ANALISA BIAYA KONSTRUKSI

PEKERJAAN PERSIAPAN
PA

6.1.

1 m' Pagar Sementara dari kayu tinggi 2 meter

6.1.1.
-

6.1.2.
-

PA

6.2.

Bahan
Kayu Laut/Dolken
Semen Portland
Pasir Beton
Koral Beton
Kayu 5/7
Paku Biasa 2" - 5"
Residu/colter

1.250
2.500
0.005
0.009
0.038
0.060
0.400

Btg
Kg
M3
M3
M3
Kg
Lt

x
x
x
x
x
x
x

Rp
19,250
Rp
1,270
Rp
87,800
Rp
170,900
Rp
3,107,500
Rp
14,520
Rp
6,530
Jumlah (1)

=
=
=
=
=
=
=
=

Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp

24,062.50
3,175.00
439.00
1,538.10
118,085.00
871.20
2,612.00
150,782.80

Tenaga
Tukang kayu
Pekerja
Kepala tukang
Mandor

0.200
0.400
0.020
0.020

Oh
Oh
Oh
Oh

x
x
x
x

Rp
78,800
Rp
52,500
Rp
91,900
Rp
65,600
Jumlah (2)
Jumlah (1) + (2)

=
=
=
=
=
=

Rp
Rp
Rp
Rp
Rp
Rp

15,760.00
21,000.00
1,838.00
1,312.00
39,910.00
190,692.80

1 m' Pagar sementara dari seng gelombang tinggi 2 meter

6.2.1.
-

6.2.2.
-

Bahan
Kayu Laut/Dolken
Semen Portland
Seng Gelombang
Pasir beton
Koral beton
Kayu 5/7
Paku biasa 2" - 5"
Meni besi

1.250
2.500
1.200
0.005
0.009
0.012
0.060
0.450

Btg
Kg
Lbr
M3
M3
M3
Kg
Kg

x
x
x
x
x
x
x
x

Rp
19,250
Rp
1,270
Rp
59,640
Rp
87,800
Rp
170,900
Rp
3,107,500
Rp
14,520
Rp
25,410
Jumlah (1)

=
=
=
=
=
=
=
=
=

Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp

24,062.50
3,175.00
71,568.00
439.00
1,538.10
37,290.00
871.20
11,434.50
150,378.30

Tenaga
Tukang kayu
Pekerja
Kepala tukang
Mandor

0.200
0.400
0.020
0.020

Oh
Oh
Oh
Oh

x
x
x
x

Rp
78,800
Rp
52,500
Rp
91,900
Rp
65,600
Jumlah (2)
Jumlah (1) + (2)

=
=
=
=
=
=

Rp
Rp
Rp
Rp
Rp
Rp

15,760.00
21,000.00
1,838.00
1,312.00
39,910.00
190,288.30

PA

PA

PA

6.3

1 M' Pagar sementara dari kawat duri tinggi 1,8 meter

6.3.1.
-

Bahan
Kayu Laut/Dolken
Semen Portland
Kawat duri
Pasir beton
Koral beton
Paku biasa 2" - 5"

1.000
2.000
1.625
0.005
0.009
0.060

Btg
Kg
Kg
M3
M3
Kg

x
x
x
x
x
x

Rp
19,250
Rp
1,270
Rp
4,030
Rp
87,800
Rp
170,900
Rp
14,520
Jumlah (1)

=
=
=
=
=
=
=

Rp
Rp
Rp
Rp
Rp
Rp
Rp

19,250.00
2,540.00
6,548.75
439.00
1,538.10
871.20
31,187.05

6.3.2.
-

Tenaga
Tukang kayu
Pekerja
Kepala tukang
Mandor

0.200
0.400
0.020
0.020

Oh
Oh
Oh
Oh

x
x
x
x

Rp
78,800
Rp
52,500
Rp
91,900
Rp
65,600
Jumlah (2)
Jumlah (1) + (2)

=
=
=
=
=
=

Rp
Rp
Rp
Rp
Rp
Rp

15,760.00
21,000.00
1,838.00
1,312.00
39,910.00
71,097.05

6.4

Pengukuran dan Pemasangan bouplank

6.4.1.
-

Bahan
Kayu 5/7
Paku biasa 2" - 5"
Kayu papan 3/20

0.012 M3
0.020 Kg
0.007 M3

x Rp
3,107,500
x Rp
14,520
x Rp
3,107,500
Jumlah (1)

=
=
=
=

Rp
Rp
Rp
Rp

37,290.00
290.40
21,752.50
59,332.90

6.4.2.
-

Tenaga
Tukang kayu
Pekerja
Kepala tukang
Mandor

0.100
0.100
0.010
0.005

x
x
x
x

=
=
=
=
=
=

Rp
Rp
Rp
Rp
Rp
Rp

7,880.00
5,250.00
919.00
328.00
14,377.00
73,709.90

=
=
=
=
=
=
=
=
=
=
=
=
=
=
=

Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp

24,062.50
6,732.00
138,490.00
3,073,000.00
190.50
15,020.00
24,780.00
5,577,000.00
16,100.00
8,360.00
1,087.20
21,780.00
10,254.00
0.00
8,916,856.20

78,800 = Rp
78,800 = Rp
52,500 = Rp

157,600.00
78,800.00
105,000.00

6.5

Oh
Oh
Oh
Oh

Rp
78,800
Rp
52,500
Rp
91,900
Rp
65,600
Jumlah (2)
Jumlah (1) + (2)

1 m2 Pembuatan Kantor Sementara dengan Lantai Plesteran

6.5.1.
-

Bahan
Kayu Laut/Dolken
Kayu
Batu Belah/Kali 15 - 20 cm
Besi Strip
Semen Portland
Pasir pasang
Pasir beton
Koral beton
Bata merah
Seng plat
Jendela nako
Kaca polos
Kunci tanam
Plywood 4 mm

6.5.2.
-

Tenaga
Tukang kayu
Tukang batu
Pekerja

1.250
0.180
0.850
1.100
35.000
0.150
0.100
0.150
30.000
0.250
2.000
0.080
0.150
0.060

Btg
M3
Kg
Kg
Kg
M3
M3
M3
Bh
Lbr
Bh
M2
Bh
Lbr

2.000 Oh
1.000 Oh
2.000 Oh

x
x
x
x
x
x
x
x
x
x
x
x
x
x

Rp
19,250
Rp
37,400
Rp
125,900
Rp
87,800
Rp
1,270
Rp
150,200
Rp
165,200
Rp
185,900
Rp
64,400
Rp
4,180
Rp
13,590
Rp
145,200
Rp
170,900
Rp
202,700
Jumlah (1)

x Rp
x Rp
x Rp

- Kepala tukang
- Mandor

PA

PA

6.6.
6.6.1.
-

Bahan
Kayu Laut/Dolken
Kayu
Paku biasa
Semen Portland
Pasir beton
Koral beton
Seng gelombang bjls 20 - 7"

6.2.2.
-

Tenaga
Tukang kayu
Pekerja
Kepala tukang
Mandor

6.7

PA

=
=
=
=

Rp
Rp
Rp
Rp

27,570.00
3,280.00
372,250.00
9,289,106.20

1.700
0.210
0.300
10.500
0.030
0.050
1.500

Btg
M3
Kg
Kg
M3
M3
Lbr

x
x
x
x
x
x
x

Rp
19,250
Rp
37,400
Rp
125,900
Rp
1,270
Rp
165,200
Rp
185,900
Rp
59,640
Jumlah (1)

=
=
=
=
=
=
=
=

Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp

32,725.00
7,854.00
37,770.00
13,335.00
4,956.00
9,295.00
89,460.00
195,395.00

0.200
0.400
0.020
0.020

Oh
Oh
Oh
Oh

x
x
x
x

Rp
78,800
Rp
52,500
Rp
91,900
Rp
65,600
Jumlah (2)
Jumlah (1) + (2)

=
=
=
=
=
=

Rp
Rp
Rp
Rp
Rp
Rp

15,760.00
21,000.00
1,838.00
1,312.00
39,910.00
235,305.00

1m Pembuatan rumah jaga / kontruksi kayu

Bahan
Kayu Laut/Dolken
Kayu
Paku biasa
Seng gelombang bjls 20 - 7"

3.000
0.276
0.700
1.500

Btg
M
Kg
Lbr

x
x
x
x

Rp
19,250
Rp
37,400
Rp
125,900
Rp
59,640
Jumlah (1)

=
=
=
=
=

Rp
Rp
Rp
Rp
Rp

57,750.00
10,322.40
88,130.00
89,460.00
245,662.40

Tenaga
Tukang kayu
Pekerja
Kepala Tukang
Mandor

1.500
1.000
0.150
0.050

Oh
Oh
Oh
Oh

x
x
x
x

Rp
78,800
Rp
52,500
Rp
91,900
Rp
65,600
Jumlah (2)
Jumlah (1) + (2)

=
=
=
=
=
=

Rp
Rp
Rp
Rp
Rp
Rp

118,200.00
52,500.00
13,785.00
3,280.00
187,765.00
433,427.40

52,500 = Rp
65,600 = Rp
= Rp

5,250.00
3,280.00
8,530.00

6.7.2

6.8
6.8.1

x Rp
91,900
x Rp
65,600
Jumlah (2)
Jumlah (1) + (2)

1 M Pembuatan gudang semen dan alat - alat

6.7.1

PA

0.300 Oh
0.050 Oh

1 m Membersihkan lapangan dan perataan


Tenaga
- Pekerja
- Mandor

6.9

0.100 Oh
0.050 Oh

x Rp
x Rp
Jumlah

1 m Pembuatan bedeng buruh

6.9.1
-

Bahan
Kayu Laut/Dolken
Kayu
Paku biasa
Semen portland
Pasir beton

1.250
0.186
0.300
18.000
0.030

Btg
M
Kg
Kg
M

x
x
x
x
x

Rp
Rp
Rp
Rp
Rp

19,250
37,400
125,900
1,270
165,200

=
=
=
=
=

Rp
Rp
Rp
Rp
Rp

24,062.50
6,956.40
37,770.00
22,860.00
4,956.00

- Koral beton
- Seng gelombang bjls 20 - 7"
- Plywood 4mm

6.9.2
-

PA

Tenaga
Tukang kayu
Pekerja
Kepala tukang
Mandor

=
=
=
=

Rp
Rp
Rp
Rp

9,295.00
89,460.00
273,645.00
469,004.90

2.000
1.000
0.200
0.050

x
x
x
x

=
=
=
=
=
=

Rp
Rp
Rp
Rp
Rp
Rp

157,600.00
52,500.00
18,380.00
3,280.00
231,760.00
700,764.90

0.036 M3 x Rp
52,300
0.080 Kg x Rp
125,900
1.000 Btg x Rp
1,270
Jumlah (1)

=
=
=
=

Rp
Rp
Rp
Rp

1,882.80
10,072.00
1,270.00
13,224.80

0.300 Oh
0.002 Oh

=
=
=
=

Rp
Rp
Rp
Rp

23,640.00
98.40
23,738.40
36,963.20

1.000 Btg x Rp
62,900 = Rp
0.250 Kg x Rp
#REF!
= Rp
Jumlah (1)
= Rp

62,900.00
#REF!
#REF!

0.017
0.002
0.250
0.013

Oh
Oh
Oh
Oh

Rp
78,800
Rp
52,500
Rp
91,900
Rp
65,600
Jumlah (2)
Jumlah (1) + (2)

1 m Pembuatan bak adukan ukuran ( 40 x 50 x 20 ) cm

6.10.1.
-

Bahan
Waterfroof
Paku biasa
Kaso 5/7

6.11.

x Rp
78,800
x Rp
65,600
Jumlah (2)
Jumlah (1) + (2)

1 m Pembuatan Stegger dari bambu, ukuran ( 40 x 50 x 20 ) cm

6.11.1 Bahan
- Bambu 6 - 8 / 600 cm
- Tali ijuk

6.11.2 Tenaga
- Tukang kayu
- Kepala tukang
- Pekerja
- Mandor

PA

x Rp
185,900
x Rp
59,640
x Rp
202,700
Jumlah (1)

6.10.

6.10.2 Tenaga
- Tukang kayu
- Mandor

PA

0.050 M
1.500 Lbr
1.350 Lbr

6.12

1 m Pembuatan jalan sementara

6. 12.1
-

Bahan
Batu belah 15/20
Batu pecah 5/7
Pasir pasang

6.12.2 Tenaga
- Pekerja
- Mandor

Oh
Oh
Oh
Oh

x
x
x
x

Rp
78,800
Rp
91,900
Rp
52,500
Rp
65,600
Jumlah (2)
Jumlah (1) + (2)

=
=
=
=
=
=

Rp
Rp
Rp
Rp
Rp
Rp

1,339.60
183.80
13,125.00
852.80
15,501.20
#REF!

0.150 M
0.090 M
0.010 M

x Rp
125,900
x Rp
150,200
x Rp
76,500
Jumlah (1)

=
=
=
=

Rp
Rp
Rp
Rp

18,885.00
13,518.00
765.00
33,168.00

1.000 Oh
0.050 Oh

x Rp
52,500 = Rp
x Rp
65,600 = Rp
Jumlah (2)
= Rp

52,500.00
3,280.00
55,780.00

Jumlah (1) + (2)


PA

6.13

6.14

PA

6.15

6.667 Oh
0.333 Oh

x Rp
x Rp
Jumlah

52,500 = Rp
65,600 = Rp
= Rp

350,017.50
21,844.80
371,862.30

x Rp
x Rp
Jumlah

52,500 = Rp
65,600 = Rp
= Rp

262,500.00
16,400.00
278,900.00

1m Bongkaran dinding tembok bata merah

6.14.1 Tenaga
- Pekerja
- Mandor

PA

88,948.00

1 m Bongkaran beton betulang

6.13.1 Tenaga
- Pekerja
- Mandor

PA

= Rp

5.000 Oh
0.250 Oh

1m Pasangan pagar kawat jaring galvanis, tinggi 1.00 m

6.15.1 Bahan
- Kawat jaring galvanis/BRC

0.434 Lbr

x Rp
235,950 = Rp
Jumlah (1)
= Rp

102,402.30
102,402.30

6.15.2.
-

Tenaga
Pekerja
Kepala tukang
Tukang
Mandor

0.042
0.004
0.042
0.002

x
x
x
x

6.16

1 m' Pasang pagar beton pracetak (5 x 50 x 213) cm

6.16.1.
-

Bahan
Panel beton pracetak
Kolom beton pracetak
Pasir beton
Koral 2/3
Batu Bata biasa 5x10x20 cm

6.16.2.
-

Tenaga
Pekerja
Kepala tukang
Tukang
Mandor

Oh
Oh
Oh
Oh

Rp
52,500
Rp
91,900
Rp
78,800
Rp
65,600
Jumlah (2)
Jumlah (1) + (2)

=
=
=
=
=
=

Rp
Rp
Rp
Rp
Rp
Rp

2,205.00
367.60
3,309.60
131.20
6,013.40
108,415.70

0.986
0.525
0.074
0.146
45.000

Lbr
Btg
M
M
Kg

x
x
x
x
x

Rp
177,700
Rp
0
Rp
165,200
Rp
0
Rp
1,270
Jumlah (1)

=
=
=
=
=
=

Rp
Rp
Rp
Rp
Rp
Rp

175,212.20
0.00
12,224.80
0.00
57,150.00
244,587.00

0.042
0.004
0.042
0.002

Oh
Oh
Oh
Oh

x
x
x
x

Rp
52,500
Rp
91,900
Rp
78,800
Rp
65,600
Jumlah (2)
Jumlah (1) + (2)

=
=
=
=
=
=

Rp
Rp
Rp
Rp
Rp
Rp

2,205.00
367.60
3,309.60
131.20
6,013.40
250,600.40

ANALISA BIAYA KONSTRUKSI


PEKERJAAN TANAH
PT

6.1.

1 m Galian tanah biasa sedalam 1 meter

6.1.1. Tenaga
- Pekerja
- Mandor

PT

6.2.

6.3.

6.4.
6.4.

PT

6.5.

6.6..

Tenaga
- Pekerja
- Mandor

6.7.

6.8.

52,500 =
65,600 =
=

Rp.
Rp.
Rp.

27,615.00
3,450.56
31,065.56

0.735 Oh x Rp.
0.0735 Oh x Rp.
Jumlah (1)

52,500 =
65,600 =
=

Rp.
Rp.
Rp.

38,587.50
4,821.60
43,409.10

0.625 Oh x Rp.
0.062 Oh x Rp.
Jumlah

52,500 =
65,600 =
=

Rp.
Rp.
Rp.

32,812.50
4,067.20
36,879.70

1.250 Oh x Rp.
0.125 Oh x Rp.
Jumlah

52,500 =
65,600 =
=

Rp.
Rp.
Rp.

65,625.00
8,200.00
73,825.00

52,500 =
65,600 =
=

Rp.
Rp.
Rp.

43,207.50
5,444.80
48,652.30

52,500 =
65,600 =
=

Rp.
Rp.
Rp.

2,625.00
328.00
2,953.00

52,500 =
65,600
=

Rp.
Rp.
Rp.

27,037.50
3,378.40
30,415.90

1 m Galian tanah lumpur sedalam 1 meter

0.823 Oh x Rp.
0.083 Oh x Rp.
Jumlah

1 m Pekerjaan stripping setinggi 1 meter

6.7.1. Tenaga
- Pekerja
- Mandor

PT

0.526 Oh x Rp.
0.0526 Oh x Rp.
Jumlah (1)

1 m Galian tanah cadas sedalam 1 meter

6.6.1. Tenaga
- Pekerja
- Mandor

PT

21,000.00
2,624.00
23,624.00

1 m Galian tanah keras sedalam 1 meter

6.5.1. Tenaga
- Pekerja
- Mandor

PT

Rp.
Rp.
Rp.

1 m Galian tanah biasa sedalam 3 meter

6.3.1. Tenaga
- Pekerja
- Mandor

PT

52,500 =
65,600 =
=

1 m Galian tanah biasa sedalam 2 meter

6.2.1. Tenaga
- Pekerja
- Mandor

PT

0.400 Oh x Rp.
0.040 Oh x Rp.
Jumlah (1)

0.050 Oh x Rp.
0.005 Oh x Rp.
Jumlah (1)

1 m Pembuangan tanah sejauh 150 meter

6.8.1. Tenaga
- Pekerja
- Mandor

0.515 Oh x Rp.
0.0515 Oh x Rp.
Jumlah

PT

6.9.

1 m Urugan kembali

6.9.1. Tenaga
- Pekerja
- Mandor

PT

6.10.

6.11.

52,500 =
65,600 =
=

Rp.
Rp.
Rp.

10,080.00
1,246.40
11,326.40

0.500 Oh x Rp.
0.050 Oh x Rp.
Jumlah

52,500 =
65,600 =
=

Rp.
Rp.
Rp.

26,250.00
3,280.00
29,530.00

1.200 M

64,400 =
=

Rp.
Rp.

77,280.00
77,280.00

Rp.
Rp.
Rp.
Rp.

15,750.00
984.00
16,734.00
94,014.00

1 m Pemadatan tanah

6.10.1. Tenaga
- Pekerja
- Mandor

PT

0.192 Oh x Rp.
0.019 Oh x Rp.
Jumlah

1 m Urugan pasir

6.11.1. Bahan
- Pasir urug

6.11.2. Tenaga
- Pekerja
- Mandor

x Rp.
Jumlah (1)

0.300 Oh x Rp.
52,500
0.015 Oh x Rp.
65,600
Jumlah (2)
Jumlah (1) + (2)

=
=
=
=

PT

6.12.

1 m Lapisan pudel campuran 1 Kp : 3 Ps : 7 TL

6.12.1.
-

Bahan
Pasir urug
Kapur padam
Tanah liat

6.12.2. Tenaga
- Pekerja
- Mandor

PT

6.13.

x Rp.
x Rp.
x Rp.
Jumlah (1)

64,400 =
1,840 =
62,900 =
=

Rp.
Rp.
Rp.
Rp.

21,252.00
200.56
47,992.70
69,445.26

=
=
=
=

Rp.
Rp.
Rp.
Rp.

26,250.00
3,280.00
29,530.00
98,975.26

1,840 =
62,900 =
=

Rp.
Rp.
Rp.

368.00
62,900.00
63,268.00

=
=
=
=

Rp.
Rp.
Rp.
Rp.

26,250.00
3,280.00
29,530.00
92,798.00

140,900 =
170,900 =
76,500 =
=

Rp.
Rp.
Rp.
Rp.

38,747.50
5,127.00
3,825.00
47,699.50

Rp.
Rp.
Rp.
Rp.

26,250.00
3,280.00
29,530.00
77,229.50

0.500 Oh x Rp.
52,500
0.050 Oh x Rp.
65,600
Jumlah (2)
Jumlah (1) + (2)

1 m Lapisan pudel campuran 1 Kp : 5 TL

6.13.1. Bahan
- Kapur padam
- Tanah liat

6.13.2. Tenaga
- Pekerja
- Mandor

PT

0.330 M
0.109 M
0.763 M

0.200 M
1.000 M

x Rp.
x Rp.
Jumlah (1)

0.500 Oh x Rp.
52,500
0.050 Oh x Rp.
65,600
Jumlah (2)
Jumlah (1) + (2)

6.16.

1 m Pembuatan jalan sementara, tebal 25 cm

6.16.1.
-

Bahan
Batu belah 10/15
Batu koral 5/7
Pasir pasang

0.275 M
0.030 M
0.050 M

x Rp.
x Rp.
x Rp.
Jumlah (1)

6.16.2. Tenaga
- Pekerja
- Mandor

0.500 Oh x Rp.
52,500
0.050 Oh x Rp.
65,600
Jumlah (2)
Jumlah (1) + (2)

=
=
=
=

ANALISA BIAYA KONSTRUKSI


PEKERJAAN PONDASI
PP

6.1.

1 M Pasangan pondasi batu kali, 1 Pc : 1 Ps

6.1.1. Bahan :
- Batu belah 15/20
- Semen porland
- Pasir pasang

6.1.2. Tenaga
- Pekerja
- Tukang batu
- Kepala tukang
- Mandor

PP

6.2.

6.2.2. Tenaga
- Pekerja
- Tukang batu
- Kepala tukang
- Mandor

6.3.

1.500
0.600
0.060
0.075

Oh
Oh
Oh
Oh

x Rp.
125,900.00
x Rp.
1,270.00
x Rp.
76,500.00
Jumlah (1)

=
=
=
=

Rp.
Rp.
Rp.
Rp.

138,490.00
497,840.00
24,021.00
660,351.00

x
x
x
x

Rp.
52,500.00
Rp.
78,800.00
Rp.
91,900.00
Rp.
65,600.00
Jumlah (2)
Jumlah (1) + (2)

=
=
=
=
=
=

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

78,750.00
47,280.00
5,514.00
4,920.00
136,464.00
796,815.00

x Rp.
125,900.00
x Rp.
1,270.00
x Rp.
76,500.00
Jumlah (1)

=
=
=
=

Rp.
Rp.
Rp.
Rp.

138,490.00
339,090.00
32,665.50
510,245.50

x
x
x
x

Rp.
52,500.00
Rp.
78,800.00
Rp.
91,900.00
Rp.
65,600.00
Jumlah (2)
Jumlah (1) +(2)

=
=
=
=
=
=

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

78,750.00
47,280.00
5,514.00
4,920.00
136,464.00
646,709.50

x Rp.
125,900.00
x Rp.
1,270.00
x Rp.
76,500.00
Jumlah (1)

=
=
=
=

Rp.
Rp.
Rp.
Rp.

138,490.00
497,840.00
24,021.00
660,351.00

x
x
x
x

=
=
=
=
=
=

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

78,750.00
47,280.00
5,514.00
4,920.00
136,464.00
796,815.00

1 M Pasang pondasi batu kali 1 Pc : 2 Ps

6.2.1. Bahan
- Batu belah 15/20 cm
- Semen porland
- Pasir Pasang

PP

1.100 M
392.000 Kg
0.314 M

1.100 M
267.000 Kg
0.427 M

1.500
0.600
0.060
0.075

Oh
Oh
Oh
Oh

1 M Pasang pondasi batu kali, 1 Pc : 2,5 Ps

6.3.1. Bahan
- Batu belah 15/20 cm
- Semen porland
- Pasir Pasang

6.3.2. Tenaga
- Pekerja
- Tukang batu
- Kepala tukang
- Mandor

1.100 M
392.000 Kg
0.314 M

1.500
0.600
0.060
0.075

Oh
Oh
Oh
Oh

Rp.
52,500.00
Rp.
78,800.00
Rp.
91,900.00
Rp.
65,600.00
Jumlah (2)
Jumlah (1) +(2)

PP

6.4.

1 M Pasang pondasi batu kali, 1 Pc : 3 Ps

6.4.1. Bahan
- Batu belah 15/20 cm
- Semen porland
- Pasir Pasang

6.4.2. Tenaga
- Pekerja
- Tukang batu
- Kepala tukang
- Mandor

PP

6.5.

6.5.2. Tenaga
- Pekerja
- Tukang batu
- Kepala tukang
- Mandor

6.6.

6.6.2. Tenaga
- Pekerja
- Tukang batu
- Kepala tukang
- Mandor

6.7.

Oh
Oh
Oh
Oh

=
=
=
=

Rp.
Rp.
Rp.
Rp.

138,490.00
256,540.00
37,102.50
432,132.50

x
x
x
x

Rp.
52,500.00
Rp.
78,800.00
Rp.
91,900.00
Rp.
65,600.00
Jumlah (2)
Jumlah (1) +(2)

=
=
=
=
=
=

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

78,750.00
47,280.00
5,514.00
4,920.00
136,464.00
568,596.50

1.100 M
163.000 Kg
0.520 M

x Rp.
125,900.00
x Rp.
1,270.00
x Rp.
76,500.00
Jumlah (1)

=
=
=
=

Rp.
Rp.
Rp.
Rp.

138,490.00
207,010.00
39,780.00
385,280.00

1.500
0.600
0.060
0.075

Oh
Oh
Oh
Oh

x
x
x
x

Rp.
52,500.00
Rp.
78,800.00
Rp.
91,900.00
Rp.
65,600.00
Jumlah (2)
Jumlah (1) +(2)

=
=
=
=
=
=

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

78,750.00
47,280.00
5,514.00
4,920.00
136,464.00
521,744.00

x Rp.
125,900.00
x Rp.
1,270.00
x Rp.
76,500.00
Jumlah (1)

=
=
=
=

Rp.
Rp.
Rp.
Rp.

138,490.00
172,720.00
41,616.00
352,826.00

x
x
x
x

Rp.
52,500.00
Rp.
78,800.00
Rp.
91,900.00
Rp.
65,600.00
Jumlah (2)
Jumlah (1) +(2)

=
=
=
=

Rp.
Rp.
Rp.
Rp.

78,750.00
47,280.00
5,514.00
4,920.00
136,464.00
489,290.00

x Rp.
125,900.00
x Rp.
1,270.00
x Rp.
76,500.00
Jumlah (1)

=
=
=
=

Rp.
Rp.
Rp.
Rp.

138,490.00
148,590.00
42,916.50
329,996.50

x Rp.
x Rp.

= Rp.
= Rp.

78,750.00
47,280.00

1 M Pasang pondasi batu kali, 1 Pc : 5 Ps

6.6.1. Bahan
- Batu belah 15/20 cm
- Semen porland
- Pasir Pasang

PP

1.500
0.600
0.060
0.075

x Rp.
125,900.00
x Rp.
1,270.00
x Rp.
76,500.00
Jumlah (1)

1 M Pasang pondasi batu kali, 1 Pc : 4 Ps.

6.5.1. Bahan
- Batu belah 15/20 cm
- Semen porland
- Pasir Pasang

PP

1.100 M
202.000 Kg
0.485 M

1.100 M
136.000 Kg
0.544 M

1.500
0.600
0.060
0.075

Oh
Oh
Oh
Oh

1 M Pasang pondasi batu kali, 1 Pc : 6 Ps

6.7.1. Bahan
- Batu belah 15/20 cm
- Semen porland
- Pasir Pasang
6.7.2. Tenaga
- Pekerja
- Tukang batu

1.100 M
117.000 Kg
0.561 M

1.500 Oh
0.600 Oh

52,500.00
78,800.00

- Kepala tukang
- Mandor

PP

6.8.

6.8.2. Tenaga
- Pekerja
- Tukang batu
- Kepala tukang
- Mandor

PP

PP

6.9.

x Rp.
91,900.00
x Rp.
65,600.00
Jumlah (2)
Jumlah (1) +(2)

=
=
=
=

Rp.
Rp.
Rp.
Rp.

5,514.00
4,920.00
136,464.00
466,460.50

x Rp.
125,900.00
x Rp.
1,270.00
x Rp.
76,500.00
Jumlah (1)

=
=
=
=

Rp.
Rp.
Rp.
Rp.

138,490.00
115,570.00
42,916.50
296,976.50

x
x
x
x

Rp.
52,500.00
Rp.
78,800.00
Rp.
91,900.00
Rp.
65,600.00
Jumlah (2)
Jumlah (1) +(2)

=
=
=
=
=
=

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

78,750.00
47,280.00
5,514.00
4,920.00
136,464.00
433,440.50

1 M Pasang pondasi batu kali, Pc : 8 Ps

6.8.1. Bahan
- Batu belah 15/20 cm
- Semen porland
- Pasir Pasang

PP

0.060 Oh
0.075 Oh

1.100 M
91.000 Kg
0.561 M

1.500
0.600
0.060
0.075

Oh
Oh
Oh
Oh

1 M Pasang pondasi batu kali, 1 Kp : 1 Sm : 1 Ps

6.9.1. Bahan
- Batu belah 15/20 cm
- Kapur pasang
- Batu Bata biasa 5x10x20 cm
- Pasir Pasang

1.100
0.229
0.229
0.544

M
Kg
M
M

x
x
x
x

Rp.
125,900.00
Rp.
187,000.00
Rp.
25,080.00
Rp.
6,270.00
Jumlah (1)

=
=
=
=
=

Rp.
Rp.
Rp.
Rp.
Rp.

138,490.00
42,823.00
5,743.32
3,410.88
190,467.20

6.9.2. Tenaga
- Pekerja
- Tukang batu
- Kepala tukang
- Mandor

1.500
0.600
0.060
0.075

Oh
Oh
Oh
Oh

x
x
x
x

Rp.
52,500.00
Rp.
78,800.00
Rp.
91,900.00
Rp.
65,600.00
Jumlah (2)
Jumlah (1) +(2)

=
=
=
=
=
=

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

78,750.00
47,280.00
5,514.00
4,920.00
136,464.00
326,931.20

6.10.

1 M Pasang pondasi batu kali, 1 Kp : 1 SM : 2 Ps

6.10.1. Bahan
- Batu belah 15/20 cm
- Kapur pasang
- Batu Bata biasa 5x10x20 cm
- Pasir Pasang

1.100
0.170
0.170
0.340

M
Kg
M
M

x
x
x
x

Rp.
125,900.00
Rp.
187,000.00
Rp.
25,080.00
Rp.
6,270.00
Jumlah (1)

=
=
=
=
=

Rp.
Rp.
Rp.
Rp.
Rp.

138,490.00
31,790.00
4,263.60
2,131.80
176,675.40

6.10.2. Tenaga
- Pekerja
- Tukang batu
- Kepala tukang
- Mandor

1.500
0.600
0.060
0.075

Oh
Oh
Oh
Oh

x
x
x
x

Rp.
52,500.00
Rp.
78,800.00
Rp.
91,900.00
Rp.
65,600.00
Jumlah (2)
Jumlah (1) +(2)

=
=
=
=
=
=

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

78,750.00
47,280.00
5,514.00
4,920.00
136,464.00
313,139.40

Rp.
Rp.
Rp.
Rp.

=
=
=
=

Rp.
Rp.
Rp.
Rp.

138,490.00
3,912,480.00
5,984.00
3,661.68

6.11.

1 M Pasangan pondasi batu kali, 1 Pc : 1/4 Kp : 4 Ps

6.11.1. Bahan
- Batu belah 15/20 cm
- Kayu Profil 4"
- Kapur pasang
- Pasir Pasang

1.100
156.000
0.032
0.584

M
Kg
M
M

x
x
x
x

125,900.00
25,080.00
187,000.00
6,270.00

6.11.2. Tenaga
- Pekerja
- Tukang batu
- Kepala tukang
- Mandor

PP

6.12.

6.12.2. Tenaga
- Pekerja
- Tukang batu
- Kepala tukang
- Mandor

6.13.

6.13.2. Tenaga
- Pekerja
- Tukang batu
- Kepala tukang
- Mandor

6.14.

4,060,615.68

x
x
x
x

Rp.
52,500.00
Rp.
78,800.00
Rp.
91,900.00
Rp.
65,600.00
Jumlah (2)
Jumlah (1) +(2)

=
=
=
=
=
=

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

78,750.00
47,280.00
5,514.00
4,920.00
136,464.00
4,197,079.68

1.100
61.000
0.147
0.492

M
Kg
M
M

x
x
x
x

Rp.
125,900.00
Rp.
25,080.00
Rp.
187,000.00
Rp.
6,270.00
Jumlah (1)

=
=
=
=
=

Rp.
Rp.
Rp.
Rp.
Rp.

138,490.00
1,529,880.00
27,489.00
3,084.84
1,698,943.84

1.500
0.600
0.060
0.075

Oh
Oh
Oh
Oh

x
x
x
x

Rp.
52,500.00
Rp.
78,800.00
Rp.
91,900.00
Rp.
65,600.00
Jumlah (2)
Jumlah (1) +(2)

=
=
=
=
=
=

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

78,750.00
47,280.00
5,514.00
4,920.00
136,464.00
1,835,407.84

1 M Pasang pondasi batu kali, 1/4 Pc : 1 Kp : 4 Ps

6.13.1. Bahan
- Batu belah 15/20 cm
- Kayu Profil 4"
- Kapur pasang
- Pasir Pasang

PP

Oh
Oh
Oh
Oh

= Rp.

1 M Pasang pondasi batu kali, 1 Pc : 3 Kp : 10 Ps

6.12.1. Bahan
- Batu belah 15/20 cm
- Kayu Profil 4"
- Kapur pasang
- Pasir Pasang

PP

1.500
0.600
0.060
0.075

Jumlah (1)

1.100
41.000
0.131
0.523

M
Kg
M
M

x
x
x
x

Rp.
125,900.00
Rp.
25,080.00
Rp.
187,000.00
Rp.
6,270.00
Jumlah (1)

=
=
=
=
=

Rp.
Rp.
Rp.
Rp.
Rp.

138,490.00
1,028,280.00
24,497.00
3,279.21
1,194,546.21

1.500
0.600
0.060
0.075

Oh
Oh
Oh
Oh

x
x
x
x

Rp.
52,500.00
Rp.
78,800.00
Rp.
91,900.00
Rp.
65,600.00
Jumlah (2)
Jumlah (1) +(2)

=
=
=
=
=
=

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

78,750.00
47,280.00
5,514.00
4,920.00
136,464.00
1,331,010.21

1 M Pasang pondasi batu kosong

6.14.1. Bahan
- Batu belah 10/15 cm
- Pasir pasang

1.200 M
0.300 M

x Rp.
140,900.00
x Rp.
76,500.00
Jumlah (1)

= Rp.
= Rp.
= Rp.

169,080.00
22,950.00
192,030.00

6.14.2. Tenaga
- Pekerja
- Tukang batu
- Kepala tukang
- Mandor

0.780
0.390
0.039
0.039

x
x
x
x

=
=
=
=
=
=

40,950.00
30,732.00
3,584.10
2,558.40
77,824.50
269,854.50

Oh
Oh
Oh
Oh

Rp.
52,500.00
Rp.
78,800.00
Rp.
91,900.00
Rp.
65,600.00
Jumlah (2)
Jumlah (1) +(2)

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

PP

6.15.

1 M Pasang pondasi siklop 40 % batu kali

6.15.1. Bahan
- Besi beton
- Semen portland
- Pasir beton
- Koral beton
- Kawat beton

6.15.2. Tenaga
- Pekerja
- Tukang batu
- Kepala tukang
- Mandor

PP

6.16.

6.16.2. Tenaga
- Pekerja
- Tukang batu
- Kepala tukang
- Mandor

6.17.

Kg
Kg
Kg
M
Kg

x
x
x
x
x

Rp.
14,410.00
Rp.
1,270.00
Rp.
87,800.00
Rp.
185,900.00
Rp.
16,830.00
Jumlah (1)

=
=
=
=
=
=

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

1,080,750.00
256,540.00
28,096.00
91,091.00
13,464.00
1,469,941.00

3.000
0.850
0.085
0.150

Oh
Oh
Oh
Oh

x
x
x
x

Rp.
52,500.00
Rp.
78,800.00
Rp.
91,900.00
Rp.
65,600.00
Jumlah (2)
Jumlah (1) +(2)

=
=
=
=
=
=

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

157,500.00
66,980.00
7,811.50
9,840.00
242,131.50
1,712,072.50

x Rp.
125,900.00
x Rp.
1,270.00
x Rp.
76,500.00
Jumlah (1)

=
=
=
=

Rp.
Rp.
Rp.
Rp.

56,655.00
355,600.00
51,255.00
463,510.00

x
x
x
x

=
=
=
=
=
=

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

124,950.00
23,640.00
2,757.00
5,248.00
156,595.00
620,105.00

1 M Pasang pondasi sumuran diameter 100 Cm

6.16.1. Bahan
- Batu belah 15/20 cm
- Semen portland
- Pasir Pasang

PP

75.000
202.000
0.320
0.490
0.800

0.450 M
280.000 Kg
0.670 M

2.380
0.300
0.030
0.080

Oh
Oh
Oh
Oh

Rp.
52,500.00
Rp.
78,800.00
Rp.
91,900.00
Rp.
65,600.00
Jumlah (2)
Jumlah (1) +(2)

1 M Pembuatan tiang pancang (40 x 40) Cm, beton bertulang

6.17.1. Bahan
- Pasir urug darat
- Pasir beton
- Koral beton
- Semen porland
- Besi beton
- Kawat beton
- Kayu kaso 5/7
- Paku
- Minyak bekisting
- Plamur tembok
6.17.2. Tenaga
- Pekerja
- Tukang batu
- Kepala tukang
- Mandor

0.019
0.094
0.150
60.500
45.000
0.900
0.032
0.120
0.090
0.240

M
M
M
Kg
Kg
Kg
M
Kg
Lt
Kg

x
x
x
x
x
x
x
x
x
x

Rp.
64,400.00
Rp.
87,800.00
Rp.
185,900.00
Rp.
1,270.00
Rp.
14,410.00
Rp.
16,830.00
Rp. 3,107,500.00
Rp.
14,520.00
Rp.
6,290.00
Rp.
15,730.00
Jumlah (1)

=
=
=
=
=
=
=
=
=
=
=

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

1,223.60
8,253.20
27,885.00
76,835.00
648,450.00
15,147.00
99,440.00
1,742.40
566.10
3,775.20
883,317.50

1.000
0.670
0.067
0.050

Oh
Oh
Oh
Oh

x
x
x
x

Rp.
52,500.00
Rp.
78,800.00
Rp.
91,900.00
Rp.
65,600.00
Jumlah (2)
Jumlah (1) +(2)

=
=
=
=
=
=

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

52,500.00
52,796.00
6,157.30
3,280.00
114,733.30
998,050.80

PP

6.18.

1 M Pembuatan tiang pancang (35 x 35) Cm, beton bertulang

6.18.1. Bahan
- Pasir urug darat
- Pasir beton
- Koral beton
- Semen porland
- Besi beton
- Kawat beton
- Kayu kaso 5/7
- Paku
- Minyak bekisting
- Plamur tembok

6.18.2. Tenaga
- Pekerja
- Tukang batu
- Kepala tukang
- Mandor

0.016
0.080
0.125
49.000
34.500
0.700
0.027
0.120
0.090
0.200

M
M
M
Kg
Kg
Kg
M
Kg
Lt
Kg

x
x
x
x
x
x
x
x
x
x

Rp.
64,400.00
Rp.
87,800.00
Rp.
185,900.00
Rp.
1,270.00
Rp.
14,410.00
Rp.
16,830.00
Rp. 3,107,500.00
Rp.
14,520.00
Rp.
6,290.00
Rp.
15,730.00
Jumlah (1)

=
=
=
=
=
=
=
=
=
=
=

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

1,030.40
7,024.00
23,237.50
62,230.00
497,145.00
11,781.00
83,902.50
1,742.40
566.10
3,146.00
691,804.90

0.800
0.500
0.050
0.040

Oh
Oh
Oh
Oh

x
x
x
x

Rp.
52,500.00
Rp.
78,800.00
Rp.
91,900.00
Rp.
65,600.00
Jumlah (2)
Jumlah (1) +(2)

=
=
=
=
=
=

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

42,000.00
39,400.00
4,595.00
2,624.00
88,619.00
780,423.90

ANALISA BIAYA KONSTRUKSI


PEKERJAAN DINDING
PD

6.1.

1 M Pasangan bata merah tebal 1 bata, 1 Pc : 1 Ps

6.1.1. Bahan
- Bata merah 5 x 10 x 20 cm
- Semen portland
- Pasir pasang

6.1.2
-

PD

6.2
6.2.1

Bahan
- Bata merah 5 x 10 x 20 cm
- Semen portland
- Pasir pasang

6.3
6.3.1

6.4.1

Tenaga
Pekerja
Tukang batu
Kepala tukang
Mandor

Bahan
- Bata merah 5 x 10 x 20 cm
- Semen portland
- Pasir pasang

6.4

Oh
Oh
Oh
Oh

Rp.
Rp.
Rp.

720
1,270
76,500
Jumlah (1)

=
=
=
=

Rp
Rp
Rp
Rp

100,800.00
81,318.10
4,513.50
186,631.60

x
x
x
x

Rp.
Rp.
Rp.
Rp.

52,500
78,800
91,900
65,600
Jumlah (2)
Jumlah (1) + (2)

=
=
=
=
=
=

Rp
Rp
Rp
Rp
Rp
Rp

34,125.00
15,760.00
1,838.00
1,968.00
53,691.00
240,322.60

140.000 Bh
43.500 Kg
0.080 M

x
x
x

Rp.
Rp.
Rp.

720
1,270
76,500
Jumlah (1)

=
=
=
=

Rp
Rp
Rp
Rp

100,800.00
55,245.00
6,120.00
162,165.00

0.650
0.200
0.020
0.030

Oh
Oh
Oh
Oh

x
x
x
x

Rp.
Rp.
Rp.
Rp.

52,500
78,800
91,900
65,600
Jumlah (2)
Jumlah (1) + (2)

=
=
=
=
=
=

Rp
Rp
Rp
Rp
Rp
Rp

34,125.00
15,760.00
1,838.00
1,968.00
53,691.00
215,856.00

x
x
x

Rp.
Rp.
Rp.

720
1,270
76,500
Jumlah (1)

=
=
=
=

Rp
Rp
Rp
Rp

100,800.00
41,846.50
6,961.50
149,608.00

x
x
x
x

Rp.
Rp.
Rp.
Rp.

52,500
78,800
91,900
65,600
Jumlah (2)
Jumlah (1) + (2)

=
=
=
=
=
=

Rp
Rp
Rp
Rp
Rp
Rp

34,125.00
15,760.00
1,838.00
1,968.00
53,691.00
203,299.00

Rp.

720 =

Rp

100,800.00

1 m Pasangan bata merah tebal 1 bata, 1Pc : 3 Ps

6.3.2

PD

0.650
0.200
0.020
0.030

x
x
x

1m Pasangan bata merah tebal 1 bata, 1Pc : 2 Ps

6.2.2

PD

Tenaga
Pekerja
Tukang batu
Kepala tukang
Mandor

140.000 Bh
64.030 Kg
0.059 M

Tenaga
Pekerja
Tukang batu
Kepala tukang
Mandor

140.000 Bh
32.950 Kg
0.091 M

0.650
0.200
0.020
0.030

Oh
Oh
Oh
Oh

1 m Pasangan bata merah tebal 1 bata, 1Pc : 4 Ps


Bahan
- Bata merah 5 x 10 x 20 cm

140.000 Bh

- Semen portland
- Pasir pasang

6.4.2
-

PD

6.5
6.5.1

Bahan
- Bata merah 5 x 10 x 20 cm
- Semen portland
- Pasir pasang

6.6
6.6.1

0.650
0.200
0.020
0.030

Oh
Oh
Oh
Oh

x
x

Rp.
Rp.

1,270 =
76,500 =
Jumlah (1)
=

Rp
Rp
Rp

33,718.50
7,114.50
141,633.00

x
x
x
x

Rp.
Rp.
Rp.
Rp.

52,500
78,800
91,900
65,600
Jumlah (2)
Jumlah (1) + (2)

=
=
=
=
=
=

Rp
Rp
Rp
Rp
Rp
Rp

34,125.00
15,760.00
1,838.00
34,125.00
51,723.00
193,356.00

x
x
x

Rp.
Rp.
Rp.

720
1,270
76,500
Jumlah (1)

=
=
=
=

Rp
Rp
Rp
Rp

100,800.00
28,194.00
7,803.00
136,797.00

x
x
x
x

Rp.
Rp.
Rp.
Rp.

52,500
78,800
91,900
65,600
Jumlah (2)
Jumlah (1) + (2)

=
=
=
=
=
=

Rp
Rp
Rp
Rp
Rp
Rp

34,125.00
0.00
0.00
1,968.00
36,093.00
172,890.00

x
x
x

Rp.
Rp.
Rp.

720
1,270
76,500
Jumlah (1)

=
=
=
=

Rp
Rp
Rp
Rp

100,800.00
28,194.00
7,803.00
136,797.00

x
x
x
x

Rp.
Rp.
Rp.
Rp.

52,500
78,800
91,900
65,600
Jumlah (2)
Jumlah (1) + (2)

=
=
=
=
=
=

Rp
Rp
Rp
Rp
Rp
Rp

34,125.00
15,760.00
1,838.00
1,968.00
53,691.00
190,488.00

1 m Pasangan bata merah tebal 1 bata, 1Pc : 5 Ps

6.5.2

PD

Tenaga
Pekerja
Tukang batu
Kepala tukang
Mandor

26.550 Kg
0.093 M

Tenaga
Pekerja
Tukang batu
Kepala tukang
Mandor

140.000 Bh
22.200 Kg
0.102 M

0.650
0.200
0.020
0.030

Oh
Oh
Oh
Oh

1 m Pasangan bata merah tebal 1 bata, 1Pc : 6 Ps


Bahan
- Bata merah 5 x 10 x 20 cm
- Semen portland
- Pasir pasang

6.6.2
-

Tenaga
Pekerja
Tukang batu
Kepala tukang
Mandor

140.000 Bh
22.200 Kg
0.102 M

0.650
0.200
0.020
0.030

Oh
Oh
Oh
Oh

PD

6.7
6.7.1

1 m Pasangan bata merah tebal 1 bata, 1Pc : 3 Kp : 10 Ps


Bahan
- Bata merah 5 x 10 x 20 cm
- Semen portland
- Pasir pasang

6.7.2
-

PD

6.8
6.8.1

Bahan
- Bata merah 5 x 10 x 20 cm
- Semen portland
- Pasir pasang

6.9
6.9.1

0.650
0.200
0.020
0.030

Oh
Oh
Oh
Oh

x
x
x

Rp.
Rp.
Rp.

720
1,270
76,500
Jumlah (1)

=
=
=
=

Rp
Rp
Rp
Rp

100,800.00
12,801.60
7,076.25
19,877.85

x
x
x
x

Rp.
Rp.
Rp.
Rp.

52,500
78,800
91,900
65,600
Jumlah (2)
Jumlah (1) + (2)

=
=
=
=
=
=

Rp
Rp
Rp
Rp
Rp
Rp

34,125.00
15,760.00
1,838.00
1,968.00
53,691.00
73,568.85

x
x
x

Rp.
Rp.
Rp.

720
1,270
76,500
Jumlah (1)

=
=
=
=

Rp
Rp
Rp
Rp

50,400.00
35,306.00
2,142.00
87,848.00

x
x
x
x

Rp.
Rp.
Rp.
Rp.

52,500
78,800
91,900
65,600
Jumlah (2)
Jumlah (1) + (2)

=
=
=
=
=
=

Rp
Rp
Rp
Rp
Rp
Rp

16,800.00
7,880.00
919.00
984.00
26,583.00
114,431.00

x
x
x

Rp.
Rp.
Rp.

720
1,270
76,500
Jumlah (1)

=
=
=
=

Rp
Rp
Rp
Rp

50,400.00
24,066.50
2,907.00
77,373.50

x
x
x
x

Rp.
Rp.
Rp.
Rp.

52,500
78,800
91,900
65,600
Jumlah (2)
Jumlah (1) + (2)

=
=
=
=
=
=

Rp
Rp
Rp
Rp
Rp
Rp

16,800.00
7,880.00
919.00
984.00
26,583.00
103,956.50

1 m Pasangan bata merah tebal 1/2 bata, 1Pc : 1 Ps

6.8.2
-

PD

Tenaga
Pekerja
Tukang batu
Kepala tukang
Mandor

140.000 Bh
10.080 Kg
0.0925 M

Tenaga
Pekerja
Tukang batu
Kepala tukang
Mandor

70.000 Bh
27.800 Kg
0.028 M

0.320
0.100
0.010
0.015

Oh
Oh
Oh
Oh

1 m Pasangan bata merah tebal 1/2 bata, 1Pc : 2 Ps


Bahan
- Bata merah 5 x 10 x 20 cm
- Semen portland
- Pasir pasang

6.9.2
-

Tenaga
Pekerja
Tukang batu
Kepala tukang
Mandor

70.000 Bh
18.950 Kg
0.038 M

0.320
0.100
0.010
0.015

Oh
Oh
Oh
Oh

PD

PD

PD

6.10

1 m Pasangan bata merah tebal 1/2 bata, 1Pc : 3 Ps

6.10.1
-

Bahan
Bata merah 5 x 10 x 20 cm
Semen portland
Pasir pasang

6.10.2
-

Tenaga
Pekerja
Tukang batu
Kepala tukang
Mandor

6.11

1 m Pasangan bata merah tebal 1/2 bata, 1Pc : 4 Ps

6.11.1
-

Bahan
Bata merah 5 x 10 x 20 cm
Semen portland
Pasir pasang

6.11.2
-

Tenaga
Pekerja
Tukang batu
Kepala tukang
Mandor

6.12

1 m Pasangan bata merah tebal 1/2 bata, 1Pc : 5 Ps

6.12.1
-

Bahan
Bata merah 5 x 11 x 22 cm
Semen portland
Pasir pasang

6.12.2
-

Tenaga
Pekerja
Tukang batu
Kepala tukang
Mandor

70.000 Bh
14.370 Kg
0.040 M

0.320
0.100
0.010
0.015

Oh
Oh
Oh
Oh

70.000 Bh
11.500 Kg
0.043 M

0.320
0.100
0.010
0.015

Oh
Oh
Oh
Oh

70.000 Bh
9.680 Kg
0.045 M

0.320
0.100
0.010
0.015

Oh
Oh
Oh
Oh

x
x
x

Rp.
Rp.
Rp.

720
1,270
76,500
Jumlah (1)

=
=
=
=

Rp
Rp
Rp
Rp

50,400.00
18,249.90
3,060.00
71,709.90

x
x
x
x

Rp.
Rp.
Rp.
Rp.

52,500
78,800
91,900
65,600
Jumlah (2)
Jumlah (1) + (2)

=
=
=
=
=
=

Rp
Rp
Rp
Rp
Rp
Rp

16,800.00
7,880.00
919.00
984.00
26,583.00
98,292.90

x
x
x

Rp.
Rp.
Rp.

720
1,270
76,500
Jumlah (1)

=
=
=
=

Rp
Rp
Rp
Rp

50,400.00
14,605.00
3,289.50
68,294.50

x
x
x
x

Rp.
Rp.
Rp.
Rp.

52,500
78,800
91,900
65,600
Jumlah (2)
Jumlah (1) + (2)

=
=
=
=
=
=

Rp
Rp
Rp
Rp
Rp
Rp

16,800.00
7,880.00
919.00
984.00
26,583.00
94,877.50

x
x
x

Rp.
Rp.
Rp.

720
1,270
76,500
Jumlah (1)

=
=
=
=

Rp
Rp
Rp
Rp

50,400.00
12,293.60
3,442.50
66,136.10

x
x
x
x

Rp.
Rp.
Rp.
Rp.

52,500
78,800
91,900
65,600
Jumlah (2)
Jumlah (1) + (2)

=
=
=
=
=
=

Rp
Rp
Rp
Rp
Rp
Rp

16,800.00
7,880.00
919.00
984.00
26,583.00
92,719.10

PD

PD

PD

6.13

1 m Pasangan bata merah tebal 1/2 bata, 1Pc : 6 Ps

6.13.1
-

Bahan
Bata merah 5 x 11 x 22 cm
Semen portland
Pasir pasang

6.13.2
-

Tenaga
Pekerja
Tukang batu
Kepala tukang
Mandor

6.14

1 m Pasangan bata merah tebal 1/2 bata, 1Pc : 8 Ps

6.14.1
-

Bahan
Bata merah 5 x 11 x 22 cm
Semen portland
Pasir pasang

6.14.2
-

Tenaga
Pekerja
Tukang batu
Kepala tukang
Mandor

6.15

1 m Pasangan bata merah tebal 1/2 bata, 1Pc : 3 Kp : 10 Ps

6.15.1
-

Bahan
Bata merah 5 x 11 x 22 cm
Semen portland
Pasir pasang
Kapur pasang

6.15.2
-

Tenaga
Pekerja
Tukang batu
Kepala tukang
Mandor

70.000 Bh
8.320 Kg
0.049 M

0.320
0.100
0.010
0.015

Oh
Oh
Oh
Oh

70.000 Bh
6.500 Kg
0.050 M

0.320
0.100
0.010
0.015

Oh
Oh
Oh
Oh

x
x
x

Rp.
Rp.
Rp.

