Scheduling/Leveling Report - 07-Mar-13 - PM.exe =============================================== Default Project..................................................BBWIHL23 Projects: BBWIHL-23....................................................... .

Big Bang Schedule - Option 1 - 12 Oct 2012 R0 Scheduling/Leveling Settings: ----------------------------General ------Scheduling ......................................................Yes Leveling ........................................................No Ignore relationships to and from other projects .................No Make open-ended activities critical .............................No Use Expected Finish Dates .......................................Yes Schedule automatically when a change affects dates ..............No Level resources during scheduling ...............................No Recalculate assignment costs after scheduling ...................No When scheduling progressed activities use .......................Retaine d Logic Calculate start-to-start lag from ...............................Early S tart Define critical activities as Total Float less than or equal to .0 Compute Total Float As ..........................................Finish Float Calculate float based on finish date of .........................Each pr oject Calendar for scheduling Relationship Lag ........................Predece ssor Activity Calendar Advanced -------Calculate multiple float paths...................................No Statistics: ----------# Projects.......................................................1 # Activities.....................................................903 # Not Started....................................................886 # In Progress....................................................7 # Completed......................................................10 # Relationships..................................................1134 # Activities with Constraint.....................................29 Project: BBWIHL-23 Activity: A10790 Governme nt approval of elevators Project: BBWIHL-23 Activity: A1330 Construc tion Documentation Project: BBWIHL-23 Activity: A5080 Big Bang Operational Project: BBWIHL-23 Activity: A8210 Delivere d on site Project: BBWIHL-23 Activity: ATL10 100% Des ign Development complete Project: BBWIHL-23 Activity: ATL11 Developm ent Plan Sanction (3 months from submission of drawings) Project: BBWIHL-23 Activity: ATL12 Submissi

on of Building Plan for Approval Project: BBWIHL-23 Activity: ATL13 t of Interim Cost Plan (based on 100% DD) Project: BBWIHL-23 Activity: ATL14 tion Documents complete Project: BBWIHL-23 Activity: ATL15 Plan Sanction (6 months from submission of drawings) Project: BBWIHL-23 Activity: ATL16 Site Project: BBWIHL-23 Activity: ATL17 n of Contract for Facade Project: BBWIHL-23 Activity: ATL18 bmission of shop drawings for facade Project: BBWIHL-23 Activity: ATL19 Contract Lifts Project: BBWIHL-23 Activity: ATL20 erformance Mock Up Approval Project: BBWIHL-23 Activity: ATL21 isual Mock Up First Approval (REMOVED AS PER INSTRUCTION BY GS) Project: BBWIHL-23 Activity: ATL22 isual Mock Up Final Approval (REMOVED AS PER INSTRUCTION BY GS) Project: BBWIHL-23 Activity: ATL23 ture Complete Project: BBWIHL-23 Activity: ATL24 aterials delivered to site Project: BBWIHL-23 Activity: ATL25 structural slab up to 4th floor Project: BBWIHL-23 Activity: ATL26 nstalled up to 4th Floor Project: BBWIHL-23 Activity: ATL27 ipment delivered to site (all lifts) Project: BBWIHL-23 Activity: ATL28 structural slab up to roof Project: BBWIHL-23 Activity: ATL29 nstalled up to roof Project: BBWIHL-23 Activity: ATL30 t Power to Buildings Project: BBWIHL-23 Activity: ATL31 ls and machinery sets (all lifts) Project: BBWIHL-23 Activity: ATL32 erformance Test complete Project: BBWIHL-23 Activity: ATL33 formance Test complete Project: BBWIHL-23 Activity: ATL34 y certificate

Agreemen Construc Building Start on Executio Final su Execute Facade P Facade V Facade V Substruc Facade m Building Facade i Lift Equ Building Facade i Permanen Lift rai Facade P Roof Per Occupanc

Errors: ------Warnings: --------Activities without predecessors..................................8 Project: BBWIHL-23 Activity: A1300 100% Des ign Development Project: BBWIHL-23 Activity: ATL11 Developm ent Plan Sanction (3 months from submission of drawings) Project: BBWIHL-23 Activity: ATL12 Submissi on of Building Plan for Approval Project: BBWIHL-23 Activity: ATL13 Agreemen t of Interim Cost Plan (based on 100% DD) Project: BBWIHL-23 Activity: ATL15 Building

