Obra:
Cliente
Fecha
Lugar
00
00.01
01
01.01
OBRAS PROVISIONALES
Movilizacin para traslado de equipos herramientas a/d obra
TRABAJOS PRELIMINARES
Limpieza y fumigacion general (Incl. Eliminacion)
glb
1.00
01.03
m2
84.62
01.04
glb
11/26/2012
PRESUPUESTO P-117-252
Descripcin
01.05
01.07
01.09
01.10
01.11
01.12
01.13
01.14
01.16
01.17
01.18
01.19
01.23
01.24
Und.
vje
3,200.00
1,280.00
0.40
447.94
447.94
1.00
84.62
9.67
818.28
129.45
0.00
56.68
81.72
14.40
22.38
21.12
420.60
0.00
60.10
145.35
127.20
385.66
25.82
66.98
0.00
219.20
8.72
6.00
12.00
1.00
1.00
30.00
Precio S/.
PRESUPUESTO P-109-236
Parcial S/.
Metrado
3,200.00
1,280.00
0.40
447.94
447.94
1.00
84.62
9.67
818.28
129.45
0.00
2.00
17.00
20.00
11.00
1.00
1.00
20.83
20.00
9.84
13.62
1.20
22.38
21.12
14.02
140.23
30.05
8.55
6.36
35.06
25.82
66.98
10.82
10.96
85.80
81.72
14.40
22.38
21.12
420.60
0.00
60.10
145.35
127.20
385.66
25.82
66.98
225.38
219.20
8.72
6.00
12.00
1.00
1.00
30.00
1.00
2.00
17.00
20.00
11.00
1.00
1.00
20.00
m3
m2
m2
m2
ml
m2
1.30
2.00
7.50
36.10
20.00
10.00
253.69
28.81
35.40
14.57
23.56
9.46
329.80
57.62
265.50
525.98
471.20
94.60
1.30
2.00
7.50
36.10
20.00
10.00
253.69
28.81
35.40
14.57
23.56
9.46
329.80
57.62
265.50
525.98
471.20
94.60
1.30
2.00
7.50
36.10
20.00
10.00
m3
m3
4.57
0.50
32.45
86.33
148.30
43.17
4.57
0.50
32.45
86.33
148.30
43.17
4.57
0.50
m3
m3
m3
2.22
2.33
0.85
30.06
80.70
58.12
66.73
188.03
49.40
2.22
2.33
0.85
30.06
80.70
58.12
66.73
188.03
49.40
2.22
2.33
0.85
m3
21.63
24.40
527.65
21.63
24.40
527.65
21.63
m3
m2
m2
1.00
20.00
10.95
470.27
32.46
65.80
470.27
649.20
720.51
1.00
20.00
10.95
470.27
32.46
65.80
470.27
649.20
720.51
1.00
50.00
10.95
2.00
150.00
40.00
15.00
75.00
5.70
20.00
20.00
150.00
855.00
800.00
300.00
2.00
120.00
55.00
15.00
75.00
5.70
20.00
20.00
150.00
684.00
1,100.00
300.00
2.00
120.00
55.00
15.00
15.00
8.33
124.95
15.00
8.33
124.95
15.00
2.00
80.00
25.00
22.00
50.00
1,760.00
2.00
80.00
25.00
22.00
50.00
1,760.00
2.00
70.00
EXCAVACIONES
03.01.01
03.01.05
03.02.01
03.02.02
CAM-55
03.03
ELIMINACION DE MATERIAL
03.03.01
04
04.01
PISOS Y PAVIMENTOS
04.01.01
04.01.03
04.01.04
05
05.01.
REPARACION DE MUROS
05.01.01
05.01.02
05.01.03
05.01.04
05.03.02
05.03.03
06
06.02
07
07.01
07.02
07.03
07.04
08
08.01.
TARRAJEOS Y VESTIDURAS
08.01.01
08.01.02
CAM-08
10
10.02
CAM-56
CAM-57
CAM-58
05.03.
Metrado
9.84
13.62
1.20
22.38
21.12
14.02
140.23
30.05
8.55
6.36
35.06
25.82
66.98
10.82
10.96
03.01
05.02.01
PRESUPUESTO P-117-251
Parcial S/.
5.76
6.00
12.00
1.00
1.00
30.00
CAM-02
02
02.01
02.03
02.04
CAM-04
CAM-05
CAM-06
03
05.02
0.40
Precio S/.
m2
und
ml
vent
pza
m2
und
und
und
und
und
und
und
m2
m2
vidrio, de
accesorios
eliminacion)
Retiro
puerta yymarco
de madera (inc. Traslado y entrega al Area
de Servicios-San
juan) (inc. Eliminacion)
Retiro
de contrazocalos
Retiro de barrotes protectores de ventanas (Incl. Eliminacion)
Retiro de lavadero.(inc. Traslado y entrega al Area de Servicios-San
juan) de ceramico para pisos y muros en mal estado (Incl.
