REMARKS
1
1.1
1. 1. 1
Applicable Standards:
Yes Yes Yes
53-TMSS-01
Based on TS&SD letter# 09-F01546/03-03032301 dated 19th. Aug 2009, it is pre-qualified for Power Transformer up to 132kV, 100MVA as confirming to SEC specification # 53-TMSS-01, rev.0 with the following conditions: All type, design, special & routine tests (including short circuit test) as per SEC specifications/standards shall be carried out on the first unit to be supplied to SEC in securing an order in the presence of three (3) SEC engineers & one (1) approved independent inspection agency Inspector. Seven (7) years warranty from the date of PAC of the turnkey project in case of contract award or date of delivery in case of direct material supply order.
TURKEY-Istanbul
Yes
Pre-Qualification & Participation for current & future SEC's Projects subjected to the mutual agreement between SEC & ABB dated 09 March 2009
ABB TRANSIT OY AREVA BEST CG POWER SYSTEMS CROMPTON GREAVES DAIHEN CORPORATION HAWKER SIDDELEY HYOSUNG (HICO)
FINLAND GERMANY TURKEY BELGIUM INDIA JAPAN-OSAKA United Kingdom KOREA, Republic of-Changwon
Yes Yes Yes Yes Yes Yes Yes Yes SUSPENDED FOR SEC 2005 PROJECTS AND ONWARD Complete Type, Routine / Sample tests for first order & 10 Years Warranty from the date of PAC is required.
Page 1 of 101
SER
MANUFACTURER
FACTORY LOCATION
KOREA, Republic of-Ulsan JAPAN FRANCE JAPAN-Romania-Craiova
REMARKS
ORIGINALLY TMT&D CORP. & DISSOLVED DURING APRIL 2005. Based on TS&SD letter # 11-002054-1-03032300 dated 10/7/2011, it is prequalified for Power Transformer up to 132kV, 100MVA, as confirming to SEC specification # 53-TMSS-01, Rev.0 with the following conditions: All Type, Special, Routine and Sample tests (including short circuit withstand test) as per SEC specifications/standards shall be carried out on the first batch of power transformer to be supplied to SEC in presence of three SEC Engineers and one (1) SEC approved independent inspection agency inspector at SEC approved Independent laboratory, all the related costs for witnessing the tests will be borne by the manufacturer. This was confirmed by SC Electroputere SA through letter # 27499 dated 14/06/2010. Ten (10) years extended warranty from the date of PAC of the turnkey project in case of contract award or date of delivery in case of direct material supply order. This was confirmed by SC Electroputere SA through letter 27500 dated 14/06/2010.
SCHNEIDER ELECTRIC
TURKEY-Kocaeli
Yes
Previously "AREVA-Turkey", the name has been changed to Schneider Electric-Turkey based on Schneider Electric letter # MKT-18.01.11 dated 18/01/2010 and AREVA T&D letter # BF/BL 25.11.2010.
SCHORCH SIEMENS AG (NURNBERG) SIEMENS TRANSFORMERS AUSTRIA GMBH & CO KG TOSHIBA CORPORATION, T&D WILSON TRANSF
Yes Yes Yes Yes Yes Total = 23 ORIGINALLY TMT&D CORP. & DISSOLVED DURING APRIL 2005.
1.2
1. 2. 1
69 KV PRIMARY
POWER TRANSFORMERS UP TO 67 MVA ABB ABB
Applicable Standards:
SWITZERLAND SWEDEN Yes Yes
53-TMSS-01
Page 2 of 101
SER
MANUFACTURER
ABB ( T& D) ABB Bilbao
FACTORY LOCATION
United States-N/A SPAIN-Bilbao
REMARKS
Based on TS&SD letter# 09-F01546/03-03032301 dated 19th. Aug 2009, it is pre-qualified for Power Transformer up to 132kV, 100MVA as confirming to SEC specification # 53-TMSS-01, rev.0 with the following conditions: All type, design, special & routine tests (including short circuit test) as per SEC specifications/standards shall be carried out on the first unit to be supplied to SEC in securing an order in the presence of three (3) SEC engineers & one (1) approved independent inspection agency Inspector. Seven (7) years warranty from the date of PAC of the turnkey project in case of contract award or date of delivery in case of direct material supply order.
TURKEY-Istanbul
Yes
Pre-Qualification & Participation for current & future SEC's Projects subjected to the mutual agreement between SEC & ABB dated 09 March 2009
ABB TRANSIT OY AREVA BEST CG POWER SYSTEMS DAIHEN CORPORATION EFACEC HYOSUNG (HICO) HYUNDAI JAPAN AE POWER SYSTEMS CORP. JEUMONT SCHNEIDER KONCAR D&ST
FINLAND GERMANY TURKEY BELGIUM JAPAN-OSAKA PORTUGAL KOREA, Republic of-Changwon KOREA, Republic of-Ulsan JAPAN FRANCE Croatia/Hrvatska
Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Limited to 40 MVA Only. Complete Type, Routine / Sample tests for first order & 10 Years Warranty from the date of PAC is required. ORIGINALLY TMT&D CORP. & DISSOLVED DURING APRIL 2005. Complete Type, Routine / Sample tests for first order & 10 Years Warranty from the date of PAC is required.
MITSUBISHI
JAPAN--
Yes
Page 3 of 101
SER
MANUFACTURER
SC ELECTROPUTERE SA
FACTORY LOCATION
Romania-Craiova
REMARKS
Based on TS&SD letter # 11-002054-1-03032300 dated 10/7/2011, it is prequalified for Power Transformer up to 132kV, 100MVA, as confirming to SEC specification # 53-TMSS-01, Rev.0 with the following conditions: All Type, Special, Routine and Sample tests (including short circuit withstand test) as per SEC specifications/standards shall be carried out on the first batch of power transformer to be supplied to SEC in presence of three SEC Engineers and one (1) SEC approved independent inspection agency inspector at SEC approved Independent laboratory, all the related costs for witnessing the tests will be borne by the manufacturer. This was confirmed by SC Electroputere SA through letter # 27499 dated 14/06/2010. Ten (10) years extended warranty from the date of PAC of the turnkey project in case of contract award or date of delivery in case of direct material supply order. This was confirmed by SC Electroputere SA through letter 27500 dated 14/06/2010.
SCHNEIDER ELECTRIC
TURKEY-Kocaeli
Yes
Previously "AREVA-Turkey", the name has been changed to Schneider Electric-Turkey based on Schneider Electric letter # MKT-18.01.11 dated 18/01/2010 and AREVA T&D letter # BF/BL 25.11.2010. based on TS&SD letter# 09-01501-03032301 dated 25th May 2009 , Siemens AG from Germany-Dresden for Power Transformer up to 230kV, 200MVA as confirming to SEC specification # 53-TMSS-01, rev.0 & 53-TMSS-02, rev.0 with the following conditions: All type, special & routine tests for each voltage class as per SEC specifications/standards shall be carried out on the first batch to be supplied to SEC in securing an order in the presence of three (3) SEC engineers & one (1) approved independent inspection agency Inspector. Ten (10) years warranty from the date of PAC of the turnkey project in case of contract award or date of delivery in case of direct material supply order.
Siemens AG (Dresden)
GERMANY-Dresden
Yes
SIEMENS AG (NURNBERG) SIEMENS TRANSFORMERS AUSTRIA GMBH & CO KG TAMINI TOSHIBA CORPORATION, T&D WILSON TRANSF
Yes Yes Yes Yes Yes Total = 25 ORIGINALLY TMT&D CORP. & DISSOLVED DURING APRIL 2005.
1.3
Page 4 of 101
SER
1. 3. 1
MANUFACTURER
FACTORY LOCATION
REMARKS
Applicable Standards:
SWITZERLAND SWEDEN United States-N/A SPAIN-Bilbao Yes Yes Yes Yes
53-TMSS-01
Based on TS&SD letter# 09-F01546/03-03032301 dated 19th. Aug 2009, it is pre-qualified for Power Transformer up to 132kV, 100MVA as confirming to SEC specification # 53-TMSS-01, rev.0 with the following conditions: All type, design, special & routine tests (including short circuit test) as per SEC specifications/standards shall be carried out on the first unit to be supplied to SEC in securing an order in the presence of three (3) SEC engineers & one (1) approved independent inspection agency Inspector. Seven (7) years warranty from the date of PAC of the turnkey project in case of contract award or date of delivery in case of direct material supply order.
TURKEY-Istanbul
Yes
Pre-Qualification & Participation for current & future SEC's Projects subjected to the mutual agreement between SEC & ABB dated 09 March 2009
ABB TRANSIT OY AREVA AREVA BEST CG POWER SYSTEMS CROMPTON GREAVES DAIHEN CORPORATION EFACEC HAWKER SIDDELEY HYOSUNG (HICO) HYUNDAI
FINLAND GERMANY TURKEY TURKEY BELGIUM INDIA JAPAN-OSAKA PORTUGAL United Kingdom KOREA, Republic of-Changwon KOREA, Republic of-Ulsan
Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes SUSPENDED FOR SEC 2005 PROJECTS AND ONWARD. Complete Type, Routine / Sample tests for first order & 10 Years Warranty from the date of PAC is required.
Page 5 of 101
SER
MANUFACTURER
Hyundai Heavy Industries Co. Bulgaria
FACTORY LOCATION
Bulgaria-Sofia
REMARKS
Based on TS&SD letter # 11-00438-03-03032301 dated 15/05/2011, it is prequalified for Power Transformers up to 132kV, 100MVA as confirming to SEC specification # 53-TMSS-01, Rev.0 with the following conditions: All type, special, routine and sample tests as per SEC specifications/standards for Power Transformers up to 132kV, 100MVA shall be carried out in case of contract award or SEC direct purchase order at SEC approved independent laboratory or at manufacturers testing laboratory in presence of three (3) SEC Engineers and one (1) SEC approved independent inspection agency. All the related costs for witnessing of the tests will be borne by the manufacturer. This was confirmed by HHIBulgaria through letter # D-0353 dated 20/08/2010. Ten (10) years extended warranty from the date of PAC of the turnkey project in case of contract award or date of delivery in case of direct material supply order. This was confirmed by HHIBulgaria through letter # D-0355 dated 20/08/2010.
Yes Yes Yes Limited to 40 MVA Only. Complete Type, Routine / Sample tests for first order & 10 Years Warranty from the date of PAC is required. ORIGINALLY TMT&D CORP. & DISSOLVED DURING APRIL 2005.
JAPAN-JAPAN Romania-Craiova
Based on TS&SD letter # 11-002054-1-03032300 dated 10/7/2011, it is prequalified for Power Transformer up to 132kV, 100MVA, as confirming to SEC specification # 53-TMSS-01, Rev.0 with the following conditions: All Type, Special, Routine and Sample tests (including short circuit withstand test) as per SEC specifications/standards shall be carried out on the first batch of power transformer to be supplied to SEC in presence of three SEC Engineers and one (1) SEC approved independent inspection agency inspector at SEC approved Independent laboratory, all the related costs for witnessing the tests will be borne by the manufacturer. This was confirmed by SC Electroputere SA through letter # 27499 dated 14/06/2010. Ten (10) years extended warranty from the date of PAC of the turnkey project in case of contract award or date of delivery in case of direct material supply order. This was confirmed by SC Electroputere SA through letter 27500 dated 14/06/2010.
Page 6 of 101
SER
MANUFACTURER
Siemens AG (Dresden)
FACTORY LOCATION
GERMANY-Dresden
REMARKS
based on TS&SD letter# 09-01501-03032301 dated 25th May 2009 , Siemens AG from Germany-Dresden for Power Transformer up to 230kV, 200MVA as confirming to SEC specification # 53-TMSS-01, rev.0 & 53-TMSS-02, rev.0 with the following conditions: All type, special & routine tests for each voltage class as per SEC specifications/standards shall be carried out on the first batch to be supplied to SEC in securing an order in the presence of three (3) SEC engineers & one (1) approved independent inspection agency Inspector. Ten (10) years warranty from the date of PAC of the turnkey project in case of contract award or date of delivery in case of direct material supply order.
SIEMENS AG (NURNBERG) SIEMENS TRANSFORMERS AUSTRIA GMBH & CO KG TOSHIBA CORPORATION, T&D WILSON TRANSF
Yes Yes Yes Yes Total = 28 ORIGINALLY TMT&D CORP. & DISSOLVED DURING APRIL 2005.
1.4
1. 4. 1
230 KV PRIMARY
POWER TRANSFORMERS UP TO 400 MVA ABB ABB ( T& D) ABB Cordoba SWEDEN United States-N/A SPAIN-Cordoba
Applicable Standards:
Yes Yes Yes
53-TMSS-02
Based on TS&SD letter# 09-F011657/03-03032301 dated 16th. Aug 2009, it is pre-qualiafied for Power Transformer up to 380kV, 500MVA as confirming to SEC specification # 53-TMSS-02, rev.0 with the following conditions: All type, design, special & routine tests (including short circuit test) as per SEC specifications/standards shall be carried out on the first unit to be supplied to SEC in securing an order in the presence of three (3) SEC engineers & one (1) approved independent inspection agency Inspector. Seven (7) years warranty from the date of PAC of the turnkey project in case of contract award or date of delivery in case of direct material supply order.
Page 7 of 101
SER
MANUFACTURER
HAWKER SIDDELEY HYOSUNG (HICO)
FACTORY LOCATION
United Kingdom KOREA, Republic of-Changwon
REMARKS
Based on TS&SD fax#09-F01255/02-03032301 dated 25th. July 2009, it is pre-qualified for Power Transformer up to 380kV, 500MVA as confirming to SEC specification # 53-TMSS-02, rev.0 with the following conditions: All type, design, special & routine tests as per SEC specifications/standards shall be carried out on the first batch to be supplied to SEC in securing an order in the presence of three (3) SEC engineers & one (1) approved independent inspection agency Inspector. Seven (7) years warranty from the date of PAC of the turnkey project in case of contract award or date of delivery in case of direct material supply order.
Yes Yes Yes Yes ORIGINALLY TMT&D CORP. & DISSOLVED DURING APRIL 2005. based on TS&SD letter# 09-01501-03032301 dated 25th May 2009 , Siemens AG from Germany-Dresden for Power Transformer up to 230kV, 200MVA as confirming to SEC specification # 53-TMSS-01, rev.0 & 53-TMSS-02, rev.0 with the following conditions: All type, special & routine tests for each voltage class as per SEC specifications/standards shall be carried out on the first batch to be supplied to SEC in securing an order in the presence of three (3) SEC engineers & one (1) approved independent inspection agency Inspector. Ten (10) years warranty from the date of PAC of the turnkey project in case of contract award or date of delivery in case of direct material supply order.
SIEMENS AG (NURNBERG) SIEMENS TRANSFORMERS AUSTRIA GMBH & CO KG TOSHIBA CORPORATION, T&D WILSON TRANSF
Yes Yes Yes Yes ORIGINALLY TMT&D CORP. & DISSOLVED DURING APRIL 2005. UP TO 100 MVA ONLY Total = 17
1.5
1. 5. 1
380KV PRIMARY
POWER TRANSFORMERS UP TO 500 MVA ABB ABB ( T& D) SWEDEN United States-N/A
Applicable Standards:
Yes Yes
53-TMSS-02
Page 8 of 101
SER
MANUFACTURER
ABB Cordoba
FACTORY LOCATION
SPAIN-Cordoba
REMARKS
Based on TS&SD letter# 09-F011657/03-03032301 dated 16th. Aug 2009, it is pre-qualiafied for Power Transformer up to 380kV, 500MVA as confirming to SEC specification # 53-TMSS-02, rev.0 with the following conditions: All type, design, special & routine tests (including short circuit test) as per SEC specifications/standards shall be carried out on the first unit to be supplied to SEC in securing an order in the presence of three (3) SEC engineers & one (1) approved independent inspection agency Inspector. Seven (7) years warranty from the date of PAC of the turnkey project in case of contract award or date of delivery in case of direct material supply order. First Unit to be Type Tested in the presence of 3 SEC Engineers & 1 SEC approved Independent Inspector; Extended Warranty of Six years.
AREVA AREVA
GERMANY TURKEY
Yes Yes
Yes Yes Yes Based on TS&SD fax#09-F01255/02-03032301 dated 25th. July 2009, it is pre-qualified for Power Transformer up to 380kV, 500MVA as confirming to SEC specification # 53-TMSS-02, rev.0 with the following conditions: All type, design, special & routine tests as per SEC specifications/standards shall be carried out on the first batch to be supplied to SEC in securing an order in the presence of three (3) SEC engineers & one (1) approved independent inspection agency Inspector. Seven (7) years warranty from the date of PAC of the turnkey project in case of contract award or date of delivery in case of direct material supply order.
HYUNDAI JAPAN AE POWER SYSTEMS CORP. MITSUBISHI SIEMENS AG (NURNBERG) SIEMENS TRANSFORMERS AUSTRIA GMBH & CO KG TOSHIBA CORPORATION, T&D
Yes Yes Yes Yes Yes Yes ORIGINALLY TMT&D CORP. & DISSOLVED DURING APRIL 2005. Total = 14 ORIGINALLY TMT&D CORP. & DISSOLVED DURING APRIL 2005.
2
2.1
Page 9 of 101
SER
2. 1. 1
MANUFACTURER
FACTORY LOCATION
REMARKS
Applicable Standards:
Saudi Arabia-RIYADH Saudi Arabia-RIYADH Yes Yes
51-TMSS-01
Based on TS&SD letter # 11-03272-03032301 dated 16/11/2011, it is prequalified for Station Service Transformer up to 1.5MVA only as confirming to SEC specification # 51-TMSS-01, Rev.0 with the following conditions: The following Special Tests as per SEC specifications/standards for Station Service Transformer shall be conducted on the first batch to be supplied to SEC in case of contract award or SEC direct purchase order in SEC approved independent laboratory, in presence of three (3) SEC Engineers and one (1) SEC approved independent inspection agency. All the related costs for witnessing of the tests will be borne by the manufacturer: 1. Off-circuit tap changers. 2. Determination of capacitance winding to earth and between windings. 3. Determination of transient voltage characteristics. 4. Measurement of zero sequence impedance. 5. Measurement of the harmonics of the no load current. 6. Measurement of D.C insulation resistance to earth of the windings (Polarization Index and core). 7. Measurement of dissipation factor (Tan Delta) of the insulation capacitance. 8. Determination of sound levels. This was confirmed by ALFANAR Electrical Systems (AES)Riyadh through letter # Nil dated 13/03/2011. Ten (10) years extended warranty from the date of PAC of the turnkey project in case of contract award or date of delivery in case of direct material supply order. This was confirmed by ALFANAR Electrical Systems (AES)Riyadh through letter # Nil dated 09/04/2011.