Plan Sanction (6 months from submission of drawings) Project: BBWIHL-23 Activity: ATL21 isual Mock Up First Approval (REMOVED AS PER INSTRUCTION BY GS) Project: BBWIHL-23 Activity: ATL22 isual Mock Up Final Approval (REMOVED AS PER INSTRUCTION BY GS) Project: BBWIHL-23 Activity: ATL30 t Power to Buildings

Facade V Facade V Permanen

Activities without successors....................................57 Project: BBWIHL-23 Activity: A10070 Technolo gy Installation & Commissioning Project: BBWIHL-23 Activity: A10100 Interior . Fit-Out (Incl furniture) Project: BBWIHL-23 Activity: A10200 Generato rs Testing & Commissioning Project: BBWIHL-23 Activity: A10350 Position air tower units, chillers, AHUs etc Project: BBWIHL-23 Activity: A10410 T&C Main HV Cables Project: BBWIHL-23 Activity: A10490 Piping ( HVAC, condensation etc) Project: BBWIHL-23 Activity: A10530 Position UPS Unit Project: BBWIHL-23 Activity: A10540 HVAC Ins tallation (incl leak detection, valves, drip pans, humidifiers etc) Project: BBWIHL-23 Activity: A10620 ER Room Ready Project: BBWIHL-23 Activity: A11800 Integrat ed T&C of entire HVAC System Project: BBWIHL-23 Activity: A11870 Piping ( HVAC, condensation etc) Project: BBWIHL-23 Activity: A11900 Position UPS Unit Project: BBWIHL-23 Activity: A11920 HVAC Ins tallation (incl leak detection, valves, drip pans, humidifiers etc) Project: BBWIHL-23 Activity: A11990 ER Room Ready Project: BBWIHL-23 Activity: A12030 Piping Project: BBWIHL-23 Activity: A12070 Install FCU Project: BBWIHL-23 Activity: A12160 GS Techn ology Installation and commissioning Project: BBWIHL-23 Activity: A1710 Testing & Commissioning generators Project: BBWIHL-23 Activity: A2690 Delivery to site Project: BBWIHL-23 Activity: A3150 GS Techn ology Installation and commissioning Project: BBWIHL-23 Activity: A3570 Interior . Fit-Out (Incl furniture) Project: BBWIHL-23 Activity: A3610 Technolo gy Installation & Commissioning (ER & TR) Project: BBWIHL-23 Activity: A3640 Kitchen & Cafeteria package (incl Connectors) Project: BBWIHL-23 Activity: A3650 Gym / He alth / Child Care Project: BBWIHL-23 Activity: A3660 Conferen ce Center incl Technology Project: BBWIHL-23 Activity: A3670 Washroom s Package (incl pipework distribution across the floor plate)

Project: d on site Project: d on site Project: d on site Project: to site Project: d on site

BBWIHL-23 BBWIHL-23 BBWIHL-23 BBWIHL-23 BBWIHL-23

Activity: Activity: Activity: Activity: Activity:

A3860 A4140 A4220 A8060 A8210 A9620 A9660 A9670 A9680 A9690 A9750 A9790 ATL10 ATL11 ATL12 ATL13 ATL14 ATL15 ATL18 ATL19 ATL20 ATL21 ATL22 ATL23 ATL25 ATL27 ATL28 ATL29 ATL31 ATL32

Delivere Delivere Delivere Delivery Delivere Technolo Kitchen Gym / He Conferen Washroom Technolo Technolo 100% Des Developm Submissi Agreemen Construc Building Final su Execute Facade P Facade V Facade V Substruc Building Lift Equ Building Facade i Lift rai Facade P