720
1,270
76,500
Jumlah (1)

=
=
=
=

Rp
Rp
Rp
Rp

50,400.00
10,566.40
3,748.50
64,714.90

x
x
x
x

Rp.
Rp.
Rp.
Rp.

52,500
78,800
91,900
65,600
Jumlah (2)
Jumlah (1) + (2)

=
=
=
=
=
=

Rp
Rp
Rp
Rp
Rp
Rp

16,800.00
7,880.00
919.00
984.00
26,583.00
91,297.90

x
x
x

Rp.
Rp.
Rp.

720
1,270
76,500
Jumlah (1)

=
=
=
=

Rp
Rp
Rp
Rp

50,400.00
8,255.00
3,825.00
62,480.00

x
x
x
x

Rp.
Rp.
Rp.
Rp.

52,500
78,800
91,900
65,600
Jumlah (2)
Jumlah (1) + (2)

=
=
=
=
=
=

Rp
Rp
Rp
Rp
Rp
Rp

16,800.00
7,880.00
919.00
984.00
26,583.00
89,063.00

70.000
4.500
0.050
0.015

Bh
Kg
M
M

x
x
x
x

Rp.
Rp.
Rp.
Rp.

720
1,270
76,500
0
Jumlah (1)

=
=
=
=
=

Rp
Rp
Rp
Rp
Rp

50,400.00
5,715.00
3,825.00
0.00
59,940.00

0.320
0.100
0.010
0.015

Oh
Oh
Oh
Oh

x
x
x
x

Rp.
Rp.
Rp.
Rp.

52,500
78,800
91,900
65,600
Jumlah (2)
Jumlah (1) + (2)

=
=
=
=
=
=

Rp
Rp
Rp
Rp
Rp
Rp

16,800.00
7,880.00
919.00
984.00
26,583.00
86,523.00

PD

PD

PD

6.16

1 m Pasangan bata merah tebal 1/2 bata, 1Kp : 1 Sm : 1 Ps

6.16.1
-

Bahan
Bata merah 5 x 11 x 22 cm
Kawat Duri
Pasir pasang
Kapur padam

6.16.2
-

Tenaga
Pekerja
Tukang batu
Kepala tukang
Mandor

6.17

1 m Pasangan bata merah tebal 1/2 bata, 1Kp : 1 Sm : 2 Ps

6.17.1
-

Bahan
Bata merah 5 x 11 x 22 cm
Kawat Duri
Pasir pasang
Kapur padam

6.17.2
-

Tenaga
Pekerja
Tukang batu
Kepala tukang
Mandor

6.18

1 m Pasangan dinding holowblock (HB.20)

6.18.1
-

Bahan
Hollow block (HB.20)
Semen portland
Pasir pasang
Besi beton polos

6.18.2
-

Tenaga
Pekerja
Tukang batu
Kepala tukang
Mandor

70.000
0.018
0.018
0.018

Bh
M
M
M

x
x
x
x

Rp.
Rp.
Rp.
Rp.

720
4,030
76,500
68,290
Jumlah (1)

=
=
=
=
=

Rp
Rp
Rp
Rp
Rp

50,400.00
72.54
1,377.00
1,229.22
53,078.76

0.320
0.100
0.010
0.015

Oh
Oh
Oh
Oh

x
x
x
x

Rp.
Rp.
Rp.
Rp.

52,500
78,800
91,900
65,600
Jumlah (2)
Jumlah (1) + (2)

=
=
=
=
=
=

Rp
Rp
Rp
Rp
Rp
Rp

16,800.00
7,880.00
919.00
984.00
26,583.00
79,661.76

70.000
0.014
0.028
0.014

Bh
Kg
M
M

x
x
x
x

Rp.
Rp.
Rp.
Rp.

720
1,270
76,500
68,290
Jumlah (1)

=
=
=
=
=

Rp
Rp
Rp
Rp
Rp

50,400.00
17.78
2,142.00
956.06
53,515.84

0.320
0.100
0.010
0.015

Oh
Oh
Oh
Oh

x
x
x
x

Rp.
Rp.
Rp.
Rp.

52,500
78,800
91,900
65,600
Jumlah (2)
Jumlah (1) + (2)

=
=
=
=
=
=

Rp
Rp
Rp
Rp
Rp
Rp

16,800.00
7,880.00
919.00
984.00
26,583.00
80,098.84

12.500
13.500
0.048
1.950

Bh
Kg
M
M

x
x
x
x

Rp.
Rp.
Rp.
Rp.

17,070
1,270
76,500
168,250
Jumlah (1)

=
=
=
=
=

Rp
Rp
Rp
Rp
Rp

213,375.00
17,145.00
3,672.00
328,087.50
562,279.50

0.320
0.150
0.015
0.017

Oh
Oh
Oh
Oh

x
x
x
x

Rp.
Rp.
Rp.
Rp.

52,500
78,800
91,900
65,600
Jumlah (2)
Jumlah (1) + (2)

=
=
=
=
=
=

Rp
Rp
Rp
Rp
Rp
Rp

16,800.00
11,820.00
1,378.50
1,115.20
31,113.70
593,393.20

PD

PD

PD

6.19

1 m Pasangan dinding holowblock (HB.15)

6.19.1
-

Bahan
Hollow block (HB.15)
Semen portland
Pasir pasang
Besi beton polos

6.19.2
-

Tenaga
Pekerja
Tukang batu
Kepala tukang
Mandor

6.20

1 m Pasangan dinding holowblock (HB.10)

6.20.1
-

Bahan
Hollow block (HB.10)
Semen portland
Pasir pasang
Besi beton polos

6.20.2
-

Tenaga
Pekerja
Tukang batu
Kepala tukang
Mandor

6.21

1 m Pasangan dinding conblock (CB.20)

6.21.1
-

Bahan
Concrete block (CB 20)
Semen portland
Pasir beton
Pasir pasang
Besi beton polos
Paku biasa 2" - 5"
Kayu sembarang
Kawat beton
Koral beton

12.500
10.450
0.038
1.950

Bh
Kg
M
M

x
x
x
x

Rp.
Rp.
Rp.
Rp.

8,540
1,270
76,500
168,250
Jumlah (1)

=
=
=
=
=

Rp
Rp
Rp
Rp
Rp

106,750.00
13,271.50
2,907.00
328,087.50
451,016.00

0.320
0.120
0.012
0.015

Oh
Oh
Oh
Oh

x
x
x
x

Rp.
Rp.
Rp.
Rp.

52,500
78,800
91,900
65,600
Jumlah (2)
Jumlah (1) + (2)

=
=
=
=
=
=

Rp
Rp
Rp
Rp
Rp
Rp

16,800.00
9,456.00
1,102.80
984.00
28,342.80
479,358.80

12.500
7.500
0.027
1.950

Bh
Kg
M
M

x
x
x
x

Rp.
Rp.
Rp.
Rp.

17,330
1,270
76,500
168,250
Jumlah (1)

=
=
=
=
=

Rp
Rp
Rp
Rp
Rp

216,625.00
9,525.00
2,065.50
328,087.50
556,303.00

0.320
0.100
0.010
0.015

Oh
Oh
Oh
Oh

x
x
x
x

Rp.
Rp.
Rp.
Rp.

52,500
78,800
91,900
65,600
Jumlah (2)
Jumlah (1) + (2)

=
=
=
=
=
=

Rp
Rp
Rp
Rp
Rp
Rp

16,800.00
7,880.00
919.00
984.00
26,583.00
582,886.00

Bh
Kg
M
M
Bh
Kg
M
M
M

x
x
x
x
x
x
x
x
x

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

2,920
1,270
87,800
76,500
14,410
14,520
3,107,500
16,830
185,900
Jumlah (1)

=
=
=
=
=
=
=
=
=
=

Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp

36,500.00
17,843.50
351.20
3,213.00
55,766.70
87.12
3,107.50
504.90
929.50
118,303.42

12.500
14.050
0.004
0.042
3.870
0.006
0.001
0.030
0.005

PD

PD

6.21.2
-

Tenaga
Pekerja
Tukang batu
Tukang besi
Kepala tukang
Mandor

6.22

1 m Pasangan dinding Conblock (CB.15)

6.22.1
-

Bahan
Concrete block (CB 15)
Semen portland
Pasir beton
Pasir pasang
Besi beton polos 8 mm
Paku biasa 2" - 5"
Kayu sembarang
Kawat beton
Koral beton

6.22.2
-

Tenaga
Pekerja
Tukang batu
Tukang besi
Kepala tukang
Mandor

6.23

1 m Pasangan dinding Conblock (CB.10)

6.23.1
-

Bahan
Concrete block (CB 10)
Semen portland
Pasir beton
Pasir pasang
Besi beton polos
Paku biasa 2" - 5"
Kayu sembarang
Kawat beton
Koral beton

6.23.2
-

Tenaga
Pekerja
Tukang batu
Tukang besi
Kepala tukang
Mandor

0.370
0.157
0.007
0.0164
0.0185

Oh
Oh
Oh
Oh
Oh

x
x
x
x
x

Rp.
Rp.
Rp.
Rp.
Rp.

52,500
78,800
78,800
91,900
65,600
Jumlah (2)
Jumlah (1) + (2)

=
=
=
=
=
=
=

Rp
Rp
Rp
Rp
Rp
Rp
Rp

19,425.00
12,371.60
551.60
1,507.16
1,213.60
35,068.96
153,372.38

12.500
10.460
0.003
0.032
2.870
0.004
0.001
0.020
0.004

Bh
Kg
M
M
Bh
Kg
M
M
M

x
x
x
x
x
x
x
x
x

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

1,600
1,270
87,800
76,500
14,410
14,520
3,107,500
16,830
185,900
Jumlah (1)

=
=
=
=
=
=
=
=
=
=

Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp

20,000.00
13,284.20
263.40
2,448.00
41,356.70
58.08
3,107.50
336.60
743.60
81,598.08

0.340
0.130
0.007
0.0137
0.017

Oh
Oh
Oh
Oh
Oh

x
x
x
x
x

Rp.
Rp.
Rp.
Rp.
Rp.

52,500
78,800
78,800
91,900
65,600
Jumlah (2)
Jumlah (1) + (2)

=
=
=
=
=
=
=

Rp
Rp
Rp
Rp
Rp
Rp
Rp

17,850.00
10,244.00
551.60
1,259.03
1,115.20
31,019.83
112,617.91

12.500
7.200
0.002
0.021
2.540
0.003
0.001
0.015
0.003

Bh
Kg
M
M
Bh
Kg
M
M
M

x
x
x
x
x
x
x
x
x

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

740
1,270
87,800
76,500
14,410
14,520
3,107,500
16,830
185,900
Jumlah (1)

=
=
=
=
=
=
=
=
=
=

Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp

9,250.00
9,144.00
175.60
1,606.50
36,601.40
43.56
3,107.50
252.45
557.70
60,738.71

0.340
0.107
0.007
0.0114
0.017

Oh
Oh
Oh
Oh
Oh

x
x
x
x
x

Rp.
Rp.
Rp.
Rp.
Rp.

52,500
78,800
78,800
91,900
65,600
Jumlah (2)
Jumlah (1) + (2)

=
=
=
=
=
=
=

Rp
Rp
Rp
Rp
Rp
Rp
Rp

17,850.00
8,431.60
551.60
1,047.66
1,115.20
28,996.06
89,734.77

PD

PD

PD

6.24

1 m Pasang dinding lantai

6.24.1
-

Bahan
Bondbeam 40 x 20 x 20 cm
Semen portland
Pasir beton
Besi beton polos
Koral beton

2.500
5.100
0.080
1.500
0.150

Bh
Kg
M
Kg
M

x
x
x
x
x

Rp.
Rp.
Rp.
Rp.
Rp.

30,250
1,270
87,800
14,410
185,900
Jumlah (1)

=
=
=
=
=
=

Rp
Rp
Rp
Rp
Rp
Rp

75,625.00
6,477.00
7,024.00
21,615.00
27,885.00
138,626.00

6.24.2
-

Tenaga
Pekerja
Tukang batu
Tukang besi
Kepala tukang
Mandor

0.100
0.030
0.030
0.006
0.005

Oh
Oh
Oh
Oh
Oh

x
x
x
x
x

Rp.
Rp.
Rp.
Rp.
Rp.

52,500
78,800
78,800
91,900
65,600
Jumlah (2)
Jumlah (1) + (2)

=
=
=
=
=
=
=

Rp
Rp
Rp
Rp
Rp
Rp
Rp

5,250.00
2,364.00
2,364.00
551.40
328.00
10,857.40
149,483.40

6.25

1 m Pasang dinding roster / terawang

6.25.1
-

Bahan
Roster/terawang
Semen portland
Pasir pasang

36.000 Bh
12.800 Kg
0.035 M

x
x
x

Rp.
Rp.
Rp.

3,030
1,270
76,500
Jumlah (1)

=
=
=
=

Rp
Rp
Rp
Rp

109,080.00
16,256.00
2,677.50
128,013.50

6.25.2
-

Tenaga
Pekerja
Tukang batu
Kepala tukang
Mandor

x
x
x
x

Rp.
Rp.
Rp.
Rp.

52,500
78,800
91,900
65,600
Jumlah (2)
Jumlah (1) + (2)

=
=
=
=
=
=

Rp
Rp
Rp
Rp
Rp
Rp

15,750.00
7,880.00
919.00
984.00
25,533.00
153,546.50

6.26

1 m Pasang bata berongga ukuran ( 5 x 10 x 20 ) cm

6.26.1
-

Bahan
Batu berongga
Semen portland
Pasir pasang

x
x
x

Rp.
Rp.
Rp.

610
1,270
76,500
Jumlah (1)

=
=
=
=

Rp
Rp
Rp
Rp

48,800.00
30,035.50
43,605.00
122,440.50

6.26.2
-

Tenaga
Pekerja
Tukang batu
Kepala tukang
Mandor

x
x
x
x

Rp.
Rp.
Rp.
Rp.

52,500
78,800
91,900
65,600
Jumlah (2)
Jumlah (1) + (2)

=
=
=
=
=
=

Rp
Rp
Rp
Rp
Rp
Rp

16,800.00
11,820.00
1,378.50
984.00
30,982.50
153,423.00

0.300
0.100
0.010
0.015

Oh
Oh
Oh
Oh

80.000 Bh
23.650 Kg
0.570 M

0.320
0.150
0.015
0.015

Oh
Oh
Oh
Oh

PD

6.27

1 m Pasang dinding anyaman bambu, rangka kayu

6.27.1
-

Bahan
Bilik bambu
Kayu 5/7
Paku
List kayu 2/4

1.500
0.014
0.012
0.003

M
M
Kg
M

x
x
x
x

Rp.
Rp.
Rp.
Rp.

16,340
5,225,000
14,520
5,225,000
Jumlah (1)

=
=
=
=
=

Rp
Rp
Rp
Rp
Rp

24,510.00
73,150.00
174.24
15,675.00
113,509.24

6.27.2
-

Tenaga
Pekerja
Tukang batu
Kepala tukang
Mandor

0.100
0.050
0.005
0.002

Oh
Oh
Oh
Oh

x
x
x
x

Rp.
Rp.
Rp.
Rp.

52,500
78,800
91,900
65,600
Jumlah (2)
Jumlah (1) + (2)

=
=
=
=
=
=

Rp
Rp
Rp
Rp
Rp
Rp

5,250.00
3,940.00
459.50
131.20
9,780.70
123,289.94

ANALISA BIAYA KONSTRUKSI


PEKERJAAN PLESTERAN
PPL 6.1.
6.1.1.

1 M Plesteran 1 Pc : 1 Ps, tebal 15 mm


Bahan
- Semen portland
- Pasir pasang

6.1.2.
-

PPL 6.2.
6.2.1.

Bahan
- Semen portland
- Pasir pasang

PPL 6.3.

Tenaga
Pekerja
Tukang batu
Kepala tukang
Mandor

Bahan
- Semen portland
- Pasir pasang

6.4.1.

16,408.40
994.50
17,402.90

52,500
78,800
91,900
65,600
Jumlah (2)
Jumlah (1) + (2)

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

10,500.00
11,820.00
1,378.50
656.00
24,354.50
41,757.40

8.520 Kg x Rp.
0.017 M x Rp.

1,270 = Rp.
76,500 = Rp.
Jumlah (1)
= Rp.

10,820.40
1,300.50
12,120.90

0.200
0.150
0.015
0.010

52,500
78,800
91,900
65,600
Jumlah (2)
Jumlah (1) + (2)

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

10,500.00
11,820.00
1,378.50
656.00
24,354.50
36,475.40

6.480 Kg x Rp.
0.019 M x Rp.

1,270 = Rp.
76,500 = Rp.
Jumlah (1)
= Rp.

8,229.60
1,453.50
9,683.10

0.200
0.150
0.015
0.010

52,500
78,800
91,900
65,600
Jumlah (2)
Jumlah (1) + (2)

0.200
0.150
0.015
0.010

Oh
Oh
Oh
Oh

x
x
x
x

Rp.
Rp.
Rp.
Rp.

=
=
=
=
=
=

Oh
Oh
Oh
Oh

x
x
x
x

Rp.
Rp.
Rp.
Rp.

=
=
=
=
=
=

1 M Plesteran 1 Pc : 3 Ps, tebal 15 mm

6.3.2.

PPL 6.4.

1,270 = Rp.
76,500 = Rp.
Jumlah (1)
= Rp.

1 M Plesteran 1 Pc : 2 Ps, tebal 15 mm

6.2.2.

6.3.1.

Tenaga
Pekerja
Tukang batu
Kepala tukang
Mandor

12.920 Kg x Rp.
0.013 M x Rp.

Tenaga
Pekerja
Tukang batu
Kepala tukang
Mandor

Oh
Oh
Oh
Oh

x
x
x
x

Rp.
Rp.
Rp.
Rp.

=
=
=
=
=
=

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

10,500.00
11,820.00
1,378.50
656.00
24,354.50
34,037.60

1,270 = Rp.
76,500 = Rp.
Jumlah (1)
= Rp.

6,604.00
1,530.00
8,134.00

1 M Plesteran 1 Pc : 4 Ps, tebal 15 mm


Bahan
- Semen portland
- Pasir pasang

5.200 Kg x Rp.
0.020 M x Rp.

6.4.2.
-

PPL 6.5.
6.5.1.

Bahan
- Semen portland
- Pasir pasang

PPL 6.6.

Oh
Oh
Oh
Oh

x
x
x
x

Rp.
Rp.
Rp.
Rp.

52,500
78,800
91,900
65,600
Jumlah (2)
Jumlah (1) + (2)

=
=
=
=
=
=

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

10,500.00
11,820.00
1,378.50
656.00
24,354.50
32,488.50

4.320 Kg x Rp.
0.022 M x Rp.

1,270 = Rp.
76,500 = Rp.
Jumlah (1)
= Rp.

5,486.40
1,683.00
7,169.40

Tenaga
Pekerja
Tukang batu
Kepala tukang
Mandor

0.200
0.150
0.015
0.010

52,500
78,800
91,900
65,600
Jumlah (2)
Jumlah (1) + (2)

Oh
Oh
Oh
Oh

x
x
x
x

Rp.
Rp.
Rp.
Rp.

=
=
=
=
=
=

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

10,500.00
11,820.00
1,378.50
656.00
24,354.50
31,523.90

3.680 Kg x Rp.
0.023 M x Rp.

1,270 = Rp.
76,500 = Rp.
Jumlah (1)
= Rp.

4,673.60
1,759.50
6,433.10

0.200
0.150
0.015
0.010

52,500
78,800
91,900
65,600
Jumlah (2)
Jumlah (1) + (2)

1 M Plesteran 1 Pc : 6 Ps, tebal 15 mm


Bahan
- Semen portland
- Pasir pasang

6.6.2.
-

PPL 6.7.
6.7.1.

0.200
0.150
0.015
0.010

1 M Plesteran 1 Pc : 5 Ps, tebal 15 mm

6.5.2.

6.6.1.

Tenaga
Pekerja
Tukang batu
Kepala tukang
Mandor

Tenaga
Pekerja
Tukang batu
Kepala tukang
Mandor

Oh
Oh
Oh
Oh

x
x
x
x

Rp.
Rp.
Rp.
Rp.

=
=
=
=
=
=

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

10,500.00
11,820.00
1,378.50
656.00
24,354.50
30,787.60

2.880 Kg x Rp.
0.024 M x Rp.

1,270 = Rp.
76,500 = Rp.
Jumlah (1)
= Rp.

3,657.60
1,836.00
5,493.60

0.200
0.150
0.015
0.010

52,500
78,800
91,900
65,600
Jumlah (2)
Jumlah (1) + (2)

1 M Plesteran 1 Pc : 8 Ps, tebal 15 mm


Bahan
- Semen portland
- Pasir pasang

6.7.2.
-

Tenaga
Pekerja
Tukang batu
Kepala tukang
Mandor

Oh
Oh
Oh
Oh

x
x
x
x

Rp.
Rp.
Rp.
Rp.

=
=
=
=
=
=

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

10,500.00
11,820.00
1,378.50
656.00
24,354.50
29,848.10

PPL 6.8.
6.8.1.

1 M Plesteran 1 Pc : 0,5 Kp : 3 Ps, tebal 15 mm


Bahan
- Semen portland
- Kapur padam
- Pasir pasang

6.8.2.
-

PPL 6.9.
6.9.1.

Tenaga
Pekerja
Tukang batu
Kepala tukang
Mandor

5.760 Kg x Rp.
0.003 M x Rp.
0.013 M x Rp.

1,270
8,470
76,500
Jumlah (1)

=
=
=
=

Rp.
Rp.
Rp.
Rp.

7,315.20
25.41
994.50
8,335.11

0.200
0.150
0.015
0.010

52,500
78,800
91,900
65,600
Jumlah (2)
Jumlah (1) + (2)

=
=
=
=
=
=

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

10,500.00
11,820.00
1,378.50
656.00
24,354.50
32,689.61

Oh
Oh
Oh
Oh

x
x
x
x

Rp.
Rp.
Rp.
Rp.

1 M Plesteran 1 Pc : 3 Kp : 10 Ps, tebal 15 mm


Bahan
- Semen portland
- Kapur padam
- Pasir pasang

6.9.2.
-

PPL 6.12.

Tenaga
Pekerja
Tukang batu
Kepala tukang
Mandor

1.840 Kg x Rp.
0.006 M x Rp.
0.014 M x Rp.

1,270
8,470
76,500
Jumlah (1)

=
=
=
=

Rp.
Rp.
Rp.
Rp.

2,336.80
50.82
1,071.00
3,458.62

0.200
0.150
0.015
0.010

52,500
78,800
91,900
65,600
Jumlah (2)
Jumlah (1) + (2)

=
=
=
=
=
=

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

10,500.00
11,820.00
1,378.50
656.00
24,354.50
27,813.12

Oh
Oh
Oh
Oh

x
x
x
x

Rp.
Rp.
Rp.
Rp.

1 M Plesteran 1 Kp : 1 Sm : 2 Ps, tebal 15 mm

6.12.1.
-

Bahan
Bingkai Naco Niki Hitam
Kapur padam
Pasir pasang

0.007 Kg x Rp.
0.007 M x Rp.
0.015 M x Rp.

1,270
8,470
76,500
Jumlah (1)

=
=
=
=

Rp.
Rp.
Rp.
Rp.

8.89
59.29
1,147.50
1,215.68

6.12.2.
-

Tenaga
Pekerja
Tukang batu
Kepala tukang
Mandor

0.200
0.150
0.015
0.010

52,500
78,800
91,900
65,600
Jumlah (2)
Jumlah (1) + (2)

=
=
=
=
=
=

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

10,500.00
11,820.00
1,378.50
656.00
24,354.50
25,570.18

1,270 = Rp.
76,500 = Rp.
Jumlah (1)
= Rp.

18,135.60
1,759.50
19,895.10

PPL 6.13.

Oh
Oh
Oh
Oh

x
x
x
x

Rp.
Rp.
Rp.
Rp.

1 M Plesteran 1 Pc : 2 Ps, tebal 20 mm

6.13.1. Bahan
- Semen Portland
- Pasir pasang

14.280 Kg x Rp.
0.023 M x Rp.

6.13.2.
-

PPL 6.14.

Tenaga
Pekerja
Tukang batu
Kepala tukang
Mandor

0.250
0.200
0.020
0.0125

Oh
Oh
Oh
Oh

x
x
x
x

Rp.
Rp.
Rp.
Rp.

52,500
78,800
91,900
65,600
Jumlah (2)
Jumlah (1) + (2)

=
=
=
=
=
=

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

13,125.00
15,760.00
1,838.00
820.00
31,543.00
51,438.10

1 M Plesteran 1 Pc : 3 Ps, tebal 20 mm

6.14.1. Bahan
- Semen Portland
- Pasir pasang

10.800 Kg x Rp.
0.026 M x Rp.

1,270 = Rp.
76,500 = Rp.
Jumlah (1)
= Rp.

13,716.00
1,989.00
15,705.00

6.14.2.
-

0.250
0.200
0.020
0.0125

52,500
78,800
91,900
65,600
Jumlah (2)
Jumlah (1) + (2)

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

13,125.00
15,760.00
1,838.00
820.00
31,543.00
47,248.00

1,270 = Rp.
76,500 = Rp.
Jumlah (1)
= Rp.

11,023.60
2,142.00
13,165.60

52,500
78,800
91,900
65,600
Jumlah (2)
Jumlah (1) + (2)

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

13,125.00
15,760.00
1,838.00
820.00
31,543.00
44,708.60

1,270 = Rp.
76,500 = Rp.
Jumlah (1)
= Rp.

9,258.30
2,142.00
11,400.30

52,500
78,800
91,900
65,600
Jumlah (2)
Jumlah (1) + (2)

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

13,125.00
15,760.00
1,838.00
820.00
31,543.00
42,943.30

PPL 6.15.

Tenaga
Pekerja
Tukang batu
Kepala tukang
Mandor

PPL 6.16.

Tenaga
Pekerja
Tukang batu
Kepala tukang
Mandor

PPL 6.17.

Rp.
Rp.
Rp.
Rp.

=
=
=
=
=
=

8.680 Kg x Rp.
0.028 M x Rp.

0.250
0.200
0.020
0.0125

Oh
Oh
Oh
Oh

x
x
x
x

Rp.
Rp.
Rp.
Rp.

=
=
=
=
=
=

1 M Plesteran 1 Pc : 5 Ps, tebal 20 mm

6.16.1. Bahan
- Semen Portland
- Pasir pasang
6.16.2.
-

x
x
x
x

1 M Plesteran 1 Pc : 4 Ps, tebal 20 mm

6.15.1. Bahan
- Semen Portland
- Pasir pasang
6.15.2.
-

Oh
Oh
Oh
Oh

Tenaga
Pekerja
Tukang batu
Kepala tukang
Mandor

7.290 Kg x Rp.
0.028 M x Rp.

0.250
0.200
0.020
0.0125

Oh
Oh
Oh
Oh

x
x
x
x

Rp.
Rp.
Rp.
Rp.

=
=
=
=
=
=

1 M Plesteran 1 Pc : 6 Ps, tebal 20 mm

6.17.1. Bahan
- Semen Portland
- Pasir pasang

6.240 Kg x Rp.
0.030 M x Rp.

1,270 = Rp.
76,500 = Rp.
Jumlah (1)
= Rp.

7,924.80
2,295.00
10,219.80

6.17.2. Tenaga
- Pekerja
- Tukang batu

0.250 Oh x Rp.
0.200 Oh x Rp.

52,500 = Rp.
78,800 = Rp.

13,125.00
15,760.00

- Kepala tukang
- Mandor

PPL 6.18.

Bahan
Bingkai Naco Niki Hitam
Kapur padam
Pasir pasang

6.18.2.
-

Tenaga
Pekerja
Tukang batu
Kepala tukang
Mandor

PPL 6.20.

Tenaga
Pekerja
Tukang batu
Kepala tukang
Mandor

PPL 6.21.

Rp.
Rp.
Rp.
Rp.

1,838.00
820.00
31,543.00
41,762.80

0.009 M x Rp.
0.009 M x Rp.
0.018 M x Rp.

1,270
8,470
76,500
Jumlah (1)

=
=
=
=

Rp.
Rp.
Rp.
Rp.

11.43
76.23
1,377.00
1,464.66

0.250
0.200
0.020
0.0125

Oh
Oh
Oh
Oh

x
x
x
x

Rp.
Rp.
Rp.
Rp.

52,500
78,800
91,900
65,600
Jumlah (2)
Jumlah (1) + (2)

=
=
=
=
=
=

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

13,125.00
15,760.00
1,838.00
820.00
31,543.00
33,007.66

15.500 Kg x Rp.
0.013 M x Rp.

1,270 = Rp.
76,500 = Rp.
Jumlah (1)
= Rp.

19,685.00
994.50
20,679.50

0.300
0.200
0.020
0.013

Oh
Oh
Oh
Oh

x
x
x
x

Rp.
Rp.
Rp.
Rp.

52,500
78,800
91,900
65,600
Jumlah (2)
Jumlah (1) + (2)

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

15,750.00
15,760.00
1,838.00
820.00
34,168.00
54,847.50

1,270 = Rp.
76,500 = Rp.
Jumlah (1)
= Rp.

14,922.50
2,677.50
17,600.00

52,500
78,800
91,900
65,600
Jumlah (2)
Jumlah (1) + (2)

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

15,750.00
15,760.00
1,838.00
852.80
34,200.80
51,800.80

1,270 = Rp.
76,500 = Rp.
Jumlah (1)
= Rp.

12,039.60
2,907.00
14,946.60

=
=
=
=
=
=

1 M Plesteran 1 Pc : 3 Ps, tebal 25 mm

6.20.1. Bahan
- Semen Portland
- Pasir pasang
6.20.2.
-

=
=
=
=

1 M Plesteran 1 Pc : 2 Ps, tebal 25 mm

6.19.1. Bahan
- Semen Portland
- Pasir pasang
6.19.2.
-

91,900
65,600
Jumlah (2)
Jumlah (1) + (2)

1 M Plesteran 1 Kp : 1 Sm : 2 Ps, tebal 20 mm

6.18.1.
-

PPL 6.19.

0.020 Oh x Rp.
0.0125 Oh x Rp.

Tenaga
Pekerja
Tukang batu
Kepala tukang
Mandor

11.750 Kg x Rp.
0.035 M x Rp.

0.300
0.200
0.020
0.013

Oh
Oh
Oh
Oh

x
x
x
x

Rp.
Rp.
Rp.
Rp.

=
=
=
=
=
=

1 M Plesteran 1 Pc : 4 Ps, tebal 25 mm

6.21.1. Bahan
- Semen Portland
- Pasir pasang

9.480 Kg x Rp.
0.038 M x Rp.

6.21.2.
-

PPL 6.22.

Tenaga
Pekerja
Tukang batu
Kepala tukang
Mandor

0.300
0.200
0.020
0.013

Oh
Oh
Oh
Oh

x
x
x
x

Rp.
Rp.
Rp.
Rp.

52,500
78,800
91,900
65,600
Jumlah (2)
Jumlah (1) + (2)

=
=
=
=
=
=

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

15,750.00
15,760.00
1,838.00
852.80
34,200.80
49,147.40

1 M Plesteran 1 Pc : 5 Ps, tebal 25 mm

6.22.1. Bahan
- Semen Portland
- Pasir pasang

7.940 Kg x Rp.
0.039 M x Rp.

1,270 = Rp.
76,500 = Rp.
Jumlah (1)
= Rp.

10,083.80
2,983.50
13,067.30

6.22.2.
-

0.300
0.200
0.020
0.013

52,500
78,800
91,900
65,600
Jumlah (2)
Jumlah (1) + (2)

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

15,750.00
15,760.00
1,838.00
852.80
34,200.80
47,268.10

1,270 = Rp.
76,500 = Rp.
Jumlah (1)
= Rp.

23,685.50
2,677.50
26,363.00

52,500
78,800
91,900
65,600
Jumlah (2)
Jumlah (1) + (2)

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

16,800.00
19,700.00
2,297.50
984.00
39,781.50
66,144.50

1,270 = Rp.
76,500 = Rp.
Jumlah (1)
= Rp.

17,970.50
2,983.50
20,954.00

52,500
78,800
91,900
65,600
Jumlah (2)
Jumlah (1) + (2)

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

16,800.00
19,700.00
2,297.50
984.00
39,781.50
60,735.50

11.380 Kg x Rp.
0.042 M x Rp.

1,270 = Rp.
76,500 = Rp.
Jumlah (1)
= Rp.

14,452.60
3,213.00
17,665.60

0.320 Oh x Rp.
0.250 Oh x Rp.

52,500 = Rp.
78,800 = Rp.

16,800.00
19,700.00

PPL 6.23.

Tenaga
Pekerja
Tukang batu
Kepala tukang
Mandor

PPL 6.24.

Tenaga
Pekerja
Tukang batu
Kepala tukang
Mandor

PPL 6.25.

Rp.
Rp.
Rp.
Rp.

=
=
=
=
=
=

18.650 Kg x Rp.
0.035 M x Rp.

0.320
0.250
0.025
0.015

Oh
Oh
Oh
Oh

x
x
x
x

Rp.
Rp.
Rp.
Rp.

=
=
=
=
=
=

1 M Plesteran 1 Pc : 3 Ps, tebal 30 mm

6.24.1. Bahan
- Semen Portland
- Pasir pasang
6.24.2.
-

x
x
x
x

1 M Plesteran 1 Pc : 2 Ps, tebal 30 mm

6.23.1. Bahan
- Semen Portland
- Pasir pasang
6.23.2.
-

Oh
Oh
Oh
Oh

Tenaga
Pekerja
Tukang batu
Kepala tukang
Mandor

14.150 Kg x Rp.
0.039 M x Rp.

0.320
0.250
0.025
0.015

Oh
Oh
Oh
Oh

x
x
x
x

Rp.
Rp.
Rp.
Rp.

=
=
=
=
=
=

1 M Plesteran 1 Pc : 4 Ps, tebal 30 mm

6.25.1. Bahan
- Semen Portland
- Pasir pasang
6.25.2. Tenaga
- Pekerja
- Tukang batu

- Kepala tukang
- Mandor

PPL 6.26.

0.025 Oh x Rp.
0.015 Oh x Rp.

91,900
65,600
Jumlah (2)
Jumlah (1) + (2)

=
=
=
=

Rp.
Rp.
Rp.
Rp.

2,297.50
984.00
39,781.50
57,447.10

1 M Plesteran 1 Pc : 4 Ps, tebal 30 mm

6.26.1. Bahan
- Semen Portland
- Pasir pasang

8.190 Kg x Rp.
0.045 M x Rp.

1,270 = Rp.
76,500 = Rp.
Jumlah (1)
= Rp.

10,401.30
3,442.50
13,843.80

6.26.2.
-

0.320
0.250
0.025
0.015

52,500
78,800
91,900
65,600
Jumlah (2)
Jumlah (1) + (2)

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

16,800.00
19,700.00
2,297.50
984.00
39,781.50
53,625.30

PPL 6.27.

Tenaga
Pekerja
Tukang batu
Kepala tukang
Mandor

Oh
Oh
Oh
Oh

x
x
x
x

Rp.
Rp.
Rp.
Rp.

=
=
=
=
=
=

1 M Berapen 1 Pc : 3 Ps, tebal 30 mm

6.27.1. Bahan
- Semen Portland
- Pasir pasang

7.070 Kg x Rp.
0.021 M x Rp.

1,270 = Rp.
76,500 = Rp.
Jumlah (1)
= Rp.

8,978.90
1,606.50
10,585.40

6.27.2.
-

0.150
0.070
0.007
0.008

52,500
78,800
91,900
65,600
Jumlah (2)
Jumlah (1) + (2)

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

7,875.00
5,516.00
643.30
524.80
14,559.10
25,144.50

7,200.90
1,759.50
8,960.40

PPL 6.28.

Tenaga
Pekerja
Tukang batu
Kepala tukang
Mandor

Oh
Oh
Oh
Oh

x
x
x
x

Rp.
Rp.
Rp.
Rp.

=
=
=
=
=
=

1 M Berapen 1 Pc : 5 Ps, tebal 30 mm

6.28.1. Bahan
- Semen Portland
- Pasir pasang

5.670 Kg x Rp.
0.023 M x Rp.

1,270 = Rp.
76,500 = Rp.
Jumlah (1)
= Rp.

6.28.2.
-

0.150
0.070
0.007
0.008

52,500
78,800
91,900
65,600
Jumlah (2)
Jumlah (1) + (2)

Tenaga
Pekerja
Tukang batu
Kepala tukang
Mandor

Oh
Oh
Oh
Oh

x
x
x
x

Rp.
Rp.
Rp.
Rp.

=
=
=
=
=
=

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

7,875.00
5,516.00
643.30
524.80
14,559.10
23,519.50

PPL 6.29.

1 M Plesteran Beton 1 Pc : 2 Ps, tebal 15 mm

6.29.1. Bahan
- Semen Portland
- Pasir pasang

9.300 Kg x Rp.
0.018 M x Rp.

1,270 = Rp.
76,500 = Rp.
Jumlah (1)
= Rp.

11,811.00
1,377.00
13,188.00

6.29.2.
-

0.260
0.200
0.020
0.013

52,500
78,800
91,900
65,600
Jumlah (2)
Jumlah (1) + (2)

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

13,650.00
15,760.00
1,838.00
852.80
32,100.80
45,288.80

PPL 6.30.

Tenaga
Pekerja
Tukang batu
Kepala tukang
Mandor

Oh
Oh
Oh
Oh

x
x
x
x

Rp.
Rp.
Rp.
Rp.

=
=
=
=
=
=

1 M Plesteran Beton 1 Pc : 3 Ps, tebal 15 mm

6.30.1. Bahan
- Semen Portland
- Pasir pasang

7.070 Kg x Rp.
0.021 M x Rp.

1,270 = Rp.
76,500 = Rp.
Jumlah (1)
= Rp.

8,978.90
1,606.50
10,585.40

6.30.2.
-

0.260
0.200
0.020
0.013

52,500
78,800
91,900
65,600
Jumlah (2)
Jumlah (1) + (2)

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

13,650.00
15,760.00
1,838.00
852.80
32,100.80
42,686.20

635.00
153.00
788.00

PPL 6.31.

Tenaga
Pekerja
Tukang batu
Kepala tukang
Mandor

Oh
Oh
Oh
Oh

x
x
x
x

Rp.
Rp.
Rp.
Rp.

=
=
=
=
=
=

1 M Plesteran Skoning 1 Pc : 2 Ps

6.31.1. Bahan
- Semen Portland
- Pasir pasang

0.500 Kg x Rp.
0.002 M x Rp.

1,270 = Rp.
76,500 = Rp.
Jumlah (1)
= Rp.

6.31.2.
-

0.057
0.038
0.038
0.002

52,500
78,800
91,900
65,600
Jumlah (2)
Jumlah (1) + (2)

PPL 6.32.

Tenaga
Pekerja
Tukang batu
Kepala tukang
Mandor

x
x
x
x

Rp.
Rp.
Rp.
Rp.

=
=
=
=
=
=

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

2,992.50
2,994.40
3,492.20
131.20
9,610.30
10,398.30

Jumlah (1)

= Rp.
= Rp.
= Rp.

0.00
0.00
0.00

52,500
78,800
91,900
65,600
Jumlah (2)
Jumlah (1) + (2)

=
=
=
=
=
=

1 M Plesteran Granito, 1 Pc warna : 2 Granito, tebal 10 mm

6.32.1. Bahan
- PC warna
- Batu granito
6.32.2.
-

Oh
Oh
Oh
Oh

Tenaga
Pekerja
Tukang batu
Kepala tukang
Mandor

0.144 Kg x Rp.
15.000 Kg x Rp.

0.050
0.020
0.002
0.005

Oh
Oh
Oh
Oh

x
x
x
x

Rp.
Rp.
Rp.
Rp.

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

2,625.00
1,576.00
183.80
328.00
4,712.80
4,712.80

PPL 6.33.

1 M Plesteran Teraso, 1 Pc warna : 2 Batu Teraso, tebal 10 mm

6.33.1. Bahan
- PC warna
- Batu teraso
6.33.2.
-

PPL 6.34.

Tenaga
Pekerja
Tukang batu
Kepala tukang
Mandor

0.440 Kg x Rp.
11.500 Kg x Rp.

0.450
0.200
0.020
0.025

Oh
Oh
Oh
Oh

x
x
x
x

Rp.
Rp.
Rp.
Rp.

Jumlah (1)

= Rp.
= Rp.
= Rp.

52,500
78,800
91,900
65,600
Jumlah (2)
Jumlah (1) + (2)

=
=
=
=
=
=

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

23,625.00
15,760.00
1,838.00
1,640.00
42,863.00
42,863.00

5,486.40
1,224.00
6,710.40

1 M Plesteran Ciprat, 1 Pc : 2 Ps, tebal 10 mm

6.34.1. Bahan
- Semen portland
- Pasir pasang

4.320 Kg x Rp.
0.016 M x Rp.

1,270 = Rp.
76,500 = Rp.
Jumlah (1)
= Rp.

6.34.2.
-

0.250
0.100
0.010
0.015

52,500
78,800
91,900
65,600
Jumlah (2)
Jumlah (1) + (2)

PPL 6.35.

0.00
0.00
0.00

Tenaga
Pekerja
Tukang batu
Kepala tukang
Mandor

Oh
Oh
Oh
Oh

x
x
x
x

Rp.
Rp.
Rp.
Rp.

=
=
=
=
=
=

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

13,125.00
7,880.00
919.00
984.00
22,908.00
29,618.40

5,486.40
1,224.00
6,710.40

1 M Plesteran Siar adukan, 1 Pc : 2 Ps

6.35.1. Bahan
- Semen portland
- Pasir pasang

4.320 Kg x Rp.
0.016 M x Rp.

1,270 = Rp.
76,500 = Rp.
Jumlah (1)
= Rp.

6.35.2.
-

0.150
0.070
0.007
0.008

52,500
78,800
91,900
65,600
Jumlah (2)
Jumlah (1) + (2)

=
=
=
=
=
=

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

7,875.00
5,516.00
643.30
524.80
14,559.10
21,269.50

1,270
66,550
76,500
Jumlah (1)

=
=
=
=

Rp.
Rp.
Rp.
Rp.

635.00
192,995.00
459.00
194,089.00

52,500
78,800
91,900
65,600
Jumlah (2)
Jumlah (1) + (2)

=
=
=
=
=
=

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

15,750.00
15,760.00
1,838.00
984.00
34,332.00
228,421.00

PPL 6.36.

Tenaga
Pekerja
Tukang batu
Kepala tukang
Mandor

Oh
Oh
Oh
Oh

x
x
x
x

Rp.
Rp.
Rp.
Rp.

1 M Plesteran waterfroof bata cote 3 lapis

6.36.1.
-

Bahan
Semen portland
0.500 Kg x Rp.
Kosen Pintu / Jendela Aluminium
2.900 Putih
Kg x Rp.
Pasir pasang
0.006 M x Rp.

6.36.2.
-

Tenaga
Pekerja
Tukang batu
Kepala tukang
Mandor

0.300
0.200
0.020
0.015

Oh
Oh
Oh
Oh

x
x
x
x

Rp.
Rp.
Rp.
Rp.

ANALISA BIAYA KONSTRUKSI


PEKERJAAN KAYU

PK

6.1.
6.1.1.

1 M Pasang kusen pintu dan jendela kayu jati :


Bahan
- Kayu jati, balok

6.1.2.
-

PK

6.2.
6.2.1.

Bahan
- Kayu meranti, balok

6.3.
6.3.1.

6.4.1.

6.4.2.

Tenaga
Pekerja
Tukang kayu
Kepala tukang
Mandor

Bahan
- Kayu kapur, balok

6.4.

Oh
Oh
Oh
Oh

= Rp.
= Rp.

26,317,500.00
26,317,500.00

x
x
x
x

=
=
=
=
=
=

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

315,000.00
1,576,000.00
183,800.00
19,680.00
2,094,480.00
28,411,980.00

Rp.
Rp.
Rp.
Rp.

52,500.00
78,800.00
91,900.00
65,600.00
Jumlah (2)
Jumlah (1) +(2)

1.200 M

6.000
18.000
2.000
0.300

Oh
Oh
Oh
Oh

x Rp.

9,075,000.00
Jumlah (1)

= Rp.
= Rp.

10,890,000.00
10,890,000.00

x
x
x
x

52,500.00
78,800.00
91,900.00
65,600.00
Jumlah (2)
Jumlah (1) +(2)

=
=
=
=
=
=

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

315,000.00
1,418,400.00
183,800.00
19,680.00
1,936,880.00
12,826,880.00

Rp.
Rp.
Rp.
Rp.

1 M Pasang kusen pintu dan jendela kayu meranti :

6.3.2.

PK

6.000
20.000
2.000
0.300

x Rp. 23,925,000.00
Jumlah (1)

1 M Pasang kusen pintu dan jendela kayu damar laut :

6.2.2.

PK

Tenaga
Pekerja
Tukang kayu
Kepala tukang
Mandor

1.100 M

Tenaga
Pekerja
Tukang kayu
Kepala tukang
Mandor

1.200 M

6.000
18.000
2.000
0.300

Oh
Oh
Oh
Oh

x Rp.

6,490,000.00
Jumlah (1)

= Rp.
= Rp.

7,788,000.00
7,788,000.00

x
x
x
x

52,500.00
78,800.00
91,900.00
65,600.00
Jumlah (2)
Jumlah (1) +(2)

=
=
=
=
=
=

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

315,000.00
1,418,400.00
183,800.00
19,680.00
1,936,880.00
9,724,880.00

Rp.
Rp.
Rp.
Rp.

1 M Pasang kusen pintu dan jendela kayu damar laut :


Bahan
- Kayu damar laut, balok

1.200 M

x Rp.

9,350,000.00
Jumlah (1)

= Rp.
= Rp.

11,220,000.00
11,220,000.00

6.000 Oh

x Rp.

52,500.00

= Rp.

315,000.00

Tenaga
- Pekerja

- Tukang kayu
- Kepala tukang
- Mandor

PK

6.5.
6.5.1.

Bahan
- Kayu meranti batu, papan
- Paku biasa 2" - 5"

6.6.
6.6.1.

Tenaga
Pekerja
Tukang kayu
Kepala tukang
Mandor

Bahan
- Kayu jati, papan
- Paku biasa 2" - 5"

6.7.
6.7.1.

78,800.00
91,900.00
65,600.00
Jumlah (2)
Jumlah (1) +(2)

=
=
=
=
=

Rp.
Rp.
Rp.
Rp.
Rp.

1,418,400.00
183,800.00
19,680.00
1,936,880.00
13,156,880.00

0.036 M
0.050 Kg

x Rp.
x Rp.

9,375,000.00
14,520.00
Jumlah (1)

= Rp.
= Rp.
= Rp.

337,500.00
726.00
338,226.00

0.350
1.050
0.105
0.018

x
x
x
x

52,500.00
78,800.00
91,900.00
65,600.00
Jumlah (2)
Jumlah (1) +(2)

=
=
=
=
=
=

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

18,375.00
82,740.00
9,649.50
1,180.80
111,945.30
450,171.30

Oh
Oh
Oh
Oh

Rp.
Rp.
Rp.
Rp.

1 M Pasang pintu klamp kayu jati

6.6.2.

PK

x Rp.
x Rp.
x Rp.

1 M Pasang pintu klamp kayu meranti batu

6.5.2.

PK

18.000 Oh
2.000 Oh
0.300 Oh

Tenaga
Pekerja
Tukang kayu
Kepala tukang
Mandor

0.036 M
0.050 Kg

x Rp. 24,104,440.00
x Rp.
14,520.00
Jumlah (1)

= Rp.
= Rp.
= Rp.

867,759.84
726.00
868,485.84

0.350
1.050
0.105
0.018

x
x
x
x

=
=
=
=
=
=

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

18,375.00
82,740.00
9,649.50
1,180.80
111,945.30
980,431.14

867,759.84
867,759.84

Oh
Oh
Oh
Oh

Rp.
Rp.
Rp.
Rp.

52,500.00
78,800.00
91,900.00
65,600.00
Jumlah (2)
Jumlah (1) +(2)

1 M Pasang pintu panel kayu jati :


Bahan
- Kayu jati, papan

6.7.2.
-

Tenaga
Pekerja
Tukang kayu
Kepala tukang
Mandor

0.036 M

x Rp. 24,104,440.00
Jumlah (1)

= Rp.

1.000
2.500
0.250
0.050

x
x
x
x

=
=
=
=
=
=

Oh
Oh
Oh
Oh

Rp.
Rp.
Rp.
Rp.

52,500.00
78,800.00
91,900.00
65,600.00
Jumlah (2)
Jumlah (1) +(2)

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

52,500.00
197,000.00
22,975.00
3,280.00
275,755.00
1,143,514.84

PK

6.8.
6.8.1.

1 M Pasang pintu panel kayu meranti batu


Bahan
- Kayu meranti batu, papan

6.8.2.
-

PK

6.9.
6.9.1.

x Rp.

9,375,000.00
Jumlah (1)

= Rp.
= Rp.

375,000.00
375,000.00

1.000
2.500
0.250
0.050

x
x
x
x

52,500.00
78,800.00
91,900.00
65,600.00
Jumlah (2)
Jumlah (1) +(2)

=
=
=
=
=
=

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

52,500.00
197,000.00
22,975.00
3,280.00
275,755.00
650,755.00

843,655.40
116,160.00
959,815.40

Oh
Oh
Oh
Oh

Rp.
Rp.
Rp.
Rp.

1 M Pasang pintu dan jendela kaca panel kayu jati :


Bahan
- Kayu jati, papan
- Kaca polos 5 mm

6.9.2.
-

PK

Tenaga
Pekerja
Tukang kayu
Kepala tukang
Mandor

0.040 M

6.10.

Tenaga
Pekerja
Tukang kayu
Kepala tukang
Mandor

0.035 M
0.800 M

x Rp. 24,104,440.00
x Rp.
145,200.00
Jumlah (1)

= Rp.
= Rp.
= Rp.

0.800
2.000
0.200
0.040

x
x
x
x

=
=
=
=
=
=

Oh
Oh
Oh
Oh

Rp.
Rp.
Rp.
Rp.

52,500.00
78,800.00
91,900.00
65,600.00
Jumlah (2)
Jumlah (1) +(2)

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

42,000.00
157,600.00
18,380.00
2,624.00
220,604.00
1,180,419.40

1 M Pasang pintu dan jendela kaca panel kayu meranti batu :

6.10.1. Bahan
- Kayu meranti batu, papan
- Kaca polos 5 mm

0.035 M
0.800 M

x Rp.
x Rp.

9,375,000.00
145,200.00
Jumlah (1)

= Rp.
= Rp.
= Rp.

328,125.00
116,160.00
444,285.00

6.10.2.
-

0.800
2.000
0.200
0.040

x
x
x
x

52,500.00
78,800.00
91,900.00
65,600.00
Jumlah (2)
Jumlah (1) +(2)

=
=
=
=
=
=

42,000.00
157,600.00
18,380.00
2,624.00
220,604.00
664,889.00

Tenaga
Pekerja
Tukang kayu
Kepala tukang
Mandor

Oh
Oh
Oh
Oh

Rp.
Rp.
Rp.
Rp.

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

PK

PK

PK

PK

6.11.

1 M Pasang pintu dan jendela kaca panel kayu meranti :

6.11.1. Bahan
- Kayu meranti, papan
- Kaca polos 5 mm

0.035 M
0.800 M

x Rp.
x Rp.

5,475,000.00
145,200.00
Jumlah (1)

= Rp.
= Rp.
= Rp.

191,625.00
116,160.00
307,785.00

6.11.2.
-

Tenaga
Pekerja
Tukang kayu
Kepala tukang
Mandor

0.800
2.000
0.200
0.040

x
x
x
x

52,500.00
78,800.00
91,900.00
65,600.00
Jumlah (2)
Jumlah (1) +(2)

=
=
=
=
=
=

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

42,000.00
157,600.00
18,380.00
2,624.00
220,604.00
528,389.00

6.12.

1 M Pasang pintu dan jendela jalusi kayu jati

Oh
Oh
Oh
Oh

Rp.
Rp.
Rp.
Rp.

6.12.1. Bahan
- Kayu jati, papan

0.064 M

x Rp. 24,104,440.00
Jumlah (1)

= Rp.
= Rp.

1,542,684.16
1,542,684.16

6.12.2.
-

Tenaga
Pekerja
Tukang kayu
Kepala tukang
Mandor

1.000
3.000
0.300
0.300

x
x
x
x

=
=
=
=
=
=

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

52,500.00
236,400.00
27,570.00
19,680.00
336,150.00
1,878,834.16

6.13.

1 M Pasang pintu dan jendela jalusi kayu meranti batu :

Oh
Oh
Oh
Oh

Rp.
Rp.
Rp.
Rp.