FEDERAL TRANSFORMERS CO. KONCAR D&ST SAUDI TRANSFORMERS CO. United Transformers Electric Co. (UTEC) WESCOSA
United Arab Emirates-ABU DHABI Yes Croatia/Hrvatska Saudi Arabia-DAMMAM Saudi Arabia-Riyadh Saudi Arabia-DAMMAM Yes Yes Yes Yes
UP TO 1.5 MVA UP TO 2.5 MVA. Complete Type, Routine / Sample tests for first order & 10 Years Warranty from the date of PAC is required. UP TO 13.8 KV ONLY
UP TO 13.8 KV ONLY
Page 10 of 101
SER
MANUFACTURER
FACTORY LOCATION
REMARKS
Total = 7
3
3.1
3. 1. 1
Applicable Standards:
Yes
52-TMSS-01
ALL APPROVED POWER TRANSFOREMER MANUFACTURERS, EXCEPT DISTRIBUTION TRANSFORMER MANUFACTURERS ARE ALSO ACCEPTABLE FOR GROUNDING TRANSFORMERS
ABB ABB ABB ( T& D) ABB SECHERON CG POWER SYSTEMS CROMPTON GREAVES HYOSUNG (HICO) HYUNDAI
United States Saudi Arabia-RIYADH ITALY SWITZERLAND-GENEVA BELGIUM INDIA KOREA, Republic of-Changwon KOREA, Republic of-Ulsan
Yes Yes Yes Yes Yes Yes Yes Yes Total = 9 SUSPENDED FOR SEC 2005 PROJECTS AND ONWARD
4
4.1
4. 1. 0
36 KV PRIMARY
36 KV PRIMARY ABB/AEIL SIEMENS WESCOSA Saudi Arabia GERMANY Saudi Arabia-DAMMAM
Applicable Standards:
Yes Yes Yes Total = 3
5
5.1
5. 1. 1
COMPACT SUBSTATION
Applicable Standards:
SWITZERLAND-GENEVA Yes
Page 11 of 101
SER
MANUFACTURER
CG POWER SYSTEMS
FACTORY LOCATION
BELGIUM
REMARKS
Total =
5.2
5. 2. 1
Applicable Standards:
United States-N/A Yes Total = 1
6
6.1
6. 1. 1
REACTOR
Applicable Standards:
Yes Yes Yes Yes
58-TMSS-01
Based on TS&SD Letter # 10-02438-02-03032301 dated 31/08/2010, it is pre-qualified for Shunt Reactor as confirming to SEC specification # 58-TMSS-01, Rev.0 with the following conditions: All type/special, routine& sample tests for Shunt Reactors on one unit of each rating supplied to SEC shall be conducted at Manufacturer's Testing Laboratory in the presence of three (3) SEC engineers & one (1) SEC approved independent inspection agency Inspector, all the related costs for witnessing the tests will be borne by the manufacturer. This was confirmed by HHI Korea through letter # S370-1007-052 dated 05/07/2010. Ten (10) years extended warranty for the proposed Shunt Reactors from the date of PAC of the turnkey project in case of contract award or date of delivery in case of direct material supply order. This was confirmed by HHI Korea through letter # S370-1008-0182 dated 18/08/2010.
JAPAN AE POWER SYSTEMS CORP. MITSUBISHI SIEMENS AG (NURNBERG) SIEMENS TRANSFORMERS AUSTRIA GMBH & CO KG
Yes Yes Yes Yes ORIGINALLY TMT&D CORP. & DISSOLVED DURING APRIL 2005.
Page 12 of 101
SER
MANUFACTURER
TOSHIBA CORPORATION, T&D
FACTORY LOCATION
JAPAN--
REMARKS
ORIGINALLY TMT&D CORP. & DISSOLVED DURING APRIL 2005. Total = 9
6. 1. 2
110 KV TO 132 KV REACTORS ABB ABB ( T& D) AREVA AREVA_(ST. QUEN) HYUNDAI SWEDEN
Applicable Standards:
Yes Yes Yes Yes Yes
58-TMSS-01
Based on TS&SD Letter # 10-02438-02-03032301 dated 31/08/2010, it is pre-qualified for Shunt Reactor as confirming to SEC specification # 58-TMSS-01, Rev.0 with the following conditions: All type/special, routine& sample tests for Shunt Reactors on one unit of each rating supplied to SEC shall be conducted at Manufacturer's Testing Laboratory in the presence of three (3) SEC engineers & one (1) SEC approved independent inspection agency Inspector, all the related costs for witnessing the tests will be borne by the manufacturer. This was confirmed by HHI Korea through letter # S370-1007-052 dated 05/07/2010. Ten (10) years extended warranty for the proposed Shunt Reactors from the date of PAC of the turnkey project in case of contract award or date of delivery in case of direct material supply order. This was confirmed by HHI Korea through letter # S370-1008-0182 dated 18/08/2010.
JAPAN AE POWER SYSTEMS CORP. MITSUBISHI SIEMENS AG (NURNBERG) SIEMENS TRANSFORMERS AUSTRIA GMBH & CO KG TOSHIBA CORPORATION, T&D
Yes Yes Yes Yes Yes ORIGINALLY TMT&D CORP. & DISSOLVED DURING APRIL 2005. Total = 10 ORIGINALLY TMT&D CORP. & DISSOLVED DURING APRIL 2005.
6. 1. 3
Applicable Standards:
Yes Yes Yes
58-TMSS-01
Page 13 of 101
SER
MANUFACTURER
AREVA_(ST. QUEN) HYUNDAI
FACTORY LOCATION
FRANCE-(ST. QUEN) KOREA, Republic of-Ulsan
REMARKS
Based on TS&SD Letter # 10-02438-02-03032301 dated 31/08/2010, it is pre-qualified for Shunt Reactor as confirming to SEC specification # 58-TMSS-01, Rev.0 with the following conditions: All type/special, routine& sample tests for Shunt Reactors on one unit of each rating supplied to SEC shall be conducted at Manufacturer's Testing Laboratory in the presence of three (3) SEC engineers & one (1) SEC approved independent inspection agency Inspector, all the related costs for witnessing the tests will be borne by the manufacturer. This was confirmed by HHI Korea through letter # S370-1007-052 dated 05/07/2010. Ten (10) years extended warranty for the proposed Shunt Reactors from the date of PAC of the turnkey project in case of contract award or date of delivery in case of direct material supply order. This was confirmed by HHI Korea through letter # S370-1008-0182 dated 18/08/2010.
JAPAN AE POWER SYSTEMS CORP. MITSUBISHI SIEMENS AG (NURNBERG) SIEMENS TRANSFORMERS AUSTRIA GMBH & CO KG TOSHIBA CORPORATION, T&D
Yes Yes Yes Yes Yes ORIGINALLY TMT&D CORP. & DISSOLVED DURING APRIL 2005. Total = 10 ORIGINALLY TMT&D CORP. & DISSOLVED DURING APRIL 2005.
6. 1. 4
380 KV OIL IMMERSED REACTORS ABB ABB ( T& D) AREVA_(ST. QUEN) SWEDEN
Applicable Standards:
Yes Yes Yes
58-TMSS-01
Page 14 of 101
SER
MANUFACTURER
FACTORY LOCATION
KOREA, Republic of-Ulsan
REMARKS
Based on TS&SD Letter # 10-02438-02-03032301 dated 31/08/2010, it is pre-qualified for Shunt Reactor as confirming to SEC specification # 58-TMSS-01, Rev.0 with the following conditions: All type/special, routine& sample tests for Shunt Reactors on one unit of each rating supplied to SEC shall be conducted at Manufacturer's Testing Laboratory in the presence of three (3) SEC engineers & one (1) SEC approved independent inspection agency Inspector, all the related costs for witnessing the tests will be borne by the manufacturer. This was confirmed by HHI Korea through letter # S370-1007-052 dated 05/07/2010. Ten (10) years extended warranty for the proposed Shunt Reactors from the date of PAC of the turnkey project in case of contract award or date of delivery in case of direct material supply order. This was confirmed by HHI Korea through letter # S370-1008-0182 dated 18/08/2010.
JAPAN AE POWER SYSTEMS CORP. MITSUBISHI SIEMENS AG (NURNBERG) SIEMENS TRANSFORMERS AUSTRIA GMBH & CO KG TOSHIBA CORPORATION, T&D
Yes Yes Yes Yes Yes ORIGINALLY TMT&D CORP. & DISSOLVED DURING APRIL 2005. Total = 9 ORIGINALLY TMT&D CORP. & DISSOLVED DURING APRIL 2005.
6.2
6. 2. 1
Applicable Standards:
Yes
58-TMSS-02
ALL POWER TRANSFORMER AND OIL IMMERSED REACTOR MANUFACTURERS ARE ACCEPTABLE TO SUPPLY AIR CORE SERIES REACTORS FROM 13.8KV TO 230 KV
Page 15 of 101
SER
MANUFACTURER
TRENCH AUSTRIA GMBH
FACTORY LOCATION
AUSTRIA-Leonding, Linz
REMARKS
Based on TS&SD letter 10-01317-1-03032301 dated May 10, 2010. TRENCH AUSTRIA GMBH is pre-qualified for Air Core Series Reactors as confirming to SEC Specification 58-TMSS-02, Rev.0 with the following conditions: Extended Warranty: Seven (7) years Extended Warranty shall be applicable for the Air Core Series Reactors to be supplied to SEC by TRENCH AUSTRIA GMBH as confirmed through their letter # NIL dated April 28, 2010. Test Witnessing: Factory Tests on the first batch of Reactors to be supplied to Contract # 10931162/00 and Contract # 10931163/00 for Dynamic Reactive Power Compensation Projects in Central Operating Area shall be conducted in presence of three (3) SEC Engineers and one (1) IIA Inspector, under the sole expense of the Manufacturer as confirmed through their Letter Letter # NIL dated April 28, 2010. Based on TS&SD letter 10-01317-1-03032301 dated May 10, 2010. TRENCH CANADA is pre-qualified for Air Core Series Reactors as confirming to SEC Specification 58-TMSS-02, Rev.0 with the following conditions: Extended Warranty: Seven (7) years Extended Warranty shall be applicable for the Air Core Series Reactors to be supplied to SEC by TRENCH CANADA as confirmed through their letter # NIL dated April 28, 2010. Test Witnessing: Factory Tests on the first batch of Air Core Series Reactors to be supplied to Contract # 20931030/00 for Taif BSP & Kayber/Bawat S/S shall be conducted in presence of three (3) SEC Engineers and one (1) IIA Inspector, under the sole expense of the Manufacturer as confirmed through their Letter # NIL dated April 27, 2010. Free Replacement: TRENCH CANADA shall supply one complete three phase set of Reactors (3 units) to SEC (Tabouk City) free of charge as already confirmed through their letter # NIL dated November 06, 2009. Total = 3
TRENCH CANADA
CANADA-Scarborough, Ontario
Yes
6.3
6. 3. 1
Applicable Standards:
Yes Yes
52-TMSS-02,58-TMSS-02
Limited to 34.5kV Only; First unit of 34.5kV Air Core Reactor shall be type tested in an independent lab. in the presence of 3 SEC Engineers & 1 SEC Approved Independent Inspection Agency; 10 years of Extended Warranty. Total = 2
Page 16 of 101
SER
MANUFACTURER
FACTORY LOCATION
REMARKS
7
7.1
7. 1. 1
Applicable Standards:
United States-N/A Saudi Arabia Yes Yes
32-TMSS-01
For 33kV AIS: classic ZS3 type with current rating up to 2500A@ 40oC; CB type VD43620-25(2000A), VD43612-25(1250A & 800A); ES type EK5, 3007N280. For 13.8kV AIS: 13.8kV switchgear type UniGear ZS1 (CT on upper & lower side of CB) with rated current of incomer, Bus Section, Bus Riser 3003A and 1756A, Out Going Feeder with rated current 924A and 682A @ 40?C, 60Hz, 25kA (3s). Out Going Feeder (CT on lower side of CB) with rated current 991A and 648A @ 40?C, 60Hz, 25kA (3s). CB types (VD4 embedded pole): VD4 17.31-25 (interrupter VG6), ABB Germany and VD4 17.16-25 (interrupter VG4/S), VD4 17.12-25 (interrupter VG4) & VD4 17.06-25 (interrupter VG4), ABB, Italy. Circuit breaker for Capacitor bank back to back switching (BC2-630A); VD4 17.12-40 (interrupter VG6), HD4 17.12-25 (interrupter SF6), HD4 24.12-25 (interrupter SF6), and (BC2900A); HD4 17.16-25 (interrupter SF6) ABB, Italy. Earthing switch type EK6, ABB-EJF, Czech. CT & VT: ABB-EJF, Czech or WTW make, Germany
Old version: Classic ZS1 . ABB-CALOR EMAG AEL -SIEMENS GERMANY-CALOR EMAG Saudi Arabia-JEDDAH Yes Yes For 13.8kV AIS: type 8BK20 with CB type 3AH. for 33kV AIS: type 8BT2 is not acceptable, as the VT is situated in a separate compartment and connected by cable.
Page 17 of 101
SER
MANUFACTURER
ALFANAR ELECTRICAL SYSTEMS
FACTORY LOCATION
Saudi Arabia-RIYADH
REMARKS
Based on TS&SD letter# 09-02613-01-03032301 dated 13th September 2009, ALFANAR ELECTRICAL SYSTEMS from Saudi Arabia-Riyadh for 13.8kV Switchgear type NES-H with degree protection IP4X; vacuum CB (rating 3150A & 1250A) and ES from LSIS (South Korea) - details of types are mentioned in the TS&SD letter; as confirming to SEC specification # 32-TMSS-01, rev.0 with the following condition: Ten (10) years warranty from the date of PAC of the turnkey project in case of contract award or date of delivery in case of direct material supply order.
Yes Yes Yes based on TS&SD letter# 09-01092-03032301 dated 18th. April 2009 it is prequalified for for 13.8kV Air Insulated Switchgear type D-17P with SCC of 25kA/3sec, degree of protection IP4X and rated current of 3000A @ 40oC, 60Hz; CB type VD4 which approved by SEC from ABB-Germany (3000A) & ABB-Italy (2500A); ES type UMR from ELECTROBUDOWA SA-Poland as confirming to SEC specification # 32-TMSS-01, rev.0 with Ten (10) years warranty from the date of PAC of the Turnkey project in case of contract award or date of delivery in case of direct material supply order. For 13.8kV AIS: Pre-qualified since 24/02/1420H for 13.8kV SWG type MC-Set with CB type LF3-3150-(2500A), LF2- 2500 (2000A), LF2-1250 (800A), LF2-630 (400A) and warranty of (7)years from commissioning date of the first delivery for any onward project or order in the first two years and then shall be (3)years from PAC. for 33kV AIS: Based on TS&SD fax ref.#09-00073-2-03032301 dated 04/02/2009. Pre-Qualified for 34.5 kV SWG type (F400NL)1250/2500 A @40C &60Hz with IP4X,SF6 CB type SF2(France),ES type TFCM(France), & (10)years warranty. old version: 33kV AIS type F400G with current rating up to 2500A @ 40oC with CB type SF & SF2 LIMITED TO DTA ONLY; FOR CTA PREQUALIFICATION UNDER PROGRESS ORIGINALLY TMT&D CORP. & DISSOLVED DURING APRIL 2005. SWITCHGEAR NOT YET TYPE TESTED
Saudi Arabia-RIYADH
Yes
JAPAN AE POWER SYSTEMS CORP. KONCAR MITSUBISHI POWER CON S&C SIEMENS
Page 18 of 101
SER
MANUFACTURER
TOSHIBA CORPORATION, T&D VA TECH WESCOSA
FACTORY LOCATION
JAPAN-FRANCE Saudi Arabia-DAMMAM
REMARKS
ORIGINALLY TMT&D CORP. & DISSOLVED DURING APRIL 2005.
18
Applicable Standards:
Yes
32-TMSS-02
Old Version: 145kV GIS type ELK-04 with CB type ELK-SW04, Hydraulic spring mechanism; DS type ELK-TE0 (3 POS), MES type ELK-TE0 (3 POS)/ TE03-DR04; HES type ELK-EB03. New Version: Based on TS&SD letter # 11-00455-5-03032301 dated April 04, 2011, the new version 145kV GIS type ELK-04 with CB type ELK-CB0 (Hydraulic Spring Mech. HMB-1), DS type ELK-DE0-3POS, MES type ELK-DE0, HSES type ELK-ES0 (Motor Spring Mech.) is pre-qualified as conforming to SEC specification # 32-TMSS-02, Rev.01 with the following condition: Ten (10) Years Extended Guarantee/Warranty from the date of PAC of project (in case of contract award) and from date of delivery for the direct material supply order. This was confirmed in writing by ABB Germany via their letter # PTPH/GVS.Nb, 10_year-warranty.doc dated May 14, 2010.
