1. a) Licensee :
IS 3196(Part 1):2006
Product: Welded low carbon steel cylinders for liquefiable petroleum gas (LPG) excluding 5 litres WC.
Size/Grade/Variety :
3 Date of inspection
4 Person(s) contacted
5 a) Date b) Conducted by
Sl No. Date of drawal of sample Date of despatch of Samples Test result : Pass/Fail, if available
1.
2.
1.
2.
3.
4.
5.
Reviewing Officer’s Name and Designation:
Date of Review :
7. Changes since Previous Inspection
a) Technical
b) Administrative
9 Raw materials
a) Name of major ones Supplied by
i) LPG Steel
ii) Bungs
1.
2.
3.
4.
5.
c) Disposal of sub-standard raw materials
10. Production and supply since last inspection (details of completed month to be furnished)
Month Quantity
a) Quantity produced
b) Quantity marked
b) Condition of storing
d) At what stage marking is done (after or before test results are known )
b) Variation in test result for principal requirements ( append Sl. Requirement Variation in test values
test results, if necessary, or if required by the Instruction
sheet for the Standard)
g) Details of counter sample left with the firm and the manner
of packing, labeling, coding, sealing etc. and also give
impression of the seal
a) Has the scheme operated satisfactorily for the period since Satisfactory / Not satisfactory
last inspection ?
Signature :
No. of Enclosures :
Inspected by :
(Name)
Station :
Designation :
Date :
ANNEX – I
Details of Checks/Testings in Factory
1. BUNGS
Select 5 bungs from already inspected lot and check the following :
ii) Dimensions
iv) Markings
a) Whether markings are as per approved drawing Yes/No
2. CIRCLES
Check deformation and concentricity of bung holes on 5 halves Satisfactory / Not Satisfactory
5. DEGREASING
i) Check whether hot water with caustic soda is being used Yes/No
6. HALVES DIMENSION
i) Whether goose neck dial gauge being used for thickness checking is Yes/No
in working condition
ii)Check availability of ultrasonic thickness gauge and whether gauge Satisfactory / Not Satisfactory
is in working condition
7. BUNG WELDING
i) Whether hand welding or submerged arc welding Hand/ submerged arc welding
iii) Quality of weld and cleaning ( check 5 pieces ) Satisfactory / Not Satisfactory
9. CIRCUMFERENTIAL WELDING
ii) Whether foot ring joint is below one of the weld Yes/No
iii) Welding quality of foot ring & cleaning ( Check 5 pieces ) Satisfactory / Not Satisfactory
iii) Whether welding has been done on both sides of stay plates Yes/No
v) Whether punching on stay plates & their sequence is as per drawing Yes/No
vii) Check bending of stay plates due to punching Satisfactory / Not Satisfactory
12. HEIGHT
i) Check use of proper gauge for height measurement Satisfactory / Not Satisfactory
iii) Check temperature controller, temperature recorder graph etc are in Satisfactory / Not Satisfactory
working condition
iv) Check the graphs for date, time, batch no. and ensure stress Satisfactory / Not Satisfactory
relieving temperature and soaking time is maintained
i) Check shot blasting on body, V P Ring assembly, inside of foot ring, Satisfactory / Not Satisfactory
etc.
ii) Protection of bung threads during shot blasting Satisfactory / Not Satisfactory
iii) Thickness
Metallizing With Primer With Enamel Paint
Cylinder Body
VP Ring Assembly
Foot Ring
i) Whether internal cleaning being done by magnet, light with vacuum Yes/No
ii) Whether hot air/compressed air used to remove water traces Yes/No
iii) Check cylinder bung threads with L1,L9,C1,C2 gauges on 5 cylinders Satisfactory / Not Satisfactory
ii) Check torque on 5 already valve fitted cylinders Satisfactory / Not Satisfactory
19. PNEUMATIC TEST
ii) Whether water tank inside walls painted white and illumination is Yes/No
proper
iv) Select 5 cylinders from already tare weight punched batch & check Satisfactory / Not Satisfactory
tare weight
i) Witness acceptance and burst test, if carried on during the day Satisfactory / Not Satisfactory
i) Check arrangement for HSST and water capacity test Satisfactory / Not Satisfactory
ii) Check 2 cylinders for these requirements if stress relieved cylinders Satisfactory / Not Satisfactory
are available before HST
23. REJECTION
Check for certificates for cylinders already despatched & co-relate with
test records
25. STORAGE OF RELEASED CYLINDERS
i) Whether cylinders are properly stored, safety caps fitted on valves Yes/No
ii) Check complete air evacuated from cylinders Satisfactory / Not Satisfactory
Annex II
CALIBRATION RECORD
2. Temperature recorder
3. Pyrometer
4. Pressure gauges
i)
ii)
iii)
iv)
5. Thread gauges
i) L1
ii) L9
iii) C1
iv) C2
7. Weighing machine