Anda di halaman 1dari 39

06.

April 2006

Introduction to UMTS Radio KPI


3G network planning introduce
www.huawei www.huawei.com .com
Huawei Northwest Africa Region RNP Solution Manage: William.chen William.chen@huawei.com
HUAWEI TECHNOLOGIES CO., LTD.

PDF created with pdfFactory Pro trial version www.pdffactory.com

Agenda
n n n

UMTS Radio KPI overview 3G Network Optimization Case Study of KPI Optimization

HUAWEI TECHNOLOGIES CO., LTD. PDF created with pdfFactory Pro trial version www.pdffactory.com

Page 2

3G KPIs Principle: S.M.A.R.T


Specific
the KPI has clear and complete definition and formula, include check point and procedure.

Measurable

KPIs are measurable by given condition, measurement equipment and procedure.

Attainable Relevant Time-bound

all the KPIs should be reachable, it is refer to the commercial network. the KPI can show the subscriber experience the KPI target should be on the base of time-bound

HUAWEI TECHNOLOGIES CO., LTD. PDF created with pdfFactory Pro trial version www.pdffactory.com

Page 3

3G KPIs : Specific
Complete KPI definition include the formula combine with the check point or procedure. The example: RRC Connection Successful Rate n formula
RRCS_SRService = RRCConnectionSuccessservice 100% RRCConnectionAttempt service

n Check point The number of RRC Connection Attempt is A1 or A2? A2 represent the effective number of RRC Connection Attempt.

HUAWEI TECHNOLOGIES CO., LTD. PDF created with pdfFactory Pro trial version www.pdffactory.com

Page 4

3G KPIs : Measurable Drive Test


n Field Test -> Drive Test
Evaluate the overall network performance, usually on the network pre-launch phase and initial stage of commercial launch.
Test platform Multiple test model UEs can perform different tests.

Driver test route is based on cluster, it is involved about 20 sites in one cluster usually.

Data analysis Probe & Assistant is used for analyzing test data

HUAWEI TECHNOLOGIES CO., LTD. PDF created with pdfFactory Pro trial version www.pdffactory.com

Page 5

3G KPIs : Measurable Stationary test


n Field Test ->stationary Test
Evaluate the system / equipment performance.
System KPI is suggested to be test by stationary: n Throughput KPI n Delay KPI n Quality KPI
Core Network NodeB

Stationary test condition is fixed, and usually used in indoor test scenario. Radio Network KPI test is suggested to be test by drive test n Call drop rate n Handover successful rate

RNC NodeB

System performance
nEquipment ability nTransmission nNetwork construct n.

Radio Network performance


nRadio network planning nSpecial environment condition

HUAWEI TECHNOLOGIES CO., LTD. PDF created with pdfFactory Pro trial version www.pdffactory.com

Page 6

3G KPIs : Measurable Statistic test


n Statistic Test
Nastar server

Monitoring & analysis center Recommended for security

Essential Optimization team

OM system

Pre-Condition for Statistic Test


Subscriber care center

Local networks

There must bePC or laptop, statistic sample, that enough no distance Terminal: ordinary mean network traffic should be reach high limitation level.

Any corresponding dept.

HUAWEI TECHNOLOGIES CO., LTD. PDF created with pdfFactory Pro trial version www.pdffactory.com

Page 7

Huawei KPI test platform


comprehensive analysis of the performance, configuration, alarm GENEX Nastar 3G iManagerTM M2000 obtaining test data op para tim me iza tion ter fil au es to de matic live sharing of ry Node B analysis results
RNC

v GENEX Probe v AGILENT v QUALCOMM v HUAWEI RNC multiple test data

GENEX Assistant 3G

Node B

HLR/AC
Node B

RNS GENEX Probe WCDMA


R NC te d a ta s t
Node B

wireless test data

MSC/SSP/ VLR
RNC

PSTN PLMN ISDN

GMSC/SSP CN

GENEX UNet
Node B

Node B

RNS

network pre-planning/planning

HUAWEI TECHNOLOGIES CO., LTD. PDF created with pdfFactory Pro trial version www.pdffactory.com