Yes Yes New version: 145kV GIS type B65 with CB type B65-CB Motor spring mechanism; DS type B65-DS; ES type B65-ES. Old version: 145kV GIS type B95 with CB type BHG 112, Motor spring mechanism; DS Bt212; ES type BE212 145kV GIS type B65 with CB type B65-CB Motor spring mechanism; DS type B65-DS; ES type B65-ES; HES type B65-EF. New Model approved on 10-04-2007, Model Type HSG-144A 145KV GIS with CB type HCSP-144A Motor spring mechanism; DS type HDMO-144A; MES type HDMO-144A, HES type HEMS-144A. All Type and Design tests have been carried out completely & accepted as mentioned in TS&SD letter#08-F02926-03032301 dated 22/11/2008. Provide extended Guarantee/Warranty for Seven(7) Years from the date of PAC Old version: 145kV GIS type 145HGS40 with CB type 145HCB,145PL40; DS type 145SDSV/SDSH; MES type 145SESM; HES type 145SESA Page 19 of 101
AREVA T&D AG
SWITZERLAND-Oberentfelden
Yes
HYOSUNG (HICO)
Yes
SER
MANUFACTURER
FACTORY LOCATION
KOREA, Republic of-Ulsan
REMARKS
New version: 145kV GIS type 145SP-1 with CB type 145SP-K1 Motor spring mechanism; BDS type 145SP-3PS1; LDS type 145SP-3PS2; MES type 145-3PS2; HES type 145SP-LES2. Old version: 145kV GIS type 145SP with CB type 145SP-K Hydraulic mechanism; DS type 145SP-DS; MES type 145SP-ES; HES type 145SP-LES New version: 145kV GIS type CFTA with CB type CFPT-120-40L, FAR3 Motor spring mechanism; DS type CFL-120; ES type CFL-120. Old version: 145kV GIS type CFT with CB type CFPT-140-40L, FAR3,C Pneumatic mechanism; DS type SFL-EA; HES type SFGM-FA. Old version: 145kV GIS type SDA5 (SDA514) with CB type BAK5, Hydraulic mechanism. GIS & ADAPTORS; LIMITED TO DTA ONLY; FOR CTA PREQUALIFICATION UNDER PROGRESS ORIGINALLY TMT&D CORP. & DISSOLVED DURING APRIL 2005. New version 145kV GIS type 100GMKD with CB type 120-SFMT-40CJ; DS type 120GRD/GLD; MES type 120GRED/GRE; HES type 120 GRED/GRE-A. Old version: 145kV GIS 120GMKM with CB type 120-SFMT-40, Pneumatic mechanism; DS type 120-GR-20, 120-GL-20; MES type 120-GRE, 120-GREC; HES type 120-GREA. Old version: 145kV GIS 100GMKD with CB type 120-SFMT-40CE Motor spring mechanism; DS type 120GLD; HES type 120-GREA. New version: 145kV GIS type TH7m with CB type TH7m AF8ER(Motor spring); BDS type CM002, CM003 (3-position); LDS type CM002, CM003 (2-position); MES type CM002,CM003; HES type CM002, CM003. Old version: 145kV GIS type HEXABOLIC-TH7 with CB type DTH7 Hydraulic mechanism; BDS type SITH7; LDS type ITH7, SI TH7; ES type ST TH7. New version: 145kV GIS type 8DN8-II with CB type 8DN8 Motor spring mechanism; DS type 8DN8; ES type 8DN8. Old version: 145kV GIS type 8DN8 with CB type 8DN6(P1) Motor spring mechanism; DS type 8DN8; ES type 8DN8. ORIGINALLY TMT&D CORP. & DISSOLVED DURING APRIL 2005. 145kV GIS type with CB type GSPK-145AP; BDS type KTM-120PW, DTM-120PW, DLM-120PW; LDS type KTM-120PW, DTM-120PW; MES type EBM-120W; HES type EAP-120W. Total = 12
JAPAN
Yes
KONCAR MITSUBISHI
Croatia/Hrvatska JAPAN--
Yes Yes
SIEMENS
FRANCE-GRENOBLE
Yes
SIEMENS
GERMANY
Yes
JAPAN--
Yes
7. 1. 3
230 KV -GIS
Applicable Standards:
32-TMSS-02
Page 20 of 101
SER
MANUFACTURER
FACTORY LOCATION
SWITZERLAND
REMARKS
230kV GIS type ELK SP2-1 with CB type ELK SP2-1; BDS type ELK-TE/ ELK-TW/ELK-TV; MES type ELK EM/ELK-EA; HES type ELK EB. 230kV GIS type T105 with CB type B105-CB; DS type CLT 230kV GIS type MFPT MFPTB-300-63L with CB type MFPTB-300-63LA, HAR/ MFTB-300-563L; BDS type FL-EA, LDS type FMG-FA/FG. ORIGINALLY TMT&D CORP. & DISSOLVED DURING APRIL 2005. Old Version 230kV GIS type 8DN40-8DN4 with CB 8DN401-8DN4; BDS type 8DN4-8DQ1; LDS type 8DP4; MES type 8DN4; HES type 8DP4. Based on SIEMENS letter# 30179023-A1 dated 02/05/2011, this type is already obsolete/phased out. New Version Based on TS&SD letter # 11-00267/01-03032301 dated 02/02/2011, it is pre-qualified for 300kV GIS type 8DN9, rated current 4000A, short time current rating of 63kA, CB (Single Break) type 8DN9-300-63-4000 with motor spring mechanism, Busbar & line DS type 8DN9-300-63-4000 with motor drive mechanism, MES type 8DN9-300-63-with motor drive mechanism & HES type 8DN9-300-63-4000 with motor drive mechanism as confirming to SEC specification # 32-TMSS-02,Rev.01, with the following conditions: Ten (10) years extended warranty starting from project "Safaniyah 380/230kV project" as confirmed through SIEMENS letter # PQ_8DN9_02 dated 26/06/2010. This GIS shall only be used for 245kV, 63kA applications.
Yes Yes
MITSUBISHI SIEMENS
JAPAN-GERMANY-Berlin
Yes Yes
FRANCE-GRENOBLE JAPAN--
Yes Yes ORIGINALLY TMT&D CORP. & DISSOLVED DURING APRIL 2005. Total = 7
7. 1. 4
Applicable Standards:
SWITZERLAND Yes
32-TMSS-02
420kV GIS type ELK-03 with CB type ELKSP-3 DOUBLE BREAK, Spring Hydraulic Charged mechanism, BDS type ELKT, LDS type ELKT, MES type ELK EM3, MES type ELK EB3 420kV GIS type T155 with CB type FB2T (Hydrolic Mech.)
FRANCE-(AIX-LES BAINS)
Yes
Page 21 of 101
SER
MANUFACTURER
HYOSUNG (HICO)
FACTORY LOCATION
KOREA, Republic of-Changwon
REMARKS
Based on TS&SD letter # 10-F-02299/02-03032301 dated 25/10/2010, it is pre-qualified for 420kV GIS type HSG 426A, 63kA, CB (Single Break) type HCHY 426A with Hydraulic Mechanism, Busbar DS type HDMO 426A, Line DS type HDMO 426B,ES type HEMO 426A&H-ES type HEMS 426A as confirming to SEC specification # 32-TMSS-02,Rev.01, with the following conditions: Supply one complete spare bay" free of charge" (for not repeating the short circuit test of circuit breaker type HCHY 426A) on the first supply of 420kV GIS type HSG 426A to SEC. This was confirmed in writing by Hyosung Corp (Korea) through letter #Nil dated 28th December 2009. Repeat/carry out the temperature rise test at 55?C (it was carried out before at 50?C) of the main circuit on the first supply of the 420kV GIS type HSG 426A to SEC. This was confirmed in writing by Hyosung Corp (Korea) through letter #HS-420GIS100830-1 dated 30th August 2010. Back to back switching tests for the capacitor bank shall be conducted in an independent test laboratory whenever there is project requirement. This was confirmed in writing by Hyosung Corp (Korea) through letter #HS-420GIS-100830-1 dated 30th August 2010. Ten (10) years extended warranty for the proposed 420kV GIS type HSG 426A from the date of PAC of the turnkey project in case of contract award or date of delivery in case of direct material supply order. This was confirmed in writing by Hyosung Corp (Korea) through letter #HS-420GIS-100830-1 dated 30th August 2010.
HYUNDAI
Yes
420 kV; 63kA; TYPE-550 SR; CB-550 SR-K (Single Break); DS-550 DRM 1&2; ES-550 ERM; HES-550 LES; back to back capacitor switching test for C.B. shall be done in independent laboratory iin the presence of SEC Engineers whenever there is a requirment for this test iin th PTS of forthcoming SEC projects. - 10 Years extended warranty. 420kV GIS type 1FT ORIGINALLY TMT&D CORP. & DISSOLVED DURING APRIL 2005. 420kV GIS type YGII with CB type SPD; DS ype YGII
Page 22 of 101
SER
MANUFACTURER
FACTORY LOCATION
GERMANY
REMARKS
New version: 550kV GIS typ 8DQ1 with CB type 8dQ1-P2; DS type 8DQ1; ES type 8DQ1. with ten (10) years extended warranty from the date of Provisional Acceptance Certificate (PAC) of the Turnkey project (In case of contract award) and from the date of delivery for the direct material supply order. The guarantee/warranty shall cover all the cost of materials and labor as per warranty/guarantee of materials and workmanship and subsequently reduced yearly in case of future project award. old version: 420kV GIS type 8DQ1 with CB type 8DQ1-T2, DOUBLE BREAK, Hydraulic mechanism; DS type 8QD1 ORIGINALLY TMT&D CORP. & DISSOLVED DURING APRIL 2005. Old virsion: 420kV GIS type GID with CB type GSR 400R2B/GSRK, DOUBLE BREAK, Hydraulic mechanism. Total = 10
JAPAN--
Yes
7. 1. 5
Applicable Standards:
Yes Based on TS&SD Letter # 10-02461-02-03032301 dated 31/08/2010, it is pre-qualified for 36kV GIS type 8DA10,rated current 2500A,short time current rating of 25kA(3sec) ,CB type 3AH with interrupter type VS 30040 (40kA) as confirming to SEC specification # 32-TMSS-03, Rev.0 with the following conditions: Capacitor bank back to back switching tests in case of non availability of test report shall be conducted in an independent testing laboratory in the presence of three (3) SEC engineers & one (1) SEC approved independent inspection agency Inspector, all the related costs for witnessing the tests will be borne by the manufacturer, in case there is a need of capacitor bank application. This was confirmed by Siemens through letter # 8DA10_PQR_R1 dated 25/08/2010. Seven (7) years extended warranty for the proposed 36kV GIS ,type 8DA10 from the date of PAC of the turnkey project in case of contract award or date of delivery in case of direct material supply order. This was confirmed by Siemens trough letter # 8DA10_PQR_R1 dated 25/08/2010. Total = 1
8
8.1
8. 1. 0
BATTERY EQUIPMENT
Applicable Standards:
Yes
46-TMSS-01
Page 23 of 101
SER
MANUFACTURER
FACTORY LOCATION
United States FRANCE FRANCE-United States ITALY United States GERMANY SLOVENIA United Kingdom GERMANY JAPAN
Pre-Qualified Manufacturers By SEC Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes
REMARKS
ENERSYS S.A.R.L. EXIDE FIAMM GOULD (GNB) HOPPECKE TOVARNA AKUMULATORSKIH BATERIJ TUNGSTONE (HAWKER TUNGSTONE) VARTA YUASA
Total =
12
8.2
8. 2. 0
Applicable Standards:
Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes
46-TMSS-04
originally was SAFT Power System SAS-France
Total =
11
8.3
8. 3. 0
Applicable Standards:
46-TMSS-06
Page 24 of 101
SER
MANUFACTURER
FACTORY LOCATION
SWEDEN FRANCE SPAIN United States GERMANY GERMANY-Zwickau
REMARKS
MERGED WITH SAFT NIFE -SWEDEN Based on TS&SD fax ref.#08-F02675/03-03032301 dated 10/01/2009. Pre-Qualified for Nicd Battery with this conditions: -First batch shall be type tested in Independent Laboratory iin presence of (3) SEC engineers & (1) independent inspector. -(07) years warranty 370 TO 1390AH
8.4
8. 4. 1
BATTERY CHARGER
BATTERY CHARGER AEES AEG Power Solutions SAS BENNING Benning Elektrotechnik & Elektronik GmbH & Co.kG. FRANCE FRANCE-FRANCE GERMANY--
Applicable Standards:
Yes Yes Yes Yes
46-TMSS-02
Previously "Theo-Benning-Germany", the name has been changed to Benning Elektrotechnik & Elektronik GmbH & Co. KG -Germany based on TS&SD/ESD letter # 11-00334-03032301 dated 30/01/2011. Based on TS&SD letter# 09-F001363/02-03032301 dated 2nd. May 2009 as confirming to SEC specifications # 46-TMSS-02, rev.0 ; with the following conditions: All tests shall be carried out on the first batch of Battery Charger or UPS to be supplied to SEC in securing an order in the manufacturer's testing laboratory in the presence of three (3) SEC engineers & one (1) approved independent inspection agency Inspector. Ten (10) years warranty from the date of PAC of the turnkey project in case of contract award or date of delivery in case of direct material supply order.
C&D CEG
Yes Yes
CHLORIDE
FRANCE
Yes
Page 25 of 101
SER
MANUFACTURER
EMISA (ELECTRO MERCANTIL INDUSTRIAL S.A. SPAIN) ERSKINE EXIDE GUTOR ELECTRONIC LTD.
FACTORY LOCATION
SPAIN United Kingdom United States SWITZERLAND
REMARKS
11
Applicable Standards:
ITALY-BIBIENA Yes
46-TMSS-03
Based on TS&SD letter# 09-F001363/02-03032301 dated 2nd. May 2009 as confirming to SEC specifications # 46-TMSS-03, rev.0 ; with the following conditions: All tests shall be carried out on the first batch of Battery Charger or UPS to be supplied to SEC in securing an order in the manufacturer's testing laboratory in the presence of three (3) SEC engineers & one (1) approved independent inspection agency Inspector. Ten (10) years warranty from the date of PAC of the turnkey project in case of contract award or date of delivery in case of direct material supply order.
SWITZERLAND
Yes Total = 2
8. 4. 3
BATTERY CHARGER, 48 VDC AEES AEG Power Solutions SAS BENNING BRAGA MORO CHLORIDE COM 10 INTERNATIONAL PTY. LTD. EMISA (ELECTRO MERCANTIL INDUSTRIAL S.A. SPAIN) FRANCE FRANCE-FRANCE ITALY FRANCE
Applicable Standards:
Yes Yes Yes Yes Yes Yes Yes
46-TMSS-02,46-TMSS-05
ACCEPTABLE FOR APPLICATIONS OTHER THAN TELECOM originally was SAFT Power System SAS-France
AUSTRALIA-ALPHA SPAIN
Page 26 of 101
SER
MANUFACTURER
FACTORY LOCATION
United Kingdom
REMARKS
Based on TS&SD letter# 09-F02210/03-03032301 dated 1st . September 2009, ERSKIN System Ltd. (a division of Dale Power Solution plc) from United Kingdom-Scarborough for 48V DC battery Charger as confirming to SEC specification # 46-TMSS-05, rev.0 with the following conditions: All type, design, special & routine tests as per SEC specifications/standards shall be carried out on the first batch to be supplied to SEC in securing an order in the manufacturer's laboratory in the presence of three (3) SEC engineers & one (1) approved independent inspection agency Inspector. Ten (10) years warranty from the date of PAC of the turnkey project in case of contract award or date of delivery in case of direct material supply order. SCR TYPE ONLY . SWITCH MODE RECTIFIERS ONLY FOR TELECOM APPLICATIONS Total = 11
9
9.1
9. 1. 0
LV DISTRIBUTION PANELS
Applicable Standards:
Yes Yes Yes Yes Yes Yes
31-TMSS-02
Ten (10) years warranty from the date of PAC of the turnkey project in case of contract award or date of delivery in case of direct material supply order.
Page 27 of 101
SER
MANUFACTURER
MEMF-ETA Switchgear Manufacturing Company
FACTORY LOCATION
Saudi Arabia-Riyadh
REMARKS
Based on TS&SD letter #11-F03210/01-03032301 dated 29/11/2011, it is pre-qualified for AC&DC Panels as confirming to SEC specification # 31-TMSS-02, Rev.0 with the following conditions: All type, special, routine and sample tests as per SEC specifications/standards shall be carried out on the first batch of AC&DC Panels to be supplied to SEC in case of securing an order in the presence of three (3) SEC Engineers & one (1) approved independent inspection agency Inspector in an independent testing laboratory. All the related costs for witnessing the tests will be borne by the manufacturer. This was confirmed by MEMF-ETA Switchgear Manufacturing Company through letter # Nil dated 14/02/2011. Ten (10) years extended warranty from the date of PAC of the turnkey project in case of contract award or date of delivery in case of direct material supply order. This was confirmed by MEMF-ETA Switchgear Manufacturing Company through letter # Nil dated 08/12/2010.
MOHAMMAD AL OJAIMI FACTORY MUSAID SWITCHGEAR REMAL SIEMENS Waha Electric Supply Co. of Saudi Arabia(WESCOSA)-Dammam
Saudi Arabia-RIYADH Saudi Arabia-RIYADH Saudi Arabia-DAMMAM Saudi Arabia-JEDDAH Saudi Arabia-Dammam
Yes Yes Yes Yes Yes Based on TS&SD Letter # 11-01751/01-03032301 dated 27/06/2011, it is pre-qualified for Auxiliary AC & DC Panels up to 132kV only as confirming to SEC specification # 31-TMSS-02, Rev.0 with the following conditions: All type, special, routine and sample tests as per SEC specifications/standards shall be carried out on the first batch of each type of Auxiliary AC&DC Panels to be supplied to SEC in case of securing an order in the presence of three (3) SEC engineers & one (1) approved independent inspection agency Inspector in an independent testing laboratory. All the related costs for witnessing the tests will be borne by the manufacturer. This was confirmed by WESCOSA-Dammam through letter # Nil dated 18/05/2010. Ten (10) years extended warranty from the date of PAC of the turnkey project in case of contract award or date of delivery in case of direct material supply order. This was confirmed by WESCOSA-Dammam through letter # Nil dated 30/08/2010. Total = 12
10
Page 28 of 101
SER 10 . 1
10. 1. 0
MANUFACTURER
FACTORY LOCATION
REMARKS
Applicable Standards:
Yes Yes Yes Yes Yes Yes Yes Total = 7
10 . 2
10. 2. 0
RMU, 15 KV
RMU, 15 KV ABB AREVA EPS LTD. (GROUPE SCHNEIDER) FRITZ DRIESHER KG GULF REYROLLE LTD MERLIN GERIN SAUDI LUCY SIEMENS AG EVM THE INTERNATIONAL ELECTRICAL PRODUCTS CO. W. LUCY
Applicable Standards:
Saudi Arabia-RIYADH FRANCE Saudi Arabia-RIYADH GERMANY Saudi Arabia-DAMMAM FRANCE Saudi Arabia-AL KHOBAR GERMANY-FRANKFURT Saudi Arabia-DAMMAM United Kingdom Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes
32-TMSS-07
Total =
10
10 . 3
10. 3. 0
Applicable Standards:
Yes
Page 29 of 101
SER
MANUFACTURER
FACTORY LOCATION
REMARKS
Total = 1
11
11 . 1
11. 1. 0
NER, UP TO 33 KV
NER, UP TO 33 KV CRESSAL RESISTOR FURSE M.S.Resistances METAL DEPLOYE NATIONAL
Applicable Standards:
United Kingdom United Kingdom FRANCE-FRANCE INDIA Yes Yes Yes Yes Yes
57-TMSS-01
Total =
12
12 . 1
12. 1. 1
BARE CONDUCTORS
Applicable Standards:
Yes Yes
10-TMSS-01
Based on TS&SD Letter # 10-01566-2-03032300 dated 14/06/2010, it is pre-qualified for Bar Conductors as confirming to SEC specification # 10-TMSS-01, Rev.01 with the following conditions: The first batch of each type of conductors to be supplied to SEC shall be type tested in an independent accredited test laboratory in the presence of three (3) SEC engineers & one (1) SEC approved independent inspection agency Inspector and all cost pertaining to the tests shall be borne by the manufacturer. This has been confirmed in writing by the manufacturer, through letter # AIL/BRD/PQ/SEC/19 dated 22nd May 2010. Ten (10) years warranty from the date of PAC of the turnkey project in case of contract award or date of delivery in case of direct material supply order. This has been confirmed in writing by the manufacturer; through letter # AIL/BRD/ SEC/PQ/19 dated 22nd May 2010.
