Prestressing platforms
Bridges
Gaz reservoirs
Silos
product information
1. BRIDGES
Suez Bridges
ref. prod. inf. Contractor: ARAB CONTRACTORS (Egypt) Technical: FREYSSINET (Egypt) No. of platforms: 1 Capacity of platform: 1.5 t Weight of jacks: 350 kg Lifting points: 2 TIRFOR TU-16H, reeved with multiple sheave blocks General Contractor: TRAVAUX S.A. (Belgium) Technical: Laboratoire de Cinmatique (Subsidiary of Freyssinet) No. of platforms: 2 Capacity of each platform: 2 t Weight of jacks: 350 kg Lifting points: 2 TIRFOR TU-32H, reeved with multiple sheave blocks M-605
MC/805
product information
2. SILOS
ref. prod. inf. General Contractor: ARAB CONTRACTORS (Egypt) Technical: FREYSSINET No. of platforms: 4 Capacity of each platform: 1.5 t Weight of jacks: 250 kg Lifting points: 4 TIRFOR TU-16H General Contractor: ARAB CONTRACTORS (Egypt) Technical: DYWIDAG No. of platforms: 2 Capacity of each platform: 2 t Weight of jacks. 500 kg Lifting points: 4 TIRFOR TU-32H No. of access platforms: 2, fitted with TIRAK hoists. General Contractor: ARAB CONTRACTORS (Egypt) Technical: DYWIDAG No. of platforms: 2 t Weight of jacks: 500 kg Lifting points: 4 TIRFOR TU-32H No. of access platforms: 2, fitted with TIRAK hoists General Contractor: VOEST (Austria) Civil Engineering Contractor: SIX CONSTRUCT (Belgium) Technical: DYWIDAG No. of platforms: 4 Capacity of each platform: 1.5 t Weight of jacks: 300 kg Lifting points: 4 TIRFOR TU-16H No. of access platforms: 4 (fitted with TIRAK hoists) General Contractor: SIX CONSTRUCT (Belgium) Technical: DYWIDAG No. of platforms: 4 Capacity of each platform: 1.5 t Weight of jacks: 300 kg Lifting points: 4 TIRFOR TU-16H No. of access platforms: 4 (fitted with TIRAK hoists) General Contractor: HELDE and FRANKE (Germany) Technical: HELDE and FRANKE No. of platforms: 8 Capacity of each platform: 1.5 t Weight of jacks: 750 kg No. of access platforms: 8 (fitted with TIRAK hoists) General Contractor: SMIDTH (Denmark) Civil Engineering Contractor: SIX CONSTRUCT (Belgium) Technical: V.S.L. No. of platforms: 4 Capacity of each platform: 1300 kg Weight of jacks: 70 kg Lifting points: 2 TIRAK T-1000 hoists, reeved with multiple sheave blocks
M-263
M-146
Ciment Franais (Beaucaire, France) Contractor: REYDEL Technical: CIPEC Lifting points: 2 TIRAK T-1000 hoists
MC/805
product information
3. GAS RESERVOIRS
ref. prod. inf. General Contractor: Chicago Bridge and Iron (USA) Civil Engineering Contractor: SPIE - BATIGNOLLES Technical: Freyssinet No. of platforms: 8 Capacity of each platform: 5 t Weight of jacks: 2.5 t Lifting points: 2 TIRFOR TU-32H reeved with multiple sheave blocks No. of access cradles: 8 (fitted with TIRAK hoists)
M-262
Zeebrugge Port Terminal (Belgium) General Contractor: TRACTIONEL (Belgium) Civil Engineering Contractor: SBBM (Belgium) Technical Laboratoire de Cinmatique (Subsidiary of Freyssinet) No. of platforms: 6 Capacity of each platform: 3 t Weight of jacks: 750 kg Lifting points: 4 TIRFOR TU-32H M-261 Pyeong Taek (South Korea) General Contractor: TECHNIGAZ Technical: FREYSSINET No. of platforms: 6 Capacity of each platform: 1 t Weight of jacks: 350 kg Lifting points: 2 TIRAK T-1000 hoists, reeved with multiple sheave blocks Contractor: AGROMAN, Empresa Constructora S.A. Technical: FREYSSINET No. of platforms: 3 Capacity of each platform: 3 t. Lifting points: 9 TIRFOR TU-16H
M-400
MC/805
product information
Contractor: Laboratoire de Cinmatique (Subsidiary of Freyssinet) Technical: Freyssinet No. of platforms: 6 Capacity of each platform: 5 t Weight of jacks: 1.6 t Lifting points: 4 TIRFOR TU-32H M-237 Contractor: GTM Technical GPN - Freyssinet No. of platforms: 2 Capacity of each platform: 6 t. Weight of jacks: 2.5 t Lifting points: 4 TIRFOR TU-32H Contractor: EWING - BURKE (USA) Technical: PRESCON (Subsidiary of Freyssinet)
Belleville (France)
MC/805
product information
bridge construction
Handling an overhead gantry. New Baldwin motorway bridge, Saybrook, Connecticut/USA. Joint-venture PERINI / PCL / C & G. 2 hydraulic TIRAK T-3000 hoists.
