OPERNS.
REV. NO.
DATE JOB/EWO
1.01 1.02 1.03 1.04 1.05 1.06 1.07 1.08 1.09 1.10 1.11
Reference Standards Related Sections Environmental Protection Control General Provisions Protection of Natural Resources Erosion and Sediment Control Measures Control and Disposal of Chemical Waste Disposal of Rubbish and Debris Air Control Noise Controls Rodent Control
PART 1 - GENERAL 1.01 A. B. Reference Standards Saudi Aramco Sanitary Code. Saudi Aramco Engineering Standards (SAES): 1. 2. 3. 4. SAES-A-104, Wastewater Treatment, Reuse and Disposal. SAES-A-105, Noise Control. SAES-A-111, Borrow Pit Requirements. SAES-S-007, Solid Waste Landfill Standard. 5. SAES-A-102, Air Pollutant Emission Source Control.
DISCIPLINE ENGINEER
__ ________ _ DATE: ________
PROJECT ENGINEER
____________ DATE
CERTIFIED _ __________
DATE: ________
CONSTRUCTION AGENCY
________________ DATE:
OPERATIONS
______________ DATE:_________ REVISION CERTIFICATION EDSD VERIFICATION THIS INDICATES THAT REV. NO.________ OF THIS DRAWING IS COVERED, FOR ALL APPROVAL/CERTIFICATION REQUIREMENTS,, CONTROL NUMBER BY DRAWING COMPLETION CERTIFICATE (DCC) NO.: __________________________ By:
C. Supply Chain Management (SCM) Instruction CU 22.03 Processing and Handling of Hazardous Material.
Date:
D. E.
SASC Saudi Aramco Sanitary Code. F. SAEP-327 Disposal of Wastewater from Cleaning, Flushing and Dewatering Pipelines and Vessels.
Section 01560
CONSTRUCTION SPECIFICATIONS
KAUST TOWN CENTER RESIDENTIAL & COMMUNITY SUPPORT BUILDINGS
DRAWING NO.
DOC K55 A
VE-417361 BI-25-00002
RABIGH
SAUDI ARABIA
JOB/EWO#
1 OF 7
00
15-Sep-07
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
DESCRIPTION
ENGG
CERT
PMT
DATE JOB/EWO
DESCRIPTION
A.
4.
REV. NO.
5. 6.
DISCIPLINE ENGINEER
__ ________ _ DATE: ________
7. 1.04 A.
PROJECT ENGINEER
____________ DATE
General Provisions The Contractor shall provide and maintain environmental protection as defined herein. The Contractor's operation shall comply with all Saudi Aramco, Saudi Arabian, and local laws, ordinances and regulations pertaining to environmental protection. Compliance of subcontractors with the provisions of this and various other sections of these specifications shall be the responsibility of the Contractor. The Contractor shall not use equipment from which factory-installed anti-pollution and noise control devices have been removed or rendered ineffective through lack of proper maintenance. The Contractor shall confine his on-site construction activities to areas defined by the Drawings and Specifications and as directed by Saudi Aramco Representative. F. Contractor shall develop and implement an accident prevention program and shall submit the program to Saudi Aramco for approval.
CERTIFIED _ __________
DATE: ________
B.
CONSTRUCTION AGENCY
________________ DATE:
C.
OPERATIONS
______________ DATE:_________ REVISION CERTIFICATION EDSD VERIFICATION THIS INDICATES THAT REV. NO.________ OF THIS DRAWING IS COVERED, FOR ALL APPROVAL/CERTIFICATION REQUIREMENTS,, CONTROL NUMBER BY DRAWING COMPLETION CERTIFICATE (DCC) NO.: __________________________ By:
D.
E.
Date:
1.05
Section 01560
SHT. NO. REV. NO.
CONSTRUCTION SPECIFICATIONS
KAUST TOWN CENTER RESIDENTIAL & COMMUNITY SUPPORT BUILDINGS
DOC K55 A
VE-417361 BI-25-00002
RABIGH
SAUDI ARABIA
JOB/EWO#
2 OF 7
00
15-Sep-07
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
ENGG
CERT
PMT
ENGG
CERT
A.
General: It is intended that the natural resources within the project boundaries and outside the limits of permanent Work performed shall be preserved in their existing condition or be restored to an equivalent of the existing condition, as approved by Saudi Aramco, upon completion of the work. The Contractor shall confine his onsite construction activities to areas defined by the Drawings and Specifications. Land Resources: 1. Except in areas indicated to be cleared, the Contractor shall not remove, cut, deface, injure, or destroy vegetation without permission from Saudi Aramco. Contractor shall restrict vehicle travel to established roads. Grading and earth moving will be confined to the areas required. Construction Facilities: The location of the Contractor's staging area, storage area, construction camp, wastewater disposal area, borrow areas, and construction buildings on public or privately owned property required temporarily in the performance of the work, shall require approval of Saudi Aramco if not shown on the Drawings. The Contractor shall store his equipment and materials at the job site in conformance with applicable local statutes, ordinances, regulations, and rulings of Saudi Aramco. Contractor shall not store unnecessary materials or equipment on the jobsite and shall take care to prevent any structure from being loaded with a weight that will endanger its security or the safety of persons. The Contractor shall not store materials or encroach upon private property without the written consent of the owners of such private property.