Page 30 of 101
SER
MANUFACTURER
APAR Industries Ltd-SILVASSA
FACTORY LOCATION
INDIA-SILVASSA
REMARKS
Based on TS&SD Letter # 10-01566-2-03032300 dated 14/06/2010, it is pre-qualified for Bar Conductors as confirming to SEC specification # 10-TMSS-01, Rev.01 with the following conditions: The first batch of each type of conductors to be supplied to SEC shall be type tested in an independent accredited test laboratory in the presence of three (3) SEC engineers & one (1) SEC approved independent inspection agency Inspector and all cost pertaining to the tests shall be borne by the manufacturer. This has been confirmed in writing by the manufacturer, through letter # AIL/BRD/PQ/SEC/19 dated 22nd May 2010. Ten (10) years warranty from the date of PAC of the turnkey project in case of contract award or date of delivery in case of direct material supply order. This has been confirmed in writing by the manufacturer; through letter # AIL/BRD/ SEC/PQ/19 dated 22nd May 2010.
BAHRAIN-MANAMA MUSCAT--
Yes Yes FIRST LOT OF EACH TYPE SHALL BE TYPE TESTED IN AN INDEPENDENT LABORATORY PER 10-TMSS-01 & OTHER INTL. STANDARDS, IN PRESENCE OF SEC ENGINEERS AND ALL COST SHALL BE BORNE BY THE MANUFACTURER.10 YEARS EXTENDED WARRANTY.
Yes Yes Yes Yes Based on TS&SD Letter # 10-F001691/01-03032301 dated 19/06/2010, it is pre-qualified for Bare Conductors types (ACAR, ACSR & AAAC) as confirming to SEC specification # 10-TMSS-01 Rev.01 with the following conditions: ACAR and ACSR conductors are successfully type tested in accredited laboratory in presence of SEC Engineers with acceptable results. For AAAC conductors, type, special, routine and sample tests shall be conducted on the first batch in an independent accredited test laboratory in the presence of three (3) SEC engineers & one (1) SEC approved independent inspection agency Inspector and all cost pertaining to the tests shall be borne by the manufacturer. Ten (10) years warranty from the date of PAC of the turnkey project in case of contract award or date of delivery in case of direct material supply order.
Page 31 of 101
SER
MANUFACTURER
FACTORY LOCATION
REMARKS
Total = 9
12 . 2
12. 2. 1
TYPE ACSR/AW
BARE CONDUCTOR, ACSR/AW ALCOA APAR Industries Ltd-NALAGARH United States INDIA-NALAGARH
Applicable Standards:
Yes Yes
10-TMSS-01
Based on TS&SD Letter # 10-01566-2-03032300 dated 14/06/2010, it is pre-qualified for Bar Conductors as confirming to SEC specification # 10-TMSS-01, Rev.01 with the following conditions: The first batch of each type of conductors to be supplied to SEC shall be type tested in an independent accredited test laboratory in the presence of three (3) SEC engineers & one (1) SEC approved independent inspection agency Inspector and all cost pertaining to the tests shall be borne by the manufacturer. This has been confirmed in writing by the manufacturer, through letter # AIL/BRD/PQ/SEC/19 dated 22nd May 2010. Ten (10) years warranty from the date of PAC of the turnkey project in case of contract award or date of delivery in case of direct material supply order. This has been confirmed in writing by the manufacturer; through letter # AIL/BRD/ SEC/PQ/19 dated 22nd May 2010.
INDIA-SILVASSA
Yes
Based on TS&SD Letter # 10-01566-2-03032300 dated 14/06/2010, it is pre-qualified for Bar Conductors as confirming to SEC specification # 10-TMSS-01, Rev.01 with the following conditions: The first batch of each type of conductors to be supplied to SEC shall be type tested in an independent accredited test laboratory in the presence of three (3) SEC engineers & one (1) SEC approved independent inspection agency Inspector and all cost pertaining to the tests shall be borne by the manufacturer. This has been confirmed in writing by the manufacturer, through letter # AIL/BRD/PQ/SEC/19 dated 22nd May 2010. Ten (10) years warranty from the date of PAC of the turnkey project in case of contract award or date of delivery in case of direct material supply order. This has been confirmed in writing by the manufacturer; through letter # AIL/BRD/ SEC/PQ/19 dated 22nd May 2010.
Yes Yes
Page 32 of 101
SER
MANUFACTURER
OMAN CABLE INDUSTRIES
FACTORY LOCATION
MUSCAT--
REMARKS
FIRST LOT OF EACH TYPE SHALL BE TYPE TESTED IN AN INDEPENDENT LABORATORY PER 10-TMSS-01 & OTHER INTL. STANDARDS, IN PRESENCE OF SEC ENGINEERS AND ALL COST SHALL BE BORNE BY THE MANUFACTURER.10 YEARS EXTENDED WARRANTY.
Yes Yes Yes Yes Based on TS&SD Letter # 10-F001691/01-03032301 dated 19/06/2010, it is pre-qualified for Bare Conductors type (ACSR/AW) as confirming to SEC specification # 10-TMSS-01 Rev.01 with the following condition: Ten (10) years warranty from the date of PAC of the turnkey project in case of contract award or date of delivery in case of direct material supply order. Total = 10
12 . 3
12. 3. 1
GROUND WIRE
GROUND WIRE ALCOA APAR Industries Ltd-NALAGARH United States INDIA-NALAGARH
Applicable Standards:
Yes Yes
10-TMSS-03
Based on TS&SD Letter # 10-01566-2-03032300 dated 14/06/2010, it is pre-qualified for Overhead Ground Wire (OGW) of Aluminum Clad Steel (ACS) Type only as confirming to SEC specification # 10-TMSS-03, Rev.0 with the following conditions: The first batch of Aluminum Clad Steel (ACS) type to be supplied to SEC shall be type tested in an independent accredited test laboratory in the presence of three (3) SEC engineers & one (1) SEC approved independent inspection agency Inspector and all cost pertaining to the tests shall be borne by the manufacturer. This has been confirmed in writing by the manufacturer through letter # AIL/BRD/PQ/SEC/19 dated 22nd May 2010. Ten (10) years warranty from the date of PAC of the turnkey project in case of contract award or date of delivery in case of direct material supply order. This has been confirmed in writing by the manufacturer through letter # AIL/BRD/ SEC/PQ/19 dated 22nd May 2010.
Page 33 of 101
SER
MANUFACTURER
APAR Industries Ltd-SILVASSA
FACTORY LOCATION
INDIA-SILVASSA
REMARKS
Based on TS&SD Letter # 10-01566-2-03032300 dated 14/06/2010, it is pre-qualified for Overhead Ground Wire (OGW) of Aluminum Clad Steel (ACS) Type only as confirming to SEC specification # 10-TMSS-03, Rev.0 with the following conditions: The first batch of Aluminum Clad Steel (ACS) type to be supplied to SEC shall be type tested in an independent accredited test laboratory in the presence of three (3) SEC engineers & one (1) SEC approved independent inspection agency Inspector and all cost pertaining to the tests shall be borne by the manufacturer. This has been confirmed in writing by the manufacturer through letter # AIL/BRD/PQ/SEC/19 dated 22nd May 2010. Ten (10) years warranty from the date of PAC of the turnkey project in case of contract award or date of delivery in case of direct material supply order. This has been confirmed in writing by the manufacturer through letter # AIL/BRD/ SEC/PQ/19 dated 22nd May 2010.
ECN CG SA J-POWER SYSTEM CORP. MIDAL CABLE LTD. RIYADH CABLES SAUDI CABLE SOUTHWIRE TREFILEUROPE
SPAIN JAPAN BAHRAIN-MANAMA Saudi Arabia-RIYADH Saudi Arabia-JEDDAH United States FRANCE
12 . 4
12. 4. 1
Applicable Standards:
United States-Statesville, NC United Kingdom-Nottingham Saudi Arabia CHINA SOUTH KOREA United States Saudi Arabia-JEDDAH Yes Yes Yes Yes Yes Yes Yes
10-TMSS-05
Page 34 of 101
SER
MANUFACTURER
FACTORY LOCATION
REMARKS
Total = 7
12 . 5
12. 5. 1
Applicable Standards:
United Kingdom-GERMANY-Monchengladbach Yes Yes
10-TMSS-04
PREVIOUSLY ALCOA FUJIKURA LTD (AFL). EXTENDED GUARANTEE/WARRANTY FOR A PERIOD OF 10 YEARS. Previously Draka Comteq Germany GmbH & KG.
BRUGG TELECOM AG CORNING CABLES (BICC) DRAKA NK FUJIKURA FURUKAWA ELECTRIC CO. LTD. Jiangsu Zhongtian Technology Co.Ltd (ZTT) -China
Yes Yes Yes Yes Yes Yes Based on TS&SD Letter # 10-01654-03032301 dated 05/06/2010, it is pre-qualified for OPGW as confirming to SEC specification # 10-TMSS-04, Rev.0 with the following conditions: The first batch of each types of OPGW to be supplied to SEC shall be type tests in an independent testing laboratory in the presence of three (3) SEC engineers & one (1) SEC approved independent inspection agency Inspector and all cost pertaining to the tests shall be borne by manufacturer .All type/design, routine/sample and special tests per SEC material specification number 10-TMSS-04, Rev.0 shall be conducted. This was confirmed in writing by the manufacturer through letter# Nil dated 18th June 2009. Ten (10) years warranty from the date of PAC of the turnkey project in case of contract award or date of delivery in case of direct material supply order. This was confirmed in writing by the manufacturer through letter # Nil dated 18th June 2009.
Page 35 of 101
SER
MANUFACTURER
FACTORY LOCATION
KOREA, Republic of
REMARKS
Based on TS&SD letter # 10-02583-03032301 dated 19/09/2010, it is pre-qualified for OPGW as confirming to SEC specification # 10-TMSS-04,Rev.0, with the following conditions: All type/design; routine/sample and special tests per SEC material specification # 10-TMSS-04, Rev.0 of first batch of each types of OPGW to be supplied to SEC shall be conducted in an independent testing laboratory in the presence of three (3) SEC engineers & one (1) SEC approved independent inspection agency Inspector and all cost pertaining to the tests shall be borne by Manufacturer. This was confirmed in writing by the manufacturer through letter #Nil dated 24th December 2009. Ten (10) years extended warranty for each types of OPGW from the date of PAC of the turnkey project in case of contract award or date of delivery in case of direct material supply order. This was confirmed in writing by the manufacturer through letter #Nil dated 24th December 2009.
Yes Yes Yes Yes PREVIOUSLY "PIRELLI" Based on TS&SD letter# 09-F00730/03-03032301 dated 24th August 2009, Taihan Electric Wire Co. Ltd. from South Korea-Anyang for OPGW as confirming to SEC specification # 10-TMSS-04, rev.0 with the following conditions: All type, design, special & routine tests as per SEC specifications/standards shall be carried out on the first batch to be supplied to SEC in securing an order in the manufacturer's laboratory in the presence of three (3) SEC engineers & one (1) approved independent inspection agency Inspector. Ten (10) years warranty from the date of PAC of the turnkey project in case of contract award or date of delivery in case of direct material supply order. Total = 13
12 . 6
12. 6. 1
Applicable Standards:
Yes
10-TMSS-06
IT IS A CONSORTIUM OF FUJIKURA & FURUKAWA. ONLY INVAR CONDUCTORS PER CLAUSE 1.3 & 1.4 OF 10-TMSS-06. FIRST LOT TO BE TYPE TESTED IN THE PRESENCE OF 3 SEC ENGRS AND IIA INSPECTOR; EXTENDED WARRANTY FOR 10 YEARS. Based on TS&SD letter# 09-00649-1-03032301 dated 28 March 2009 it is pre-qualified for GTACSR & GZTACSR.
JAPAN
Yes
Page 36 of 101
SER
MANUFACTURER
FACTORY LOCATION
KOREA, Republic of
REMARKS
Based on TS&SD letter # 10-02584-03032301 dated 19/09/2010, it is pre-qualified for Heat Resistance Aluminum Alloy Conductors, Gap& Non Gap type as confirming to SEC specification # 10-TMSS-06,Rev.0, with the following conditions: All type/design; routine/sample and special tests per SEC material specification # 10-TMSS-06, Rev.0 of first batch of each types of Heat Resistance Aluminum Alloy Conductors to be supplied to SEC shall be conducted in an independent testing laboratory in the presence of three (3) SEC engineers & one (1) SEC approved independent inspection agency Inspector and all cost pertaining to the tests shall be borne by Manufacturer. This was confirmed in writing by the manufacturer through letter #Nil dated 08th January 2010. Ten (10) years extended warranty for each types of Heat Resistance Aluminum Alloy Conductors from the date of PAC of the turnkey project in case of contract award or date of delivery in case of direct material supply order. This was confirmed in writing by the manufacturer through letter #Nil dated 08th January 2010. Full time presence of LS-Korea expert during execution of first order with Gap type conductor for guidance and training of SEC/Contractor staff about installation of this type of conductor as confirmed through LS letter # LS/LHJ-100526/00 dated 26th May 2010. Full technical support will be provided to SEC during operation of Gap Conductors for minimum five (5) years period from first project as confirmed through LS letter # LS/LHJ100526/00 dated 26th May 2010. Total = 3
13
13 . 1
13. 1. 1
13.8 KV
XLPE CABLE 13.8 KV DUBAI CABLE CO. ELSEWEDY EGYTECH CABLE CO. JEDDAH CABLE CO. LS
Applicable Standards:
United Arab Emirates-DUBAI EGYPT-Saudi Arabia-JEDDAH KOREA, Republic of Yes Yes Yes Yes Including Joints & Terminations Including Joints & Terminations Including Joints & Terminations PREVIOUSLY LG; Including Joints & Terminations
Page 37 of 101
SER
MANUFACTURER
OMAN CABLE INDUSTRIES RIYADH CABLES SAUDI CABLE TAIHAN ELECTRIC WIRE COMPANY
FACTORY LOCATION
MUSCAT-Saudi Arabia-RIYADH Saudi Arabia-JEDDAH KOREA, Republic of
REMARKS
Ref# is 08-02531/01-0303230 dated 08/11/2008 no accessories are pre-qualified Including Joints & Terminations Including Joints & Terminations Including Joints & Terminations Total = 8
13 . 2
13. 2. 1
33 & 34.5 KV
XLPE CABLE 33 & 34.5 KV DAINICHI-NIPPON CABLES (MITSUBISHI) DEMIRER KABLO/SAUDI CABLE CO. DUBAI CABLE CO. ELSEWEDY EGYTECH CABLE CO. FUJIKURA CABLES JEDDAH CABLE CO. J-POWER SYSTEM CORP. LS MKM OMAN CABLE INDUSTRIES RIYADH CABLES SAUDI CABLE SHOWA CABLE TAIHAN ELECTRIC WIRE COMPANY JAPAN TURKEY-United Arab Emirates-DUBAI EGYPT-JAPAN Saudi Arabia-JEDDAH JAPAN KOREA, Republic of HUNGARY MUSCAT-Saudi Arabia-RIYADH Saudi Arabia-JEDDAH JAPAN KOREA, Republic of
Applicable Standards:
Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Including Joints & Terminations Including Joints & Terminations Including Joints & Terminations Including Joints & Terminations Including Joints & Terminations Including Joints & Terminations Including Joints & Terminations PREVIOUSLY LG; Including Joints & Terminations Including Joints & Terminations Ref# is 08-02531/01-0303230 dated 08/11/2008 no accessories are pre-qualified Including Joints & Terminations Including Joints & Terminations Including Joints & Terminations Including Joints & Terminations Total = 14
13 . 3
13. 3. 1
XLPE CABLES 69 KV
XLPE CABLES 69 KV ALCATEL DAINICHI-NIPPON CABLES (MITSUBISHI) DEMIRER KABLO/SAUDI CABLE CO. FRANCE JAPAN TURKEY--
Applicable Standards:
Yes Yes Yes
11-TMSS-01
Including Joints & Terminations Including Joints & Terminations Including Joints & Terminations
Page 38 of 101
SER
MANUFACTURER
FACTORY LOCATION
FINLAND EGYPT--
REMARKS
Including Joints & Terminations TO CARRY OUT ALL TYPE/DESIGN AND ROUTINE/SAMPLE TESTS AT SEC APPROVED INDEPENDENT LABORATORY IN PRESENCE OF A REPRESENTATIVE OF 3RD PARTY INSPECTION AGENCY & THREE ENGINEERS OF SEC FOR FIRST CONTRACT; 10 YEARS OF EXTENDED GUARANTEE/WARRANTY; FOR JOINTS & TERMINATIONS ALSO; Including Joints & Terminations Including Joints & Terminations Based on TS&SD letter # 10-02784-01-03032301 dated 24/10/2010, it is pre-qualified for 69kV, 1x630mm XLPE Power Cable as confirming to SEC specification # 11-TMSS-01, Rev.0, with the following condition: Ten (10) years extended warranty for the proposed 69kV, 1x630mm XLPE Power Cable from the date of PAC of the turnkey project in case of contract award or date of delivery in case of direct material supply order. This was confirmed in writing by Jeddah Cable Co. through letter #Nil dated 26th June 2006.
J-POWER SYSTEM CORP. MKM NEXANS NORWAY AS PIRELLI KABEL AND SYSTEM GMBH RIYADH CABLES SAUDI CABLE SUDKABEL
Including Joints & Terminations Including Joints & Terminations Including Joints & Terminations Including Joints & Terminations Including Joints & Terminations Including Joints & Terminations PREVIOUSLY ABB. Including Joints & Terminations Total = 15
13 . 4
13. 4. 1
110KV TO 132 KV
XLPE CABLES 110 TO 132 KV BRUGG DAINICHI-NIPPON CABLES (MITSUBISHI) DEMIRER KABLO/SAUDI CABLE CO. DRAKA NK
Applicable Standards:
SWITZERLAND JAPAN TURKEY-FINLAND Yes Yes Yes Yes
11-TMSS-02
Including Joints & Terminations Including Joints & Terminations Including Joints & Terminations Including Joints & Terminations
Page 39 of 101
SER
MANUFACTURER
ELSEWEDY EGYTECH CABLE CO.