The new 770 m Baldwin motorway bridge over the Connecticut river at Saybrook and Old Lyne has been built using a new method of post-tensioned pre-cast segmental concrete. The system used an overhead gantry to transport and position the prefabricated segmental concrete sections amongst the heaviest and widest ever used for balanced cantilever construction. The 2 hydraulic TIRAK T-3000 hoists were used for handling the overhead gantry. These large 3 tonne capacity hoists operated in both directions for achieving the necessary to-and-fro movements to position the segments. The pulling effort was checked by 2 DYNAFOR load indicators with remote display mounted in the crane cabin. The 2 post-tensioning platforms were lifted and lowered by 2x2 TIRAK T-1000 machines reeved on 4 parts of wire rope (photo PA556.2).
PA556.1
PA556
MC1317
product information
bridge construction
Application:
Positioning and pre-stressing prefabricated bridge sections. Site: Viaduct over the river Recht, for the Verviers to Prm motorway, Belgium. General contractor: Travaux S.A. Prestressing technique: Laboratoire de Cinmatique (Freyssinet subsidiary company). Equipment: 2 special pre-stressing platforms, 2000 kg capacity, each fitted with 2 hydraulic TIRFOR TU-32H machines, mounted in a multiple sheave system, and 2 prestressing rams. Description of application: The platforms are freely suspended from and are able to traverse along the construction beam. They are used for: a) Transporting the personnel and materials to the working position during the positioning and pre-stressing of the prefabricated bridge sections (weight: 54 tonnes). These are transported and positioned using the guyed construction beam; total length 94 m. b) Positioning the pre-stressing rams (weight: 350 kg) using a chain hoist which traverses along a fixed jib on the platform.
PA112.10
MC1314
product information
Application: Prestressing work (Freyssinet system) on gazometers. Site: Liquid Natural Gaz reservoir (LNG), Das Island, Abu-Dhabi Customer: Freyssinet International Boulogne-Billancourt/France Building owner: Abu Dhabi National Oil Corporation Equipment: 8 special double-deck prestressing platforms (11,40 m long, cap. 5,400 kg) each equipped with: 2 hydraulic TIRFOR TU32H machines, 1 two-way power pack, 4 safety devices BLOCSTOP BS 35.30, 2 reeved suspension wire ropes 88 m long, 4 safety wire ropes 44 m long, 4 manual chain hoists 1,500 kg for handling the tensioning jacks, 1 access cradle (ALTA-Mono) with 1 TIRAK T-500, 1 safety device BLOCSTOP BS 15.301, 2 safety wire ropes 45 m long. 8 suspension brackets. Description of application: The work is to prestress the safety cement walls which surround the metallic reservoirs. The eight double deck platforms enable the installation of the prestressing ropes and the tensioning jacks on the eight rigs simultaneously. The installation of prestressing ropes takes place at the upper level whereas the tensioning takes place at the lower level of the platform. The platform move along the rigs. They are manoeuvred by two reeved TIRFOR TU-32H and fitted with a suspension beams' system and with chain hoists for handling the tensioning jack (500 kg).
PA161.9
PA161.15
MC729
product information
drawing 811008B/03
SUSPENSION BRACKET
PA161.8
1850
The small cradle designed for 3 people gives access to the bigger platform to which it is suspended whatever the working level. It is manoeuvred with 1 TIRAK T-500, speed 9 m/min. PA161.19
TIRAK T-500 BLOCSTOP BS 15.301 safety device overload safety device electric winder ACCESS CRADLE
MC729
3300
TIRFOR TU-32H
product information
drawing 811008B/03
ladder 4700
TIRFOR TU32H
4650
hydraulic pack
MC729
product information
MC729
product information
Application: Presterssing work (Freyssinet system) on 3 liquid gas tanks Site: Zeebrugge port/Belgium Customer: Laboratoire Cinmatique, Bruxelles Equipment: 6 special prestressing platforms each fitted with: 4 hydraulic TIRFOR TU-32H, 1 four way power pack, 4 safety devices BLOCSTOP BS 35.30, 1 electric trolley for the manoeuvring of the tensioning jack, 8 suspension and safety wire ropes, 40 m long. 6 suspension systems. Description of application: Problem: The work consists in tensioning the prestressing wire ropes on the inner part, cutting the extra length of the ropes and injecting a protective cement to prevent corrosion. Each part is fitted with 3 ribs. Inner part: height 22.30 m, diam. 75.80 m. Outer part: height 14 m, diam. 85.80 m. Solution: The contractor has used the same platforms as for the Nuclear Plant in Thiange (se M-237). They had been previously mended and modified for this new application. The platforms are suspended to special suspension system. They move in tandem along the ribs. They have three functions: lifting personnel and material up to the working position; operating on the left and right of each rib for the placement of the prestressing ropes and tensioning jacks; handling the tensioning jacks (weight 750 kg) by means of an electric trolley which moves along a mobile beam. A metallic frame construction is needed to support the beam, which is an integral part of the platform.
