ @ @ @ @ @ @ @

#REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!

#REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!

@ @ @ @ @ @ @ @

#REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!

#REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!

@ @ @ @ @ @

#REF! #REF! #REF! #REF! #REF! #REF!

#REF! #REF! #REF! #REF! #REF! #REF!

#REF! BA 53 1 M2 Pasang Lantai Karpet 80% Wool, 20% Nylon 53.1 Bahan 1.050 M2 Carpet 80% Woll, 20% Nylon 0.350 Kg Lem Vinyl 53.2 Tenaga 0.170 Oh Pekerja 0.170 Oh Tukang Batu 0.017 Oh Kepala Tukang 0.009 Oh Mandor

@ @ @ @ @ @

#REF! #REF! #REF! #REF! #REF! #REF!

#REF! #REF! #REF! #REF! #REF! #REF! #REF!

BB 54 1 M2 Pasang Underlyer, Tebal 6 mm 54.1 Bahan 1.050 @ M2 Underlyer Tebal 6 mm/ rubber Corrugated 54.2 Tenaga @ 0.120 Oh Pekerja @ 0.120 Oh Tukang Batu @ 0.012 Oh Kepala Tukang @ 0.006 Oh Mandor BC 55 1 M2 Pasang Lantai Karpet 55.1 Bahan 1.050 M2 Carpet 0.350 Kg Lem Vinyl 55.2 Tenaga 0.170 Oh Pekerja 0.170 Oh Tukang Batu 0.017 Oh Kepala Tukang 0.009 Oh Mandor BD 56 1 M2 Pasang Lantai Parquet Jati 56.1 Bahan 1.050 M2 Parquet Jati 0.600 Kg Lem Vinyl 56.2 Tenaga 0.650 Oh Pekerja 0.350 Oh Tukang Batu 0.035 Oh Kepala Tukang 0.033 Oh Mandor BE 57 1 M2 Pasang Gymfloor 57.1 Bahan 1.050 M2 Gymfloor 0.600 Kg Lem Vinyl 57.2 Tenaga 0.650 Oh Pekerja 0.350 Oh Tukang Batu 0.035 Oh Kepala Tukang 0.033 Oh Mandor BF 58 1 M2 Pasang Dinding Porselin 11 x 11 cm, Putih 58.1 Bahan 83.000 Bh Porselin 11 x 11 cm 9.300 Kg Semen Abu-abu 0.018 M3 Pasir Pasang 1.500 Kg Semen Warna 58.2 Tenaga 0.620 Oh Pekerja 0.500 Oh Tukang Batu 0.050 Oh Kepala Tukang 0.030 Oh Mandor

#REF! #REF! #REF! #REF! #REF!

#REF! #REF! #REF! #REF! #REF! #REF!

@ @ @ @ @ @

#REF! #REF! #REF! #REF! #REF! #REF!

#REF! #REF! #REF! #REF! #REF! #REF! #REF!

@ @ @ @ @ @

#REF! #REF! #REF! #REF! #REF! #REF!

#REF! #REF! #REF! #REF! #REF! #REF! #REF!

@ @ @ @ @ @

#REF! #REF! #REF! #REF! #REF! #REF!

#REF! #REF! #REF! #REF! #REF! #REF! #REF!

@ @ @ @ @ @ @ @

#REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!

#REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!

BG 59 1 M2 Pasang Dinding Porselin 11 x 11 cm, Warna 59.1 Bahan 83.000 Bh Porselin 11 x 11 cm Warna 9.300 Kg Semen Abu-abu 0.018 M3 Pasir Pasang

@ @ @

#REF! #REF! #REF!

#REF! #REF! #REF!

1.500 59.2 Tenaga 0.620 0.500 0.050 0.030

Kg Oh Oh Oh Oh

Semen Warna Pekerja Tukang Batu Kepala Tukang Mandor

@ @ @ @ @

#REF! #REF! #REF! #REF! #REF!

#REF! #REF! #REF! #REF! #REF! #REF!