FACTORY LOCATION
EGYPT--
REMARKS
TO CARRY OUT ALL TYPE/DESIGN AND ROUTINE/SAMPLE TESTS AT SEC APPROVED INDEPENDENT LABORATORY IN PRESENCE OF A REPRESENTATIVE OF 3RD PARTY INSPECTION AGENCY & THREE ENGINEERS OF SEC FOR FIRST CONTRACT; 10 YEARS OF EXTENDED GUARANTEE/WARRANTY; FOR JOINTS & TERMINATIONS ALSO; Including Joints & Terminations Including Joints & Terminations Based on TS&SD letter # 10-02784-01-03032301 dated 24/10/2010, it is pre-qualified for 132kV, 1x1200mm XLPE Power Cable as confirming to SEC specification # 11-TMSS-02, Rev.0, with the following condition: Ten (10) years extended warranty for the proposed 132kV, 1x1200mm XLPE Power Cable from the date of PAC of the turnkey project in case of contract award or date of delivery in case of direct material supply order. This was confirmed in writing by Jeddah Cable Co. through letter #Nil dated 26th June 2006.
J-POWER SYSTEM CORP. LS NEXANS NORWAY AS PIRELLI KABEL AND SYSTEM GMBH RIYADH CABLES SAUDI CABLE SUDKABEL TAIHAN ELECTRIC WIRE COMPANY
JAPAN KOREA, Republic of NORWAY GERMANY-BERLIN Saudi Arabia-RIYADH Saudi Arabia-JEDDAH GERMANY-GERMANY KOREA, Republic of
Including Joints & Terminations PREVIOUSLY LG; Including Joints & Terminations Including Joints & Terminations Including Joints & Terminations Including Joints & Terminations Including Joints & Terminations PREVIOUSLY ABB. Including Joints & Terminations Including Joints & Terminations Total = 16
13 . 5
13. 5. 1
230 K V
XLPE CABLE 230 K V BRUGG
Applicable Standards:
SWITZERLAND Yes
11-TMSS-02
Including Joints & Terminations; COMPLETE TYPE, SPECIAL & ROUTINE TESTS FOR THE FIRST ORDER , ALSO 10 YEARS WARRANTY FROM THE DATE OF PAC ARE REQUIRED Including Joints & Terminations Including Joints & Terminations Including Joints & Terminations Including Joints & Terminations
DAINICHI-NIPPON CABLES (MITSUBISHI) DEMIRER KABLO/SAUDI CABLE CO. FUJIKURA FURUKAWA ELECTRIC CO. LTD.
Page 40 of 101
SER
MANUFACTURER
J-POWER SYSTEM CORP. LS
FACTORY LOCATION
JAPAN KOREA, Republic of
REMARKS
Including Joints & Terminations PREVIOUSLY LG; Including Joints & Terminations. Ten (10) years extended warranty from the date of PAC of the First turnkey project in case of contract award or date of the First delivery in case of direct material supply order. Including Joints & Terminations Including Joints & Terminations based on TS&SD letter# 09-01366-03032301 dated 10th. May 2009, it is pre-qualified as conforming to SEC specifications # 11-TMSS-02, rev.0 with the following conditions: All type/design and routine/sample tests shall be carried out on the first batch of 230kV XLPE power cable to be supplied to SEC in securing an order in an independent testing laboratory as per IEC/AEIC and SEC standards in the presence of three (3) SEC engineers & one (1) approved independent inspection agency Inspector. Ten (10) years warranty from the date of PAC of the turnkey project in case of contract award or date of delivery in case of direct material supply order. PREVIOUSLY ABB. Including Joints & Terminations Including Joints & Terminations. Ten (10) years extended warranty from the date of PAC of the First turnkey project in case of contract award or date of the First delivery in case of direct material supply order. Total = 12
Yes Yes
13 . 6
13. 6. 1
380 KV
XLPE CABLE -380 KV BRUGG
Applicable Standards:
SWITZERLAND Yes
11-TMSS-02
Including Joints & Terminations; COMPLETE TYPE, SPECIAL & ROUTINE TESTS FOR THE FIRST ORDER , ALSO 10 YEARS WARRANTY FROM THE DATE OF PAC ARE REQUIRED Including Joints & Terminations Based on TS&SD letter 11-01374-03032301 dated April 27, 2011. It is DISQUALIFIED for 380KV XLPE Cable. Including Joints & Terminations PREVIOUSLY LG; Including Joints & Terminations. Ten (10) years extended warranty from the date of PAC of the First turnkey project in case of contract award or date of the First delivery in case of direct material supply order.
DAINICHI-NIPPON CABLES (MITSUBISHI) DEMIRER KABLO/SAUDI CABLE CO. J-POWER SYSTEM CORP. LS
Page 41 of 101
SER
MANUFACTURER
FACTORY LOCATION
NORWAY FRANCE GERMANY GERMANY-BERLIN GERMANY-GERMANY KOREA, Republic of
REMARKS
Including Joints & Terminations Including Joints & Terminations Including Joints & Terminations Including Joints & Terminations PREVIOUSLY ABB. Including Joints & Terminations Including Joints & Terminations. Ten (10) years extended warranty from the date of PAC of the First turnkey project in case of contract award or date of the First delivery in case of direct material supply order. Including Joints & Terminations Total = 12
VISCAS FUJIKURA
JAPAN
Yes
14
14 . 1
14. 1. 1
110 TO 132 KV
LPOF CABLE 110 KV TO 132 KV ALCATEL CABLE CANADA WIRE DAINICHI-NIPPON CABLES (MITSUBISHI) DATWYLER FUJIKURA FURUKAWA ELECTRIC CO. LTD. J-POWER SYSTEM CORP. KABEL RHEYDT (AEG) KABEL WERK BRUGG AG LS CABLES NEXAN(CORTALLIOD) NEXANS NORWAY AS PIRELLI PIRELLI KABEL AND SYSTEM GMBH SHOWA CABLE SUDKABEL TAIHAN ELECTRIC WIRE COMPANY FRANCE CANADA JAPAN United Kingdom JAPAN JAPAN JAPAN GERMANY SWITZERLAND KOREA, Republic of SWITZERLAND NORWAY ITALY GERMANY-BERLIN JAPAN GERMANY-GERMANY KOREA, Republic of
Applicable Standards:
Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes
11-TMSS-03
Including Joints & Terminations Including Joints & Terminations Including Joints & Terminations Including Joints & Terminations Including Joints & Terminations Including Joints & Terminations Including Joints & Terminations Including Joints & Terminations Including Joints & Terminations PREVIOUSLY LG; Including Joints & Terminations Including Joints & Terminations Including Joints & Terminations Including Joints & Terminations Including Joints & Terminations Including Joints & Terminations PREVIOUSLY ABB. Including Joints & Terminations Including Joints & Terminations
Page 42 of 101
SER
MANUFACTURER
FACTORY LOCATION
REMARKS
Total = 17
14 . 2
14. 2. 1
230 KV
LPOF CABLE 230 KV ALCATEL CANADA WIRE DAINICHI-NIPPON CABLES (MITSUBISHI) FUJIKURA FURUKAWA ELECTRIC CO. LTD. J-POWER SYSTEM CORP. KABEL RHEYDT (AEG) NEXANS NORWAY AS PIRELLI KABEL AND SYSTEM GMBH SUDKABEL TAIHAN ELECTRIC WIRE COMPANY FRANCE CANADA JAPAN JAPAN JAPAN JAPAN GERMANY NORWAY GERMANY-BERLIN GERMANY-GERMANY KOREA, Republic of
Applicable Standards:
Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes
11-TMSS-03
Including Joints & Terminations Including Joints & Terminations Including Joints & Terminations Including Joints & Terminations Including Joints & Terminations Including Joints & Terminations Including Joints & Terminations Including Joints & Terminations Including Joints & Terminations PREVIOUSLY ABB. Including Joints & Terminations Including Joints & Terminations. Complete Type, Routine / Sample tests for first order. Ten (10) years extended warranty from the date of PAC of the First turnkey project in case of contract award or date of the First delivery in case of direct material supply order. Total = 11
14 . 3
14. 3. 1
380 KV
LPOF CABLE 380 KV ALCATEL CANADA WIRE DAINICHI-NIPPON CABLES (MITSUBISHI) FUJIKURA FURUKAWA ELECTRIC CO. LTD. HITACHI CABLE LTD. J-POWER SYSTEM CORP. KABEL RHEYDT (AEG) FRANCE CANADA JAPAN JAPAN JAPAN JAPAN JAPAN GERMANY
Applicable Standards:
Yes Yes Yes Yes Yes Yes Yes Yes
11-TMSS-03
Including Joints & Terminations Including Joints & Terminations Including Joints & Terminations Including Joints & Terminations Including Joints & Terminations Including Joints & Terminations Including Joints & Terminations Including Joints & Terminations
Page 43 of 101
SER
MANUFACTURER
FACTORY LOCATION
KOREA, Republic of
REMARKS
PREVIOUSLY LG; Including Joints & Terminations. Ten (10) years extended warranty from the date of PAC of the First turnkey project in case of contract award or date of the First delivery in case of direct material supply order. Including Joints & Terminations Including Joints & Terminations Including Joints & Terminations Including Joints & Terminations Including Joints & Terminations Including Joints & Terminations Including Joints & Terminations Including Joints & Terminations. Complete Type, Routine / Sample tests for first order. Ten (10) years extended warranty from the date of PAC of the First turnkey project in case of contract award or date of the First delivery in case of direct material supply order. Total = 17
MITSUBISHI CABLE INDUSTRIES LTD PIRELLI PIRELLI GENERAL PIRELLI KABEL AND SYSTEM GMBH SHOWA CABLE SIEMENS STANDARD TELEFON OG KABELFABRIK A/S TAIHAN ELECTRIC WIRE COMPANY
JAPAN ITALY United Kingdom GERMANY-BERLIN JAPAN GERMANY NORWAY KOREA, Republic of
14 . 4
14. 4. 1
Applicable Standards:
Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes
12-TMSS-11
LINK BOX SUPPLIED / MANUFACTURED BY APPROVED POWER CABLE MANUFACTURERS ARE ACCEPTABLE UP TO 230KV.
PREVIOUSLY LG PAD MOUNTED STAINLESS STEEL BOXES AND UNDER GROUND FIBER GLASS BOXES UP TO 132KV ACCEPTABLE. EXTENDED GUARANTEE FOR 10 YEARS FOR THE FIRST SUPPLY AND IT WILL BE REDUCED YEARLY IN CASE OF FUTURE PROJECT AWARDS.
Page 44 of 101
SER
MANUFACTURER
FACTORY LOCATION
FRANCE GERMANY-BERLIN Saudi Arabia-Jeddah
REMARKS
Based on TS&SD fax ref# 09-00396-1-03032301 dated 17/02/2009 P.T.E is prequalified for Link Boxes rated up to 380kV. * (10) years extended warranty.
STEINER
GERMANY
Yes Total = 14
14 . 5
14. 5. 0
Applicable Standards:
Yes Yes Total = 2
14 . 6
14. 6. 0
Applicable Standards:
Yes Yes Yes Yes Yes Yes Total = 6 PREVIOUSLY LG
15
15 . 1
15. 1. 0
Applicable Standards:
United Kingdom-SWEDEN Yes Yes
48-TMSS-02
PREVIOUSLY ALCOA FUJIKURA LTD. (AFL)
Page 45 of 101
SER
MANUFACTURER
B.V.TWENTSCHE KABELFABRIEK BICC BRUGG TELECOM AG CORNING CABLES DRAKA NK ERICSON FUJIKURA LTD. FURUKAWA HITACHI INDUSTRIAS ARRUTI LS MIDDLE EAST OPTIC FIBER & CABLE MANUFACTURING CO. (MEFC) MIDDLE EAST SPECIALIZED CABLE (MESC) NKF KABEL B.V. NOKIA Oman Fiber Optic Cable Company
FACTORY LOCATION
NETHERLANDS- NAAKSBERGEN United Kingdom SWITZERLAND United Kingdom-PRESCOT FINLAND SWEDEN JAPAN JAPAN JAPAN SPAIN KOREA, Republic of Saudi Arabia-RIYADH Saudi Arabia-Riyadh NETHERLANDS FINLAND Oman-Rusayl
Pre-Qualified Manufacturers By SEC Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes ACCESSORIES ONLY ONLY ACCESSORIES PREVIOUSLY LG ACCESSORIES ONLY
REMARKS
Based on TS&SD letter# 10-00909-2-03032300 dated April 06, 2010. It is pre-qualified for Non Metallic Fiber Optic Cable per SEC Specification 48-TMSS-02, Rev.0 with the following conditions: Type Test: The first batch of each type of Non Metallic Fiber Optic Cable to be supplied to SEC shall be type tested per relevant International and SEC Specifications in presence of three (3) SEC Engineers and one (1) SEC approved IIA Inspector and all cost pertaining to the test shall be borne by the Manufacturer as confirmed through Letter# Nil dated September 12, 2009. Extended Warranty: Ten (10) year Extended Warranty shall be applicable for all supplies made by Oman Fiber Optic Cable Company to SEC as confirmed through Letter# EU.SEC.PQ.01 dated June17, 2009.
Page 46 of 101
SER
MANUFACTURER
FACTORY LOCATION
CZECH REPUBLIC-Jihlava
REMARKS
ONLY FOR THE FOLLOWING ACCESSORIES 1 Standard 19 rack (ROV Series) and 23" rack 2 Standard 19" rack Mount Fiber Optic Patch Panel type MCNP & MFDC consisting of 12/24/36/48 Ports 3 Fiber Optic Wall Mount Box type MPIC consisting of 12/24/36/48 Ports 4 Fiber Storage Shelf type MFSS 5 Optical Pig Tails/Patch Chords equipped with FC/PC & E2000 Connectors PREVIOUSLY "PIRELLI"
PIRELLI PRYSMIAN TELECOM RIYADH CABLES RIYADH TELEPHONE CABLES CO. SAUDI CABLE
Yes Yes Yes Yes Yes Based on TS&SD Letter # 11-02708-01-03032301 dated 01/02/2011, it is "suspended" for Non-Metallic Fiber Optic Cable (F/O) Cable & Accessories.
Yes Yes Yes Based on S&SD Letter 12-03688-01-30504401 dated January 03, 2012. The name of the manufacturer has been changed from ADC- United States to TE Connectivity Ltd.-United States. based on TS&SD letter# 09-01095-03032301 dated 18th. April 2009 for the following accessories: - Management Rack E-9000 series - Distribution & Termination Unit LCX. - Wall mounted unit LanLinxs. Total = 28
TELECT
Poland-Wroclaw
Yes
16
16 . 0
16. 0. 0
PILOT WIRE CABLES & ACCESSORIES DEMIRER KABLO GOLDSTAR CABLE JEDDAH CABLE CO. KERPENWORK LS CABLES MIDDLE EAST SPECIALIZED CABLE (MESC) TURKEY
Applicable Standards:
Yes Yes Yes Yes Yes Yes
48-TMSS-01,48-TMSS-03,48-TMSS-04,48-TMSS-05
CABLE & ACCESSORIES UP TO 100 PAIRS
Page 47 of 101
SER
MANUFACTURER
RIYADH CABLES SAUDI CABLE SIEMENS STEINER TAIHAN ELECTRIC WIRE COMPANY
FACTORY LOCATION
Saudi Arabia-RIYADH Saudi Arabia-JEDDAH GERMANY GERMANY KOREA, Republic of
Pre-Qualified Manufacturers By SEC Yes Yes Yes Yes Yes CABLE & ACCESSORIES
REMARKS
Total =
11
17
17 . 0
17. 0. 0
SHIELDED CABLE FOR INSTRUMENTATION ALPHA AT & T BELDEN MIDDLE EAST SPECIALIZED CABLE (MESC) SAUDI CABLE United States
Applicable Standards:
Yes Yes Yes Yes Yes Based on TS&SD fax ref.#08-02969-3-03032301 dated 07/01/2009. Pre-Qualified for Shielded Instrumentation & Thermocouple Cables with this conditions: -First batch shall be type, designe, special, acceptance & routine tests in the factory test laboratory in presence of (3) SEC engineers & (1) independent inspector. -(10) years warranty APPROVED FOR CABLES WITHOUT METALLIC SHEATH; TYPE TEST CERTIFICATE FROM INDEPENDENT LAB TO BE SUBMITTED FOR 1ST ORDER; EXTENDED QUARANTEE FOR 10 YEARS. Total = 6
Yes
18
18 . 0
18. 0. 0
Applicable Standards:
11-TMSS-10
Page 48 of 101
SER
MANUFACTURER
ALFANAR ELECTRICAL SYSTEMS
FACTORY LOCATION
Saudi Arabia-RIYADH
REMARKS
Based on TS&SD letter# 09-01432-03032301 dated 16th. May 2009 is pre-qualified for Low Voltage Power & Control Cables 0.6/1kV as conforming to SEC specifications # 11-TMSS-10, rev.0 with the following conditions: Ten (10) years warranty from the date of PAC of the turnkey project in case of contract award or date of delivery in case of direct material supply order. based on TS&SD fax ref# 09-00303/01-03032301 dated 18/02/2009.
BELDEN ELSEWEDY EGYTECH CABLE CO. JEDDAH CABLE CO. JORDAN NEW CABLE COMPANY MIDDLE EAST SPECIALIZED CABLE (MESC) OMAN CABLE INDUSTRIES
Yes Yes Yes Yes Yes Yes Based on TS&SD letters # 10-02435-03032301 dated 06/09/2010 & 10-02611-03032301 dated 02/10/2010, it is pre-qualified for LV Power& Control Cables (0.6/1kV) rating as confirming to SEC specification # 11-TMSS-10,Rev.0, with the following condition: Ten (10) years extended warranty for the proposed LV Power& Control Cables from the date of PAC of the turnkey project in case of contract award or date of delivery in case of direct material supply order. This was confirmed by Oman Cables Industry through letter # Nil dated 21/08/2010.
RIYADH CABLES SAUDI CABLE TAIHAN ELECTRIC WIRE COMPANY TEKAB Co. Ltd.
