Anda di halaman 1dari 8

Ahmed Mahmoud Ahmed Mahmoud Soliman Elassal Senior Planning / Deputy Project Controls Manager MBA Student - BSc

Mech. Engineering CCE certified Address: Dubai , UAE Tel: +00971554961063 - 0020102508831 - 00971505581628(Cellular) E-Mail: Elassal@engineer.com Skype : ahmed.elassal11

Objective
To have a progressive career through which my skills, knowledge and responsibilities develop in a dynamic and encouraging corporate environment. I am reliable, active and flexible in any work situation. I have the capability and motivation to meet all different challenges and acquire new skills.

Background (10) Years combined experience of Planning & Project Control Engineering. Key Skills
1- Expert knowledge in preparing the planning requirements as: A- Schedule using primavera project planning 3 and 6. B- Resources loading, resources leveling and histograms. C- Monitoring work progress using The KPIs (Key performance indicator), D- Tracking Projects and Manpower requirement. E- Updating schedule periodically and analyze the delays. F- Producing cash flow report and Earned Values reports. G- Preparing the project reports (Daily, weekly, monthly and flash). H- Preparing the planning, reporting & progress measurements, and Risk Analysis procedures. I Applying Risk Analysis using Monte Carlo Methodology using Primavera Risk Management. J- Preparation of project budget. K-Coordination with procurement department in request for quotation , Material approval request , material requisitions and technical bids evaluation preparation. L-Preparation of invoices

2- Very Good Knowledge experience of different types of Claims and extension of time (Impacted baseline, Window analysis). 3- Good Knowledge in tracking and controlling projects Documents and contract s using Primavera Expedition Software. 4- Good knowledge of the international coding system. (Master Format). 5- High capability to work as team leader. 6- High capability in direct and distance training and support for planning skill. 7- Ability to prepare planning training manuals.

1 of 8

Major Accomplishments:
1- Playing key role with Archirodon construction company in the planning , project control , claims and delay analysis and Schedule Risk analysis in several types of projects ( oil & gas , ports , infrastructure , precast elements bridges , suspended deck bridge ,seawater intakes , pipelines , substation , dredging , reclamation and buildings , power plant and railways ) with some of the most ranked international organizations like Snampojetti , fosterweeler , Gasco( Abudhabi national gas company ) , Bechtel oveerseas , Abu Dhabi ports company , SNC. Lavalin , Emirates Aluminium company , Hyndai , Bosskallis , the Linde group , AbuDhabi municiplity , French TOTAL , Jacobs International , Saudi MARAFIQ , TAKREER ( Abu Dhabi Oil Refinery Company , ATKINS ..and etc. 2- Prepararion of learning CDs for primavera project planning versions 3 and 6 in arabic languages produced by BUSSMA group ( WWW. Bussma.com ) which have been distributed in most of the arabic ountries . 3Direct and distance monitoring for various projects of different scale companies in most of the Arabic World countries like Egypt , Saudi Arabia , Oman , Kuwait, Qatar , lyibia , Iraq and UAE :

4- Supervise and train 9 planners with Archirodon .

2 of 8

Professional Experience
1- ARHIRODON Construction (overseas) CO S.A (Gulf office in Dubai)
Project Rwuis LNG3 Lead Planner- Deputy Project Control Manger October 2007 till Now Description Start Till PC- Works of jetty construction for Rwuis 1-1-2009 Project Completed LNG3( liquefied natural gas phase 3 ) under December2010Claims Snamporjetti as main contractor, Abu Dhabi Completed on May2011. Company for Industrial Gases (Gasco) as a client and Fosterweeler as a client representative. The scope was 1- 1.7 KM Jetty and two loading & offloading platforms construction 2- Pipe rack 9 process lines 3- Process piping, equipments, instrumentation and loading arms. 4- Firefighting Systems The US $160 million finished with the pre commissioning on Dec2009. Khalifa port and industrial zone phase1 Khalifa port and industrial zone phase1 under Bechtel Co as Management and ADPC as Client. I am the senior planner with supervision of Archirodon planning manger in the consortium of Archirodon construction, Hyundai engineering and Boskalis westinmar with a scope of US $ 2 Billion. In this project I am playing the role of the contractor with the client and the role of the client with the consortium three companies to control the following 1-two bridges with 1 KM long for each designed for heavy transportation vehicle ( access to the port) and one for normal transportation ( 1.7 KM length ) access for a special berth for Aluminum Station. 2- 4 KM causeways to complete the access of the port. 3- Around 8 KM of Quay walls 4- Dredging of Basin and Channel till -18.5 depth 5- Seawater intake ( culvert design ). 5- Around 7 KM length of Breakwaters to protect the marine process in the port and also to protect the coral life in the area. Emirates Aluminum seawater intake and return Pipelines system (infrastructure) with Bechtel Co as Management and ADPC as Client. Scope is US $ 34.87 to install 6 pipelines for intake and three for drainage. Installation of 1.7 km Steel Structure which will be used for the electro mechanical equipment of the loading and offloading process for Emirates Aluminum complex with SNC. Lavalin . The Sheikh Zayed Bridge will be the third bridge to the island on which Abu Dhabi is situated. The highway bridge will have four lanes, an emergency lane and a pedestrian walkway in each direction. The bridge is about 68 meters in width and 842 meters in length, with a central steel arch span of 234 meters. The central pier alone contains enough concrete to 1-11-2007 Project Completed August2010 Claims completed May 2011

Emirates Aluminum seawater intake and return Pipelines system


EMAL Transfer Gallery

7-05-2009

June-2010

2-11-2009

22-04-2010

Sheikh Zayed Bridge

7-3-2010

Bridge 2011.

completed

April

3 of 8

Elixier 2 Project/Mirfa 1 ( Seawater Intake)

Boubyan Seaport Project (Phase 1-Stage 2) The Seaport works

Tender Department YANBU II power & Water Project Marine Facility

RAS ELZOR Power & Water Plant Marine Package HALUL Desalination & Potable Water Intake Plant Qatar Petroleum Company Nakilat ( Qatar Petroleum )

cover a football pitch to a height of five meters. The steel arch cross-sections are up to 6 x 8 meters ($224million) A seawater intake & outfall with pipelines ( GRP , PE100) , substation building , piping steel structure and stationary and rotating equipment installation with Linde group and GASCO as a client one year project. Design, execution, completion and maintenance of Boubyan Seaport Project (Phase 1-Stage 2) The Seaport works a subcontract( 50%) from Hyundai construction Company which has 80% of the JV with Alkharafi National company the project scope is design & build of 1600 m of pile/ sheet pile quay wall with 176 Ha reclamation area- furniture & settlement Monitoring Main Contractors Designer: Royal Haskoning Clients Site Representative: Mouchel Parkman Prepare the planning requirements for most of the tenders that Archirodon has applied during 2.5 years. EPIC of marine package (package II) for YANBU II power and water plant in the kingdom of Saudi Arabia ( $210 Million ) , the scope is civil ,mechanical , electrical & instrumentation of intake and outfall system of the power & water plant with Jacobs international as a project management & MARAFIQ as the owner of the project . -The scope is intake structure & breakwaters , outfall pipe line ( 12KM- 4 M diameter onshore , offshore) , pumps station , power substation , control system , etc. Consortium with DOSAN construction ( our scope is $380 million ) for the power and water Plant in RAS ELZOR in the Kingdom of Saudi Arabia. EPIC of desalination unit and potable water intake system at HALUL Island with Qatar Petroleum company. Scope of $ 58Million Nakilat - Erhama Bin Jaber Al Jalahma Shipyard project $ 40Million Scope is marine dolphins with 2 Jetties , pontoon and tower crane . EPIC of marine package (package IV) for YANBU II power and water plant in the kingdom of Saudi Arabia ( $66 Million ) , the scope is Pipelines from the Sea water Package to the industrial city & the power plant. EPIC of Jetty to import & Export the oil product ( Piping ,Pipe rack, Power, Equipment, Control , F&G, Loading Arms , Dolphins, Breakwater, Loading Platform ) with value of $60 Million .Client :Abu Dhabi oil refining Company ( TAKREER) . Consultant : ATKINS , AICI/ARCHIRODON - Joint Venture, Arlington to provide for the design, construction, security and training services at Cairo West Air Base in support of the Egyptian Air Force ($66,588,000), the supervision is by the corps of Engineers ( civil division ) .

17-03-2010

Project 2011

Completed

June

June -2010

My Duties finished January 2011

1-11-2007 March-2011

Now Expected finish on July 2013

March2011

Expected finish February 2013 Completed 2012 November

May 2011

1August 2011

Project 2012

Completed

July

YANBU II Power Plant Sea Water supply package

1 September 2011

Expected Finish September 2013.

EPC-2 of construction of Jetty at Hamriyah Free Zone

15DEC2011

Expected Finish 15April2014

Cairo West Air Base

29 August 2012

Expected Finish 29 August 2014

4 of 8

5- Part Time With more than multinational company


Lead Planner October 2007 till Now Project Shah Gas development program Company Saipem - Italy Description $ 3.5 billion EPC contracts as part of the Shah Gas development program. The development program is designed to treat 1 billion cubic feet a day of sour gas from the Shah field, before separating the sulphur from the natural gas and transporting both to processing facilities at Habshan area, and then to Ruwais, located in the northern part of the Emirate. The Shah field is located 180 kilometres south west of Abu Dhabi city. The first two contracts encompass the engineering, procurement, and construction of the gas process plant and of the sulphur recovery unit. The third contract covers the engineering, procurement, and construction of nearly 250 kilometre long pipelines in total for transporting gas, condensate and NGL from the Shah Gas plant to Habshan and ASAB tie-in point. The activities will be completed within 52 months.
Steel Structure, Equipment installation, Piping , Painting , Electrical , Instrumentation , and Telecommunication Works

Role -

Planning Advisor

Grassroots LNG Plant 4.7 MTPA, ARZEWAlgeria

Consortium (Snamproget
ti / Chioda / Saipem Contracting Algeria)

Planning Advisor

Heart of Doha

TURNER

Jaber ALAhmed ALJaber international Hospital

Kuwait Arab Contractors

A US $5.5 billion (QAR20 billion) owned by DOHALAND to rebuilt a 350,000m2 area in the city centre. The project, aims to reduce the citys urban sprawl and includes plans for an underground city., The project will be completed in five phases, with Phase 1 due for completion by 2012, and the entire project to be completed by 2016.A joint venture between Turner and DOHALAND, provides project and construction management services; Rider Levett Bucknall is the executive cost consultant. ARUP, AECOM, and Allies and Morrison will handle master plan design regulations and site planning approvals. The Phase 1-A first construction contract awarded to Bauer International Qatar LLC & Hyundai Construction . The total built up area is 270,000 square meters, Kuwait Arab Contractors Co. was awarded the main construction contract.. The project cost 900 million $. Project duration is 3years. Main Consultants are Gulf Consults , Langdon Wilson International 12 schools in various areas of Saudi Arabia kingdom , 193000000 RS Budgeted cost , estimated duration 4 Years . The electro mechanical contract , 30 month duration 14300 activities

Support in primavera technical problems for the 120,000 activities schedule. Support in the extension of time claims apllied by the main sub contractors.

Support in the updating & monitoring of the 35000 activities schedule .

Dependent School project Residential City for Jabel Ali international air port

Fiafit co. for trading & Const. Pioneer international project management with group

Support in the extenstion of time claim. Schedule Analysis . Updating methodology

5 of 8

(UAE) Trepoli Main Terminal Lybia. Various Projetcs (UAE) Blue City Project

five construction Berga Petroleum Marketing Company Alhabtoor Construction AECO Development LLC

20 month duration project , 45,000,000 LD

Schedule Preparation . Project Monitoring. Delay Analysis Delay Analysis

Like : HABTOOR GRAND PALM RESORT

SCHOOL OF BUSINESS BUILDING (Qatar)

AMANA STEEL BUILDINGS & CONT. CO.

6 years duration project s a $15 billion megacity project in the Sultanate of Oman. Spread over 32 square kilometers and 16 kilometers of coastline along the coastal region at Al Sawaadi, only 45 minutes from Muscat. When completed, the city will include more than 20 hotels, hospitals, university. It will also have shopping centers, marina, schools, and other amenities and facilities 2 Years Duration project , 176,000,000 QR

Schedule Analysis.

Schedule Analysis. Monitoring support.

3- Vodafone Egypt Telecommunication S.A.E


Project Construction

Maintenance Planning Engineer March 2005 till October 2007 Start March2005 Till October-2007

Maintenance

Description Plan and monitor all the construction work in Vodafone new communication sites and buildings in the north area of Egypt more than $ 200 million. Plan and monitor all the maintenance cycle (each 3 months) for the existing sites and buildings.

March2005

October 2007

4- Marcelia For Real state Company (Part time)


Project Marcelia Beach

Planning Engineer From 8/11/2006 till 31/10/2007 Description Start Till A 118 Buildings, 50 villas, 10 Palaces and 2 Hotels. March2005 October-2007

5- Toshiba Elaraby Group Technical Office (Part time) Planning Technical support Engineer
From 15/9/2006 till 31/10/2007 Project A group of Projects Description Factories, Hospital, villa, mosque, orphans house, roads which are by their internal construction team and owned by the group. Start March2005 Till October-2007

6- PSC Under supervision of KPR Co. in Project (Weekly Part time)


Project Fertilizing plant Description A scope of 10 tanks for a Fertilizing plant in Suez owned by Orascom group.

Planning Engineer From 1/9/2006 till 1/9/2007 Start Till 1/9/2006 1/9/2007

7- International Computer Center, Egyptian Engineering Group


Responsibility:

Primavera instructor August 2002 till 31/10/2007

6 of 8

Prepare training courses and Workshops for those centers a Primavera project planning instructor as a part time

8- Alexandria Electricity Distribution Co.


Project Construction Maintenance

Maintenance Planning Engineer October 2002 till May2004 and from October 2004 till March 2005 Description Start Till The electricity network extension projects During the above mentioned period. Plan and monitor all the maintenance cycle the company buildings and equipment. Planning Engineer From 1/5/2004 till 1/ 10/2004 Start Till 1/5/2004 1/10/2004

8- Elnashar Alex with BECHTEL Co. in Egyptian LNG Project


Project Egypt LNG Description A scope of construction and commissioning of electromechanical (piping, instrumentation, equipment)

Education A -B.Sc. in Mechanical Engineering "power", Faculty of Engineering, Alexandria University, Egypt
Graduation Date: May 2002.

B I studied a diploma in Engineering Management at the Arab Academy for technology and
maritime transportation (two terms) I have finished the first term. (I didn't make the exam yet because the course exceeds the time frame and I have to travel to UAE). In this diploma I have studying: 1- Operation management. 2- Business economy. 3- Statistics. 4- I prepare my Diploma project in project management C - I Studied automated manufacturing and enterprise resource planning (ERP) course developed by Fujitsu on Microsoft great plain application. (I didn't make the exam yet because the course exceeds the time frame and I have to travel to UAE).

D- I registered for MBA with Harriot WATT university two years expected finish June 2014 With the following courses: Accounting, Economics, Finance, Marketing , organizational behavior , Project Management , Strategic Planning . E- Cost Certified Engineer ( CEE ) credential holding certificate (4060) Training:
1- Three months in Transport & Engineering Company deal with pipelines, machining workshop, steam boilers. 2- Four months in Power Company (Air conditioning Company), deal with central units' maintenance. 3- I have attended Training course on corrosion control in industries using paints & cathodic protection in Institute of Graduate studies &Research (IGSR) &university of Alexandria researches center (UNARC) 4- I have a safety course in Global Santa Fe Company as introduction to its Employers from 17/10/2004 to 21/10/2004.

7 of 8

5- Training course in the environment Protection in Alexandria university public sector for youth from 10/4/2001 till 12/4/2001

6- Training course in the low voltage distribution panels at the power electricity training center in Alexandria Electricity Distribution Company from 24/5/2003 till 5/6/2003. 7- Soft Skills with Fujitsu Company within an ERP (Enterprise Resource Planning) Track (Develop your self, Project Management). 8- 40 Hours online training course in project management with Indian institute of Technology Delhi. Personal Data
Date of Birth Nationality Marital Status Military status Driving license September 1, 1979 Egyptian Married Exempt Valid ( EGYPT UAE)

Personal memo 1- I was a member of student federation of faculty of engineer in Alexandria University from 1999 till 2002. 2- Science Club of Alexandria University (one of its founders) in science club I have training courses in visual basic, solar heaters design and small water desalination equipment design. And I have awarded the 3rd prize from the ministry of youth and sport in programming Through The first youth innovations exhibition for science and technology clubs (28Feb 3 march 2002).

8 of 8

Anda mungkin juga menyukai