Sl No. 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 38 Document No. TLMAL-QM-001 TLMAL-QP-001 TLMAL-QP-002 TLMAL-QP-003 TLMAL-QP-004 TLMAL-QP-005 TLMAL-QP-006 TLMAL-QP-007 TLMAL-QP-008 TLMAL-QP-009 TLMAL-QP-010 TLMAL-QP-011 TLMAL-QP-012 TLMAL-QP-013 TLMAL-QP-014 TLMAL-QP-015 TLMAL-QP-016 TLMAL-QP-017 TLMAL-QP-018 TLMAL-QP-019 TLMAL-QP-020 TLMAL-QP-021 TLMAL-QP-022 TLMAL-QP-023 TLMAL-QP-024 TLMAL-QP-025 TLMAL-QP-026 TLMAL-QP-027 TLMAL-QP-028 TLMAL-QP-029 TLMAL-QP-030 TLMAL-QP-031 TLMAL-QP-032 TLMAL-QP-033 TLMAL-QP-034 TLMAL-QP-035 TLMAL-QP-036 TLMAL-QP-037 TLMAL-QP-039 Description QUALITY MANUAL FIRST ARTICLE INSPECTION APPROVAL OF NDT PERSONNEL LIQUID PENETRANT TESTING EYESIGHT TEST QUALITY PLAN-C130J CONTRACT REVIEW PURCHASING CONFIGURATION MANAGEMENT TOOLING PROCEDURE RECEIVING INSPECTION IN-PROCESS INSPECTION & TESTING CONTROL OF INSPECTION, MEASURING AND TEST EQUIPMENT CONTROL OF NON-CONFORMING PRODUCT CONTROL OF DOCUMENTS PRODUCT IDENTIFICATION, TRACEABILITY, INSPECTION AND TEST STATUS CUSTOMER COMPLAINTS AND CUSTOMER SATISFACTION SURVEY CONTROL OF QUALITY RECORDS INTERNAL QUALITY AUDITS TRAINING ISSUE, CONTROL AND USAGE OF STAMPS MANUFACTURING ENGINEERING CUSTOMER SUPPLIED PRODUCTS Corrective Action and Preventive Action VALIDATION OF INSPECTION, TEST AND MEASUREMENTS PRODUCTION, PLANNING AND CONTROL MEASUREMENT OF REGULATORY BODY REQUIREMENTS ERP/MRP PROCEDURE ELECTRONIC DATA MANAGEMENT INFORMATION SYSTEM QUALITY ASSURANCE REQUIREMENTS FOR SUB CONTRACTOR RISK FACTORS AND THEIR MANAGEMENT SUPPLIER EVALUATION AUTHORISED SIGNATURES PROCEDURE FOR POSITIVE RECALL PROJECT MANAGEMENT IDENTIFICATION OF KEY CHARACTERISTICS PRODUCTION PROCEDURE FIXED ASSETS PROCEDURE Rev 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 Planned Start Date 9-May-11 12-May-11 13-May-11 17-May-11 20-May-11 24-May-11 27-May-11 31-May-11 3-Jun-11 7-Jun-11 10-Jun-11 14-Jun-11 17-Jun-11 21-Jun-11 24-Jun-11 28-Jun-11 1-Jul-11 5-Jul-11 8-Jul-11 12-Jul-11 15-Jul-11 19-Jul-11 22-Jul-11 26-Jul-11 29-Jul-11 2-Aug-11 5-Aug-11 9-Aug-11 12-Aug-11 16-Aug-11 19-Aug-11 23-Aug-11 26-Aug-11 30-Aug-11 2-Sep-11 5-Sep-11 5-Sep-11 5-Sep-11 8-Sep-11 Planned End Date 15-Jul-11 15-May-11 16-May-11 19-May-11 23-May-11 26-May-11 30-May-11 2-Jun-11 6-Jun-11 9-Jun-11 13-Jun-11 16-Jun-11 20-Jun-11 23-Jun-11 27-Jun-11 30-Jun-11 4-Jul-11 7-Jul-11 11-Jul-11 14-Jul-11 18-Jul-11 21-Jul-11 25-Jul-11 28-Jul-11 1-Aug-11 4-Aug-11 8-Aug-11 11-Aug-11 15-Aug-11 18-Aug-11 22-Aug-11 25-Aug-11 29-Aug-11 1-Sep-11 4-Sep-11 7-Sep-11 7-Sep-11 7-Sep-11 10-Sep-11 Actual End Date In Progress 3-May-11 2-May-11 2-May-11 23-May-11 9-Jun-11 25-Jun-11 30-May-11 9-May-11 In progress 25-Jun-11 25-Jun-11 13-May-11 2-Jul-11 In Progress Reviewed by LM Yes Yes Yes Yes yes Review Yes Approved by TLMAL
7-Jul-11 18-Jun-11
Review
9 10
AS9100 Heading
Part 4
4.1. 4.2. 4.2.1. 4.2.2. 4.2.3. 4.2.4.