Yes Yes Yes Yes FOR CABLES WITH COPPER CONDUCTOR WITH ARMOR PER CLAUSE 4.3.5.b, 4.3.5.c and 4.3.5.d ONLY;TYPE TEST CERTIFICATE FROM INDEPENDENT LAB TO BE SUBMITTED FOR 1ST ORDER; EXTENDED QUARANTEE FOR 10 YEARS. Total = 11
19
19 . 1
19. 1. 1
Applicable Standards:
Yes
12-TMSS-10
APPROVED POWER CABLE MANUFACTURERS UP TO 132KV ARE ACCEPTABLE SUPPLIERS FOR SPLICE AND TERMINATION KITS OF THE SAME RATING
Page 49 of 101
SER
MANUFACTURER
FACTORY LOCATION
SWITZERLAND SWITZERLAND United Kingdom United States JAPAN United States
REMARKS
SUSPENDED FOR ALL ONGOING & FUTURE PROJECTS DUE TO FREQUENT FAILURE & VERY POOR FOLLOWUP RESPONSE FROM THE MANUFACTURER. PREVIOUSLY LG
J-POWER SYSTEM CORP. LS CABLES NEXAN PFISTERER IXOSIL PIRELLI RAYCHEM RAYCHEM TAIHAN ELECTRIC WIRE COMPANY
JAPAN KOREA, Republic of SWITZERLAND SWITZERLAND GERMANY-BERLIN GERMANY Saudi Arabia-DAMMAM KOREA, Republic of
Yes Yes Yes Yes Yes Yes Yes Yes Total = 15 LIMITED TO 69KV ONLY. UNDER THE GROUP OF TYCO PREVIOUSLY SEFAG IXOSIL
19 . 2
19. 2. 1
Applicable Standards:
Yes
12-TMSS-10
APPROVED 230 KV POWER CABLE MANUFACTURERS ARE ALSO ACCEPTABLE SUPPLIERS FOR SPLICE AND TERMINATION KITS OF THE SAME RATING
ABB
GERMANY
Yes Total = 2
19 . 3
19. 3. 0
Applicable Standards:
Yes
12-TMSS-10
APPROVED 380 KV POWER CABLE MANUFACTURERS ARE ALSO ACCEPTABLE SUPPLIERS FOR SPLICE AND TERMINATION KITS OF THE SAME RATING PREVIOUSLY LG
Yes Yes
Page 50 of 101
SER
MANUFACTURER
FACTORY LOCATION
REMARKS
Total = 3
20
20 . 0
20. 0. 0
CONNECTORS, OVERHEAD LINE COMPRESSION TYPE A SALVI & C SPA ALCOA BURNDY CAROBENI DALEKOVOD
Applicable Standards:
ITALY-MILANO United States United States ITALY Croatia/Hrvatska Yes Yes Yes Yes Yes
12-TMSS-02
Based on TS&SD fax # 10-01179-03032301 dated April 20, 2010, this manufacturer is pre-qualified for Compression Type Connectors for O/H T/L per 12-TMSS-02, Rev.0 with the following conditions: Each new design of Compression Type Connectors for O/H T/L which has NOT been type tested/supplied to SEC before, shall be type tested as per 12-TMSS-02. Extended warranty of 10 years.
ELASTIMOLD HOMAC INDUSTRIAS ARRUTI ISELFA MOSDORFER PFISTERER PFISTERER SA_RA Energy, Construction, Trade and Industry Co. Inc.
United States United States SPAIN ITALY AUSTRIA SWITZERLAND SWEDEN TURKEY-Ankara (Polatli Plant) &
Yes Yes Yes Yes Yes Yes Yes Yes PREVIOUSLY SEFAG AG PREVIOUSLY SEFAG Based on TS&SD fax ref.#09-00087-03032301 dated 11/01/2009. Pre-Qualified for TL & S/S Lattice Steel Structure, Line Hardware and Compression Type Connector for T/L O/H upto 380kV except Space Damper upto 230kV with the following conditions: -All tests shall be carried out in presence of (3) SEC engineers. -(10) years warranty PREVIOUSLY AS FCI(SAAE), FRANCE. Total = 15
SICAMEX SM-CI
Yes Yes
21
INSULATORS
Page 51 of 101
SER 21 . 1
21. 1. 1
MANUFACTURER
FACTORY LOCATION
REMARKS
PORCELAIN INSULATORS
STATION POST INSULATOR PORCELAIN, UP TO 132 KV, 230 KV and 380 KV DIELVE LAPP LAPP NGK PPC INSULATORS ITALY GERMANY-ROSENTHAL United States JAPAN AUSTRIA
Applicable Standards:
Yes Yes Yes Yes Yes
15-TMSS-01
Approved Only Up To 132 KV Only
. . Based on TS&SD/ESD e-mail dated 07/07/2010 and PPC Insulators (Austria) Letter # Nil dated 4th July 2010, it is pre-qualified for Station Post Insulator Porcelain, up to 132kV, 230kV&380kV as confirming to SEC specification # 15-TMSS-01, Rev.0 with the following conditions: A) Type tests conducted in presence of SEC Engineers on 132kV-10.9KN (Drawing # 124-11740-132-101), 230kV-10.3KN (Drawing # 124-11850-132-101) and 380kV-12KN (Drawing # 124-11860-132-101 & 124-11870-132-801) Insulators. B) Any new type of Insulators (other than the types which are mentioned in A) offered by PPC shall Type Tested in presence of three (3) SEC Engineers and one (1) Approved Independent Agency Inspector. C) Ten (10) years warranty from the date of PAC of the turnkey project in case of contract award or date of delivery in case of direct material supply order.
SIEMENS W.S.I
GERMANY INDIA
Yes Yes
21. 1. 2
Applicable Standards:
GERMANY-N/A ITALY GERMANY-ROSENTHAL JAPAN GERMANY Yes Yes Yes Yes Yes
15-TMSS-02,15-TMSS-03
Total =
Page 52 of 101
SER
21. 1. 3
MANUFACTURER
FACTORY LOCATION
REMARKS
LONG ROD PORCELAIN INSULATORS UP TO 380 KV LAPP NGK PPC INSULATORS (ELEKTROKERAMIK SONNEBERG)
Applicable Standards:
GERMANY-ROSENTHAL JAPAN GERMANY Yes Yes Yes
15-TMSS-04
Based on TS&SD/ESD e-mail dated 07/07/2010 and PPC Insulators (ELEKTROKERAMIK SONNEBERG, Germany) Letter # Nil dated 4th July 2010, it is pre-qualified for Long Rod Porcelain Insulators up to 380kV as confirming to SEC specification # 15-TMSS-04, Rev.01 with the following conditions: A) Type tests conducted in presence of SEC Engineers on 160KN:LG75/18+17/1450 (Drawing # 11134-339900-B) and 330KN: LG105/18+17/1545 (Drawing # 11134-621400-A) Insulators. B) Any new type of Insulators (other than the types which are mentioned in A) offered by PPC shall Type Tested in presence of three (3) SEC Engineers and one (1) Approved Independent Agency Inspector. C) Ten (10) years warranty from the date of PAC of the first turnkey project in case of contract award or date of first delivery in case of direct material supply order.
SIEMENS
GERMANY
Yes Total = 4
21 . 2
21. 2. 0
Applicable Standards:
Yes Yes
15-TMSS-02
COMPLETE SAMPLE, TYPE & ROUTINE TESTS FOR THE FIRST ORDER IS REQUIRED. Complete Sample, Type & Routine Tests for the first order is required. Total = 2
21 . 3
21. 3. 1
Applicable Standards:
Yes
15-TMSS-05
Up To 132 kV only. Complete Type, Routine / Sample tests for first order & 10 Years Warranty from the date of PAC is required.
Page 53 of 101
SER
MANUFACTURER
FCI (FURUKAWA COMPOSITE INSULATORS LTD) LAPP MACLEAN POWER SYSTEM NGK LOCKE INC. PFISTERER SEFAG AG
FACTORY LOCATION
HUNGARY-BUDAPEST GERMANY-ROSENTHAL United States-ILLINOIS United States SWITZERLAND
REMARKS
It is pre-qualified for Composite Suspension & Tension insulators up to 380 kV, Composite Line Post insulators up to 132 kV per SEC Specification 15-TMSS-05, Rev.0 with the following conditions based on TS&SD letter# 10-02374-03032301 dated August 18, 2010: A) Type Tests have been conducted in presence of SEC Engineers on: 110KV, 120KN (Drawing # 138 206 -393A) and 160KN (Drawing # 138 206 -667A) at 40 kA. 380KV, 160KN (Drawing # 138 206 -588BC) at 50kA. However, the manufacturer shall perform the Power Arc Test only at 63kA. B) Any new type of Insulators (other than the types which are mentioned in A) offered by PFISTERRER SEFAG AG Switzerland shall be Type Tested in presence of three (3) SEC Engineers and one (1) Approved Independent Agency Inspector. C) Ten (10) years warranty from the date of PAC.
BRAZIL CHINA--
Yes Yes
COMPLETE SAMPLE, TYPE & ROUTINE TESTS FOR THE FIRST ORDER IS REQUIRED MOLDED DESIGN ONLY; UPTO 132KV ONLY; ALL THE TYPE/SPECIAL / ROUTINE TESTS TO BE CARRIED OUT FOR FIRST CONTRACT/PROJECT AT SEC APPROVED INDEPENDENT LAB IN PRESENCE OF 3 SEC ENGRS & A THIRD PARTY INSPECTOR APPROVED BY SEC; 10 YEARS EXTENDED WARRANTY Total = 8
21. 3. 2
Applicable Standards:
GERMANY-ROSENTHAL Yes
15-TMSS-05
FIRST BATCH OF EVERY NEW TYPE OF 380KV INSULATOR TO BE TYPE TESTED IN PRESENCE OF 3 SEC ENGINEERS AND ONE SEC APPROVED INDEPENDENT INSPECTOR; EXTENDED WARRANTY OF 10 YEARS *All type/design & special tests were performed for first batch at Independent lab. in presence of SEC/IIA Inspectorbased on TS&SD fax#09-F00306-030323001 dated 17/02/2009. -Extended 10(ten) year guarantee/warranty is required.
United States-ILLINOIS
Yes
Page 54 of 101
SER
MANUFACTURER
NGK LOCKE
FACTORY LOCATION
United States
REMARKS
Based on TS&SD letter # 10-F02356/02-03032301 dated 22/11/2010, it is pre-qualified for 380kV Composite Insulators with the following conditions: Manufacturer shall conduct/repeat the following tests on the 380kV Composite Insulators 160kN, Cat.# 402-SL1370-SK95 using test series X (Note: Type tests using test series Y on the 380kV Composite Insulators,160kN , Cat.# 402-SL1370-SK95 have already been conducted satisfactory by the manufacturer in the presence of SEC engineers). 1. Power Arc Test (by using test series X) as per IEC 61467. 2. High Pressure Water Withstand Test followed by Electrical Test and Verification of the Specified Mechanical Load (SML) as per IEC 61109 Any new type of composite insulator (other than type Cat. # 402-SL1370-SK-95) offered by NGK Locke Polymer Insulators Inc.(USA) shall be subjected to all type, special ,sample and routine tests as per SEC standards specifications in the presence of three (03) SEC engineers & one (01) SEC approved independent inspection agency(IIA) Inspector. Ten (10) years extended warranty from the date of PAC of the turnkey project in case of contract award or date of delivery in case of direct material supply order.
PFISTERER SEFAG AG
SWITZERLAND
Yes
It is pre-qualified for Composite Suspension & Tension insulators up to 380 kV, Composite Line Post insulators up to 132 kV per SEC Specification 15-TMSS-05, Rev.0 with the following conditions based on TS&SD letter# 10-02374-03032301 dated August 18, 2010: A) Type Tests have been conducted in presence of SEC Engineers on: 110KV, 120KN (Drawing # 138 206 -393A) and 160KN (Drawing # 138 206 -667A) at 40 kA. 380KV, 160KN (Drawing # 138 206 -588BC) at 50kA. However, the manufacturer shall perform the Power Arc Test only at 63kA. B) Any new type of Insulators (other than the types which are mentioned in A) offered by PFISTERRER SEFAG AG Switzerland shall be Type Tested in presence of three (3) SEC Engineers and one (1) Approved Independent Agency Inspector. C) Ten (10) years warranty from the date of PAC.
SEDIVER
BRAZIL
Yes
COMPLETE SAMPLE, TYPE & ROUTINE TESTS FOR THE FIRST ORDER IS REQUIRED Total = 5
Page 55 of 101
SER
MANUFACTURER
FACTORY LOCATION
REMARKS
22
22 . 1
22. 1. 0
HARDWARE FITTINGS
HARDWARE FITTINGS A B CHANCE A SALVI & C SPA ALCOA CAROBENI DALEKOVOD
Applicable Standards:
United States-Centralia, MO ITALY-MILANO United States ITALY Croatia/Hrvatska Yes Yes Yes Yes Yes
12-TMSS-01
Based on TS&SD fax # 10-01179-03032301 dated April 20, 2010, this manufacturer is pre-qualified for Line Hardware except Spacer Dampers per 12-TMSS-01, Rev.0 with the following conditions: Each new design of hardware which has NOT been type tested/supplied to SEC before, shall be type tested as per 12-TMSS-01. Extended warranty of 10 years. Previously "SM-CI-France", the name has been change to DERVAUX-France based on DERVAUX-France letter # Nil dated 13/10/2009.
DAMP DERVAUX
ITALY FRANCE
Yes Yes
INDUSTRIAS ARRUTI ISELFA JOSLYN MOSDORFER GMBH PFISTERER PFISTERER PREFORMED LINE PRODUCTS (PLP) SA_RA Energy, Construction, Trade and Industry Co. Inc.
SPAIN ITALY United States AUSTRIA-WEIZ SWEDEN SWITZERLAND United States TURKEY-Ankara (Polatli Plant) &
Yes Yes Yes Yes Yes Yes Yes Yes Based on TS&SD fax ref.#09-00087-03032301 dated 11/01/2009. Pre-Qualified for TL & S/S Lattice Steel Structure, Line Hardware and Compression Type Connector for T/L O/H upto 380kV except Space Damper upto 230kV with the following conditions: -All tests shall be carried out in presence of (3) SEC engineers. -(10) years warranty PREVIOUSLY SEFAG PREVIOUSLY SEFAG AG
SICAMEX
FRANCE-FEUGEROLLE &
Yes Total = 16
22 . 2
SER
22. 2. 0
MANUFACTURER
FACTORY LOCATION
REMARKS
OBSTRUCTION MARKERS AND CONDUCTOR LIGHTING BP SOLAR ARABIA LTD DERVAUX OBSTA P&R TECHNOLOGIES PFISTERER SEFAG SHIN SEONG IND CORP. SM-CI TANA WIRE MARKER Saudi Arabia FRANCE FRANCE United States
Applicable Standards:
Yes Yes Yes Yes Yes Yes Yes Yes
12-TMSS-03
PREVIOUSLY SEFAG AG
Total =
23
23 . 1
23. 1. 0
Applicable Standards:
Saudi Arabia-RIYADH Saudi Arabia-Jeddah Yes Yes
20-TMSS-01
Based on TS&SD letter # 11-03472-03032301 dated 09/01/2011, it is pre-qualified for Substation Steel Structure (Latticed) up to 132kV as confirming to SEC specification # 20-TMSS-01, Rev.0 with the following conditions: Any Substation Steel Structure (Latticed) of new design proposed by Al-Yamamah Electric Power Towers Factory, Jeddah (except for the pervious approved design and drawings provided by SEC to the manufacturer) shall be subjected to full-scale loading tests and other type, routine and special tests as per SEC standards specifications and relevant International Standards in the presence of three (03) SEC engineers & one (01) SEC approved independent inspection agency (IIA) Inspector and all cost pertaining to the tests shall be borne by the manufacturer. Ten (10) years extended warranty from the date of PAC of the turnkey project in case of contract award or date of delivery in case of direct material supply order. This was confirmed in writing by Al-Yamamah Electric Power Towers Factory, Jeddah through letter # Nil dated 21st October 2009.
AL ZAMIL STEEL
Saudi Arabia-DAMMAM
Yes
Page 57 of 101
SER
MANUFACTURER
AL-BABTAIN POWER&TELECOM CO.
FACTORY LOCATION
EGYPT-N/A
REMARKS
FIRST LOT OF EACH TYPE OF STRUCTURE SHALL BE TYPE TESTED IN AN INDEPENDENT LAB IN PRESENCE OF SEC ENGINEERS; 10 YEARS EXTENDED WARRANTY. Based on TS&SD letter# 08-1058/1-03032301 dated 25th May 2009 it is pre-qualified for Transmission Towers for projects up to 132kV, Substation & Gantry Steel Structures up to 380kV and Communications Tower for transmission sector as confirming to SEC specification # 20-TMSS-01, rev.0 with the following conditions: All type, routine & special tests including the load test shall be carried out on the first batch to be supplied to SEC in securing an order in the manufacturer's testing laboratory in the presence of three (3) SEC engineers & one (1) approved independent inspection agency Inspector. Ten (10) years warranty from the date of PAC of the turnkey project in case of contract award or date of delivery in case of direct material supply order. Based on TS&SD letter# 09-2179/07-03032301 dated 11th. Nov 2009 & approval of Executive Directive for TS&SD letter# 09-02179/06-03032301 dated 11th Nov 2009, it is pre-qualified for Transmission Line, Substation Steel Structures and Communication Towers as confirming to SEC specification # 20-TMSS-01, rev.0 with the following conditions: The approval will be initially restricted to the following items only: 1. Transmission Towers for projects up to 132kV. 2. Substation Steel Structures and Gantry Steel Structures for projects up to 380kV. 3. Communication Towers for Transmission Sector. All type, design, special & routine tests (including the load test) as per SEC specifications/standards and all relevant international standards shall be carried out on the first batch to be supplied to SEC in securing an order in the presence of three (3) SEC engineers & one (1) approved independent inspection agency Inspector. Ten (10) years warranty from the date of PAC of the turnkey project in case of contract award or date of delivery in case of direct material supply order.
Alfanar Steel
Saudi Arabia-Riyadh
Yes
ARABIAN INTERNATIONAL CO. Energya Steel Solution (Hesham Helal El Sewedy & Partners for Steel Industries Co.)
Yes Yes
GEYARD FOR COMMERCE AND IMPORT CO. HIDADA KEC INTERNATIONAL LTD.
Yes Yes Yes NAGPUR-BUTIPORI, JABALPUR, JAIPUR PLANTS ARE ACCEPTABLE; ALL THE TESTS SHALL BE CARRIED OUT FOR FIRST CONTRACT/PROJECT IN PRESENCE OF THREE (3) SEC ENGINEERS; 10 YEARS OF EXTENDED WARRANTY.