PA196.18
PA196.7
PA196.14
MC728
product information
+ 22,32
+ 14,00
+ 8,00
7,00
PA196.9
120 120
1000
1000
R 36900 900 R 41
120 Nervure 3 Rib 3 Nervure 2 Rib 2
MC728
4000
product information
Application: Prestressing work (Freyssinet system) on a gas reservoir. Site: ENFERSA factory, Cartagena S.A./Spain. Contractor: AGROMAN, Empresa Constructora S.A. Equipment: 3 x 10 m prestressing platforms, capacity 3000 kg, each fitted with 3 hydraulic TIRFOR TU-16H machines, controlled from a power pack, 3 BLOCSTOP safety devices and 6 x 40 m wire ropes. 9 stirrups suspended from trollies to allow movement of the platforms. 3 hoists for manoeuvring the prestressing jacks. Description of application: It was necessary to prestress the concrete safety ring which circled the metal reservoir. The 3 platforms allowed the work to continue simultaneously on the 3 seams for fitting and tensioning the horizontal wire ropes. For work on the ledge, the platforms had to be slightly reversed using the trollies on the suspension stirrups.
PA309.3
PA309.1
MC957
product information
Application: Post tensioning work (DYWIDAG system) on concrete silos Site: Hassioud Cement Plant, Egypt Customer: The Arab Contractor Osman Ahmed Osman, Cairo Equipment: 2 special prestressing platforms each equipped with: 4 hydraulic TIRFOR TU-32H, 1 four-way power pack, 4 BLOCSTOP safety devices 2x4 safety and suspension wire ropes 4 suspension brackets Description of application: In the present application the platforms have been designed for prestressing work according to the conception of the German specialised Co. DYWIDAG. Only one mobile beam is used for handling the tensioning jack giving access to the wire ropes, either on the right or left rig. This suspension beam is moved manually along two rails and is telescopic so that accurate positioning of the jack is possible. The platforms are fixed to the suspension brackets which are anchored at the top of the silo.
PA117.5
PA117.1
PA117.2
MC730
product information
drawing 810101/B/01
TIRFOR TU32H
2805 3390
2805 3390
2000
B
1200 1600
Coupe B B
Blocstop
PA117.7
MC730
product information
Application: Post tensioning of cement silos (Freyssinet system) Site: Suez Cement Company, Suez/Egypt Customer: The Arab Contractors Osman Ahmed Osman, Cairo/Egypt Equipment: 4 special ALTA platforms, length 8 m, width 1.56 m, each fitted with: 4 motorised TIRFOR TU-16H machines 1 four-way power pack 4 BLOCSTOP BS 20.301 safety devices 8 wire ropes C12, 80 m long 2 overhead trolleys Description of application: Problem: The tensioning of the prestressing ropes of 5 silos (3 for clinker material and 2 for homogenisation) to the new SUEZ CEMENT COMPANY plant. The silos are 76 m high. After the tensioning, the extra lengths of the ropes have to be cut, and to prevent corrosion, a protective cement is injected. Solution: The use of 4 supporting platforms equipped with 4 PA101.8 motorised TIRFORs which move up and down 4 ribs outside the silo wall. These platforms have 2 functions: a) lifting personel and material up to the working level where they can operate simultaneously on the left and on the right of each rib for the placement of the prestressing ropes and tensioning jacks, b) handling the tensioning jacks by means of 2 chain-blocks (250 kg capacity) which are suspended from a trolley running on a I-beam. A metallic frame construction is needed to support the I-beam, which is an integral part of the platform.
mobile beam wire rope bundle 4 way hydraulic power pack 8000 800 chain hoist 250 kg
TIRFOR TU16H
flooring
0 00 17
suspension
1800
BLOCSTOP
MC495
product information
Application: Pestressing work (Freyssinet conception) at a power station Site: Tihange power station/Belgium Customer: Laboratoire de Cinmatique, Brussels Equipment: 6 special prestressing platforms dim. 5x2 m, each equipped with: 4 hydraulic TIRFOR TU-32H 1 four-way power pack 4 BLOCSTOP safety devices 1 electric pulley block for handling the tensioning jack.
Description of application: Problem: The work consists of tensioning the prestressing wire ropes on the inner part, cutting the extra length of the ropes and injecting a protective cement to prevent corrosion. Solution: The platforms move two by two along the ribs. They have three functions: lifting personnel and materials up to the working level working on the left and on the right of each rib for the positionning of the prestressing ropes and tensioning jacks, handling of the tensioning jacks (weight 1600 kg) by means of an electric pulley block which moves along a mobile beam (PA107.18). A metallic frame construction is needed to support the beam. It is an integral part of the platform. The platforms come in from the top by means of a crane (PA107.16/19).
PA107.14
PA107.21
PA107.18
MC709
product information
PA107.19
PA107.16
MC709