52,500.00
78,800.00
91,900.00
65,600.00
Jumlah (2)
Jumlah (1) +(2)

6.13.1. Bahan
- Kayu meranti batu, papan

0.064 M

x Rp.

9,375,000.00
Jumlah (1)

= Rp.
= Rp.

600,000.00
600,000.00

6.13.2.
-

Tenaga
Pekerja
Tukang kayu
Kepala tukang
Mandor

1.000
3.000
0.300
0.500

x
x
x
x

52,500.00
78,800.00
91,900.00
65,600.00
Jumlah (2)
Jumlah (1) +(2)

=
=
=
=
=
=

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

52,500.00
236,400.00
27,570.00
32,800.00
349,270.00
949,270.00

6.14.

1 M Pasang pintu plywood rangka, rangka kayu jati

6.14.1.
-

Bahan
Kayu jati, papan
Paku biasa " - 1"
Lem kayu
Playwood 4' x 3' x 4 mm

=
=
=
=
=

Rp.
Rp.
Rp.
Rp.
Rp.

472,447.02
508.20
11,220.00
51,920.00
536,095.22

0.0196
0.030
0.300
1.000

Oh
Oh
Oh
Oh

M
Kg
Lt
Lbr

x
x
x
x

Rp.
Rp.
Rp.
Rp.

Rp. 24,104,440.00
Rp.
16,940.00
Rp.
37,400.00
Rp.
51,920.00
Jumlah (1)

PK

PK

PK

6.14.2.
-

Tenaga
Pekerja
Tukang kayu
Kepala tukang
Mandor

6.15.

1 M Pasang pintu plywood rangka, rangka kayu meranti batu

6.15.1.
-

Bahan
Kayu meranti batu, papan
Paku biasa " - 1"
Lem kayu
Playwood 4' x 3' x 4 mm

6.15.2.
-

Tenaga
Pekerja
Tukang kayu
Kepala tukang
Mandor

6.16.

1 M Pasang jalusi mati kusen kayu jati

0.600
2.000
0.200
0.030

Oh
Oh
Oh
Oh

x
x
x
x

Rp.
Rp.
Rp.
Rp.

52,500.00
78,800.00
91,900.00
65,600.00
Jumlah (2)
Jumlah (1) +(2)

=
=
=
=
=
=

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

31,500.00
157,600.00
18,380.00
1,968.00
209,448.00
745,543.22

0.0196
0.030
0.300
1.000

M
Kg
Lt
Lbr

x
x
x
x

Rp.
Rp.
Rp.
Rp.

9,375,000.00
16,940.00
37,400.00
51,920.00
Jumlah (1)

=
=
=
=
=

Rp.
Rp.
Rp.
Rp.
Rp.

183,750.00
508.20
11,220.00
51,920.00
247,398.20

0.600
2.000
0.200
0.030

Oh
Oh
Oh
Oh

x
x
x
x

Rp.
Rp.
Rp.
Rp.

52,500.00
78,800.00
91,900.00
65,600.00
Jumlah (2)
Jumlah (1) +(2)

=
=
=
=
=
=

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

31,500.00
157,600.00
18,380.00
1,968.00
209,448.00
456,846.20

6.16.1. Bahan
- Kayu jati, papan
- Paku biasa " - 1"

0.060 M
0.150 Kg

x Rp. 24,104,440.00
x Rp.
16,940.00
Jumlah (1)

= Rp.
= Rp.
= Rp.

1,446,266.40
2,541.00
1,448,807.40

6.16.2.
-

Tenaga
Pekerja
Tukang kayu
Kepala tukang
Mandor

0.500
2.000
0.200
0.025

x
x
x
x

52,500.00
78,800.00
91,900.00
65,600.00
Jumlah (2)
Jumlah (1) +(2)

=
=
=
=
=
=

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

26,250.00
157,600.00
18,380.00
1,640.00
203,870.00
1,652,677.40

6.17.

1 M Pasang jalusi mati kusen kayu damar laut :

Oh
Oh
Oh
Oh

Rp.
Rp.
Rp.
Rp.

6.17.1. Bahan
- Kayu damar laut, papan
- Paku biasa " - 1"

0.060 M
0.150 Kg

x Rp.
x Rp.

9,650,000.00
16,940.00
Jumlah (1)

= Rp.
= Rp.
= Rp.

579,000.00
2,541.00
581,541.00

6.17.2.
-

0.500
2.000
0.200
0.025

x
x
x
x

52,500.00
78,800.00
91,900.00
65,600.00
Jumlah (2)
Jumlah (1) +(2)

=
=
=
=
=
=

26,250.00
157,600.00
18,380.00
1,640.00
203,870.00
785,411.00

Tenaga
Pekerja
Tukang kayu
Kepala tukang
Mandor

Oh
Oh
Oh
Oh

Rp.
Rp.
Rp.
Rp.

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

PK

PK

PK

6.18.

1 M Pasang pintu plywood rangka, rangka kayu meranti :

6.18.1.
-

Bahan
Kayu meranti, papan
Paku biasa " - 1"
Lem kayu
Playwood 4' x 3' x 4 mm

6.18.2.
-

Tenaga
Pekerja
Tukang kayu
Kepala tukang
Mandor

6.19.

1 M Pasang pintu teakwood rangka, rangka kayu jati

6.19.1.
-

Bahan
Kayu jati, papan
Paku biasa " - 1"
Lem kayu
Teakwood 4' x 8' x 4 mm

6.19.2.
-

Tenaga
Pekerja
Tukang kayu
Kepala tukang
Mandor

6.20.

1 M Pasang pintu teakwood rangka, rangka kayu meranti batu :

6.20.1.
-

Bahan
Kayu meranti batu, papan
Paku biasa " - 1"
Lem kayu
Teakwood 4' x 8' x 4 mm

6.20.2.
-

Tenaga
Pekerja
Tukang kayu
Kepala tukang
Mandor

0.0196
0.030
0.300
1.000

M
Kg
Lt
Lbr

x
x
x
x

Rp.
Rp.
Rp.
Rp.

5,475,000.00
16,940.00
37,400.00
51,920.00
Jumlah (1)

=
=
=
=
=

Rp.
Rp.
Rp.
Rp.
Rp.

107,310.00
508.20
11,220.00
51,920.00
63,140.00

0.600
2.000
0.200
0.030

Oh
Oh
Oh
Oh

x
x
x
x

Rp.
Rp.
Rp.
Rp.

52,500.00
78,800.00
91,900.00
65,600.00
Jumlah (2)
Jumlah (1) +(2)

=
=
=
=
=
=

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

31,500.00
157,600.00
18,380.00
1,968.00
209,448.00
272,588.00

0.0196
0.300
0.300
1.000

M
Kg
Lt
Lbr

x
x
x
x

Rp. 24,104,440.00
Rp.
16,940.00
Rp.
37,400.00
Rp.
54,450.00
Jumlah (1)

=
=
=
=
=

Rp.
Rp.
Rp.
Rp.
Rp.

472,447.02
5,082.00
11,220.00
54,450.00
543,199.02

0.600
2.000
0.200
0.030

Oh
Oh
Oh
Oh

x
x
x
x

Rp.
Rp.
Rp.
Rp.

=
=
=
=
=
=

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

31,500.00
157,600.00
18,380.00
1,968.00
209,448.00
752,647.02

52,500.00
78,800.00
91,900.00
65,600.00
Jumlah (2)
Jumlah (1) +(2)

0.0196
0.300
0.300
1.000

M
Kg
Lt
Lbr

x
x
x
x

Rp.
Rp.
Rp.
Rp.

9,375,000.00
16,940.00
37,400.00
54,450.00
Jumlah (1)

=
=
=
=
=

Rp.
Rp.
Rp.
Rp.
Rp.

183,750.00
5,082.00
11,220.00
54,450.00
254,502.00

0.600
2.000
0.200
0.030

Oh
Oh
Oh
Oh

x
x
x
x

Rp.
Rp.
Rp.
Rp.

52,500.00
78,800.00
91,900.00
65,600.00
Jumlah (2)
Jumlah (1) +(2)

=
=
=
=
=
=

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

31,500.00
157,600.00
18,380.00
1,968.00
209,448.00
463,950.00

PK

PK

PK

6.21.

1 M Pasang pintu plywood & formika, rangka kayu jati

6.21.1.
-

Bahan
Kayu jati, papan
Paku biasa " - 1"
Lem kayu
Plywood 4' x 8' x 4 mm
Formica 4' x 8'

6.21.2.
-

Tenaga
Pekerja
Tukang kayu
Kepala tukang
Mandor

6.22.

1 M Pasang pintu plywood & formika, rangka kayu meranti batu :

6.22.1.
-

Bahan
Kayu meranti batu, papan
Paku biasa " - 1"
Lem kayu
Plywood 4' x 8' x 4 mm
Formica 4' x 8'

6.22.2.
-

Tenaga
Pekerja
Tukang kayu
Kepala tukang
Mandor

6.23.

1 M Pasang pintu plywood & formika, rangka kayu jati :

6.23.1.
-

Bahan
Kayu jati, papan
Paku biasa " - 1"
Lem kayu
Teakwood 4' x 8' x 4 mm
Formica 4' x 8'

6.23.2.
-

Tenaga
Pekerja
Tukang kayu
Kepala tukang
Mandor

0.0196
0.300
0.800
1.000
1.000

M
Kg
Lt
Lbr
Lbr

x
x
x
x
x

Rp. 24,104,440.00
Rp.
16,940.00
Rp.
37,400.00
Rp.
51,920.00
Rp.
74,250.00
Jumlah (1)

=
=
=
=
=
=

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

472,447.02
5,082.00
29,920.00
51,920.00
74,250.00
633,619.02

0.800
2.500
0.250
0.040

Oh
Oh
Oh
Oh

x
x
x
x

Rp.
Rp.
Rp.
Rp.

=
=
=
=
=
=

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

42,000.00
197,000.00
22,975.00
2,624.00
264,599.00
898,218.02

52,500.00
78,800.00
91,900.00
65,600.00
Jumlah (2)
Jumlah (1) +(2)

0.0196
0.300
0.800
1.000
1.000

M
Kg
Lt
Lbr
Lbr

x
x
x
x
x

Rp.
Rp.
Rp.
Rp.
Rp.

9,375,000.00
16,940.00
37,400.00
51,920.00
74,250.00
Jumlah (1)

=
=
=
=
=
=

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

183,750.00
5,082.00
29,920.00
51,920.00
74,250.00
344,922.00

0.800
2.500
0.250
0.040

Oh
Oh
Oh
Oh

x
x
x
x

Rp.
Rp.
Rp.
Rp.

52,500.00
78,800.00
91,900.00
65,600.00
Jumlah (2)
Jumlah (1) +(2)

=
=
=
=
=
=

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

42,000.00
197,000.00
22,975.00
2,624.00
264,599.00
609,521.00

0.0196
0.300
0.800
1.000
1.000

M
Kg
Lt
Lbr
Lbr

x
x
x
x
x

Rp. 24,104,440.00
Rp.
16,940.00
Rp.
37,400.00
Rp.
54,450.00
Rp.
74,250.00
Jumlah (1)

=
=
=
=
=
=

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

472,447.02
5,082.00
29,920.00
54,450.00
74,250.00
636,149.02

0.800
2.500
0.250
0.040

Oh
Oh
Oh
Oh

x
x
x
x

Rp.
Rp.
Rp.
Rp.

=
=
=
=
=
=

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

42,000.00
197,000.00
22,975.00
2,624.00
264,599.00
900,748.02

52,500.00
78,800.00
91,900.00
65,600.00
Jumlah (2)
Jumlah (1) +(2)

PK

PK

PK

6.24.

1 M Pasang pintu plywood & formika, rangka kayu damar laut (divermis) :

6.24.1.
-

Bahan
Kayu meranti batu, papan
Paku biasa " - 1"
Lem kayu
Teakwood 4' x 8' x 4 mm
Vernis
Formica 4' x 8'

6.24.2.
-

Tenaga
Pekerja
Tukang kayu
Kepala tukang
Mandor

6.29.

1 M Pasang konstruksi kuda-kuda kayu damar laut :

6.29.1.
-

Bahan
Kayu damar laut, balok
Besi strip
Paku biasa 2" - 5"

1.1000 M
15.000 Kg
0.800 Kg

x Rp.
x Rp.
x Rp.

6.29.2.
-

Tenaga
Pekerja
Tukang kayu
Kepala tukang
Mandor

4.000
12.000
1.200
0.200

x
x
x
x

6.30.

1 M Pasang konstruksi kuda-kuda kayu meranti :

6.30.1.
-

Bahan
Kayu meranti, balok
Besi strip
Paku biasa 2" - 5"

1.1000 M
15.000 Kg
0.800 Kg

x Rp.
x Rp.
x Rp.

6.30.2.
-

Tenaga
Pekerja
Tukang kayu
Kepala tukang
Mandor

4.000
12.000
1.200
0.200

x
x
x
x

0.0196
0.300
0.800
0.500
0.500
0.500

M
Kg
Lt
Lbr
Lt
Lbr

x
x
x
x
x
x

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

9,375,000.00
16,940.00
37,400.00
54,450.00
48,280.00
74,250.00
Jumlah (1)

=
=
=
=
=
=
=

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

183,750.00
5,082.00
29,920.00
27,225.00
24,140.00
37,125.00
307,242.00

0.800
2.500
0.250
0.040

Oh
Oh
Oh
Oh

x
x
x
x

Rp.
Rp.
Rp.
Rp.

52,500.00
78,800.00
91,900.00
65,600.00
Jumlah (2)
Jumlah (1) +(2)

=
=
=
=
=
=

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

42,000.00
197,000.00
22,975.00
2,624.00
264,599.00
571,841.00

9,350,000.00
11,880.00
16,940.00
Jumlah (1)

=
=
=
=

Rp.
Rp.
Rp.
Rp.

10,285,000.00
178,200.00
13,552.00
10,476,752.00

52,500.00
78,800.00
91,900.00
65,600.00
Jumlah (2)
Jumlah (1) +(2)

=
=
=
=
=
=

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

210,000.00
945,600.00
110,280.00
13,120.00
1,279,000.00
11,755,752.00

5,225,000.00
11,880.00
16,940.00
Jumlah (1)

=
=
=
=

Rp.
Rp.
Rp.
Rp.

5,747,500.00
178,200.00
13,552.00
5,939,252.00

52,500.00
78,800.00
91,900.00
65,600.00
Jumlah (2)
Jumlah (1) +(2)

=
=
=
=
=
=

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

210,000.00
945,600.00
110,280.00
13,120.00
1,279,000.00
7,218,252.00

Oh
Oh
Oh
Oh

Oh
Oh
Oh
Oh

Rp.
Rp.
Rp.
Rp.

Rp.
Rp.
Rp.
Rp.

PK

PK

PK

PK

6.31.

1 M Pasang kaso + reng genteng kodok kayu meranti :

6.31.1. Bahan
- Kayu meranti, balok
- Paku biasa 2" - 5"

0.012 M
0.150 Kg

x Rp.
x Rp.

5,225,000.00
16,940.00
Jumlah (1)

= Rp.
= Rp.
= Rp.

62,700.00
2,541.00
65,241.00

6.31.2.
-

Tenaga
Pekerja
Tukang kayu
Kepala tukang
Mandor

0.100
0.100
0.010
0.005

x
x
x
x

52,500.00
78,800.00
91,900.00
65,600.00
Jumlah (2)
Jumlah (1) +(2)

=
=
=
=
=
=

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

5,250.00
7,880.00
919.00
328.00
14,377.00
79,618.00

6.32.

1 M Pasang kaso + reng genteng kodok kayu damar laut :

Oh
Oh
Oh
Oh

Rp.
Rp.
Rp.
Rp.

6.32.1. Bahan
- Kayu damar laut, balok
- Paku biasa 2" - 5"

0.012 M
0.150 Kg

x Rp.
x Rp.

9,350,000.00
16,940.00
Jumlah (1)

= Rp.
= Rp.
= Rp.

112,200.00
2,541.00
114,741.00

6.32.2.
-

Tenaga
Pekerja
Tukang kayu
Kepala tukang
Mandor

0.100
0.100
0.010
0.005

x
x
x
x

52,500.00
78,800.00
91,900.00
65,600.00
Jumlah (2)
Jumlah (1) +(2)

=
=
=
=
=
=

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

5,250.00
7,880.00
919.00
328.00
14,377.00
129,118.00

6.33.

1 M Pasang kaso + reng genteng monier kayu jati :

Oh
Oh
Oh
Oh

Rp.
Rp.
Rp.
Rp.

6.33.1. Bahan
- Kayu jati, balok
- Paku biasa 2" - 5"

0.014 M
0.150 Kg

x Rp. 23,925,000.00
x Rp.
16,940.00
Jumlah (1)

= Rp.
= Rp.
= Rp.

334,950.00
2,541.00
337,491.00

6.33.2.
-

Tenaga
Pekerja
Tukang kayu
Kepala tukang
Mandor

0.100
0.100
0.010
0.005

x
x
x
x

=
=
=
=
=
=

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

5,250.00
7,880.00
919.00
328.00
14,377.00
351,868.00

6.34.

1 M Pasang kaso + reng genteng monier kayu damar laut :

= Rp.
= Rp.
= Rp.

130,900.00
2,541.00
133,441.00

6.34.1. Bahan
- Kayu damar laut, balok
- Paku biasa 2" - 5"

Oh
Oh
Oh
Oh

0.014 M
0.150 Kg

Rp.
Rp.
Rp.
Rp.

x Rp.
x Rp.

52,500.00
78,800.00
91,900.00
65,600.00
Jumlah (2)
Jumlah (1) +(2)

9,350,000.00
16,940.00
Jumlah (1)

PK

PK

PK

6.34.2.
-

Tenaga
Pekerja
Tukang kayu
Kepala tukang
Mandor

6.35.

1 M Pasang kaso + reng genteng beton kayu damar laut :

0.100
0.100
0.010
0.005

Oh
Oh
Oh
Oh

x
x
x
x

Rp.
Rp.
Rp.
Rp.

52,500.00
78,800.00
91,900.00
65,600.00
Jumlah (2)
Jumlah (1) +(2)

=
=
=
=
=
=

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

5,250.00
7,880.00
919.00
328.00
14,377.00
147,818.00

6.35.1. Bahan
- Kayu damar laut, balok
- Paku biasa 2" - 5"

0.014 M
0.150 Kg

x Rp.
x Rp.

9,350,000.00
16,940.00
Jumlah (1)

= Rp.
= Rp.
= Rp.

130,900.00
2,541.00
133,441.00

6.35.2.
-

Tenaga
Pekerja
Tukang kayu
Kepala tukang
Mandor

0.100
0.100
0.010
0.005

x
x
x
x

52,500.00
78,800.00
91,900.00
65,600.00
Jumlah (2)
Jumlah (1) +(2)

=
=
=
=
=
=

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

5,250.00
7,880.00
919.00
328.00
14,377.00
147,818.00

6.36.

1 M Pasang kaso + reng atap sirap kayu damar laut

Oh
Oh
Oh
Oh

Rp.
Rp.
Rp.
Rp.

6.36.1. Bahan
- Kayu damar laut, balok
- Paku biasa 2" - 5"

0.165 M
0.200 Kg

x Rp.
x Rp.

9,350,000.00
16,940.00
Jumlah (1)

= Rp.
= Rp.
= Rp.

1,542,750.00
3,388.00
1,546,138.00

6.36.2.
-

Tenaga
Pekerja
Tukang kayu
Kepala tukang
Mandor

0.120
0.120
0.012
0.006

x
x
x
x

52,500.00
78,800.00
91,900.00
65,600.00
Jumlah (2)
Jumlah (1) +(2)

=
=
=
=
=
=

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

6,300.00
9,456.00
1,102.80
393.60
17,252.40
1,563,390.40

6.37.

1 M Pasang kaso + reng atap sirap kayu meranti :

Oh
Oh
Oh
Oh

Rp.
Rp.
Rp.
Rp.

6.37.1. Bahan
- Kayu meranti, balok
- Paku biasa 2" - 5"

0.165 M
0.200 Kg

x Rp.
x Rp.

5,225,000.00
16,940.00
Jumlah (1)

= Rp.
= Rp.
= Rp.

862,125.00
3,388.00
865,513.00

6.37.2.
-

0.120
0.120
0.012
0.006

x
x
x
x

52,500.00
78,800.00
91,900.00
65,600.00
Jumlah (2)
Jumlah (1) +(2)

=
=
=
=
=
=

6,300.00
9,456.00
1,102.80
393.60
17,252.40
882,765.40

Tenaga
Pekerja
Tukang kayu
Kepala tukang
Mandor

Oh
Oh
Oh
Oh

Rp.
Rp.
Rp.
Rp.

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

PK

PK

PK

6.38.

1 M Pasang rangka langit-langit (1.00 x 1.00) m, kayu jati :

6.38.1. Bahan
- Kayu jati, balok
- Paku biasa 2" - 5"

0.012 M
0.100 Kg

x Rp. 23,925,000.00
x Rp.
16,940.00
Jumlah (1)

= Rp.
= Rp.
= Rp.

287,100.00
1,694.00
288,794.00

6.38.2.
-

0.150
0.250
0.025
0.075

x
x
x
x

=
=
=
=
=
=

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

7,875.00
19,700.00
2,297.50
4,920.00
34,792.50
323,586.50

Tenaga
Pekerja
Tukang kayu
Kepala tukang
Mandor

Oh
Oh
Oh
Oh

Rp.
Rp.
Rp.
Rp.

52,500.00
78,800.00
91,900.00
65,600.00
Jumlah (2)
Jumlah (1) +(2)

6.38. A 1 M Pasang rangka langit-langit (1.00 x 1.00) m, damar laut :


6.38.1. Bahan
- Kayu damar laut, balok
- Paku biasa 2" - 5"

0.012 M
0.100 Kg

x Rp.
x Rp.

9,350,000.00
16,940.00
Jumlah (1)

= Rp.
= Rp.
= Rp.

112,200.00
1,694.00
113,894.00

6.38.2.
-

0.150
0.250
0.025
0.075

x
x
x
x

52,500.00
78,800.00
91,900.00
65,600.00
Jumlah (2)
Jumlah (1) +(2)

=
=
=
=
=
=

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

7,875.00
19,700.00
2,297.50
4,920.00
34,792.50
148,686.50

Tenaga
Pekerja
Tukang kayu
Kepala tukang
Mandor

Oh
Oh
Oh
Oh

Rp.
Rp.
Rp.
Rp.

6.38. B 1 M Pasang rangka langit-langit (1.00 x 1.00) m, Kayu meranti :


6.38.1. Bahan
- Kayu meranti, balok
- Paku biasa 2" - 5"

0.012 M
0.100 Kg

x Rp.
x Rp.

5,225,000.00
16,940.00
Jumlah (1)

= Rp.
= Rp.
= Rp.

62,700.00
1,694.00
64,394.00

6.38.2.
-

0.150
0.250
0.025
0.075

x
x
x
x

52,500.00
78,800.00
91,900.00
65,600.00
Jumlah (2)
Jumlah (1) +(2)

=
=
=
=
=
=

7,875.00
19,700.00
2,297.50
4,920.00
34,792.50
99,186.50

Tenaga
Pekerja
Tukang kayu
Kepala tukang
Mandor

Oh
Oh
Oh
Oh

Rp.
Rp.
Rp.
Rp.

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

PK

6.44.

1 M Pasang rangka langit-langit (30 x 30) cm, kayu jati :

6.44.1. Bahan
- Kayu jati, balok
- Paku biasa 2" - 5"

PK

x Rp. 23,925,000.00
x Rp.
16,940.00
Jumlah (1)

= Rp.
= Rp.
= Rp.

645,975.00
3,388.00
649,363.00

x
x
x
x

=
=
=
=
=
=

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

13,125.00
27,580.00
3,216.50
820.00
44,741.50
694,104.50

6.44.2.
-

Tenaga
Pekerja
Tukang kayu
Kepala tukang
Mandor

6.45.

1 M Pasang rangka langit-langit (30 x 30) cm, kayu damar laut

6.45.1. Bahan
- Kayu damar laut, balok
- Paku biasa 2" - 5"

PK

0.027 M
0.200 Kg

0.250
0.350
0.035
0.0125

Oh
Oh
Oh
Oh

0.027 M
0.200 Kg

Rp.
Rp.
Rp.
Rp.

52,500.00
78,800.00
91,900.00
65,600.00
Jumlah (2)
Jumlah (1) +(2)

x Rp.
x Rp.

9,350,000.00
16,940.00
Jumlah (1)

= Rp.
= Rp.
= Rp.

252,450.00
3,388.00
255,838.00

x
x
x
x

52,500.00
78,800.00
91,900.00
65,600.00
Jumlah (2)
Jumlah (1) +(2)

=
=
=
=
=
=

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

13,125.00
27,580.00
3,216.50
820.00
44,741.50
300,579.50

= Rp.
= Rp.
= Rp.

141,075.00
3,388.00
144,463.00

=
=
=
=
=
=

13,125.00
27,580.00
3,216.50
820.00
44,741.50
189,204.50

6.45.2.
-

Tenaga
Pekerja
Tukang kayu
Kepala tukang
Mandor

6.46.
6.46.1.
-

1 M Pasang rangka langit-langit (30 x 30) cm, kayu meranti :


Bahan
Kayu meranti, balok
0.027 M x Rp. 5,225,000.00
Paku biasa 2" - 5"
0.200 Kg x Rp.
16,940.00
Jumlah (1)
Tenaga
Pekerja
0.250 Oh x Rp.
52,500.00
Tukang kayu
0.350 Oh x Rp.
78,800.00
Kepala tukang
0.035 Oh x Rp.
91,900.00
Mandor
0.0125 Oh x Rp.
65,600.00
Jumlah (2)
Jumlah (1) +(2)

6.46.2.
-

0.250
0.350
0.035
0.0125

Oh
Oh
Oh
Oh

Rp.
Rp.
Rp.
Rp.

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

PK

6.47.

1 M Pasang lisplang ukuran (3 x 20) cm, kayu meranti

6.47.1. Bahan
- Kayu meranti, papan
- Paku biasa 2" - 5"

PK

5,475,000.00
16,940.00
Jumlah (1)

= Rp.
= Rp.
= Rp.

39,420.00
847.00
40,267.00

x
x
x
x

52,500.00
78,800.00
91,900.00
65,600.00
Jumlah (2)
Jumlah (1) +(2)

=
=
=
=
=
=

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

5,250.00
15,760.00
2,297.50
328.00
23,635.50
63,902.50

Tenaga
Pekerja
Tukang kayu
Kepala tukang
Mandor

6.48.

1 M Pasang lisplang ukuran (3 x 20) cm, kayu meranti batu

0.100
0.200
0.025
0.005

Oh
Oh
Oh
Oh

0.0072 M
0.050 Kg

Rp.
Rp.
Rp.
Rp.

9,375,000.00
16,940.00
Jumlah (1)

= Rp.
= Rp.
= Rp.

67,500.00
847.00
68,347.00

x
x
x
x

52,500.00
78,800.00
91,900.00
65,600.00
Jumlah (2)
Jumlah (1) +(2)

=
=
=
=
=
=

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

5,250.00
15,760.00
1,838.00
328.00
23,176.00
91,523.00

x Rp. 24,104,440.00
x Rp.
16,940.00
Jumlah (1)

= Rp.
= Rp.
= Rp.

265,148.84
847.00
265,995.84

x
x
x
x

=
=
=
=
=
=

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

5,775.00
17,336.00
2,021.80
328.00
25,460.80
291,456.64

= Rp.
= Rp.
= Rp.

103,125.00
847.00
103,972.00

Tenaga
Pekerja
Tukang kayu
Kepala tukang
Mandor

6.49.

1 M Pasang lisplang ukuran (3 x 30) cm, kayu jati

0.100
0.200
0.020
0.005

Oh
Oh
Oh
Oh

0.0110 M
0.050 Kg

Rp.
Rp.
Rp.
Rp.

6.49.2.
-

Tenaga
Pekerja
Tukang kayu
Kepala tukang
Mandor

6.50.

1 M Pasang lisplang ukuran (3 x 30) cm, kayu meranti batu

6.50.1. Bahan
- Meranti batu, papan
- Paku biasa 2" - 5"

0.110
0.220
0.022
0.005

Oh
Oh
Oh
Oh

0.011 M
0.050 Kg

x Rp.
x Rp.

6.48.2.
-

6.49.1. Bahan
- Kayu jati, papan
- Paku biasa 2" - 5"

PK

x Rp.
x Rp.

6.47.2.
-

6.48.1. Bahan
- Meranti batu, papan
- Paku biasa 2" - 5"

PK

0.0072 M
0.050 Kg

Rp.
Rp.
Rp.
Rp.

x Rp.
x Rp.

52,500.00
78,800.00
91,900.00
65,600.00
Jumlah (2)
Jumlah (1) +(2)

9,375,000.00
16,940.00
Jumlah (1)

PK

6.50.2.
-

Tenaga
Pekerja
Tukang kayu
Kepala tukang
Mandor

6.51.

1 M Pasang lisplang ukuran 2 x (3 x 20) cm, kayu meranti batu

6.51.1. Bahan
- Meranti batu, papan
- Paku biasa 2" - 5"

PK

Oh
Oh
Oh
Oh

0.0145 M
0.060 Kg

x
x
x
x

Rp.
Rp.
Rp.
Rp.

52,500.00
78,800.00
91,900.00
65,600.00
Jumlah (2)
Jumlah (1) +(2)

x
x
x
x

52,500.00
78,800.00
91,900.00
65,600.00
Jumlah (2)
Jumlah (1) +(2)

=
=
=
=
=
=

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

7,875.00
19,700.00
2,297.50
4,920.00
34,792.50
171,746.40

Rp.
Rp.
Rp.
Rp.

9,375,000.00
16,940.00
Jumlah (1)

= Rp.
= Rp.
= Rp.

80,625.00
1,016.40
81,641.40

x
x
x
x

52,500.00
78,800.00
91,900.00
65,600.00
Jumlah (2)
Jumlah (1) +(2)

=
=
=
=
=
=

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

5,250.00
7,880.00
919.00
3,280.00
17,329.00
98,970.40

Tenaga
Pekerja
Tukang kayu
Kepala tukang
Mandor

6.53.

1 M Pasang lisplang ukuran 2 x (2 x 20) cm, kayu meranti :

6.53.1. Bahan
- Kayu meranti,papan
- Paku biasa 2" - 5"
6.53.2.
-

Tenaga
Pekerja
Tukang kayu
Kepala tukang
Mandor

Oh
Oh
Oh
Oh

0.0086 M
0.060 Kg

0.100
0.100
0.010
0.050

Oh
Oh
Oh
Oh

x Rp.
x Rp.

6.52.2.
-

0.100
0.100
0.010
0.050

135,937.50
1,016.40
136,953.90

1 M Pasang lisplang ukuran 2 x (2 x 20) cm, kayu meranti batu

0.0086 M
0.060 Kg

5,775.00
17,336.00
2,021.80
328.00
25,460.80
129,432.80

= Rp.
= Rp.
= Rp.

6.52.

Oh
Oh
Oh
Oh

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

9,375,000.00
16,940.00
Jumlah (1)

Tenaga
Pekerja
Tukang kayu
Kepala tukang
Mandor

0.150
0.250
0.025
0.075

=
=
=
=
=
=

x Rp.
x Rp.

6.51.2.
-

6.52.1. Bahan
- Meranti batu, papan
- Paku biasa 2" - 5"

PK

0.110
0.220
0.022
0.005

Rp.
Rp.
Rp.
Rp.

x Rp.
x Rp.

5,475,000.00
16,940.00
Jumlah (1)

= Rp.
= Rp.
= Rp.

47,085.00
1,016.40
48,101.40

x
x
x
x

52,500.00
78,800.00
91,900.00
65,600.00
Jumlah (2)
Jumlah (1) +(2)

=
=
=
=
=
=

5,250.00
7,880.00
919.00
3,280.00
17,329.00
65,430.40

Rp.
Rp.
Rp.
Rp.

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

PK

PK

PK

PK

6.54.

1 M Pasang rangka dinding pemisah, kayu damar laut

6.54.1.
-

Bahan
Kayu damar laut, balok
Meranti batu, papan
Paku biasa 2" - 5"

6.54.2.
-

Tenaga
Pekerja
Tukang kayu
Kepala tukang
Mandor

6.55.

1 M Pasang rangka dinding pemisah, kayu meranti :

6.55.1.
-

Bahan
Kayu meranti, balok
Kayu meranti, papan
Paku biasa 2" - 5"

6.55.2.
-

Tenaga
Pekerja
Tukang kayu
Kepala tukang
Mandor

6.56.

1 M Pasang dinding pemisah teakwood rangka, rangka kayu damar laut :

6.56.1.
-

Bahan
Kayu damar laut, balok
Teakwood 4' x 8'
Paku biasa 2" - 5"

6.56.2.
-

Tenaga
Pekerja
Tukang kayu
Kepala tukang
Mandor

6.57.

1 M Pasang dinding pemisah double plywood, rangka kayu damar laut :

6.57.1.
-

Bahan
Kayu damar laut, balok
Paku biasa 2" - 5"
Lem kayu
Plywood 4' x 8' x 4 mm

0.0195 M
0.007 M
0.100 Kg

0.150
0.450
0.045
0.075

Oh
Oh
Oh
Oh

0.0195 M
0.007 M
0.100 Kg

0.150
0.450
0.045
0.075

Oh
Oh
Oh
Oh

0.0195 M
1.000 M
0.100 Kg

0.150
0.450
0.045
0.075

0.0195
0.100
0.560
1.000

Oh
Oh
Oh
Oh

M
Kg
Lt
Lbr

x Rp.
x Rp.
x Rp.

9,350,000.00
9,375,000.00
16,940.00
Jumlah (1)

=
=
=
=

Rp.
Rp.
Rp.
Rp.

182,325.00
65,625.00
1,694.00
249,644.00

x
x
x
x

52,500.00
78,800.00
91,900.00
65,600.00
Jumlah (2)
Jumlah (1) +(2)

=
=
=
=
=
=

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

7,875.00
35,460.00
4,135.50
4,920.00
52,390.50
302,034.50

Rp.
Rp.
Rp.
Rp.

x Rp.
x Rp.
x Rp.

5,225,000.00
5,475,000.00
16,940.00
Jumlah (1)

=
=
=
=

Rp.
Rp.
Rp.
Rp.

101,887.50
38,325.00
1,694.00
141,906.50

x
x
x
x

52,500.00
78,800.00
91,900.00
65,600.00
Jumlah (2)
Jumlah (1) +(2)

=
=
=
=
=
=

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

7,875.00
35,460.00
4,135.50
4,920.00
52,390.50
194,297.00

Rp.
Rp.
Rp.
Rp.

x Rp.
x Rp.
x Rp.

9,350,000.00
54,450.00
16,940.00
Jumlah (1)

=
=
=
=

Rp.
Rp.
Rp.
Rp.

182,325.00
54,450.00
1,694.00
238,469.00

x
x
x
x

52,500.00
78,800.00
91,900.00
65,600.00
Jumlah (2)
Jumlah (1) +(2)

=
=
=
=
=
=

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

7,875.00
35,460.00
4,135.50
4,920.00
52,390.50
290,859.50

x
x
x
x

Rp.
Rp.
Rp.
Rp.

Rp.
Rp.
Rp.
Rp.

9,350,000.00
16,940.00
37,400.00
51,920.00
Jumlah (1)

=
=
=
=
=

Rp.
Rp.
Rp.
Rp.
Rp.

182,325.00
1,694.00
20,944.00
51,920.00
256,883.00

PK

PK

6.57.2.
-

Tenaga
Pekerja
Tukang kayu
Kepala tukang
Mandor

6.58.

1 M Pasang dinding lambrizering dari papan meranti :

6.58.1.
-

Bahan
Kayu meranti, papan
Paku biasa 2" - 5"
Paku skrup 3,5"

6.58.2.
-

Tenaga
Pekerja
Tukang kayu
Kepala tukang
Mandor

6.59.

1 M Pasang plywood tebal 4 mm, untuk dinding :

0.200
0.600
0.060
0.010

Oh
Oh
Oh
Oh

0.0120 M
0.100 Kg
0.150 Lbr

0.600
1.800
0.180
0.030

Oh
Oh
Oh
Oh

x
x
x
x

Rp.
Rp.
Rp.
Rp.

52,500.00
78,800.00
91,900.00
65,600.00
Jumlah (2)
Jumlah (1) +(2)

=
=
=
=
=
=

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

10,500.00
47,280.00
5,514.00
656.00
63,950.00
320,833.00

x Rp.
x Rp.
x Rp.

5,475,000.00
16,940.00
21,180.00
Jumlah (1)

=
=
=
=

Rp.
Rp.
Rp.
Rp.

65,700.00
1,694.00
3,177.00
70,571.00

x
x
x
x

52,500.00
78,800.00
91,900.00
65,600.00
Jumlah (2)
Jumlah (1) +(2)

=
=
=
=
=
=

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

31,500.00
141,840.00
16,542.00
1,968.00
191,850.00
262,421.00

Rp.
Rp.
Rp.
Rp.

6.59.1. Bahan
- Plywood 4' x 8' x 4 mm
- Paku biasa 2" - 5"

0.4000 Lbr
0.050 Kg

x Rp.
x Rp.

51,920.00
16,940.00
Jumlah (1)

= Rp.
= Rp.
= Rp.

20,768.00
847.00
21,615.00

0.025
0.075
0.0075
0.0013

x
x
x
x

Rp.
Rp.
Rp.
Rp.

52,500.00
78,800.00
91,900.00
65,600.00
Jumlah (2)
Jumlah (1) +(2)

=
=
=
=
=
=

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

1,312.50
5,910.00
689.25
85.28
7,997.03
29,612.03

1.050 M'

x Rp.

12,540.00
Jumlah (1)

= Rp.
= Rp.

13,167.00
13,167.00

0.021
0.021
0.002
0.001

x
x
x
x

52,500.00
78,800.00
91,900.00
65,600.00
Jumlah (2)
Jumlah (1) +(2)

=
=
=
=
=
=

1,102.50
1,654.80
183.80
65.60
3,006.70
16,173.70

6.59.2. Tenaga
-

PK

6.60.

Pekerja
Tukang kayu
Kepala tukang
Mandor

Oh
Oh
Oh
Oh

1 M' Pasang list plafond kayu profil :

6.60.1. Bahan
- Kayu profil 2"
6.60.2. Tenaga
-

Pekerja
Tukang kayu
Kepala tukang
Mandor

Oh
Oh
Oh
Oh

Rp.
Rp.
Rp.
Rp.

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

ANALISA BIAYA KONSTRUKSI


PEKERJAAN BETON

PB 6.1.

1 M Membuat beton tumbuk, 1 Pc : 3 Ps : 5 Kr

6.1.1
-

Bahan
Semen portland
Pasir beton
Koral beton 5/7

6.1.2.
-

Tenaga
Pekerja
Tukang batu
Kepala tukang
Mandor

PB 6.2.

Bahan
Semen portland
Pasir beton
Koral beton 5/7

6.2.2.
-

Tenaga
Pekerja
Tukang batu
Kepala tukang
Mandor

PB 6.3.

1,270
87,800
170,900
Jumlah (1)

=
=
=
=

Rp.
Rp.
Rp.
Rp.

276,860.00
45,656.00
148,683.00
471,199.00

x
x
x
x

Rp.
Rp.
Rp.
Rp.

52,500
78,800
91,900
65,600
Jumlah (2)
Jumlah (1) + (2)

=
=
=
=
=
=

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

86,625.00
19,700.00
2,297.50
5,248.00
113,870.50
585,069.50

197.000 Kg x
0.470 M x
0.940 M x

Rp.
Rp.
Rp.

1,270
87,800
170,900
Jumlah (1)

=
=
=
=

Rp.
Rp.
Rp.
Rp.

250,190.00
41,266.00
160,646.00
452,102.00

x
x
x
x

Rp.
Rp.
Rp.
Rp.

52,500
78,800
91,900
65,600
Jumlah (2)
Jumlah (1) + (2)

=
=
=
=
=
=

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

86,625.00
19,700.00
2,297.50
5,248.00
113,870.50
565,972.50

173.000 Kg x
0.570 M x
0.870 M x

Rp.
Rp.
Rp.

1,270
87,800
170,900
Jumlah (1)

=
=
=
=

Rp.
Rp.
Rp.
Rp.

219,710.00
50,046.00
148,683.00
418,439.00

Rp.
Rp.
Rp.
Rp.

52,500
78,800
91,900
65,600
Jumlah (2)
Jumlah (1) + (2)

=
=
=
=
=
=

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

86,625.00
19,700.00
2,297.50
5,248.00
113,870.50
532,309.50

1,270
87,800
170,900
Jumlah (1)

=
=
=
=

Rp.
Rp.
Rp.
Rp.

12,700.00
2,282.80
7,519.60
22,502.40

1.650
0.250
0.025
0.080

Oh
Oh
Oh
Oh

1.650
0.250
0.025
0.080

Oh
Oh
Oh
Oh

1 M Membuat beton tumbuk, 1 Pc : 4 Ps : 6 Kr

6.3.1
-

Bahan
Semen portland
Pasir beton
Koral beton 5/7

6.3.2.
-

Tenaga
Pekerja
Tukang batu
Kepala tukang
Mandor

6.4.1

Rp.
Rp.
Rp.

1 M Membuat beton tumbuk, 1 Pc : 3 Ps : 6 Kr

6.2.1
-

PB 6.4.

218.000 Kg x
0.520 M x
0.870 M x

1.650
0.250
0.025
0.080

Oh
Oh
Oh
Oh

x
x
x
x

1 M Membuat beton tumbuk, 1 Pc : 3 Ps : 5 Kr, Tebal 5 Cm


Bahan
- Semen portland
- Pasir beton
- Koral beton 5/7

6.4.2. Tenaga

10.000 Kg x
0.026 M x
0.044 M x

Rp.
Rp.
Rp.

PB 6.5.

Pekerja
Tukang batu
Kepala tukang
Mandor

PB 6.6.

Tenaga
Pekerja
Tukang batu
Kepala tukang
Mandor

PB 6.7.

Tenaga
Pekerja
Tukang batu
Kepala tukang
Mandor

PB 6.8.

Rp.
Rp.
Rp.
Rp.

52,500
78,800
91,900
65,600
Jumlah (2)
Jumlah (1) + (2)

=
=
=
=
=
=

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

8,662.50
1,970.00
183.80
393.60
11,209.90
33,712.30

232.000 Kg x
0.520 M x
0.780 M x

Rp.
Rp.
Rp.

1,270
87,800
170,900
Jumlah (1)

=
=
=
=

Rp.
Rp.
Rp.
Rp.

294,640.00
45,656.00
133,302.00
473,598.00

x
x
x
x

Rp.
Rp.
Rp.
Rp.

52,500
78,800
91,900
65,600
Jumlah (2)
Jumlah (1) + (2)

=
=
=
=
=
=

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

86,625.00
19,700.00
2,297.50
5,248.00
113,870.50
587,468.50

280.000 Kg x
0.450 M x
0.900 M x

Rp.
Rp.
Rp.

1,270
87,800
185,900
Jumlah (1)

=
=
=
=

Rp.
Rp.
Rp.
Rp.

355,600.00
39,510.00
167,310.00
562,420.00

x
x
x
x

Rp.
Rp.
Rp.
Rp.

52,500
78,800
91,900
65,600
Jumlah (2)
Jumlah (1) + (2)

=
=
=
=
=
=

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

86,625.00
19,700.00
2,297.50
5,248.00
113,870.50
676,290.50

352.000 Kg x
0.560 M x
0.700 M x

Rp.
Rp.
Rp.

1,270
87,800
185,900
Jumlah (1)

=
=
=
=

Rp.
Rp.
Rp.
Rp.

447,040.00
49,168.00
130,130.00
626,338.00

x
x
x
x

Rp.
Rp.
Rp.
Rp.

52,500
78,800
91,900
65,600
Jumlah (2)
Jumlah (1) + (2)

=
=
=
=
=
=

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

86,625.00
19,700.00
2,297.50
5,248.00
113,870.50
740,208.50

357.000 Kg x
0.420 M x
0.540 M x

Rp.
Rp.
Rp.

1,270
87,800
185,900
Jumlah (1)

=
=
=
=

Rp.
Rp.
Rp.
Rp.

453,390.00
36,876.00
100,386.00
590,652.00

1.650 Oh x
0.250 Oh x

Rp.
Rp.

52,500 =
78,800 =

Rp.
Rp.

86,625.00
19,700.00

1.650
0.250
0.025
0.080

Oh
Oh
Oh
Oh

1.650
0.250
0.025
0.080

Oh
Oh
Oh
Oh

1 M Membuat beton 1 Pc : 2 Ps : 2,5 Kr

6.7.1. Bahan
- Semen portland
- Pasir beton
- Koral beton 3/5
6.7.2.
-

x
x
x
x

1 M Membuat beton 1 Pc : 2 Ps : 4 Kr

6.6.1. Bahan
- Semen portland
- Pasir beton
- Koral beton 3/5
6.6.2.
-

Oh
Oh
Oh
Oh

1 M Membuat beton 1 Pc : 2 Ps : 3 Kr

6.5.1. Bahan
- Semen portland
- Pasir beton
- Koral beton 5/7
6.5.2.
-

0.165
0.025
0.002
0.006

Tenaga
Pekerja
Tukang batu
Kepala tukang
Mandor

1.650
0.250
0.025
0.080

Oh
Oh
Oh
Oh

1 M Membuat beton 1 Pc : 1,5 Ps : 3 Kr

6.8.1. Bahan
- Semen portland
- Pasir beton
- Koral beton 3/5
6.8.2. Tenaga
- Pekerja
- Tukang batu

- Kepala tukang
- Mandor

PB 6.9.

PB 6.10.

Tenaga
Pekerja
Tukang batu
Kepala tukang
Mandor

Bahan
Semen portland
Pasir beton
Koral beton 3/5

6.10.2.
-

Tenaga
Pekerja
Tukang batu
Kepala tukang
Mandor

Bahan
Semen portland
Pasir beton
Koral beton/batu pecah 2/3
Rapidrant

6.11.2.
-

Tenaga
Pekerja
Tukang batu
Kepala tukang
Mandor

6.12.1.
-

=
=
=
=

Rp.
Rp.
Rp.
Rp.

2,297.50
5,248.00
113,870.50
704,522.50

386.000 Kg x
0.470 M x
0.780 M x

Rp.
Rp.
Rp.

1,270
87,800
185,900
Jumlah (1)

=
=
=
=

Rp.
Rp.
Rp.
Rp.

490,220.00
41,266.00
145,002.00
676,488.00

x
x
x
x

Rp.
Rp.
Rp.
Rp.

52,500
78,800
91,900
65,600
Jumlah (2)
Jumlah (1) + (2)

=
=
=
=
=
=

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

86,625.00
19,700.00
2,297.50
5,248.00
113,870.50
790,358.50

479.000 Kg x
0.370 M x
0.740 M x

Rp.
Rp.
Rp.

1,270
87,800
185,900
Jumlah (1)

=
=
=
=

Rp.
Rp.
Rp.
Rp.

608,330.00
32,486.00
137,566.00
778,382.00

1.650
0.250
0.025
0.080

Oh
Oh
Oh
Oh

1.650
0.250
0.025
0.080

Oh
Oh
Oh
Oh

x
x
x
x

Rp.
Rp.
Rp.
Rp.

52,500
78,800
91,900
65,600
Jumlah (2)
Jumlah (1) + (2)

=
=
=
=
=
=

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

86,625.00
19,700.00
2,297.50
5,248.00
113,870.50
892,252.50

440.000
0.500
0.800
2.460

Kg
M
M
Gln

x
x
x
x

Rp.
Rp.
Rp.
Rp.

1,270 =
87,800 =
177,700 =
=
Jumlah (1)
=

Rp.
Rp.
Rp.
Rp.
Rp.

558,800.00
43,900.00
142,160.00
0.00
744,860.00

1.650
0.250
0.025
0.080

Oh
Oh
Oh
Oh

x
x
x
x

Rp.
Rp.
Rp.
Rp.

52,500
78,800
91,900
65,600
Jumlah (2)
Jumlah (1) + (2)

=
=
=
=
=
=

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

86,625.00
19,700.00
2,297.50
5,248.00
113,870.50
858,730.50

Kg
M
M
Ltr

x
x
x
x

Rp.
Rp.
Rp.
Rp.

1,270 =
87,800 =
185,900 =
=
Jumlah (1)
=

Rp.
Rp.
Rp.
Rp.
Rp.

426,720.00
47,412.00
150,579.00
0.00
624,711.00

1.650 Oh x
0.250 Oh x

Rp.
Rp.

52,500 =
78,800 =

Rp.
Rp.

86,625.00
19,700.00

1 M Membuat tiang pancang prestressed beton

6.11.1.
-

PB 6.12.

91,900
65,600
Jumlah (2)
Jumlah (1) + (2)

1 M Membuat beton 1 Pc : 1 Ps : 2 Kr

6.10.1.
-

PB 6.11.

Rp.
Rp.

1 M Membuat beton 1 Pc : 1,5 Ps : 2,5 Kr

6.9.1. Bahan
- Semen portland
- Pasir beton
- Koral beton 3/5
6.9.2.
-

0.025 Oh x
0.080 Oh x

1 M Membuat beton dengan puzzdith - 100 XR


Bahan
Semen portland
Pasir beton
Koral beton
Puzzdith - 100 XR

6.12.2. Tenaga
- Pekerja
- Tukang batu

336.000
0.540
0.810
1.000

- Kepala tukang
- Mandor

PB 6.13.

0.025 Oh x
0.080 Oh x

Rp.
Rp.

91,900
65,600
Jumlah (2)
Jumlah (1) + (2)

=
=
=
=

Rp.
Rp.
Rp.
Rp.

2,297.50
5,248.00
113,870.50
738,581.50

336.000 Kg x
0.540 M x
0.810 M x

Rp.
Rp.
Rp.

1,270
87,800
177,700
Jumlah (1)

=
=
=
=

Rp.
Rp.
Rp.
Rp.

426,720.00
47,412.00
143,937.00
618,069.00

x
x
x
x

Rp.
Rp.
Rp.
Rp.

52,500
78,800
91,900
65,600
Jumlah (2)
Jumlah (1) + (2)

=
=
=
=
=
=

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

105,000.00
27,580.00
3,216.50
65,600.00
201,396.50
819,465.50

291.000 Kg x
0.470 M x
0.930 M x

Rp.
Rp.
Rp.

1,270
87,800
177,700
Jumlah (1)

=
=
=
=

Rp.
Rp.
Rp.
Rp.

369,570.00
41,266.00
165,261.00
576,097.00

x
x
x
x

Rp.
Rp.
Rp.
Rp.

52,500
78,800
91,900
65,600
Jumlah (2)
Jumlah (1) + (2)

=
=
=
=
=
=

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

105,000.00
27,580.00
3,216.50
65,600.00
201,396.50
777,493.50

367.000 Kg x
0.440 M x
0.880 M x

Rp.
Rp.
Rp.

1,270
87,800
177,700
Jumlah (1)

=
=
=
=

Rp.
Rp.
Rp.
Rp.

466,090.00
38,632.00
156,376.00
661,098.00

x
x
x
x

Rp.
Rp.
Rp.
Rp.

52,500
78,800
91,900
65,600
Jumlah (2)
Jumlah (1) + (2)

=
=
=
=
=
=

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

105,000.00
27,580.00
3,216.50
65,600.00
201,396.50
862,494.50

400.000 Kg x
0.480 M x
0.880 M x

Rp.
Rp.
Rp.

1,270
87,800
177,700
Jumlah (1)

=
=
=
=

Rp.
Rp.
Rp.
Rp.

508,000.00
42,144.00
156,376.00
706,520.00

2.000 Oh x
0.350 Oh x
0.035 Oh x

Rp.
Rp.
Rp.

52,500 =
78,800 =
91,900 =

Rp.
Rp.
Rp.

105,000.00
27,580.00
3,216.50

1 M Membuat beton 1 Pc : 2 Ps : 3 Kr

6.13.1.
-

Bahan
Semen portland
Pasir beton
Koral beton/batu pecah 2/3

6.13.2.
-

Tenaga
Pekerja
Tukang batu
Kepala tukang
Mandor

PB 6.14.

2.000
0.350
0.035
1.000

Oh
Oh
Oh
Oh

1 M Membuat beton 1 Pc : 2 Ps : 4 Kr

6.14.1.
-

Bahan
Semen portland
Pasir beton
Koral beton/batu pecah 2/3

6.14.2.
-

Tenaga
Pekerja
Tukang batu
Kepala tukang
Mandor

PB 6.15.

2.000
0.350
0.035
1.000

Oh
Oh
Oh
Oh

1 M Membuat beton 1 Pc : 1,5 Ps : 3 Kr

6.15.1.
-

Bahan
Semen portland
Pasir beton
Koral beton 2/3

6.15.2. Tenaga
-

PB 6.16.

Pekerja
Tukang batu
Kepala tukang
Mandor

2.000
0.350
0.035
1.000

Oh
Oh
Oh
Oh

1 M Membuat beton 1 Pc : 1,5 Ps : 2,5 Kr

6.16.1.
-

Bahan
Semen portland
Pasir beton
Koral beton 2/3

6.16.2.
-

Tenaga
Pekerja
Tukang batu
Kepala tukang

- Mandor

PB 6.17.