Project: BBWIHL-23 Activity: gy Installation & Commissioning (ER & TR) Project: BBWIHL-23 Activity: & Cafeteria package (incl Connectors) Project: BBWIHL-23 Activity: alth / Child Care Project: BBWIHL-23 Activity: ce Center incl Technology Project: BBWIHL-23 Activity: s Package (early finish to allow for overall t&c of building) Project: BBWIHL-23 Activity: gy Installation & Commissioning (Workplace Technology) Project: BBWIHL-23 Activity: gy Installation & Commissioning Project: BBWIHL-23 Activity: ign Development complete Project: BBWIHL-23 Activity: ent Plan Sanction (3 months from submission of drawings) Project: BBWIHL-23 Activity: on of Building Plan for Approval Project: BBWIHL-23 Activity: t of Interim Cost Plan (based on 100% DD) Project: BBWIHL-23 Activity: tion Documents complete Project: BBWIHL-23 Activity: Plan Sanction (6 months from submission of drawings) Project: BBWIHL-23 Activity: bmission of shop drawings for facade Project: BBWIHL-23 Activity: Contract Lifts Project: BBWIHL-23 Activity: erformance Mock Up Approval Project: BBWIHL-23 Activity: isual Mock Up First Approval (REMOVED AS PER INSTRUCTION BY GS) Project: BBWIHL-23 Activity: isual Mock Up Final Approval (REMOVED AS PER INSTRUCTION BY GS) Project: BBWIHL-23 Activity: ture Complete Project: BBWIHL-23 Activity: structural slab up to 4th floor Project: BBWIHL-23 Activity: ipment delivered to site (all lifts) Project: BBWIHL-23 Activity: structural slab up to roof Project: BBWIHL-23 Activity: nstalled up to roof Project: BBWIHL-23 Activity: ls and machinery sets (all lifts) Project: BBWIHL-23 Activity: erformance Test complete

Project: formance Test complete

BBWIHL-23

Activity:

ATL33

Roof Per

Out-of-sequence activities.......................................1 Project: BBWIHL-23 Activity: A1860 Developm ent of RFP for Facade Activities with Actual Dates > Data Date.........................3 Project: BBWIHL-23 Activity: A12420 Level Bi ds Project: Negotiations Project: wings Milestone Activities with invalid relationships..................0 Finish milestone and predecessors have different calendars.......3 Project: BBWIHL-23 Activity: A5080 Big Bang Operational Project: BBWIHL-23 Activity: A9130 Option 1 - Core A Available Project: BBWIHL-23 Activity: A9130 Option 1 - Core A Available Scheduling/Leveling Results: ---------------------------# Projects Scheduled/Leveled.....................................1 # Activities Scheduled/Leveled...................................903 # Relationships with other projects..............................0 Data Date........................................................10-Oct12 Earliest Early Start Date........................................10-Oct12 Latest Early Finish Date.........................................04-Dec17 Exceptions: ----------Critical Activities..............................................110 Project: BBWIHL-23 Activity: A1010 Site Sur vey Project: BBWIHL-23 Activity: A1020 Site Cle arance Project: BBWIHL-23 Activity: A1030 Bearing Piles and Plunge Columns Project: BBWIHL-23 Activity: A1040 Guide wa lls for secant piling Project: BBWIHL-23 Activity: A1050 Secant P iling Project: BBWIHL-23 Activity: A1060 Capping beams Project: BBWIHL-23 Activity: A1070 Excavati on of basement Project: BBWIHL-23 Activity: A1080 Blinding Project: BBWIHL-23 Activity: A1090 B4 Slab Project: BBWIHL-23 Activity: A1100 B3 slab (incl cores for towers) Project: BBWIHL-23 Activity: A1110 B2 slab (incl core for towers) Project: BBWIHL-23 Activity: A1120 B1 slab BBWIHL-23 Activity: A8250 Shop Dra BBWIHL-23 Activity: A12440 Contract

