MINUTES OF MEETING

DATE: TIME: VENUE: PRESENT: 19/01/2013 1300 - 1500 SIM HQ ANNEX KHOO JUN XIANG (Leader) ANG WEN CAN STEPHEN GOH KHENG SIANG JOEL LIM SING HUI LOW JIA HUI JETHRO

OPENING: Sing Hui recorded the minutes. AGENDA: 1. Brief Introduction of Agenda 2. Actions from last minutes 3. Implementation 4. Current Situation 5. Update Summary 6. Arrangement of Next Meeting 7. Any other matters 8. End of Meeting Items 1 Presentation Of Agenda Jun Xiang addressed the group with current progress. All to note Actions to be taken

Actions from last minutes Delegated tasks from previous minutes are completed. All to note

Implementation All administration pages and functionalities are finalized. Hash function for password using MD5 is done and checked. Validation for all textboxes are done and checked. Implement on Make Queries and generating of reports is in progress. We are stuck in using result generated to create a report. Researching on how to export report to excel files instead of text document. JiaHui, Jun Xiang

Current Situation Submitted deliverables of System Test Plan and Progress Report
including the Minutes of Meeting and Project Diary. There is a need to arrange a meet up next week with our supervisor Mr Jappit to review on the submitted progress report. Arrangement will be made over this weekend. The team is to carry out the Integration Test and produce the User Manual for the system. Integration test will produce test script and test cases documents. Results of testing will be shown in test log and test result documents. User manual will be an improvement of our preliminarily user manual with all the screenshots and description. Deliverable: User Manual (9 February 2013).

All to take note

Update Summary To focus on Coding of Program, Integration Test and producing of User Manual. Coding of Program JunXiang, JiaHui Integration Testing Joel, Stephen User Manual Singhui, JunXiang, JiaHui All to take note

Arrangement of Next Meeting Next meeting will be held o Thursday, 24/01/2013 Location: SIM Annex Time: 1300 Members must inform group leader to request for change of date and/or timing. Nil

7 8

Any other matters Nil End of Meeting The meeting ended at 15:00

Item

Action Item

Date Added

Assigned To

Date Due

Status

A1-01 A1-02 A1-03 A1-04 A1-05 A1-06 A1-07 A1-08 A1-09 A1-10 A1-11 A1-12 A1-13 A1-14 A1-15 A1-16 A1-17 A1-18 A1-19 A1-20 A1-21 A1-22 A1-23 A1-24 A1- 25 A1-26 A1-27 A1-28 A1-29

Project Diaries Members Profile Literature review on proposal Development of Project Website Proposal Draft 1 Introduction, Project Scope Stakeholder, Development Methodology Project Team, Project Website Control Records, Test Plan Introduction of Requirement Specification Update Objective, Scope and Problem Limitation Project Proposal Introduction & Glossary General Description Requirements Definition Main Constraints Proofread all the documents Redo of prototype Review on feedbacks from Accessor on 29/12/2012 prototype demonstration Download QT creator from website - Understand the basics usage of QT creator Implement codes and establish connection Design UI interface Research on System Test Plan Progression and implementation of prototype Drafting out System Test Plan Finalized on all Test Plan documents Proofread the System Test Plan, Minutes, Project Diaries and coding progress Preliminarily user manual (Admin) Test cases documents

20/10/2012 20/10/2012 20/10/2012 30/10/2012 20/10/2012 08/11/2012 08/11/2012 08/11/2012 08/11/2012 08/11/2012 23/11/2012 20/10/2012 08/12/2012 08/12/2012 08/12/2012 08/12/2012 26/12/2012 26/12/2012 30/12/2012 30/12/2012 30/12/2012 30/12/2012 30/12/2012 30/12/2012 10/01/2013 17/01/2013 17/01/2013 19/01/2013 19/01/2013

Everyone Everyone Everyone Joel Everyone JunXiang SingHui Stephen Joel JiaHui Everyone Everyone JiaHui JiaHui Everyone Everyone Everyone Everyone Everyone Everyone Jia Hui, Jun Xiang Sing Hui, Jun Xiang Joel, Stephen Everyone Joel, Stephen Joel, Stephen Everyone SingHui, Jun Xiang, Jiahui Joel, Stephen

On-going 08/11/2012 04/11/2012 04/11/2012 26/12/2012 23/11/2012 23/11/2012 08/11/2012 23/11/2012 23/11/2012 26/11/2012 08/12/2012 25/12/2012 25/12/2012 25/12/2012 25/12/2012 29/12/2012 29/12/2012 10/01/2013 30/12/2012 10/01/2013 10/01/2013 10/01/2013 01/02/2013 14/01/2013 19/01/2013 19/01/2013 24/01/2013 24/01/2013

Open Close Close Close Close Close Close Close Close Close Close Close Close Close Close Close Close Close Close Close Close Close Close Open Close Close Close Open Open