Bahan
Semen portland
Pasir beton
Koral beton 2/3

6.17.2.
-

Tenaga
Pekerja
Tukang batu
Kepala tukang
Mandor

Bahan
Semen portland
Pasir beton
Koral beton 2/3
Strorox - 100

6.18.2.
-

Tenaga
Pekerja
Tukang batu
Kepala tukang
Mandor

PB 6.20.

Tenaga
Pekerja
Tukang batu
Kepala tukang
Mandor

65,600.00
201,396.50
907,916.50

615.000 Kg x
0.520 M x
0.520 M x

Rp.
Rp.
Rp.

1,270
87,800
177,700
Jumlah (1)

=
=
=
=

Rp.
Rp.
Rp.
Rp.

781,050.00
45,656.00
92,404.00
919,110.00

x
x
x
x

Rp.
Rp.
Rp.
Rp.

52,500
78,800
91,900
65,600
Jumlah (2)
Jumlah (1) + (2)

=
=
=
=
=
=

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

105,000.00
27,580.00
3,216.50
65,600.00
201,396.50
1,120,506.50

2.000
0.350
0.035
1.000

Oh
Oh
Oh
Oh

400.000
0.480
0.800
1.200

Kg
M
M
M

x
x
x
x

Rp.
Rp.
Rp.
Rp.

1,270 =
87,800 =
177,700 =
=
Jumlah (1)
=

Rp.
Rp.
Rp.
Rp.
Rp.

508,000.00
42,144.00
142,160.00
0.00
692,304.00

2.000
0.350
0.035
1.000

Oh
Oh
Oh
Oh

x
x
x
x

Rp.
Rp.
Rp.
Rp.

52,500
78,800
91,900
65,600
Jumlah (2)
Jumlah (1) + (2)

=
=
=
=
=
=

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

105,000.00
27,580.00
3,216.50
65,600.00
201,396.50
893,700.50

1.050 M' x

Rp.
Jumlah (1)

=
=

Rp.
Rp.

0.00
0.00

52,500
78,800
91,900
65,600
Jumlah (2)
Jumlah (1) + (2)

=
=
=
=
=
=

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

2,625.00
2,364.00
275.70
131.20
5,395.90
5,395.90

Jumlah (1)

=
=

Rp.
Rp.

0.00
0.00

52,500
78,800
91,900
65,600
Jumlah (2)
Jumlah (1) + (2)

=
=
=
=
=
=

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

2,625.00
2,758.00
321.65
131.20
5,835.85
5,835.85

0.050
0.030
0.003
0.002

Oh
Oh
Oh
Oh

x
x
x
x

Rp.
Rp.
Rp.
Rp.

1.050 M' x

Rp.

1 M' Memasang PVC Waterstop lebar 200 mm

6.20.1. Bahan
- Waterstop lebar 200 mm

6.20.2.
-

Rp.
Rp.
Rp.

1 M' Memasang PVC Waterstop lebar 150 mm

6.19.1. Bahan
- Waterstop lebar 150 mm

6.19.2.
-

65,600 =
Jumlah (2)
=
Jumlah (1) + (2) =

1 M Membuat beton kedap air dengan strorox - 100

6.18.1.
-

PB 6.19.

Rp.

1 M Membuat beton 1 Pc : 1 Ps : 1 Kr

6.17.1.
-

PB 6.18.

1.000 Oh x

Tenaga
Pekerja
Tukang batu
Kepala tukang
Mandor

0.050
0.035
0.0035
0.002

Oh
Oh
Oh
Oh

x
x
x
x

Rp.
Rp.
Rp.
Rp.

PB 6.21.

1 M' Memasang PVC Waterstop lebar 230 mm

6.21.1. Bahan
- Waterstop lebar 230 mm

1.050 M' x

Rp.
Jumlah (1)

=
=

Rp.
Rp.

0.00
0.00

6.21.2.
-

PB 6.22.

Tenaga
Pekerja
Tukang batu
Mandor

PB 6.23.

Tenaga
Pekerja
Tukang batu
Mandor

PB

PB

52,500
78,800
65,600
Jumlah (2)
Jumlah (1) + (2)

=
=
=
=
=

Rp.
Rp.
Rp.
Rp.
Rp.

28,875.00
2,758.00
131.20
31,764.20
31,764.20

1.050 M' x

Jumlah (1)

=
=

Rp.
Rp.

0.00
0.00

0.550 Oh x
0.035 Oh x
0.003 Oh x

52,500
78,800
65,600
Jumlah (2)
Jumlah (1) + (2)

=
=
=
=
=

Rp.
Rp.
Rp.
Rp.
Rp.

28,875.00
2,758.00
196.80
31,829.80
31,829.80

Jumlah (1)

=
=

Rp.
Rp.

0.00
0.00

Rp.

Rp.
Rp.
Rp.

1 M' Memasang PVC Waterstop lebar 300 mm

6.23.1. Bahan
- Waterstop lebar 300 mm

6.23.2.
-

Rp.
Rp.
Rp.

1 M' Memasang PVC Waterstop lebar 250 mm

6.22.1. Bahan
- Waterstop lebar 250 mm

6.22.2.
-

0.550 Oh x
0.035 Oh x
0.002 Oh x

Tenaga
Pekerja
Tukang batu
Kepala tukang
Mandor

1.050 M' x

0.300
0.260
0.026
0.005

Oh
Oh
Oh
Oh

Rp.

x
x
x
x

Rp.
Rp.
Rp.
Rp.

52,500
78,800
91,900
65,600
Jumlah (2)
Jumlah (1) + (2)

=
=
=
=
=
=

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

15,750.00
20,488.00
2,389.40
328.00
38,955.40
38,955.40

6.25.1 Bahan
Besi beton polos
Kawat beton

1.050 Kg x
0.015 Kg x

Rp.
Rp.

14,410 =
16,830 =
Jumlah (1)
=

Rp.
Rp.
Rp.

15,130.50
252.45
15,382.95

6.25.2 Tenaga
Pekerja
Tukang besi
Kepala tukang
Mandor

0.007
0.007
0.007
0.003

x
x
x
x

Rp.
Rp.
Rp.
Rp.

52,500
78,800
91,900
65,600
Jumlah (2)
Jumlah (1) + (2)

=
=
=
=
=
=

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

367.50
551.60
643.30
196.80
1,759.20
17,142.15

6.26.1 Bahan
Besi Presstressed polos
Kawat beton

1.050 Kg x
0.010 Kg x

Rp.
Rp.

14,410 =
16,830 =
Jumlah (1)
=

Rp.
Rp.
Rp.

15,130.50
168.30
15,298.80

6.26.2 Tenaga
Pekerja
Tukang besi
Kepala tukang

0.005 Oh x
0.005 Oh x
0.005 Oh x

Rp.
Rp.
Rp.

52,500 =
78,800 =
91,900 =

Rp.
Rp.
Rp.

262.50
394.00
459.50

6.25 1 Kg Pembesian dengan Besi polos

Oh
Oh
Oh
Oh

6.26 1 M Kabel Presstressed polos / strands

Mandor

PB

0.003 Oh x

Rp.

65,600 =
Jumlah (2)
=
Jumlah (1) + (2) =

Rp.
Rp.
Rp.

196.80
1,312.80
16,611.60

6.28.1 Bahan
Kayu sembarang
Paku biasa 2" - 5"
Minyak bekisting

0.040 M x
0.300 Kg x
0.100 Ltr x

Rp.
Rp.
Rp.

3,107,500
14,520
6,290
Jumlah (1)

=
=
=
=

Rp.
Rp.
Rp.
Rp.

124,300.00
4,356.00
629.00
129,285.00

6.28.2 Tenaga
Pekerja
Tukang besi
Kepala tukang
Mandor

0.300
0.260
0.026
0.005

x
x
x
x

Rp.
Rp.
Rp.
Rp.

52,500
78,800
91,900
65,600
Jumlah (2)
Jumlah (1) + (2)

=
=
=
=
=
=

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

15,750.00
20,488.00
2,389.40
328.00
38,955.40
168,240.40

6.28 1 M Pasang bekisting untuk pondasi

PB 6.29.

Oh
Oh
Oh
Oh

1 M Pasang bekisting untuk sloof

6.29.1.
-

Bahan
Kayu sembarang
Paku biasa 2' - 5"
Minyak bekisting

0.045 M x
0.300 Kg x
0.100 Lt x

Rp.
Rp.
Rp.

3,107,500
14,520
6,290
Jumlah (1)

=
=
=
=

Rp.
Rp.
Rp.
Rp.

139,837.50
4,356.00
629.00
144,822.50

6.29.2.
-

Tenaga
Pekerja
Tukang batu
Kepala tukang
Mandor

0.300
0.260
0.026
0.005

Rp.
Rp.
Rp.
Rp.

52,500
78,800
91,900
65,600
Jumlah (2)
Jumlah (1) + (2)

=
=
=
=
=
=

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

15,750.00
20,488.00
2,389.40
328.00
38,955.40
183,777.90

Oh
Oh
Oh
Oh

x
x
x
x

PB 6.30.

1 M Pasang bekisting untuk kolom

6.30.1.
-

Bahan
Kayu sembarang
Paku biasa 2' - 5"
Minyak bekisting
Balok kayu sembarang
Plywood tebal 9 mm
Kayu dolken/Laut 3"-4"/4 m

0.040
0.400
0.200
0.015
0.350
2.000

M
Kg
Lt
M
Lbr
Btg

x
x
x
x
x
x

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

3,107,500
14,520
6,290
3,107,500
116,820
19,250
Jumlah (1)

=
=
=
=
=
=
=

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

124,300.00
5,808.00
1,258.00
46,612.50
40,887.00
38,500.00
257,365.50

6.30.2.
-

Tenaga
Pekerja
Tukang batu
Kepala tukang
Mandor

0.300
0.330
0.033
0.006

Oh
Oh
Oh
Oh

x
x
x
x

Rp.
Rp.
Rp.
Rp.

52,500
78,800
91,900
65,600
Jumlah (2)
Jumlah (1) + (2)

=
=
=
=
=
=

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

15,750.00
26,004.00
3,032.70
393.60
45,180.30
302,545.80

PB 6.31.

1 M Pasang bekisting untuk balok

6.31.1.
-

Bahan
Kayu sembarang
Paku biasa 2' - 5"
Minyak bekisting
Balok kayu sembarang
Plywood tebal 9 mm
Kayu dolken/Laut 3"-4"/4 m

0.040
0.400
0.200
0.018
0.350
2.000

M
Kg
Lt
M
Lbr
Btg

x
x
x
x
x
x

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

3,107,500
14,520
6,290
3,107,500
116,820
19,250
Jumlah (1)

=
=
=
=
=
=
=

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

124,300.00
5,808.00
1,258.00
55,935.00
40,887.00
38,500.00
266,688.00

6.31.2.
-

Tenaga
Pekerja
Tukang batu
Kepala tukang
Mandor

0.320
0.330
0.033
0.006

Oh
Oh
Oh
Oh

x
x
x
x

Rp.
Rp.
Rp.
Rp.

52,500
78,800
91,900
65,600
Jumlah (2)
Jumlah (1) + (2)

=
=
=
=
=
=

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

16,800.00
26,004.00
3,032.70
393.60
46,230.30
312,918.30

0.040
0.400
0.200
0.015
0.350
6.000

M
Kg
Lt
M
Lbr
Btg

x
x
x
x
x
x

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

3,107,500
14,520
6,290
3,107,500
116,820
19,250
Jumlah (1)

=
=
=
=
=
=
=

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

124,300.00
5,808.00
1,258.00
46,612.50
40,887.00
115,500.00
334,365.50

PB 6.32.
6.32.1.
-

1 M Pasang bekisting untuk lantai


Bahan
Kayu sembarang
Paku biasa 2' - 5"
Minyak bekisting
Balok kayu sembarang
Plywood tebal 9 mm
Kayu dolken/Laut 3"-4"/4 m

6.32.2.
-

PB 6.33.

Tenaga
Pekerja
Tukang batu
Kepala tukang
Mandor

0.320
0.330
0.033
0.006

Oh
Oh
Oh
Oh

x
x
x
x

Rp.
Rp.
Rp.
Rp.

52,500
78,800
91,900
65,600
Jumlah (2)
Jumlah (1) + (2)

=
=
=
=
=
=

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

16,800.00
26,004.00
3,032.70
393.60
46,230.30
380,595.80

1 M Pasang bekisting untuk dinding

6.33.1.
-

Bahan
Kayu sembarang
Paku biasa 2' - 5"
Minyak bekisting
Balok kayu sembarang
Plywood tebal 9 mm
Kayu dolken/Laut 3"-4"/4 m
Formtie/penjaga jarak bekisting/spacer

0.030
0.400
0.200
0.020
0.350
3.000
4.000

M
Kg
Lt
M
Lbr
Btg
Btg

x
x
x
x
x
x
x

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

3,107,500
14,520
6,290
3,107,500
116,820
19,250
5,000
Jumlah (1)

=
=
=
=
=
=
=
=

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

93,225.00
5,808.00
1,258.00
62,150.00
40,887.00
57,750.00
20,000.00
281,078.00

6.33.2.
-

Tenaga
Pekerja
Tukang batu
Kepala tukang
Mandor

0.320
0.330
0.033
0.006

Oh
Oh
Oh
Oh

x
x
x
x

Rp.
Rp.
Rp.
Rp.

52,500
78,800
91,900
65,600
Jumlah (2)
Jumlah (1) + (2)

=
=
=
=
=
=

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

16,800.00
26,004.00
3,032.70
393.60
46,230.30
327,308.30

PB 6.34.

1 M Pasang bekisting untuk tangga

6.34.1.
-

Bahan
Kayu sembarang
Paku biasa 2' - 5"
Minyak bekisting
Balok kayu sembarang
Plywood tebal 9 mm
Kayu dolken/Laut 3"-4"/4 m

0.030
0.400
0.150
0.015
0.350
2.000

M
Kg
Lt
M
Lbr
Btg

x
x
x
x
x
x

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

3,107,500
14,520
6,290
3,107,500
116,820
19,250
Jumlah (1)

=
=
=
=
=
=
=

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

93,225.00
5,808.00
943.50
46,612.50
40,887.00
38,500.00
225,976.00

6.34.2.
-

Tenaga
Pekerja
Tukang batu
Kepala tukang
Mandor

0.320
0.330
0.033
0.006

Oh
Oh
Oh
Oh

x
x
x
x

Rp.
Rp.
Rp.
Rp.

52,500
78,800
91,900
65,600
Jumlah (2)
Jumlah (1) + (2)

=
=
=
=
=
=

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

16,800.00
26,004.00
3,032.70
393.60
46,230.30
272,206.30

PB 6.35.

1 M Pasang beton dengan mutu K 225

6.35.1.
-

Bahan
Semen portland
Pasir beton
Batu pecah

6.35.2.
-

Tenaga
Pekerja
Tukang batu
Kepala tukang
Mandor

PB 6.36.

Rp.
Rp.
Rp.

1,270
87,800
190,200
Jumlah (1)

=
=
=
=

Rp.
Rp.
Rp.
Rp.

492,760.00
57,070.00
123,630.00
673,460.00

x
x
x
x

Rp.
Rp.
Rp.
Rp.

52,500
78,800
91,900
65,600
Jumlah (2)
Jumlah (1) + (2)

=
=
=
=
=
=

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

315,000.00
78,800.00
9,190.00
19,680.00
422,670.00
1,096,130.00

400.000 Kg x
0.400 M x
0.820 M x

Rp.
Rp.
Rp.

1,270
87,800
190,200
Jumlah (1)

=
=
=
=

Rp.
Rp.
Rp.
Rp.

508,000.00
35,120.00
155,964.00
699,084.00

x
x
x
x

Rp.
Rp.
Rp.
Rp.

52,500
78,800
91,900
65,600
Jumlah (2)
Jumlah (1) + (2)

=
=
=
=
=
=

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

315,000.00
78,800.00
9,190.00
19,680.00
422,670.00
1,121,754.00

0.0264 M x
0.600 Kg x
0.500 Btg x

Rp.
Rp.
Rp.

3,107,500
14,520
19,250
Jumlah (1)

=
=
=
=

Rp.
Rp.
Rp.
Rp.

82,038.00
8,712.00
9,625.00
100,375.00

Rp.
Rp.
Rp.
Rp.

52,500
78,800
91,900
65,600
Jumlah (2)
Jumlah (1) + (2)

=
=
=
=
=
=

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

7,875.00
3,940.00
459.50
459.20
12,733.70
113,108.70

6.000
1.000
0.100
0.300

Oh
Oh
Oh
Oh

1 M Pasang beton dengan mutu K 275

6.36.1.
-

Bahan
Semen portland
Pasir beton
Koral beton

6.36.2.
-

Tenaga
Pekerja
Tukang batu
Kepala tukang
Mandor

PB 6.37.

388.000 Kg x
0.650 M x
0.650 M x

6.000
1.000
0.100
0.300

Oh
Oh
Oh
Oh

1 M Pasang jembatan cor

6.37.1.
-

Bahan
Kayu sembarang
Paku biasa 2" - 5 "
Kayu dolken/Laut 3"-4"/4 m

6.37.2.
-

Tenaga
Pekerja
Tukang batu
Kepala tukang
Mandor

0.150
0.050
0.005
0.007

Oh
Oh
Oh
Oh

x
x
x
x

PB 6.38.

1 M Membuat pondasi beton bertulang (150 kg besi + bekisting)

6.38.1.
-

Bahan
Kayu sembarang
Paku biasa 2" - 5 "
Minyak bekisting
Besi beton polos
Kawat beton
Semen portland
Pasir beton
Koral beton

6.38.2.
-

Tenaga
Pekerja
Tukang batu
Tukang kayu
Tukang besi
Kepala tukang
Mandor

PB 6.39.

0.2000
1.500
0.400
150.000
2.250
323.000
0.520
0.780

M
Kg
Lt
Kg
Kg
Kg
M
M

x
x
x
x
x
x
x
x

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

3,107,500
14,520
6,290
14,410
16,830
1,270
87,800
190,200
Jumlah (1)

=
=
=
=
=
=
=
=
=

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

621,500.00
21,780.00
2,516.00
2,161,500.00
37,867.50
410,210.00
45,656.00
148,356.00
3,449,385.50

3.900
0.350
1.040
1.050
0.245
0.165

Oh
Oh
Oh
Oh
Oh
Oh

x
x
x
x
x
x

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

52,500
78,800
78,800
78,800
91,900
65,600
Jumlah (2)
Jumlah (1) + (2)

=
=
=
=
=
=
=
=

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

204,750.00
27,580.00
81,952.00
82,740.00
22,515.50
10,824.00
430,361.50
3,879,747.00

1 M Membuat sloof beton bertulang (200 kg besi + bekisting)

6.39.1.
-

Bahan
Kayu sembarang
Paku biasa 2" - 5 "
Minyak bekisting
Besi beton polos
Kawat beton
Semen portland
Pasir beton
Koral beton

6.39.2.
-

Tenaga
Pekerja
Tukang batu
Tukang kayu
Tukang besi
Kepala tukang
Mandor

0.2700
2.000
0.600
200.000
3.000
323.000
0.520
0.780

M
Kg
Lt
Kg
Kg
Kg
M
M

x
x
x
x
x
x
x
x

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

3,107,500
14,520
6,290
14,410
16,830
1,270
87,800
190,200
Jumlah (1)

=
=
=
=
=
=
=
=
=

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

839,025.00
29,040.00
3,774.00
2,882,000.00
50,490.00
410,210.00
45,656.00
148,356.00
4,408,551.00

4.850
0.350
1.560
1.400
0.331
0.170

Oh
Oh
Oh
Oh
Oh
Oh

x
x
x
x
x
x

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

52,500
78,800
78,800
78,800
91,900
65,600
Jumlah (2)
Jumlah (1) + (2)

=
=
=
=
=
=
=
=

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

254,625.00
27,580.00
122,928.00
110,320.00
30,418.90
11,152.00
557,023.90
4,965,574.90

PB 6.40.

1 M Membuat kolom beton bertulang (300 kg besi + bekisting)

6.40.1.
-

Bahan
Kayu sembarang
Paku biasa 2" - 5 "
Minyak bekisting
Besi beton polos
Kawat beton
Semen portland
Pasir beton
Koral beton
Kayu sembarang balok
Plywood 9 mm
Kayu dolken/Laut 3"-4"/4 m

6.40.2.
-

Tenaga
Pekerja
Tukang batu
Tukang kayu
Tukang besi
Kepala tukang
Mandor

PB 6.41.

Bahan
Kayu sembarang
Paku biasa 2" - 5 "
Minyak bekisting
Besi beton polos
Kawat beton
Semen portland
Pasir beton
Koral beton
Kayu sembarang balok
Plywood 9 mm
Kayu dolken/Laut 3"-4"/4 m

6.41.2.
-

Tenaga
Pekerja
Tukang batu
Tukang kayu
Tukang besi
Kepala tukang
Mandor

6.42.1.
-

M
Kg
Lt
Kg
Kg
Kg
M
M
M
Lbr
Btg

x
x
x
x
x
x
x
x
x
x
x

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

3,107,500
14,520
6,290
14,410
16,830
1,270
87,800
190,200
3,107,500
116,820
19,250
Jumlah (1)

=
=
=
=
=
=
=
=
=
=
=
=

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

1,243,000.00
58,080.00
12,580.00
4,323,000.00
75,735.00
410,210.00
45,656.00
148,356.00
466,125.00
408,870.00
385,000.00
7,576,612.00

7.300
0.350
3.300
2.100
0.570
0.250

Oh
Oh
Oh
Oh
Oh
Oh

x
x
x
x
x
x

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

52,500
78,800
78,800
78,800
91,900
65,600
Jumlah (2)
Jumlah (1) + (2)

=
=
=
=
=
=
=
=

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

383,250.00
27,580.00
260,040.00
165,480.00
52,383.00
16,400.00
905,133.00
8,481,745.00

1 M Membuat balok beton bertulang (200 kg besi + bekisting)

6.41.1.
-

PB 6.42.

0.4000
4.000
2.000
300.000
4.500
323.000
0.520
0.780
0.150
3.500
20.000

0.3200
3.200
1.600
200.000
3.000
323.000
0.520
0.780
0.140
2.800
16.000

M
Kg
Lt
Kg
Kg
Kg
M
M
M
Lbr
Btg

x
x
x
x
x
x
x
x
x
x
x

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

3,107,500
14,520
6,290
14,410
16,830
1,270
87,800
190,200
3,107,500
116,820
19,250
Jumlah (1)

=
=
=
=
=
=
=
=
=
=
=
=

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

994,400.00
46,464.00
10,064.00
2,882,000.00
50,490.00
410,210.00
45,656.00
148,356.00
435,050.00
327,096.00
308,000.00
5,657,786.00

5.960
0.350
2.800
1.400
0.455
0.208

Oh
Oh
Oh
Oh
Oh
Oh

x
x
x
x
x
x

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

52,500
78,800
78,800
78,800
91,900
65,600
Jumlah (2)
Jumlah (1) + (2)

=
=
=
=
=
=
=
=

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

312,900.00
27,580.00
220,640.00
110,320.00
41,814.50
13,644.80
726,899.30
6,384,685.30

=
=
=
=
=
=

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

994,400.00
46,464.00
10,064.00
2,161,500.00
37,867.50
410,210.00

1 M Membuat balok beton bertulang (150 kg besi + bekisting)


Bahan
Kayu sembarang
Paku biasa 2" - 5 "
Minyak bekisting
Besi beton polos
Kawat beton
Semen portland

0.320
3.200
1.600
150.000
2.250
323.000

M
Kg
Lt
Kg
Kg
Kg

x
x
x
x
x
x

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

3,107,500
14,520
6,290
14,410
16,830
1,270

6.42.2.
-

PB 6.43.

Pasir beton
Koral beton
Kayu sembarang balok
Plywood 9 mm
Kayu dolken/Laut 3"-4"/4 m
Tenaga
Pekerja
Tukang batu
Tukang kayu
Tukang besi
Kepala tukang
Mandor

Bahan
Kayu sembarang
Paku biasa 2" - 5 "
Minyak bekisting
Besi beton polos
Kawat beton
Semen portland
Pasir beton
Koral beton
Kayu sembarang balok
Plywood 9 mm
Kayu dolken/Laut 3"-4"/4 m

6.43.2.
-

Tenaga
Pekerja
Tukang batu
Tukang kayu
Tukang besi
Kepala tukang
Mandor

6.44.1.
-

M
M
M
Lbr
Btg

x
x
x
x
x

Rp.
Rp.
Rp.
Rp.
Rp.

87,800
190,200
3,107,500
116,820
19,250
Jumlah (1)

=
=
=
=
=
=

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

45,656.00
148,356.00
372,900.00
327,096.00
616,000.00
5,170,513.50

5.800
0.350
2.800
1.050
0.420
0.185

Oh
Oh
Oh
Oh
Oh
Oh

x
x
x
x
x
x

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

52,500
78,800
78,800
78,800
91,900
65,600
Jumlah (2)
Jumlah (1) + (2)

=
=
=
=
=
=
=
=

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

304,500.00
27,580.00
220,640.00
82,740.00
38,598.00
12,136.00
686,194.00
5,856,707.50

1 M Membuat dinding beton bertulang (150 kg besi + bekisting)

6.43.1.
-

PB 6.44.

0.520
0.780
0.120
2.800
32.000

0.240
3.200
1.600
150.000
2.250
323.000
0.520
0.780
0.160
2.800
24.000

M
Kg
Lt
Kg
Kg
Kg
M
M
M
Lbr
Btg

x
x
x
x
x
x
x
x
x
x
x

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

3,107,500
14,520
6,290
14,410
16,830
1,270
87,800
190,200
3,107,500
116,820
19,250
Jumlah (1)

=
=
=
=
=
=
=
=
=
=
=
=

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

745,800.00
46,464.00
10,064.00
2,161,500.00
37,867.50
410,210.00
45,656.00
148,356.00
497,200.00
327,096.00
462,000.00
4,892,213.50

5.600
0.350
2.640
1.050
0.400
0.193

Oh
Oh
Oh
Oh
Oh
Oh

x
x
x
x
x
x

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

52,500
78,800
78,800
78,800
91,900
65,600
Jumlah (2)
Jumlah (1) + (2)

=
=
=
=
=
=
=
=

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

294,000.00
27,580.00
208,032.00
82,740.00
36,760.00
12,660.80
661,772.80
5,553,986.30

=
=
=
=
=
=
=
=
=
=
=
=

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

776,875.00
43,560.00
7,548.00
2,882,000.00
50,490.00
410,210.00
45,656.00
148,356.00
326,287.50
292,050.00
269,500.00
5,252,532.50

52,500 =

Rp.

294,000.00

1 M Membuat tangga beton bertulang (150 kg besi + bekisting)


Bahan
Kayu sembarang
Paku biasa 2" - 5 "
Minyak bekisting
Besi beton polos
Kawat beton
Semen portland
Pasir beton
Koral beton
Kayu sembarang balok
Plywood 9 mm
Kayu dolken/Laut 3"-4"/4 m

6.44.2. Tenaga
- Pekerja

0.250
3.000
1.200
200.000
3.000
323.000
0.520
0.780
0.105
2.500
14.000

M
Kg
Lt
Kg
Kg
Kg
M
M
M
Lbr
Btg

x
x
x
x
x
x
x
x
x
x
x

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

5.600 Oh x

Rp.

3,107,500
14,520
6,290
14,410
16,830
1,270
87,800
190,200
3,107,500
116,820
19,250
Jumlah (1)

PB 6.45.

Tukang batu
Tukang kayu
Tukang besi
Kepala tukang
Mandor

0.350
2.300
1.400
0.405
0.202

Oh
Oh
Oh
Oh
Oh

x
x
x
x
x

Rp.
Rp.
Rp.
Rp.
Rp.

78,800
78,800
78,800
91,900
65,600
Jumlah (2)
Jumlah (1) + (2)

=
=
=
=
=
=
=

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

27,580.00
181,240.00
110,320.00
37,219.50
13,251.20
663,610.70
5,916,143.20

1 M' Membuat kolom penguat beton bertulang (11 x 11) cm

6.45.1.
-

Bahan
Kayu sembarang
Paku biasa 2" - 5 "
Besi beton polos
Kawat beton
Semen portland
Pasir beton
Koral beton

0.002
0.010
3.000
0.450
4.000
0.006
0.009

M
Kg
Kg
Kg
Kg
M
M

x
x
x
x
x
x
x

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

3,107,500
14,520
14,410
16,830
1,270
87,800
190,200
Jumlah (1)

=
=
=
=
=
=
=
=

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

6,215.00
145.20
43,230.00
7,573.50
5,080.00
526.80
1,711.80
64,482.30

6.45.2.
-

Tenaga
Pekerja
Tukang batu
Tukang kayu
Tukang besi
Kepala tukang
Mandor

0.060
0.020
0.020
0.020
0.006
0.003

Oh
Oh
Oh
Oh
Oh
Oh

x
x
x
x
x
x

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

52,500
78,800
78,800
78,800
91,900
65,600
Jumlah (2)
Jumlah (1) + (2)

=
=
=
=
=
=
=
=

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

3,150.00
1,576.00
1,576.00
1,576.00
551.40
196.80
8,626.20
73,108.50

PB 6.46.

1 M' Membuat ring balok beton bertulang (10 x 15) cm

6.46.1.
-

Bahan
Kayu sembarang
Paku biasa 2" - 5 "
Besi beton polos
Kawat beton
Semen portland
Pasir beton
Koral beton

0.003
0.020
3.600
0.050
5.500
0.009
0.015

M
Kg
Kg
Kg
Kg
M
M

x
x
x
x
x
x
x

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

3,107,500
14,520
14,410
16,830
1,270
87,800
190,200
Jumlah (1)

=
=
=
=
=
=
=
=

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

9,322.50
290.40
51,876.00
841.50
6,985.00
790.20
2,853.00
72,958.60

6.46.2.
-

Tenaga
Pekerja
Tukang batu
Tukang kayu
Tukang besi
Kepala tukang
Mandor

0.100
0.033
0.033
0.033
0.010
0.005

Oh
Oh
Oh
Oh
Oh
Oh

x
x
x
x
x
x

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

52,500
78,800
78,800
78,800
91,900
65,600
Jumlah (2)
Jumlah (1) + (2)

=
=
=
=
=
=
=
=

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

5,250.00
2,600.40
2,600.40
2,600.40
919.00
328.00
14,298.20
87,256.80

ANALISA BIAYA KONSTRUKSI


PEKERJAAN PENUTUP ATAP
PPA 6.1

1 M Pasang atap genteng palentong kecil

6.1.1 Bahan
- Genteng Palentong

25.000 Buah x Rp.


Jumlah (1)

6.1.2 Tenaga
- Pekerja
- Tukang Kayu
- Kepala Tukang
- Mandor

PPA 6.2

0.150
0.075
0.008
0.008

0.150
0.075
0.008
0.008

Oh
Oh
Oh
Oh

x
x
x
x

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

7,875.00
5,910.00
735.20
524.80
15,045.00
56,795.00

2,170 = Rp.
= Rp.

54,250.00
54,250.00

Rp.
52,500
Rp.
78,800
Rp.
91,900
Rp.
65,600
Jumlah (2)
Jumlah (1) + (2)

12.000 Buah x Rp.


Jumlah (1)

6.3.2 Tenaga
- Pekerja
- Tukang Kayu
- Kepala Tukang
- Mandor

=
=
=
=
=
=

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

7,875.00
5,910.00
735.20
524.80
15,045.00
69,295.00

3,980 = Rp.
= Rp.

47,760.00
47,760.00

0.150
0.060
0.006
0.008

Oh
Oh
Oh
Oh

x
x
x
x

Rp.
52,500
Rp.
78,800
Rp.
91,900
Rp.
65,600
Jumlah (2)
Jumlah (1) + (2)

=
=
=
=
=
=

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

7,875.00
4,728.00
551.40
524.80
13,679.20
61,439.20

5.000 Buah x Rp.


9,350 =
8.000 Kg x Rp.
1,270 =
0.032 M x Rp.
76,500 =
Jumlah (1)
=

Rp.
Rp.
Rp.
Rp.

46,750.00
10,160.00
2,448.00
59,358.00

0.400
0.200
0.020
0.002

=
=
=
=
=
=

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

21,000.00
15,760.00
1,838.00
131.20
38,729.20
98,087.20

5.000 Buah x Rp.


9,560 =
8.000 Kg x Rp.
1,270 =
0.032 M x Rp.
76,500 =
Jumlah (1)
=

Rp.
Rp.
Rp.
Rp.

47,800.00
10,160.00
2,448.00
60,408.00

0.400
0.200
0.020
0.002

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

21,000.00
15,760.00
1,838.00
131.20
38,729.20
99,137.20

1 M Pasang genteng bubung palentong

6.4.1 Bahan
- Bubung geneteng palentong
- Semen portland
- Pasir Pasang
6.4.2 Tenaga
- Pekerja
- Tukang Kayu
- Kepala Tukang
- Mandor

Oh
Oh
Oh
Oh

x
x
x
x

Rp.
52,500
Rp.
78,800
Rp.
91,900
Rp.
65,600
Jumlah (2)
Jumlah (1) + (2)

1 M' Pasang bubung genteng kodok glazzuur

6.5.1 Bahan
- Bubung genteng kodok
- Semen portland
- Pasir Pasang
6.5.2 Tenaga
- Pekerja
- Tukang Kayu
- Kepala Tukang
- Mandor

PPA 6.6

=
=
=
=
=
=

1 M Pasang atap genteng palentong super / besar

6.3.1 Bahan
- Genteng Palentong super

PPA 6.5

Rp.
52,500
Rp.
78,800
Rp.
91,900
Rp.
65,600
Jumlah (2)
Jumlah (1) + (2)

25.000 Buah x Rp.


Jumlah (1)

6.2.2 Tenaga
- Pekerja
- Tukang Kayu
- Kepala Tukang
- Mandor

PPA 6.4

x
x
x
x

41,750.00
41,750.00

1 M Pasang atap genteng kodok / glazzur

6.2.1 Bahan
- Genteng Kodok

PPA 6.3

Oh
Oh
Oh
Oh

1,670 = Rp.
= Rp.

1 M' Pasang bubung genteng palentong besar

Oh
Oh
Oh
Oh

x
x
x
x

Rp.
52,500
Rp.
78,800
Rp.
91,900
Rp.
65,600
Jumlah (2)
Jumlah (1) + (2)

=
=
=
=
=
=

6.6.1 Bahan
- Bubung genteng palentong super
- Semen portland
- Pasir Pasang
6.6.2 Tenaga
- Pekerja
- Tukang Kayu
- Kepala Tukang
- Mandor

PPA 6.7

4.000 Buah x Rp.


12,740 = Rp.
8.000 Kg x Rp.
1,270 = Rp.
0.032 M x Rp.
76,500 = Rp.
Jumlah (1)
= Rp.
0.400
0.200
0.020
0.002

Oh
Oh
Oh
Oh

x
x
x
x

Rp.
52,500
Rp.
78,800
Rp.
91,900
Rp.
65,600
Jumlah (2)
Jumlah (1) + (2)

=
=
=
=
=
=

50,960.00
10,160.00
2,448.00
63,568.00

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

21,000.00
15,760.00
1,838.00
131.20
38,729.20
102,297.20

1 M Pasang roof light fiberglass ( 180 x 90 ) cm

6.7.1 Bahan
- Roof light fibreglass
- Paku biasa " - 1"

0.600 Lbr
0.050 Kg

x Rp.
46,390 = Rp.
x Rp.
16,940 = Rp.
Jumlah (1)
= Rp.

27,834.00
847.00
28,681.00

6.7.2 Tenaga
- Pekerja
- Tukang Kayu
- Kepala Tukang
- Mandor

0.140
0.067
0.007
0.007

x
x
x
x

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

7,350.00
5,279.60
643.30
459.20
13,732.10
42,413.10

PPA 6.8

Oh
Oh
Oh
Oh

Rp.
52,500
Rp.
78,800
Rp.
91,900
Rp.
65,600
Jumlah (2)
Jumlah (1) + (2)

=
=
=
=
=
=

1 M Pasang atap asbes gelombang ( 2,70 x 0,92 m ) x 5 mm

6.8.1 Bahan
- Atap asbes gelombang
- Paku seng

0.450 Lbr
0.120 Kg

x Rp.
106,810 = Rp.
x Rp.
20,350 = Rp.
Jumlah (1)
= Rp.

48,064.50
2,442.00
50,506.50

6.8.2 Tenaga
- Pekerja
- Tukang Kayu
- Kepala Tukang
- Mandor

0.140
0.075
0.008
0.008

x
x
x
x

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

7,350.00
5,910.00
735.20
524.80
14,520.00
65,026.50

PPA 6.9

Oh
Oh
Oh
Oh

Rp.
52,500
Rp.
78,800
Rp.
91,900
Rp.
65,600
Jumlah (2)
Jumlah (1) + (2)

=
=
=
=
=
=

1 M Pasang atap asbes gelombang ( 2,40 x 0,92 m ) x 5 mm

6.9.1 Bahan
- Atap asbes gelombang
- Paku seng

0.500 Lbr
0.120 Kg

x Rp.
97,020 = Rp.
x Rp.
20,350 = Rp.
Jumlah (1)
= Rp.

48,510.00
2,442.00
50,952.00

6.9.2 Tenaga
- Pekerja
- Tukang Kayu
- Kepala Tukang
- Mandor

0.140
0.075
0.008
0.008

x
x
x
x

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

7,350.00
5,910.00
735.20
524.80
14,520.00
65,472.00

PPA 6.10

Oh
Oh
Oh
Oh

Rp.
52,500
Rp.
78,800
Rp.
91,900
Rp.
65,600
Jumlah (2)
Jumlah (1) + (2)

=
=
=
=
=
=

1 M Pasang atap asbes gelombang ( 2,10 x 0,92 m ) x 5 mm

6.10.1 Bahan
- Atap asbes gelombang
- Paku seng

0.600 Lbr
0.120 Kg

x Rp.
88,770 = Rp.
x Rp.
20,350 = Rp.
Jumlah (1)
= Rp.

53,262.00
2,442.00
55,704.00

6.10.2 Tenaga
- Pekerja
- Tukang Kayu
- Kepala Tukang
- Mandor

0.140
0.075
0.008
0.008

x
x
x
x

7,350.00
5,910.00
735.20
524.80
14,520.00
70,224.00

PPA 6.11

Oh
Oh
Oh
Oh

Rp.
52,500
Rp.
78,800
Rp.
91,900
Rp.
65,600
Jumlah (2)
Jumlah (1) + (2)

1 M Pasang atap asbes gelombang ( 1,80 x 0,92 m ) x 5 mm

6.11.1 Bahan

=
=
=
=
=
=

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

- Atap asbes gelombang


- Paku seng
6.11.2 Tenaga
- Pekerja
- Tukang Kayu
- Kepala Tukang
- Mandor

PPA 6.12

0.750 Lbr
0.120 Kg

x Rp.
70,950 = Rp.
x Rp.
20,350 = Rp.
Jumlah (1)
= Rp.

53,212.50
2,442.00
55,654.50

0.140
0.070
0.007
0.007

x
x
x
x

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

7,350.00
5,516.00
643.30
459.20
13,968.50
69,623.00

Oh
Oh
Oh
Oh

Rp.
52,500
Rp.
78,800
Rp.
91,900
Rp.
65,600
Jumlah (2)
Jumlah (1) + (2)

=
=
=
=
=
=

1 M Pasang atap asbes gelombang ( 2,40 x 1,05 m ) x 4 mm

6.12.1 Bahan
- Atap asbes gelombang
- Paku seng

0.450 Lbr
0.120 Kg

x Rp.
108,130 = Rp.
x Rp.
20,350 = Rp.
Jumlah (1)
= Rp.

48,658.50
2,442.00
51,100.50

6.12.2 Tenaga
- Pekerja
- Tukang Kayu
- Kepala Tukang
- Mandor

0.140
0.070
0.007
0.007

x
x
x
x

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

7,350.00
5,516.00
643.30
459.20
13,968.50
65,069.00

PPA 6.13

Oh
Oh
Oh
Oh

Rp.
52,500
Rp.
78,800
Rp.
91,900
Rp.
65,600
Jumlah (2)
Jumlah (1) + (2)

=
=
=
=
=
=

1 M Pasang atap asbes gelombang ( 2,10 x 1,05 m ) x 4 mm

6.13.1 Bahan
- Atap asbes gelombang
- Paku seng

0.500 Lbr
0.120 Kg

x Rp.
93,170 = Rp.
x Rp.
20,350 = Rp.
Jumlah (1)
= Rp.

46,585.00
2,442.00
49,027.00

6.13.2 Tenaga
- Pekerja
- Tukang Kayu
- Kepala Tukang
- Mandor

0.140
0.070
0.007
0.007

x
x
x
x

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

7,350.00
5,516.00
643.30
459.20
13,968.50
62,995.50

PPA 6.14

Oh
Oh
Oh
Oh

Rp.
52,500
Rp.
78,800
Rp.
91,900
Rp.
65,600
Jumlah (2)
Jumlah (1) + (2)

=
=
=
=
=
=

1 M Pasang atap asbes gelombang ( 1,80 x 1,05 m ) x 4 mm

6.14.1 Bahan
- Atap asbes gelombang
- Paku seng

0.600 Lbr
0.120 Kg

x Rp.
59,380 = Rp.
x Rp.
20,350 = Rp.
Jumlah (1)
= Rp.

35,628.00
2,442.00
38,070.00

6.14.2 Tenaga
- Pekerja
- Tukang Kayu
- Kepala Tukang
- Mandor

0.140
0.067
0.007
0.007

x
x
x
x

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

7,350.00
5,279.60
643.30
459.20
13,732.10
51,802.10

PPA 6.15

Oh
Oh
Oh
Oh

Rp.
52,500
Rp.
78,800
Rp.
91,900
Rp.
65,600
Jumlah (2)
Jumlah (1) + (2)

=
=
=
=
=
=

1 M Pasang atap asbes gelombang ( 2,10 x 1,05 m ) x 4 mm

6.15.1 Bahan
- Atap asbes gelombang
- Paku seng

0.510 Lbr
0.120 Kg

x Rp.
59,380 = Rp.
x Rp.
20,350 = Rp.
Jumlah (1)
= Rp.

30,283.80
2,442.00
32,725.80

6.15.2 Tenaga
- Pekerja
- Tukang Kayu
- Kepala Tukang
- Mandor

0.140
0.067
0.007
0.007

x
x
x
x

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

7,350.00
5,279.60
643.30
459.20
13,732.10
46,457.90

59,380 = Rp.

47,504.00

PPA 6.16

Oh
Oh
Oh
Oh

Rp.
52,500
Rp.
78,800
Rp.
91,900
Rp.
65,600
Jumlah (2)
Jumlah (1) + (2)

=
=
=
=
=
=

1 M Pasang atap asbes gelombang ( 1,5 x 1,05 m ) x 4 mm

6.16.1 Bahan
- Atap asbes gelombang

0.800 Lbr

x Rp.

- Paku seng
6.16.2 Tenaga
- Pekerja
- Tukang Kayu
- Kepala Tukang
- Mandor

PPA 6.17

0.120 Kg

x Rp.
20,350 = Rp.
Jumlah (1)
= Rp.

2,442.00
49,946.00

0.140
0.067
0.007
0.007

x
x
x
x

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

7,350.00
5,279.60
643.30
459.20
13,732.10
63,678.10

Oh
Oh
Oh
Oh

Rp.
52,500
Rp.
78,800
Rp.
91,900
Rp.
65,600
Jumlah (2)
Jumlah (1) + (2)

=
=
=
=
=
=

1 M Pasang atap asbes gelombang ( 3,00 x 1,08 m ) x 6 mm

6.17.1 Bahan
- Atap asbes gelombang
- Paku seng

0.370 Lbr
0.120 Kg

x Rp.
59,380 = Rp.
x Rp.
20,350 = Rp.
Jumlah (1)
= Rp.

21,970.60
2,442.00
24,412.60

6.17.2 Tenaga
- Pekerja
- Tukang Kayu
- Kepala Tukang
- Mandor

0.140
0.067
0.007
0.007

x
x
x
x

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

7,350.00
5,279.60
643.30
459.20
13,732.10
38,144.70

PPA 6.18

Oh
Oh
Oh
Oh

Rp.
52,500
Rp.
78,800
Rp.
91,900
Rp.
65,600
Jumlah (2)
Jumlah (1) + (2)

=
=
=
=
=
=

1 M Pasang atap asbes gelombang ( 2,70 x 1,08 m ) x 6 mm

6.18.1 Bahan
- Atap asbes gelombang
- Paku seng

0.380 Lbr
0.120 Kg

x Rp.
155,430 = Rp.
x Rp.
20,350 = Rp.
Jumlah (1)
= Rp.

59,063.40
2,442.00
61,505.40

6.18.2 Tenaga
- Pekerja
- Tukang Kayu
- Kepala Tukang
- Mandor

0.140
0.067
0.007
0.007

x
x
x
x

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

7,350.00
5,279.60
643.30
459.20
13,732.10
75,237.50

PPA 6.19

Oh
Oh
Oh
Oh

Rp.
52,500
Rp.
78,800
Rp.
91,900
Rp.
65,600
Jumlah (2)
Jumlah (1) + (2)

=
=
=
=
=
=

1 M Pasang atap asbes gelombang ( 2,4 x 1,08 m ) x 6 mm

6.19.1 Bahan
- Atap asbes gelombang
- Paku seng

0.450 Lbr
0.120 Kg

x Rp.
128,370 = Rp.
x Rp.
20,350 = Rp.
Jumlah (1)
= Rp.

57,766.50
2,442.00
60,208.50

6.19.2 Tenaga
- Pekerja
- Tukang Kayu
- Kepala Tukang
- Mandor

0.140
0.067
0.007
0.007

x
x
x
x

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

7,350.00
5,279.60
643.30
459.20
13,732.10
73,940.60

PPA 6.20

Oh
Oh
Oh
Oh

Rp.
52,500
Rp.
78,800
Rp.
91,900
Rp.
65,600
Jumlah (2)
Jumlah (1) + (2)

=
=
=
=
=
=

1 M Pasang atap asbes gelombang ( 2,1 x 1,08 m ) x 6 mm

6.20.1 Bahan
- Atap asbes gelombang
- Paku seng

0.490 Lbr
0.120 Kg

x Rp.
120,450 = Rp.
x Rp.
20,350 = Rp.
Jumlah (1)
= Rp.

59,020.50
2,442.00
61,462.50

6.16.2 Tenaga
- Pekerja
- Tukang Kayu
- Kepala Tukang
- Mandor

0.140
0.067
0.007
0.007

x
x
x
x

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

7,350.00
5,279.60
643.30
459.20
13,732.10
75,194.60

103,620 = Rp.

59,063.40

PPA 6.21

Oh
Oh
Oh
Oh

Rp.
52,500
Rp.
78,800
Rp.
91,900
Rp.
65,600
Jumlah (2)
Jumlah (1) + (2)

=
=
=
=
=
=

1 M Pasang atap asbes gelombang ( 1,80 x 1,08 m ) x 6 mm

6.21.1 Bahan
- Atap asbes gelombang

0.570 Lbr

x Rp.

- Paku seng
6.21.2 Tenaga
- Pekerja
- Tukang Kayu
- Kepala Tukang
- Mandor

PPA 6.22

0.120 Kg

x Rp.
20,350 = Rp.
Jumlah (1)
= Rp.

2,442.00
61,505.40

0.140
0.067
0.007
0.007

x
x
x
x

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

7,350.00
5,279.60
643.30
459.20
13,732.10
75,237.50

Oh
Oh
Oh
Oh

Rp.
52,500
Rp.
78,800
Rp.
91,900
Rp.
65,600
Jumlah (2)
Jumlah (1) + (2)

=
=
=
=
=
=

1 M' Pasang bubung stel gelombang 0,92 m

6.22.1 Bahan
- Bubung stel gelombang
- Paku seng

2.400 Lbr
6.000 Bh

x Rp.
19,590 = Rp.
x Rp.
410 = Rp.
Jumlah (1)
= Rp.

47,016.00
2,460.00
49,476.00

6.22.2 Tenaga
- Pekerja
- Tukang Kayu
- Kepala Tukang
- Mandor

0.084
0.125
0.013
0.004

x
x
x
x

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

4,410.00
9,850.00
1,194.70
262.40
15,717.10
65,193.10

PPA 6.23

Oh
Oh
Oh
Oh

Rp.
52,500
Rp.
78,800
Rp.
91,900
Rp.
65,600
Jumlah (2)
Jumlah (1) + (2)

=
=
=
=
=
=

1 M' Pasang nok stel gelombang 1,05 m

6.23.1 Bahan
- Bubung stel gelombang
- Paku seng

2.100 Lbr
6.000 Bh

x Rp.
25,990 = Rp.
x Rp.
410 = Rp.
Jumlah (1)
= Rp.

54,579.00
2,460.00
57,039.00

6.23.2 Tenaga
- Pekerja
- Tukang Kayu
- Kepala Tukang
- Mandor

0.084
0.125
0.013
0.004

x
x
x
x

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

4,410.00
9,850.00
1,194.70
262.40
15,717.10
72,756.10

PPA 6.24

Oh
Oh
Oh
Oh

Rp.
52,500
Rp.
78,800
Rp.
91,900
Rp.
65,600
Jumlah (2)
Jumlah (1) + (2)

=
=
=
=
=
=

1 M' Pasang nok stel gelombang 1,08 m

6.24.1 Bahan
- Bubung stel gelombang
- Paku seng

2.050 Lbr
6.000 Bh

x Rp.
28,510 = Rp.
x Rp.
410 = Rp.
Jumlah (1)
= Rp.

58,445.50
2,460.00
60,905.50

6.24.2 Tenaga
- Pekerja
- Tukang Kayu
- Kepala Tukang
- Mandor

0.084
0.125
0.013
0.004

x
x
x
x

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

4,410.00
9,850.00
1,194.70
262.40
15,717.10
76,622.60

PPA 6.25

Oh
Oh
Oh
Oh

Rp.
52,500
Rp.
78,800
Rp.
91,900
Rp.
65,600
Jumlah (2)
Jumlah (1) + (2)

=
=
=
=
=
=

1 M' Pasang nok paten 1,05 m

6.25.1 Bahan
- Nok paten 5 mm
- Paku seng

1.200 Lbr
6.000 Bh

x Rp.
36,810 = Rp.
x Rp.
410 = Rp.
Jumlah (1)
= Rp.

44,172.00
2,460.00
46,632.00

6.25.2 Tenaga
- Pekerja
- Tukang Kayu
- Kepala Tukang
- Mandor

0.084
0.125
0.013
0.004

x
x
x
x

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

4,410.00
9,850.00
1,194.70
262.40
15,717.10
62,349.10

30,950 = Rp.
410 = Rp.

37,140.00
2,460.00

PPA 6.26

Oh
Oh
Oh
Oh

Rp.
52,500
Rp.
78,800
Rp.
91,900
Rp.
65,600
Jumlah (2)
Jumlah (1) + (2)

=
=
=
=
=
=

1 M' Pasang nok paten 1,05 m

6.26.1 Bahan
- Nok paten 4 mm
- Paku seng

1.200 Lbr
6.000 Bh

x Rp.
x Rp.

6.26.2 Tenaga
- Pekerja
- Tukang Kayu
- Kepala Tukang
- Mandor

PPA 6.27

0.084
0.125
0.013
0.004

Oh
Oh
Oh
Oh

x
x
x
x

Jumlah (1)

= Rp.

39,600.00

Rp.
52,500
Rp.
78,800
Rp.
91,900
Rp.
65,600
Jumlah (2)
Jumlah (1) + (2)

=
=
=
=
=
=

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

4,410.00
9,850.00
1,194.70
262.40
15,717.10
55,317.10

1 M' Pasang nok paten 1,08 m

6.27.1 Bahan
- Nok paten 6 mm
- Paku seng

1.200 Lbr
6.000 Bh

x Rp.
42,960 = Rp.
x Rp.
410 = Rp.
Jumlah (1)
= Rp.

51,552.00
2,460.00
54,012.00

6.27.2 Tenaga
- Pekerja
- Tukang Kayu
- Kepala Tukang
- Mandor

0.084
0.125
0.013
0.004

x
x
x
x

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

4,410.00
9,850.00
1,194.70
262.40
15,717.10
69,729.10

PPA 6.28

Oh
Oh
Oh
Oh

Rp.
52,500
Rp.
78,800
Rp.
91,900
Rp.
65,600
Jumlah (2)
Jumlah (1) + (2)

=
=
=
=
=
=

1 M' Pasang nok stel rata 0,92 m

6.28.1 Bahan
- Nok stel rata 5 mm
- Paku seng

1.100 Lbr
6.000 Bh

x Rp.
36,080 = Rp.
x Rp.
410 = Rp.
Jumlah (1)
= Rp.

39,688.00
2,460.00
42,148.00

6.28.2 Tenaga
- Pekerja
- Tukang Kayu
- Kepala Tukang
- Mandor

0.100
0.150
0.013
0.004

x
x
x
x

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

5,250.00
11,820.00
1,194.70
262.40
18,527.10
60,675.10

PPA 6.29

Oh
Oh
Oh
Oh

Rp.
52,500
Rp.
78,800
Rp.
91,900
Rp.
65,600
Jumlah (2)
Jumlah (1) + (2)

=
=
=
=
=
=

1 M' Pasang nok stel rata 1,05 m

6.29.1 Bahan
- Nok stel rata 4 mm
- Paku seng

1.100 Lbr
6.000 Bh

x Rp.
30,250 = Rp.
x Rp.
410 = Rp.
Jumlah (1)
= Rp.