Retiro
Eliminacion)
Retiro de tina de ducha incluye retiro de mayolica existente (Incl.
eliminacion)
Retiro
de tendal existente
Desmontaje de luminarias y accesorios (Focos, fluorescentes
circulares o lineales
inc. Cableria
Desmontaje
de aparatos
electricosy eliminacion)
(Tomacorrientes, Interruptores,
soquetes entre
similares
inc. Cableria
y eliminacion)
Desmontaje
de otros
Aparatos
sanitarios
(Inc. Acarreo
y entrega al Area de
sevicios
San
juan)
Desmontaje de Tableros Electricos (Inc. Eliminacion)
Desmontaje de therma y campana (Inc. Acarreo y entrega al Area de
sevicios - Sandejuan)
Desmontaje
cobertura eternit gran onda techo inc. elementos de
fijacinde
(inc.
Acarreo
eliminacion al almacen 5)
Retiro
vinilico
(inc.yEliminacion)
DEMOLICIONES Y PICADOS DE CONCRETO Y BLOQUETAS EN
MAL ESTADO
Demolicin
de concreto armado (inc.acarreo, hasta 10mt de distancia)
Demolicion de muro de bloquetas c/acero estructural (Incluye acarreo)
Demolicin de pisos de concreto incluye falso piso c/equipo
Picado de cielo raso para dejar libre acero corroido e=5cm
Perfilado de viga de borde alero c/Equipo
Picado de estructuras de concreto en losa para adehrencia de
sobrecarga
MOVIMIENTO DE TIERRAS
03.02
Metrado
2.00
17.00
20.00
11.00
1.00
1.00
50.00
0.50
76.72
38.36
0.50
76.72
38.36
0.50
0.52
1.20
45.00
7.00
410.43
479.48
5.09
69.89
213.42
575.38
229.05
489.23
0.52
1.20
45.00
7.00
410.43
479.48
5.09
69.89
213.42
575.38
229.05
489.23
0.52
1.20
45.00
7.00
m2
m
m
85.00
58.30
20.00
18.52
12.07
9.60
1,574.20
703.68
192.00
85.00
58.30
20.00
18.52
12.07
9.60
1,574.20
703.68
192.00
85.00
58.30
20.00
m2
0.56
262.16
146.81
0.56
262.16
146.81
0.56
m2
0.16
293.36
46.94
0.16
293.36
46.94
m2
0.24
275.16
66.04
0.24
275.16
66.04
Precio S/.
PRESUPUESTO P-102-221
Parcial S/.
Metrado
3,200.00
447.94
1,280.00
0.40
447.94
1.00
Precio S/.
PRESUPUESTO P-112-241
Parcial S/.
Metrado
3,200.00
1,280.00
0.40
447.94
447.94
1.00
Precio S/.
PRESUPUESTO GENERAL
Parcial S/.
Metrado
Precio S/.
3,200.00
1,280.00
2.00
3,200.00
447.94
447.94
5.00
447.94
9.67
818.28
84.62
9.67
818.28
84.62
9.67
818.28
423.10
9.67
129.45
0.00
129.45
129.45
129.45
2.00
129.45
85.80
81.72
14.40
22.38
21.12
420.60
140.23
60.10
145.35
127.20
385.66
25.82
66.98
0.00
548.00
9.84
13.62
1.20
22.38
21.12
14.02
140.23
30.05
8.55
6.36
35.06
25.82
66.98
10.82
10.96
56.68
108.96
14.40
22.38
21.12
280.40
140.23
60.10
145.35
127.20
385.66
25.82
66.98
225.38
219.20
1.00
5.76
8.00
12.00
1.00
1.00
20.00
1.00
2.00
17.00
20.00
11.00
1.00
1.00
20.83
20.00
129.45
9.84
13.62
1.20
22.38
21.12
14.02
140.23
30.05
8.55
6.36
35.06
25.82
66.98
10.82
10.96
253.69
28.81
35.40
14.57
23.56
9.46
32.45
86.33
30.06
80.70
58.12
24.40
470.27
32.46
65.80
75.00
5.70
20.00
20.00
8.33
25.00
22.00
76.72
410.43
479.48
5.09
69.89
18.52
12.07
9.60
-
1.00
5.76
8.00
12.00
1.00
1.00
20.00
1.00
2.00
17.00
20.00
11.00
1.00
1.00
20.83
20.00
9.84
13.62
1.20
22.38
21.12
14.02
140.23
30.05
8.55
6.36
35.06
25.82
66.98
10.82
10.96
56.68
108.96
14.40
22.38
21.12
280.40
140.23
60.10
145.35
127.20
385.66
25.82
66.98
225.38
219.20
34.72
34.00
60.00
5.00
5.00
130.00
3.00
10.00