Page 8

3G KPIs: Relevant
Examples of User Experience (QoE)
completion of a download file End-to-end response is fast The voice and video is Clare

Voice, Video Phone, MMS, WAP, Email, FTP, HTTP Service Performance

Radio Network KPI


AMR12.2, CS64k,PS64k/128k/384k, HSDPA/HSUPA Accessibility Retainability Integrity Mobility Utilization Availability

Statistic / Measurement data


HUAWEI TECHNOLOGIES CO., LTD. PDF created with pdfFactory Pro trial version www.pdffactory.com
Page 9

Huawei 3G KPIs Architecture


3G KPIs

Accessability

Retainability

Service Integrity

Mobility

Delay/Latency

Availability

Call Setup Success Rate (Voice/VP) PDP Context Activation Success Rate SMS/MMS Success Rate

Call Drop Rate (Voice/VP) PDP Context Drop Rate

PS Throughput

SHO Success Rate Hard Handover Success Rate Inter-RAT Handover Success Rate

Call Setup Delay (Voice/VP) PDP Context Activation Time RTT

Worst Cell Rate

HUAWEI TECHNOLOGIES CO., LTD. PDF created with pdfFactory Pro trial version www.pdffactory.com

Page 10

3G KPIs: It is not only a value


3G KPI is not only a value, but a system, for example of CDR (Call Drop Rate)
Network Planning Network Construct Transmission optimization

Coverage

Root cause drop-call

Hand over

Pilot pollution

Neighbor cell 2G Transport problem Interference Scramble congestionresource


4.56% 0.68% 0.68% 3% 2.28%

Others

59.45%

10.02%

7.29%

11.94%

Call drop cause

HUAWEI TECHNOLOGIES CO., LTD. PDF created with pdfFactory Pro trial version www.pdffactory.com

Page 11

3G KPIs: Attainable
3G KPI is output of combination with investment include technology, HR, cost, competition strategy etc. Cost

Huawei KPI comply principle:

Reasonable n Cooperate with Mobilis to work out a Competitive KPI; KPI target
n Use the experience from other commercial network; Competition

n Huawei will be responsibility for every complied KPI;

Attainable

Common target for Mobilis and Huawei

Technical

HUAWEI TECHNOLOGIES CO., LTD. PDF created with pdfFactory Pro trial version www.pdffactory.com

Page 12

3G KPIs: Time-bound
nMature Network
Drive Test KPIs Stationary test KPIs Network Statistics

nOngoing Optimization

100 100 90 90 80 80 70 70 60 60 50 50 40 40 30 30 20 20 10 10 0 0

nCommercial Launch
Nastar Probe & Assistant

n Pre-Launch KPI Acceptance

Probe & Assistant

Ea lif c h K ed P ur I h at a s io n

Drive Test KPIs Stationary test KPIs

nNetwork construct

HUAWEI TECHNOLOGIES CO., LTD. PDF created with pdfFactory Pro trial version www.pdffactory.com

Page 13

0 0 3 3 6 6 9 9 12 12 15 15 18 18 21 21 24 24 27 27 30 30 33 33 36 36 39 39 42 42 45 45 48 48 Number of Sites Number of Sites

Network Statistics Benchmark test


Probe & Assistant

Site verification

Recommend test methodology


Test Methodology
RRC connection success rate Call setup success rate PDP activation success rate CS Call drop rate PS Call drop rate CS Call complete rate PS Call Complete rate HSPA Call drop rate R99 PS Throughput HSPA Throughput Soft handover success rate Inter-RAT handover success rate

Pre-launch Acceptance
Drive Test Drive Test Drive Test Drive Test Drive Test Stationary Stationary Stationary Drive Test Drive Test

On-going Optimization
Statistic Test Statistic Test Statistic Test Statistic Test Statistic Test Statistic Test Stationary Stationary Stationary Statistic Test Statistic Test

HUAWEI TECHNOLOGIES CO., LTD. PDF created with pdfFactory Pro trial version www.pdffactory.com

Page 14

Contents
UMTS Radio KPI overview 3G Radio Network Optimization Case Study of KPI Optimization

HUAWEI TECHNOLOGIES CO., LTD. PDF created with pdfFactory Pro trial version www.pdffactory.com

Page 15

Optimization throughout Life Cycle


Subs. Number
Pre-launch optimization Single site verification

Drop call Congestion Poor quality Access failure

RF adjustment Para. adjustment Maintenance and upgrade Contingency planning Network expansion .