Part 5
5.1. 5.2. 5.3. 5.4. 5.4.1. 5.4.2. 5.5. 5.5.1. 5.5.2. 5.5.3. 5.6. 5.6.1. 5.6.2. 5.6.3.
Management Responsibility
Management Commitment Customer Focus Quality Policy Planning Quality Objectives Quality Management System Planning Responsibility, Authority and Communication Responsibility and Authority Management Representative Internal Communication Management Review General Review Input Review Output
Part 6
6.1. 6.2. 6.2.1. 6.2.2. 6.3. 6.4
Resource Management
Provision of Resources Human Resources General Competence training & awareness Infrastructure Work Environment
Part 7
7.1. 7.1.1 7.1.2 7.1.3 7.1.4 7.2
Product Realisation
Planning of Product Realisation Project Management Risk Management Configuration Management Control of Work transfer Customer Related Process
7.2.1 7.2.2 7.2.3 7.4 7.4.1 7.4.2 7.4.3 7.5 7.5.1 7.5.1.1 7.5.1.2 7.5.1.3 7.5.1.4 7.5.2 7.5.3 7.5.4 7.5.5 7.6
Determination of Requirements Related to Product Review of Requirements related to products Customer Communication Purchase Purchasing Process Purchasing Information Verification of Purchased Product Production and service provision Control of Production and service provision Production Process Verification Control of Production Process Change Control of Production equipments, tools and software Programs Post delivery Support Validation of Processes for Production and service Provision Identification and Traceability Customer Property Preservation of Product Control of Monitoring and Measuring Equipment
Part 8
8.1. 8.2. 8.2.1. 8.2.2. 8.2.3. 8.2.4. 8.3. 8.4. 8.5. 8.5.1. 8.5.2. 8.5.3.
11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39
40 41 42 43 44 45 46 47 48 49 50 51 52 53 54 55 56 57
Date
1-May-11 4-May-11 7-May-11 10-May-11 13-May-11 16-May-11 19-May-11 22-May-11 25-May-11 28-May-11 31-May-11 3-Jun-11 6-Jun-11 9-Jun-11 12-Jun-11 15-Jun-11 18-Jun-11 21-Jun-11 25-Jun-11 28-Jun-11 2-Jul-11 5-Jul-11 8-Jul-11 11-Jul-11 14-Jul-11 17-Jul-11 20-Jul-11 23-Jul-11 26-Jul-11 29-Jul-11 1-Aug-11 4-Aug-11 7-Aug-11 10-Aug-11 13-Aug-11 16-Aug-11 19-Aug-11 22-Aug-11 25-Aug-11 28-Aug-11 31-Aug-11 3-Sep-11 6-Sep-11 9-Sep-11
0 0 0 0 0 2 3 3 4 5 6 7 8 9 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 26 27 28 29 30 31 32 32 33 34 35 36
0 3 3 4 5 5 5 5 6 6 7 7 7 8 8 8 9 9 12 12 13 14 16
40
QMS PROCEDURES
35 Planned End date Actual End Date 30
25
20
15
15 13
12 Procedures Completed out of 36. 3 procedures are to be reviewed. and 3 procedures are in progress
10