85.00
100.00
55.00
5.00
5.00
62.49
130.00
9.84
13.62
1.20
22.38
21.12
14.02
140.23
30.05
8.55
6.36
35.06
25.82
66.98
10.82
10.96
329.80
57.62
265.50
525.98
471.20
94.60
1.30
2.00
7.50
36.10
10.00
5.00
253.69
28.81
35.40
14.57
23.56
9.46
329.80
57.62
265.50
525.98
235.60
47.30
1.30
2.00
7.50
36.10
10.00
5.00
253.69
28.81
35.40
14.57
23.56
9.46
329.80
57.62
265.50
525.98
235.60
47.30
6.50
10.00
37.50
180.50
80.00
40.00
253.69
28.81
35.40
14.57
23.56
9.46
148.30
43.17
4.57
0.50
32.45
86.33
148.30
43.17
4.57
0.50
32.45
86.33
148.30
43.17
22.85
2.50
32.45
86.33
66.73
188.03
49.40
2.22
2.33
0.85
30.06
80.70
58.12
66.73
188.03
49.40
2.22
2.33
0.85
30.06
80.70
58.12
66.73
188.03
49.40
11.10
11.65
4.25
30.06
80.70
58.12
527.65
21.63
24.40
527.65
21.63
24.40
527.65
108.13
24.40
470.27
1,623.00
720.51
1.00
10.00
10.95
470.27
32.46
65.80
470.27
324.60
720.51
1.00
10.00
10.95
470.27
32.46
65.80
470.27
324.60
720.51
5.00
110.00
54.75
470.27
32.46
65.80
150.00
684.00
1,100.00
300.00
2.00
100.00
100.00
15.00
75.00
5.70
20.00
20.00
150.00
570.00
2,000.00
300.00
2.00
100.00
100.00
15.00
75.00
5.70
20.00
20.00
150.00
570.00
2,000.00
300.00
10.00
590.00
350.00
75.00
75.00
5.70
20.00
20.00
124.95
10.00
8.33
83.30
10.00
8.33
83.30
65.00
8.33
50.00
1,540.00
2.00
40.00
25.00
22.00
50.00
880.00
2.00
40.00
25.00
22.00
50.00
880.00
10.00
310.00
25.00
22.00
38.36
0.50
76.72
38.36
0.50
76.72
38.36
2.50
76.72
213.42
575.38
229.05
489.23
0.52
1.20
45.00
7.00
410.43
479.48
5.09
69.89
213.42
575.38
229.05
489.23
0.52
1.20
45.00
7.00
410.43
479.48
5.09
69.89
213.42
575.38
229.05
489.23
2.60
6.00
225.00
35.00
410.43
479.48
5.09
69.89
1,574.20
703.68
192.00
85.00
58.30
20.00
18.52
12.07
9.60
1,574.20
703.68
192.00
85.00
25.00
20.00
18.52
12.07
9.60
1,574.20
301.75
192.00
425.00
258.20
100.00
18.52
12.07
9.60
262.16
146.81
0.56
262.16
146.81
0.56
262.16
146.81
2.80
262.16
0.16
293.36
46.94
0.16
293.36
46.94
0.16
293.36
46.94
0.80
293.36
0.24
275.16
66.04
0.24
275.16
66.04
0.24
275.16
66.04
1.20
275.16
PRESUPUESTO P-117-252
Descripcin
CAM-10
CAM-12
CAM-59
CAM-9
Und.
Metrado
Precio S/.
PRESUPUESTO P-117-251
Parcial S/.
Metrado
Precio S/.
PRESUPUESTO P-109-236
Parcial S/.
Metrado
m2
245.21
0.00
245.21
0.00
m2
252.44
0.00
1.85
252.44
Precio S/.
PRESUPUESTO P-102-221
Parcial S/.
1.02
245.21
250.11
467.01
1.85
252.44
467.01
239.24
746.43
3.12
239.24
746.43
3.12
239.24
746.43
m2
235.33
0.00
4.32
235.33
1,016.63
1.44
235.33
338.88
m2
215.41
0.00
4.40
215.41
947.80
4.40
215.41
947.80
10.02.05
m2
3.52
257.64
906.89
3.52
257.64
906.89
3.52
257.64
906.89
10.02.06
m2
3.52
240.73
847.37
3.52
240.73
847.37
1.76
240.73
423.68
CAM-13
m2
4.40
260.29
1,145.28
4.40
260.29
1,145.28
4.40
260.29
1,145.28
CAM-60
10.03
10.03.01
10.03.02
10.03.06
10.04
10.04.01
10.04.02
10.04.05
10.04.07
10.04.08
10.04.09
11
11.01
BISAGRAS
11.01.01
11.02.01
11.02.02
11.02.03
12
12.01
12.02
12.04
13
13.01
13.02
13.03
13.04
13.05
14
14.01
14.02
14.03
15
15.01
15.01.01
15.02
15.02.01
15.02.02
15.02.05
15.02.06
15.02.07
15.03
15.03.01
15.04
15.04.01
15.04.02
15.04.04
15.04.05
15.04.06
15.04.07
15.05
15.05.01
15.05.02
15.05.03