(incl cores for towers) Project: BBWIHL-23 Activity: A1130 loor slab (incl core for Towers) Project: BBWIHL-23 Activity: A1140 onstruction Project: BBWIHL-23 Activity: A1150 loor RC incl core walls and stair cases Project: BBWIHL-23 Activity: A1170 RC incl core walls and stair cases Project: BBWIHL-23 Activity: A1180 RC incl core walls and stair cases Project: BBWIHL-23 Activity: A1190 RC incl core walls and stair cases Project: BBWIHL-23 Activity: A1200 RC incl core walls and stair cases Project: BBWIHL-23 Activity: A1210 RC incl core walls and stair cases Project: BBWIHL-23 Activity: A1220 RC incl core walls and stair cases Project: BBWIHL-23 Activity: A1230 RC incl core walls and stair cases Project: BBWIHL-23 Activity: A1240 RC incl core walls and stair cases Project: BBWIHL-23 Activity: A1250 RC incl core walls and stair cases Project: BBWIHL-23 Activity: A1260 ucture RC Project: BBWIHL-23 Activity: A1330 tion Documentation Project: BBWIHL-23 Activity: A1490 al testing & Commissioning Project: BBWIHL-23 Activity: A1500 ety Systems Testing & Commissioning Project: BBWIHL-23 Activity: A1510 al Testing & Commissioning Project: BBWIHL-23 Activity: A1720 al Time for 100% DD detailing Project: BBWIHL-23 Activity: A1740 storm drainage Project: BBWIHL-23 Activity: A1750 atertight Project: BBWIHL-23 Activity: A1760 nce testing of facade Project: BBWIHL-23 Activity: A1840 esign Development Project: BBWIHL-23 Activity: A1860 ent of RFP for Facade Project: BBWIHL-23 Activity: A1870 P Project: BBWIHL-23 Activity: A1880 eriod Project: BBWIHL-23 Activity: A1890 ds (incl techn. & comm. Levelling) Project: BBWIHL-23 Activity: A1900 Award Project: BBWIHL-23 Activity: A1910 Negotiations (opportunity to re-tender and potential re-design) Project: BBWIHL-23 Activity: A1920 n of Contract for Facade Project: BBWIHL-23 Activity: A1940

Ground F Podium C Ground F Floor 1 Floor 2 Floor 3 Floor 4 Floor 5 Floor 6 Floor 7 Floor 8 Floor 9 Roof Str Construc Mechanic Life Saf Electric Addition Install Wing A w Performa Facade D Developm Issue RF Tender P Level Bi Contract Contract Executio Vendor r

eviews existing design Project: BBWIHL-23 enerates shop drawings Project: BBWIHL-23 bmission of shop drawings for facade Project: BBWIHL-23 op Drawings approval by Kalyani Project: BBWIHL-23 Performance Mock Up Project: BBWIHL-23 erformance Mock Up Approval Project: BBWIHL-23 atertight Project: BBWIHL-23 ms Testing & Commissioning Project: BBWIHL-23 e Strip Out and Demolition Works Project: BBWIHL-23 e Strip Out and Demolition Works Project: BBWIHL-23 e Strip Out and Demolition Works Project: BBWIHL-23 e Strip Out and Demolition Works Project: BBWIHL-23 e Strip Out and Demolition Works Project: BBWIHL-23 e Strip Out and Demolition Works Project: BBWIHL-23 e Strip Out and Demolition Works Project: BBWIHL-23 e Strip Out and Demolition Works Project: BBWIHL-23 . Fit-Out (Incl furniture) Project: BBWIHL-23 gy Installation & Commissioning Project: BBWIHL-23 e Strip Out and Demolition Works Project: BBWIHL-23 e MEP Works Project: BBWIHL-23 storm drainage Project: BBWIHL-23 nce testing of facade Project: BBWIHL-23 loor RC incl core walls and stair cases Project: BBWIHL-23 RC incl core walls and stair cases Project: BBWIHL-23 RC incl core walls and stair cases Project: BBWIHL-23 RC incl core walls and stair cases Project: BBWIHL-23 RC incl core walls and stair cases Project: BBWIHL-23 RC incl core walls and stair cases Project: BBWIHL-23 RC incl core walls and stair cases Project: BBWIHL-23 RC incl core walls and stair cases Project: BBWIHL-23

Activity: Activity: Activity: Activity: Activity: Activity: Activity: Activity: Activity: Activity: Activity: Activity: Activity: Activity: Activity: Activity: Activity: Activity: Activity: Activity: Activity: Activity: Activity: Activity: Activity: Activity: Activity: Activity: Activity: Activity:

A1950 A1960 A1980 A1990 A2010 A2970 A2980 A3230 A3250 A3270 A3310 A3350 A3390 A3430 A3470 A3490 A3500 A3510 A3520 A4940 A4950 A4960 A4970 A4980 A4990 A5000 A5010 A5020 A5030 A5040