33,275.00
2,460.00
35,735.00

6.29.2 Tenaga
- Pekerja
- Tukang Kayu
- Kepala Tukang
- Mandor

0.084
0.125
0.013
0.004

x
x
x
x

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

4,410.00
9,850.00
1,194.70
262.40
15,717.10
51,452.10

x Rp.
5,970 = Rp.
x Rp.
14,520 = Rp.
Jumlah (1)
= Rp.

65,670.00
435.60
66,105.60

PPA 6.30

Rp.
52,500
Rp.
78,800
Rp.
91,900
Rp.
65,600
Jumlah (2)
Jumlah (1) + (2)

=
=
=
=
=
=

1 M Pasang atap genteng beton

6.30.1 Bahan
- Atap genteng beton
- Paku biasa 2" - 5"
6.30.2 Tenaga
- Pekerja
- Tukang Kayu
- Kepala Tukang
- Mandor

PPA 6.31

Oh
Oh
Oh
Oh

11.000 Bh
0.030 Kg

0.200
0.100
0.010
0.010

Oh
Oh
Oh
Oh

x
x
x
x

Rp.
52,500
Rp.
78,800
Rp.
91,900
Rp.
65,600
Jumlah (2)
Jumlah (1) + (2)

=
=
=
=
=
=

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

10,500.00
7,880.00
919.00
656.00
19,955.00
86,060.60

6.900
0.350
0.030
0.500

Lbr
Lbr
Kg
Bh

x
x
x
x

Rp.
Rp.
Rp.
Rp.

=
=
=
=

Rp.
Rp.
Rp.
Rp.

78,108.00
27,258.00
508.20
13,750.00

1 M Pasang atap genteng aspal

6.31.1 Bahan
- Nok genteng aspal
- Plywood 4" x 8" x 6 mm
- Paku biasa " - 1"
- Plastic aerator

11,320
77,880
16,940
27,500

6.31.2 Tenaga
- Pekerja
- Tukang Kayu
- Kepala Tukang
- Mandor

PPA 6.32

0.200
0.300
0.003
0.010

Oh
Oh
Oh
Oh

x
x
x
x

Jumlah (1)

= Rp.

119,624.20

Rp.
52,500
Rp.
78,800
Rp.
91,900
Rp.
65,600
Jumlah (2)
Jumlah (1) + (2)

=
=
=
=
=
=

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

10,500.00
23,640.00
275.70
656.00
35,071.70
154,695.90

1 M Pasang atap genteng metal / multi roof

6.32.1 Bahan
- Atap genteng metal
- Paku biasa 2" - 5"

1.020 Bh
0.200 Kg

x Rp.
64,130 = Rp.
x Rp.
14,520 = Rp.
Jumlah (1)
= Rp.

65,412.60
2,904.00
68,316.60

6.32.2 Tenaga
- Pekerja
- Tukang Kayu
- Kepala Tukang
- Mandor

0.200
0.100
0.010
0.010

x
x
x
x

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

10,500.00
7,880.00
919.00
656.00
19,955.00
88,271.60

x Rp.
1,030 = Rp.
x Rp.
16,940 = Rp.
Jumlah (1)
= Rp.

61,800.00
3,388.00
65,188.00

PPA 6.33

6.33.2 Tenaga
- Pekerja
- Tukang Kayu
- Kepala Tukang
- Mandor

6.34.2 Tenaga
- Pekerja
- Tukang Kayu
- Kepala Tukang
- Mandor

60.000 Bh
0.200 Kg

0.166
0.250
0.025
0.008

Oh
Oh
Oh
Oh

x
x
x
x

Rp.
52,500
Rp.
78,800
Rp.
91,900
Rp.
65,600
Jumlah (2)
Jumlah (1) + (2)

=
=
=
=
=
=

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

8,715.00
19,700.00
2,297.50
524.80
31,237.30
96,425.30

3.500
0.050
10.800
0.032
1.000

Bh
Kg
Kg
M
Kg

x
x
x
x
x

Rp.
13,440 = Rp.
Rp.
14,520 = Rp.
Rp.
1,270 = Rp.
Rp.
76,500 = Rp.
Rp.
2,500 = Rp.
Jumlah (1)
= Rp.

47,040.00
726.00
13,716.00
2,448.00
2,500.00
66,430.00

0.400
0.200
0.020
0.020

Oh
Oh
Oh
Oh

x
x
x
x

Rp.
52,500
Rp.
78,800
Rp.
91,900
Rp.
65,600
Jumlah (2)
Jumlah (1) + (2)

=
=
=
=
=
=

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

21,000.00
15,760.00
1,838.00
1,312.00
39,910.00
106,340.00

x Rp.
11,320
x Rp.
16,940
x Rp.
9,650,000
Jumlah (1)

=
=
=
=

Rp.
Rp.
Rp.
Rp.

22,640.00
847.00
33,775.00
57,262.00

x
x
x
x

=
=
=
=
=
=

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

6,562.50
19,700.00
2,297.50
393.60
28,953.60
86,215.60

x Rp.
41,140 = Rp.
x Rp.
16,940 = Rp.
Jumlah (1)
= Rp.

45,254.00
847.00
46,101.00

1 M' Pasang nok genteng aspal

6.35.1 Bahan
- Nok genteng aspal
- Paku biasa " - 1"
- Kayu papan
6.35.2 Tenaga
- Pekerja
- Tukang Kayu
- Kepala Tukang
- Mandor

PPA 6.36

=
=
=
=
=
=

1 M' Pasang nok genteng beton

6.34.1 Bahan
- Nok atap genteng beton
- Paku biasa 2" x 5"
- Semen PC
- Pasir pasang
- Semen warna

PPA 6.35

Rp.
52,500
Rp.
78,800
Rp.
91,900
Rp.
65,600
Jumlah (2)
Jumlah (1) + (2)

1 M Pasang atap sirap

6.33.1 Bahan
- Atap sirap
- Paku biasa " - 1"

PPA 6.34

Oh
Oh
Oh
Oh

2.000 Bh
0.050 Kg
0.0035 M

0.125
0.250
0.025
0.006

Oh
Oh
Oh
Oh

Rp.
52,500
Rp.
78,800
Rp.
91,900
Rp.
65,600
Jumlah (2)
Jumlah (1) + (2)

1 M' Pasang nok genteng metal

6.36.1 Bahan
- Nok genteng decra bond
- Paku biasa " - 1"

1.100 Bh
0.050 Kg

6.36.2 Tenaga
- Pekerja
- Tukang Kayu
- Kepala Tukang
- Mandor

0.250
0.150
0.015
0.013

Oh
Oh
Oh
Oh

x
x
x
x

Rp.
52,500
Rp.
78,800
Rp.
91,900
Rp.
65,600
Jumlah (2)
Jumlah (1) + (2)

=
=
=
=
=
=

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

13,125.00
11,820.00
1,378.50
852.80
27,176.30
73,277.30

6.37.1 Bahan
- Seng plat 3" x 6" BJLS 35
- Paku biasa " - 1"
- Paku biasa 2" - 5"
- Kayu papan tbl. 3 cm

0.400
0.060
0.050
0.004

Lbr
Kg
Kg
M

x
x
x
x

Rp.
115,500
Rp.
16,940
Rp.
14,520
Rp.
9,650,000
Jumlah (1)

=
=
=
=
=

Rp.
Rp.
Rp.
Rp.
Rp.

46,200.00
1,016.40
726.00
38,600.00
86,542.40

6.37.2 Tenaga
- Pekerja
- Tukang Kayu
- Kepala Tukang
- Mandor

0.125
0.250
0.025
0.006

Oh
Oh
Oh
Oh

x
x
x
x

Rp.
52,500
Rp.
78,800
Rp.
91,900
Rp.
65,600
Jumlah (2)
Jumlah (1) + (2)

=
=
=
=
=
=

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

6,562.50
19,700.00
2,297.50
393.60
28,953.60
115,496.00

PPA 6.37

PPA 6.38

1 M' Pasang nok sirap

1 M' Pasang atap seng gelombang

6.38.1 Bahan
- Seng gelombang 3" x 6" BJLS 30
- Paku seng

0.700 Lbr
0.040 Kg

x Rp.
59,640 = Rp.
x Rp.
20,350 = Rp.
Jumlah (1)
= Rp.

41,748.00
814.00
42,562.00

6.38.2 Tenaga
- Pekerja
- Tukang Kayu
- Kepala Tukang
- Mandor

0.120
0.060
0.006
0.006

x
x
x
x

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

6,300.00
4,728.00
551.40
393.60
11,973.00
54,535.00

PPA 6.39

Oh
Oh
Oh
Oh

Rp.
52,500
Rp.
78,800
Rp.
91,900
Rp.
65,600
Jumlah (2)
Jumlah (1) + (2)

=
=
=
=
=
=

1 M' Pasang atap nok seng

6.39.1 Bahan
- Seng plat 3" x 6" BJLS 35
- Paku seng

0.300 Bh
0.020 Kg

x Rp.
115,500 = Rp.
x Rp.
20,350 = Rp.
Jumlah (1)
= Rp.

34,650.00
407.00
35,057.00

6.39.2 Tenaga
- Pekerja
- Tukang Kayu
- Kepala Tukang
- Mandor

0.150
0.070
0.008
0.006

x
x
x
x

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

7,875.00
5,516.00
735.20
393.60
14,519.80
49,576.80

PPA 6.40

Oh
Oh
Oh
Oh

Rp.
52,500
Rp.
78,800
Rp.
91,900
Rp.
65,600
Jumlah (2)
Jumlah (1) + (2)

=
=
=
=
=
=

1 M' Pasang atap aluminium

6.40.1 Bahan
- Atap aluminium gelombang 0,55
- Paku hak panjang 15 cm

1.050 Bh
0.020 Kg

x Rp.
98,180 = Rp.
x Rp.
30,530 = Rp.
Jumlah (1)
= Rp.

103,089.00
610.60
103,699.60

6.40.2 Tenaga
- Pekerja
- Tukang Kayu
- Kepala Tukang
- Mandor

0.150
0.075
0.008
0.006

x
x
x
x

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

7,875.00
5,910.00
735.20
393.60
14,913.80
118,613.40

x Rp.
47,890 = Rp.
x Rp.
30,530 = Rp.
Jumlah (1)
= Rp.

57,468.00
1,221.20
58,689.20

PPA 6.41

Oh
Oh
Oh
Oh

Rp.
52,500
Rp.
78,800
Rp.
91,900
Rp.
65,600
Jumlah (2)
Jumlah (1) + (2)

=
=
=
=
=
=

1 M' Pasang nok aluminium

6.41.1 Bahan
- Nok standard 40 cm 18 SWG 22
- Paku hak panjang 15 cm
6.41.2 Tenaga

1.200 Bh
0.040 Kg

PPA 6.42

Pekerja
Tukang Kayu
Kepala Tukang
Mandor

0.100
0.100
0.010
0.010

Oh
Oh
Oh
Oh

x
x
x
x

Rp.
52,500
Rp.
78,800
Rp.
91,900
Rp.
65,600
Jumlah (2)
Jumlah (1) + (2)

=
=
=
=
=
=

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

5,250.00
7,880.00
919.00
656.00
14,705.00
73,394.20

1 M' Pasang aluminium foil / sisalation

6.42.1 Bahan
- Sisalation / Aluminium foil

1.050 M

x Rp.
77,200 = Rp.
Jumlah (1)
= Rp.

81,060.00
81,060.00

6.42.2 Tenaga
- Pekerja
- Tukang Kayu
- Kepala Tukang
- Mandor

0.150
0.050
0.005
0.008

x
x
x
x

7,875.00
3,940.00
459.50
524.80
12,799.30
93,859.30

Oh
Oh
Oh
Oh

Rp.
52,500
Rp.
78,800
Rp.
91,900
Rp.
65,600
Jumlah (2)
Jumlah (1) + (2)

=
=
=
=
=
=

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

ANALISA BIAYA KONSTRUKSI


PEKERJAAN PENUTUP LANTAI
PPL 6.9

1 M Pasang lantai ubin granito ukuran 40 x 40 cm

6.9.1
-

Bahan
Ubin granito 40 x 40 cm
Semen portland
Pasir pasang
Semen warna

6.930
9.800
0.0215
1.300

Bh
Kg
M
Kg

x
x
x
x

Rp.
46,590
Rp.
1,270
Rp.
76,500
Rp.
2,500
Jumlah (1)

=
=
=
=
=

Rp.
Rp.
Rp.
Rp.
Rp.

322,868.70
12,446.00
1,644.75
3,250.00
340,209.45

Tenaga
Pekerja
Tukang batu
Kepala tukang
Mandor

0.250
0.120
0.012
0.0125

Oh
Oh
Oh
Oh

x
x
x
x

Rp.
52,500
Rp.
78,800
Rp.
91,900
Rp.
65,600
Jumlah (2)
Jumlah (1) + (2)

=
=
=
=
=
=

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

13,125.00
9,456.00
1,102.80
820.00
24,503.80
364,713.25

6.9.2

PPL 6.10

1 M Pasang lantai ubin granito ukuran 30 x 30 cm

6.10.1
-

Bahan
Ubin granito 30 x 30 cm
Semen portland
Pasir pasang
Semen warna

11.870
10.000
0.0215
1.500

Bh
Kg
M
Kg

x
x
x
x

Rp.
26,260
Rp.
1,270
Rp.
76,500
Rp.
2,500
Jumlah (1)

=
=
=
=
=

Rp.
Rp.
Rp.
Rp.
Rp.

311,706.20
12,700.00
1,644.75
3,750.00
329,800.95

6.10.2
-

Tenaga
Pekerja
Tukang batu
Kepala tukang
Mandor

0.260
0.125
0.0125
0.013

Oh
Oh
Oh
Oh

x
x
x
x

Rp.
52,500
Rp.
78,800
Rp.
91,900
Rp.
65,600
Jumlah (2)
Jumlah (1) + (2)

=
=
=
=
=
=

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

13,650.00
9,850.00
1,148.75
852.80
25,501.55
355,302.50

PPL 6.13

1 M Pasang lantai ubin teralux marmer ukuran 60 x 60 cm

6.13.1
-

Bahan
Ubin marmer 60 x 60 cm
Semen portland
Pasir pasang
Semen warna

2.780
8.190
0.0215
1.000

Bh
Kg
M
Kg

x
x
x
x

Rp.
109,510
Rp.
1,270
Rp.
76,500
Rp.
2,500
Jumlah (1)

=
=
=
=
=

Rp.
Rp.
Rp.
Rp.
Rp.

304,437.80
10,401.30
1,644.75
2,500.00
318,983.85

6.13.2
-

Tenaga
Pekerja
Tukang batu
Kepala tukang
Mandor

0.250
0.120
0.012
0.0125

Oh
Oh
Oh
Oh

x
x
x
x

Rp.
52,500
Rp.
78,800
Rp.
91,900
Rp.
65,600
Jumlah (2)
Jumlah (1) + (2)

=
=
=
=
=
=

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

13,125.00
9,456.00
1,102.80
820.00
24,503.80
343,487.65

PPL 6.14

1 M Pasang lantai ubin teralux marmer ukuran 40 x 40 cm

6.14.1
-

Bahan
ubin marmer 40 x 40 cm
Semen portland
Pasir pasang
Semen warna

6.14.2
-

Tenaga
Pekerja
Tukang batu
Kepala tukang
Mandor

6.250
8.800
0.0215
1.300

Bh
Kg
M
Kg

x
x
x
x

Rp.
48,400
Rp.
1,270
Rp.
76,500
Rp.
2,500
Jumlah (1)

=
=
=
=
=

Rp.
Rp.
Rp.
Rp.
Rp.

302,500.00
11,176.00
1,644.75
3,250.00
318,570.75

0.672
0.224
0.022
0.034

Oh
Oh
Oh
Oh

x
x
x
x

Rp.
52,500
Rp.
78,800
Rp.
91,900
Rp.
65,600
Jumlah (2)
Jumlah (1) + (2)

=
=
=
=
=
=

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

35,280.00
17,651.20
2,021.80
2,230.40
57,183.40
375,754.15

PPL 6.15

1 M Pasang lantai ubin teralux marmer ukuran 30 x 30 cm

6.15.1
-

Bahan
Ubin marmer 30 x 30 cm
Semen portland
Pasir pasang
Semen warna

6.15.2
-

Tenaga
Pekerja
Tukang batu
Kepala tukang
Mandor

PPL 6.24

Bh
Kg
M
Kg

x
x
x
x

Rp.
27,230
Rp.
1,270
Rp.
76,500
Rp.
2,500
Jumlah (1)

=
=
=
=
=

Rp.
Rp.
Rp.
Rp.
Rp.

323,220.10
12,700.00
1,644.75
3,750.00
341,314.85

0.700
0.340
0.034
0.035

Oh
Oh
Oh
Oh

x
x
x
x

Rp.
52,500
Rp.
78,800
Rp.
91,900
Rp.
65,600
Jumlah (2)
Jumlah (1) + (2)

=
=
=
=
=
=

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

36,750.00
26,792.00
3,124.60
2,296.00
68,962.60
410,277.45

1 M' Pasang plint ubin granito ukuran 10 x 40 cm

6.24.1
-

Bahan
Plint ubin granito 10 x 40 cm
Semen portland
Pasir pasang
Semen warna

6.24.2
-

Tenaga
Pekerja
Tukang batu
Kepala tukang
Mandor

PPL 6.25

11.870
10.000
0.0215
1.500

2.650
1.200
0.0032
0.100

Bh
Kg
M
Kg

x
x
x
x

Rp.
62,800
Rp.
1,270
Rp.
76,500
Rp.
2,500
Jumlah (1)

=
=
=
=
=

Rp.
Rp.
Rp.
Rp.
Rp.

166,420.00
1,524.00
244.80
250.00
168,438.80

0.600
0.030
0.003
0.003

Oh
Oh
Oh
Oh

x
x
x
x

Rp.
52,500
Rp.
78,800
Rp.
91,900
Rp.
65,600
Jumlah (2)
Jumlah (1) + (2)

=
=
=
=
=
=

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

31,500.00
2,364.00
275.70
196.80
34,336.50
202,775.30

1 M' Pasang plint ubin granito ukuran 10 x 30 cm

6.25.1
-

Bahan
Plint ubin granito 10 x 30 cm
Semen portland
Pasir pasang
Semen warna

3.330
1.650
0.0032
0.100

Bh
Kg
M
Kg

x
x
x
x

Rp.
27,950
Rp.
1,270
Rp.
76,500
Rp.
2,500
Jumlah (1)

=
=
=
=
=

Rp.
Rp.
Rp.
Rp.
Rp.

93,073.50
2,095.50
244.80
250.00
95,663.80

6.25.2
-

Tenaga
Pekerja
Tukang batu
Kepala tukang
Mandor

0.900
0.090
0.009
0.0045

Oh
Oh
Oh
Oh

x
x
x
x

Rp.
52,500
Rp.
78,800
Rp.
91,900
Rp.
65,600
Jumlah (2)
Jumlah (1) + (2)

=
=
=
=
=
=

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

47,250.00
7,092.00
827.10
295.20
55,464.30
151,128.10

PPL 6.28

1 M' Pasang plint ubin teralux marmer ukuran 10 x 60 cm

6.28.1
-

Bahan
Plint ubin marmer 10 x 60 cm
Semen portland
Pasir pasang
Semen warna

1.700
1.650
0.0032
0.100

Bh
Kg
M
Kg

x
x
x
x

Rp.
65,700
Rp.
1,270
Rp.
76,500
Rp.
2,500
Jumlah (1)

=
=
=
=
=

Rp.
Rp.
Rp.
Rp.
Rp.

111,690.00
2,095.50
244.80
250.00
114,280.30

6.28.2
-

Tenaga
Pekerja
Tukang batu
Kepala tukang
Mandor

0.900
0.090
0.009
0.0045

Oh
Oh
Oh
Oh

x
x
x
x

Rp.
52,500
Rp.
78,800
Rp.
91,900
Rp.
65,600
Jumlah (2)
Jumlah (1) + (2)

=
=
=
=
=
=

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

47,250.00
7,092.00
827.10
295.20
55,464.30
169,744.60

PPL 6.29

1 M' Pasang plint ubin teralux marmer ukuran 10 x 40 cm

6.29.1
-

Bahan
Plint ubin marmer 10 x 40 cm
Semen portland
Pasir pasang
Semen warna

2.500
1.650
0.0032
0.100

Bh
Kg
M
Kg

x
x
x
x

Rp.
29,040
Rp.
1,270
Rp.
76,500
Rp.
2,500
Jumlah (1)

=
=
=
=
=

Rp.
Rp.
Rp.
Rp.
Rp.

72,600.00
2,095.50
244.80
250.00
75,190.30

6.29.2
-

Tenaga
Pekerja
Tukang batu
Kepala tukang
Mandor

0.900
0.090
0.009
0.0045

Oh
Oh
Oh
Oh

x
x
x
x

Rp.
52,500
Rp.
78,800
Rp.
91,900
Rp.
65,600
Jumlah (2)
Jumlah (1) + (2)

=
=
=
=
=
=

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

47,250.00
7,092.00
827.10
295.20
55,464.30
130,654.60

PPL 6.30

1 M' Pasang plint ubin teralux marmer ukuran 10 x 30 cm

6.30.1
-

Bahan
Plint ubin marmer 10 x 30 cm
Semen portland
Pasir pasang
Semen warna

3.330
1.650
0.0032
0.100

Bh
Kg
M
Kg

x
x
x
x

Rp.
16,340
Rp.
1,270
Rp.
76,500
Rp.
2,500
Jumlah (1)

=
=
=
=
=

Rp.
Rp.
Rp.
Rp.
Rp.

54,412.20
2,095.50
244.80
250.00
57,002.50

6.30.2
-

Tenaga
Pekerja
Tukang batu
Kepala tukang
Mandor

0.900
0.090
0.009
0.0045

Oh
Oh
Oh
Oh

x
x
x
x

Rp.
52,500
Rp.
78,800
Rp.
91,900
Rp.
65,600
Jumlah (2)
Jumlah (1) + (2)

=
=
=
=
=
=

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

47,250.00
7,092.00
827.10
295.20
55,464.30
112,466.80

PPL 6.34

1 M Pasang lantai keramik artistik 10 x 20 cm

6.34.1
-

Bahan
Keramik artistik 10 x 20 cm
Semen portland
Pasir pasang
Semen warna

6.34.2
-

Tenaga
Pekerja
Tukang batu
Kepala tukang
Mandor

PPL 6.35

50.000
11.380
0.042
1.500

Bh
Kg
M
Kg

x
x
x
x

Rp.
1,760
Rp.
1,270
Rp.
76,500
Rp.
2,500
Jumlah (1)

=
=
=
=
=

Rp.
Rp.
Rp.
Rp.
Rp.

88,000.00
14,452.60
3,213.00
3,750.00
109,415.60

0.620
0.350
0.035
0.030

Oh
Oh
Oh
Oh

x
x
x
x

Rp.
52,500
Rp.
78,800
Rp.
91,900
Rp.
65,600
Jumlah (2)
Jumlah (1) + (2)

=
=
=
=
=
=

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

32,550.00
27,580.00
3,216.50
1,968.00
65,314.50
174,730.10

1 M Pasang lantai keramik artistik 10 x 10 cm

6.35.1
-

Bahan
Keramik artistik 10 x 10 cm
Semen portland
Pasir pasang
Semen warna

6.35.2
-

Tenaga
Pekerja
Tukang batu
Kepala tukang
Mandor

50.000
11.380
0.042
2.000

Bh
Kg
M
Kg

x
x
x
x

Rp.
910
Rp.
1,270
Rp.
76,500
Rp.
2,500
Jumlah (1)

=
=
=
=
=

Rp.
Rp.
Rp.
Rp.
Rp.

45,500.00
14,452.60
3,213.00
5,000.00
68,165.60

0.620
0.350
0.035
0.030

Oh
Oh
Oh
Oh

x
x
x
x

Rp.
52,500
Rp.
78,800
Rp.
91,900
Rp.
65,600
Jumlah (2)
Jumlah (1) + (2)

=
=
=
=
=
=

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

32,550.00
27,580.00
3,216.50
1,968.00
65,314.50
133,480.10

PPL 6.36

1 M Pasang lantai keramik artistik ukuran 5 x 20 cm

6.36.1
-

Bahan
Keramik artistik 5 x 20 cm
Semen portland
Pasir pasang
Semen warna

6.36.2
-

Tenaga
Pekerja
Tukang batu
Kepala tukang
Mandor

PPL 6.37

100.000
11.380
0.042
1.500

Bh
Kg
M
Kg

x
x
x
x

Rp.
910
Rp.
1,270
Rp.
76,500
Rp.
2,500
Jumlah (1)

=
=
=
=
=

Rp.
Rp.
Rp.
Rp.
Rp.

91,000.00
14,452.60
3,213.00
3,750.00
112,415.60

0.620
0.350
0.035
0.030

Oh
Oh
Oh
Oh

x
x
x
x

Rp.
52,500
Rp.
78,800
Rp.
91,900
Rp.
65,600
Jumlah (2)
Jumlah (1) + (2)

=
=
=
=
=
=

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

32,550.00
27,580.00
3,216.50
1,968.00
65,314.50
177,730.10

1 M' Pasang plint keramik artistik ukuran 10 x 20 cm

6.37.1
-

Bahan
keramik artistik 10 x 20 cm
Semen portland
Pasir pasang
Semen warna

5.000
1.650
0.0032
0.100

Bh
Kg
M
Kg

x
x
x
x

Rp.
1,760
Rp.
1,270
Rp.
76,500
Rp.
2,500
Jumlah (1)

=
=
=
=
=

Rp.
Rp.
Rp.
Rp.
Rp.

8,800.00
2,095.50
244.80
250.00
11,390.30

6.37.2
-

Tenaga
Pekerja
Tukang batu
Kepala tukang
Mandor

0.090
0.090
0.009
0.0045

Oh
Oh
Oh
Oh

x
x
x
x

Rp.
52,500
Rp.
78,800
Rp.
91,900
Rp.
65,600
Jumlah (2)
Jumlah (1) + (2)

=
=
=
=
=
=

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

4,725.00
7,092.00
827.10
295.20
12,939.30
24,329.60

PPL 6.38

1 M' Pasang plint keramik artistik ukuran 10 x 10 cm

6.38.1
-

Bahan
keramik artistik 10 x 10 cm
Semen portland
Pasir pasang
Semen warna

10.000
1.650
0.0032
0.120

Bh
Kg
M
Kg

x
x
x
x

Rp.
910
Rp.
1,270
Rp.
76,500
Rp.
2,500
Jumlah (1)

=
=
=
=
=

Rp.
Rp.
Rp.
Rp.
Rp.

9,100.00
2,095.50
244.80
300.00
11,740.30

6.38.2
-

Tenaga
Pekerja
Tukang batu
Kepala tukang
Mandor

0.090
0.090
0.009
0.0045

Oh
Oh
Oh
Oh

x
x
x
x

Rp.
52,500
Rp.
78,800
Rp.
91,900
Rp.
65,600
Jumlah (2)
Jumlah (1) + (2)

=
=
=
=
=
=

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

4,725.00
7,092.00
827.10
295.20
12,939.30
24,679.60

PPL 6.39.A 1 M' Pasang plint keramik ukuran 10 x 20 cm


6.39.1
-

Bahan
Keramik 10 x 20 cm
Semen portland
Pasir pasang
Semen warna

5.000
0.850
0.0032
0.080

Bh
Kg
M
Kg

x
x
x
x

Rp.
1,210
Rp.
1,270
Rp.
76,500
Rp.
2,500
Jumlah (1)

=
=
=
=
=

Rp.
Rp.
Rp.
Rp.
Rp.

6,050.00
1,079.50
244.80
200.00
7,574.30

6.39.2
-

Tenaga
Pekerja
Tukang batu
Kepala tukang
Mandor

0.090
0.090
0.009
0.0045

Oh
Oh
Oh
Oh

x
x
x
x

Rp.
52,500
Rp.
78,800
Rp.
91,900
Rp.
65,600
Jumlah (2)
Jumlah (1) + (2)

=
=
=
=
=
=

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

4,725.00
7,092.00
827.10
295.20
12,939.30
20,513.60

PPL 6.39.B 1 M' Pasang plint keramik ukuran 10 x 30 cm


6.39.1
-

Bahan
Keramik 10 x 30 cm
Semen portland
Pasir pasang
Semen warna

3.340
0.850
0.0032
0.080

Bh
Kg
M
Kg

x
x
x
x

Rp.
4,110
Rp.
1,270
Rp.
76,500
Rp.
2,500
Jumlah (1)

=
=
=
=
=

Rp.
Rp.
Rp.
Rp.
Rp.

13,727.40
1,079.50
244.80
200.00
15,251.70

6.39.2
-

Tenaga
Pekerja
Tukang batu
Kepala tukang
Mandor

0.090
0.090
0.009
0.0045

Oh
Oh
Oh
Oh

x
x
x
x

Rp.
52,500
Rp.
78,800
Rp.
91,900
Rp.
65,600
Jumlah (2)
Jumlah (1) + (2)

=
=
=
=
=
=

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

4,725.00
7,092.00
827.10
295.20
12,939.30
28,191.00

PPL 6.39.C 1 M' Pasang plint keramik ukuran 10 x 40 cm


6.39.1
-

Bahan
Keramik 10 x 40 cm
Semen portland
Pasir pasang
Semen warna

2.500
0.850
0.0032
0.080

Bh
Kg
M
Kg

x
x
x
x

Rp.
5,690
Rp.
1,270
Rp.
76,500
Rp.
2,500
Jumlah (1)

=
=
=
=
=

Rp.
Rp.
Rp.
Rp.
Rp.

14,225.00
1,079.50
244.80
200.00
15,749.30

6.39.2
-

Tenaga
Pekerja
Tukang batu
Kepala tukang
Mandor

0.090
0.090
0.009
0.0045

Oh
Oh
Oh
Oh

x
x
x
x

Rp.
52,500
Rp.
78,800
Rp.
91,900
Rp.
65,600
Jumlah (2)
Jumlah (1) + (2)

=
=
=
=
=
=

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

4,725.00
7,092.00
827.10
295.20
12,939.30
28,688.60

3.500 Bh x Rp.
8,230 = Rp.
0.080 Kg x Rp.
44,900 = Rp.
Jumlah (1)
= Rp.

28,805.00
3,592.00
32,397.00

0.080
0.080
0.008
0.004

Oh
Oh
Oh
Oh

x
x
x
x

Rp.
52,500
Rp.
78,800
Rp.
91,900
Rp.
65,600
Jumlah (2)
Jumlah (1) + (2)

=
=
=
=
=
=

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

4,200.00
6,304.00
735.20
262.40
11,501.60
43,898.60

50.000
11.380
0.042
1.500

Bh
Kg
M
Kg

x
x
x
x

Rp.
1,210
Rp.
1,270
Rp.
76,500
Rp.
2,500
Jumlah (1)

=
=
=
=
=

Rp.
Rp.
Rp.
Rp.
Rp.

60,500.00
14,452.60
3,213.00
3,750.00
81,915.60

0.620
0.350
0.035
0.030

Oh
Oh
Oh
Oh

x
x
x
x

Rp.
52,500
Rp.
78,800
Rp.
91,900
Rp.
65,600
Jumlah (2)
Jumlah (1) + (2)

=
=
=
=
=
=

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

32,550.00
27,580.00
3,216.50
1,968.00
65,314.50
147,230.10

PPL 6.41

1 M' Pasang plint vinyil tanpa adukan

6.41.1 Bahan
- Vinyl 30 x 30 cm
- Lem vinyl
6.41.2
-

PPL 6.42

Tenaga
Pekerja
Tukang batu
Kepala tukang
Mandor

1 M Pasang lantai keramik 10 x 20 cm

6.42.1
-

Bahan
Ubin keramik 10 x 20 cm
Semen portland
Pasir pasang
Semen warna

6.42.2
-

Tenaga
Pekerja
Tukang batu
Kepala tukang
Mandor

PPL 6.43

1 M Pasang lantai keramik 15 x 15 cm

6.43.1
-

Bahan
Ubin keramik 15 x 15 cm
Semen portland
Pasir pasang
Semen warna

6.43.2
-

Tenaga
Pekerja
Tukang batu
Kepala tukang
Mandor

PPL 6.44

Bahan
Ubin keramik 20 x 20 cm
Semen portland
Pasir pasang
Semen warna

6.44.2
-

Tenaga
Pekerja
Tukang batu
Kepala tukang
Mandor

x
x
x
x

Rp.
1,400
Rp.
1,270
Rp.
76,500
Rp.
2,500
Jumlah (1)

=
=
=
=
=

Rp.
Rp.
Rp.
Rp.
Rp.

61,600.00
14,452.60
3,213.00
3,750.00
83,015.60

0.620
0.350
0.035
0.030

Oh
Oh
Oh
Oh

x
x
x
x

Rp.
52,500
Rp.
78,800
Rp.
91,900
Rp.
65,600
Jumlah (2)
Jumlah (1) + (2)

=
=
=
=
=
=

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

32,550.00
27,580.00
3,216.50
1,968.00
65,314.50
148,330.10

25.000
11.380
0.042
1.500

Bh
Kg
M
Kg

x
x
x
x

Rp.
2,490
Rp.
1,270
Rp.
76,500
Rp.
2,500
Jumlah (1)

=
=
=
=
=

Rp.
Rp.
Rp.
Rp.
Rp.

62,250.00
14,452.60
3,213.00
3,750.00
83,665.60

0.620
0.350
0.035
0.030

Oh
Oh
Oh
Oh

x
x
x
x

Rp.
52,500
Rp.
78,800
Rp.
91,900
Rp.
65,600
Jumlah (2)
Jumlah (1) + (2)

=
=
=
=
=
=

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

32,550.00
27,580.00
3,216.50
1,968.00
65,314.50
148,980.10

20.000
11.380
0.042
1.500

Bh
Kg
M
Kg

x
x
x
x

Rp.
3,150
Rp.
1,270
Rp.
76,500
Rp.
2,500
Jumlah (1)

=
=
=
=
=

Rp.
Rp.
Rp.
Rp.
Rp.

63,000.00
14,452.60
3,213.00
3,750.00
84,415.60

0.620
0.350
0.035
0.030

Oh
Oh
Oh
Oh

x
x
x
x

Rp.
52,500
Rp.
78,800
Rp.
91,900
Rp.
65,600
Jumlah (2)
Jumlah (1) + (2)

=
=
=
=
=
=

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

32,550.00
27,580.00
3,216.50
1,968.00
65,314.50
149,730.10

16.000
11.380
0.042
1.500

Bh
Kg
M
Kg

x
x
x
x

Rp.
3,870
Rp.
1,270
Rp.
76,500
Rp.
2,500
Jumlah (1)

=
=
=
=
=

Rp.
Rp.
Rp.
Rp.
Rp.

61,920.00
14,452.60
3,213.00
3,750.00
83,335.60

0.620
0.350
0.035
0.030

Oh
Oh
Oh
Oh

x
x
x
x

Rp.
52,500
Rp.
78,800
Rp.
91,900
Rp.
65,600
Jumlah (2)
Jumlah (1) + (2)

=
=
=
=
=
=

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

32,550.00
27,580.00
3,216.50
1,968.00
65,314.50
148,650.10

1 M Pasang lantai keramik 20 x 25 cm

6.45.1
-

Bahan
Ubin keramik 20 x 25 cm
Semen portland
Pasir pasang
Semen warna

6.45.2
-

Tenaga
Pekerja
Tukang batu
Kepala tukang
Mandor

PPL 6.46

Bh
Kg
M
Kg

1 M Pasang lantai keramik 20 x 20 cm

6.44.1
-

PPL 6.45

44.000
11.380
0.042
1.500

1 M Pasang lantai keramik 25 x 25 cm

6.46.1
-

Bahan
Ubin keramik 25 x 25 cm
Semen portland
Pasir pasang
Semen warna

6.46.2
-

Tenaga
Pekerja
Tukang batu
Kepala tukang
Mandor

PPL 6.47

1 M Pasang lantai keramik 30 x 30 cm

6.47.1
-

Bahan
Ubin keramik 30 x 30 cm
Semen portland
Pasir pasang
Semen warna

6.47.2
-

Tenaga
Pekerja
Tukang batu
Kepala tukang
Mandor

PPL 6.48

Bahan
Ubin keramik 30 x 30 cm anti slip
Semen portland
Pasir pasang
Semen warna

6.48.2
-

Tenaga
Pekerja
Tukang batu
Kepala tukang
Mandor

x
x
x
x

Rp.
5,570
Rp.
1,270
Rp.
76,500
Rp.
2,500
Jumlah (1)

=
=
=
=
=

Rp.
Rp.
Rp.
Rp.
Rp.

61,938.40
14,452.60
3,213.00
3,750.00
83,354.00

0.620
0.350
0.035
0.030

Oh
Oh
Oh
Oh

x
x
x
x

Rp.
52,500
Rp.
78,800
Rp.
91,900
Rp.
65,600
Jumlah (2)
Jumlah (1) + (2)

=
=
=
=
=
=

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

32,550.00
27,580.00
3,216.50
1,968.00
65,314.50
148,668.50

11.120
11.380
0.042
1.500

Bh
Kg
M
Kg

x
x
x
x

Rp.
6,290
Rp.
1,270
Rp.
76,500
Rp.
2,500
Jumlah (1)

=
=
=
=
=

Rp.
Rp.
Rp.
Rp.
Rp.

69,944.80
14,452.60
3,213.00
3,750.00
91,360.40

0.620
0.350
0.035
0.030

Oh
Oh
Oh
Oh

x
x
x
x

Rp.
52,500
Rp.
78,800
Rp.
91,900
Rp.
65,600
Jumlah (2)
Jumlah (1) + (2)

=
=
=
=
=
=

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

32,550.00
27,580.00
3,216.50
1,968.00
65,314.50
156,674.90

6.250
11.380
0.042
1.500

Bh
Kg
M
Kg

x
x
x
x

Rp.
9,680
Rp.
1,270
Rp.
76,500
Rp.
2,500
Jumlah (1)

=
=
=
=
=

Rp.
Rp.
Rp.
Rp.
Rp.

60,500.00
14,452.60
3,213.00
3,750.00
81,915.60

0.620
0.350
0.035
0.030

Oh
Oh
Oh
Oh

x
x
x
x

Rp.
52,500
Rp.
78,800
Rp.
91,900
Rp.
65,600
Jumlah (2)
Jumlah (1) + (2)

=
=
=
=
=
=

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

32,550.00
27,580.00
3,216.50
1,968.00
65,314.50
147,230.10

1 M Pasang lantai keramik 40 x 40 cm

6.49.1
-

Bahan
Ubin keramik 40 x 40 cm
Semen portland
Pasir pasang
Semen warna

6.49.2
-

Tenaga
Pekerja
Tukang batu
Kepala tukang
Mandor

PPL 6.50

Bh
Kg
M
Kg

1 M Pasang lantai keramik 30 x 30 cm anti slip

6.48.1
-

PPL 6.49

11.120
11.380
0.042
1.500

1 M Pasang lantai mosaik 30 x 30 cm, ex lokal

6.50.1
-

Bahan
Mosaik 30 x 30 cm
Semen portland
Pasir pasang
Semen warna

6.50.2
-

Tenaga
Pekerja
Tukang batu
Kepala tukang
Mandor

12.000
14.150
0.039
2.000

Bh
Kg
M
Kg

x
x
x
x

Rp.
13,920
Rp.
1,270
Rp.
76,500
Rp.
2,500
Jumlah (1)

=
=
=
=
=

Rp.
Rp.
Rp.
Rp.
Rp.

167,040.00
17,970.50
2,983.50
5,000.00
192,994.00

0.620
0.350
0.035
0.030

Oh
Oh
Oh
Oh

x
x
x
x

Rp.
52,500
Rp.
78,800
Rp.
91,900
Rp.
65,600
Jumlah (2)
Jumlah (1) + (2)

=
=
=
=
=
=

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

32,550.00
27,580.00
3,216.50
1,968.00
65,314.50
258,308.50

PPL 6.51

1 M Pasang lantai marmer

6.51.1
-

Bahan
Marmer
Semen portland
Pasir pasang
Semen warna

6.51.2
-

Tenaga
Pekerja
Tukang batu
Kepala tukang
Mandor

PPL 6.52

PPL 6.53

Tenaga
Pekerja
Tukang
Kepala tukang
Mandor

PPL 6.55

Tenaga
Pekerja
Tukang
Kepala tukang
Mandor

Rp.
261,970
Rp.
1,270
Rp.
76,500
Rp.
2,500
Jumlah (1)

=
=
=
=
=

Rp.
Rp.
Rp.
Rp.
Rp.

275,592.44
17,970.50
2,983.50
5,000.00
301,546.44

0.620
0.350
0.035
0.030

Oh
Oh
Oh
Oh

x
x
x
x

Rp.
52,500
Rp.
78,800
Rp.
91,900
Rp.
65,600
Jumlah (2)
Jumlah (1) + (2)

=
=
=
=
=
=

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

32,550.00
27,580.00
3,216.50
1,968.00
65,314.50
366,860.94

1.050 M x Rp.
85,250 = Rp.
0.350 Kg x Rp.
44,900 = Rp.
Jumlah (1)
= Rp.

89,512.50
15,715.00
105,227.50

0.170
0.170
0.017
0.0085

Oh
Oh
Oh
Oh

x
x
x
x

Rp.
52,500
Rp.
78,800
Rp.
91,900
Rp.
65,600
Jumlah (2)
Jumlah (1) + (2)

=
=
=
=
=
=

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

8,925.00
13,396.00
1,562.30
557.60
24,440.90
129,668.40

1.050 M x Rp.
87,450 = Rp.
0.350 Kg x Rp.
44,900 = Rp.
Jumlah (1)
= Rp.

91,822.50
15,715.00
107,537.50

0.170
0.170
0.017
0.0085

Oh
Oh
Oh
Oh

x
x
x
x

Rp.
52,500
Rp.
78,800
Rp.
91,900
Rp.
65,600
Jumlah (2)
Jumlah (1) + (2)

=
=
=
=
=
=

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

8,925.00
13,396.00
1,562.30
557.60
24,440.90
131,978.40

1.050 M x Rp.
90,750 = Rp.
0.350 Kg x Rp.
44,900 = Rp.
Jumlah (1)
= Rp.

95,287.50
15,715.00
111,002.50

1 M Pasang lantai karpet

6.55.1 Bahan
- Carpet
- Lem vinyl
6.55.2
-

x
x
x
x

1 M Pasang lantai karpet 80% wool, 20% nylon

6.53.1 Bahan
- Karpet wool + nylon
- Lem vinyl

6.53.2
-

Bh
Kg
M
Kg

1 M Pasang lantai karpet 100% wool

6.52.1 Bahan
- Karpet wool
- Lem vinyl
6.52.2
-

1.052
14.150
0.039
2.000

Tenaga
Pekerja
Tukang
Kepala tukang
Mandor

0.170
0.170
0.017
0.0085

Oh
Oh
Oh
Oh

x
x
x
x

Rp.
52,500
Rp.
78,800
Rp.
91,900
Rp.
65,600
Jumlah (2)
Jumlah (1) + (2)

=
=
=
=
=
=

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

8,925.00
13,396.00
1,562.30
557.60
24,440.90
135,443.40

PPL 6.56

1 M Pasang lantai parquet jati

6.56.1 Bahan
- Perquet jati
- Lem vinyl
6.56.2
-

PPL 6.58

Tenaga
Pekerja
Tukang
Kepala tukang
Mandor

Bahan
Porselin 11 x 11 cm
Semen portland
Pasir pasang
Semen warna

6.58.2
-

Tenaga
Pekerja
Tukang batu
Kepala tukang
Mandor

Oh
Oh
Oh
Oh

x
x
x
x

Rp.
52,500
Rp.
78,800
Rp.
91,900
Rp.
65,600
Jumlah (2)
Jumlah (1) + (2)

=
=
=
=
=
=

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

34,125.00
27,580.00
3,216.50
2,132.00
67,053.50
480,918.50

83.000
9.300
0.018
1.500

Bh
Kg
M
Kg

x
x
x
x

Rp.
1,210
Rp.
1,270
Rp.
76,500
Rp.
2,500
Jumlah (1)

=
=
=
=
=

Rp.
Rp.
Rp.
Rp.
Rp.

100,430.00
11,811.00
1,377.00
3,750.00
117,368.00

0.620
0.500
0.050
0.030

Oh
Oh
Oh
Oh

x
x
x
x

Rp.
52,500
Rp.
78,800
Rp.
91,900
Rp.
65,600
Jumlah (2)
Jumlah (1) + (2)

=
=
=
=
=
=

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

32,550.00
39,400.00
4,595.00
1,968.00
78,513.00
195,881.00

1 M Pasang dinding porselin 11 x 11 cm, warna

6.59.1
-

Bahan
Porselin 11 x 11 cm warna
Semen portland
Pasir pasang
Semen warna

6.59.2
-

Tenaga
Pekerja
Tukang batu
Kepala tukang
Mandor

PPL 6.60

0.650
0.350
0.035
0.0325

386,925.00
26,940.00
413,865.00

1 M Pasang dinding porselin 11 x 11 cm, putih

6.58.1
-

PPL 6.59

1.050 M x Rp.
368,500 = Rp.
0.600 Kg x Rp.
44,900 = Rp.
Jumlah (1)
= Rp.

83.000
9.300
0.018
1.500

Bh
Kg
M
Kg

x
x
x
x

Rp.
145
Rp.
1,270
Rp.
76,500
Rp.
2,500
Jumlah (1)

=
=
=
=
=

Rp.
Rp.
Rp.
Rp.
Rp.

12,035.00
11,811.00
1,377.00
3,750.00
28,973.00

0.620
0.500
0.050
0.030

Oh
Oh
Oh
Oh

x
x
x
x

Rp.
52,500
Rp.
78,800
Rp.
91,900
Rp.
65,600
Jumlah (2)
Jumlah (1) + (2)

=
=
=
=
=
=

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

32,550.00
39,400.00
4,595.00
1,968.00
78,513.00
107,486.00

1 M Pasang dinding porselin 15 x 15 cm, putih

6.60.1
-

Bahan
Porselin 15 x 15 cm putih
Semen portland
Pasir pasang
Semen warna

6.60.2
-

Tenaga
Pekerja
Tukang batu
Kepala tukang
Mandor

45.000
9.300
0.018
1.500

Bh
Kg
M
Kg

x
x
x
x

Rp.
2,300
Rp.
1,270
Rp.
76,500
Rp.
2,500
Jumlah (1)

=
=
=
=
=

Rp.
Rp.
Rp.
Rp.
Rp.

103,500.00
11,811.00
1,377.00
3,750.00
120,438.00

0.600
0.450
0.045
0.030

Oh
Oh
Oh
Oh

x
x
x
x

Rp.
52,500
Rp.
78,800
Rp.
91,900
Rp.
65,600
Jumlah (2)
Jumlah (1) + (2)

=
=
=
=
=
=

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

31,500.00
35,460.00
4,135.50
1,968.00
73,063.50
193,501.50

PPL 6.61

1 M Pasang dinding porselin 15 x 15 cm, warna

6.61.1
-

Bahan
Porselin 15 x 15 cm warna
Semen portland
Pasir pasang
Semen warna

6.61.2
-

Tenaga
Pekerja
Tukang batu
Kepala tukang
Mandor

PPL 6.64

Bahan
Keramik artistik 10 x 20 cm
Semen portland
Pasir pasang
Semen warna

6.64.2
-

Tenaga
Pekerja
Tukang batu
Kepala tukang
Mandor

x
x
x
x

Rp.
2,540
Rp.
1,270
Rp.
76,500
Rp.
2,500
Jumlah (1)

=
=
=
=
=

Rp.
Rp.
Rp.
Rp.
Rp.

114,300.00
11,811.00
1,377.00
3,750.00
131,238.00

0.600
0.450
0.045
0.030

Oh
Oh
Oh
Oh

x
x
x
x

Rp.
52,500
Rp.
78,800
Rp.
91,900
Rp.
65,600
Jumlah (2)
Jumlah (1) + (2)

=
=
=
=
=
=

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

31,500.00
35,460.00
4,135.50
1,968.00
73,063.50
204,301.50

100.000
9.300
0.018
1.500

Bh
Kg
M
Kg

x
x
x
x

Rp.
1,760
Rp.
1,270
Rp.
76,500
Rp.
2,500
Jumlah (1)

=
=
=
=
=

Rp.
Rp.
Rp.
Rp.
Rp.

176,000.00
11,811.00
1,377.00
3,750.00
192,938.00

0.600
0.450
0.045
0.030

Oh
Oh
Oh
Oh

x
x
x
x

Rp.
52,500
Rp.
78,800
Rp.
91,900
Rp.
65,600
Jumlah (2)
Jumlah (1) + (2)

=
=
=
=
=
=

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

31,500.00
35,460.00
4,135.50
1,968.00
73,063.50
266,001.50

1 M Pasang dinding keramik artistik 5 x 20 cm

6.65.1
-

Bahan
Keramik artistik 5 x 20 cm
Semen portland
Pasir pasang
Semen warna

6.65.2
-

Tenaga
Pekerja
Tukang batu
Kepala tukang
Mandor

PPL 6.66

Bh
Kg
M
Kg

1 M Pasang dinding keramik artistik 10 x 20 cm

6.64.1
-

PPL 6.65

45.000
9.300
0.018
1.500

100.000
9.300
0.018
1.500

Bh
Kg
M
Kg

x
x
x
x

Rp.
910
Rp.
1,270
Rp.
76,500
Rp.
2,500
Jumlah (1)

=
=
=
=
=

Rp.
Rp.
Rp.
Rp.
Rp.

91,000.00
11,811.00
1,377.00
3,750.00
107,938.00

0.600
0.450
0.045
0.030

Oh
Oh
Oh
Oh

x
x
x
x

Rp.
52,500
Rp.
78,800
Rp.
91,900
Rp.
65,600
Jumlah (2)
Jumlah (1) + (2)

=
=
=
=
=
=

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

31,500.00
35,460.00
4,135.50
1,968.00
73,063.50
181,001.50

50.000
9.300
0.018
1.500

Bh
Kg
M
Kg

x
x
x
x

Rp.
1,210
Rp.
1,270
Rp.
76,500
Rp.
2,500
Jumlah (1)

=
=
=
=
=

Rp.
Rp.
Rp.
Rp.
Rp.

60,500.00
11,811.00
1,377.00
3,750.00
77,438.00

0.600
0.450
0.045
0.030

Oh
Oh
Oh
Oh

x
x
x
x

Rp.
52,500
Rp.
78,800
Rp.
91,900
Rp.
65,600
Jumlah (2)
Jumlah (1) + (2)

=
=
=
=
=
=

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

31,500.00
35,460.00
4,135.50
1,968.00
73,063.50
150,501.50

1 M Pasang dinding keramik 10 x 20 cm

6.66.1
-

Bahan
Keramik 10 x 20 cm
Semen portland
Pasir pasang
Semen warna

6.66.2
-

Tenaga
Pekerja
Tukang batu
Kepala tukang
Mandor

PPL 6.67

1 M Pasang dinding keramik 15 x 15 cm

6.67.1
-

Bahan
Keramik 15 x 15 cm
Semen portland
Pasir pasang
Semen warna

6.67.2
-

Tenaga
Pekerja
Tukang batu
Kepala tukang
Mandor

PPL 6.68

Bh
Kg
M
Kg

x
x
x
x

Rp.
1,400
Rp.
1,270
Rp.
76,500
Rp.
2,500
Jumlah (1)

=
=
=
=
=

Rp.
Rp.
Rp.
Rp.
Rp.

63,000.00
11,811.00
1,377.00
3,750.00
79,938.00

0.600
0.450
0.045
0.030

Oh
Oh
Oh
Oh

x
x
x
x

Rp.
52,500
Rp.
78,800
Rp.
91,900
Rp.
65,600
Jumlah (2)
Jumlah (1) + (2)

=
=
=
=
=
=

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

31,500.00
35,460.00
4,135.50
1,968.00
73,063.50
153,001.50

25.000
9.300
0.018
1.500

Bh
Kg
M
Kg

x
x
x
x

Rp.
2,490
Rp.
1,270
Rp.
76,500
Rp.
2,500
Jumlah (1)

=
=
=
=
=

Rp.
Rp.
Rp.
Rp.
Rp.

62,250.00
11,811.00
1,377.00
3,750.00
79,188.00

0.600
0.100
0.045
0.030

Oh
Oh
Oh
Oh

x
x
x
x

Rp.
52,500
Rp.
78,800
Rp.
91,900
Rp.
65,600
Jumlah (2)
Jumlah (1) + (2)

=
=
=
=
=
=

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

31,500.00
7,880.00
4,135.50
1,968.00
45,483.50
124,671.50

1 M Pasang dinding keramik 20 x 20 cm

6.68.1
-

Bahan
Keramik 20 x 20 cm
Semen portland
Pasir pasang
Semen warna

6.68.2
-

Tenaga
Pekerja
Tukang batu
Kepala tukang
Mandor

PPL 6.69

45.000
9.300
0.018
1.500

1 M Pasang dinding keramik 20 x 25 cm

6.69.1
-

Bahan
Keramik 20 x 25 cm
Semen portland
Pasir pasang
Semen warna

20.000
9.300
0.018
1.500

Bh
Kg
M
Kg

x
x
x
x

Rp.
3,150
Rp.
1,270
Rp.
76,500
Rp.
2,500
Jumlah (1)

=
=
=
=
=

Rp.
Rp.
Rp.
Rp.
Rp.