DESCRIPTION
B.
2.
DATE JOB/EWO
DISCIPLINE ENGINEER
__ ________ _ DATE: ________
PROJECT ENGINEER
____________ DATE
C.
Water Resources: 1. Temporary culverts or bridge structures shall be removed, if used, upon completion of the project and the area repaired to its original condition and as directed by Saudi Aramco. At all times, measures shall be taken to prevent oil or other hazardous substances from entering the ground, drainage areas, and local bodies of water.
CERTIFIED _ __________
DATE: ________
CONSTRUCTION AGENCY
________________ DATE:
2.
OPERATIONS
______________ DATE:_________ REVISION CERTIFICATION EDSD VERIFICATION THIS INDICATES THAT REV. NO.________ OF THIS DRAWING IS COVERED, FOR ALL APPROVAL/CERTIFICATION REQUIREMENTS,, CONTROL NUMBER BY DRAWING COMPLETION CERTIFICATE (DCC) NO.: __________________________ By:
D.
Wildlife Resources: The Contractor shall not disturb native habitat adjacent to the project construction area. Protection of Existing Wetlands and Watercourses: 1. Work shall be planned, scheduled, and undertaken in a manner that will ensure the protection and preservation of existing wetlands and watercourses.
E.
Date:
Section 01560
CONSTRUCTION SPECIFICATIONS
KAUST TOWN CENTER RESIDENTIAL & COMMUNITY SUPPORT BUILDINGS
DRAWING NO.
DOC K55 A
VE-417361 BI-25-00002
RABIGH
SAUDI ARABIA
JOB/EWO#
3 OF 7
00
15-Sep-07
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
REV. NO.
PMT
F. Contractor shall convey sanitary waste and brine reject water to HDPE lined ponds in accordance with Saudi Aramco standard SAES-A-104 Wastewater Treatment, Reuse and Disposal and Contractor shall operate per the requirements of SASC-S-02. G. Contractor shall provide diked areas for all potential spill storage areas.
H. Contractor shall develop and implement an emergency response plan to mitigate the potential of contamination from spills and leaks. I. Contractor shall dispose of hydrotest water in accordance with SAES-327 - Disposal of Waste Water from Cleaning, Flushing and Hydrostatic Tests.
1.06 A. B.
Erosion and Sediment Control Measures Burn-off of ground cover shall not be permitted. Borrow areas shall be managed and controlled as per SAES-A-111 - Borrow Pit Requirements. Reduction of Exposure of Unprotected Erodible Soils: Side slopes and backslopes shall be protected immediately upon completion of rough grading. Operations in connection with earthwork shall be planned and conducted in such a manner as to minimize the duration of exposure of unprotected soils. Temporary Protection of Erodible Soils: 1. Such methods as necessary shall be used to effectively prevent erosion and to control sedimentation. Temporary protection shall be provided on all side slopes and back slopes as soon as rough grading is completed or sufficient soil is exposed to require protection to prevent erosion. 3. Sediment traps, small ponds or excavated depressions where stormwater runoff is diverted and held so that sediment can settle out. 4. Protection of all storm drains around the construction site by gravel or filter fabric to trap sediment. 5. Provide and install silt fences around the perimeter of the construction site. Silt fences consist of wood posts and black filter fabric that must anchored at least 25 cm into the ground so that runoff cannot
Section 01560
DISCIPLINE ENGINEER
__ ________ _ DATE: ________
C.
PROJECT ENGINEER
____________ DATE
CERTIFIED _ __________
DATE: ________
D.
CONSTRUCTION AGENCY
________________ DATE:
2.
OPERATIONS
______________ DATE:_________ REVISION CERTIFICATION EDSD VERIFICATION THIS INDICATES THAT REV. NO.________ OF THIS DRAWING IS COVERED, FOR ALL APPROVAL/CERTIFICATION REQUIREMENTS,, CONTROL NUMBER BY DRAWING COMPLETION CERTIFICATE (DCC) NO.: __________________________ By:
CONSTRUCTION SPECIFICATIONS
KAUST TOWN CENTER RESIDENTIAL & COMMUNITY SUPPORT BUILDINGS
DRAWING NO.
DOC K55 A
VE-417361 BI-25-00002
RABIGH
SAUDI ARABIA
JOB/EWO#
4 OF 7
00
15-Sep-07
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
REV. NO.