15.06
15.06.01
15.06.02
15.06.03
15.06.04
15.06.05
15.06.06
15.06.07
15.06.08
11.02
m2
3.12
m2
m2
m2
10.56
6.85
9.87
62.24
55.69
56.77
657.25
381.48
560.32
10.56
3.90
4.94
62.24
55.69
56.77
657.25
217.19
280.44
12.32
4.32
4.94
ml
ml
m2
und
m
und
3.00
3.00
16.61
1.00
2.20
14.00
126.33
54.38
148.35
82.00
30.44
29.34
378.99
163.14
2,464.09
82.00
66.97
410.76
3.00
3.00
16.61
1.00
2.20
14.00
126.33
54.38
148.35
82.00
30.44
29.34
378.99
163.14
2,464.09
82.00
66.97
410.76
3.00
3.00
16.61
1.00
3.80
14.00
pza
36.00
12.00
432.00
36.00
12.00
432.00
36.00
pza
pza
und
8.00
5.00
10.00
70.00
100.00
8.00
560.00
500.00
80.00
8.00
5.00
10.00
70.00
100.00
8.00
560.00
500.00
80.00
8.00
5.00
10.00
p2
p2
und
179.56
15.80
3.00
6.27
5.13
30.00
1,125.84
81.05
90.00
179.56
15.80
3.00
6.27
5.13
30.00
1,125.84
81.05
90.00
179.56
15.80
3.00
m2
m2
m2
m2
m
371.20
256.25
111.50
35.00
103.20
14.72
14.37
10.88
14.44
3.71
5,464.06
3,682.31
1,213.12
505.40
382.87
371.20
256.25
111.50
35.00
103.20
14.72
14.37
10.88
14.44
3.71
5,464.06
3,682.31
1,213.12
505.40
382.87
371.20
256.25
111.50
35.00
103.20
m
m2
m2
20.00
30.00
5.27
16.46
64.16
57.66
329.20
1,924.80
303.87
20.00
30.00
5.27
16.46
64.16
57.66
329.20
1,924.80
303.87
20.00
30.00
5.27
49.00
11.86
581.14
49.00
11.86
581.14
49.00
pza
pza
pza
und
und
12.00
42.00
6.00
10.00
4.00
4.05
2.38
16.54
6.63
61.80
48.60
99.96
99.24
66.30
247.20
12.00
42.00
6.00
10.00
4.00
4.05
2.38
16.54
6.63
61.80
48.60
99.96
99.24
66.30
247.20
12.00
42.00
6.00
10.00
4.00
pto
8.00
90.90
727.20
8.00
90.90
727.20
8.00
pza
pza
und
und
und
und
20.00
6.00
6.00
6.00
5.00
18.00
3.84
4.14
4.64
5.14
3.93
2.48
76.80
24.84
27.84
30.84
19.65
44.64
20.00
6.00
6.00
6.00
5.00
18.00
3.84
4.14
4.64
5.14
3.93
2.48
76.80
24.84
27.84
30.84
19.65
44.64
20.00
6.00
6.00
6.00
5.00
18.00
m
m
pza
18.50
16.50
5.00
25.01
20.83
18.50
462.69
343.70
92.50
18.50
16.50
5.00
25.01
20.83
18.50
462.69
343.70
92.50
18.50
16.50
5.00
und
und
und
und
und
und
und
und
20.00
5.00
3.00
8.00
2.00
3.00
5.00
4.00
1.62
5.09
8.25
1.26
3.80
30.13
2.46
3.93
32.40
25.45
24.75
10.08
7.60
90.39
12.30
15.72
20.00
5.00
3.00
8.00
2.00
3.00
5.00
4.00
1.62
5.09
8.25
1.26
3.80
30.13
2.46
3.93
32.40
25.45
24.75
10.08
7.60
90.39
12.30
15.72
20.00
5.00
3.00
8.00
2.00
3.00
5.00
4.00
62.24
55.69
56.77
126.33
54.38
148.35
82.00
30.44
29.34
12.00
70.00
100.00
8.00
6.27
5.13
30.00
14.72
14.37
10.88
14.44
3.71
16.46
64.16
57.66
11.86
4.05
2.38
16.54
6.63
61.80
90.90
3.84
4.14
4.64
5.14
3.93
2.48
25.01
20.83
18.50
1.62
5.09
8.25
1.26
3.80
30.13
2.46
3.93
Metrado
1.02
Precio S/.
PRESUPUESTO P-112-241
Parcial S/.
Metrado
Precio S/.
PRESUPUESTO GENERAL
Parcial S/.
Metrado
Precio S/.
245.21
250.11
245.21
0.00
2.04
245.21
252.44
0.00
252.44
0.00
3.70
252.44
239.24
0.00
235.33
677.75
239.24
0.00
9.36
239.24
235.33
677.75
11.52
215.41
0.00
235.33
215.41
0.00
8.80
215.41
257.64
906.89
257.64
906.89
17.60
257.64
240.73
0.00
240.73
0.00
8.80
240.73
4.40
260.29
1,145.28
4.40
260.29
1,145.28
22.00
260.29
766.80
240.58
280.44
14.08
4.32
11.72
62.24
55.69
56.77
876.34
240.58
665.34
14.08
4.32
12.46
62.24
55.69
56.77
876.34
240.58
707.35
