Gantt Chart
Muhammad Uzair
Week3
Week4
Week5
Week6
Week7
Week8
Week9
Week10
Week11
1 1.1 1.2 1.3 1.4 1.5 1.6 1.7 1.8 1.9 1.1 2 2.1 2.2 2.3 2.4 2.5 2.6 3 3.1 3.2 3.3 3.4 3.5 4 4.1 4.2 4.3 4.4 4.5 4.6 4.7 4.8 4.9 4.1 4.1 4.1 5 5.1 5.2 5.3 5.4 5.5 5.6 5.7 5.8 5.9 Key
actual weekly hours actual cumulative hours planned duration actual duration (and hours) Milestones
Schedule
Muhammad Uzair
Task Objective Task Description 1 1.1 1.2 1.3 1.4 1.5 1.6 1.7 1.8 1.9 1.1 2 2.1 2.2 2.3 2.4 2.5 2.6 3 3.1 3.2 3.3 3.4 3.5 4 4.1 4.2 4.3 4.4 4.5 4.6 4.7 4.8 4.9 4.1 4.11 4.12 5 5.1 5.2 5.3 5.4 5.5 5.6 5.7 5.8 5.9 Planning/start of the project 1 Discuss project with the client 1 Creat and hand in project proposal 1 Client consultation 1 Discussion on TOR with supervisor 1 Create draft of Terms of Reference (TOR) 1 Get TOR signed off by client 1 Preperation of Gantt chart, and Schedule 1 Risk Identification. 1 Getting TOR, Gantt Chart and Schedule signed by supervisor 1 First reveiw preparation and session. Litrature Survey 2 Research of litrature on risk management 2 Reading and analyzing research material 3 Identification of risk control methods 3 Research on different techniques used for assessment of risk 3 Comprehensive Review on Existing risk management and Quality management in construction projects 3 Update second review documents 3 Second review preperation and session 4 Research of methods of improvement on risk management and Quality management in construction projects 1 Discuss current risk management system of client's company with supervisor 2 Review the documents and analyse the theories and concepts 4 Extensive research of methodology 3 Define and elaborate research methods Data collection from client's company 5 Analysis of current risk management plan adopted by client's organization 5 Comparison of client's strategy for risks with other organizations 5 Discussion on questionnaire with client 5 Analysis of Interviews and literature to support the development of integrated tool 5 Drafting of 4th Chapter (Research Analysis and Results) 5 Investigation of lapses in risk management strategy adopted by client's company 6 Critical Evaluation of the result with client requirement 7 5 6 6 Suggesting a Risk Management strategy Drafting of chapter 5(A proposed risk management strategy) Evaluation of Research Objectives Evaluation of questionnaire
Hours 0 18 19 25 4 5 5 4 4 4 8 0 35 37
planned
Planned deliverables
9/28/2011 Project decision and client consultation 9/30/2011 Project proposal preperation 10/7/2011 Client requirements
9/16/2011 10/10/2011 9/23/2011 10/10/2011 9/24/2011 10/10/2011 9/26/2011 10/11/2011 9/30/2011 10/11/2011 10/1/2011 10/12/2011 10/5/2011 10/6/2011 10/12/2011 10/9/2011 10/17/2011
9/22/2011 10/10/2011 TOR discussed with supervisor 9/24/2011 10/10/2011 TOR draft prepeared 9/24/2011 10/10/2011 Sending and receiving TOR to client via Email 9/28/2011 10/11/2011 Gantt chart and Schedule prepeared 9/30/2011 10/11/2011 Risks assessment 10/1/2011 10/12/2011 Deliverables for 1st review prepared 10/5/2011 First review
10/8/2011 10/14/2011 Research Material gathered 10/12/2011 10/19/2011 Researach material analyzed 10/15/2011 10/21/2011 methods studied 10/19/2011 10/25/2011 Risk assesment techniques researched 10/23/2011 10/27/2011 Research material reviewed 10/28/2011 10/28/2011 Documents updated for Second Review 10/31/2011 10/31/2011 Second Review 10/30/2011 11/3/2011 11/6/2011 11/8/2011 11/3/2011 areas of improvement explored 11/7/2011 view of supervisor obtained 11/8/2011 Important theories reviewed 11/9/2011 Variouse Methodology of Research Studied
24 10/12/2011 10/20/2011 24 10/16/2011 10/24/2011 29 10/19/2011 10/25/2011 12 10/24/2011 10/27/2011 8 10/31/2011 10/31/2011 38 10/31/2011 31-11-2011 32 21 13 13 0 11/1/2011 11/4/2011 11/7/2011 11/3/2011 11/7/2011 11/9/1900
11/9/2011 11/10/2011
11/10/2011 11/10/2011 Methodology of research selected 11/11/2011 11/11/2011 relavent data received and studied 11/13/2011 11/14/2011 Company's risk plan compared and analysed 11/14/2011 11/15/2011 Notes taken about client's requirements 11/17/2011 11/16/2011 interviews and literature analyzed 11/19/2011 11/18/2011 chapter 4 drafted 11/21/2011 11/21/2011 lapses identified 11/23/2011 11/22/2011 evaluation of result 11/24/2011 11/26/2011 11/27/2011 11/29/2011 11/22/2011 11/23/2011 11/24/2011 11/25/2011 Deliverables of project reviewed chapter 5th drafted research objectives reviewed questionnaires data studied
13 11/11/2011 11/11/2011 14 11/12/2011 11/14/2011 12 11/14/2011 11/15/2011 14 11/15/2011 11/16/2011 24 11/17/2011 11/17/2011 12 11/20/2011 11/21/2011 9 11/22/2011 11/22/2011 5 13 12 13 11/24/2011 11/25/2011 11/27/2011 11/28/2011 11/22/2011 11/23/2011 11/24/2011 11/25/2011
13 11/29/2011 11/28/2011 0 8 11/29/2011 11/29/2011 6 7 6 6 8 7 7 8 12/1/2011 11/29/2011 11/3/2011 11/30/2011 12/3/2011 11/30/2011 12/3/2011 12/4/2011 12/4/2011 12/5/2011 12/5/2011 12/1/2011 12/1/2011 12/2/2011 12/2/2011 12/5/2011
11/29/2011 11/28/2011 chapter 6 drafted 11/30/2011 11/29/2011 3rd and 4th chapter finalized 11/2/2011 11/29/2011 5th and 6th cahpter fianlized final recommendation reviewed 12/3/2011 11/30/2011 Dissertation shown and discussed with supervisor 12/3/2011 11/30/2011 Strategy prepeard 12/4/2011 12/4/2011 12/4/2011 12/5/2011 12/5/2011 12/1/2011 Client's requirement incorporated in final formation of strategy 12/1/2011 Project final evaluation 12/2/2011 Draft of dissertation showed to Supervisor 12/2/2011 Revision of dissertation 12/5/2011 Final submission
3 Finalizing Methodology and Research Analysis Chapter 6 Finalizing Evaluation Chapter and review of proposed risk management strategy 8 Produce draft dissertation 5 Formulating strategy for the client. 5 Discussion on final strategy parameters with the client 7 Critical evaluation of the overall project. 8 Discussion on draft dissertation with supervisor 8 Revise and finalize dissertation 8 Printing and submission of dissertation
Schedule
Muhammad Uzair