Company Date Supervisor Work Area Work Description Civil Electrical Equipment Installation Excavations Chemicals Instrumentation Crafts Involved Basic Job Steps Task to be carried out Pipe Tie-In General Work Permit Special Work permit Confined Space Entry Hole/Fire Watch Risk S.R. Recommended Safe Job Procedure MSDS Lock-out Tag Emergency Response Plan
*Cause fire incident *Cutting cause hand injury *Spools fall down due to improper rigging practice. * Crane trip over due to overloading or improper position of crane.
*spools slips from trailer *property damage due to car accident *trailer hits pipe rack
*Spools fall down due to improper rigging practice. * Crane trip over due to overloading or improper position of crane. *fire case due to unloading in restricted area.
*Correct using Firefighting equipment. *Proper PPE require for activity *Qualified rigger and operator shall be assigned for lifting activity. * Load chart and pre-lifting checklist shall be followed. Crane position shall be on firm ground with fully extend outrigger. *All spools shall be secured by competent person. *Traffic route shall be planned. *Flagman shall be provided with vehicle. *Goal post shall be equipped with pipe rack elevation . *Qualified rigger and operator shall be assigned for lifting activity. * Load chart and pre-lifting checklist shall be followed. Crane position shall be on firm ground with fully extend outrigger.\ *IR work permit shall be followed. Toolbox meeting shall be
IBN RUSHD ARABIAN INDUSTRIAL FIBERS COMPANY IR II U&O DBN PROJECT JOB SAFETY ANALYSIS (JSA)
Required Personal Protective Equipment Hard Hat Safety Glasses Fall Protection Gloves
Erection scaffolding
*Scaffolding collapsed and fall down. *Worker fall down *Tools and material fall down *Scaffolding tubes touch living line causes electrical shock
NDT & UT
Severity Rating (S.R.)
conducted prior starting activity. *Competent person shall erect scaffolding platform. *100% tie up policy shall be followed. *Tools and material shall be secured while working at height. *Safe distance shall be kept between living line and scaffolding. *Existing pipe shall be properly flushed and inspected before starting any activity. *Cool cutting will be carried out. *Fire protection such as fire blanket, fire hydrant and fire extinguisher shall be available on the spot. *Proper tight tie or support X-ray unit at position, good insulation condition of x ray power cables, sockets plug. *Assign watch man to make sure person not entering to barricade area. *Cap shall be fitted properly according to specification. *Proper disposal hydro test water.
Hydro Test
*Cap remove on high pressure condition cause person injury *Trip and electrical shock due to hydro test water overflow.
IBN RUSHD ARABIAN INDUSTRIAL FIBERS COMPANY IR II U&O DBN PROJECT JOB SAFETY ANALYSIS (JSA)
2 3 4 5 First Aid/Property Damage Recordable Accident/Property Damage Lost time Accident/Major Property Damage Catastrophic Accident
WE CAN GO BACK AND DO THE WORK AGAIN, BUT WE CANNOT UNDO ANY DAMAGE AND OR INJURY