61.60
23.71
43.93
62.24
55.69
56.77
378.99
163.14
2,464.09
82.00
115.67
410.76
3.00
3.00
16.61
1.00
3.80
14.00
126.33
54.38
148.35
82.00
30.44
29.34
378.99
163.14
2,464.09
82.00
115.67
410.76
3.00
3.00
16.61
1.00
3.80
14.00
126.33
54.38
148.35
82.00
30.44
29.34
378.99
163.14
2,464.09
82.00
115.67
410.76
15.00
15.00
83.05
5.00
15.80
70.00
126.33
54.38
148.35
82.00
30.44
29.34
432.00
560.00
500.00
80.00
36.00
12.00
432.00
36.00
12.00
432.00
180.00
12.00
8.00
5.00
10.00
70.00
100.00
8.00
560.00
500.00
80.00
8.00
5.00
10.00
70.00
100.00
8.00
560.00
500.00
80.00
40.00
25.00
50.00
70.00
100.00
8.00
1,125.84
81.05
90.00
154.56
15.80
3.00
6.27
5.13
30.00
969.09
81.05
90.00
154.56
15.80
3.00
6.27
5.13
30.00
969.09
81.05
90.00
847.80
79.00
15.00
6.27
5.13
30.00
5,464.06
3,682.31
1,213.12
505.40
382.87
371.20
256.25
111.50
35.00
103.20
14.72
14.37
10.88
14.44
3.71
5,464.06
3,682.31
1,213.12
505.40
382.87
371.20
256.25
111.50
35.00
103.20
14.72
14.37
10.88
14.44
3.71
5,464.06
3,682.31
1,213.12
505.40
382.87
1,856.00
1,281.25
557.50
175.00
516.00
14.72
14.37
10.88
14.44
3.71
329.20
1,924.80
303.87
10.00
30.00
5.27
16.46
64.16
57.66
164.60
1,924.80
303.87
10.00
30.00
5.27
16.46
64.16
57.66
164.60
1,924.80
303.87
80.00
150.00
26.35
16.46
64.16
57.66
2.88
3.52
2.88
3.52
581.14
49.00
11.86
581.14
49.00
11.86
581.14
245.00
11.86
48.60
99.96
99.24
66.30
247.20
12.00
42.00
6.00
10.00
4.00
4.05
2.38
16.54
6.63
61.80
48.60
99.96
99.24
66.30
247.20
12.00
42.00
6.00
10.00
4.00
4.05
2.38
16.54
6.63
61.80
48.60
99.96
99.24
66.30
247.20
60.00
210.00
30.00
50.00
20.00
4.05
2.38
16.54
6.63
61.80
727.20
8.00
90.90
727.20
8.00
90.90
727.20
40.00
90.90
76.80
24.84
27.84
30.84
19.65
44.64
20.00
6.00
6.00
6.00
5.00
18.00
3.84
4.14
4.64
5.14
3.93
2.48
76.80
24.84
27.84
30.84
19.65
44.64
20.00
6.00
6.00
6.00
5.00
18.00
3.84
4.14
4.64
5.14
3.93
2.48
76.80
24.84
27.84
30.84
19.65
44.64
100.00
30.00
30.00
30.00
25.00
90.00
3.84
4.14
4.64
5.14
3.93
2.48
462.69
343.70
92.50
18.50
16.50
5.00
25.01
20.83
18.50
462.69
343.70
92.50
18.50
16.50
5.00
25.01
20.83
18.50
462.69
343.70
92.50
92.50
82.50
25.00
25.01
20.83
18.50
32.40
25.45
24.75
10.08
7.60
90.39
12.30
15.72
20.00
5.00
3.00
8.00
2.00
3.00
5.00
4.00
1.62
5.09
8.25
1.26
3.80
30.13
2.46
3.93
32.40
25.45
24.75
10.08
7.60
90.39
12.30
15.72
20.00
5.00
3.00
8.00
2.00
3.00
5.00
4.00
1.62
5.09
8.25
1.26
3.80
30.13
2.46
3.93
32.40
25.45
24.75
10.08
7.60
90.39
12.30
15.72
100.00
25.00
15.00
40.00
10.00
15.00
25.00
20.00
1.62
5.09
8.25
1.26
3.80
30.13
2.46
3.93
PRESUPUESTO P-117-252
Descripcin
Und.
15.07
CAMARA DE INSPECCION
15.07.01
15.07.02
15.08
15.08.01
15.08.02
15.08.03
15.08.04
15.08.05
15.08.07
15.08.08
15.08.09
15.08.10
15.08.11
16
16.01
CONDUCTORES ELCTRICOS
16.01.01
16.01.02
16.01.03
16.01.04
16.01.05
16.01.06
16.01.07
16.01.08
CAM-64
16.02
16.02.01
16.02.02
pto
pto
16.03
ARTEFACTOS ELCTRICOS
16.03.01
16.03.02
16.03.03
16.03.04
16.03.05
17
17.03
17.05
17.06
17.10
17.12
17.14
17.18
17.19
17.21
17.24
17.25
CAM-16
CAM-61
CAM-62
CAM-63
CAM-69
TOTAL PRESUPUESTO
Metrado
Precio S/.
Metrado
Precio S/.
PRESUPUESTO P-109-236
Parcial S/.