63,000.00
11,811.00
1,377.00
3,750.00
79,938.00

6.69.2
-

Tenaga
Pekerja
Tukang batu
Kepala tukang
Mandor

0.600
0.450
0.0450
0.030

Oh
Oh
Oh
Oh

x
x
x
x

Rp.
52,500
Rp.
78,800
Rp.
91,900
Rp.
65,600
Jumlah (2)
Jumlah (1) + (2)

=
=
=
=
=
=

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

31,500.00
35,460.00
4,135.50
1,968.00
73,063.50
153,001.50

1.020
2.000
12.440
0.025
1.500

M
Bh
Kg
M
Kg

x
x
x
x
x

Rp.
261,970
Rp.
720
Rp.
1,270
Rp.
76,500
Rp.
2,500
Jumlah (1)

=
=
=
=
=
=

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

267,209.40
1,440.00
15,798.80
1,912.50
3,750.00
290,110.70

0.720
0.650
0.065
0.035

Oh
Oh
Oh
Oh

x
x
x
x

Rp.
52,500
Rp.
78,800
Rp.
91,900
Rp.
65,600
Jumlah (2)
Jumlah (1) + (2)

=
=
=
=
=
=

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

37,800.00
51,220.00
5,973.50
2,296.00
97,289.50
387,400.20

PPL 6.70

1 M Pasang dinding marmer

6.70.1
-

Bahan
Marmer
Paku pancing
Semen portland
Pasir pasang
Semen warna

6.70.2
-

Tenaga
Pekerja
Tukang batu
Kepala tukang
Mandor

PPL 6.71

1 M Pasang dinding bata pelapis 7 x 3 x 20 cm

6.71.1
-

Bahan
Bata pelapis dinding
Semen portland
Pasir pasang

6.71.2
-

Tenaga
Pekerja
Tukang batu
Kepala tukang
Mandor

PPL 6.73

Bahan
Batu poros
Semen portland
Pasir pasang

6.73.2
-

Tenaga
Pekerja
Tukang batu
Kepala tukang
Mandor

Bahan
Batu tempel hitam
Semen portland
Pasir pasang

6.74.2
-

Tenaga
Pekerja
Tukang batu
Kepala tukang
Mandor

122,400.00
15,798.80
1,912.50
140,111.30

Rp.
52,500
Rp.
78,800
Rp.
91,900
Rp.
65,600
Jumlah (2)
Jumlah (1) + (2)

=
=
=
=
=
=

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

34,125.00
39,400.00
4,595.00
1,968.00
80,088.00
220,199.30

1.050 M x Rp.
114,680
11.750 Kg x Rp.
1,270
0.035 M x Rp.
76,500
Jumlah (1)

=
=
=
=

Rp.
Rp.
Rp.
Rp.

120,414.00
14,922.50
2,677.50
138,014.00

Rp.
52,500
Rp.
78,800
Rp.
91,900
Rp.
65,600
Jumlah (2)
Jumlah (1) + (2)

=
=
=
=
=
=

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

32,550.00
27,580.00
3,216.50
1,968.00
65,314.50
203,328.50

1.050 M x Rp.
104,500
11.750 Kg x Rp.
1,270
0.035 M x Rp.
76,500
Jumlah (1)

=
=
=
=

Rp.
Rp.
Rp.
Rp.

109,725.00
14,922.50
2,677.50
127,325.00

=
=
=
=
=
=

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

32,550.00
27,580.00
3,216.50
1,968.00
65,314.50
192,639.50

11.050 Bh x Rp.
9,800 = Rp.
0.350 Kg x Rp.
44,900 = Rp.
Jumlah (1)
= Rp.

108,290.00
15,715.00
124,005.00

0.150
0.150
0.015
0.0075

7,875.00
11,820.00
1,378.50
492.00
21,565.50
145,570.50

0.650
0.500
0.050
0.030

Oh
Oh
Oh
Oh

x
x
x
x

0.620
0.350
0.035
0.030

Oh
Oh
Oh
Oh

x
x
x
x

0.620
0.350
0.035
0.030

Oh
Oh
Oh
Oh

x
x
x
x

Rp.
52,500
Rp.
78,800
Rp.
91,900
Rp.
65,600
Jumlah (2)
Jumlah (1) + (2)

1 M Pasang lantai vinyl karet 30 x 30 cm KL I

6.75.1 Bahan
- Vinyl karet
- Lem vinyl
6.75.2
-

Rp.
Rp.
Rp.
Rp.

1 M Pasang dinding batu tempel hitam

6.74.1
-

PPL 6.75

=
=
=
=

1 M Pasang dinding batu poros

6.73.1
-

PPL 6.74

60.000 Bh x Rp.
2,040
12.440 Kg x Rp.
1,270
0.025 M x Rp.
76,500
Jumlah (1)

Tenaga
Pekerja
Tukang batu
Kepala tukang
Mandor

Oh
Oh
Oh
Oh

x
x
x
x

Rp.
52,500
Rp.
78,800
Rp.
91,900
Rp.
65,600
Jumlah (2)
Jumlah (1) + (2)

=
=
=
=
=
=

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

PPL 6.76

1 M Pasang lantai vinyl karet 30 x 30 cm KL II

6.76.1 Bahan
- Vinyl karet
- Lem vinyl
6.76.2
-

PPL 6.77

Tenaga
Pekerja
Tukang batu
Kepala tukang
Mandor

PPL 6.78

Tenaga
Pekerja
Tukang batu
Kepala tukang
Mandor

PPL 6.79

Tenaga
Pekerja
Tukang batu
Kepala tukang
Mandor

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

7,875.00
11,820.00
1,378.50
492.00
21,565.50
137,614.50

11.050 Bh x Rp.
8,230 = Rp.
0.350 Kg x Rp.
44,900 = Rp.
Jumlah (1)
= Rp.

90,941.50
15,715.00
106,656.50

0.150
0.150
0.015
0.0075

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

7,875.00
11,820.00
1,378.50
492.00
21,565.50
128,222.00

11.050 Bh x Rp.
9,440 = Rp.
0.350 Kg x Rp.
44,900 = Rp.
Jumlah (1)
= Rp.

104,312.00
15,715.00
120,027.00

0.150
0.150
0.015
0.0075

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

7,875.00
11,820.00
1,378.50
492.00
21,565.50
141,592.50

1.100 M x Rp.
63,250 = Rp.
0.250 Kg x Rp.
44,900 = Rp.
Jumlah (1)
= Rp.

69,575.00
11,225.00
80,800.00

Oh
Oh
Oh
Oh

x
x
x
x

Rp.
52,500
Rp.
78,800
Rp.
91,900
Rp.
65,600
Jumlah (2)
Jumlah (1) + (2)

=
=
=
=
=
=

Oh
Oh
Oh
Oh

x
x
x
x

Rp.
52,500
Rp.
78,800
Rp.
91,900
Rp.
65,600
Jumlah (2)
Jumlah (1) + (2)

=
=
=
=
=
=

Oh
Oh
Oh
Oh

x
x
x
x

Rp.
52,500
Rp.
78,800
Rp.
91,900
Rp.
65,600
Jumlah (2)
Jumlah (1) + (2)

=
=
=
=
=
=

1 M Pasang wall corvering lebar 50 cm

6.79.1 Bahan
- Corvering L.50 cm
- Lem
6.79.2
-

0.150
0.150
0.015
0.0075

1 M Pasang lantai vinyl motif kembang 30 x 30 cm

6.78.1 Bahan
- Vinyl motif kembang
- Lem vinyl
6.78.2
-

100,334.00
15,715.00
116,049.00

1 M Pasang lantai vinyl asbes 30 x 30 cm

6.77.1 Bahan
- Vinyl asbes 30 x 30 cm
- Lem vinyl
6.77.2
-

11.050 Bh x Rp.
9,080 = Rp.
0.350 Kg x Rp.
44,900 = Rp.
Jumlah (1)
= Rp.

Tenaga
Pekerja
Tukang batu
Kepala tukang
Mandor

0.750
0.170
0.017
0.0085

Oh
Oh
Oh
Oh

x
x
x
x

Rp.
52,500
Rp.
78,800
Rp.
91,900
Rp.
65,600
Jumlah (2)
Jumlah (1) + (2)

=
=
=
=
=
=

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

39,375.00
13,396.00
1,562.30
557.60
54,890.90
135,690.90

PPL 6.82

1 M Plint kayu Jati 2 x 10 cm

6.82.1 Bahan
- Kayu jati papan
- Paku skrup 3,5"
6.82.2
-

0.0024 M x Rp. 24,104,440 = Rp.


0.050 Kg x Rp.
20,350 = Rp.
Jumlah (1)
= Rp.

Tenaga
Pekerja
Tukang kayu
Kepala tukang
Mandor

0.120
0.120
0.012
0.006

Oh
Oh
Oh
Oh

x
x
x
x

Rp.
52,500
Rp.
78,800
Rp.
91,900
Rp.
65,600
Jumlah (2)
Jumlah (1) + (2)

=
=
=
=
=
=

57,850.66
1,017.50
58,868.16

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

6,300.00
9,456.00
1,102.80
393.60
17,252.40
76,120.56

0.0024 M x Rp.
9,375,000 = Rp.
0.050 Kg x Rp.
20,350 = Rp.
Jumlah (1)
= Rp.

22,500.00
1,017.50
23,517.50

PPL 6.82.A 1 M Plint kayu Meranti batu 2 x 10 cm


6.82.1 Bahan
- Kayu meranti batu, papan
- Paku skrup 3,5"
6.82.2
-

Tenaga
Pekerja
Tukang kayu
Kepala tukang
Mandor

0.120
0.120
0.012
0.006

Oh
Oh
Oh
Oh

x
x
x
x

Rp.
52,500
Rp.
78,800
Rp.
91,900
Rp.
65,600
Jumlah (2)
Jumlah (1) + (2)

=
=
=
=
=
=

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

6,300.00
9,456.00
1,102.80
393.60
17,252.40
40,769.90

ANALISA BIAYA KONSTRUKSI


PEKERJAAN KUNCI DAN KACA

PKK 6.1
6.1.1

1 buah pasang kunci tanam antik


Bahan
- Kunci tanam antik

6.1.2
-

PKK 6.2
6.2.1

Bahan
- Kunci tanam biasa

PKK 6.3

Tenaga
Pekerja
Tukang Kayu
Kepala Tukang
Mandor

Bahan
- Kunci tanam kamar mandi

PKK 6.4

0.060
0.600
0.060
0.003

x
x
x
x

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

3,150.00
47,280.00
5,514.00
196.80
56,140.80
270,640.80

90,020 = Rp.
= Rp.

90,020.00
90,020.00

Oh
Oh
Oh
Oh

Rp.
52,500
Rp.
78,800
Rp.
91,900
Rp.
65,600
Jumlah (2)
Jumlah (1) + (2)

=
=
=
=
=
=

1.000 Bh

x Rp.
Jumlah (1)

0.010
0.500
0.010
0.005

x
x
x
x

Oh
Oh
Oh
Oh

Rp.
52,500
Rp.
78,800
Rp.
91,900
Rp.
65,600
Jumlah (2)
Jumlah (1) + (2)

=
=
=
=
=
=

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

525.00
39,400.00
919.00
328.00
41,172.00
131,192.00

Tenaga
Pekerja
Tukang Kayu
Kepala Tukang
Mandor

1.000 Bh

0.005
0.500
0.005
0.0025

Oh
Oh
Oh
Oh

x Rp.
Jumlah (1)

54,690 = Rp.
= Rp.

54,690.00
54,690.00

x
x
x
x

Rp.
52,500
Rp.
78,800
Rp.
91,900
Rp.
65,600
Jumlah (2)
Jumlah (1) + (2)

=
=
=
=
=
=

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

262.50
39,400.00
459.50
164.00
40,286.00
94,976.00

34,490 = Rp.
= Rp.

34,490.00
34,490.00

1 buah pasang kunci silinder


Bahan
- Kunci silinder

6.4.2
-

PKK 6.5
6.5.1

214,500.00
214,500.00

1 buah pasang kunci tanam kamar mandi

6.3.2

6.4.1

x Rp.
214,500 = Rp.
Jumlah (1)
= Rp.

1 buah pasang kunci tanam biasa

6.1.2

6.3.1

Tenaga
Pekerja
Tukang Kayu
Kepala Tukang
Mandor

1.000 Bh

Tenaga
Pekerja
Tukang Kayu
Kepala Tukang
Mandor

1.000 Bh

0.005
0.500
0.005
0.00025

Oh
Oh
Oh
Oh

x Rp.
Jumlah (1)
x
x
x
x

Rp.
52,500
Rp.
78,800
Rp.
91,900
Rp.
65,600
Jumlah (2)
Jumlah (1) + (2)

=
=
=
=
=
=

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

262.50
39,400.00
459.50
16.40
40,138.40
74,628.40

15,130 = Rp.
= Rp.

15,130.00
15,130.00

1 buah pasang engsel pintu


Bahan
- engsel pintu

6.5.2
-

Tenaga
Pekerja
Tukang Kayu
Kepala Tukang
Mandor

1.000 Bh

0.015
0.150
0.015
0.00075

Oh
Oh
Oh
Oh

x Rp.
Jumlah (1)
x
x
x
x

Rp.
52,500
Rp.
78,800
Rp.
91,900
Rp.
65,600
Jumlah (2)
Jumlah (1) + (2)

=
=
=
=
=
=

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

787.50
11,820.00
1,378.50
49.20
14,035.20
29,165.20

PKK 6.6
6.6.1

1 buah pasang engsel jendela kupu-kupu


Bahan
- Engsel jendela

6.6.2
-

PKK 6.7
6.7.1

Bahan
- Engsel angin

PKK 6.8

Oh
Oh
Oh
Oh

x
x
x
x

15,730 = Rp.
= Rp.

Rp.
52,500
Rp.
78,800
Rp.
91,900
Rp.
65,600
Jumlah (2)
Jumlah (1) + (2)

=
=
=
=
=
=

15,730.00
15,730.00

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

525.00
7,880.00
919.00
32.80
9,356.80
25,086.80

Tenaga
Pekerja
Tukang Kayu
Kepala Tukang
Mandor

1.000 Bh

x Rp.
Jumlah (1)

25,050 = Rp.
= Rp.

25,050.00
25,050.00

0.020
0.200
0.020
0.010

x
x
x
x

Oh
Oh
Oh
Oh

Rp.
52,500
Rp.
78,800
Rp.
91,900
Rp.
65,600
Jumlah (2)
Jumlah (1) + (2)

=
=
=
=
=
=

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

1,050.00
15,760.00
1,838.00
656.00
19,304.00
44,354.00

9,080 = Rp.
= Rp.

9,080.00
9,080.00

1 buah pasang spring knip


Bahan
- Spring knip

6.8.2
-

PKK 6.9
6.9.1

0.010
0.100
0.010
0.0005

x Rp.
Jumlah (1)

1 buah pasang engsel angin

6.7.2

6.8.1

Tenaga
Pekerja
Tukang Kayu
Kepala Tukang
Mandor

1.000 Bh

Tenaga
Pekerja
Tukang Kayu
Kepala Tukang
Mandor

1.000 Bh

0.015
0.150
0.015
0.00075

Oh
Oh
Oh
Oh

x Rp.
Jumlah (1)
x
x
x
x

Rp.
52,500
Rp.
78,800
Rp.
91,900
Rp.
65,600
Jumlah (2)
Jumlah (1) + (2)

=
=
=
=
=
=

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

787.50
11,820.00
1,378.50
49.20
14,035.20
23,115.20

19,120 = Rp.
= Rp.

19,120.00
19,120.00

1 buah pasang kait angin


Bahan
- Kait angin

6.9.2
-

PKK 6.10

Tenaga
Pekerja
Tukang Kayu
Kepala Tukang
Mandor

0.015
0.150
0.015
0.00075

Oh
Oh
Oh
Oh

x Rp.
Jumlah (1)
x
x
x
x

Rp.
52,500
Rp.
78,800
Rp.
91,900
Rp.
65,600
Jumlah (2)
Jumlah (1) + (2)

=
=
=
=
=
=

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

787.50
11,820.00
1,378.50
49.20
14,035.20
33,155.20

x Rp.
109,750 = Rp.
Jumlah (1)
= Rp.

109,750.00
109,750.00

x
x
x
x

2,625.00
39,400.00
4,595.00
164.00
46,784.00
156,534.00

1 buah pasang door closer

6.10.1 Bahan
- Door closer
6.10.2
-

1.000 Bh

Tenaga
Pekerja
Tukang Kayu
Kepala Tukang
Mandor

1.000 Bh

0.050
0.500
0.050
0.0025

Oh
Oh
Oh
Oh

Rp.
52,500
Rp.
78,800
Rp.
91,900
Rp.
65,600
Jumlah (2)
Jumlah (1) + (2)

=
=
=
=
=
=

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

PKK 6.11

1 buah pasang kunci selot

6.11.1 Bahan
- Kunci selot

1.000 Bh

x Rp.
Jumlah (1)

6.11.2
-

0.020
0.200
0.020
0.001

x
x
x
x

PKK 6.12

Tenaga
Pekerja
Tukang Kayu
Kepala Tukang
Mandor

PKK 6.13

1.000 Bh

Tenaga
Pekerja
Tukang Kayu
Kepala Tukang
Mandor

0.050
0.500
0.050
0.0025

PKK 6.14

=
=
=
=
=
=

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

1,050.00
15,760.00
1,838.00
65.60
18,713.60
45,943.60

x Rp.
113,010 = Rp.
Jumlah (1)
= Rp.

113,010.00
113,010.00

Oh
Oh
Oh
Oh

x
x
x
x

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

2,625.00
39,400.00
4,595.00
164.00
46,784.00
159,794.00

38,120 = Rp.
= Rp.

38,120.00
38,120.00

Rp.
52,500
Rp.
78,800
Rp.
91,900
Rp.
65,600
Jumlah (2)
Jumlah (1) + (2)

=
=
=
=
=
=

1 buah pasang door stop

6.13.1 Bahan
- Door stop
6.13.2
-

Rp.
52,500
Rp.
78,800
Rp.
91,900
Rp.
65,600
Jumlah (2)
Jumlah (1) + (2)

27,230.00
27,230.00

1 buah pasang pegangan pintu / door holder

6.12.1 Bahan
- Pegangan pintu / door holder
6.12.2
-

Oh
Oh
Oh
Oh

27,230 = Rp.
= Rp.

1.000 Bh

Tenaga
Pekerja
Tukang Kayu
Kepala Tukang
Mandor

0.010
0.100
0.010
0.0005

Oh
Oh
Oh
Oh

x Rp.
Jumlah (1)
x
x
x
x

Rp.
52,500
Rp.
78,800
Rp.
91,900
Rp.
65,600
Jumlah (2)
Jumlah (1) + (2)

=
=
=
=
=
=

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

525.00
7,880.00
919.00
32.80
9,356.80
47,476.80

1 buah pasang rel pintu dorong

6.14.1 Bahan
- Rel pintu dorong

1.000 Bh

x Rp.
160,330 = Rp.
Jumlah (1)
= Rp.

160,330.00
160,330.00

6.14.2
-

0.060
0.600
0.060
0.003

x
x
x
x

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

3,150.00
47,280.00
5,514.00
196.80
56,140.80
216,470.80

12,340 = Rp.
= Rp.

12,340.00
12,340.00

PKK 6.15

Tenaga
Pekerja
Tukang Kayu
Kepala Tukang
Mandor

Rp.
52,500
Rp.
78,800
Rp.
91,900
Rp.
65,600
Jumlah (2)
Jumlah (1) + (2)

=
=
=
=
=
=

1 buah pasang kunci lemari

6.15.1 Bahan
- Kunci lemari
6.15.2
-

Oh
Oh
Oh
Oh

Tenaga
Pekerja
Tukang Kayu
Kepala Tukang
Mandor

1.000 Bh

0.025
0.250
0.025
0.00125

Oh
Oh
Oh
Oh

x Rp.
Jumlah (1)
x
x
x
x

Rp.
52,500
Rp.
78,800
Rp.
91,900
Rp.
65,600
Jumlah (2)
Jumlah (1) + (2)

=
=
=
=
=
=

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

1,312.50
19,700.00
2,297.50
82.00
23,392.00
35,732.00

PKK 6.16

1 M pasang kaca, tebal 3 mm

6.16.1 Bahan
- Kaca
6.16.2
-

PKK 6.17

Tenaga
Pekerja
Tukang Kayu
Kepala Tukang
Mandor

PKK 6.18

Tenaga
Pekerja
Tukang Kayu
Kepala Tukang
Mandor

PKK 6.19

Tenaga
Pekerja
Tukang Kayu
Kepala Tukang
Mandor

PKK 6.20

Tenaga
Pekerja
Tukang Kayu
Kepala Tukang
Mandor

Oh
Oh
Oh
Oh

x
x
x
x

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

787.50
11,820.00
1,378.50
49.20
14,035.20
109,867.20

1.100

x Rp.
145,200 = Rp.
Jumlah (1)
= Rp.

159,720.00
159,720.00

0.0155
0.1550
0.0155
0.00075

Oh
Oh
Oh
Oh

x
x
x
x

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

813.75
12,214.00
1,424.45
49.20
14,501.40
174,221.40

1.100

x Rp.
232,320 = Rp.
Jumlah (1)
= Rp.

255,552.00
255,552.00

0.0165
0.165
0.0165
0.0008

Oh
Oh
Oh
Oh

x
x
x
x

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

866.25
13,002.00
1,516.35
52.48
15,437.08
270,989.08

x Rp.
111,320 = Rp.
x Rp.
39,330 = Rp.
Jumlah (1)
= Rp.

122,452.00
1,966.50
124,418.50

Oh
Oh
Oh
Oh

x
x
x
x

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

813.75
12,214.00
1,424.45
49.20
14,501.40
138,919.90

1.100

x Rp.
161,700 = Rp.
Jumlah (1)
= Rp.

177,870.00
177,870.00

0.0155
0.1550
0.0155
0.00075

Oh
Oh
Oh
Oh

x
x
x
x

813.75
12,214.00
1,424.45
49.20
14,501.40
192,371.40

Rp.
52,500
Rp.
78,800
Rp.
91,900
Rp.
65,600
Jumlah (2)
Jumlah (1) + (2)

=
=
=
=
=
=

95,832.00
95,832.00

Rp.
52,500
Rp.
78,800
Rp.
91,900
Rp.
65,600
Jumlah (2)
Jumlah (1) + (2)

=
=
=
=
=
=

Rp.
52,500
Rp.
78,800
Rp.
91,900
Rp.
65,600
Jumlah (2)
Jumlah (1) + (2)

=
=
=
=
=
=

1.100 M
0.050 Kg

0.0155
0.1550
0.0155
0.00075

Rp.
52,500
Rp.
78,800
Rp.
91,900
Rp.
65,600
Jumlah (2)
Jumlah (1) + (2)

=
=
=
=
=
=

1 M pasang kaca cermin, tebal 5 mm

6.20.1 Bahan
- Kaca cermin
6.20.2
-

0.015
0.150
0.015
0.00075

87,120 = Rp.
= Rp.

1 M pasang kaca buram, tebal 5 mm

6.19.1 Bahan
- Kaca buram
- Sealent
6.19.2
-

x Rp.
Jumlah (1)

1 M pasang kaca, tebal 8 mm

6.18.1 Bahan
- Kaca polos
6.18.2
-

1 M pasang kaca, tebal 5 mm

6.17.1 Bahan
- Kaca
6.17.2
-

1.100

Tenaga
Pekerja
Tukang Kayu
Kepala Tukang
Mandor

Rp.
52,500
Rp.
78,800
Rp.
91,900
Rp.
65,600
Jumlah (2)
Jumlah (1) + (2)

=
=
=
=
=
=

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

PKK 6.21

1 M pasang kaca cermin, tebal 8 mm

6.21.1 Bahan
- Kaca cermin
6.21.2
-

PKK 6.23

Tenaga
Pekerja
Tukang Kayu
Kepala Tukang
Mandor

PKK 6.24

Tenaga
Pekerja
Tukang Kayu
Kepala Tukang
Mandor

x Rp.
258,720 = Rp.
Jumlah (1)
= Rp.

284,592.00
284,592.00

0.0165
0.165
0.0165
0.0008

Oh
Oh
Oh
Oh

x
x
x
x

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

866.25
13,002.00
1,516.35
52.48
15,437.08
300,029.08

Rp.
52,500
Rp.
78,800
Rp.
91,900
Rp.
65,600
Jumlah (2)
Jumlah (1) + (2)

=
=
=
=
=
=

1.100

x Rp.
151,250 = Rp.
Jumlah (1)
= Rp.

166,375.00
166,375.00

0.0155
0.1550
0.0155
0.00075

Oh
Oh
Oh
Oh

x
x
x
x

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

813.75
12,214.00
1,424.45
49.20
14,501.40
180,876.40

1.100

x Rp.
169,400 = Rp.
Jumlah (1)
= Rp.

186,340.00
186,340.00

0.0250
0.2500
0.0250
0.00125

Oh
Oh
Oh
Oh

x
x
x
x

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

1,312.50
19,700.00
2,297.50
82.00
23,392.00
209,732.00

1.100

x Rp.
193,120 = Rp.
Jumlah (1)
= Rp.

212,432.00
212,432.00

0.0155
0.1550
0.0155
0.00075

Oh
Oh
Oh
Oh

x
x
x
x

813.75
12,214.00
1,424.45
49.20
14,501.40
226,933.40

Rp.
52,500
Rp.
78,800
Rp.
91,900
Rp.
65,600
Jumlah (2)
Jumlah (1) + (2)

=
=
=
=
=
=

1 M pasang kaca patri, tebal 5 mm

6.24.1 Bahan
- Kaca patri
6.24.2
-

1 M pasang kaca "wireglass" , tebal 5 mm

6.23.1 Bahan
- Kaca wireglass
6.23.2
-

1.100

Tenaga
Pekerja
Tukang Kayu
Kepala Tukang
Mandor

Rp.
52,500
Rp.
78,800
Rp.
91,900
Rp.
65,600
Jumlah (2)
Jumlah (1) + (2)

=
=
=
=
=
=

PKK 6.24.A 1 M pasang kaca Reyben, tebal 5 mm


6.24.1 Bahan
- Kaca reyben
6.24.2
-

Tenaga
Pekerja
Tukang Kayu
Kepala Tukang
Mandor

Rp.
52,500
Rp.
78,800
Rp.
91,900
Rp.
65,600
Jumlah (2)
Jumlah (1) + (2)

=
=
=
=
=
=

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

ANALISA BIAYA KONTRUKSI


PEKERJAAN PENGECATAN
PC

6.1
6.1.1

6.1.2

PC

6.2.2

6.3.2

6.4.2

Bahan
- Sabun
Tenaga
- Pekerja
- Mandor

0.150 Oh x Rp.
52,500
0.0025 Oh x Rp.
65,600
Jumlah (2)
Jumlah (1) + (2)

=
=
=
=

605.00
605.00

Rp.
Rp.
Rp.
Rp.

7,875.00
164.00
8,039.00
8,644.00

0.050 Kg x Rp.
10,290 = Rp.
Jumlah (1)
= Rp.

514.50
514.50

0.150 Oh x Rp.
52,500
0.0025 Oh x Rp.
65,600
Jumlah (2)
Jumlah (1) + (2)

=
=
=
=

Rp.
Rp.
Rp.
Rp.

7,875.00
164.00
8,039.00
8,553.50

0.050 Kg x Rp.
10,290 = Rp.
Jumlah (1)
= Rp.

514.50
514.50

1M Mengerok karat cat lama permukaan baja dengan cara manual


Bahan
- Sabun
Tenaga
- Pekerja
- Mandor

0.150 Oh x Rp.
52,500
0.0025 Oh x Rp.
65,600
Jumlah (2)
Jumlah (1) + (2)

=
=
=
=

Rp.
Rp.
Rp.
Rp.

7,875.00
164.00
8,039.00
8,553.50

0.050 Kg x Rp.
10,290 = Rp.
Jumlah (1)
= Rp.

514.50
514.50

1M Menyabun permukaan tembok lama


Bahan
- Sabun
Tenaga
- Pekerja
- Mandor

6.6
6.4 .1

0.050 Kg x Rp.
12,100 = Rp.
Jumlah (1)
= Rp.

1M Mencuci bidang permukaan tembok yang pernah di cat

6.4
6.4 .1

PC

Tenaga
- Pekerja
- Mandor

6.3.
6.3 .1

PC

Bahan
- Soda api

6.2.
6.2.1

PC

1M Mengikis/ mengerok permukaan cat tembok lama

0.150 Oh x Rp.
52,500
0.0025 Oh x Rp.
65,600
Jumlah (2)
Jumlah (1) + (2)

=
=
=
=

Rp.
Rp.
Rp.
Rp.

7,875.00
164.00
8,039.00
8,553.50

0.080 Kg x Rp.
11,860 = Rp.
0.020 Kg x Rp.
11,010 = Rp.
0.100 Lbr x Rp.
1,820 = Rp.
Jumlah (1)
= Rp.

948.80
220.20
182.00
1,351.00

1M Mendempul dan menggosok kayu


Bahan
- Dempul jadi
- Minyak cat
- Amplas

6.4.2
-

Tenaga
Pekerja
Tukang cat
Kepala tukang
Mandor

0.040
0.040
0.040
0.0025

Oh
Oh
Oh
Oh

x
x
x
x

Rp.
52,500
Rp.
78,800
Rp.
91,900
Rp.
65,600
Jumlah (2)
Jumlah (1) + (2)

=
=
=
=
=
=

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

2,100.00
3,152.00
3,676.00
164.00
9,092.00
10,443.00

PC

6.7
6.7.1

1M Pengecatan bidang kayu lama


Bahan
- Plamir
- Minyak Cat
- Cat Minyak

6.7.2
-

PC

6.8

Oh
Oh
Oh
Oh

x
x
x
x

Rp.
52,500
Rp.
78,800
Rp.
91,900
Rp.
65,600
Jumlah (2)
Jumlah (1) + (2)

=
=
=
=
=
=

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

3,675.00
5,910.00
689.25
164.00
10,438.25
20,738.45

Bahan
Cat menie kayu
Plamir
Cat dasar
Cat Minyak

0.200
0.150
0.170
0.260

Kg
Kg
Kg
Kg

x
x
x
x

Rp.
Rp.
Rp.
Rp.
Jumlah (1)

20,570
15,730
15,730
35,700

=
=
=
=
=

Rp.
Rp.
Rp.
Rp.
Rp.

4,114.00
2,359.50
2,674.10
9,282.00
18,429.60

Tenaga
Pekerja
Tukang cat
Kepala tukang
Mandor

0.070
0.090
0.0090
0.0025

Oh
Oh
Oh
Oh

x
x
x
x

Rp.
52,500
Rp.
78,800
Rp.
91,900
Rp.
65,600
Jumlah (2)
Jumlah (1) + (2)

=
=
=
=
=
=

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

3,675.00
7,092.00
827.10
164.00
11,758.10
30,187.70

6.8.2

6.9

1M Pengecatan bidang kayu baru 1 lps plamir, 1 lps cat dasar, 3lps cat minyak

6.9.1
-

Bahan
Cat menie kayu
Plamir
Minyak Cat
Cat Minyak

0.200
0.150
0.170
0.350

Kg
Kg
Kg
Kg

x
x
x
x

Rp.
Rp.
Rp.
Rp.
Jumlah (1)

20,570
15,730
11,010
35,700

=
=
=
=
=

Rp.
Rp.
Rp.
Rp.
Rp.

4,114.00
2,359.50
1,871.70
12,495.00
20,840.20

Tenaga
Pekerja
Tukang cat
Kepala tukang
Mandor

0.070
0.105
0.0105
0.0025

Oh
Oh
Oh
Oh

x
x
x
x

Rp.
52,500
Rp.
78,800
Rp.
91,900
Rp.
65,600
Jumlah (2)
Jumlah (1) + (2)

=
=
=
=
=
=

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

3,675.00
8,274.00
964.95
164.00
13,077.95
33,918.15

0.150 Kg x Rp.
11,010 = Rp.
0.372 Kg x Rp.
48,280 = Rp.
2.000 Kg x Rp.
1,820 = Rp.
Jumlah (1)
= Rp.

1,651.50
17,960.16
3,640.00
23,251.66

6.9.2

PC

0.070
0.075
0.0075
0.0025

2,359.50
1,871.70
6,069.00
10,300.20

1M Pengecatan bidang kayu baru 1 lps plamir, 1 lps cat dasar, 2 lps cat minyak

6.8.1

PC

Tenaga
Pekerja
Tukang cat
Kepala tukang
Mandor

0.150 Kg x Rp.
15,730 = Rp.
0.170 Kg x Rp.
11,010 = Rp.
0.170 Kg x Rp.
35,700 = Rp.
Jumlah (1)
= Rp.

6.11

1M Peleburan kayu dengan politur

6.11.1
-

Bahan
Minyak politur
Politur Jadi / vernis
Amplas

6.11.2
-

Tenaga
Pekerja
Tukang cat
Kepala tukang
Mandor

0.040
0.060
0.0160
0.0025

Oh
Oh
Oh
Oh

x
x
x
x

Rp.
52,500
Rp.
78,800
Rp.
91,900
Rp.
65,600
Jumlah (2)
Jumlah (1) + (2)

=
=
=
=
=
=

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

2,100.00
4,728.00
1,470.40
164.00
8,462.40
31,714.06

PC

6.12 1M Peleburan kayu dengan residu


6.12.1 Bahan
- Residu
6.12.2 Tenaga
- Pekerja
- Mandor

PC

PC

PC

0.350 Kg x Rp.
Jumlah (1)

6,530 = Rp.
= Rp.

0.100 Oh x Rp.
52,500
0.006 Oh x Rp.
65,600
Jumlah (2)
Jumlah (1) + (2)

=
=
=
=

2,285.50
2,285.50

Rp.
Rp.
Rp.
Rp.

5,250.00
393.60
5,643.60
7,929.10

7,242.00
593.00
182.00
78.70
8,095.70

6.13 1M Peleburan bidang kayu dan vernis


6.13.1
-

Bahan
Vernis
Dempul
Ampelas
Kuas

6.13.2
-

Tenaga
Pekerja
Tukang cat
Kepala tukang
Mandor

0.150
0.050
0.100
0.010

Ltr
Kg
Lbr
bh

x
x
x
x

Rp.
48,280 = Rp.
Rp.
11,860 = Rp.
Rp.
1,820 = Rp.
Rp.
7,870 = Rp.
Jumlah (1)
= Rp.

0.160
0.160
0.016
0.0025

Oh
Oh
Oh
Oh

x
x
x
x

Rp.
52,500
Rp.
78,800
Rp.
91,900
Rp.
65,600
Jumlah (2)
Jumlah (1) + (2)

=
=
=
=
=
=

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

8,400.00
12,608.00
1,470.40
164.00
22,642.40
30,738.10

6.14 1M Pengecatan tembok baru ( 1 lapis plamir, 1 lapis cat dasar, 2 lapis cat penutup )
6.14.1
-

Bahan
Plamir
Cat dasar
Cat tembok 2 x

6.14.2
-

Tenaga
Pekerja
Tukang cat
Kepala tukang
Mandor

0.120 Kg x Rp.
15,730 = Rp.
0.120 Kg x Rp.
15,730 = Rp.
0.260 Kg x Rp.
19,360 = Rp.
Jumlah (1)
= Rp.
0.040
0.120
0.0120
0.002

Oh
Oh
Oh
Oh

x
x
x
x

Rp.
52,500
Rp.
78,800
Rp.
91,900
Rp.
65,600
Jumlah (2)
Jumlah (1) + (2)

=
=
=
=
=
=

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

1,887.60
1,887.60
5,033.60
8,808.80
2,100.00
9,456.00
1,102.80
131.20
12,790.00
21,598.80

6.15 1M Pengecatan tembok lama ( 1 lapis cat dasar, 2 lapis cat penutup )
6.15.1 Bahan
- Cat dasar
- Cat tembok 2 x
6.15.2
-

Tenaga
Pekerja
Tukang cat
Kepala tukang
Mandor

0.120 Kg x Rp.
15,730 = Rp.
0.260 Kg x Rp.
19,360 = Rp.
Jumlah (1)
= Rp.
0.030
0.090
0.0090
0.0015

Oh
Oh
Oh
Oh

x
x
x
x

Rp.
52,500
Rp.
78,800
Rp.
91,900
Rp.
65,600
Jumlah (2)
Jumlah (1) + (2)

=
=
=
=
=
=

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

1,887.60
5,033.60
6,921.20
1,575.00
7,092.00
827.10
98.40
9,592.50
16,513.70

PC

6.19 1M Pemasangan wall paper


6.19.1 Bahan
- wall paper
- Perekat lem karet
6.19.2
-

PC

Tenaga
Pekerja
Tukang cat
Kepala tukang
Mandor

6.20.2
-

PC

0.020
0.200
0.002
0.0025

Oh
Oh
Oh
Oh

x
x
x
x

Rp.
52,500
Rp.
78,800
Rp.
91,900
Rp.
65,600
Jumlah (2)
Jumlah (1) + (2)

=
=
=
=
=
=

36,732.00
8,980.00
45,712.00

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

1,050.00
15,760.00
183.80
164.00
17,157.80
62,869.80

0.100 Kg x Rp.
25,410 = Rp.
0.010 Bh x Rp.
7,870 = Rp.
Jumlah (1)
= Rp.

2,541.00
78.70
2,619.70

0.020
0.020
0.02
0.01

6.20 1M Pengecatan permukaan baja dengan meni besi


6.20.1 Bahan
- Meni besi
- Kuas

PC

1.200 M x Rp.
30,610 = Rp.
0.200 Kg x Rp.
44,900 = Rp.
Jumlah (1)
= Rp.

Tenaga
Pekerja
Tukang cat
Kepala tukang
Mandor

Oh
Oh
Oh
Oh

x
x
x
x

Rp.
52,500
Rp.
78,800
Rp.
91,900
Rp.
65,600
Jumlah (2)
Jumlah (1) + (2)

=
=
=
=
=
=

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

1,050.00
1,576.00
1,838.00
656.00
5,120.00
7,739.70

=
=
=
=

Rp.
Rp.
Rp.
Rp.

2,541.00
78.70
6,215.00
8,834.70

=
=
=
=
=
=

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

13,125.00
17,730.00
2,067.75
492.00
33,414.75
42,249.45

0.300 Kg x Rp.
39,330 = Rp.
Jumlah (1)
= Rp.

11,799.00
11,799.00

6.21. 1M Pengecatan permukaan baja dengan meni besi dan perancah


6.21.1
-

Bahan
Meni besi
Kuas
Peranca kayu

6.21.2
-

Tenaga
Pekerja
Tukang cat
Kepala tukang
Mandor

0.100 Kg x Rp.
25,410
0.010 Bh x Rp.
7,870
0.002 M x Rp.
3,107,500
Jumlah (1)
0.250
0.225
0.0225
0.0075

Oh
Oh
Oh
Oh

x
x
x
x

Rp.
52,500
Rp.
78,800
Rp.
91,900
Rp.
65,600
Jumlah (2)
Jumlah (1) + (2)

6.23. 1M Pengecatan permukaan baja lapis seng (galbani) secara manual


sistem 1 lapis cat konvensional dengan tebal 200 um.
6.23.1 Bahan
- Cat Minyak besi
6.23.2
-

Tenaga
Pekerja
Tukang cat
Kepala tukang
Mandor

0.060
0.060
0.1200
0.006

Oh
Oh
Oh
Oh

x
x
x
x

Rp.
52,500
Rp.
78,800
Rp.
91,900
Rp.
65,600
Jumlah (2)
Jumlah (1) + (2)

=
=
=
=
=
=

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

3,150.00
4,728.00
11,028.00
393.60
19,299.60
31,098.60

PC

PC

6.24. 1M Pengecatan permukaan baja lapis seng (galbani) secara manual


sistem 3 lapis cat konvensional dengan tebal 200 um.
6.24.1
-

Bahan
Cat dasar
Cat menie besi
Cat minyak besi

6.24.2
-

Tenaga
Pekerja
Tukang cat
Kepala tukang
Mandor

0.110 Kg x Rp.
15,730 = Rp.
0.170 Kg x Rp.
25,410 = Rp.
0.080 Kg x Rp.
39,330 = Rp.
Jumlah (1)
= Rp.
0.500
0.800
0.300
0.200

Oh
Oh
Oh
Oh

x
x
x
x

Rp.
52,500
Rp.
78,800
Rp.
91,900
Rp.
65,600
Jumlah (2)
Jumlah (1) + (2)

=
=
=
=
=
=

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

1,730.30
4,319.70
3,146.40
9,196.40
26,250.00
63,040.00
27,570.00
13,120.00
129,980.00
139,176.40

6.25. 1M Pengecatan permukaan baja lapis seng (galbani) secara semprot


(airless spray) dengan sistem 1 lapis cat konvensional dengan tebal 200 um.
6.25.1 Bahan
- Cat dasar
6.25.2
-

Tenaga
Pekerja
Tukang cat
Kepala tukang
Mandor

0.300 Kg x Rp.
Jumlah (1)

15,730 = Rp.
= Rp.

0.400
0.700
0.200
0.200

52,500
78,800
91,900
65,600

Oh
Oh
Oh
Oh

x Rp.
x Rp.
x Rp.
x Rp.
Jumlah (2)
Jumlah (1) + (2)

=
=
=
=
=
=

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

4,719.00
4,719.00
21,000.00
55,160.00
18,380.00
13,120.00
107,660.00
112,379.00

ANALISA BIAYA KONSTRUKSI


PEKERJAAN SANITASI
PS 6.1.

Memasang 1 buah kloset duduk/monoblok

6.1.1. Bahan
- Klosed duduk/monoblok
- Perlengkapan
6%
6.1.2.
-

PS 6.2.

Tenaga
Pekerja
Tukang batu
Kepala tukang
Mandor

1.000 Bh x Rp.
harga klosed x Rp.

3.300
1.500
0.150
0.160

Oh
Oh
Oh
Oh

x
x
x
x

1,931,600 = Rp.
1,931,600 = Rp.
Jumlah (1)
= Rp.

1,931,600.00
115,896.00
2,047,496.00

Rp.
Rp.
Rp.
Rp.

52,500
78,800
91,900
65,600
Jumlah (2)
Jumlah (1) +(2)

=
=
=
=
=
=

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

173,250.00
118,200.00
13,785.00
10,496.00
315,731.00
2,363,227.00

Memasang 1 buah kloset jongkok porselen

6.2.1.
-

Bahan
Klosed jongkok porselin
Semen portland
Pasir pasang

1.000 Bh x Rp.
6.000 Kg x Rp.
0.010 M x Rp.

225,280
1,270
76,500
Jumlah (1)

=
=
=
=

Rp.
Rp.
Rp.
Rp.

225,280.00
7,620.00
765.00
233,665.00

6.2.2.
-

Tenaga
Pekerja
Tukang batu
Kepala tukang
Mandor

1.100
1.500
0.150
0.110

PS 6.3.

Oh
Oh
Oh
Oh

x
x
x
x

Rp.
Rp.
Rp.
Rp.

52,500
78,800
91,900
65,600
Jumlah (2)
Jumlah (1) +(2)

=
=
=
=
=
=

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

57,750.00
118,200.00
13,785.00
7,216.00
196,951.00
430,616.00

Memasang 1 buah kloset jongkok teraso

6.3.1.
-

Bahan
Klosed jongkok teraso
Bata merah 5x10x20 cm
Semen portland
Pasir pasang

1.000
7.000
6.000
0.010

Bh
Bh
Kg
M

x
x
x
x

Rp.
Rp.
Rp.
Rp.

526,350
610
1,270
76,500
Jumlah (1)

=
=
=
=
=

Rp.
Rp.
Rp.
Rp.
Rp.

526,350.00
4,270.00
7,620.00
765.00
539,005.00

6.3.2.
-

Tenaga
Pekerja
Tukang batu
Kepala tukang
Mandor

1.000
1.500
0.150
0.100

Oh
Oh
Oh
Oh

x
x
x
x

Rp.
Rp.
Rp.
Rp.

52,500
78,800
91,900
65,600
Jumlah (2)
Jumlah (1) +(2)

=
=
=
=
=
=

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

52,500.00
118,200.00
13,785.00
6,560.00
191,045.00
730,050.00

PS 6.4

Memasang 1 buah urinoir

6.4.1.
-

Bahan
Urinoir
Perlengkapan
Semen portland
Pasir pasang

6.4.2.
-

Tenaga
Pekerja
Tukang batu
Kepala tukang
Mandor

PS 6.5

1.000 Bh
harga urinoir
6.000 Kg
0.010 M

Rp.
Rp.
Rp.
Rp.

557,480
557,480
1,270
76,500
Jumlah (1)

=
=
=
=
=

Rp.
Rp.
Rp.
Rp.
Rp.

557,480.00
83,622.00
7,620.00
765.00
649,487.00

Oh
Oh
Oh
Oh

x
x
x
x

Rp.
Rp.
Rp.
Rp.

52,500
78,800
91,900
65,600
Jumlah (2)
Jumlah (1) +(2)

=
=
=
=
=
=

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

52,500.00
78,800.00
9,190.00
6,560.00
147,050.00
796,537.00

1.000 Bh
12% harga wastafel
6.000 Kg
0.010 M

x
x
x
x

Rp.
Rp.
Rp.
Rp.

526,350
526,350
1,270
76,500
Jumlah (1)

=
=
=
=
=

Rp.
Rp.
Rp.
Rp.
Rp.

526,350.00
63,162.00
7,620.00
765.00
597,897.00

x
x
x
x

Rp.
Rp.
Rp.
Rp.

52,500
78,800
91,900
65,600
Jumlah (2)
Jumlah (1) +(2)

=
=
=
=
=
=

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

63,000.00
114,260.00
13,785.00
6,560.00
197,605.00
795,502.00

1.000
1.000
0.100
0.100

Memasang 1 buah wastafel

6.5.1.
-

Bahan
Wastafel
Perlengkapan
Semen portland
Pasir pasang

6.5.2.
-

Tenaga
Pekerja
Tukang batu
Kepala tukang
Mandor

PS 6.6.

x
x
x
x

15%

1.200
1.450
0.150
0.100

Oh
Oh
Oh
Oh

Memasang 1 buah bak mandi teraso volume 0,30 m

6.6.1.
-

Bahan
Bak teraso
Semen portland
Pasir pasang

1.000 Bh x Rp.
6.000 Kg x Rp.
0.010 M x Rp.

181,500
1,270
76,500
Jumlah (1)

=
=
=
=

Rp.
Rp.
Rp.
Rp.

181,500.00
7,620.00
765.00
189,885.00

6.6.2.
-

Tenaga
Pekerja
Tukang batu
Kepala tukang
Mandor

2.100
0.750
0.075
0.110

52,500
78,800
91,900
65,600
Jumlah (2)
Jumlah (1) +(2)

=
=
=
=
=
=

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

110,250.00
59,100.00
6,892.50
7,216.00
183,458.50
373,343.50

Oh
Oh
Oh
Oh

x
x
x
x

Rp.
Rp.
Rp.
Rp.

PS 6.7.

Memasang 1 buah bak mandi fibreglass volume 0,30 m

6.7.1. Bahan
- Bak fibreglass
- Perlengkapan
6.7.2.
-

18%

Tenaga
Pembantu tukang
Tukang batu
Kepala tukang
Mandor

1.000 Bh x Rp.
Harga bak x Rp.

181,500 = Rp.
181,500 = Rp.
Jumlah (1)
= Rp.

181,500.00
32,670.00
214,170.00

1.800
0.540
0.054
0.110

52,500
78,800
91,900
65,600
Jumlah (2)
Jumlah (1) +(2)

Oh
Oh
Oh
Oh

x
x
x
x

Rp.
Rp.
Rp.
Rp.

=
=
=
=
=
=

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

94,500.00
42,552.00
4,962.60
7,216.00
149,230.60
363,400.60

0.35129

PS 6.8.

Memasang 1 buah bak mandi batu bata volume 0,30 m

6.8.1.
-

Bahan
Batu bata
Semen portland
Pasir pasang
Porselin (11x11) cm
Semen putih

6.8.2.
-

Tenaga
Pekerja
Tukang batu
Kepala tukang
Mandor

PS 6.9.

M
Kg
M
Bh
Kg

x
x
x
x
x

Rp.
Rp.
Rp.
Rp.
Rp.

720
1,270
76,500
145
2,500
Jumlah (1)

=
=
=
=
=
=

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

31,680.00
152,400.00
22,950.00
52,200.00
15,000.00
274,230.00

3.000
3.000
0.300
0.300

Oh
Oh
Oh
Oh

x
x
x
x

Rp.
Rp.
Rp.
Rp.

52,500
78,800
91,900
65,600
Jumlah (2)
Jumlah (1) +(2)

=
=
=
=
=
=

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

157,500.00
236,400.00
27,570.00
19,680.00
441,150.00
715,380.00

3,025,000 = Rp.
3,025,000 = Rp.
Jumlah (1)
= Rp.

3,025,000.00
605,000.00
3,630,000.00

52,500
78,800
91,900
65,600
Jumlah (2)
Jumlah (1) +(2)

131,250.00
59,100.00
6,892.50
16,400.00
213,642.50
3,843,642.50

Memasang 1 buah badkip porselin

6.9.1. Bahan
- Badkip
- Perlengkapan
6.9.2.
-

44.000
120.000
0.300
360.000
6.000

Tenaga
Pekerja
Tukang batu
Kepala tukang
Mandor

20%

1.000 Bh x Rp.
Harga badkip x Rp.

2.500
0.750
0.075
0.250

Oh
Oh
Oh
Oh

x
x
x
x

Rp.
Rp.
Rp.
Rp.

=
=
=
=
=
=

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

PS 6.10. Memasang 1 buah bak mandi beton volume 1 m air


6.10.1.Bahan
- Beton 1 : 1 : 2
- Besi beton
- Kayu cetakan
- Ubin porselin
- Perlengkapan

0.900 M
180.000 Kg
0.096 M
420.000 M
10% Hrg total bahan

6.10.2.Tenaga
- Pekerja
- Tukang batu
- Kepala tukang
- Mandor

x
x
x
x
x

Rp.
Rp.
Rp.
Rp.
Rp.

12,500
14,410
3,107,500
145
2,964,270
Jumlah (1)

=
=
=
=
=
=

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

11,250.00
2,593,800.00
298,320.00
60,900.00
296,427.00
3,260,697.00

x
x
x
x

Rp.
Rp.
Rp.
Rp.

52,500
78,800
91,900
65,600
Jumlah (2)
Jumlah (1) +(2)

=
=
=
=
=
=

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

183,750.00
354,600.00
82,710.00
59,040.00
680,100.00
3,940,797.00

1.000 Bh x Rp.
Harga bak x Rp.

181,500 = Rp.
181,500 = Rp.
Jumlah (1)
= Rp.

181,500.00
21,780.00
203,280.00

3.000
4.500
0.900
0.900

52,500
78,800
91,900
65,600
Jumlah (2)
Jumlah (1) +(2)

3.500
4.500
0.900
0.900

Oh
Oh
Oh
Oh

PS 6.11. Memasang 1 buah bak fibreglass volume 1 m air


6.11.1.Bahan
- Bak fibreglass
- Perlengkapan
6.11.2.Tenaga
- Pekerja
- Tukang batu
- Kepala tukang
- Mandor

12%

Oh
Oh
Oh
Oh

x
x
x
x

Rp.
Rp.
Rp.
Rp.

=
=
=
=
=
=

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

157,500.00
354,600.00
82,710.00
59,040.00
653,850.00
857,130.00

PS 6.15. Memasang 1 m' pipa beton, diameter 30 cm - 100 cm


6.15.1.Bahan
- Pipa beton
- Batu bata
- Semen portland
- Pasir pasang
- Pasir urug
6.15.2.Tenaga
- Pekerja
- Tukang batu
- Kepala tukang
- Mandor

1.100
55.000
10.300
0.061
0.069

Bh
Bh
Kg
M
M

x
x
x
x
x

Rp.
Rp.
Rp.
Rp.
Rp.

56,270
720
1,270
76,500
64,400
Jumlah (1)

=
=
=
=
=
=

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

61,897.00
39,600.00
13,081.00
4,666.50
4,443.60
123,688.10

0.380
0.190
0.019
0.019

Oh
Oh
Oh
Oh

x
x
x
x

Rp.
Rp.
Rp.
Rp.

52,500
78,800
91,900
65,600
Jumlah (2)
Jumlah (1) +(2)

=
=
=
=
=
=

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

19,950.00
14,972.00
1,746.10
1,246.40
37,914.50
161,602.60

PS 6.16. Memasang 1 buah bak kontrol pasangan batu bata ukuran (30 x 30) cm
tinggi 35 cm
6.16.1.Bahan
- Batu bata
- Semen portland
- Pasir pasang
- Batu kerikil
- Besi beton
- Pasir beton
6.16.2.Tenaga
- Pekerja
- Tukang batu
- Kepala tukang
- Mandor

145.000
44.000
0.070
0.070
1.600
0.060

Bh
Kg
M
M
Kg
M

x
x
x
x
x
x

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

720
1,270
76,500
185,900
14,410
87,800
Jumlah (1)

=
=
=
=
=
=
=

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

104,400.00
55,880.00
5,355.00
13,013.00
23,056.00
5,268.00
206,972.00

3.200
1.015
0.0015
0.016

Oh
Oh
Oh
Oh

x
x
x
x

Rp.
Rp.
Rp.
Rp.