INDIA-CHENNAI
Yes
Page 58 of 101
SER
MANUFACTURER
FACTORY LOCATION
Saudi Arabia TURKEY-Ankara (Polatli Plant) &
REMARKS
Based on TS&SD fax ref.#09-00087-03032301 dated 11/01/2009. Pre-Qualified for TL & S/S Lattice Steel Structure, Line Hardware and Compression Type Connector for T/L O/H upto 380kV except Space Damper upto 230kV with the following conditions: -All tests shall be carried out in presence of (3) SEC engineers. -(10) years warranty Total = 13
23 . 2
23. 2. 0
Applicable Standards:
Saudi Arabia-RIYADH Yes
20-TMSS-01
Page 59 of 101
SER
MANUFACTURER
Al Yamamah Electric Powers Factory
FACTORY LOCATION
Saudi Arabia-Jeddah
REMARKS
Based on TS&SD letter # 11-03472-03032301 dated January 09, 2011 & letter # 12-0054-30504401 dated January 10, 2012. It is pre-qualified for Transmission Line Structure (Latticed) up to 380kV as conforming to SEC specification # 20-TMSS-01, Rev.0 with the following conditions: For 230kV up to 380kV: all required Tests for Transmission Line Steel Structures (Latticed) from 230kV up to 380kV as per latest SEC specifications 20-TMSS-01 and 01-TMSS-01, technical requirements and latest revision of relevant IEC standards shall be carried out for the first Contract / Project in an independent testing laboratory in the presence of three (3) Engineers of SEC and one (01) SEC approved Independent Inspection Agency (IIA) Inspector. The relevant cost of which shall be borne by the manufacturer. This was confirmed by their letter # Nil dated January 07, 2012. Up to 132kV: Any Transmission Line Structure (Latticed) of new design proposed by Al-Yamamah Electric Power Towers Factory, Jeddah (except for the pervious approved design and drawings provided by SEC to the manufacturer) shall be subjected to full-scale loading tests and other type, routine and special tests as per SEC standards specifications and relevant International Standards in the presence of three (03) SEC engineers & one (01) SEC approved independent inspection agency (IIA) Inspector and all cost pertaining to the tests shall be borne by the manufacturer. Ten (10) years extended warranty from the date of PAC of the First turnkey project in case of contract award or date of the First delivery in case of direct material supply order. This was confirmed in writing by the manufacturer through their letter # Nil dated October 21, 2009 & letter # Nil dated January 07, 2012.
Yes Yes FIRST LOT OF EACH TYPE OF STRUCTURE SHALL BE TYPE TESTED IN AN INDEPENDENT LAB IN PRESENCE OF SEC ENGINEERS; 10 YEARS EXTENDED WARRANTY.
Page 60 of 101
SER
MANUFACTURER
Alfanar Steel
FACTORY LOCATION
Saudi Arabia-Riyadh
REMARKS
Based on TS&SD letter# 08-1058/1-03032301 dated 25th May 2009 it is pre-qualified for Transmission Towers for projects up to 132kV, Substation & Gantry Steel Structures up to 380kV and Communications Tower for transmission sector as confirming to SEC specification # 20-TMSS-01, rev.0 with the following conditions: All type, routine & special tests including the load test shall be carried out on the first batch to be supplied to SEC in securing an order in the manufacturer's testing laboratory in the presence of three (3) SEC engineers & one (1) approved independent inspection agency Inspector. Ten (10) years warranty from the date of PAC of the turnkey project in case of contract award or date of delivery in case of direct material supply order. ONE TRIAL PROJECT FOR 110/132 KV SHORT LINE.
AL-SALAM INSDUTRIES AND TRADING EST./ADVANCE TECHNOLOGIES. ARABIAN INTERNATIONAL CO. Energya Steel Solution (Hesham Helal El Sewedy & Partners for Steel Industries Co.)
Based on TS&SD letter# 09-2179/07-03032301 dated 11th. Nov 2009 , it is pre-qualified for Transmission Line, Substation Steel Structures and Communication Towers as confirming to SEC specification # 20-TMSS-01, rev.0 with the following conditions: The approval will be initially restricted to the following items only: 1. Transmission Towers for projects up to 132kV. 2. Substation Steel Structures and Gantry Steel Structures for projects up to 380kV. 3. Communication Towers for Transmission Sector. All type, design, special & routine tests (including the load test) as per SEC specifications/standards and all relevant international standards shall be carried out on the first batch to be supplied to SEC in securing an order in the presence of three (3) SEC engineers & one (1) approved independent inspection agency Inspector. Ten (10) years warranty from the date of PAC of the turnkey project in case of contract award or date of delivery in case of direct material supply order. Based on TS&SD letter 09-00665/1-03032301 dated 16th. March 2009 for Galvanised Transmission line Lattice Steel Tower up to 380kV as conforming to SEC specifications # 20-TMSS-01, rev.0; with the following conditions: Ten (10) years extended warranty. Improvement needs indicated in the plant survey report. All the tests shall be carried out for first contract/project in presence of three (3) sec engineers & independent Inspector.
Yes Yes
Page 61 of 101
SER
MANUFACTURER
KEC INTERNATIONAL LTD.
FACTORY LOCATION
INDIA--
REMARKS
Only NAGPUR-BUTIPORI, JABALPUR & JAIPUR Plants are acceptable. Any new transmission line structure designed by KEC, India shall be subjected to full-scale loading tests and other type/routine/sample tests per SEC specifications in the presence of three (3) SEC engineers and one (1) SEC approved Independent Inspection Agency (IIA) inspector and all costs pertaining to tests shall be borne by the manufacturer. Ten (10) years extended warranty from the date of PAC of the first turnkey project in case of contract award or date of delivery in case of first direct material supply order.
LARSEN & TOUBRO LTD. SA_RA Energy, Construction, Trade and Industry Co. Inc.
Yes Yes Based on TS&SD fax ref.#09-00087-03032301 dated 11/01/2009. Pre-Qualified for TL & S/S Lattice Steel Structure, Line Hardware and Compression Type Connector for T/L O/H upto 380kV except Space Damper upto 230kV with the following conditions: -All tests shall be carried out in presence of (3) SEC engineers. -(10) years warranty Total = 13
23 . 3
23. 3. 0
Applicable Standards:
Saudi Arabia-RIYADH Yes
20-TMSS-02
Page 62 of 101
SER
MANUFACTURER
Energya Steel Solution (Hesham Helal El Sewedy & Partners for Steel Industries Co.)
FACTORY LOCATION
Saudi Arabia-Rabigh
REMARKS
Based on TS&SD Letter # 10-0331/06-03032301 dated 28/06/2010, it is pre-qualified for Steel Poles, Tubular up to 230kV as confirming to SEC specification # 20-TMSS-02. Rev.0 with the following conditions: All Type, Routine and Special Tests including the load test per SEC specification # 20-TMSS-02 and all relevant International Standards shall be conducted on the first batch in presence of three (3) SEC Engineers and one (1) SEC approved independent inspection agency (IIA) Inspector and related cost pertaining to the test shall be borne by Hesham Helal EL Sewedy & Partners for Steel Industries Co.(Energya Steel Solutions) as confirmed by manufacturer through letter # SEC/WK/100524 dated 24th May 2010. Ten (10) years extended warranty from the date of PAC of the turnkey project in case of contract award or date of delivery in case of direct material supply order as confirmed by Hesham Helal EL Sewedy & Partners for Steel Industries Co.(Energya Steel Solutions) letter # SEC/WK/100524 dated 24th May 2010 .
23 . 5
23. 5. 1
WOOD POLES
WOOD POLES, ANSI CLASS HI H 3 ATLANTIC WOOD IND. CAHABA PRESSURE TREATED FOREST PRODUCT (NORTH PACIFIC GROUP) COLFAX CREOSOTING CO KOPPERS INDUSTRIES STALLWORTH TIMBER STELLA JONES INC. TAYLOR LUMBER (NORTH PACIFIC GROUP)
Applicable Standards:
United States-GEORGIA United States-ALABAMA United States-LOUISIANA United States-PA United States-ALABAMA CANADA-NEW WESTMINSTER United States-OREGON Yes Yes Yes Yes Yes Yes Yes Total = 7
Page 63 of 101
SER
23. 5. 2
MANUFACTURER
FACTORY LOCATION
REMARKS
Applicable Standards:
ATLANTIC WOOD IND. CAHABA PRESSURE TREATED FOREST PRODUCT (NORTH PACIFIC GROUP) COLFAX CREOSOTING CO KOPPERS INDUSTRIES STALLWORTH TIMBER STELLA JONES INC. TAYLOR LUMBER (NORTH PACIFIC GROUP) United States-GEORGIA United States-ALABAMA United States-LOUISIANA United States-PA United States-ALABAMA CANADA-NEW WESTMINSTER United States-OREGON Yes Yes Yes Yes Yes Yes Yes Total = 7
24
24 . 0
24. 0. 0
.
GALVANIZED GUY WIRE (GROUNDING) FLORIDA WIRE & CABLE JOSLYN SOUTHWIRE TREFILEUROPE United States United States United States FRANCE
Applicable Standards:
Yes Yes Yes Yes
10-TMSS-02
Total =
25
25 . 1
25. 1. 0
RACEWAYS
Applicable Standards:
United States-N/A United States Saudi Arabia-DAMMAM Yes Yes Yes Total = 3
25 . 2
Page 64 of 101
SER
25. 2. 0
MANUFACTURER
FACTORY LOCATION
REMARKS
Applicable Standards:
United States-Minnesota SWEDEN-sweden Saudi Arabia- DHAHRAN Saudi Arabia-RIYADH Saudi Arabia-Riyadh Yes Yes Yes Yes Yes
24-TMSS-01
FOR LADDERS & ACCESSORIES ALSO; 10 YEARS OF EXTENDED WARRANTY; Based on TS&SD letter # 11-0036/04-03032301 dated 06/06/2011, it's prequalified for Cable Trays & Cable Ladders as conforming to SEC Specification # 24-TMSS-01, Rev.0 with the following conditions: Ten (10) years extended warranty from the date of PAC of the first turnkey project in case of contract award or date of first delivery in case of direct material supply order. This was confirmed by Al-Ashouri Industries through letter # 2010/403/0003 dated 01/08/2010. For any new design of Cable Trays or Cable Ladders proposed by Al-Ashouri Industries (other than the test proven SEC designs), Type, Special, routine and Sample test as per the SEC standards/Specification shall be conduct on the first batch to be supplied to SEC in presence of three (03) SEC Engineers in an SEC approved independent test laboratory.
Saudi Arabia-Riyadh
Yes
Based on TS&SD letter 09-00509/1-03032301 dated 16th. March 2009 for Metallic Cable Tray Systems as conforming to SEC specifications # 24-TMSS-01, rev.0; with the following conditions: Ten (10) years extended warranty. Improvement needs indicated in the plant survey report
Yes Yes Yes based on TS&SD letter 09-00524/1-03032301 dated 16th. March 2009 for Metallic Cable Tray Systems as conforming to SEC specifications # 24-TMSS-01, rev.0; with the following conditions: Eight (8) years extended warranty. Improvement needs indicated in the plant survey report.
HIDADA MECSS - MID EAST CABLE SUPPORT SOLUTIONS O-Z GEDNEY SAUDI ELECTRIC INDUSTRIES CO. LTD.
Page 65 of 101
SER
MANUFACTURER
TOLARTOIS WESCOSA
FACTORY LOCATION
FRANCE Saudi Arabia-DAMMAM
REMARKS
Total =
15
26
26 . 1
26. 1. 0
CONDUIT FITTINGS
Applicable Standards:
Saudi Arabia-DAMMAM United Arab Emirates Yes Yes
23-TMSS-02
Total =
27
27 . 1
27. 1. 0
SWITCHES
Applicable Standards:
United States-N/A SWITZERLAND FRANCE PORTUGAL NETHERLANDS JAPAN FRANCE United States FRANCE GERMANY United States Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes
30-TMSS-01
27 . 2
LV AUTO-TRANSFER SWITCH
Page 66 of 101
SER
27. 2. 0
MANUFACTURER
FACTORY LOCATION
REMARKS
Applicable Standards:
FRANCE United Arab Emirates United States Yes Yes Yes Total = 3
WESTINGHOUSE
27 . 3
27. 3. 0
Applicable Standards:
Yes Total = 1
28
28 . 1
28. 1. 0
Applicable Standards:
Yes Yes Yes Yes Yes
31-TMSS-01
Based on TS&SD letter# 09-01251-03032301 dated 03rd. May 2009 UP TO 380KV as confirming to SEC specification # 31-TMSS-01, rev.0 with Ten (10) years warranty from the date of PAC of the Turnkey project in case of contract award or date of delivery in case of direct material supply order.
AREVA CRUINKSHANK & PARTNERS LTD. EPS LTD. (GROUPE SCHNEIDER) ETA-PCS
Yes Yes Yes Yes It is pre-qualified for Relay & Control Panels as conforming to SEC specification # 31-TMSS-01, Rev.0 with the following condition: Ten (10) years extended warranty from the date of PAC of the turnkey project in case of contract award or date of delivery in case of direct material supply order.
Page 67 of 101
SER
MANUFACTURER
JAL INTERNATIONAL
FACTORY LOCATION
Saudi Arabia-KHOBAR
REMARKS
Up to 132kV only. Ten (10) years extended warranty from the date of PAC of the first turnkey project in case of contract award or date of delivery in case of first direct material supply order. PREVIOUSLY LG Extended warranty for 10 years. 10 YEAR EXTENDED WARRANTY
LS MOHD. AL-OJAIMI LTD. PROTEA/AREVA T&D REYROLLE LTD. SCHNEIDER H.V FACTORY SIEMENS System House Factory for Electric Panels (SEP)
KOREA, Republic of Saudi Arabia-Riyadh FRANCE-United Kingdom FRANCE-GRENOBLE GERMANY Saudi Arabia-Riyadh
based on TS&SD letter# 09-01500-03032301 dated May 25, 2009 & 10-01055/02-03032301 dated May 03, 2010, System House Factory for Electric Panels (SEP) from Saudi Arabia-Riyadh for Relay & Control Panel up to 132kV as confirming to SEC specification # 31-TMSS-01, rev.0 with the following condition: Ten (10) years warranty from the date of PAC of the turnkey project in case of contract award or date of delivery in case of direct material supply order. ASSEMBLING UP TO 132KV ONLY, ENCLOSURES SHALL BE PROCURED FROM MESCO (RIYADH) Based on TS&SD letter # 11-F02715-03032301 dated 17/09/2011, it is prequalified for Relay & Control Panels, 230kV and above as confirming to SEC specification # 31-TMSS-01, Rev.0 with the following conditions: All type, special, routine and sample tests as per SEC specifications/standards shall be carried out on the first batch of Relay & Control Panels to be supplied to SEC, in case of securing an order, in the presence of three (3) SEC Engineers & one (1) approved Independent Inspection Agency Inspector in an Independent Testing Laboratory. All the related costs for witnessing the tests will be borne by the manufacturer. This was confirmed by WESCOSA-Dammam through letter # Nil dated 16/06/2010. Ten (10) years extended warranty from the date of PAC of the turnkey project in case of contract award or date of delivery in case of direct material supply order. This was confirmed by WESCOSA-Dammam through letter # Nil dated 05/10/2010. Total = 20
28 . 2
ANNUNCIATOR SYSTEM
Page 68 of 101
SER
28. 2. 0
MANUFACTURER
FACTORY LOCATION
REMARKS
Applicable Standards:
ABB SUBSTATION AUTOMATION OY AMETEK POWER INSTRUMENTS FUJIKURA VISCAS CORP J-POWER SYSTEM CORP. LS NEXANS PAN ALARM PIRELLI RONAN ENGINEERING RTK ENGINEERING LTD. SIEMENS STEINER FINLAND United States JAPAN JAPAN KOREA, Republic of SWITZERLAND United States GERMANY-BERLIN United Kingdom United Kingdom GERMANY JAPAN Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes
38-TMSS-05
SACO 16D3
PREVIOUSLY LG
Total =
12
29
29 . 1
29. 1. 0
Applicable Standards:
Yes Yes Yes Yes Yes Yes
35-TMSS-01
Upto 132 kV Only - Complete Type, Routine / Acceptance tests for first order & 10 Years Warranty from the date of PAC is required. ORIGINALLY TMT&D CORP. & DISSOLVED DURING APRIL 2005.
Page 69 of 101
SER
MANUFACTURER
TOSHIBA CORPORATION, T&D TRIDELTA
FACTORY LOCATION
JAPAN-GERMANY
REMARKS
ORIGINALLY TMT&D CORP. & DISSOLVED DURING APRIL 2005.
Total =
12
30
30 . 1
30. 1. 1
CIRCUIT BREAKER
Applicable Standards:
United States-N/A United States-CHARLEROI United States-GEORGIA JAPAN JAPAN-JAPAN-Yes Yes Yes Yes Yes Yes
37-TMSS-01
ORIGINALLY TMT&D CORP. & DISSOLVED DURING APRIL 2005. ORIGINALLY TMT&D CORP. & DISSOLVED DURING APRIL 2005. Total = 6
30. 1. 2
DEADTANK SF6 BREAKERS,110 - 132 KV ABB ABB ( T& D) AREVA T&D Inc.-USA
Applicable Standards:
SWITZERLAND United States-N/A United States-Charleroi Yes Yes Yes
37-TMSS-01
Based on TS&SD letter # 10-02708-02-03032301 dated 25/10/2010, it is pre-qualified for 145kV Dead Tank Circuit Breaker type DT1-145FK, 40KA, 2000A as confirming to SEC specification # 37-TMSS-01, Rev.0, with the following condition: Ten (10) years extended warranty for the proposed 145kV Dead Tank Circuit Breaker type DT1-145FK from the date of PAC of the turnkey project in case of contract award or date of delivery in case of direct material supply order. This was confirmed in writing by AREVA T&D, Inc-USA through letter #Nil dated 6th March 2009.
GE-HITACHI HVB JAPAN AE POWER SYSTEMS CORP. MITSUBISHI SIEMENS TOSHIBA CORPORATION, T&D
Yes Yes Yes Yes Yes ORIGINALLY TMT&D CORP. & DISSOLVED DURING APRIL 2005. ORIGINALLY TMT&D CORP. & DISSOLVED DURING APRIL 2005.
Page 70 of 101
SER
MANUFACTURER
FACTORY LOCATION
REMARKS
Total = 8
30. 1. 3
Applicable Standards:
United States-N/A United States-CHARLEROI Yes Yes
37-TMSS-01
TYPE DT1-245 F3; 10 YEARS OF EXTENDED WARRANTY; DI-ELECTRIC TEST, RIV TEST, CONTINUOUS CURRENT TEMPERATURE RISE TEST @ 2500 A, 60HZ IS TO BE CARRIED OUT IN THE FIRST BATCH IN THE PRESENCE OF 3 SEC ENGINEERS AND 1 IIA INSPECTOR.