Metrado
1.00
84.62
31.50
10.00
5.00
7.00
1.00
1.00
2.00
2.00
1.00
1.00
0.20
2,683.68
3.00
2.00
137.87
120.00
413.61
240.00
3.00
2.00
137.87
120.00
413.61
240.00
3.00
2.00
pza
pza
pza
und
pza
pza
pza
pza
pza
pza
1.00
3.00
2.00
2.00
1.00
2.00
2.00
3.00
3.00
4.00
198.39
163.39
191.75
15.00
244.16
284.16
130.03
48.14
34.48
34.48
198.39
490.17
383.50
30.00
244.16
568.32
260.06
144.42
103.44
137.92
1.00
3.00
2.00
2.00
1.00
2.00
2.00
3.00
3.00
4.00
198.39
163.39
191.75
15.00
244.16
284.16
130.03
48.14
34.48
34.48
198.39
490.17
383.50
30.00
244.16
568.32
260.06
144.42
103.44
137.92
1.00
3.00
2.00
2.00
1.00
2.00
2.00
3.00
3.00
4.00
73.90
68.20
93.12
44.92
86.79
14.00
18.00
21.00
95.24
812.90
886.60
372.48
44.92
173.58
168.00
54.00
315.00
95.24
73.90
68.20
93.12
44.92
86.79
14.00
18.00
21.00
95.24
812.90
886.60
372.48
44.92
173.58
168.00
54.00
315.00
95.24
15.00
1.00
30.00
50.00
450.00
50.00
30.00
50.00
450.00
50.00
15.00
1.00
9.00
6.00
9.00
1.00
1.00
8.50
93.40
14.00
411.08
2,100.00
76.50
560.40
126.00
411.08
2,100.00
9.00
6.00
9.00
1.00
8.50
93.40
14.00
411.08
2,100.00
76.50
560.40
126.00
411.08
0.00
9.00
6.00
9.00
1.00
1.00
2.00
1.00
1.00
1.00
84.62
31.50
10.00
5.00
10.00
1.00
1.00
2.00
2.00
1.00
1.00
45.00
206.15
200.00
248.00
18.36
12.76
72.80
8.82
22.23
295.03
228.00
43.74
20.21
55.99
111.74
90.00
206.15
200.00
248.00
1,553.62
401.94
728.00
44.10
222.30
295.03
228.00
87.48
40.42
55.99
111.74
2.00
1.00
1.00
1.00
84.62
31.50
10.00
5.00
10.00
1.00
1.00
2.00
2.00
1.00
1.00
45.00
206.15
200.00
248.00
18.36
12.76
72.80
8.82
22.23
295.03
228.00
43.74
20.21
55.99
111.74
90.00
206.15
200.00
248.00
1,553.62
401.94
728.00
44.10
222.30
295.03
228.00
87.48
40.42
55.99
111.74
2.00
1.00
2,683.68
536.74
2,683.68
536.74
pto
pto
pto
pto
pto
pza
pza
pza
und
11.00
13.00
4.00
1.00
2.00
12.00
3.00
15.00
1.00
0.20
S/.
S/.
60,773.95
16,852.62
4,861.92
---------------82,488.48
11.00
13.00
4.00
1.00
2.00
12.00
3.00
15.00
1.00
15.00
1.00
0.20
S/.
S/.
61,044.74
16,927.71
4,883.58
---------------82,856.03
Precio S/.
137.87
120.00
198.39
163.39
191.75
15.00
244.16
284.16
130.03
48.14
34.48
34.48
73.90
68.20
93.12
44.92
86.79
14.00
18.00
21.00
95.24
30.00
50.00
8.50
93.40
14.00
411.08
2,100.00
45.00
206.15
200.00
248.00
18.36
12.76
72.80
8.82
22.23
295.03
228.00
43.74
20.21
55.99
111.74
und
und
PRESUPUESTO P-117-251
Parcial S/.
11.00
13.00
4.00
1.00
2.00
12.00
3.00
15.00
1.00
PRESUPUESTO P-102-221
Parcial S/.
PRESUPUESTO P-112-241
Parcial S/.
Metrado
Precio S/.
PRESUPUESTO GENERAL
Parcial S/.
Metrado
Precio S/.
3.00
2.00
137.87
120.00
413.61
240.00
3.00
2.00
137.87
120.00
413.61
240.00
15.00
10.00
137.87
120.00
198.39
490.17
383.50
30.00
244.16
568.32
260.06
144.42
103.44
137.92
1.00
3.00
2.00
2.00
1.00
2.00
2.00
3.00
3.00
4.00
198.39
163.39
191.75
15.00
244.16
284.16
130.03
48.14
34.48
34.48
198.39
490.17
383.50
30.00
244.16
568.32
260.06
144.42
103.44
137.92
1.00
3.00
2.00
2.00
1.00
2.00
2.00
3.00
3.00
4.00
198.39
163.39
191.75
15.00
244.16
284.16
130.03
48.14
34.48
34.48
198.39
490.17
383.50
30.00
244.16
568.32
260.06
144.42
103.44
137.92
5.00
15.00
10.00
10.00
5.00
10.00
10.00
15.00
15.00
20.00
198.39
163.39
191.75
15.00
244.16
284.16
130.03
48.14
34.48
34.48
73.90
68.20
93.12
44.92
86.79
14.00
18.00
21.00
95.24
0.00
0.00
0.00
44.92
0.00
168.00
54.00
315.00
95.24
73.90
68.20
93.12
44.92
86.79
14.00
18.00
21.00
95.24
0.00
0.00
0.00
44.92
0.00
168.00
54.00
315.00
95.24
33.00
39.00
12.00
5.00
6.00
60.00
15.00
75.00
5.00
73.90
68.20
93.12
44.92
86.79
14.00
18.00
21.00
95.24
30.00
50.00
450.00
50.00
15.00
1.00
30.00
50.00
450.00
50.00
75.00
5.00
30.00
50.00
8.50
93.40
14.00
411.08
2,100.00
76.50
560.40
126.00
411.08
0.00
9.00
6.00
9.00
1.00
8.50
93.40
14.00
411.08
2,100.00
76.50
560.40
126.00
411.08
0.00
45.00
30.00
45.00
5.00
2.00
8.50
93.40
14.00
411.08
2,100.00
45.00
206.15
200.00
248.00
18.36
12.76
72.80
8.82
22.23
295.03
228.00
43.74
20.21
55.99
111.74
90.00
206.15
0.00
248.00
1,553.62
401.94
728.00
44.10
111.15
295.03
228.00
43.74
40.42
55.99
111.74
45.00
206.15
200.00
248.00
18.36
12.76
72.80
8.82
22.23
295.03
228.00
43.74
20.21
55.99
111.74
90.00
206.15
0.00
248.00
1,553.62
401.94
728.00
44.10
111.15
295.03
228.00
43.74
40.42
55.99
111.74
10.00
5.00
2.00
5.00
423.10
157.50
50.00
25.00
37.00
5.00
5.00
8.00
10.00
5.00
5.00
45.00
206.15
200.00
248.00
18.36
12.76
72.80
8.82
22.23
295.03
228.00
43.74
20.21
55.99
111.74
2,683.68
536.74
2,683.68
536.74
1.00
2,683.68
450.00
50.00
76.50
560.40
126.00
411.08
2,100.00
90.00
206.15
0.00
248.00
1,553.62
401.94
728.00
44.10
155.61
295.03
228.00
87.48
40.42
55.99
111.74
536.74
S/.