52,500
78,800
91,900
65,600
Jumlah (2)
Jumlah (1) +(2)

=
=
=
=
=
=

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

168,000.00
79,982.00
137.85
1,049.60
249,169.45
456,141.45

PS 6.17. Memasang 1 buah bak kontrol pasangan batu bata ukuran (45 x 45) cm
tinggi 50 cm
6.17.1.Bahan
- Batu bata
- Semen portland
- Pasir pasang
- Batu kerikil
- Besi beton
- Pasir beton
6.17.2.Tenaga
- Pekerja
- Tukang batu
- Kepala tukang
- Mandor

250.000
77.000
0.130
0.020
2.600
0.090

Bh
Kg
M
M
Kg
M

x
x
x
x
x
x

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

720
1,270
76,500
185,900
14,410
87,800
Jumlah (1)

=
=
=
=
=
=
=

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

180,000.00
97,790.00
9,945.00
3,718.00
37,466.00
7,902.00
336,821.00

1.420
0.473
0.047
0.071

Oh
Oh
Oh
Oh

x
x
x
x

Rp.
Rp.
Rp.
Rp.

52,500
78,800
91,900
65,600
Jumlah (2)
Jumlah (1) +(2)

=
=
=
=
=
=

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

74,550.00
37,272.40
4,319.30
4,657.60
120,799.30
457,620.30

PS 6.18. Memasang 1 buah bak kontrol pasangan batu bata ukuran (60 x 60) cm
tinggi 65 cm
6.18.1.Bahan
- Batu bata
- Semen portland
- Pasir pasang
- Batu koral
- Besi beton
- Pasir beton
6.18.2.Tenaga
- Pekerja
- Tukang batu
- Kepala tukang
- Mandor
- Tukang gali

371.000
114.000
0.184
0.033
4.850
0.120

Bh
Kg
M
M
Kg
M

x
x
x
x
x
x

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

720
1,270
76,500
185,900
14,410
87,800
Jumlah (1)

=
=
=
=
=
=
=

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

267,120.00
144,780.00
14,076.00
6,134.70
69,888.50
10,536.00
512,535.20

2.160
0.720
0.072
0.108
0.100

Oh
Oh
Oh
Oh
Oh

x
x
x
x
x

Rp.
Rp.
Rp.
Rp.
Rp.

52,500
78,800
91,900
65,600
52,500
Jumlah (2)
Jumlah (1) +(2)

=
=
=
=
=
=
=

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

113,400.00
56,736.00
6,616.80
7,084.80
5,250.00
189,087.60
701,622.80

PS 6.19. Memasang 1 m' pipa galvanis diameter "


6.19.1.Bahan
- Pipa galvanis
- Perlengkapan

35%

6.19.2.Tenaga
- Pekerja
- Tukang batu
- Kepala tukang
- Mandor

1.200 M x Rp.
harga pipa x Rp.

14,770 = Rp.
14,770 = Rp.
Jumlah (1)
= Rp.

17,724.00
5,169.50
22,893.50

0.054
0.090
0.009
0.027

52,500
78,800
91,900
65,600
Jumlah (2)
Jumlah (1) +(2)

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

2,835.00
7,092.00
827.10
1,771.20
12,525.30
35,418.80

1.200 M x Rp.
harga pipa x Rp.

20,140 = Rp.
20,140 = Rp.
Jumlah (1)
= Rp.

24,168.00
7,049.00
31,217.00

0.054
0.090
0.009
0.027

52,500
78,800
91,900
65,600
Jumlah (2)
Jumlah (1) +(2)

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

2,835.00
7,092.00
827.10
1,771.20
12,525.30
43,742.30

1.200 M x Rp.
harga pipa x Rp.

29,520 = Rp.
29,520 = Rp.
Jumlah (1)
= Rp.

35,424.00
10,332.00
45,756.00

0.054
0.090
0.009
0.027

52,500
78,800
91,900
65,600
Jumlah (2)
Jumlah (1) +(2)

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

2,835.00
7,092.00
827.10
1,771.20
12,525.30
58,281.30

1.200 M x Rp.
harga pipa x Rp.

37,580 = Rp.
37,580 = Rp.
Jumlah (1)
= Rp.

45,096.00
13,153.00
58,249.00

0.108
0.180
0.018
0.0054

52,500
78,800
91,900
65,600
Jumlah (2)
Jumlah (1) +(2)

5,670.00
14,184.00
1,654.20
354.24
21,862.44
80,111.44

Oh
Oh
Oh
Oh

x
x
x
x

Rp.
Rp.
Rp.
Rp.

=
=
=
=
=
=

PS 6.20. Memasang 1 m' pipa galvanis diameter 3/4"


6.20.1.Bahan
- Pipa galvanis
- Perlengkapan

35%

6.20.2.Tenaga
- Pekerja
- Tukang batu
- Kepala tukang
- Mandor

Oh
Oh
Oh
Oh

x
x
x
x

Rp.
Rp.
Rp.
Rp.

=
=
=
=
=
=

PS 6.21. Memasang 1 m' pipa galvanis diameter 1"


6.21.1.Bahan
- Pipa galvanis
- Perlengkapan

35%

6.21.2.Tenaga
- Pekerja
- Tukang batu
- Kepala tukang
- Mandor

Oh
Oh
Oh
Oh

x
x
x
x

Rp.
Rp.
Rp.
Rp.

=
=
=
=
=
=

PS 6.22. Memasang 1 m' pipa galvanis diameter 1 "


6.22.1.Bahan
- Pipa galvanis
- Perlengkapan
6.22.2.Tenaga
- Pekerja
- Tukang batu
- Kepala tukang
- Mandor

35%

Oh
Oh
Oh
Oh

x
x
x
x

Rp.
Rp.
Rp.
Rp.

=
=
=
=
=
=

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

PS 6.23. Memasang 1 m' pipa galvanis diameter 2"


6.23.1.Bahan
- Pipa galvanis
- Perlengkapan

35%

6.23.2.Tenaga
- Pekerja
- Tukang batu
- Kepala tukang
- Mandor

1.200 M x Rp.
harga pipa x Rp.

47,600 = Rp.
47,600 = Rp.
Jumlah (1)
= Rp.

57,120.00
16,660.00
73,780.00

0.108
0.180
0.018
0.0054

52,500
78,800
91,900
65,600
Jumlah (2)
Jumlah (1) +(2)

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

5,670.00
14,184.00
1,654.20
354.24
21,862.44
95,642.44

1.200 M x Rp.
harga pipa x Rp.

52,440 = Rp.
52,440 = Rp.
Jumlah (1)
= Rp.

62,928.00
18,354.00
81,282.00

0.135
0.225
0.0225
0.0068

52,500
78,800
91,900
65,600
Jumlah (2)
Jumlah (1) +(2)

Oh
Oh
Oh
Oh

x
x
x
x

Rp.
Rp.
Rp.
Rp.

=
=
=
=
=
=

PS 6.24. Memasang 1 m' pipa galvanis diameter 3"


6.24.1.Bahan
- Pipa galvanis
- Perlengkapan

35%

6.24.2.Tenaga
- Pekerja
- Tukang batu
- Kepala tukang
- Mandor

Oh
Oh
Oh
Oh

x
x
x
x

Rp.
Rp.
Rp.
Rp.

=
=
=
=
=
=

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

7,087.50
17,730.00
2,067.75
446.08
27,331.33
108,613.33

1.200 M x Rp.
harga pipa x Rp.

5,540 = Rp.
5,540 = Rp.
Jumlah (1)
= Rp.

6,648.00
1,939.00
8,587.00

0.036
0.060
0.006
0.0018

52,500
78,800
91,900
65,600
Jumlah (2)
Jumlah (1) +(2)

PS 6.25. Memasang 1 m' pipa PVC tipe AW diameter "


6.25.1.Bahan
- Pipa PVC
- Perlengkapan

35%

6.25.2.Tenaga
- Pekerja
- Tukang batu
- Kepala tukang
- Mandor

Oh
Oh
Oh
Oh

x
x
x
x

Rp.
Rp.
Rp.
Rp.

=
=
=
=
=
=

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

1,890.00
4,728.00
551.40
118.08
7,287.48
15,874.48

1.200 M x Rp.
harga pipa x Rp.

7,440 = Rp.
7,440 = Rp.
Jumlah (1)
= Rp.

8,928.00
2,604.00
11,532.00

0.036
0.060
0.006
0.0018

52,500
78,800
91,900
65,600
Jumlah (2)
Jumlah (1) +(2)

1,890.00
4,728.00
551.40
118.08
7,287.48
18,819.48

PS 6.26. Memasang 1 m' pipa PVC tipe AW diameter "


6.26.1.Bahan
- Pipa PVC
- Perlengkapan
6.26.2.Tenaga
- Pekerja
- Tukang batu
- Kepala tukang
- Mandor

35%

Oh
Oh
Oh
Oh

x
x
x
x

Rp.
Rp.
Rp.
Rp.

=
=
=
=
=
=

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

PS 6.27. Memasang 1 m' pipa PVC tipe AW diameter 1"


6.27.1.Bahan
- Pipa PVC
- Perlengkapan

35%

6.27.2.Tenaga
- Pekerja
- Tukang batu
- Kepala tukang
- Mandor

1.200 M x Rp.
harga pipa x Rp.

13,620 = Rp.
13,620 = Rp.
Jumlah (1)
= Rp.

16,344.00
4,767.00
21,111.00

0.036
0.060
0.006
0.0018

52,500
78,800
91,900
65,600
Jumlah (2)
Jumlah (1) +(2)

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

1,890.00
4,728.00
551.40
118.08
7,287.48
28,398.48

19,670 = Rp.
19,670 = Rp.
Jumlah (1)
= Rp.

23,604.00
6,884.50
30,488.50

52,500
78,800
91,900
65,600
Jumlah (2)
Jumlah (1) +(2)

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

1,890.00
4,728.00
551.40
118.08
7,287.48
37,775.98

1.200 M x Rp.
harga pipa x Rp.

23,190 = Rp.
23,190 = Rp.
Jumlah (1)
= Rp.

27,828.00
8,116.50
35,944.50

0.054
0.090
0.009
0.0027

52,500
78,800
91,900
65,600
Jumlah (2)
Jumlah (1) +(2)

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

2,835.00
7,092.00
827.10
177.12
10,931.22
46,875.72

1.200 M x Rp.
harga pipa x Rp.

26,620 = Rp.
26,620 = Rp.
Jumlah (1)
= Rp.

31,944.00
9,317.00
41,261.00

0.036
0.060
0.006
0.0018

52,500
78,800
91,900
65,600
Jumlah (2)
Jumlah (1) +(2)

1,890.00
4,728.00
551.40
118.08
7,287.48
48,548.48

Oh
Oh
Oh
Oh

x
x
x
x

Rp.
Rp.
Rp.
Rp.

PS 6.28. Memasang 1 m' pipa PVC tipe AW diameter 1 "


6.28.1.Bahan
- Pipa PVC
1.200 M x Rp.
- Perlengkapan
35%
harga pipa x Rp.
6.28.2.Tenaga
- Pekerja
- Tukang batu
- Kepala tukang
- Mandor

0.036
0.060
0.006
0.0018

Oh
Oh
Oh
Oh

x
x
x
x

Rp.
Rp.
Rp.
Rp.

=
=
=
=
=
=

=
=
=
=
=
=

PS 6.29. Memasang 1 m' pipa PVC tipe AW diameter 2"


6.29.1.Bahan
- Pipa PVC
- Perlengkapan

35%

6.29.2.Tenaga
- Pekerja
- Tukang batu
- Kepala tukang
- Mandor

Oh
Oh
Oh
Oh

x
x
x
x

Rp.
Rp.
Rp.
Rp.

=
=
=
=
=
=

PS 6.30. Memasang 1 m' pipa PVC tipe AW diameter 2 "


6.30.1.Bahan
- Pipa PVC
- Perlengkapan
6.30.2.Tenaga
- Pekerja
- Tukang batu
- Kepala tukang
- Mandor

35%

Oh
Oh
Oh
Oh

x
x
x
x

Rp.
Rp.
Rp.
Rp.

=
=
=
=
=
=

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

PS 6.31. Memasang 1 m' pipa PVC tipe AW diameter 3"


6.31.1.Bahan
- Pipa PVC
- Perlengkapan
6.31.2.Tenaga
- Pekerja
- Tukang batu
- Kepala tukang
- Mandor

35%

1.200 M x Rp.
harga pipa x Rp.

29,840 = Rp.
29,840 = Rp.
Jumlah (1)
= Rp.

35,808.00
10,444.00
46,252.00

0.081
0.135
0.0135
0.0041

52,500
78,800
91,900
65,600
Jumlah (2)
Jumlah (1) +(2)

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

4,252.50
10,638.00
1,240.65
268.96
16,400.11
62,652.11

49,920 = Rp.
49,920 = Rp.
Jumlah (1)
= Rp.

59,904.00
17,472.00
77,376.00

52,500
78,800
91,900
65,600
Jumlah (2)
Jumlah (1) +(2)

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

4,252.50
10,638.00
1,240.65
268.96
16,400.11
93,776.11

466,700 = Rp.
15,000 = Rp.
Jumlah (1)
= Rp.

466,700.00
15,000.00
481,700.00

Rp.
Rp.
Rp.
Rp.

52,500
78,800
91,900
65,600
Jumlah (2)
Jumlah (1) +(2)

=
=
=
=
=
=

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

1,575.00
23,640.00
2,757.00
98.40
28,070.40
509,770.40

Oh
Oh
Oh
Oh

x
x
x
x

Rp.
Rp.
Rp.
Rp.

PS 6.32. Memasang 1 m' pipa PVC tipe AW diameter 4"


6.32.1.Bahan
- Pipa PVC
1.200 M x Rp.
- Perlengkapan
35%
harga pipa x Rp.
6.32.2.Tenaga
- Pekerja
- Tukang batu
- Kepala tukang
- Mandor

0.081
0.135
0.0135
0.0041

Oh
Oh
Oh
Oh

x
x
x
x

Rp.
Rp.
Rp.
Rp.

PS 6.33. Memasang 1 bh bak cuci piring stainles steel


6.33.1.Bahan
- Bak cuci stainless steel
1.000 Bh x Rp.
- Water drain asesories
1.000 Set x Rp.
6.33.2.Tenaga
- Pekerja
- Tukang batu
- Kepala tukang
- Mandor

0.030
0.300
0.030
0.0015

Oh
Oh
Oh
Oh

x
x
x
x

=
=
=
=
=
=

=
=
=
=
=
=

PS 6.34. Memasang 1 bh bak cuci piring teraso


6.34.1.Bahan
- Bak cuci teraso
- Water drain + asesories
- Semen portland
- Pasir

1.000
1.000
20.000
0.050

Bh x Rp.
Bh x Rp.
Kg x Rp.
M x Rp.

272,250
15,000
1,270
76,500
Jumlah (1)

=
=
=
=
=

Rp.
Rp.
Rp.
Rp.
Rp.

272,250.00
15,000.00
25,400.00
3,825.00
316,475.00

6.34.2.Tenaga
- Pekerja
- Tukang batu
- Kepala tukang
- Mandor

0.050
0.500
0.050
0.0025

Oh
Oh
Oh
Oh

52,500
78,800
91,900
65,600
Jumlah (2)
Jumlah (1) +(2)

=
=
=
=
=
=

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

2,625.00
39,400.00
4,595.00
164.00
46,784.00
363,259.00

x
x
x
x

Rp.
Rp.
Rp.
Rp.

PS 6.35. Memasang 1 bh kran diameter " atau "


6.35.1.Bahan
- Kran air
- Seal tape

1.000 Bh x Rp.
0.025 Bh x Rp.

27,350 = Rp.
92,570 = Rp.
Jumlah (1)
= Rp.

27,350.00
2,314.25
29,664.25

6.35.2.Tenaga
- Pekerja
- Tukang batu
- Kepala tukang
- Mandor

0.010
0.100
0.010
0.005

52,500
78,800
91,900
65,600
Jumlah (2)
Jumlah (1) +(2)

Rp.
Rp.
Rp.
Rp.

525.00
7,880.00
919.00
328.00
9,652.00
39,316.25

Oh
Oh
Oh
Oh

x
x
x
x

Rp.
Rp.
Rp.
Rp.

=
=
=
=

PS 6.36. Memasang 1 bh Floor drain


6.36.1.Bahan
- Floor drain

1.000 Bh x Rp.

15,000 = Rp.
Jumlah (1)
= Rp.

15,000.00
15,000.00

6.36.2.Tenaga
- Pekerja
- Tukang batu
- Kepala tukang
- Mandor

0.010
0.100
0.010
0.005

52,500
78,800
91,900
65,600
Jumlah (2)
Jumlah (1) +(2)

525.00
7,880.00
919.00
328.00
9,652.00
24,652.00

Oh
Oh
Oh
Oh

x
x
x
x

Rp.
Rp.
Rp.
Rp.

=
=
=
=

Rp.
Rp.
Rp.
Rp.

ANALISA BIAYA KONSTRUKSI


PEKERJAAN BESI DAN ALUMINIUM
PBA 6.1
6.1.1

1 Kg Pasang rangka atap baja


Bahan
- Besi profil WF
- Meni besi

6.1.2.
-

PBA 6.2
6.2.1

Bahan
- Pintu besi baja

PBA 6.3

Tenaga
Tukang besi konstruksi
Pekerja
Kepala tukang
Mandor

Bahan
- Jendela besi

PBA 6.5

17,545.00
2,032.80
19,577.80

x
x
x
x

78,800
52,500
91,900
65,600
Jumlah (2)
Jumlah (1) +(2)

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

472.80
3,150.00
551.40
19.68
4,193.88
23,771.68

Rp.
Rp.
Rp.
Rp.

=
=
=
=
=
=

1.000 M

x Rp.

816,750 = Rp.
Jumlah (1)
= Rp.

816,750.00
816,750.00

0.650
0.650
0.065
0.032

x
x
x
x

78,800
52,500
91,900
65,600
Jumlah (2)
Jumlah (1) +(2)

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

51,220.00
34,125.00
5,973.50
2,099.20
93,417.70
910,167.70

x Rp.

347,270 = Rp.
Jumlah (1)
= Rp.

347,270.00
347,270.00

x
x
x
x

78,800
52,500
91,900
65,600
Jumlah (2)
Jumlah (1) +(2)

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

82,740.00
55,125.00
9,649.50
344.40
147,858.90
495,128.90

Oh
Oh
Oh
Oh

Rp.
Rp.
Rp.
Rp.

=
=
=
=
=
=

Tenaga
Tukang besi konstruksi
Pekerja
Kepala tukang
Mandor

1.000 M

1.050
1.050
0.105
0.00525

Oh
Oh
Oh
Oh

Rp.
Rp.
Rp.
Rp.

=
=
=
=
=
=

1 M Pasang pintu gulung besi


Bahan
- Pintu gulung besi

6.5.2.
-

PBA 6.6
6.6.1

Oh
Oh
Oh
Oh

15,950 = Rp.
25,410 = Rp.
Jumlah (1)
= Rp.

1 M Pasang jendela besi

6.3.2.

6.5.1

0.006
0.060
0.006
0.0003

x Rp.
x Rp.

1 M Pasang pintu besi baja

6.2.2.

6.3.1

Tenaga
Tukang besi
Pekerja
Kepala tukang
Mandor

1.100 Kg
0.080 Kg

Tenaga
Tukang besi konstruksi
Pekerja
Kepala tukang
Mandor

1.000 M

x Rp.

828,850 = Rp.
Jumlah (1)
= Rp.

828,850.00
828,850.00

1.200
1.200
0.120
0.006

x
x
x
x

78,800
52,500
91,900
65,600
Jumlah (2)
Jumlah (1) +(2)

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

94,560.00
63,000.00
11,028.00
393.60
168,981.60
997,831.60

x Rp.

837,320 = Rp.
Jumlah (1)
= Rp.

837,320.00
837,320.00

x
x
x
x

78,800
52,500
91,900
65,600
Jumlah (2)
Jumlah (1) +(2)

82,740.00
55,125.00
9,649.50
341.12
147,855.62
985,175.62

Oh
Oh
Oh
Oh

Rp.
Rp.
Rp.
Rp.

=
=
=
=
=
=

1 M Pasang pintu lipat


Bahan
- Pintu lipat

6.6.2.
-

Tenaga
Tukang besi konstruksi
Pekerja
Kepala tukang
Mandor

1.000 M

1.050
1.050
0.105
0.0052

Oh
Oh
Oh
Oh

Rp.
Rp.
Rp.
Rp.

=
=
=
=
=
=

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

PBA 6.7
6.7.1

1 M Pasang pintu Sunscreen alluminium


Bahan
- Sunscreen alluminium

6.7.2.
-

PBA 6.8
6.8.1

x Rp.

287,380 = Rp.
Jumlah (1)
= Rp.

287,380.00
287,380.00

0.800
0.080
0.080
0.004

x
x
x
x

78,800
52,500
91,900
65,600
Jumlah (2)
Jumlah (1) +(2)

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

63,040.00
4,200.00
7,352.00
262.40
74,854.40
362,234.40

x Rp.

465,850 = Rp.
Jumlah (1)
= Rp.

465,850.00
465,850.00

x
x
x
x

78,800
52,500
91,900
65,600
Jumlah (2)
Jumlah (1) +(2)

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

118,200.00
55,125.00
9,649.50
341.12
183,315.62
649,165.62

x Rp.

405,350 = Rp.
Jumlah (1)
= Rp.

405,350.00
405,350.00

x
x
x
x

78,800
52,500
91,900
65,600
Jumlah (2)
Jumlah (1) +(2)

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

82,740.00
55,125.00
9,649.50
341.12
147,855.62
553,205.62

x Rp.

163,350 = Rp.
Jumlah (1)
= Rp.

163,350.00
163,350.00

x
x
x
x

61,775
52,500
91,900
65,600
Jumlah (2)
Jumlah (1) +(2)

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

21,621.25
18,375.00
3,216.50
114.80
43,327.55
206,677.55

x Rp.

175,450 = Rp.
Jumlah (1)
= Rp.

175,450.00
175,450.00

x
x
x
x

61,775
52,500
91,900
65,600
Jumlah (2)
Jumlah (1) +(2)

21,621.25
18,375.00
3,216.50
114.80
43,327.55
218,777.55

Oh
Oh
Oh
Oh

Rp.
Rp.
Rp.
Rp.

=
=
=
=
=
=

1 M Pasang Rolling door


Bahan
- Roll door

6.8.2.
-

PBA 6.9
6.9.1

Tenaga
Tukang besi konstruksi
Pekerja
Kepala tukang
Mandor

1.000 M

Tenaga
Tukang besi konstruksi
Pekerja
Kepala tukang
Mandor

1.000 M

1.500
1.050
0.105
0.0052

Oh
Oh
Oh
Oh

Rp.
Rp.
Rp.
Rp.

=
=
=
=
=
=

1 M Pasang pintu alluminium


Bahan
- Pintu alluminium

6.9.2.
-

PBA 6.10

Tenaga
Tukang besi konstruksi
Pekerja
Kepala tukang
Mandor

PBA 6.11

Tenaga
Tukang kayu
Pekerja
Kepala tukang
Mandor

Oh
Oh
Oh
Oh

Rp.
Rp.
Rp.
Rp.

=
=
=
=
=
=

1.000 M

0.350
0.350
0.035
0.00175

Oh
Oh
Oh
Oh

Rp.
Rp.
Rp.
Rp.

=
=
=
=
=
=

1 M Pasang Vertikals blinds

6.11.1 Bahan
- Vertikals blinds

6.11.2.
-

1.050
1.050
0.105
0.0052

1 M Pasang Venetions blinds

6.10.1 Bahan
- Venetions blinds

6.10.2.
-

1.000 M

Tenaga
Tukang kayu
Pekerja
Kepala tukang
Mandor

1.000 M

0.350
0.350
0.035
0.00175

Oh
Oh
Oh
Oh

Rp.
Rp.
Rp.
Rp.

=
=
=
=
=
=

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

PBA 6.12

1 M Pasang terali besi

6.12.1 Bahan
- Besi strip 2 x 3

11.500 M'

x Rp.

11,880 = Rp.
Jumlah (1)
= Rp.

136,620.00
136,620.00

6.12.2.
-

1.200
1.200
0.012
0.0006

x
x
x
x

Rp.
Rp.
Rp.
Rp.

61,775
52,500
91,900
65,600
Jumlah (2)
Jumlah (1) +(2)

=
=
=
=
=
=

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

74,130.00
63,000.00
1,102.80
39.36
138,272.16
274,892.16

PBA 6.13

Tenaga
Tukang las
Pekerja
Kepala tukang
Mandor

Oh
Oh
Oh
Oh

1 M Pasang kawat harmonika

6.13.1 Bahan
- Kawat harmonika
- Paku biasa " - 1"
- Kayu meranti

1.100 M
0.020 Kg
0.0018 M

x Rp.
x Rp.
x Rp.

23,600
16,940
5,225,000
Jumlah (1)

=
=
=
=

Rp.
Rp.
Rp.
Rp.

25,960.00
338.80
9,405.00
35,703.80

6.13.2.
-

0.100
0.100
0.010
0.0005

x
x
x
x

Rp.
Rp.
Rp.
Rp.

52,500
78,800
91,900
65,600
Jumlah (2)
Jumlah (1) +(2)

=
=
=
=
=
=

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

5,250.00
7,880.00
919.00
32.80
14,081.80
49,785.60

PBA 6.14

Tenaga
Pekerja
Tukang kayu
Kepala tukang
Mandor

Oh
Oh
Oh
Oh

1 M Pasang kawat nyamuk

6.14.1 Bahan
- Kawat nyamuk
- Paku biasa " - 1"
- Kayu meranti

1.100 M
0.020 Kg
0.0018 M

x Rp.
x Rp.
x Rp.

11,980
16,940
5,225,000
Jumlah (1)

=
=
=
=

Rp.
Rp.
Rp.
Rp.

13,178.00
338.80
9,405.00
22,921.80

6.14.2.
-

0.100
0.100
0.010
0.0005

x
x
x
x

Rp.
Rp.
Rp.
Rp.

52,500
78,800
91,900
65,600
Jumlah (2)
Jumlah (1) +(2)

=
=
=
=
=
=

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

5,250.00
7,880.00
919.00
32.80
14,081.80
37,003.60

PBA 6.15

Tenaga
Pekerja
Tukang kayu
Kepala tukang
Mandor

Oh
Oh
Oh
Oh

1 M Pasang kawat kassa

6.15.1 Bahan
- Kawat kassa
- Paku biasa " - 1"
- Kayu meranti

1.100 M
0.020 Kg
0.0018 M

x Rp.
x Rp.
x Rp.

13,920
16,940
5,225,000
Jumlah (1)

=
=
=
=

Rp.
Rp.
Rp.
Rp.

15,312.00
338.80
9,405.00
25,055.80

6.15.2.
-

0.100
0.100
0.010
0.0005

x
x
x
x

Rp.
Rp.
Rp.
Rp.

52,500
78,800
91,900
65,600
Jumlah (2)
Jumlah (1) +(2)

=
=
=
=
=
=

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

5,250.00
7,880.00
919.00
32.80
14,081.80
39,137.60

x Rp.
x Rp.
x Rp.

12,710
16,940
5,225,000
Jumlah (1)

=
=
=
=

Rp.
Rp.
Rp.
Rp.

13,981.00
338.80
9,405.00
23,724.80

PBA 6.16

Tenaga
Pekerja
Tukang kayu
Kepala tukang
Mandor

Oh
Oh
Oh
Oh

1 M Pasang kawat burung

6.15.1 Bahan
- Kawat burung
- Paku biasa " - 1"
- Kayu meranti

1.100 M
0.020 Kg
0.0018 M

6.15.2.
-

PBA 6.17

Tenaga
Pekerja
Tukang kayu
Kepala tukang
Mandor

0.100
0.100
0.010
0.0005

Oh
Oh
Oh
Oh

x
x
x
x

Rp.
Rp.
Rp.
Rp.

52,500
78,800
91,900
65,600
Jumlah (2)
Jumlah (1) +(2)

=
=
=
=
=
=

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

5,250.00
7,880.00
919.00
32.80
14,081.80
37,806.60

1 M Pasang jendela nako dan tralis

6.17.1 Bahan
- Jendela nako
- Paku biasa " - 1" atau skrup
- Besi strip # 12 mm

1.100 M
0.020 Kg
1.500 M

x Rp.
x Rp.
x Rp.

201,660
16,940
11,880
Jumlah (1)

=
=
=
=

Rp.
Rp.
Rp.
Rp.

221,826.00
338.80
17,820.00
239,984.80

6.17.2.
-

0.200
0.200
0.020
0.001

Oh
Oh
Oh
Oh

x
x
x
x

Rp.
Rp.
Rp.
Rp.

52,500
78,800
91,900
65,600
Jumlah (2)
Jumlah (1) +(2)

=
=
=
=
=
=

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

10,500.00
15,760.00
1,838.00
65.60
28,163.60
268,148.40

0.500
0.015
0.0096
0.250

Lbr
Kg
M
Kg

x
x
x
x

Rp.
Rp.
Rp.
Rp.

115,500
16,940
5,225,000
25,410
Jumlah (1)

=
=
=
=
=

Rp.
Rp.
Rp.
Rp.
Rp.

57,750.00
254.10
50,160.00
6,352.50
114,516.60

0.150
0.400
0.025
0.00125

Oh
Oh
Oh
Oh

x
x
x
x

Rp.
Rp.
Rp.
Rp.

52,500
78,800
91,900
65,600
Jumlah (2)
Jumlah (1) +(2)

=
=
=
=
=
=

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

7,875.00
31,520.00
2,297.50
82.00
41,774.50
156,291.10

0.500
0.015
0.019
0.300

Lbr
Kg
M
Kg

x
x
x
x

Rp.
Rp.
Rp.
Rp.

115,500
16,940
5,225,000
25,410
Jumlah (1)

=
=
=
=
=

Rp.
Rp.
Rp.
Rp.
Rp.

57,750.00
254.10
99,275.00
7,623.00
164,902.10

0.150
0.400
0.025
0.00125

Oh
Oh
Oh
Oh

x
x
x
x

Rp.
Rp.
Rp.
Rp.

52,500
78,800
91,900
65,600
Jumlah (2)
Jumlah (1) +(2)

=
=
=
=
=
=

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

7,875.00
31,520.00
2,297.50
82.00
41,774.50
206,676.60

PBA 6.18

Tenaga
Pekerja
Tukang kayu
Kepala tukang
Mandor

1 M' Pasang talang datar, seng bjls 35

6.18.1 Bahan
- Seng plat 3' x 6' bjls 35
- Paku biasa " - 1" atau skrup
- Kayu meranti
- Flincote / meni besi
6.18.2.
-

PBA 6.19

Tenaga
Pekerja
Tukang kayu
Kepala tukang
Mandor

1 M' Pasang talang miring, seng bjls 35

6.19.1 Bahan
- Seng plat 3' x 6' bjls 35
- Paku biasa " - 1" atau skrup
- Kayu meranti
- Flincote / meni besi
6.19.2.
-

PBA 6.20

Tenaga
Pekerja
Tukang kayu
Kepala tukang
Mandor

1 M' Pasang talang lingkaran D-10 cm, seng bjls 35

6.20.1 Bahan
- Seng plat 3' x 6' bjls 35
- Paku biasa " - 1" atau skrup
- Kayu meranti
- Besi strip
6.20.2.
-

Tenaga
Pekerja
Tukang kayu
Kepala tukang
Mandor

0.300
0.100
0.019
0.500

Lbr
Kg
M
Kg

x
x
x
x

Rp.
Rp.
Rp.
Rp.

115,500
16,940
5,225,000
11,880
Jumlah (1)

=
=
=
=
=

Rp.
Rp.
Rp.
Rp.
Rp.

34,650.00
1,694.00
99,275.00
5,940.00
141,559.00

0.150
0.250
0.025
0.00125

Oh
Oh
Oh
Oh

x
x
x
x

Rp.
Rp.
Rp.
Rp.

52,500
78,800
91,900
65,600
Jumlah (2)
Jumlah (1) +(2)

=
=
=
=
=
=

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

7,875.00
19,700.00
2,297.50
82.00
29,954.50
171,513.50

PBA 6.21

1 M' Pasang talang lingkaran D-10 cm, seng bjls 30

6.21.1 Bahan
- Seng plat 3' x 6' bjls 30
- Paku biasa " - 1" atau skrup
- Kayu meranti
- Besi strip
6.21.2.
-

Tenaga
Pekerja
Tukang kayu
Kepala tukang
Mandor

0.300
0.100
0.019
0.500

Lbr
Kg
M
Kg

x
x
x
x

Rp.
Rp.
Rp.
Rp.

103,950
16,940
5,225,000
11,880
Jumlah (1)

=
=
=
=
=

Rp.
Rp.
Rp.
Rp.
Rp.

31,185.00
1,694.00
99,275.00
5,940.00
138,094.00

0.150
0.250
0.025
0.00125

Oh
Oh
Oh
Oh

x
x
x
x

Rp.
Rp.
Rp.
Rp.

52,500
78,800
91,900
65,600
Jumlah (2)
Jumlah (1) +(2)

=
=
=
=
=
=

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

7,875.00
19,700.00
2,297.50
82.00
29,954.50
168,048.50

ANALISA BIAYA KONSTRUKSI


PEKERJAAN LANGIT - LANGIT

PLL

6.1
6.1.1

1 M langit - langit asbes ( 1,00 x 1,00 ) m tebal 6 mm


Bahan
- Pelat asbes tebal 6 mm
- Paku

6.1.2
-

PLL

6.2
6.2.1

Bahan
- Pelat asbes tebal 5 mm
- Paku

6.3
6.3.1

Tenaga
Pekerja
Tukang kayu
Kepala tukang
Mandor

Bahan
- Pelat asbes tebal 4 mm
- Paku

6.4
6.4.1

Oh
Oh
Oh
Oh

x
x
x
x

Rp.
Rp.
Rp.
Rp.

19,063.00
169.40
19,232.40

52,500
78,800
91,900
65,600
Jumlah (2)
Jumlah (1) +(2)

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

1,575.00
5,516.00
643.30
98.40
7,832.70
27,065.10

14,440 = Rp.
16,940 = Rp.
Jumlah (1)
= Rp.

15,884.00
169.40
16,053.40

52,500
78,800
91,900
65,600
Jumlah (2)
Jumlah (1) +(2)

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

1,575.00
5,516.00
643.30
98.40
7,832.70
23,886.10

11,550 = Rp.
16,940 = Rp.
Jumlah (1)
= Rp.

12,705.00
169.40
12,874.40

52,500
78,800
91,900
65,600
Jumlah (2)
Jumlah (1) +(2)

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

1,575.00
5,516.00
643.30
98.40
7,832.70
20,707.10

9,350 = Rp.
16,940 = Rp.
Jumlah (1)
= Rp.

10,285.00
169.40
10,454.40

52,500
78,800
91,900
65,600
Jumlah (2)
Jumlah (1) +(2)

1,575.00
5,516.00
643.30
98.40
7,832.70
18,287.10

=
=
=
=
=
=

1.100 Lbr x Rp.


0.010 Kg x Rp.

0.030
0.070
0.007
0.0015

Oh
Oh
Oh
Oh

x
x
x
x

Rp.
Rp.
Rp.
Rp.

=
=
=
=
=
=

1 M langit - langit asbes ( 1,00 x 1,00 ) m tebal 4 mm

6.3.2

PLL

0.030
0.070
0.007
0.0015

17,330 = Rp.
16,940 = Rp.
Jumlah (1)
= Rp.

1 M langit - langit asbes ( 1,00 x 1,00 ) m tebal 5 mm

6.2.2

PLL

Tenaga
Pekerja
Tukang kayu
Kepala tukang
Mandor

1.100 Lbr x Rp.


0.010 Kg x Rp.

Tenaga
Pekerja
Tukang kayu
Kepala tukang
Mandor

1.100 Lbr x Rp.


0.010 Kg x Rp.

0.030
0.070
0.007
0.0015

Oh
Oh
Oh
Oh

x
x
x
x

Rp.
Rp.
Rp.
Rp.

=
=
=
=
=
=

1 M langit - langit asbes ( 1,00 x 1,00 ) m tebal 3,5 mm


Bahan
- Pelat asbes tebal 3,5 mm
- Paku

6.4.2
-

Tenaga
Pekerja
Tukang kayu
Kepala tukang
Mandor

1.100 Lbr x Rp.


0.010 Kg x Rp.

0.030
0.070
0.007
0.0015

Oh
Oh
Oh
Oh

x
x
x
x

Rp.
Rp.
Rp.
Rp.

=
=
=
=
=
=

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

PLL

6.5
6.5.1

1 M Langit - langit akustik ( 30 x 30 ) cm


Bahan
- Akustik ukuran 30 x 30 cm
- Paku

6.5.2
-

PLL

6.6
6.6.1

Bahan
- Akustik ukuran 30 x 60 cm
- Paku

6.7
6.7.1

6.8

Tenaga
Pekerja
Tukang kayu
Kepala tukang
Mandor

Bahan
- Plywood 4' x 8' x 4 mm
- Paku

6.9
6.9.1

Oh
Oh
Oh
Oh

x
x
x
x

Rp.
Rp.
Rp.
Rp.

52,500
78,800
91,900
65,600
Jumlah (2)
Jumlah (1) +(2)

=
=
=
=
=
=

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

3,150.00
9,456.00
1,102.80
196.80
13,905.60
112,962.60

5.800 Lbr x Rp.


0.050 Kg x Rp.

17,070 = Rp.
16,940 = Rp.
Jumlah (1)
= Rp.

99,006.00
847.00
99,853.00

0.060
0.100
0.010
0.003

52,500
78,800
91,900
65,600
Jumlah (2)
Jumlah (1) +(2)

Oh
Oh
Oh
Oh

x
x
x
x

Rp.
Rp.
Rp.
Rp.

=
=
=
=
=
=

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

3,150.00
7,880.00
919.00
196.80
12,145.80
111,998.80

1.500 Lbr x Rp.


0.050 Kg x Rp.

68,290 = Rp.
16,940 = Rp.
Jumlah (1)
= Rp.

102,435.00
847.00
103,282.00

0.060
0.100
0.010
0.003

52,500
78,800
91,900
65,600
Jumlah (2)
Jumlah (1) +(2)

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

3,150.00
7,880.00
919.00
196.80
12,145.80
115,427.80

51,920 = Rp.
16,940 = Rp.
Jumlah (1)
= Rp.

18,691.20
508.20
19,199.40

52,500
78,800
91,900
65,600
Jumlah (2)
Jumlah (1) +(2)

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

3,675.00
7,880.00
919.00
229.60
12,703.60
31,903.00

77,880 = Rp.
16,940 = Rp.
Jumlah (1)
= Rp.

28,036.80
508.20
28,545.00

52,500
78,800
91,900
65,600
Jumlah (2)
Jumlah (1) +(2)

3,675.00
7,880.00
919.00
229.60
12,703.60
41,248.60

Oh
Oh
Oh
Oh

x
x
x
x

Rp.
Rp.
Rp.
Rp.

=
=
=
=
=
=

1 M Langit - langit plywood ( 30 x 60 ) cm, tebal 4 mm

6.8.2

PLL

Tenaga
Pekerja
Tukang kayu
Kepala tukang
Mandor

Bahan
- Akustik arm strong ukuran 60 x 120 cm
- Paku

6.8.1

0.060
0.120
0.012
0.003

98,210.00
847.00
99,057.00

1 M Langit - langit akustik ( 60 x 120 ) cm

6.7.2

PLL

Tenaga
Pekerja
Tukang kayu
Kepala tukang
Mandor

8,540 = Rp.
16,940 = Rp.
Jumlah (1)
= Rp.

1 M Langit - langit akustik ( 30 x 60 ) cm

6.6.2

PLL

11.500 Lbr x Rp.


0.050 Kg x Rp.

Tenaga
Pekerja
Tukang kayu
Kepala tukang
Mandor

0.360 Lbr x Rp.


0.030 Kg x Rp.

0.070
0.100
0.010
0.0035

Oh
Oh
Oh
Oh

x
x
x
x

Rp.
Rp.
Rp.
Rp.

=
=
=
=
=
=

1 M Langit - langit plywood ( 30 x 60 ) cm, tebal 6 mm


Bahan
- Plywood 4' x 8' x 6 mm
- Paku

6.9.2
-

Tenaga
Pekerja
Tukang kayu
Kepala tukang
Mandor

0.360 Lbr x Rp.


0.030 Kg x Rp.

0.070
0.100
0.010
0.0035

Oh
Oh
Oh
Oh

x
x
x
x

Rp.
Rp.
Rp.
Rp.

=
=
=
=
=
=

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

PLL

6.10

1 M Langit - langit plywood ( 60 x 120 ) cm, tebal 4 mm

6.10.1 Bahan
- Plywood 4' x 8' x 4 mm
- Paku

51,920 = Rp.
16,940 = Rp.
Jumlah (1)
= Rp.

19,470.00
508.20
19,978.20

52,500
78,800
91,900
65,600
Jumlah (2)
Jumlah (1) +(2)

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

3,675.00
7,880.00
919.00
229.60
12,703.60
32,681.80

77,880 = Rp.
16,940 = Rp.
Jumlah (1)
= Rp.

29,205.00
508.20
29,713.20

52,500
78,800
91,900
65,600
Jumlah (2)
Jumlah (1) +(2)

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

3,675.00
7,880.00
919.00
229.60
12,703.60
42,416.80

54,450 = Rp.
16,940 = Rp.
Jumlah (1)
= Rp.

19,602.00
508.20
20,110.20

52,500
78,800
91,900
65,600
Jumlah (2)
Jumlah (1) +(2)

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

3,675.00
7,880.00
919.00
229.60
12,703.60
32,813.80

54,450 = Rp.
16,940 = Rp.
Jumlah (1)
= Rp.

20,418.75
508.20
20,926.95

Rp.
Rp.
Rp.
Rp.

52,500
78,800
91,900
65,600
Jumlah (2)
Jumlah (1) +(2)

=
=
=
=
=
=

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

3,675.00
7,880.00
919.00
229.60
12,703.60
33,630.55

6.14.1 Bahan
- Kayu jati, papan
- Paku
- Paku sekrup

0.024 M x Rp.
0.010 Kg x Rp.
0.050 Kg x Rp.

24,104,440
16,940
21,180
Jumlah (1)

=
=
=
=

Rp.
Rp.
Rp.
Rp.

578,506.56
169.40
1,059.00
579,734.96

6.14.2 Tenaga
- Pekerja
- Tukang kayu
- Kepala tukang
- Mandor

0.200
0.600
0.060
0.010

52,500
78,800
91,900
65,600
Jumlah (2)
Jumlah (1) +(2)

=
=
=
=
=
=

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

10,500.00
47,280.00
5,514.00
656.00
63,950.00
643,684.96

6.10.2 Tenaga
- Pekerja
- Tukang kayu
- Kepala tukang
- Mandor

PLL

6.11

6.11.2 Tenaga
- Pekerja
- Tukang kayu
- Kepala tukang
- Mandor

6.12

6.12.2 Tenaga
- Pekerja
- Tukang kayu
- Kepala tukang
- Mandor

6.13

6.13.2 Tenaga
- Pekerja
- Tukang kayu
- Kepala tukang
- Mandor

6.14

x
x
x
x

Rp.
Rp.
Rp.
Rp.

=
=
=
=
=
=

0.375 Lbr x Rp.


0.030 Kg x Rp.

0.070
0.100
0.010
0.0035

Oh
Oh
Oh
Oh

x
x
x
x

Rp.
Rp.
Rp.
Rp.

=
=
=
=
=
=

0.360 Lbr x Rp.


0.030 Kg x Rp.

0.070
0.100
0.010
0.0035

Oh
Oh
Oh
Oh

x
x
x
x

Rp.
Rp.
Rp.
Rp.

=
=
=
=
=
=

1 M Langit - langit teakwood ( 60 x 120 ) cm, tebal 4 mm

6.13.1 Bahan
- Teakwood 4' x 8' x 4 mm
- Paku

PLL

Oh
Oh
Oh
Oh

1 M Langit - langit teakwood ( 30 x 60 ) cm, tebal 4 mm

6.12.1 Bahan
- Teakwood 4' x 8' x 4 mm
- Paku

PLL

0.070
0.100
0.010
0.0035

1 M Langit - langit plywood ( 60 x 120 ) cm, tebal 6 mm

6.11.1 Bahan
- Plywood 4' x 8' x 6 mm
- Paku

PLL

0.375 Lbr x Rp.


0.030 Kg x Rp.

0.375 Lbr x Rp.


0.030 Kg x Rp.

0.070
0.100
0.010
0.0035

Oh
Oh
Oh
Oh

x
x
x
x

1 M Langit - langit lat kayu jati

Oh
Oh
Oh
Oh

x
x
x
x

Rp.
Rp.
Rp.
Rp.

PLL

PLL

PLL

6.16

1 M Langit - langit lat papan rider

6.16.1 Bahan
- Papan rider
- Paku
- Paku sekrup

1.000 Lbr x Rp.


0.010 Kg x Rp.
0.050 Kg x Rp.

225,000
16,940
21,180
Jumlah (1)

=
=
=
=

Rp.
Rp.
Rp.
Rp.

225,000.00
169.40
1,059.00
226,228.40

6.16.2 Tenaga
- Pekerja
- Tukang kayu
- Kepala tukang
- Mandor

0.200
0.600
0.060
0.010

52,500
78,800
91,900
65,600
Jumlah (2)
Jumlah (1) +(2)

=
=
=
=
=
=

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

10,500.00
47,280.00
5,514.00
656.00
63,950.00
290,178.40

6.17

x
x
x
x

Rp.
Rp.
Rp.
Rp.

1 M Langit - langit soft board

6.17.1 Bahan
- Soft board 4' x 8' x 4 mm
- Paku biasa

0.350 Lbr x Rp.


0.030 Kg x Rp.

55,990 = Rp.
16,940 = Rp.
Jumlah (1)
= Rp.

19,596.50
508.20
20,104.70

6.17.2 Tenaga
- Pekerja
- Tukang kayu
- Kepala tukang
- Mandor

0.600
0.100
0.010
0.003

52,500
78,800
91,900
65,600
Jumlah (2)
Jumlah (1) +(2)

6.18

6.18.2 Tenaga
- Pekerja
- Tukang kayu
- Kepala tukang
- Mandor

6.19

Oh
Oh
Oh
Oh

x
x
x
x

Rp.
Rp.
Rp.
Rp.

=
=
=
=
=
=

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

31,500.00
7,880.00
919.00
196.80
40,495.80
60,600.50

1 M Langit - langit akustik 60 x 120 cm + rangka alluminium

6.18.1 Bahan
- Profil alluminium "T"
- Kawat seng polos
- Ramset/dina bolt
- Akustik arm strong 60 x 120 cm

PLL

Oh
Oh
Oh
Oh

3.600
0.150
1.000
1.500

M'
Kg
Bh
Lbr

x
x
x
x

Rp.
Rp.
Rp.
Rp.

8,470
22,530
720
68,290
Jumlah (1)

=
=
=
=
=

Rp.
Rp.
Rp.
Rp.
Rp.

30,492.00
3,379.50
720.00
102,435.00
137,026.50

0.150
0.500
0.050
0.0075

Oh
Oh
Oh
Oh

x
x
x
x

Rp.
Rp.
Rp.
Rp.

52,500
78,800
91,900
65,600
Jumlah (2)
Jumlah (1) +(2)

=
=
=
=
=
=

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

7,875.00
39,400.00
4,595.00
492.00
52,362.00
189,388.50

1 M' List Langit - langit Kayu profil 3"

6.19.1 Bahan
- List kayu profil
- Paku

1.100 M' x Rp.


0.010 Kg x Rp.

18,810 = Rp.
16,940 = Rp.
Jumlah (1)
= Rp.

20,691.00
169.40
20,860.40

6.19.2 Tenaga
- Pekerja
- Tukang kayu
- Kepala tukang
- Mandor

0.050
0.050
0.005
0.003

52,500
78,800
91,900
65,600
Jumlah (2)
Jumlah (1) +(2)

2,625.00
3,940.00
459.50
196.80
7,221.30
28,081.70

Oh
Oh
Oh
Oh

x
x
x
x

Rp.
Rp.
Rp.
Rp.

=
=
=
=
=
=

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

PLL

PLL

6.20

1 M Langit - langit asbes (1,00 x 1,00) m, rangka kayu meranti

6.20.1 Bahan
- Kayu meranti
- Paku
- Asbes 1,00 x 1,00 m

0.012 M x Rp.
0.060 Kg x Rp.
1.100 Lbr x Rp.

5,225,000
16,940
11,550
Jumlah (1)

=
=
=
=

Rp.
Rp.
Rp.
Rp.

62,700.00
1,016.40
12,705.00
76,421.40

6.20.2 Tenaga
- Pekerja
- Tukang kayu
- Kepala tukang
- Mandor

0.180
0.320
0.032
0.009

52,500
78,800
91,900
65,600
Jumlah (2)
Jumlah (1) +(2)

=
=
=
=
=
=

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

9,450.00
25,216.00
2,940.80
590.40
38,197.20
114,618.60

5,225,000
16,940
51,920
Jumlah (1)

=
=
=
=

Rp.
Rp.
Rp.
Rp.

67,925.00
1,016.40
20,248.80
89,190.20

52,500
78,800
91,900
65,600
Jumlah (2)
Jumlah (1) +(2)

=
=
=
=
=
=

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

14,175.00
31,520.00
3,676.00
885.60
50,256.60
139,446.80

6.21

6.21.2 Tenaga
- Pekerja
- Tukang kayu
- Kepala tukang
- Mandor

PLL

6.22

x
x
x
x

Rp.
Rp.
Rp.
Rp.

1 M Langit - langit plywood 4 mm + rangka kayu meranti

6.21.1 Bahan
- Kayu meranti
- Paku biasa 2" - 5"
- Plywood 4' x 8' x 4 mm

PLL

Oh
Oh
Oh
Oh

0.013 M x Rp.
0.060 Kg x Rp.
0.390 Lbr x Rp.

0.270
0.400
0.040
0.0135

Oh
Oh
Oh
Oh

x
x
x
x

Rp.
Rp.
Rp.
Rp.

1 M Langit - langit akustik ( 30 x 60 ) cm + rangka kayu meranti

6.22.1 Bahan
- Kayu meranti
- Paku
- Akustik 30 x 60 cm

0.013 M x Rp.
0.060 Kg x Rp.
5.800 Lbr x Rp.

5,225,000
16,940
17,070
Jumlah (1)

=
=
=
=

Rp.
Rp.
Rp.
Rp.

67,925.00
1,016.40
99,006.00
167,947.40

6.22.2 Tenaga
- Pekerja
- Tukang kayu
- Kepala tukang
- Mandor

0.260
0.400
0.040
0.013

52,500
78,800
91,900
65,600
Jumlah (2)
Jumlah (1) +(2)

=
=
=
=
=
=

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

13,650.00
31,520.00
3,676.00
852.80
49,698.80
217,646.20

6.23

Oh
Oh
Oh
Oh

x
x
x
x

Rp.
Rp.
Rp.
Rp.

1 M Langit - langit akustik ( 30 x 30 ) cm + rangka kayu borneo

6.23.1 Bahan
- Kayu meranti
- Paku
- Akustik 30 x 30 cm

0.013 M x Rp.
0.060 Kg x Rp.
11.500 Lbr x Rp.

5,225,000
16,940
8,540
Jumlah (1)

=
=
=
=

Rp.
Rp.
Rp.
Rp.

67,925.00
1,016.40
98,210.00
167,151.40

6.23.2 Tenaga
- Pekerja
- Tukang kayu
- Kepala tukang
- Mandor

0.310
0.470
0.047
0.0155

52,500
78,800
91,900
65,600
Jumlah (2)
Jumlah (1) +(2)

=
=
=
=
=
=

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

16,275.00
37,036.00
4,319.30
1,016.80
58,647.10
225,798.50

Oh
Oh
Oh
Oh

x
x
x
x

Rp.
Rp.
Rp.
Rp.

PLL

PLL

PLL

6.24

1 M Langit - langit gypsum board, tebal 9 mm

6.24.1 Bahan
- Gypsum board (120 x 240 x 9) mm
- Paku sekrup

0.364 Lbr x Rp.


0.110 Kg x Rp.

71,500 = Rp.
21,180 = Rp.
Jumlah (1)
= Rp.

26,026.00
2,329.80
28,355.80

6.24.2 Tenaga
- Pekerja
- Tukang kayu
- Kepala tukang
- Mandor

0.100
0.050
0.005
0.005

52,500
78,800
91,900
65,600
Jumlah (2)
Jumlah (1) +(2)

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

5,250.00
3,940.00
459.50
328.00
9,977.50
38,333.30

Oh
Oh
Oh
Oh

x
x
x
x

Rp.
Rp.
Rp.
Rp.