BH 60 1 M2 Pasang Dinding Porselin 15 x 15 cm, Putih 60.1 Bahan 45.000 Bh Porselin 15 x 15 cm 9.300 Kg Semen Abu-abu 0.018 M3 Pasir Pasang 1.500 Kg Semen Warna 60.2 Tenaga 0.600 Oh Pekerja 0.450 Oh Tukang Batu 0.045 Oh Kepala Tukang 0.030 Oh Mandor BI 61 1 M2 Pasang Dinding Porselin 15 x 15 cm, Warna 61.1 Bahan 45.000 Bh Porselin 15 x 15 cm Warna 9.300 Kg Semen Abu-abu 0.018 M3 Pasir Pasang 1.500 Kg Semen Warna 61.2 Tenaga 0.600 Oh Pekerja 0.450 Oh Tukang Batu 0.045 Oh Kepala Tukang 0.030 Oh Mandor 62 1 M2 Pasang Dinding Porselin 10 x 20 cm, Warna 62.1 Bahan 100.000 Bh Porselin 10 x 20 cm Warna 9.300 Kg Semen Abu-abu 0.018 M3 Pasir Pasang 1.500 Kg Semen Warna 62.2 Tenaga 0.600 Oh Pekerja 0.450 Oh Tukang Batu 0.045 Oh Kepala Tukang 0.030 Oh Mandor

@ @ @ @ @ @ @ @

#REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!

#REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!

@ @ @ @ @ @ @ @

#REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!

#REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!

BJ

@ @ @ @ @ @ @ @

#REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!

#REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!

BK 63 1 M2 Pasang Dinding Porselin 20 x 20 cm, Warna 63.1 Bahan 25.000 Bh Porselin 20 x 20 cm Warna 9.300 Kg Semen Abu-abu 0.018 M3 Pasir Pasang 1.500 Kg Semen Warna 63.2 Tenaga 0.600 Oh Pekerja 0.450 Oh Tukang Batu 0.045 Oh Kepala Tukang 0.030 Oh Mandor BL 64 1 M2 Pasang Dinding Keramik Artistik 10 x 20 cm 64.1 Bahan 100.000 Bh Keramik Artistik 10 x 20 cm 9.300 Kg Semen Abu-abu 0.018 M3 Pasir Pasang 1.500 Kg Semen Warna 64.2 Tenaga 0.600 Oh Pekerja 0.450 Oh Tukang Batu 0.045 Oh Kepala Tukang 0.030 Oh Mandor 1 M2 Pasang Dinding Keramik Artistik 5 x 20 cm

@ @ @ @ @ @ @ @

#REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!

#REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!

@ @ @ @ @ @ @ @

#REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!

#REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!

BM 65

65.1 Bahan 100.000 9.300 0.018 1.500 65.2 Tenaga 0.600 0.450 0.045 0.030

Bh Kg M3 Kg Oh Oh Oh Oh

Keramik Artistik 5 x 20 cm Semen Abu-abu Pasir Pasang Semen Warna Pekerja Tukang Batu Kepala Tukang Mandor

@ @ @ @ @ @ @ @

#REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!

#REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!

BN 66 1 M2 Pasang Dinding Keramik 10 x 20 cm 66.1 Bahan 50.000 Bh Keramik 10 x 20 cm 9.300 Kg Semen Abu-abu 0.018 M3 Pasir Pasang 1.500 Kg Semen Warna 66.2 Tenaga 0.600 Oh Pekerja 0.450 Oh Tukang Batu 0.045 Oh Kepala Tukang 0.030 Oh Mandor BO 67 1 M2 Pasang Dinding Keramik 15 x 15 cm 67.1 Bahan 45.000 Bh Keramik 15 x 15 cm 9.300 Kg Semen Abu-abu 0.018 M3 Pasir Pasang 1.500 Kg Semen Warna 67.2 Tenaga 0.600 Oh Pekerja 0.450 Oh Tukang Batu 0.045 Oh Kepala Tukang 0.030 Oh Mandor BP 68 1 M2 Pasang Dinding Keramik 20 x 20 cm 68.1 Bahan 25.000 Bh Keramik 20 x 20 cm 9.300 Kg Semen Abu-abu 0.018 M3 Pasir Pasang 1.500 Kg Semen Warna 68.2 Tenaga 0.600 Oh Pekerja 0.100 Oh Tukang Batu 0.045 Oh Kepala Tukang 0.030 Oh Mandor BQ 69 1 M2 Pasang Dinding Keramik 10 x 20 cm 69.1 Bahan 50.000 Bh Keramik 10 x 20 cm 9.300 Kg Semen Abu-abu 0.018 M3 Pasir Pasang 1.500 Kg Semen Warna 69.2 Tenaga 0.600 Oh Pekerja 0.125 Oh Tukang Batu 0.013 Oh Kepala Tukang 0.030 Oh Mandor B R 70 1 M2 Pasang Dinding Marmer 70.1 Bahan 1.020 M2 Mamer 2.000 Bh Paku Pancing 60 x 230 12.440 Kg Semen Abu-abu 0.025 M3 Pasir Pasang 1.500 Kg Semen Warna 70.2 Tenaga 0.720 Oh Pekerja