Precio S/.
413.61
240.00
812.90
886.60
372.48
44.92
173.58
168.00
54.00
315.00
95.24
S/.
Metrado
63,205.82
17,526.97
5,056.47
---------------85,789.26
1.00
12.00
3.00
15.00
1.00
15.00
1.00
9.00
6.00
9.00
1.00
2.00
1.00
1.00
84.62
31.50
10.00
5.00
5.00
1.00
1.00
1.00
2.00
1.00
1.00
0.20
S/.
S/.
55,086.09
15,275.37
4,406.89
---------------74,768.35
1.00
12.00
3.00
15.00
1.00
2.00
1.00
1.00
84.62
31.50
10.00
5.00
5.00
1.00
1.00
1.00
2.00
1.00
1.00
0.20
S/.
S/.
54,476.05
15,106.21
4,358.08
---------------73,940.34
Proyecto:
Obra:
Cliente
Fecha
Lugar
00
00.01
01
01.01
OBRAS PROVISIONALES
Movilizacin para traslado de equipos herramientas a/d obra
TRABAJOS PRELIMINARES
Limpieza y fumigacion general (Incl. Eliminacion)
vje
6,400.00
glb
2,239.70
01.03
m2
4,091.38
01.04
glb
258.90
m2
und
ml
vent
pza
m2
und
und
und
und
und
und
und
m2
m2
341.64
463.08
72.00
111.90
105.60
1,822.60
420.69
300.50
726.75
636.00
1,928.30
129.10
334.90
676.14
1,424.80
m3
m2
m2
m2
ml
m2
1,648.99
288.10
1,327.50
2,629.89
1,884.80
378.40
m3
m3
741.48
215.83
m3
m3
m3
333.67
940.16
247.01
m3
2,638.25
m3
m2
m2
2,351.35
3,570.60
3,602.55
11/26/2012
PRESUPUESTO GENERAL
Descripcin
01.05
01.07
01.09
01.10
01.11
01.12
01.13
01.14
01.16
01.17
01.18
01.19
01.23
01.24
Und.
CAM-02
02
02.01
02.03
02.04
CAM-04
CAM-05
CAM-06
03
vidrio, de
accesorios
eliminacion)
Retiro
puerta yymarco
de madera (inc. Traslado y entrega al Area
de Servicios-San
juan) (inc. Eliminacion)
Retiro
de contrazocalos
Retiro de barrotes protectores de ventanas (Incl. Eliminacion)
Retiro de lavadero.(inc. Traslado y entrega al Area de Servicios-San
juan) de ceramico para pisos y muros en mal estado (Incl.
Retiro
Eliminacion)
Retiro de tina de ducha incluye retiro de mayolica existente (Incl.
eliminacion)
Retiro
de tendal existente
Desmontaje de luminarias y accesorios (Focos, fluorescentes
circulares o lineales
inc. Cableria
Desmontaje
de aparatos
electricosy eliminacion)
(Tomacorrientes, Interruptores,
soquetes entre
similares
inc. Cableria
y eliminacion)
Desmontaje
de otros
Aparatos
sanitarios
(Inc. Acarreo
y entrega al Area de
sevicios
San
juan)
Desmontaje de Tableros Electricos (Inc. Eliminacion)
Desmontaje de therma y campana (Inc. Acarreo y entrega al Area de
sevicios - Sandejuan)
Desmontaje
cobertura eternit gran onda techo inc. elementos de
fijacinde
(inc.
Acarreo
eliminacion al almacen 5)
Retiro
vinilico
(inc.yEliminacion)
DEMOLICIONES Y PICADOS DE CONCRETO Y BLOQUETAS EN
MAL ESTADO
Demolicin
de concreto armado (inc.acarreo, hasta 10mt de distancia)
Demolicion de muro de bloquetas c/acero estructural (Incluye acarreo)
Demolicin de pisos de concreto incluye falso piso c/equipo
Picado de cielo raso para dejar libre acero corroido e=5cm
Perfilado de viga de borde alero c/Equipo
Picado de estructuras de concreto en losa para adehrencia de
sobrecarga
MOVIMIENTO DE TIERRAS
03.01
EXCAVACIONES
03.01.01
03.01.05
03.02.01
03.02.02
CAM-55
03.03
ELIMINACION DE MATERIAL
03.03.01
04
04.01
PISOS Y PAVIMENTOS
04.01.01
04.01.03
04.01.04
05
05.01.