=
=
=
=
=
=

6.24A 1 M Langit - langit gypsum board, tebal 6 mm


6.24.1 Bahan
- Gypsum board (120 x 240 x 6) mm
- Paku sekrup

0.364 Lbr x Rp.


0.110 Kg x Rp.

59,950 = Rp.
21,180 = Rp.
Jumlah (1)
= Rp.

21,821.80
2,329.80
24,151.60

6.24.2 Tenaga
- Pekerja
- Tukang kayu
- Kepala tukang
- Mandor

0.100
0.050
0.005
0.005

52,500
78,800
91,900
65,600
Jumlah (2)
Jumlah (1) +(2)

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

5,250.00
3,940.00
459.50
328.00
9,977.50
34,129.10

93,500 = Rp.
21,180 = Rp.
Jumlah (1)
= Rp.

34,034.00
2,329.80
36,363.80

52,500
78,800
91,900
65,600
Jumlah (2)
Jumlah (1) +(2)

7,875.00
6,304.00
689.25
492.00
15,360.25
51,724.05

Oh
Oh
Oh
Oh

x
x
x
x

Rp.
Rp.
Rp.
Rp.

=
=
=
=
=
=

6.24B 1 M Langit - langit gypsum board, tebal 12 mm


6.24.1 Bahan
- Gypsum board (120 x 240 x 12) mm
- Paku sekrup

6.24.2 Tenaga
- Pekerja
- Tukang kayu
- Kepala tukang
- Mandor

0.364 Lbr x Rp.


0.110 Kg x Rp.

0.150
0.080
0.0075
0.0075

Oh
Oh
Oh
Oh

x
x
x
x

Rp.
Rp.
Rp.
Rp.

=
=
=
=
=
=

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

DAFTAR HARGA SATUAN UPAH DAN BAHAN


PEKERJAAN PEMBANGUNAN GEDUNG NEGARA
TAHUN ANGGARAN 2010

NO.

URAIAN HARGA UPAH

HARGA

SATUAN

1
2
3
4
5
6
7
8
9
10
11

Pekerja
Mandor
Tukang Batu
Tukang Kayu
Tukang Besi
Tukang Keramik
Tukang Plafond
Tukang Pasang Pipa
Tukang Cat
Kepala Tukang
Jaga Malam

@Rp.
@Rp.
@Rp.
@Rp.
@Rp.
@Rp.
@Rp.
@Rp.
@Rp.
@Rp.
@Rp.

52,500.00
65,600.00
78,800.00
78,800.00
78,800.00
78,800.00
78,800.00
78,800.00
78,800.00
91,900.00
42,000.00

/
/
/
/
/
/
/
/
/
/
/

Org/Hari
OH
OH
OH
OH
OH
OH
OH
OH
OH
OM

NO.

URAIAN HARGA BAHAN

HARGA

SATUAN

A
1
2
3
4
5
6

TIMBUNAN / GALIAN
Tanah Timbun/Merah
Pasir Timbun / Urug
Pasir Pasang
Pasir beton
Sirtu
Tanah Humus

@Rp.
@Rp.
@Rp.
@Rp.
@Rp.
@Rp.

62,900.00
64,400.00
76,500.00
87,800.00
87,800.00
71,500.00

/
/
/
/
/
/

M3
M3
M3
M3
M3
M3

B
1
2
3
4
5
6

BAHAN PEREKAT
Portland Cement (PC)
Cement Putih
Lem Kayu
Lem Vinyl / Karet
Perekat Kaca
Waterfroof

@Rp.
@Rp.
@Rp.
@Rp.
@Rp.
@Rp.

1,270.00
2,500.00
37,400.00
44,900.00
76,500.00
52,300.00

/
/
/
/
/
/

Kg
Kg
Kg
Kg
Kg
Kg

C
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27

BATU / BATU CETAKAN


Batu Krikil / Koral 3 - 5 cm
Batu Krikil / Koral 5 - 7 cm
Batu Krikil / Koral 7 - 10 cm
Batu Belah/Kali 10 - 15 cm
Batu Belah/Kali 15 - 20 cm
Batu Pecah 1 - 2 cm
Batu Pecah 2 - 3 cm
Batu Pecah 3 - 5 cm
Batu Pecah 5 - 7 cm
Batu Kacang /jagung 0,5 - 1 cm
Batu Splyt
Batu Bata biasa 5x10x20 cm
Batu Bata Mesin 5x10x20 cm
Batu Bataco 6x12x24 cm
Batu Krawang 10x10x20 cm
Batu Krawang 10x15x15 cm
Batu Krawang 10x20x20 cm
Concrete Block (CB) 10
Concrete Block (CB) 15
Concrete Block (CB) 20
Bondbeam 40x20x20 cm
Con Block warna type Holland tb 6 cm
Con Block warna type Uni pave tb 6 cm
Con Block warna type Dosex Six tb 6 cm
Con Block warna type Hexagon tb 6 cm
Con Block K 125
Con Block K 175

@Rp.
@Rp.
@Rp.
@Rp.
@Rp.
@Rp.
@Rp.
@Rp.
@Rp.
@Rp.
@Rp.
@Rp.
@Rp.
@Rp.
@Rp.
@Rp.
@Rp.
@Rp.
@Rp.
@Rp.
@Rp.
@Rp.
@Rp.
@Rp.
@Rp.
@Rp.
@Rp.

185,900.00
170,900.00
155,900.00
140,900.00
125,900.00
190,200.00
177,700.00
165,200.00
150,200.00
202,700.00
212,700.00
610.00
720.00
4,180.00
3,030.00
3,470.00
3,740.00
740.00
1,600.00
2,920.00
30,250.00
1,720.00
1,600.00
1,840.00
1,710.00
1,750.00
2,700.00

/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/

M3
M3
M3
M3
M3
M3
M3
M3
M3
M3
M3
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh

1
D
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
37
38
39
40
41
42
43
44
45
46
47
48
49
50
51
52
53

2
KAYU / LANGIT - LANGIT
Balok Kayu Jati
Papan Kayu Jati
Balok Kayu Damar Laut
Papan Kayu Damar Laut
Balok Kayu Meranti Batu
Papan Kayu Meranti Batu
Balok Kayu Kapur
Papan kayu Kapur
Balok Kayu Meranti Kls I
Papan Kayu Meranti Kls I
Kayu Sembarang/Bekisting
Kayu Bakar
Papan Lambersering/Rider
Kayu Lat Asbes 5x30x400 mm
Kayu Kaso 5 - 7 /400 cm
Kayu Dolken / Kayu Laut 7,5 - 10 / 400 cm
Bambu 6 - 8 /600 cm
Bilik Bambu
Kayu Profil 1"
Kayu Profil 2"
Kayu Profil 3"
Kayu Profil 4"
Profil Gypsum 2"
Profil Gypsum 3"
Profil Gypsum 4"
Profil Gypsum 6"
Plywood 120x240 tbl. 18 mm
Plywood 120x240 tbl. 12 mm
Plywood 120x240 tbl. 9 mm
Plywood 120x240 tbl. 6 mm
Plywood 120x240 tbl. 4 mm
Teakwood 120x240 tbl. 3 mm
Triplek Jati 120x240 tbl. 3 mm
Triplek Sungkai 120x240 tbl. 3 mm
Formika 120x240
Soft Board 120x240 tbl. 4 mm
Soft Board 120x240 tbl. 6 mm
Soft Board 120x240 tbl. 9 mm
Soft Board 120x240 tbl. 12 mm
Gypsum 120x240 tbl. 6 mm
Gypsum 120x240 tbl. 9 mm
Gypsum 120x240 tbl. 12 mm
Asbes Lokal 100x100 cm
Asbes Atrisco 100x100 cm t= 4 mm
Asbes Atrisco 100x100 cm t= 5 mm
Asbes Atrisco 100x100 cm t= 6 mm
Akustik 30x30 cm
Akustik 30x60 cm
Akustik 60x120 cm
Rangka Furing Ceiling Gypsum
Rangka Furing Dinding Gypsum
Tepung Dempul
Kain kasa/Paper Tape

@Rp. 23,925,000.00 /
@Rp. 24,104,440.00 /
@Rp. 9,350,000.00 /
@Rp. 9,650,000.00 /
@Rp. 9,075,000.00 /
@Rp. 9,375,000.00 /
@Rp. 6,490,000.00 /
@Rp. 6,790,000.00 /
@Rp. 5,225,000.00 /
@Rp. 5,475,000.00 /
@Rp. 3,107,500.00 /
@Rp.
187,000.00 /
@Rp.
225,000.00 /
@Rp.
7,430.00 /
@Rp.
87,780.00 /
@Rp.
19,250.00 /
@Rp.
13,750.00 /
@Rp.
16,340.00 /
@Rp.
6,270.00 /
@Rp.
12,540.00 /
@Rp.
18,810.00 /
@Rp.
25,080.00 /
@Rp.
4,600.00 /
@Rp.
5,450.00 /
@Rp.
6,660.00 /
@Rp.
7,870.00 /
@Rp.
233,640.00 /
@Rp.
155,760.00 /
@Rp.
116,820.00 /
@Rp.
77,880.00 /
@Rp.
51,920.00 /
@Rp.
54,450.00 /
@Rp.
85,250.00 /
@Rp.
79,750.00 /
@Rp.
74,250.00 /
@Rp.
55,990.00 /
@Rp.
84,150.00 /
@Rp.
126,230.00 /
@Rp.
168,250.00 /
@Rp.
59,950.00 /
@Rp.
71,500.00 /
@Rp.
93,500.00 /
@Rp.
9,350.00 /
@Rp.
11,550.00 /
@Rp.
14,440.00 /
@Rp.
17,330.00 /
@Rp.
8,540.00 /
@Rp.
17,070.00 /
@Rp.
68,290.00 /
@Rp.
52,250.00 /
@Rp.
63,800.00 /
@Rp.
10,450.00 /
@Rp.
57,750.00 /

M3
M3
M3
M3
M3
M3
M3
M3
M3
M3
M3
M3
M2
Btg
Btg
Btg
Btg
M2
M'
M'
M'
M'
M'
M'
M'
M'
Lbr
Lbr
Lbr
Lbr
Lbr
Lbr
Lbr
Lbr
Lbr
Lbr
Lbr
Lbr
Lbr
Lbr
Lbr
Lbr
Lbr
Lbr
Lbr
Lbr
Lbr
Lbr
Lbr
M2
M2
Kg
Roll

E
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24

BESI / ALUMINIUM
Besi Beton polos
Besi Beton Ulir
Besi Profil WF/INP
Besi siku
Besi CNP
Besi Plat Strip
Besi Plat Polos
Kawat Besi Beton
Kawat Licin / Seng Polos
Kawat Duri
Kawat Nyamuk
Kawat Kasa
Kawat Harmonika # 1"
Kawat Burung
Pagar kawat BRC 120 Polos
Pintu Besi
Pintu gulung Besi
Pintu Lipat Besi
Pintu Rolling Door
Jerajak besi Bermotif
Jerajak Besi Strip
Rangka Baja Ringan
Kosen Pintu Aluminium (80 x 210) Coklat
Kosen Pintu Aluminium (80 x 210) Putih

@Rp.
@Rp.
@Rp.
@Rp.
@Rp.
@Rp.
@Rp.
@Rp.
@Rp.
@Rp.
@Rp.
@Rp.
@Rp.
@Rp.
@Rp.
@Rp.
@Rp.
@Rp.
@Rp.
@Rp.
@Rp.
@Rp.
@Rp.
@Rp.

14,410.00
14,580.00
15,950.00
11,990.00
13,090.00
11,880.00
13,630.00
16,830.00
22,530.00
4,030.00
11,980.00
13,920.00
23,600.00
12,710.00
235,950.00
816,750.00
828,850.00
837,320.00
465,850.00
347,270.00
312,180.00
177,870.00
405,350.00
371,470.00

/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/

Kg
Kg
Kg
Kg
Kg
Kg
Kg
Kg
Kg
M'
M2
M2
M2
M2
Lbr
M2
M2
M2
M2
M2
M2
M2
Bh
Bh

25
26
27
28
29
30
31
32
33
34
35
36
37
38
39
40
41

Kosen Jendela aluminium (120x60) Coklat


Kosen Jendela aluminium (120x60) Putih
Pintu Aluminium ( 80 x 210) Coklat
Pintu Aluminium ( 80 x 210) Putih
Jendela Aluminium + Kaca 5 mm (120 x 60) Coklat
Jendela Aluminium + Kaca 5 mm (120 x 60) Putih
Kosen Pintu / Jendela Aluminium Coklat
Kosen Pintu / Jendela Aluminium Putih
Daun Jendela Aluminium Coklat
Daun Jendela Aluminium Putih
Profil Aluminium T
Ventions Blinds
Verticals Blinds
Bingkai Naco Niki Hitam
Bingkai Naco Niki Putih
Paku Beton 0,5 - 2"
Paku Beton 2" - 5"

@Rp.
@Rp.
@Rp.
@Rp.
@Rp.
@Rp.
@Rp.
@Rp.
@Rp.
@Rp.
@Rp.
@Rp.
@Rp.
@Rp.
@Rp.
@Rp.
@Rp.

287,380.00
248,050.00
711,480.00
609,840.00
304,920.00
261,360.00
78,650.00
66,550.00
54,450.00
48,400.00
8,470.00
163,350.00
175,450.00
201,660.00
168,060.00
310.00
530.00

/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/

Bh
Bh
Bh
Bh
Bh
Bh
M'
M'
M'
M'
M'
M2
M2
M2
M2
Bh
Bh

42
43
44
45
46
47
48
49
50

Paku Biasa 0,5 - 2"


Paku Biasa 2" - 5"
Sekrup macam ukuran
Sekrup 0,5 - 2"
Sekrup fisher
Baut 5/8" - 8"
Baut Angker 3/4" - 10"
Baut Ramset / Dina Bolt
Rangka Atap Twin light

@Rp.
@Rp.
@Rp.
@Rp.
@Rp.
@Rp.
@Rp.
@Rp.
@Rp.

16,940.00
14,520.00
21,180.00
420.00
360.00
19,970.00
45,380.00
720.00
302,500.00

/
/
/
/
/
/
/
/
/

Kg
Kg
Kg
Bh
Bh
Bh
Bh
Bh
M2

F
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17

PENUTUP LANTAI DAN DINDING


Ubin Granito 30 x 30 cm
Ubin Granito 40 x 40 cm
Ubin Granito 60 x 60 cm
Ubin Mosaik 30 x 30 cm
Ubin Marmer Ex. DN
Ubin teralux marmer 30 x 30 cm
Ubin teralux marmer 40 x 40 cm
Ubin teralux marmer 60 x 60 cm
Ubin keramik 10 x 20 cm
Ubin keramik 15 x 15 cm
Ubin keramik 20 x 20 cm
Ubin keramik 20 x 25 cm
Ubin keramik 25 x 25 cm
Ubin keramik 30 x 30 cm
Ubin keramik 30 x 30 cm anti slip
Ubin keramik 40 x 40 cm
Ubin keramik artistik 5 x 20 cm

@Rp.
@Rp.
@Rp.
@Rp.
@Rp.
@Rp.
@Rp.
@Rp.
@Rp.
@Rp.
@Rp.
@Rp.
@Rp.
@Rp.
@Rp.
@Rp.
@Rp.

26,260.00
46,590.00
104,670.00
13,920.00
261,970.00
27,230.00
48,400.00
109,510.00
1,210.00
1,400.00
2,490.00
3,150.00
3,870.00
5,570.00
6,290.00
9,680.00
910.00

/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/

Bh
Bh
Bh
Bh
M2
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh

18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
37
38
39
40
41
42
43
44
45
46
47
48
49
50
51
52
53
54

Ubin keramik artistik 10 x 10 cm


Ubin keramik artistik 10 x 20 cm
Ubin keramik Essenza 30 x 30 cm
Ubin keramik Essenza 40 x 40 cm
Porselin 11 x 11 cm Putih
Porselin 11 x 11 cm, warna
Porselin 15 x 15 cm, putih
Porselin 15 x 15 cm, warna
Plint ubin teralux marmer 10 x 30 cm
Plint ubin teralux marmer 10 x 40 cm
Plint ubin teralux marmer 10 x 60 cm
Plint ubin granito 10 x 30 cm
Plint ubin granito 10 x 40 cm
Plint ubin granito 10 x 60 cm
Plint ubin keramik 10 x 30 cm
Plint ubin keramik 10 x 40 cm
Plint ubin keramik 10 x 60 cm
Plint ubin keramik 15 x 30 cm
Plint ubin keramik 15 x 40 cm
Plint ubin keramik 15 x 60 cm
Batu Lapis Dinding 7x3x24
Batu Tempel Hitam
Batu Poros
Carpet
Carpet 80 % wool, 20 % nylon
Feltex carpet 100 % wool-T-21
Underlyer tebal 6 mm / rubber corrugated
Vynil asbes 30 x 30 cm
Vynil karet 30 x 30 cm KL I
Vynil karet 30 x 30 cm KL II
Vynil motif kembang ex DN 30 x 30 cm
Vynil wall covering lebar 50 cm
Perquet Jati
Gymfloor
Paku Pancing 60 - 230
Sekrup 3,5"
Sekrup 3,5"

@Rp.
@Rp.
@Rp.
@Rp.
@Rp.
@Rp.
@Rp.
@Rp.
@Rp.
@Rp.
@Rp.
@Rp.
@Rp.
@Rp.
@Rp.
@Rp.
@Rp.
@Rp.
@Rp.
@Rp.
@Rp.
@Rp.
@Rp.
@Rp.
@Rp.
@Rp.
@Rp.
@Rp.
@Rp.
@Rp.
@Rp.
@Rp.
@Rp.
@Rp.
@Rp.
@Rp.
@Rp.

910.00
1,760.00
21,180.00
37,630.00
1,210.00
145.00
2,300.00
2,540.00
16,340.00
29,040.00
65,700.00
27,950.00
62,800.00
157,180.00
4,110.00
5,690.00
8,110.00
5,810.00
7,740.00
11,620.00
2,040.00
104,500.00
114,680.00
90,750.00
87,450.00
85,250.00
104,500.00
8,230.00
9,800.00
9,080.00
9,440.00
63,250.00
368,500.00
79,750.00
720.00
410.00
20,350.00

/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/

Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
M2
M2
M2
M2
M2
M2
Bh
Bh
Bh
Bh
M2
M2
M2
Bh
Kg
Kg

1
G
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
37
38
39
40
41
42
43
44
45
46
47

PENUTUP ATAP

48
49
50
51
52

Atap Genteng Palentong


Atap Genteng Palentong super
Atap Genteng Kodok

Atap Genteng Beton


Atap Genteng Keramik
Atap Genteng Aspal
Atap Genteng Metal/Multi Roof 35
Atap Genteng Asbes cement 0,35
Atap Sirap
Atap Aluminium gelombang tebal 0,55
Atap seng Gelombang 3' x 6' bjls 35
Atap seng Super Deck 3' x 6' tbl 0,30
Roof light fibreglass gelombang
Atap Asbes Gelombang 1,8 x 1,05 tbl.4 mm
Atap Asbes Gelombang 2,1 x 1,05 tbl.4 mm
Atap Asbes Gelombang 2,4 x 1,05 tbl.4 mm
Atap Asbes Gelombang 2,7 x 1,05 tbl.4 mm
Atap Asbes Gelombang 1,8 x 0,92 tbl.5 mm
Atap Asbes Gelombang 2,1 x 0,92 tbl.5 mm
Atap Asbes Gelombang 2,4 x 0,92 tbl.5 mm
Atap Asbes Gelombang 2,7 x 0,92 tbl.5 mm
Atap Asbes Gelombang 1,8 x 1,08 tbl.6 mm
Atap Asbes Gelombang 2,1 x 1,08 tbl.6 mm
Atap Asbes Gelombang 2,4 x 1,08 tbl.6 mm
Atap Asbes Gelombang 2,7 x 1,08 tbl.6 mm
Genteng bubung palentong
Genteng bubung palentong super
Genteng bubung kodok
Nok genteng beton
Nok genteng keramik
Nok Genteng Aspal
Nok Genteng Metal/Multi Roof (decra bond)
Nok Genteng Asbes cement 0,35
Nok Aluminium standard 40 cm 18 swg22
Bubung/Nok Stel Gelombang 0,92 m' tbl.5 mm
Bubung/Nok Stel Gelombang 1,05 m' tbl.4 mm
Bubung/Nok Stel Gelombang 1,08 m' tbl.6 mm
Bubung/Nok Paten 0,92 m' tbl.5 mm
Bubung/Nok Paten 1,05 m' tbl.4 mm
Bubung/Nok Paten 1,08 m' tbl.6 mm
Bubung/Nok Stel Rata 0,92 m' tbl.5 mm
Bubung/Nok Stel Rata 1,05 m' tbl.4 mm
Bubung/Nok Stel Rata 1,08 m' tbl.6 mm
Seng Plat 3" x 6" bjls 35
Seng Plat 3" x 6" bjls 30
Plastic aerator
Sisalation / aluminium foil

@Rp.
@Rp.
@Rp.
@Rp.
@Rp.
@Rp.
@Rp.
@Rp.
@Rp.
@Rp.
@Rp.
@Rp.
@Rp.
@Rp.
@Rp.
@Rp.
@Rp.
@Rp.
@Rp.
@Rp.
@Rp.
@Rp.
@Rp.
@Rp.
@Rp.
@Rp.
@Rp.
@Rp.
@Rp.
@Rp.
@Rp.
@Rp.
@Rp.
@Rp.
@Rp.
@Rp.
@Rp.
@Rp.
@Rp.
@Rp.
@Rp.
@Rp.
@Rp.
@Rp.
@Rp.
@Rp.
@Rp.

1,670.00
3,980.00
2,170.00
5,970.00
11,390.00
11,320.00
64,130.00
66,790.00
1,030.00
98,180.00
59,640.00
68,750.00
46,390.00
59,380.00
93,170.00
108,130.00
113,300.00
70,950.00
88,770.00
97,020.00
106,810.00
103,620.00
120,450.00
128,370.00
155,430.00
9,350.00
12,740.00
9,560.00
13,440.00
15,040.00
29,350.00
41,140.00
33,770.00
47,890.00
19,590.00
25,990.00
28,510.00
36,810.00
30,950.00
42,960.00
36,080.00
30,250.00
40,600.00
115,500.00
103,950.00
27,500.00
77,200.00

/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/

Bh
Bh
Bh
Bh
Bh
Lbr
M2
Lbr
Bh
Lbr
Lbr
Lbr
Lbr
Lbr
Lbr
Lbr
Lbr
Lbr
Lbr
Lbr
Lbr
Lbr
Lbr
Lbr
Lbr
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Lbr
M2
Lbr
Lbr
Lbr
Lbr
Lbr
Lbr
Lbr
Lbr
Lbr
Lbr
Lbr
Bh
M2

Paku seng + Ring karet


Paku seng + Ring karet
Paku hak panjang 15 cm
Atap Seng Alumi Zinc warna 0,35
Atap Twin light

@Rp.
@Rp.
@Rp.
@Rp.
@Rp.

20,350.00
410.00
30,530.00
62,040.00
74,250.00

/
/
/
/
/

Kg
Bh
Kg
M2
M2

H
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33

KUNCI DAN KACA


Kunci tanam antik
Kunci tanam biasa
Kunci tanam kamar mandi
Kunci silinder
Kunci selot
Kunci lemari
Engsel pintu 4"
Engsel jendela 3"
Engsel angin
Kait angin
Rel pintu dorong
Sealent
Spring Knip
Door closer
Door handle
Door stoop
Espanyolet
Kaca Block 20 x 20 cm
Kaca polos tbl.3 mm
Kaca polos tbl.5 mm
Kaca polos tbl.8 mm
Kaca Reyben tbl.5 mm
Kaca Reyben tbl.8 mm
Kaca Buram tbl.3 mm
Kaca Buram tbl.5 mm
Kaca buram tbl.8 mm
Kaca cermin tbl.5 mm
Kaca cermin tbl.6 mm
Kaca cermin tbl.8 mm
Kaca patri
Kaca Wireglass
Kaca Reyben Naco 30 x 60 cm tbl.5 mm
Kaca Bening Naco 30 x 60 cm tbl.5 mm

@Rp.
@Rp.
@Rp.
@Rp.
@Rp.
@Rp.
@Rp.
@Rp.
@Rp.
@Rp.
@Rp.
@Rp.
@Rp.
@Rp.
@Rp.
@Rp.
@Rp.
@Rp.
@Rp.
@Rp.
@Rp.
@Rp.
@Rp.
@Rp.
@Rp.
@Rp.
@Rp.
@Rp.
@Rp.
@Rp.
@Rp.
@Rp.
@Rp.

214,500.00
90,020.00
54,690.00
34,490.00
27,230.00
12,340.00
15,130.00
11,250.00
25,050.00
19,120.00
160,330.00
39,330.00
9,080.00
109,750.00
113,010.00
38,120.00
88,450.00
26,020.00
87,120.00
145,200.00
232,320.00
193,120.00
308,980.00
72,600.00
111,320.00
193,600.00
161,700.00
194,040.00
258,720.00
169,400.00
151,250.00
13,590.00
10,730.00

/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/

Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Kg
Bh
Bh
Bh
Bh
Bh
Bh
M2
M2
M2
M2
M2
M2
M2
M2
M2
M2
M2
M2
M2
Lbr
Lbr

I
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20

CAT / MINYAK
Cat dasar
Cat Tembok setara Vinilex
Cat Minyak untuk kayu
Cat Minyak untuk Besi
Cat Menie kayu
Cat Menie besi
Cat sending
Cat Melamix
Cat Vernis Jadi
Plamir
Dempul gypsum
Dempul Cat
Minyak Cat
Minyak Bekisting
Residu / Kolter
Soda api
Sabun
Kuas
Ampelas / Kertas pasir
Wall paper

@Rp.
@Rp.
@Rp.
@Rp.
@Rp.
@Rp.
@Rp.
@Rp.
@Rp.
@Rp.
@Rp.
@Rp.
@Rp.
@Rp.
@Rp.
@Rp.
@Rp.
@Rp.
@Rp.
@Rp.

15,730.00
19,360.00
35,700.00
39,330.00
20,570.00
25,410.00
54,450.00
59,290.00
48,280.00
15,730.00
10,410.00
11,860.00
11,010.00
6,290.00
6,530.00
12,100.00
10,290.00
7,870.00
1,820.00
30,610.00

/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/

Kg
Kg
Kg
Kg
Kg
Kg
Kg
Kg
Kg
Kg
Kg
Kg
Kg
Ltr
Ltr
Kg
Kg
Bh
Lbr
M2

1
J
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
37
38
39
40
41
42
43
44
45
46
47
48
49
50
51
52
53
54
55
56
57
58
59
60
61

SANITASI / PIPA
Kloset duduk / monoblok lengkap tangki
Kloset duduk / monoblok tanpa tangki
Kloset jongkok porselin
Bakkif Porselin
Wastafel
Urinoir
Kran air 1/2" - 3/4"
Kran air leher angsa 1/2"
Kran shower
Kran Cebok
Bak fibreglass 0,3 M3
Bak fibreglass 1 M3
Bak cuci piring stainless 2 lobang
Bak cuci piring teraso 2 lobang
Tempat sabun keramik
Floor drain 4" steinless
Stop kran 3/4"
Tutup bak air 1" Kuningan
Instalasi air bersih
Instalasi air kotor/limbah
Buis Beton 1/2 15 cm
Buis Beton 1/2 20 cm
Buis Beton 1/2 30 cm
Buis Beton 15 cm
Buis Beton 20 cm
Buis Beton 30 cm
Buis Beton 40 cm
Buis Beton 50 cm
Buis Beton 60 cm
Buis Beton 80 cm
Buis Beton 100 cm
Pipa PVC Tipe AW 1/2"
Pipa PVC Tipe AW 3/4"
Pipa PVC Tipe AW 1"
Pipa PVC Tipe AW 1 1/2"
Pipa PVC Tipe AW 2"
Pipa PVC Tipe AW 2 1/2"
Pipa PVC Tipe AW 3"
Pipa PVC Tipe AW 4"
Pipa Besi Hitam 1/2"
Pipa Besi Hitam 3/4"
Pipa Besi Hitam 1"
Pipa Besi Hitam 1 1/2"
Pipa Besi Hitam 2"
Pipa Besi Hitam 2 1/2"
Pipa Galvanis 1/2"
Pipa Galvanis 3/4"
Pipa Galvanis 1"
Pipa Galvanis 1 1/4"
Pipa Galvanis 1 1/2"
Pipa Galvanis 2"
Pipa Galvanis 2 1/2"
Fitting Pipa AW 1"
Knee AW 1"
Tee AW 1"
Socht AW 1"
F-Knee 1"
F-Tee 1"
Bocht LL-D 1"
Union Socht 1"
D-Nipple 1"

@Rp.
@Rp.
@Rp.
@Rp.
@Rp.
@Rp.
@Rp.
@Rp.
@Rp.
@Rp.
@Rp.
@Rp.
@Rp.
@Rp.
@Rp.
@Rp.
@Rp.
@Rp.
@Rp.
@Rp.
@Rp.
@Rp.
@Rp.
@Rp.
@Rp.
@Rp.
@Rp.
@Rp.
@Rp.
@Rp.
@Rp.
@Rp.
@Rp.
@Rp.
@Rp.
@Rp.
@Rp.
@Rp.
@Rp.
@Rp.
@Rp.
@Rp.
@Rp.
@Rp.
@Rp.
@Rp.
@Rp.
@Rp.
@Rp.
@Rp.
@Rp.
@Rp.
@Rp.
@Rp.
@Rp.
@Rp.
@Rp.
@Rp.
@Rp.
@Rp.
@Rp.

1,931,600.00
1,391,500.00
225,280.00
3,025,000.00
526,350.00
557,480.00
27,350.00
77,200.00
92,570.00
72,240.00
181,500.00
522,720.00
466,700.00
272,250.00
56,270.00
15,000.00
27,500.00
12,500.00
100,000.00
125,000.00
11,250.00
17,790.00
20,090.00
19,240.00
27,350.00
56,270.00
63,400.00
95,950.00
136,000.00
201,100.00
345,820.00
25,300.00
7,440.00
13,620.00
19,670.00
23,190.00
26,620.00
29,840.00
49,920.00
14,770.00
20,140.00
29,520.00
37,580.00
47,600.00
50,220.00
14,770.00
20,140.00
29,520.00
33,560.00
37,580.00
47,600.00
52,440.00
5,230.00
7,150.00
4,680.00
11,500.00
24,750.00
7,430.00
18,150.00

/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/

Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Ttk
Ttk
M'
M'
M'
M'
M'
M'
M'
M'
M'
M'
M'
Btg
Btg
Btg
Btg
Btg
Btg
Btg
Btg
Btg
Btg
Btg
Btg
Btg
Btg
Btg
Btg
Btg
Btg
Btg
Btg
Btg
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh

62

Water Moer 1"

@Rp.

1
J
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26

SANITASI / PIPA
Kloset duduk / monoblok lengkap tangki
Kloset duduk / monoblok tanpa tangki
Kloset jongkok porselin
Bakkif Porselin
Wastafel
Urinoir
Kran air 1/2" - 3/4"

27
28
29
30
31
32
33
34
35
36
37
38
39
40
41
42
43
44
45
46
47
48
49
50
51
52
53

Buis Beton
Buis Beton
Buis Beton
Buis Beton
Buis Beton

54
55
56
57
58
59

Fitting Knee AW 1"


Fitting Tee AW 1"
Fitting Socht AW 1"
Bocht LL-D 1"
Union Socht 1"
D-Nipple 1"

Kran air leher angsa 1/2"


Kran shower
Kran Cebok
Bak fibreglass 0,3 M3
Bak fibreglass 1 M3
Bak cuci piring stainless 2 lobang
Bak cuci piring teraso 2 lobang
Tempat sabun keramik
Floor drain 4" steinless
Stop kran 3/4"
Tutup bak air 1" Kuningan
Instalasi air bersih
Instalasi air kotor/limbah
Buis Beton 1/2 15 cm
Buis Beton 1/2 20 cm
Buis Beton 1/2 30 cm
Buis Beton 15 cm
Buis Beton 20 cm
Buis Beton 30 cm
40 cm
50 cm
60 cm
80 cm
100 cm

Bodeam 30 x 60 cm
Pipa PVC Tipe AW 1/2"
Pipa PVC Tipe AW 3/4"
Pipa PVC Tipe AW 1"
Pipa PVC Tipe AW 1 1/2"
Pipa PVC Tipe AW 2"
Pipa PVC Tipe AW 2 1/2"
Pipa PVC Tipe AW 3"
Pipa PVC Tipe AW 4"
Pipa Besi Hitam 1/2"
Pipa Besi Hitam 3/4"
Pipa Besi Hitam 1"
Pipa Besi Hitam 1 1/2"
Pipa Besi Hitam 2"
Pipa Besi Hitam 2 1/2"
Pipa Galvanis 1/2"
Pipa Galvanis 3/4"
Pipa Galvanis 1"
Pipa Galvanis 1 1/4"
Pipa Galvanis 1 1/2"
Pipa Galvanis 2"
Pipa Galvanis 2 1/2"
Fitting Pipa AW 1" yang terdiri dari :

29,500.00 /

Bh

@Rp.
@Rp.
@Rp.
@Rp.
@Rp.
@Rp.
@Rp.
@Rp.
@Rp.
@Rp.
@Rp.
@Rp.
@Rp.
@Rp.
@Rp.
@Rp.
@Rp.
@Rp.
@Rp.
@Rp.
@Rp.
@Rp.
@Rp.
@Rp.
@Rp.
@Rp.

1,931,600.00
1,391,500.00
225,280.00
3,025,000.00
526,350.00
557,480.00
27,350.00
77,200.00
92,570.00
72,240.00
181,500.00
522,720.00
466,700.00
272,250.00
56,270.00
15,000.00
27,500.00
12,500.00
100,000.00
125,000.00
11,250.00
17,790.00
20,090.00
19,240.00
27,350.00
56,270.00

/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/

Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Ttk
Ttk
M'
M'
M'
M'
M'
M'

@Rp.
@Rp.
@Rp.
@Rp.
@Rp.
@Rp.
@Rp.
@Rp.
@Rp.
@Rp.
@Rp.
@Rp.
@Rp.
@Rp.
@Rp.
@Rp.
@Rp.
@Rp.
@Rp.
@Rp.
@Rp.
@Rp.
@Rp.
@Rp.
@Rp.
@Rp.
@Rp.
@Rp.
@Rp.
@Rp.
@Rp.
@Rp.
@Rp.
@Rp.

63,400.00
95,950.00
136,000.00
201,100.00
345,820.00
25,300.00
5,540.00
7,440.00
13,620.00
19,670.00
23,190.00
26,620.00
29,840.00
49,920.00
14,770.00
20,140.00
29,520.00
37,580.00
47,600.00
50,220.00
14,770.00
20,140.00
29,520.00
33,560.00
37,580.00
47,600.00
52,440.00

/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/

M'
M'
M'
M'
M'
Bh
M'
M'
M'
M'
M'
M'
M'
M'
M'
M'
M'
M'
M'
M'
M'
M'
M'
M'
M'
M'
M'

5,230.00
7,150.00
4,680.00
24,750.00
7,430.00
18,150.00

Bh
Bh
Bh
Bh
Bh
Bh

1
K
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
37
38

LISTRIK / ACSESORIES
Lampu TL 1 x 20 W Lengkap Kotak
Lampu TL 1 x 40 W Lengkap Kotak
Lampu TL 2 x 20 W Lengkap Kotak
Lampu TL 2 x 40 W Lengkap Kotak
Lampu TL Bambu 1 x 20 W Lengkap
Lampu TL Bambu 1 x 40 W Lengkap
Lampu XL 5 W + Fitting
Lampu XL 8 W + Fitting
Lampu XL 10 W + Fitting
Lampu XL 14 W + Fitting
Lampu XL 18 W + Fitting
Lampu XL 24 W + Fitting
Lampu Downlight 5 W lengkap
Lampu Pijar 5 w + Fitting
Lampu Pijar 10 w + Fitting
Lampu Pijar 15 w + Fitting
Lampu Pijar 20 w + Fitting
Lampu Pijar 25 w + Fitting
Lampu Pijar 40 w + Fitting
Stop Kontak tanam
Saklar tunggal
Saklar ganda
Saklar Triple
Zekring box 1 grup
Zekring box 2 grup
Zekring box 3 grup
Zekring box 4 grup
MCB 2 Ampere
MCB 4 Ampere
MCB 6 Ampere
MCB 8 Ampere
Kabel Listrik NYA 1,5 mm
Kabel Listrik NYA 2,5 mm
Kabel Listrik NYA 4 mm
Kabel Listrik NYM 2 1,5 mm
Kabel Listrik NYM 2 2,5 mm
Kabel Listrik NYM 2 4 mm

@Rp.
@Rp.
@Rp.
@Rp.
@Rp.
@Rp.
@Rp.
@Rp.
@Rp.
@Rp.
@Rp.
@Rp.
@Rp.
@Rp.
@Rp.
@Rp.
@Rp.
@Rp.
@Rp.
@Rp.
@Rp.
@Rp.
@Rp.
@Rp.
@Rp.
@Rp.
@Rp.
@Rp.
@Rp.
@Rp.
@Rp.
@Rp.
@Rp.
@Rp.
@Rp.
@Rp.
@Rp.
@Rp.

Instalasi Listrik titik api / Lampu nyala

Medan,
Diketahui Oleh :
Kepala Dinas Penataan Ruang dan
Permukiman Prov. Sumatera Utara

Ir. H. Syafruddin Siregar, MSi


Pembina Utama Muda
NIP. 400025884

54,450.00
60,500.00
163,350.00
183,920.00
108,900.00
123,420.00
25,410.00
27,230.00
29,040.00
33,280.00
33,880.00
38,720.00
54,450.00
8,250.00
8,800.00
9,350.00
9,900.00
10,450.00
11,550.00
10,290.00
14,520.00
15,730.00
18,150.00
26,620.00
31,350.00
38,500.00
46,200.00
35,200.00
42,900.00
67,760.00
99,220.00
1,120.00
1,930.00
8,250.00
4,020.00
9,900.00
15,970.00
101,750.00

/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/

Set
Set
Set
Set
Set
Set
Set
Set
Set
Set
Set
Set
Set
Set
Set
Set
Set
Set
Set
Bh
Bh
Bh
Bh
Unit
Unit
Unit
Unit
Unit
Unit
Unit
Unit
M'
M'
M'
M'
M'
M'
Ttk

Maret 2008

Dibuat oleh : TIM TEKNIS


1. Ir. Jeremias Sinaga, MAP

(.)

2. Ir. Herimas

(.)

3. H. Sugiarto Bharata, ST

(.)

4. Ali Muhar, ST

(.)

5. Sekula Karokaro, ST

(.)

6. Ebenser Saragih, SE

(.)

7. Sahat Hasudungan, ST

(.)

8. Ir. Tanogara Siahaan

(.)

9. Ali Fauzen, ST

(.)

10. Naimul Ahmad R. ST

(.)

11. Chandra, ST

(.)

DAFTAR ANALISA
PEKERJAAN PEMBANGUNAN GEDUNG NEGARA

NO

ANALISA

URAIAN

1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16

Anl.
Anl.
Anl.
Anl.
Anl.
Anl.
Anl.
Anl.
Anl.
Anl.
Anl.
Anl.
Anl.
Anl.
Anl.
Anl.

6.1
6.2
6.3
6.4
6.5
6.6
6.7
6.8
6.9
6.10
6.11
6.12
6.13
6.14
6.15
6.16

1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1

M'
M'
M'
M'
M
M
M
M
M
M
M
M
M
M
M'
M'

Pagar sementara dari kayu tinggi 2 meter


Pagar sementara dari seng gelombang tinggi 2 meter
Pagar sementara dari kawat duri tinggi 1,8 meter
Pengukuran dan pemasangan bouwlank
Pembuatan kantor sementara dengan lantai plesteran
Pembuatan gudang semen dan alat - alat
Pembuatan rumah jaga/ konstruksi kayu
Membersihkan Lapangan dan peralatan
Pembuatan bedeng buruh
Pembuatan bak adukan ukuran (40 x 50 x 20) cm
Pembuatan Stegger dari bambu ukuran (40 x 50 x 20) cm
Pembuatan jalan sementara
Bongkaran beton bertulang
Bongkaran dinding tembok bata merah
Pasang pagar kawat jaring galvanis, tinggi 1,00 m
Pasang pagar beton pracetak (5 x 50 x 213) cm

17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32

Anl.
Anl.
Anl.
Anl.
Anl.
Anl.
Anl.
Anl.
Anl.
Anl.
Anl.
Anl.
Anl.
Anl.
Anl.
Anl.

6.1
6.2
6.3
6.4
6.5
6.6
6.7
6.8
6.9
6.10
6.11
6.12
6.13
6.14
6.15
6.16

1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1

M
M
M
M
M
M
M
M
M
M
M
M
M
M
M
M

Galian tanah biasa sedalam 1 meter


Galian tanah biasa sedalam 2 meter
Galian tanah biasa sedalam 3 meter
Galian tanah keras sedalam 1 meter
Galian tanah cadas sedalam 1 meter
Galian tanah lumpur sedalam 1 meter
Pekerjaan Stripping setinggi 1 meter
Pembuangan tanah sejauh 150 meter
Urugan kembali
Pemadatan tanah
Urugan pasir
Lapisan pudel campuran 1 Kp : 3 Ps : 7 TL
Lapisan pudel campuran 1 Kp : 5 TL
Pemasangan lapisan ijuk
Urugan sirtu
Pembuatan jalan sementara, tebal 25 cm

33
34
35
36
37
38
39
40
41
42

Anl.
Anl.
Anl.
Anl.
Anl.
Anl.
Anl.
Anl.
Anl.
Anl.

6.1
6.2
6.3
6.4
6.5
6.6
6.7
6.8
6.9
6.10

1
1
1
1
1
1
1
1
1
1

M
M
M
M
M
M
M
M
M
M

Pasangan pondasi batu kali, 1 Pc : 1 Ps


Pasang pondasi batu kali 1 Pc : 2 Ps
Pasang pondasi batu kali, 1 Pc : 2,5 Ps
Pasang pondasi batu kali, Pc : 3 Ps
Pasang pondasi batu kali, 1 Pc : 4 Ps.
Pasang pondasi batu kali, 1 Pc : 5 Ps
Pasang pondasi batu kali, 1 Pc : 6 Ps
Pasang pondasi batu kali, Pc : 8 Ps
Pasang pondasi batu kali, 1 Kp : 1 Sm : 1 Ps
Pasang pondasi batu kali, 1 Kp : 1 SM : 2 Ps

HARGA

Pekerjaan Persiapan
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

Pekerjaan Tanah
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

Pekerjaan Pondasi
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

NO

ANALISA

43
44
45
46
47
48
49
50

Anl.
Anl.
Anl.
Anl.
Anl.
Anl.
Anl.
Anl.

6.11
6.12
6.13
6.14
6.15
6.16
6.17
6.18

1
1
1
1
1
1
1
1

M
M
M
M
M
M
M
M

URAIAN

51
52
53
54
55
56
57
58
59
60
61
62
63
64
65
66
67
68
69
70
71
72
73
74
75
76
77

Anl.
Anl.
Anl.
Anl.
Anl.
Anl.
Anl.
Anl.
Anl.
Anl.
Anl.
Anl.
Anl.
Anl.
Anl.
Anl.
Anl.
Anl.
Anl.
Anl.
Anl.
Anl.
Anl.
Anl.
Anl.
Anl.
Anl.

6.1
6.2
6.3
6.4
6.5
6.6
6.7
6.8
6.9
6.10
6.11
6.12
6.13
6.14
6.15
6.16
6.17
6.18
6.19
6.20
6.21
6.22
6.23
6.24
6.25
6.26
6.27

1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1

m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m

Pasangan pondasi batu kali, 1 Pc : 1/4 Kp : 4 Ps


Pasang pondasi batu kali, 1 Pc : 3 Kp : 10 Ps
Pasang pondasi batu kali, 1/4 Pc : 1 Kp : 4 Ps
Pasang pondasi batu kosong
Pasang pondasi siklop 40 % batu kali
Pasang pondasi sumuran diameter 100 Cm
Pembuatan tiang pancang (40 x 40) Cm, beton bertulang
Pembuatan tiang pancang (35 x 35) Cm, beton bertulang

HARGA
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

Pekerjaan Dinding
Pasangan
Pasangan bata
bata merah
merah tebal
tebal 11 bata,
bata, 1Pc
1 Pc: :21Ps
Ps
Pasangan bata merah tebal 1 bata, 1Pc : 2 Ps
Pasangan bata merah tebal 1 bata, 1Pc : 3 Ps
Pasangan bata merah tebal 1 bata, 1Pc : 4 Ps
Pasangan bata merah tebal 1 bata, 1Pc : 5 Ps
Pasangan bata merah tebal 1 bata, 1Pc : 6 Ps
Pasangan bata merah tebal 1 bata, 1Pc : 3 Kp : 10 Ps
Pasangan bata merah tebal 1/2 bata, 1Pc : 1 Ps
Pasangan bata merah tebal 1/2 bata, 1Pc : 2 Ps
Pasangan bata merah tebal 1/2 bata, 1Pc : 3 Ps
Pasangan bata merah tebal 1/2 bata, 1Pc : 4 Ps
Pasangan bata merah tebal 1/2 bata, 1Pc : 5 Ps
Pasangan bata merah tebal 1/2 bata, 1Pc : 6 Ps
Pasangan bata merah tebal 1/2 bata, 1Pc : 8 Ps
Pasangan bata merah tebal 1/2 bata, 1Pc : 3 Kp : 10 Ps
Pasangan bata merah tebal 1/2 bata, 1Kp : 1 Sm : 1 Ps
Pasangan bata merah tebal 1/2 bata, 1Kp : 1 Sm : 2 Ps
Pasangan dinding holowblock (HB.20)
Pasangan dinding holowblock (HB.15)
Pasangan dinding holowblock (HB.10)
Pasangan dinding holowblock (HB.10)
Pasangan dinding Conblock (CB.15)
Pasangan dinding Conblock (CB.10)
Pasang dinding lantai
Pasang dinding lantai
Pasang bata berongga ukuran ( 5 x 11 x 24 ) cm
Pasang dinding anyaman bambu, rangka kayu

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

Pekerjaan Plesteran
78
79
80
81
82
83
84
85
86
87
88
89
90

Anl.
Anl.
Anl.
Anl.
Anl.
Anl.
Anl.
Anl.
Anl.
Anl.
Anl.
Anl.
Anl.

6.1
6.2
6.3
6.4
6.5
6.6
6.7
6.8
6.9
6.10
6.11
6.12
6.13

1 M Plesteran 1 Pc : 1 Ps, tebal 15 mm

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

NO

ANALISA

91
92
93
94
95
96
97
98
99
100
101
102
103
104
105
106
107
108
109
110
111
112
113

Anl.
Anl.
Anl.
Anl.
Anl.
Anl.
Anl.
Anl.
Anl.
Anl.
Anl.
Anl.
Anl.
Anl.
Anl.
Anl.
Anl.
Anl.
Anl.
Anl
Anl
Anl
Anl

6.14
6.15
6.16
6.17
6.18
6.19
6.20
6.21
6.22
6.23
6.24
6.25
6.26
6.27
6.28
6.29
6.30
6.31
6.32
6.33
6.34
6.35
6.36

114
115
116
117
118
119
120
121
122
123
124
125
126
127
128
129
130
131
132
133
134
135
136
137
138
139
140

Anl
Anl
Anl
Anl
Anl
Anl
Anl
Anl
Anl
Anl
Anl
Anl
Anl
Anl
Anl
Anl
Anl
Anl
Anl
Anl
Anl
Anl
Anl
Anl
Anl
Anl
Anl

6.1
6.2
6.3
6.4
6.5
6.6
6.7
6.8
6.9
6.10
6.11
6.12
6.13
6.14
6.15
6.16
6.17
6.18
6.19
6.20
6.21
6.22
6.23
6.24
6.25
6.26
6.27

URAIAN

HARGA
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

Pekerjaan Kayu
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

NO

ANALISA

141
142
143
144
145
146
147
148
149
150
151
152
153
154
155
156
157
158
159
160
161
162
163
164
165
166
167
168
169
170
171
172
173

Anl
Anl
Anl
Anl
Anl
Anl
Anl
Anl
Anl
Anl
Anl
Anl
Anl
Anl
Anl
Anl
Anl
Anl
Anl
Anl
Anl
Anl
Anl
Anl
Anl
Anl
Anl
Anl
Anl
Anl
Anl
Anl
Anl

6.28
6.29
6.30
6.31
6.32
6.33
6.34
6.35
6.36
6.37
6.38
6.39
6.40
6.41
6.42
6.43
6.44
6.45
6.46
6.47
6.48
6.49
6.50
6.51
6.52
6.53
6.54
6.55
6.56
6.57
6.58
6.59
6.60

174
175
176
177
178
179
180
181
182
183
184
185
186
187
188
189
190

Anl
Anl
Anl
Anl
Anl
Anl
Anl
Anl
Anl
Anl
Anl
Anl
Anl
Anl
Anl
Anl
Anl

6.1
6.2
6.3
6.4
6.5
6.6
6.7
6.8
6.9
6.10
6.11
6.12
6.13
6.14
6.15
6.16
6.17

URAIAN

HARGA
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

Pekerjaan Beton
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1

M Membuat
M Membuat
M Membuat
M Membuat
M Membuat
M Membuat
M Membuat
M Membuat
M Membuat
M Membuat
M Membuat
M Membuat
M Membuat
M Membuat
M Membuat
M Membuat
M Membuat

beton tumbuk, 1 Pc : 3 Ps : 5 Kr
beton tumbuk, 1 Pc : 3 Ps : 6 Kr
beton tumbuk, 1 Pc : 4 Ps : 6 Kr
beton tumbuk, 1 Pc : 3 Ps : 5 Kr, Tebal 5 Cm
beton 1 Pc : 2 Ps : 3 Kr
beton 1 Pc : 2 Ps : 4 Kr
beton 1 Pc : 2 Ps : 2,5 Kr
beton 1 Pc : 1,5 Ps : 3 Kr
beton 1 Pc : 1,5 Ps : 2,5 Kr
beton 1 Pc : 1 Ps : 2 Kr
tiang pancang prestressed beton
beton dengan puzzdith - 100 XR
beton 1 Pc : 2 Ps : 3 Kr
beton 1 Pc : 2 Ps : 4 Kr
beton 1 Pc : 1,5 Ps : 3 Kr
beton 1 Pc : 1,5 Ps : 2,5 Kr
beton 1 Pc : 1 Ps : 1 Kr

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

585,069.50
565,972.50
532,309.50
33,712.30
587,468.50
676,290.50
740,208.50
704,522.50
790,358.50
892,252.50
858,730.50
738,581.50
819,465.50
777,493.50
862,494.50
907,916.50
1,120,506.50

NO

ANALISA

191
192
193
194
195
196
197
198
199
200
201
202
203
204
205
206
207
208
209
210
211
212
213
214
215
216
217
218
219

Anl
Anl
Anl
Anl
Anl
Anl
Anl
Anl
Anl
Anl
Anl
Anl
Anl
Anl
Anl
Anl
Anl
Anl
Anl
Anl
Anl
Anl
Anl
Anl
Anl
Anl
Anl
Anl
Anl

6.18
6.19
6.20
6.21
6.22
6.23
6.24
6.25
6.26
6.27
6.28
6.29
6.30
6.31
6.32
6.33
6.34
6.35
6.36
6.37
6.38
6.39
6.40
6.41
6.42
6.43
6.44
6.45
6.46

URAIAN
1
1
1
1
1
1

M Membuat beton kedap air dengan strorox - 100


M' Memasang PVC Waterstop lebar 150 mm
M' Memasang PVC Waterstop lebar 200 mm
M' Memasang PVC Waterstop lebar 230 mm
M' Memasang PVC Waterstop lebar 250 mm
M' Memasang PVC Waterstop lebar 300 mm

1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1

M Pasang bekisting untuk sloof


M Pasang bekisting untuk kolom
M Pasang bekisting untuk balok
M Pasang bekisting untuk lantai
M Pasang bekisting untuk dinding
M Pasang bekisting untuk tangga
M Pasang beton dengan mutu K 225
M Pasang beton dengan mutu K 275
M Pasang jembatan cor
M Membuat pondasi beton bertulang (150 kg besi + bekisting)
M Membuat sloof beton bertulang (200 kg besi + bekisting)
M Membuat kolom beton bertulang (300 kg besi + bekisting)
M Membuat balok beton bertulang (200 kg besi + bekisting)
M Membuat balok beton bertulang (150 kg besi + bekisting)
M Membuat dinding beton bertulang (150 kg besi + bekisting)
M Membuat tangga beton bertulang (150 kg besi + bekisting)
M' Membuat kolom penguat beton bertulang (11 x 11) cm
M' Membuat ring balok beton bertulang (10 x 15) cm

HARGA
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

893,700.50
5,395.90
5,835.85
31,764.20
31,829.80
38,955.40

183,777.90
302,545.80
312,918.30
380,595.80
327,308.30
272,206.30
1,096,130.00
1,121,754.00
113,108.70
3,879,747.00
4,965,574.90
8,481,745.00
6,384,685.30
5,856,707.50
5,553,986.30
5,916,143.20
73,108.50
87,256.80