Vendor g Final su Final Sh Produce Facade P Wing B w IT & Com Warm Cor Warm Cor Warm Cor Warm Cor Warm Cor Warm Cor Warm Cor Warm Cor Interior Technolo Warm Cor Warm Cor Install Performa Ground F Floor 1 Floor 2 Floor 3 Floor 4 Floor 5 Floor 6 Floor 7 Floor 8

RC incl core walls and stair cases Project: BBWIHL-23 Activity: A5050 RC incl core walls and stair cases Project: BBWIHL-23 Activity: A5060 ucture RC Project: BBWIHL-23 Activity: A5080 Operational Project: BBWIHL-23 Activity: A5180 al testing & Commissioning Project: BBWIHL-23 Activity: A5190 ety Systems Testing & Commissioning Project: BBWIHL-23 Activity: A5200 al Testing & Commissioning Project: BBWIHL-23 Activity: A5210 ms Testing & Commissioning Project: BBWIHL-23 Activity: A8310 soft landscaping Project: BBWIHL-23 Activity: A8320 dscaping and security works (to be linked to BMS) Project: BBWIHL-23 Activity: A8330 dscaping Project: BBWIHL-23 Activity: A9760 e Strip Out and Demolition Works Project: BBWIHL-23 Activity: A9780 Fit-Out (Incl 4 wks furniture) Project: BBWIHL-23 Activity: A9790 gy Installation & Commissioning Project: BBWIHL-23 Activity: A9800 e Strip Out and Demolition Works Project: BBWIHL-23 Activity: A9810 e MEP Works Project: BBWIHL-23 Activity: ATL11 ent Plan Sanction (3 months from submission of drawings) Project: BBWIHL-23 Activity: ATL12 on of Building Plan for Approval Project: BBWIHL-23 Activity: ATL13 t of Interim Cost Plan (based on 100% DD) Project: BBWIHL-23 Activity: ATL14 tion Documents complete Project: BBWIHL-23 Activity: ATL15 Plan Sanction (6 months from submission of drawings) Project: BBWIHL-23 Activity: ATL16 Site Project: BBWIHL-23 Activity: ATL17 n of Contract for Facade Project: BBWIHL-23 Activity: ATL18 bmission of shop drawings for facade Project: BBWIHL-23 Activity: ATL20 erformance Mock Up Approval Project: BBWIHL-23 Activity: ATL21 isual Mock Up First Approval (REMOVED AS PER INSTRUCTION BY GS) Project: BBWIHL-23 Activity: ATL22 isual Mock Up Final Approval (REMOVED AS PER INSTRUCTION BY GS) Project: BBWIHL-23 Activity: ATL23 ture Complete Project: BBWIHL-23 Activity: ATL25 structural slab up to 4th floor Project: BBWIHL-23 Activity: ATL30 t Power to Buildings Project: BBWIHL-23 Activity: ATL32

Floor 9 Roof Str Big Bang Mechanic Life Saf Electric IT & Com Hard and Hard lan Soft Lan Warm Cor Interior Technolo Warm Cor Warm Cor Developm Submissi Agreemen Construc Building Start on Executio Final su Facade P Facade V Facade V Substruc Building Permanen Facade P

erformance Test complete Project: formance Test complete Project: y certificate Project: erproofing Project: Guttering Project: Storm Drainage Project: erproofing Project: Guttering Project: Storm Drainage

BBWIHL-23 BBWIHL-23 BBWIHL-23 BBWIHL-23 BBWIHL-23 BBWIHL-23 BBWIHL-23 BBWIHL-23

Activity: Activity: Activity: Activity: Activity: Activity: Activity: Activity:

ATL33 ATL34

Roof Per Occupanc

WARO-10 Roof wat WARO-20 Install WARO-30 Install WBRO-50 Roof wat WBRO-60 Install WBRO-70 Install

Activities with unsatisfied constraints..........................3 Project: BBWIHL-23 Activity: ATL11 Developm ent Plan Sanction (3 months from submission of drawings) Project: BBWIHL-23 Activity: ATL12 Submissi on of Building Plan for Approval Project: BBWIHL-23 Activity: ATL14 Construc tion Documents complete Activities with unsatisfied relationships........................0 Activities with external dates...................................0