@ @ @ @ @ @ @ @

#REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!

#REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!

@ @ @ @ @ @ @ @

#REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!

#REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!

@ @ @ @ @ @ @ @

#REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!

#REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!

@ @ @ @ @ @ @ @

#REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!

#REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!

@ @ @ @ @ @

#REF! #REF! #REF! #REF! #REF! #REF!

#REF! #REF! #REF! #REF! #REF! #REF!

0.650 0.065 0.035

Oh Oh Oh

Tukang Batu Kepala Tukang Mandor

@ @ @

#REF! #REF! #REF!

#REF! #REF! #REF! #REF!

BS 71 1 M2 Pasang Dinding Bata Pelapis 7 x 3 x 24 cm 71.1 Bahan 60.000 Bh Bata Pelapis Dinding 12.440 Kg Semen Abu-abu 0.025 M3 Pasir Pasang 71.2 Tenaga 0.650 Oh Pekerja 0.500 Oh Tukang Batu 0.050 Oh Kepala Tukang 0.030 Oh Mandor BT 72 1 M2 Pasang Dinding Bata Klinker 5 x 5 x 24 cm 72.1 Bahan 80.000 Bh Bata Pelapis Klinker 12.440 Kg Semen Abu-abu 0.025 M3 Pasir Pasang 72.2 Tenaga 0.620 Oh Pekerja 0.350 Oh Tukang Batu 0.035 Oh Kepala Tukang 0.030 Oh Mandor

@ @ @ @ @ @ @

#REF! #REF! #REF! #REF! #REF! #REF! #REF!

#REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!

@ @ @ @ @ @ @

#REF! #REF! #REF! #REF! #REF! #REF! #REF!

#REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!

BU 73 1 M2 Pasang Dinding Batu Paros 73.1 Bahan 1.050 M2 Batu Paros 11.750 Kg Semen Abu-abu 0.035 M3 Pasir Pasang 73.2 Tenaga 0.620 Oh Pekerja 0.350 Oh Tukang Batu 0.035 Oh Kepala Tukang 0.030 Oh Mandor BV 74 1 M2 Pasang Dinding Batu Tempel Hitam 74.1 Bahan 1.050 M2 Batu Tempel Hitam 11.750 Kg Semen Abu-abu 0.035 M3 Pasir Pasang 74.2 Tenaga 0.620 Oh Pekerja 0.350 Oh Tukang Batu 0.035 Oh Kepala Tukang 0.030 Oh Mandor BW 75 1 M2 Pasang Lantai Vinyl Karet 30 x 30 cm KL I 75.1 Bahan 11.050 Bh Vinyl Karet 30 x 30 cm KL I 0.350 Kg Lem Vinyl 75.2 Tenaga 0.150 Oh Pekerja 0.150 Oh Tukang Batu 0.015 Oh Kepala Tukang 0.008 Oh Mandor BX 76 1 M2 Pasang Lantai Vinyl Karet 30 x 30 cm KL II 76.1 Bahan 11.050 Bh Vinyl Karet 30 x 30 cm KL II 0.350 Kg Lem Vinyl 76.2 Tenaga 0.150 Oh Pekerja 0.150 Oh Tukang Batu 0.015 Oh Kepala Tukang 0.008 Oh Mandor

@ @ @ @ @ @ @

#REF! #REF! #REF! #REF! #REF! #REF! #REF!

#REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!

@ @ @ @ @ @ @

#REF! #REF! #REF! #REF! #REF! #REF! #REF!

#REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!

@ @ @ @ @ @

#REF! #REF! #REF! #REF! #REF! #REF!

#REF! #REF! #REF! #REF! #REF! #REF! #REF!

@ @ @ @ @ @

#REF! #REF! #REF! #REF! #REF! #REF!

#REF! #REF! #REF! #REF! #REF! #REF! #REF!

BY 77 1 M2 Pasang Lantai Vinyl Asbes 30 x 30 cm 77.1 Bahan 11.050 Bh Vinyl Asbes 30 x 30 cm 0.350 Kg Lem Vinyl 77.2 Tenaga 0.150 Oh Pekerja 0.150 Oh Tukang Batu 0.015 Oh Kepala Tukang 0.008 Oh Mandor BZ

@ @ @ @ @ @

#REF! #REF! #REF! #REF! #REF! #REF!

#REF! #REF! #REF! #REF! #REF! #REF! #REF!

78 1 M2 Pasang Lantai Vinyl Motif Kembang 30 x 30 cm 78.1 Bahan @ 11.050 Bh Vinyl Motif Kembang 30 x 30 cm Ex DN @ 0.350 Kg Lem Vinyl 78.2 Tenaga @ 0.150 Oh Pekerja @ 0.150 Oh Tukang Batu @ 0.015 Oh Kepala Tukang @ 0.008 Oh Mandor

#REF! #REF! #REF! #REF! #REF! #REF!

#REF! #REF! #REF! #REF! #REF! #REF! #REF!

C A 79 1 M2 Pasang Wall Covering Lebar 50 cm 79.1 Bahan 1.100 M2 Vinyl Wall Covering, Lebar 50 cm 0.250 Kg Lem 79.2 Tenaga 0.750 Oh Pekerja 0.170 Oh Tukang Batu 0.017 Oh Kepala Tukang 0.009 Oh Mandor CB 80 1 M2 Floor Hardener Ferrovax 80.1 Bahan 3.000 Kg Floor Hardener Ferrovax 80.2 Tenaga 0.120 Oh Pekerja 0.120 Oh Tukang Batu 0.012 Oh Kepala Tukang 0.006 Oh Mandor CC 81 1 M2 Floor Hardener Mastercron 81.1 Bahan 5.000 Kg Mastercron "S" 81.2 Tenaga 0.120 Oh Pekerja 0.120 Oh Tukang Batu 0.012 Oh Kepala Tukang 0.006 Oh Mandor CD 82 1 M2 Plint Kayu 2 x 10 cm 82.1 Bahan 0.002 M3 Kayu Jati Papan 0.050 Kg Paku Skrup 3.5" 82.2 Tenaga 0.120 Oh Pekerja 0.120 Oh Tukang Batu 0.012 Oh Kepala Tukang 0.006 Oh Mandor

@ @ @ @ @ @

#REF! #REF! #REF! #REF! #REF! #REF!

#REF! #REF! #REF! #REF! #REF! #REF! #REF!

@ @ @ @ @

#REF! #REF! #REF! #REF! #REF!

#REF! #REF! #REF! #REF! #REF! #REF!

@ @ @ @ @

#REF! #REF! #REF! #REF! #REF!

#REF! #REF! #REF! #REF! #REF! #REF!

@ @ @ @ @ @

#REF! #REF! #REF! #REF! #REF! #REF!

#REF! #REF! #REF! #REF! #REF! #REF! #REF!

ANALISA BIAYA KONSTRUKSI (ABK) BANGUNAN GEDUNG DAN PERUMAHAN PEKERJAAN PENGECETAN
A 1 1.1 1.2 1 M2 Mengikis / Mengerok Permukaan Cat tembok Lama Bahan @ 0.050 Kg Soda Api Tenaga @ 0.150 Oh Pekerja @ Oh Tukang Cat @ Oh Kepala Tukang @ 0.003 Oh Mandor

#REF! #REF! #REF! #REF! #REF!

#REF! #REF! #REF! #REF! #REF! #REF!

