Water Depth Rig Floor Elevation Hydrogen Sulphide Carbon Dioxide

430 ft MSL 70 ft MSL 0 mol% 0 mol% N ft 0.00 5320.00 5320.00 DLS 2.00 4.00 E ft 0.00 0.00 0.00 TVD ftbrt 0.00 9500.00 10250.00

Surface location of rig Target location TD Directional KOP - immediately below surface casing DOP - where needed to be Vertical at target vertical to TD

deg/100ft deg/100ft

Casing Conductor Surface casing Intermediate casing Production casing Production Liner

OD 30 20 13 3/8 9 5/8 7

" OD " OD " OD " OD " OD

must have clearance for drillbit size must have clearance for drillbit size must have clearance for drillbit size must have clearance for drillbit size must have clearance for drillbit size Shoe track length 45ft 80ft 80ft 80ft 160ft

26 17 1/2 12 1/4 8 1/2 6 od 30 20 13 3/8 9 5/8 7

Cementing Top Lead Height of Tail Conductor n/a seabed Surface casing seabed 500ft Intermediate casing 1950 500ft Production casing n/a 500ft Production Liner n/a entire length Drilling Fluids Conductor hole Surface casing hole Intermediate casing hole Production casing hole Production Liner hole Drilling Systems Rotary Steerable mud motor Rotary steerable Wellbore surveying MWD Drilling mechanics Torque Drag Vibration

no reported problems there is a low pressure aquifer reactive shales natural fractured formations high porosity, high permeable sands

Question to answer

Design the 'S' profile tie-in KOP End of Build Start of drop End of drop @target to be vertical TD

md md md md md md

inc inc inc inc inc inc

azi azi azi azi azi azi

tvd tvd tvd tvd tvd tvd

n n n n n n

" " " " "

Select the setting depths TVD'd based on PP/FP only - the formations are all competent Calculate the appropriate Measured Depths from your directional plan Look up API 5C2 and select the wt/ft of J-55 20" and the wt/ft of P-110 casing which has the closest clearance for the next drillbit

id Volumes of lead and tail cements and the number of sacks required for each from the yield 27 lead yield is 1.5 cuft/sack API 5C2 tail yield is 1.15cuft/sack API 5C2 API 5C2 API 5C2 Select a mud density and mud type for each hole section How would the problems be best solved List 2 items of solids control equipment used to remove drill cuttings from the mud

List pro's and con's for each system Which, in your opinion will deliver the smoothest wellbore and why?

What can influence the magnetic azimuth readings of the MWD magnetometers What can cause the inclinometers of the MWD to give wrong inclination measurements

List the major influences on Torque and Drag

e e e e e e

dls dls dls dls dls dls

which has the closest clearance for the next drillbit for 13.3/8", 9.5/8" and 7" casings

TVD ft 500 2449.999133 3800 4399.998265 5300 6349.997398 8000 8299.99653 9300 9500 10249.99566 10251

Pore Pressure PP Eq Density psi lbm/gal 216.8907799 8.35 8.85 1062.764445 8.35 8.85 1652.082405 8.36880597 8.868806 2208.469481 9.661716418 10.16172 2660.202923 9.661716418 10.16172 3628.698147 11 11.5 6233.986487 15 15.5 6467.758276 15 15.5 7247.009291 15 15.5 6613.220665 13.4 13.9 7135.314014 13.4 13.9 7135.317033 13.4 13.9

TVD ft 500 2449.999133 3800 4399.998265 5300 6349.997398 8000 8299.99653 9300 9500 10249.99566 10251

Fracture Gradient FG Eq Density psi lbm/gal 259.7494369 10 9.5 1654.603328 13 12.5 2961.143581 15 14.5 3609.29454 15.79011194 15.29011 4543.017652 16.5 16 5542.011716 16.8 16.3 7148.304505 17.2 16.7 7481.040406 17.35 16.85 8479.00087 17.55 17.05 8686.021172 17.6 17.1 9478.252944 17.8 17.3 9478.256954 17.8 17.3

8
0 500 1000 1500 2000 2500 3000 3500 4000

10

11

12

13

14

15

16

17

18

4500
5000 5500 6000 6500 7000 7500

Pore Pressure EMW Pore Pressure + SF Fracture Pressure - SF Fracture Pressure EMW

8000
8500 9000 9500 10000 10500 11000