Pr ob an lem dr a es nal y olu s tio is n

Customized and differentiated services Billing strategies

Investment RF plan review DT & CQT KPI analysis Complaints

Return

Construction phase Troubleshooting

Commercia l launch

Booming phase Optimizing


Page 16

Mature phase Balancing

Time

HUAWEI TECHNOLOGIES CO., LTD. PDF created with pdfFactory Pro trial version www.pdffactory.com

Network Optimization Phases


Optimization preparation

RF optimization

New site integrated

Service test and parameter optimization Routine drive test and stats. analysis

Single site verification

80 sites in the cluster ready?

Acceptance criteria satisfied?

Y
Acceptance
Page 17

HUAWEI TECHNOLOGIES CO., LTD. PDF created with pdfFactory Pro trial version www.pdffactory.com

RF Optimization Target
n To optimize coverage n To minimize pilot pollution n To optimize cell dominance n To optimize neighbor cell list n To resolve RF-related drop calls

HUAWEI TECHNOLOGIES CO., LTD. PDF created with pdfFactory Pro trial version www.pdffactory.com

Page 18

RF Parameters Optimization
n Engineering parameters adjustment
To adjust antenna down tilt To adjust antenna azimuth To adjust antenna location To adjust antenna height To replace antenna To replace site To add new cell

n Radio part parameters adjustment


To optimize neighbor cell list

HUAWEI TECHNOLOGIES CO., LTD. PDF created with pdfFactory Pro trial version www.pdffactory.com

Page 19

Pilot Pollution Minimization


Pilot pollution definition:
n SHO candidates (A) n Active set size (B) n If A>B, pilot pollution exists
-60 -65 RSCP (dBm) -70 -75 -80 -85 -90 SC1 SC2 SC3 SC4 SC5 SC6 Not Pilot Pollution
Page 20

Pilot pollution will result in: (1) low signal quality (2) decreased system capacity (3) Call drops easier

Margin

-62

-64

-66

-68

-69 -81

Ways to optimize: (1) Antenna adjustment (e.g. azimuth or down tilt) (2) Pilot power optimization

Active Set

Pilot Pollution

HUAWEI TECHNOLOGIES CO., LTD. PDF created with pdfFactory Pro trial version www.pdffactory.com

Pilot Pollution: Example

HUAWEI TECHNOLOGIES CO., LTD. PDF created with pdfFactory Pro trial version www.pdffactory.com

Page 21

RF-related Drop Calls


Problems
n Poor coverage n High interference n Poor UL coverage n Poor dominance n Pilot pollution n Missing neighbors

Appearance
Poor RSCP & Ec/Io Poor Ec/Io or RTWP UE max Tx power many SHO events many cells present

Fast change of RF conditions usually causes drop calls, e.g. turning a corner.

HUAWEI TECHNOLOGIES CO., LTD. PDF created with pdfFactory Pro trial version www.pdffactory.com

Page 22

Para. Optimization Target


n To reduce access failures n To reduce drop calls n To enhance service quality
Para. optimization is an important step after RF optimization

Service quality and network resources utilization will be improved after para. optimization

HUAWEI TECHNOLOGIES CO., LTD. PDF created with pdfFactory Pro trial version www.pdffactory.com

Page 23

Parameters to be Optimized
n CCCH power allocation para. n RL maximum power para. n Cell re-selection para. n Intra-freq. handover para. n Inter-RAT handover para. n Power control para. n Access power para. n Other related para.
The influence caused by the cell parameters adjustment should be analyzed carefully.
An effective way to reduce drop calls

Seldom adjusted

HUAWEI TECHNOLOGIES CO., LTD. PDF created with pdfFactory Pro trial version www.pdffactory.com

Page 24

Intra-freq. Re-selection Para.