2 2.1 2.2

1 M2 Mencuci Bidang Permukaan Tembok Yang Pernah Dicat Bahan @ #REF! 0.050 Kg Sabun Tenaga @ #REF! 0.150 Oh Pekerja @ #REF! Oh Tukang Cat @ #REF! Oh Kepala Tukang @ #REF! 0.003 Oh Mandor 1 M2 Mengerok Karat Cat Lama Permukaan Baja dengan Cara Manual Bahan @ #REF! 0.050 Kg Sabun Tenaga @ #REF! 0.150 Oh Pekerja @ #REF! Oh Tukang Cat @ #REF! Oh Kepala Tukang @ #REF! 0.003 Oh Mandor 1 M2 Menyabun Permukaan Tembok Lama Bahan 0.050 Kg Sabun Tenaga 0.150 Oh Pekerja Oh Tukang Cat Oh Kepala Tukang 0.003 Oh Mandor

#REF! #REF! #REF! #REF! #REF! #REF!

3 3.1 3.2

#REF! #REF! #REF! #REF! #REF! #REF!

4 4.1 4.2

@ @ @ @ @

#REF! #REF! #REF! #REF! #REF!

#REF! #REF! #REF! #REF! #REF! #REF!

5 5.1

5.2

5.3

1 M2 Mengerok Karat atau Cat Lama Permukaan Baja dengan Pancar Pasir (sanblasting) dengan Tingkat kebersihan Sa 2 1/2 Bahan @ #REF! 40.000 Kg Pasir Silika @ #REF! 10.000 Ltr BBM Peralatan @ #REF! 1.000 Hr Kompresor, Blasting Pot, Selang dan Nozzle Tenaga @ #REF! 1.600 Oh Pekerja @ #REF! 1.600 Oh Tukang Cat @ #REF! 0.800 Oh Kepala Tukang @ #REF! 0.500 Oh Mandor 1 M2 Mendempul dan Menggosok Kayu Bahan 0.080 Kg Dempul Jadi 0.020 Kg Minyak Cat 0.010 Kg Batu Apung Tenaga 0.040 Oh Pekerja 0.040 Oh Tukang Cat 0.004 Oh Kepala Tukang 0.003 Oh Mandor 1 M2 Pengecatan Bidang Kayu Lama Bahan

#REF! #REF! #REF!

#REF! #REF! #REF! #REF! #REF!

6 6.1

@ @ @ @ @ @ @

#REF! #REF! #REF! #REF! #REF! #REF! #REF!

#REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!

6.2

7 7.1

7.2

0.150 0.170 0.170 Tenaga 0.070 0.075 0.008 0.003

Kg Kg Kg Oh Oh Oh Oh

Plamir Cat Dasar Cat Penutup Pekerja Tukang Cat Kepala Tukang Mandor

@ @ @ @ @ @ @

#REF! #REF! #REF! #REF! #REF! #REF! #REF!

#REF! #REF! #REF!

