Anda di halaman 1dari 47

Peter Jones Head of Technology ABB

peter.r.jones@gb.abb.com

BorWin 1
BWEA 31
ABB Group September 08 Slide 1

The Worlds First 400 MW HVDC Light connection for wind power
21 October 2009

The Project

ABB Group September 08 Slide 2

BorWin 1, 400 MW HVDC Light


400 MW Offshore converter

125 km sea cable

First HVDC Wind Power Connector Contract Sep 2007 Completion Nov 2009

75 km land cable

400 MW converter

ABB Group September 08 | Slide 3

BorWin 1 Project

Customer

transpower offshore gmbh


(former E.ON Netz Offshore GmbH, Germany)

Scope
400 MW HVDC Light system off-shore station on platform with sub-sea structure Onshore station at E.ON substation Diele Telecommunication Control and protection

Cables
DC cable submarine (2x125km) DC cable on land (2x75km) Fibre optic cable (200 km)

ABB Group September 08 | Slide 4

The Platform

ABB Group September 08 Slide 5

BorWin 1 Overview of platform layout


Helipad Topside Transformers

Crane

Piles J-Tubes

Jacket

ABB Group September 08 | Slide 6

BorWin 1

Topside

weight approx 3200 t

Size

approx 50 x 33,5 x 22 m weight 1700 t 62 m

Jacket

Height

Sea

level to topside 20 m

ABB Group September 08 | Slide 7

BorWin 1
Topside

and jacket verified, witnessed and approved by Germanische Lloyd according to the German rules & regulations for the platform has to be obtained from BSH before start of installation & operation

Permits

ABB Group September 08 | Slide 8

BorWin 1 Fabrication at Heerema, Vlissingen, Deck elevation east February 2009

ABB Group September 08 | Slide 9

BorWin 1 Fabrication at Heerema, Vlissingen, Jacket structure roll-up April 2009

ABB Group September 08 | Slide 10

BorWin 1 Fabrication at Heerema, Vlissingen, Topside roll out May 4, 2009

ABB Group September 08 | Slide 11

BorWin 1, 400 MW HVDC Light

ABB Group September 08 | Slide 12

BorWin 1 Jacket in place

ABB Group September 08 | Slide 13

BorWin 1 Jacket installation

ABB Group September 08 | Slide 14

BorWin 1 Various weather at BorWin Alpha site

ABB Group September 08 | Slide 15

BorWin 1 Platform in Place

ABB Group September 08 | Slide 16

BorWin 1 Top deck from helicopter August 2009

ABB Group September 08 | Slide 17

BorWin 1 Installation of additional cables September 2009

ABB Group September 08 | Slide 18

The Onshore HVDC Converter

ABB Group September 08 Slide 19

Diele - Onshore site Diele Onshore HVDC Light station


AC Filter Yard

Reactors Valves Power Transformer Chopper

Cooling Units DC Filter Yard


ABB Group September 08 | Slide 20

Diele - Onshore site Earth work early September 2008

ABB Group September 08 | Slide 21

Diele - Onshore site Converter building January 2009

ABB Group September 08 | Slide 22

Diele - Onshore site Installation of valve and control enclosures April 2009

ABB Group September 08 | Slide 23

Diele - Onshore site Transformer transport

ABB Group September 08 | Slide 24

Diele - Onshore site Chopper resistors

ABB Group September 08 | Slide 25

Diele - Onshore site Overview of substation

ABB Group September 08 | Slide 26

Onshore and Offshore Cable

ABB Group September 08 Slide 27

BorWin 1 HVDC Light cable


121

km sea cable (1200 mm2 Cu) km Wadden Sea, Norderney and Ems (1600 mm2 Cu) km land cable (2300 mm2 Al)

8,4

73,6

ABB Group September 08 | Slide 28

BorWin 1 Cable 125km Offshore route

ABB Group September 08 | Slide 29

BorWin 1 Cable Part of submarine cable


Waiting for installation March 2009

ABB Group September 08 | Slide 30

BorWin 1

Cable Team Oman installation vessel for submarine cables

ABB Group September 08 | Slide 31

BorWin 1 Waiting for the Weather

ABB Group September 08 | Slide 32

The image cannot be displayed. Your computer may not have enough memory to open the image, or the image may have been corrupted. Restart your computer, and then open the le again. If the red x still appears, you may have to delete the image and then insert it again.

BorWin 1 Cable Onshore route

ABB Group September 08 | Slide 33

BorWin 1 Cable Installation of land cable

Cable pieces
150 cm

Approx. 750 m cable per drum Approx. weight 10 t per drum

Cable protection

Standard

ABB Group September 08 | Slide 34

BorWin 1 Cable Installation LK Aurich


Excavating trenches: summer 2008

ABB Group September 08 | Slide 35

BorWin 1 Cable Installation LK Aurich


Installation of land cable: summer 2008

ABB Group September 08 | Slide 36

BorWin 1 Cable Installation LK Aurich


Cable jointing cubicle: summer 2008

ABB Group September 08 | Slide 37

BorWin 1 Cable Installation LK Aurich


Cable jointing: summer 2008

ABB Group September 08 | Slide 38

BorWin 1 Cable Installation


Drilling rig for river Ems crossing: autumn 2008

ABB Group September 08 | Slide 39

BorWin 1 Cable Installation


Welded steel pipes for river Ems Crossing: autumn 2008

ABB Group September 08 | Slide 40

BorWin 1 Cable Trenching equipment Excalibur

ABB Group September 08 | Slide 41

BorWin 1 Cable Installation at Wadden Sea

ABB Group September 08 | Slide 42

BorWin 1 Cable Installation at Wadden Sea

ABB Group September 08 | Slide 43

BorWin 1 Cable Installation at Wadden Sea

ABB Group September 08 | Slide 44

BorWin 1 Cable Installation at Wadden Sea

ABB Group September 08 | Slide 45

BorWin 1 Cable Installation at Wadden Sea

ABB Group September 08 | Slide 46

ABB Group September 08 | Slide 47