Optimize Treselection, Qhysts and Sintrasearch so as to have minimum ping-pong and minimum camped onto wrong cell
The black dotted line is the serving cells. Qhyst2 Qhyst2 Qhyst2

CPICH_Ec/Io Qhyst2

Qhyst2

CPICH_Ec/Io

UE doesnt camp onto the best cells. Qqualmin

The black dotted line is the serving cells. Sintrasearch UE doesnt camp onto the best cells.

Qqualmin Treselection Treselection Treselection Treselection Treselection Treselection Time

Treselection, Qhyst2, Sintrasearch = 0

Treselection, Qhyst2, Sintrasearch != 0

HUAWEI TECHNOLOGIES CO., LTD. PDF created with pdfFactory Pro trial version www.pdffactory.com

Page 25

Contents
UMTS Radio KPI overview 3G Radio Network Optimization Case Study of KPI Optimization

HUAWEI TECHNOLOGIES CO., LTD. PDF created with pdfFactory Pro trial version www.pdffactory.com

Page 26

Case study from commercial projects

Example of Accessibility KPI analysis Example of Call Drop KPI issue & solution Example of Throughput KPI issue analysis

HUAWEI TECHNOLOGIES CO., LTD. PDF created with pdfFactory Pro trial version www.pdffactory.com

Page 27

Example of accessibility KPIs issue

Trouble-shooting of RRC setup and RAB assignment problems:


STEP1: Identify the counter with the highest number STEP2: Identify the Top 10 cells with the same problem
VS.RRC.Rej.R

Breakdown of CS RAB failure (Counters) VS.RAB.FailEstCS.I UB.Band VS.RAB.FailEstabCS. Other.Cell VS.RAB.FailEstPS. RIPFail

Breakdown of CS RRC failure (Counters) VS.RRC.Rej.Cod VS.RRC.Rej.UL.C E.Cong RRC.FailConnEstab. NoReply

Definition of Counters L.Fail e.Cong l VS.RAB.FailEstPs.IUB.Band: The number of RABs unsuccessfully established in a cell due to IUB resource congestion causes. VS.RAB.FailEstabCS.Other.Cell: Pre-admission control module reports a resource congestion.

VS.RRC.Rej.UL.CE.Cong: RRC setup failure due to lack of UL CE resources

HUAWEI TECHNOLOGIES CO., LTD. PDF created with pdfFactory Pro trial version www.pdffactory.com

Page 28

Analysis
The worst sites (cells) that have been found to have both IUB and CE congestion issues:
n0109TO (cell id 578/579/580) n0111TO (3882/3883/3884) n0070TO (18641/18642/18643)
NodeB Name
2007-02-19 2007-02-20 132.29% 175.00% 132.29% 2007-02-21 132.29% 175.00% 132.29% 2007-02-22 171.88% 180.21% 148.96%

UL CE Occupation Rate

0070TO 0109TO 0111TO

120.83% 142.71% 158.33%

HUAWEI TECHNOLOGIES CO., LTD. PDF created with pdfFactory Pro trial version www.pdffactory.com

Page 29

Suggested solution
A comparative analysis shows that, if excluding the problematic sites, the KPI would improve substantially, say, AMR RAB assignment success rate from 97.79% to 98.09%:
KPIs (including IUB Congestion sites)
RRC Connection Setup Success Rate (CS)(>98%) AMR RAB Assignment Success Rate(>98%) Video Call RAB Assignment Success Rate(>98%) PS64 RAB Assignment Success Rate(>97%) PS128 RAB Assignment Success Rate(>97%) PS384 RAB Assignment Success Rate(>97%) 99.17%(313992/316615)

KPIs (without IUB Congestion sites)


99.35%(256449/258126)

97.79%(294499/301169)

98.09%(241127/245815)

Suggested action plan:


CE/IUB expansion Perform regular neighbour list check to further tune the performance

98.31%(3314/3371)

98.67%(2891/2930)

84.93%(2462/2899)

83.10%(1981/2384)

98.48%(16674/16932)

98.80%(13638/13803)

97.53%(58114/59584)

97.81%(48854/49946)

HUAWEI TECHNOLOGIES CO., LTD. PDF created with pdfFactory Pro trial version www.pdffactory.com

Page 30

Case study from commercial projects

Example of Accessibility KPI analysis Example of Call Drop KPI issue & solution Example of Throughput KPI issue analysis

HUAWEI TECHNOLOGIES CO., LTD. PDF created with pdfFactory Pro trial version www.pdffactory.com

Page 31

Example of Call drop rate issues


AMR12.2 Call Drop Rate
3.5% 3.0% 2.5% 2.0% 1.5% 1.0% 0.5% 0.0% 2006-01-16 2006-01-18 2006-01-20 2006-01-22 2006-01-24 2006-01-26 2006-01-28 2006-01-30 2006-02-01 2006-02-03 2006-02-05 2006-02-07 2006-02-09 2006-02-11 2006-02-13 2006-02-15 2006-02-17 2006-02-19 2006-02-21 2006-02-23 2006-02-25 2006-02-27 2006-03-01 2006-03-03 2006-03-05 2006-03-07 2006-03-09 2006-03-11 2006-03-13 2006-03-15 2006-03-17 2006-03-19 Drop Call Rate Voice(3G) Drop Call Rate Video(3G) Drop Call Rate (2G)

Voice call drop rate changes over a threemonth optimization period

Zone1
Solving Voice call drop rate problems in Top 3 zones

Zone2 Zone3

HUAWEI TECHNOLOGIES CO., LTD. PDF created with pdfFactory Pro trial version www.pdffactory.com

Page 32

What measures were taken to solve the call drop problems?


Zone Zone 1 Zone 2 Action time Feb. 14-17 Feb. 23-25 Call drop rate reduction 1.57%->1.27% 1.38%->1.21% Optimization measures Scrambling code planning adjustment System/handover parameter tuning Neighbour list optimization RF optimization, etc.

Zone 3

Mar.2-6

1.34%->1.10%

HUAWEI TECHNOLOGIES CO., LTD. PDF created with pdfFactory Pro trial version www.pdffactory.com

Page 33

Case study from commercial projects

Example of Accessibility KPI analysis Example of Call Drop KPI issue & solution Example of Throughput issue analysis

HUAWEI TECHNOLOGIES CO., LTD. PDF created with pdfFactory Pro trial version www.pdffactory.com

Page 34

Example of throughput KPI issues

45 Huawei sites provide coverage for DT route (Madrid South East)

Group
FTP application throughput Minimum application throughput DL

Service
I/B PS UL:384 DL:384 HSDPA

Target
UL > 300 kbps DL > 361 kbps > 384 Kbit/s

Valid calls
118 (UL) 87 (DL) 87

Successful
118 (UL) 87 (DL) 87

KPI
319 (UL) 293 (DL) 280

HUAWEI TECHNOLOGIES CO., LTD. PDF created with pdfFactory Pro trial version www.pdffactory.com

Page 35

Analysis: coverage problems


RNC 123

RNC 122

Areas that lack dominant pilot Drive test route involves 3 Huawei RNCs and 1 Nortel RNC
RNC 121

HUAWEI TECHNOLOGIES CO., LTD. PDF created with pdfFactory Pro trial version www.pdffactory.com

Page 36

The impact of missing neighbours


DL R99 throughput has been impacted by the interference generated by missing neighbors, mostly concerning the new sites that had been recently put on air Areas with low throughput corresponds to bad Ec/Io figures and HHO to 2G
Low throughput

UE handover to GSM

HUAWEI TECHNOLOGIES CO., LTD. PDF created with pdfFactory Pro trial version www.pdffactory.com

Page 37

Other causes
In addition to coverage and missing neighbour causes, the HSDPA minimum throughput problem is due to:
DT route crosses the IUR area where HSDPA calls are reconfigured to DCH (H2D) UE moves from a non-hotspot to a hotspot site in HSDPA connected mode

RNC 122 RNC 123 RNC 123 RNC 122

RNC 121

RNC 121

HUAWEI TECHNOLOGIES CO., LTD. PDF created with pdfFactory Pro trial version www.pdffactory.com

Page 38

06.April 2006

Thank You
www.huawei.com
www.huawei .com

HUAWEI TECHNOLOGIES CO., LTD.

PDF created with pdfFactory Pro trial version www.pdffactory.com

Anda mungkin juga menyukai