8 8.1

8.2

9 9.1

9.2

10 10.1 10.2

11 11.1

11.2

12 12.1 12.2

13 13.1

#REF! #REF! #REF! #REF! #REF! 1 M2 Pengecatan Bidang Kayu Baru (1 Lapis Plamir), 1 Lapis Cat Dasar, 2 Lapis Cat Pentup Bahan @ #REF! #REF! 0.200 Kg Cat Meni @ #REF! #REF! 0.150 Kg Plamir @ #REF! #REF! 0.170 Kg Cat Dasar @ #REF! #REF! 0.260 Kg Cat Penutup Tenaga @ #REF! #REF! 0.070 Oh Pekerja @ #REF! #REF! 0.009 Oh Tukang Cat @ #REF! #REF! 0.006 Oh Kepala Tukang @ #REF! #REF! 0.003 Oh Mandor #REF! 1 M2 Pengecatan Bidang Kayu Baru (1 Lapis Plamir), 1 Lapis Cat Dasar, 3 Lapis Cat Pentup Bahan @ #REF! #REF! 0.200 Kg Cat Meni @ #REF! #REF! 0.150 Kg Plamir @ #REF! #REF! 0.170 Kg Cat Dasar @ #REF! #REF! 0.350 Kg Cat Penutup Tenaga @ #REF! #REF! 0.070 Oh Pekerja @ #REF! #REF! 0.105 Oh Tukang Cat @ #REF! #REF! 0.004 Oh Kepala Tukang @ #REF! #REF! 0.003 Oh Mandor #REF! 1 M2 Pelaburan Bidang Kayu dengan Teak Oil Bahan @ #REF! #REF! 0.360 Ltr Teak Oil Tenaga @ #REF! #REF! 0.040 Oh Pekerja @ #REF! #REF! 0.063 Oh Tukang Cat @ #REF! #REF! 0.063 Oh Kepala Tukang @ #REF! #REF! 0.003 Oh Mandor #REF! 1 M2 Pelaburan Bidang Kayu dengan Politur Bahan @ #REF! #REF! 0.150 Ltr Politur @ #REF! #REF! 0.372 Ltr Politur Jadi @ #REF! #REF! 2.000 Lbr Amplas Tenaga @ #REF! #REF! Oh Pekerja @ #REF! #REF! 0.060 Oh Tukang Cat @ #REF! #REF! 0.016 Oh Kepala Tukang @ #REF! #REF! 0.003 Oh Mandor #REF! 1 M2 Pelaburan Bidang Kayu Cat Residu dan Ter Bahan @ #REF! #REF! 0.350 Ltr Residu atau Ter Tenaga @ #REF! #REF! 0.100 Oh Pekerja @ #REF! #REF! Oh Tukang Cat @ #REF! #REF! Oh Kepala Tukang @ #REF! #REF! 0.006 Oh Mandor #REF! 1 M2 Pelaburan Bidang Kayu dengan Vernis Bahan @ #REF! #REF! 0.150 Ltr Vernis @ #REF! #REF! 0.050 Ltr Dempul @ #REF! #REF! 0.100 Lbr Amplas @ #REF! #REF! 0.010 Bh Kuas

13.2 Tenaga 0.160 0.160 0.016 0.003 N

Oh Oh Oh Oh

Pekerja Tukang Cat Kepala Tukang Mandor

@ @ @ @

#REF! #REF! #REF! #REF!

#REF! #REF! #REF! #REF! #REF!

14 1 M2 Pengecetan Tembok Baru (1 Lapis Plamir, 1 Lapis Cat Dasar, 2 Lapis Cat Penutup) 14.1 Bahan @ #REF! 0.100 Kg Plamir @ #REF! 0.100 Kg Cat Dasar @ #REF! 0.260 Kg Cat Penutup 2 x 14.2 Tenaga @ #REF! 0.020 Oh Pekerja @ #REF! 0.063 Oh Tukang Cat @ #REF! 0.006 Oh Kepala Tukang @ #REF! 0.003 Oh Mandor 15 1 M2 Pengecetan Tembok Baru (1 Lapis Plamir, 2 Lapis Cat Penutup) 15.1 Bahan @ #REF! 0.120 Kg Cat Dasar @ #REF! 0.180 Kg Cat Penutup 2 x 15.2 Tenaga @ #REF! 0.028 Oh Pekerja @ #REF! 0.042 Oh Tukang Cat @ #REF! 0.004 Oh Kepala Tukang @ #REF! 0.003 Oh Mandor 16 1 M2 Melabur Tembok dengan Kalkarium 16.1 Bahan 0.100 Kg Kalkarium 16.2 Tenaga 0.028 Oh Pekerja 0.042 Oh Tukang Cat 0.004 Oh Kepala Tukang 0.003 Oh Mandor 17 1 M2 Melabur Tembok dengan Kapur Sirih 17.1 Bahan 0.100 Lbr Ampelas 0.250 Ikat Alang-alang 0.002 M3 Perancah kayu 0.150 Kg Kapur Sirih 17.2 Tenaga 0.150 Oh Pekerja 0.001 Oh Tukang Cat 0.000 Oh Kepala Tukang 0.003 Oh Mandor

#REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!

#REF! #REF! #REF! #REF! #REF! #REF! #REF!

@ @ @ @ @

#REF! #REF! #REF! #REF! #REF!

#REF! #REF! #REF! #REF! #REF! #REF!

@ @ @ @ @ @ @ @

#REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!

#REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!

18 1 M2 Melabur Tembok Lama dengan Kapur Sirih (untuk Pemeliharaan) 18.1 Bahan 0.002 @ #REF! M3 Perancah kayu @ #REF! 0.300 Kg Kapur Sirih 18.2 Tenaga @ #REF! 0.040 Oh Pekerja @ #REF! 0.005 Oh Tukang Cat @ #REF! 0.001 Oh Kepala Tukang @ #REF! 0.003 Oh Mandor 19 1 M2 Pemasangan Wall Paper 19.1 Bahan 1.200 M3 Wall Paper 0.200 Kg Perekat 19.2 Tenaga 0.020 Oh Pekerja 0.200 Oh Tukang Cat 0.002 Oh Kepala Tukang 0.003 Oh Mandor

#REF! #REF! #REF! #REF! #REF! #REF! #REF!

@ @ @ @ @ @

#REF! #REF! #REF! #REF! #REF! #REF!

#REF! #REF! #REF! #REF! #REF! #REF! #REF!

20 1 M2 Pengecetan Permukaan Baja dengan Meni Besi 20.1 Bahan @ 0.100 Kg Meni Besi @ 0.010 Bh Kuas 20.2 Tenaga @ 0.020 Oh Pekerja @ 0.200 Oh Tukang Cat @ 0.020 Oh Kepala Tukang @ 0.010 Oh Mandor

#REF! #REF! #REF! #REF! #REF! #REF!

#REF! #REF! #REF! #REF! #REF! #REF! #REF!

21 1 M2 Pengecetan Permukaan Baja dengan Meni Besi dan Perancah 21.1 Bahan @ #REF! 0.100 Kg Meni Besi @ #REF! 0.010 Bh Kuas 0.002 @ #REF! M3 Perancah Kayu 21.2 Tenaga @ #REF! 0.250 Oh Pekerja @ #REF! 0.225 Oh Tukang Cat @ #REF! 0.023 Oh Kepala Tukang @ #REF! 0.008 Oh Mandor 22 22.1

#REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!

22.2

23 23.1 23.2

24 24.1

24.2

25 25.1 25.2

1 M2 Pengecetan Permukaan Baja Lapis Seng (Galbani) secara Manual Sistem 4 Lapis Cat Konvensional dengan tebal 20 Um Bahan @ #REF! #REF! 0.100 Kg Meni (read lead) A @ #REF! #REF! 0.100 Kg Meni (read lead) B @ #REF! #REF! 0.040 Kg Aluminium C @ #REF! #REF! 0.040 Kg Aluminium B @ #REF! #REF! 0.010 Ltr Pengencer 0.002 @ #REF! #REF! M3 Perancah Kayu Tenaga @ #REF! #REF! 0.006 Oh Pekerja @ #REF! #REF! 0.006 Oh Tukang Cat @ #REF! #REF! 0.023 Oh Kepala Tukang @ #REF! #REF! 0.008 Oh Mandor #REF! 1 M2 Pengecetan Permukaan Baja Lapis Seng (Galbani) secara Manual Sistem 1 Lapis Cat Mutakhir dengan tebal 20 Um Bahan @ #REF! #REF! 0.300 Kg Cat Tenaga @ #REF! #REF! 0.006 Oh Pekerja @ #REF! #REF! 0.006 Oh Tukang Cat @ #REF! #REF! 0.012 Oh Kepala Tukang @ #REF! #REF! 0.006 Oh Mandor #REF! 1 M2 Pengecetan Permukaan Baja Lapis Seng (Galbani) secara Manual Sistem 3 Lapis Cat Konvensional dengan tebal 20 Um Bahan @ #REF! #REF! 0.110 Kg Cat Dasar @ #REF! #REF! 0.170 Kg Cat Antara @ #REF! #REF! 0.080 Kg Cat Penutup Tenaga @ #REF! #REF! 0.500 Oh Pekerja @ #REF! #REF! 0.800 Oh Tukang Cat @ #REF! #REF! 0.300 Oh Kepala Tukang @ #REF! #REF! 0.200 Oh Mandor #REF! 1 M2 Pengecetan Permukaan Baja Lapis Seng (Galbani) secara Semprot Sistem 1 Lapis Cat Mutakhir dengan tebal 20 Um Bahan @ #REF! #REF! 0.300 Kg Cat Dasar Tenaga @ #REF! #REF! 0.400 Oh Pekerja @ #REF! #REF! 0.700 Oh Tukang Cat @ #REF! #REF! 0.200 Oh Kepala Tukang @ #REF! #REF! 0.200 Oh Mandor #REF!