REPARACION DE MUROS
05.01.01
05.01.02
05.01.03
05.01.04
05.03.02
05.03.03
06
06.02
07
07.01
07.02
07.03
07.04
08
08.01.
TARRAJEOS Y VESTIDURAS
08.01.01
08.01.02
CAM-08
10
10.02
CAM-56
03.02
05.02
05.02.01
05.03.
Parcial S/.
750.00
3,363.00
7,000.00
1,500.00
541.45
250.00
6,820.00
191.80
1,067.12
2,876.88
1,145.25
2,446.15
m2
m
m
7,871.00
3,116.47
960.00
m2
734.05
CAM-57
m2
234.69
CAM-58
m2
330.19
PRESUPUESTO GENERAL
Descripcin
00
CAM-59
Und.
Parcial S/.
CAM-10
OBRAS
ProvisionPROVISIONALES
y colocacion de ventanas / madera tornillo / Incl. Pintado, riel
o bisagra (0.85x1.20m)
Provision y colocacion de ventanas / madera tornillo / Incl. accesorios
de 1.85x1.0m
Provision y colocacion de ventanas / madera tornillo / Incl. accesorios
de 2.4x1.3m
Provision y colocacion de ventanas / madera tornillo / Incl. accesorios
de 1.2x1.2m
CAM-12
m2
1,895.61
10.02.05
m2
4,534.46
10.02.06
m2
2,118.42
CAM-13
m2
5,726.38
m2
m2
m2
3,833.98
1,320.41
2,493.91
ml
ml
m2
und
m
und
1,894.95
815.70
12,320.47
410.00
480.95
2,053.80
pza
2,160.00
pza
pza
und
2,800.00
2,500.00
400.00
p2
p2
und
5,315.71
405.27
450.00
m2
m2
m2
m2
m
27,320.32
18,411.56
6,065.60
2,527.00
1,914.36
m
m2
m2
1,316.80
9,624.00
1,519.34
CAM-9
CAM-60
10.03
10.03.01
10.03.02
10.03.06
10.04
10.04.01
10.04.02
10.04.05
10.04.07
10.04.08
10.04.09
11
11.01
BISAGRAS
11.01.01
11.02.01
11.02.02
11.02.03
12
12.01
12.02
12.04
13
13.01
13.02
13.03
13.04
13.05
14
14.01
14.02
14.03
15
15.01
15.01.01
15.02
15.02.01
15.02.02
15.02.05
15.02.06
15.02.07
15.03
15.03.01
15.04
15.04.01
15.04.02
15.04.04
15.04.05
15.04.06
15.04.07
15.05
15.05.01
15.05.02
15.05.03
15.06
15.06.01
15.06.02
15.06.03
15.06.04
15.06.05
15.06.06
15.06.07
15.06.08
11.02
m2
500.23
m2
934.03
m2
2,239.29
m2
2,711.00
2,905.70
pza
pza
pza
und
und
243.00
499.80
496.20
331.50
1,236.00
pto
3,636.00
pza
pza
und
und
und
und
384.00
124.20
139.20
154.20
98.25
223.20
m
m
pza
2,313.43
1,718.48
462.50
und
und
und
und
und
und
und
und
162.00
127.25
123.75
50.40
38.00
451.95
61.50
78.60
PRESUPUESTO GENERAL
Descripcin
00
15.07
OBRAS PROVISIONALES
CAMARA
DE INSPECCION
15.07.01
15.07.02
15.08
15.08.01
15.08.02
15.08.03
15.08.04
15.08.05
15.08.07
15.08.08
15.08.09
15.08.10
15.08.11
16
16.01
CONDUCTORES ELCTRICOS
16.01.01
16.01.02
16.01.03
16.01.04
16.01.05
16.01.06
16.01.07
16.01.08
CAM-64
16.02
16.02.01
16.02.02
16.03
ARTEFACTOS ELCTRICOS
16.03.01
16.03.02
16.03.03
16.03.04
16.03.05
17
17.03
17.05
17.06
17.10
17.12
17.14
17.18
17.19
17.21
17.24
17.25
CAM-16
CAM-61
CAM-62
CAM-63
CAM-69
Und.
Parcial S/.
und
und
2,068.05
1,200.00
pza
pza
pza
und
pza
pza
pza
pza
pza
pza
991.95
2,450.85
1,917.50
150.00
1,220.80
2,841.60
1,300.30
722.10
517.20
689.60
pto
pto
pto
pto
pto
pza
pza
pza
und
2,438.70
2,659.80
1,117.44
224.60
520.74
840.00
270.00
1,575.00
476.20
pto
pto
2,250.00
250.00
382.50
2,802.00
630.00
2,055.40
4,200.00
TOTAL PRESUPUESTO
450.00
1,030.75
400.00
1,240.00
7,768.12
2,009.70
3,640.00
220.50
822.51
1,475.15
1,140.00
349.92
202.10
279.95
558.70
2,683.68
S/.
294,586.65
S/.
81,688.88
23,566.93
---------------399,842.46