DATE JOB/EWO
DESCRIPTION
ENGG
CERT
PMT
Date:
DISCIPLINE ENGINEER
__ ________ _ DATE: ________
PROJECT ENGINEER
____________ DATE
CERTIFIED _ __________
DATE: ________
CONSTRUCTION AGENCY
________________ DATE:
OPERATIONS
______________ DATE:_________ REVISION CERTIFICATION EDSD VERIFICATION THIS INDICATES THAT REV. NO.________ OF THIS DRAWING IS COVERED, FOR ALL APPROVAL/CERTIFICATION REQUIREMENTS,, CONTROL NUMBER BY DRAWING COMPLETION CERTIFICATE (DCC) NO.: __________________________ By:
1.07 A.
Date:
Control and Disposal of Chemical Waste Chemical waste shall be stored in corrosion-resistant containers, removed from the project site, and disposed of as necessary, but not less frequently than monthly. Disposal of chemical waste shall be in accordance with standard established practices as approved by Saudi Aramco. Fueling and lubricating of equipment and motor vehicles onsite shall be conducted in a manner that affords the maximum protection against spills and evaporation. Lubricants to be discarded, including burned oil, shall be disposed of in accordance with approved procedures meeting local regulations. For oil and hazardous material spills that
DWG. TYPE PLANT NO. INDEX DRAWING NO.
Section 01560
SHT. NO. REV. NO.
CONSTRUCTION SPECIFICATIONS
KAUST TOWN CENTER RESIDENTIAL & COMMUNITY SUPPORT BUILDINGS
DOC K55 A
VE-417361 BI-25-00002
RABIGH
SAUDI ARABIA
JOB/EWO#
5 OF 7
00
15-Sep-07
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
REV. NO.
DATE JOB/EWO
DESCRIPTION
ENGG
CERT
PMT
DATE JOB/EWO
DESCRIPTION
A.
REV. NO.
2.
DISCIPLINE ENGINEER
__ ________ _ DATE: ________
B.
PROJECT ENGINEER
____________ DATE
CERTIFIED _ __________
DATE: ________
Excess excavated material that is approved by Saudi Aramco as clean fill may be disposed of onsite if (1) a soil disposal area(s) has been identified on the drawings, or (2) an onsite soil disposal area is approved by Saudi Aramco. If no such site is approved, the material shall be disposed of in accordance with the provisions herein. Small amounts of material generated by excavation for fencing may be exempted from this provision. In all cases the provisions of paragraphs 1.3 and 1.4 shall apply to the onsite disposal of excavated material. Trash shall be picked up and placed in containers that shall be emptied on a regular schedule. Handling and disposal shall be so conducted as to prevent contamination of the site and other areas and shall not be disposed of in the wetlands. On completion, the area shall be left clean and natural looking. Air Control Dust shall be kept down at all times. Soil at the site, haul roads, and other areas disturbed by the Contractor's operations and materials stockpiled shall be treated with dust suppressor to control dust. Work areas shall be watered down as necessary to control dust. Excavated sand piles shall be covered. The Contractor shall inspect all vehicles for dirt prior to their leaving the construction site. Dirt, soil, and rubble likely to be dislodged during transit shall be removed from the trucks and other vehicles prior to leaving site.
Section 01560
C.
CONSTRUCTION AGENCY
________________ DATE:
OPERATIONS
______________ DATE:_________ REVISION CERTIFICATION EDSD VERIFICATION THIS INDICATES THAT REV. NO.________ OF THIS DRAWING IS COVERED, FOR ALL APPROVAL/CERTIFICATION REQUIREMENTS,, CONTROL NUMBER BY DRAWING COMPLETION CERTIFICATE (DCC) NO.: __________________________ By:
1.09 A.
B.
CONSTRUCTION SPECIFICATIONS
KAUST TOWN CENTER RESIDENTIAL & COMMUNITY SUPPORT BUILDINGS
DRAWING NO.
DOC K55 A
VE-417361 BI-25-00002
RABIGH
SAUDI ARABIA
JOB/EWO#
6 OF 7
00
15-Sep-07
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
ENGG
CERT
PMT
Date:
A.
REV. NO.
B. 1.11
Rodent Control A. Provide rodent control to prevent infestation of construction or storage areas. 1. Employ methods and materials which will not adversely affect condition at site or adjacent property. Submit a proposed program within 30 days after the effective date of signing the Contract with the following indicated: a. b. The areas to be treated. The rodenticide to be used with a copy of the manufacturer's printed instructions. The pollution preventative measures to be taken.
DISCIPLINE ENGINEER
__ ________ _ DATE: ________
PROJECT ENGINEER
____________ DATE
CERTIFIED _ __________
DATE: ________
2.
CONSTRUCTION AGENCY
________________ DATE:
OPERATIONS
______________ DATE:_________ REVISION CERTIFICATION EDSD VERIFICATION THIS INDICATES THAT REV. NO.________ OF THIS DRAWING IS COVERED, FOR ALL APPROVAL/CERTIFICATION REQUIREMENTS,, CONTROL NUMBER BY DRAWING COMPLETION CERTIFICATE (DCC) NO.: __________________________ By:
c. 3.
The use of any rodenticide shall be in full accordance with the manufacturer's printed instructions and recommendations.
- END OF SECTION -
Section 01560
CONSTRUCTION SPECIFICATIONS
KAUST TOWN CENTER RESIDENTIAL & COMMUNITY SUPPORT BUILDINGS
DRAWING NO.
DOC K55 A
VE-417361 BI-25-00002
RABIGH
SAUDI ARABIA
JOB/EWO#
7 OF 7
00
15-Sep-07
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
DATE JOB/EWO
DESCRIPTION
ENGG
CERT
PMT
Date: