Figured dimensions and levels should be veried by the Contractor on site before construction or manufacture and any discrepancies brought to the attention of the Architect. Dimensions should not be scaled.
2. Existing Building and Services
37 36
1 to 1
ACE
12
1 to 4
31
Where shown, existing buildings and services will not indicate condition. The Contractor shall therefore investigate and report to the Architect at the commencement of the works.
3. Copyright
1 to 15
Arena House
NOR TH P L
11
21
10
Jubilee Library
la
38
23
Copyright for all designs and drawings in full or part shall remain with the Architect in accordance with the Copyright Act.
4. Scope of Works
Aren a Ho use
19
16
BAR RAC K YA RD
Drawings are issued in accordance with and on the basis of the RIBA Conditions of Engagement and the JCT Form of Contract unless otherwise agreed in writing
5. Statutory Requirements and Standards
40
21
18
14
13 to
24
All work is to comply with the current Building Regulations and the requirements of the respective local authority. Workmanship and standards shall also comply with the current Codes of Practice and the relevant British Standards.
7. Revisions rev date comment drawn
17
11 to
13
Row
44 to
ET
Oran ge
STRE
32
1 to 2
48
1 to 5
REG
39
ENT
out line
of ext . wal l
above
Planti
ng
20 00
30M2 28 co vers
D.G19-2
3c
3d
ce
ing terra
3a 3b
Addi tiona l down reces sed into lights cano unde py rside
Smok
of
D.G14
8 7 8 9 10
11 12 13
43
14 15
16
17
18
19
20
21
py/ Plant
er over
17
my ho te
Cano
Cup'd
Planti
ng
Hotel
2
l batch
terra
ce
Sto res
Smal
of
Addi tiona l down reces sed into lights cano unde py rside
130M
Of c
TCBs
57
37 36
1 to 1 2
TICKE AND TS CL OA KS
LACE
12
1 to 4
31
la
1 to 15
10
Arena House
21
NOR TH P
11
38
FF L 0.0
Jubilee Library
00
23
a Ho use
FF L -0.
400
KITC
HEN
EXTR
100
FF L -0.
870
MEN
ACT
FROM
BASE
BIN
STOR
REE T
El Su b Sta
18a
ge R 5 ow
44 to 4
DNE
32
Oran
1 to 2
ET
1 to 5
39
TRE
48
JUBIL
EE S
21
3c 3d
24
Posts
GAR
109
17
23
Hotel
11 4
LB
1
TCBs
100
4b
25
18a
21
109
24
23
114
LB
1
27
xch ang
26 25
27
rn E
22
29
28
CHU
Hall
RCH
PH
STR
118
EET
119
120
22
115 116
29
20
29
30
30
20
29
28
Co
26
Pavil
PH
Co rn E xch ang e
6a
45
PH
11 5 11 6
11 8
3
43
57
3a 3b
Hall
11 9
ion M ews
120
20
R ST
16
PH
13
6a
BAR
45
4b
40
21
17
K YA RD
Aren
13 to
24
11 to
RAC
1 to 3
43
20
18
19
14
16
10 co vers
Chefs
Table
Posts
El Su
47
16
b Sta
1 to 3
43
Pavilion Theatre
19
Pavilion Theatre
19
Chalk Architecture Ltd The Chalk Store 102a Gloucester Road North Laine Brighton East Sussex BN1 4AL UK 0044 (0) 1273 697262 info@chalkarchitecture.com www.chalkarchitecture.com
Client
20.
40.
MYHOTEL GROUP
Project
Drawing
01
02
GCW
Job No.
AUGUST 2012
Drg. No.
1138
A.01
Drawing status
PLANNING
Figured dimensions and levels should be veried by the Contractor on site before construction or manufacture and any discrepancies brought to the attention of the Architect. Dimensions should not be scaled.
2. Existing Building and Services
Where shown, existing buildings and services will not indicate condition. The Contractor shall therefore investigate and report to the Architect at the commencement of the works.
3. Copyright
Copyright for all designs and drawings in full or part shall remain with the Architect in accordance with the Copyright Act.
4. Scope of Works
Drawings are issued in accordance with and on the basis of the RIBA Conditions of Engagement and the JCT Form of Contract unless otherwise agreed in writing
5. Statutory Requirements and Standards
1
37 36
1 to 1 2
All work is to comply with the current Building Regulations and the requirements of the respective local authority. Workmanship and standards shall also comply with the current Codes of Practice and the relevant British Standards.
7. Revisions
N OR TH P LACE
Jubilee Library
1 to 4
5
12
1 to 15
Arena House
rev
date
comment
drawn
31
11
21
use
10
38
23
40
Aren a Ho
21
18
19
14
16
la
11 to
Oran ge R 5 ow
1 to 2
3
1
44 to
32
48
1 to 5
39
5
3
43
3a 3b
3c 3d
Hotel
17
57
TCBs
100
18a
21
24
109
23
114
LB
1
rn E xch ang e
26 2 5
27
22
29
28
30
20
29
Co
Pavilion Theatre
19
PH
115 116
118
3
Hall
119
120
PH
6a
45
4b
Pavil ion M e
ws
20
Posts
El Su b
47
13
16
Sta
BAR
RAC
1 to 3
43
17
K YA RD
13 to
24
Chalk Architecture Ltd The Chalk Store 102a Gloucester Road North Laine Brighton East Sussex BN1 4AL UK 0044 (0) 1273 697262 info@chalkarchitecture.com www.chalkarchitecture.com
Client
MYHOTEL GROUP
Project
40.
100.
Drawing
PHOTO SURVEY
Drawn
Date
Scale
GCW
Job No.
NOVEMBER 2012
Drg. No.
1:2000 @ A3 1:1000 @ A1
Rev.
1138
A.03
Drawing status
PLANNING
Figured dimensions and levels should be veried by the Contractor on site before construction or manufacture and any discrepancies brought to the attention of the Architect. Dimensions should not be scaled.
2. Existing Building and Services
Where shown, existing buildings and services will not indicate condition. The Contractor shall therefore investigate and report to the Architect at the commencement of the works.
3. Copyright
Copyright for all designs and drawings in full or part shall remain with the Architect in accordance with the Copyright Act.
4. Scope of Works
Drawings are issued in accordance with and on the basis of the RIBA Conditions of Engagement and the JCT Form of Contract unless otherwise agreed in writing
5. Statutory Requirements and Standards
All work is to comply with the current Building Regulations and the requirements of the respective local authority. Workmanship and standards shall also comply with the current Codes of Practice and the relevant British Standards.
37 36
1 to 1 2
N OR TH P LACE
12
1 to 15
Arena House
1 to 4
31
11
21
10
Jubilee Library
38
23
use
40
Aren a Ho
21
18
19
14
16
la
17
K YA RD
9
13 to
24
11 to
13
Oran ge R 5 ow
44 to
32
1 to 2
Posts
48
1 to 5
39
3c 3d
43
3a 3b
Hotel
17
N
20
57
TCBs
100
18a
21
109
24
23
114
LB
1
rn E xch ang e
26 2 5
2
29
27
22
29
28
30
20
Co
Pavilion Theatre
19
3 4
PH
115 116
118
3
Hall
119
120
PH
6a
45
4b
Pavil ion M e
ws
El Su b
47
16
Sta
BAR
RAC
1 to 3
43
Chalk Architecture Ltd The Chalk Store 102a Gloucester Road North Laine Brighton East Sussex BN1 4AL UK 0044 (0) 1273 697262 info@chalkarchitecture.com www.chalkarchitecture.com
Client
MYHOTEL GROUP
Project
40.
100.
Drawing
PHOTO SURVEY
Drawn
Date
Scale
GCW
Job No.
NOVEMBER 2012
Drg. No.
1:2000 @ A3 1:1000 @ A1
Rev.
1138
A.04
Drawing status
PLANNING
Figured dimensions and levels should be veried by the Contractor on site before construction or manufacture and any discrepancies brought to the attention of the Architect. Dimensions should not be scaled.
2. Existing Building and Services
Where shown, existing buildings and services will not indicate condition. The Contractor shall therefore investigate and report to the Architect at the commencement of the works.
3. Copyright
Copyright for all designs and drawings in full or part shall remain with the Architect in accordance with the Copyright Act.
4. Scope of Works
Drawings are issued in accordance with and on the basis of the RIBA Conditions of Engagement and the JCT Form of Contract unless otherwise agreed in writing
5. Statutory Requirements and Standards
All work is to comply with the current Building Regulations and the requirements of the respective local authority. Workmanship and standards shall also comply with the current Codes of Practice and the relevant British Standards.
7. Revisions rev
37 36
1 to 1 2
date
comment
drawn
N OR TH P LACE
12
1 to 15
Arena House
11
21
10
Jubilee Library
38
23
use
40
Aren a Ho
21
18
19
14
16
17
K YA RD BAR RAC
13 to
1
El Su b Sta
24
11 to
13
2
47
16
REG ENT STRE ET
Oran ge R 5 ow
1 to 2
Posts
44 to
32
48
4
Hotel
1 to 5
39
3c 3d
43
3a 3b
17
57
TCBs
100
18a
21
109
24
23
114
LB
1
rn E xch ang e
26 2 5
27
22
29
28
30
20
29
Pavilion Theatre
Co
19
PH
115 116
118
3
Hall
119
120
PH
6a
45
4b
Pavil ion M e
ws
20
1 to 3
43
1 to 4
31
la
Chalk Architecture Ltd The Chalk Store 102a Gloucester Road North Laine Brighton East Sussex BN1 4AL UK 0044 (0) 1273 697262 info@chalkarchitecture.com www.chalkarchitecture.com
Client
MYHOTEL GROUP
Project
Drawing
40.
PHOTO SURVEY
100.
Drawn Date Scale
GCW
Job No.
NOVEMBER 2012
Drg. No.
1:2000 @ A3 1:1000 @ A1
Rev.
1138
A.05
Drawing status
PLANNING
Figured dimensions and levels should be veried by the Contractor on site before construction or manufacture and any discrepancies brought to the attention of the Architect. Dimensions should not be scaled.
2. Existing Building and Services
Where shown, existing buildings and services will not indicate condition. The Contractor shall therefore investigate and report to the Architect at the commencement of the works.
3. Copyright
Copyright for all designs and drawings in full or part shall remain with the Architect in accordance with the Copyright Act.
4. Scope of Works
CHEFS OFFICE
Drawings are issued in accordance with and on the basis of the RIBA Conditions of Engagement and the JCT Form of Contract unless otherwise agreed in writing
5. Statutory Requirements and Standards
All work is to comply with the current Building Regulations and the requirements of the respective local authority. Workmanship and standards shall also comply with the current Codes of Practice and the relevant British Standards.
7. Revisions rev date comment drawn
Disabled refuge
STAIR
WORKSHOP
RAMP UP
REFUSE
BOTTLE STORE
ADMINISTRATION
CORRIDOR
Disabled refuge
COMMUNICATIONS
Chalk Architecture Ltd The Chalk Store 102a Gloucester Road North Laine Brighton East Sussex BN1 4AL UK 0044 (0) 1273 5697262 info@chalkarchitecture.com www.chalkarchitecture.com
Client
MYHOTEL GROUP
metres
01 -
10
Project
Drawing
Drawn
Date
Scale
PN
Job No.
SEPTEMBER 2012
Drg. No.
1:200 @ A3 1:100 @ A1
Rev.
1138
A.05
Drawing status
PLANNING
Figured dimensions and levels should be veried by the Contractor on site before construction or manufacture and any discrepancies brought to the attention of the Architect. Dimensions should not be scaled.
2. Existing Building and Services
Where shown, existing buildings and services will not indicate condition. The Contractor shall therefore investigate and report to the Architect at the commencement of the works.
3. Copyright
Copyright for all designs and drawings in full or part shall remain with the Architect in accordance with the Copyright Act.
4. Scope of Works
Drawings are issued in accordance with and on the basis of the RIBA Conditions of Engagement and the JCT Form of Contract unless otherwise agreed in writing
5. Statutory Requirements and Standards
12 13 14 15 16 17 18 19 20 21
All work is to comply with the current Building Regulations and the requirements of the respective local authority. Workmanship and standards shall also comply with the current Codes of Practice and the relevant British Standards.
7. Revisions rev date comment drawn
D.G19-2
10 11
D.G14
my
my
Chalk Architecture Ltd The Chalk Store 102a Gloucester Road North Laine Brighton East Sussex BN1 4AL UK 0044 (0) 1273 5697262 info@chalkarchitecture.com www.chalkarchitecture.com
Client
MYHOTEL GROUP
metres
01 -
10
Project
Drawing
Drawn
Date
Scale
PN
Job No.
SEPTEMBER 2012
Drg. No.
1:200 @ A3 1:100 @ A1
Rev.
1138
A.07
Drawing status
PLANNING
Figured dimensions and levels should be veried by the Contractor on site before construction or manufacture and any discrepancies brought to the attention of the Architect. Dimensions should not be scaled.
2. Existing Building and Services
Where shown, existing buildings and services will not indicate condition. The Contractor shall therefore investigate and report to the Architect at the commencement of the works.
3. Copyright
Copyright for all designs and drawings in full or part shall remain with the Architect in accordance with the Copyright Act.
4. Scope of Works
Drawings are issued in accordance with and on the basis of the RIBA Conditions of Engagement and the JCT Form of Contract unless otherwise agreed in writing
5. Statutory Requirements and Standards
All work is to comply with the current Building Regulations and the requirements of the respective local authority. Workmanship and standards shall also comply with the current Codes of Practice and the relevant British Standards.
7. Revisions rev date comment drawn
Chalk Architecture Ltd The Chalk Store 102a Gloucester Road North Laine Brighton East Sussex BN1 4AL UK 0044 (0) 1273 5697262 info@chalkarchitecture.com www.chalkarchitecture.com
Client
MYHOTEL GROUP
metres
01 -
10
Project
Drawing
Drawn
Date
Scale
PN
Job No.
SEPTEMBER 2012
Drg. No.
1:100 @ A3 1:100 @ A1
Rev.
1138
A.08
Drawing status
PLANNING
Figured dimensions and levels should be veried by the Contractor on site before construction or manufacture and any discrepancies brought to the attention of the Architect. Dimensions should not be scaled.
2. Existing Building and Services
Where shown, existing buildings and services will not indicate condition. The Contractor shall therefore investigate and report to the Architect at the commencement of the works.
3. Copyright
Copyright for all designs and drawings in full or part shall remain with the Architect in accordance with the Copyright Act.
4. Scope of Works
Drawings are issued in accordance with and on the basis of the RIBA Conditions of Engagement and the JCT Form of Contract unless otherwise agreed in writing
5. Statutory Requirements and Standards
All work is to comply with the current Building Regulations and the requirements of the respective local authority. Workmanship and standards shall also comply with the current Codes of Practice and the relevant British Standards.
7. Revisions rev date comment drawn
Chalk Architecture Ltd The Chalk Store 102a Gloucester Road North Laine Brighton East Sussex BN1 4AL UK 0044 (0) 1273 5697262 info@chalkarchitecture.com www.chalkarchitecture.com
Client
MYHOTEL GROUP
metres
01 -
10
Project
Drawing
Drawn
Date
Scale
PN
Job No.
SEPTEMBER 2012
Drg. No.
1:100 @ A3 1:100 @ A1
Rev.
1138
A.09
Drawing status
PLANNING
Figured dimensions and levels should be veried by the Contractor on site before construction or manufacture and any discrepancies brought to the attention of the Architect. Dimensions should not be scaled.
2. Existing Building and Services
Where shown, existing buildings and services will not indicate condition. The Contractor shall therefore investigate and report to the Architect at the commencement of the works.
3. Copyright
Copyright for all designs and drawings in full or part shall remain with the Architect in accordance with the Copyright Act.
4. Scope of Works
Drawings are issued in accordance with and on the basis of the RIBA Conditions of Engagement and the JCT Form of Contract unless otherwise agreed in writing
5. Statutory Requirements and Standards
All work is to comply with the current Building Regulations and the requirements of the respective local authority. Workmanship and standards shall also comply with the current Codes of Practice and the relevant British Standards.
7. Revisions rev date comment drawn
Chalk Architecture Ltd The Chalk Store 102a Gloucester Road North Laine Brighton East Sussex BN1 4AL UK 0044 (0) 1273 5697262 info@chalkarchitecture.com www.chalkarchitecture.com
Client
MYHOTEL GROUP
Project
Drawing
metres 0 1 2 3 4 5 10
Drawn Date Scale
JG
OCTOBER 2012
Drg. No.
1:200 @ A3 1:100 @ A1
Rev.
01 -
Job No.
1138
A.10
Drawing status
PLANNING
Figured dimensions and levels should be veried by the Contractor on site before construction or manufacture and any discrepancies brought to the attention of the Architect. Dimensions should not be scaled.
2. Existing Building and Services
Where shown, existing buildings and services will not indicate condition. The Contractor shall therefore investigate and report to the Architect at the commencement of the works.
3. Copyright
Copyright for all designs and drawings in full or part shall remain with the Architect in accordance with the Copyright Act.
4. Scope of Works
Drawings are issued in accordance with and on the basis of the RIBA Conditions of Engagement and the JCT Form of Contract unless otherwise agreed in writing
5. Statutory Requirements and Standards
All work is to comply with the current Building Regulations and the requirements of the respective local authority. Workmanship and standards shall also comply with the current Codes of Practice and the relevant British Standards.
7. Revisions rev date comment drawn
10900
2400
20500 5000
9050
Chalk Architecture Ltd The Chalk Store 102a Gloucester Road North Laine Brighton East Sussex BN1 4AL UK 0044 (0) 1273 5697262 info@chalkarchitecture.com www.chalkarchitecture.com
Client
MYHOTEL GROUP
Project
Drawing
metres 0 1 2 3 4 5 10
Drawn
Date
Scale
JG
OCTOBER 2012
Drg. No.
01 -
1:200 @ A3 1:100 @ A1
Rev.
Job No.
1138
A.11
Drawing status
PLANNING
Figured dimensions and levels should be veried by the Contractor on site before construction or manufacture and any discrepancies brought to the attention of the Architect. Dimensions should not be scaled.
2. Existing Building and Services
Where shown, existing buildings and services will not indicate condition. The Contractor shall therefore investigate and report to the Architect at the commencement of the works.
6 6 1
3. Copyright
Copyright for all designs and drawings in full or part shall remain with the Architect in accordance with the Copyright Act.
4. Scope of Works
Drawings are issued in accordance with and on the basis of the RIBA Conditions of Engagement and the JCT Form of Contract unless otherwise agreed in writing
5. Statutory Requirements and Standards
my
All work is to comply with the current Building Regulations and the requirements of the respective local authority. Workmanship and standards shall also comply with the current Codes of Practice and the relevant British Standards.
7. Revisions rev date comment drawn
SWIMMING POOL
JUBILEE STREET
01 -
Chalk Architecture Ltd The Chalk Store 102a Gloucester Road North Laine Brighton East Sussex BN1 4AL UK 0044 (0) 1273 5697262 info@chalkarchitecture.com www.chalkarchitecture.com
Client
MYHOTEL GROUP
Project
01 -
Drawing
AS EXISTING ELEVATIONS
10
Drawn
Date
Scale
metres
PN
Job No.
SEPTEMBER 2012
Drg. No.
1:200 @ A3 1:100 @ A1
Rev.
1138
A.15
Drawing status
PLANNING
Figured dimensions and levels should be veried by the Contractor on site before construction or manufacture and any discrepancies brought to the attention of the Architect. Dimensions should not be scaled.
2. Existing Building and Services
Where shown, existing buildings and services will not indicate condition. The Contractor shall therefore investigate and report to the Architect at the commencement of the works.
3. Copyright
Copyright for all designs and drawings in full or part shall remain with the Architect in accordance with the Copyright Act.
4. Scope of Works
Drawings are issued in accordance with and on the basis of the RIBA Conditions of Engagement and the JCT Form of Contract unless otherwise agreed in writing
5. Statutory Requirements and Standards
All work is to comply with the current Building Regulations and the requirements of the respective local authority. Workmanship and standards shall also comply with the current Codes of Practice and the relevant British Standards.
7. Revisions rev date comment drawn
THE TWITTEN
JUBILEE STREET
SWIMMING POOL
01 -
Chalk Architecture Ltd The Chalk Store 102a Gloucester Road North Laine Brighton East Sussex BN1 4AL UK 0044 (0) 1273 5697262 info@chalkarchitecture.com www.chalkarchitecture.com
Client
MYHOTEL GROUP
Project
01 -
Drawing
AS EXISTING ELEVATIONS
10
Drawn
Date
Scale
metres
PN
Job No.
SEPTEMBER 2012
Drg. No.
1:200 @ A3 1:100 @ A1
Rev.
1138
A.16
Drawing status
PLANNING