GE-HITACHI HVB JAPAN AE POWER SYSTEMS CORP. MITSUBISHI TOSHIBA CORPORATION, T&D
Yes Yes Yes Yes ORIGINALLY TMT&D CORP. & DISSOLVED DURING APRIL 2005. ORIGINALLY TMT&D CORP. & DISSOLVED DURING APRIL 2005. Total = 6
30 . 2
30. 2. 1
Applicable Standards:
Yes Yes Yes
37-TMSS-02
30. 2. 2
LIVE TANK, 110 - 132 KV SF6 BREAKER ABB AREVA AREVA_FRANCE,VILLEUR BANNE SIEMENS SWEDEN GERMANY
Applicable Standards:
Yes Yes Yes Yes
37-TMSS-02
Total =
Page 71 of 101
SER
30. 2. 3
MANUFACTURER
FACTORY LOCATION
REMARKS
Applicable Standards:
SWEDEN FRANCE-,VILLEUR BANNE GERMANY Yes Yes Yes
37-TMSS-02
Total = 30. 2. 4 CIRCUIT SWITCHER, 69 230 KV S&C S&C SIEMENS CANADA United States GERMANY
Applicable Standards:
Yes Yes Yes Total = 3
31
31 . 1
31. 1. 0
LINE TRAP
LINE TRAP HAEFELY-TRENCH ELECTRIC HAEFELY-TRENCH ELECTRIC CANADA SWITZERLAND
Applicable Standards:
Yes Yes
38-TMSS-01
Total =
31 . 2
31. 2. 0
LINE TUNER
LINE TUNER ABB HV TECHNOLOGIES
Applicable Standards:
SWITZERLAND Yes
38-TMSS-02
Total =
31 . 3
31. 3. 1
Applicable Standards:
Yes Yes
38-TMSS-08,50-TMSS-02
Page 72 of 101
SER
MANUFACTURER
FACTORY LOCATION
United States FRANCE CANADA SWITZERLAND Croatia/Hrvatska--
REMARKS
HAEFELY-TRENCH ELECTRIC HAEFELY-TRENCH ELECTRIC HAEFELY-TRENCH ELECTRIC KONCAR INSTRUMENT TRANSFORMERS INC.
Limited up to 132kV only. All Type, Special, Routine tests per SEC Standards and IEC to be performed at KONCAR-Electrical Institute Inc. as independent and accredited testing laboratory. Extended guarantee/warrenty for 10 years.
Yes Yes Yes Based on TS&SD letter# 09-01105-03032301 dated 24th June 2009, it is pre-qualified for CT & CVT rated up to 380kV as confirming to SEC specification # 50-TMSS-01, rev.0 & # 50-TMSS-02, rev.0 respectively with the following conditions: All type, routine & special tests including the load test shall be carried out on the first batch to be supplied to SEC in securing an order in an independent testing laboratory in the presence of three (3) SEC engineers & one (1) approved independent inspection agency Inspector. Ten (10) years warranty from the date of PAC of the turnkey project in case of contract award or date of delivery in case of direct material supply order. TYPE TEST REQUIRED IN FIRST SUPPLY PREVIOUSLY AS VA TECH (NOUVA MAGRINI GALILEO) Total = 12
Yes Yes
31 . 4
31. 4. 0
Applicable Standards:
Yes Yes Yes
38-TMSS-03
RTU-560, SPIDER 200,232 & 233
Based on TS&SD letter# 09-01819-03032301 dated 23rd June 2009, it is prequalified for for RTU type CLP500 as confirming to SEC specification # 38-TMSS-03, rev.0 with the following condition: Ten (10) years warranty from the date of PAC of the first turnkey project in case of contract award or date of first delivery in case of direct material supply order.
FOXBORO
AUSTRALIA
Yes
Page 73 of 101
SER
MANUFACTURER
GE HARRIS Global Energy Technologies Ltd. HARRIS CORPORATION JAL INTERNATIONAL LSIS MICROSOL LTD. SAT SIEMENS SIEMENS (LANDYS) - TELEGYR VA TECH
FACTORY LOCATION
CANADA United Arab Emirates-Dubai United States-MELBOURNE, Saudi Arabia-KHOBAR KOREA, Republic of-Ireland-DUBLIN AUSTRIA GERMANY United States-SAN JOSE, CA AUSTRIA
Pre-Qualified Manufacturers By SEC Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes
REMARKS
HARRIS D20 Ten (10) years extended warranty. Microsol XCell SCADA RTU System HARRIS MICROPLEX 5000 ASSEMBLING ONLY SEVEN (7) YEARS EXTENDED WARRANTY. MICROSOL
TELEGYR 5700
Total =
14
31 . 5
31. 5. 0
Applicable Standards:
Yes Yes Yes Yes Yes Yes Yes
38-TMSS-04
RTU 560 HARRIS D20 Ten (10) years extended warranty. Microsol XCell SOE RTU System SOE RECORDING SYSTEM AND INTERFACE & CONTROL CABINET/MARSHALING PANELS SEVEN (7) YEARS EXTENDED WARRANTY. MICROSOL X500E/1000 Total = 7
31 . 6
31. 6. 1
TRANSDUCERS
FREQUENCY TRANSDUCERS ALSTOM ISKRA MIS United States SLOVENIA-KRANJ
Applicable Standards:
Yes Yes ACCEPTANCE SUBJECTED TO SUCCESSFUL PRODUCT EVALUATION / ACCEPTANCE BY SEC CONCERNED END USER DEPARTMENT FOR EACH PURCHASE ORDER / PROJECT DURING TENDER/BIDDING STAGE.
Page 74 of 101
SER
MANUFACTURER
FACTORY LOCATION
REMARKS
Total = 2
31. 6. 2
Applicable Standards:
United Kingdom Yes Total = 1
31. 6. 3
TRANSDUCERS CEWE INSTRUMENTS AB ENERDIS LSIS TILLQUIST TYCO ELECTRONICS (UK) Ltd - CROMPTON INSTRUMENTS SWEDEN FRANCE
Applicable Standards:
Yes Yes Yes Yes Yes Based on TS&SD Letters (08-F00975/01-03032301 dated June 04, 2008), (10-F00230/01-03032301 dated February 03, 2010) & (11-F03017/01-03032301 dated October 16, 2011). Integra 1560 is prequalified for Transducers as confirming to SEC Specification # 40-TMSS-02, Rev.0 with the following condition: Five (05) years extended warranty from the date of PAC of the First turnkey project in case of contract award or date of the First delivery in case of direct material supply order. This was confirmed by TYCO Electronic UK through their letter # INT-SEC-06 dated January 03, 2008 and its Amendment dated November 21, 2011. Total = 5 SEVEN (7) YEARS EXTENDED WARRANTY.
31. 6. 4
Applicable Standards:
SLOVENIA-KRANJ Yes ACCEPTANCE SUBJECTED TO SUCCESSFUL PRODUCT EVALUATION / ACCEPTANCE BY SEC CONCERNED END USER DEPARTMENT FOR EACH PURCHASE ORDER / PROJECT DURING TENDER/BIDDING STAGE.
31. 6. 5
Applicable Standards:
CANADA-MONTREAL Yes
Page 75 of 101
SER
MANUFACTURER
FACTORY LOCATION
United Kingdom SLOVENIA-KRANJ
REMARKS
ACCEPTANCE SUBJECTED TO SUCCESSFUL PRODUCT EVALUATION / ACCEPTANCE BY SEC CONCERNED END USER DEPARTMENT FOR EACH PURCHASE ORDER / PROJECT DURING TENDER/BIDDING STAGE.
TRANSDATA
United States
Yes Total = 4
31. 6. 6
Applicable Standards:
CANADA-MONTREAL United Kingdom SLOVENIA-KRANJ Yes Yes Yes ACCEPTANCE SUBJECTED TO SUCCESSFUL PRODUCT EVALUATION / ACCEPTANCE BY SEC CONCERNED END USER DEPARTMENT FOR EACH PURCHASE ORDER / PROJECT DURING TENDER/BIDDING STAGE.
TRANSDATA
United States
Yes Total = 4
31 . 7
31. 7. 1
RELAYS
PROTECTIVE RELAYS ABB AREVA FRANCE/ STAFFORD, ENGLAND ELECTRO-SWITCH GE MORS SMITT MR SCHNEIDER ELECTRIC (Merlin Gerin) SWEDEN FRANCE-/ STAFFORD, ENGLAND United States United Kingdom FRANCE-GERMANY FRANCE--
Applicable Standards:
Yes Yes Yes Yes Yes Yes Yes Type of Relay subject to review/approval by the concerned Protection Engineering Division Type of Relay subject to review/approval by the concerned Protection Engineering Division For Auxiliary Relays. Type of Relay subject to review/approval by the concerned Protection Engineering Division Type of Relay subject to review/approval by the concerned Protection Engineering Division Up to 33 kV VOLTAGE LEVEL ONLY; Type of Relay subject to review/approval by the concerned Protection Engineering Division Type of Relay subject to review/approval by the concerned Protection Engineering Division Type of Relay subject to review/approval by the concerned Protection Engineering Division Type of Relay subject to review/approval by the concerned Protection Engineering Division
FRANCE-United States
Yes Yes
Page 76 of 101
SER
MANUFACTURER
FACTORY LOCATION
GERMANY United Kingdom
REMARKS
Type of Relay subject to review/approval by the concerned Protection Engineering Division Type of Relay subject to review/approval by the concerned Protection Engineering Division Total = 11
31. 7. 2
Applicable Standards:
CANADA-ONTARIO Yes Type of Relay subject to review/approval by the concerned Protection Engineering Division Total = 1
31 . 8
31. 8. 0
TERMINAL BLOCK
TERMINAL BLOCK ENTRELEC PHOENIX WEIDMULLER FRANCE GERMANY GERMANY
Applicable Standards:
Yes Yes Yes Total = 3
31 . 9
31. 9. 0
FAULT RECORDERS
FAULT RECORDERS AMETEK (ROCHESTER) QUALITROL HATHAWAY United States NORTHERN IRELAND
Applicable Standards:
Yes Yes Total = 2
31 . 10
31. 10. 0
Applicable Standards:
Yes Yes
38-TMSS-06
Total =
32
METERS
Page 77 of 101
SER 32 . 1
32. 1. 0
MANUFACTURER
FACTORY LOCATION
REMARKS
Applicable Standards:
Yes Yes Yes
40-TMSS-02
PREVIOUSLY ABB (T &D)
ACCEPTANCE SUBJECTED TO SUCCESSFUL PRODUCT EVALUATION / ACCEPTANCE BY SEC CONCERNED END USER DEPARTMENT FOR EACH PURCHASE ORDER / PROJECT DURING TENDER/BIDDING STAGE. Based on TS&SD Letters (08-F00975/01-03032301 dated June 04, 2008), (10-F00230/01-03032301 dated February 03, 2010) & (11-F03017/01-03032301 dated October 16, 2011). Integra (1530, 1540, &1630) are prequalified for Digital Metering Devices (NOT FOR BULK ENERGY METERS) as confirming to SEC Specification # 40-TMSS-02, Rev.0 with the following condition: Five (05) years extended warranty from the date of PAC of the First turnkey project in case of contract award or date of the First delivery in case of direct material supply order. This was confirmed by TYCO Electronic UK through their letter # INT-SEC-06 dated January 03, 2008 and its Amendment dated November 21, 2011. Total = 5
Yes Yes
32 . 2
32. 2. 0
Applicable Standards:
Yes Yes Yes
40-TMSS-02
Page 78 of 101
SER
MANUFACTURER
FACTORY LOCATION
TURKEY-ISTANBUL
REMARKS
Based on TS&SD letter # 10-F2298/03-03032301 dated 02/10/2010, it is pre-qualified for Digital Ammeter type (EPM-34) and Digital Voltmeter type (EVM-35) as conforming to SEC specification # 40-TMSS-02, Rev.0 with the following condition: ENTES (Turkey) has agreed to give SEC a Guarantee/Warranty on the proposed digital meters for a period of two (02) years and eight (08) years (for maintenance) for total of ten (10) years from the date of PAC of the turnkey project in case of contract award or date of delivery in case of direct material supply order.
ISKRA MIS
SLOVENIA-KRANJ
Yes
ACCEPTANCE SUBJECTED TO SUCCESSFUL PRODUCT EVALUATION / ACCEPTANCE BY SEC CONCERNED END USER DEPARTMENT FOR EACH PURCHASE ORDER / PROJECT DURING TENDER/BIDDING STAGE. DIGITAL POWER METERS TYPE ION 6200 (0.5% ACCURACY CLASS); 10 YEARS EXTENDED WARRANTY Based on TS&SD Letters (08-F00975/01-03032301 dated June 04, 2008), (10-F00230/01-03032301 dated February 03, 2010) & (11-F03017/01-03032301 dated October 16, 2011). Integra (1530, 1540, &1630) are prequalified for Digital Metering Devices as confirming to SEC Specification # 40-TMSS-02, Rev.0 with the following condition: Five (05) years extended warranty from the date of PAC of the First turnkey project in case of contract award or date of the First delivery in case of direct material supply order. This was confirmed by TYCO Electronic UK through their letter # INT-SEC-06 dated January 03, 2008 and its Amendment dated November 21, 2011. Total = 7
CANADA-United Kingdom--
Yes Yes
32 . 3
32. 3
Applicable Standards:
Saudi Arabia-Riyadh Yes
40-TMSS-03
Based on approval of Executive Directive for TS&SD Letter # 08-1105-03032301 dated 20/10/2008, it is pre-qualified for Energy Meters Type (ADDAD-4) & Quality Meters Type (SEL-734). Based on TS&SD letter# 09-F00181/03-03032301 dated 06th. April 2009 with (5) years warranty from the date of PAC Total = 2
ALps Technologies
FRANCE-ANNECY-LE-VIEUX
Yes
33
CAPACITOR
Page 79 of 101
SER 33 . 1
33. 1. 0
MANUFACTURER
FACTORY LOCATION
REMARKS
SHUNT CAPACITOR
SHUNT CAPACITOR ABB SWEDEN
Applicable Standards:
Yes
43-TMSS-01
Based on TS&SD Letter # 10-00269-03032301 dated 24/01/2010, it is pre-qualified for Shunt Capacitor Banks as confirming to SEC specification # 43-TMSS-01, rev.0 with the following condition: Seven (7) years warranty from the date of PAC of the turnkey project in case of contract award or date of delivery in case of direct material supply order.
FINLAND-Tampere
Yes
Previously " Nokian Capacitors Ltd. Finland", the name has been changed to Areva T&D Ltd. Finland as per TS&SD/ESD Letter # 10-00145-03032301 dated 16/01/2010 and Areva T&D Ltd.-Finland Letter # Nil dated 04/01/2010. Based on TS&SD fax ref.#08-F0623/01-03032301 dated 02/12/2008. Pre-Qualified for Capacitor Bank (13.8kV through 380kV) with this conditions: -First batch shall be type test in an independent laboratory in presence of (3) SEC engineers & (1) independent inspector. -(10) years warranty Based on TS&SD Letter # 11-02016/01-03032301 dated 06/07/2011, it is pre-qualified for Substation Type 13.8kV to 36kV Only Shunt Capacitor Banks as confirming to SEC specification # 43-TMSS-01, Rev.0 with the following conditions: All type, special, routine and sample tests as per SEC specifications/standards shall be carried out on the first batch of each type of capacitor bank (Substation Type 13.8kV to 36kV Only Shunt Capacitor Banks) in case of securing an order in the presence of three (3) SEC engineers & one (1) approved independent inspection agency Inspector in an independent testing laboratory. All the related costs for witnessing the tests will be borne by the manufacturer. This was confirmed by SAMWAHA through letter # Nil dated 12/03/2010. Ten (10) years extended warranty from the date of PAC of the turnkey project in case of contract award or date of delivery in case of direct material supply order. This was confirmed by SAMWAHA through letter # Nil dated 12/03/2010.
Yes Yes
Yes
Page 80 of 101
SER
MANUFACTURER
VISHAY ELECTRONICS
FACTORY LOCATION
CZECH REPUBLIC-BLATNA
REMARKS
Based on TS&SD Letter # 10-F01787/03-03032301 dated 18/08/2010, it is pre-qualified for Shunt Capacitor Banks as confirming to SEC specification # 43-TMSS-01, Rev.0 with the following conditions: All type/design, special & routine tests for the first batch of proposed Power Capacitors up to 380kV, manufactured in Vishay, Blatna Czech Republic to be supplied to SEC shall be conducted in an independent testing laboratory in the presence of three (3) SEC engineers & one (1) SEC approved independent inspection agency Inspector, the relevant cost of which shall be borne by manufacturer. This was confirmed by the manufacturer as per submitted confirmation letter dated 28/05/2010G. Ten (10) years extended warranty from the date of PAC of the turnkey project in case of contract award or date of delivery in case of direct material supply order. This was confirmed by the manufacturer as per submitted guaranty/warranty certificated dated 28/05/2010G. Total = 6
34
34 . 1
34. 1. 0
ELECTRONIC COMPONENTS
Applicable Standards:
Yes Total = 1
35
35 . 1
35. 1. 0
INSTRUMENT TRANFORMERS
Applicable Standards:
United States-N/A CZECH REPUBLIC United States Croatia/Hrvatska-Yes Yes Yes Yes
50-TMSS-01
All Type, Special, Routine tests per SEC Standards and IEC to be performed at KONCAR-Electrical Institute Inc. as independent and accredited testing laboratory. Extended guarantee/warrenty for 10 years.
Page 81 of 101
SER
MANUFACTURER
KUHLMAN ELECTRIC CORPORATION KWK MESWANDLER MEMF
FACTORY LOCATION
United States GERMANY Saudi Arabia-RIYADH
REMARKS
RING/SPLIT CORE TYPE RING TYPE TS&SD letter# 09-00918-03032301 dated 29 March 2009 it is prequalified for CT up to 36kV with the following conditions: TYPE TEST SHALL BE DONE AT AN INTL. TESTING LAB IN PRESENCE OF 3RD PARTY INSPECTOR; EXTENDED GUARANTEE/ WARRANTY FOR 10 YEARS FROM PAC. RING/SPLIT CORE TYPE RING/SPLIT CORE TYPE & BLOCK TYPE CTs UP TO 36kV. . RING/SPLIT CORE TYPE Total = 11
35 . 2
35. 2. 0
69KV CTS
69KV CTS ABB ABB ( T& D) ALSTOM (T & D) BALTEAU SA (NV) AREVA E. PFIFFNER GE HAEFELY-TRENCH ELECTRIC HAEFELY-TRENCH ELECTRIC KONCAR INSTRUMENT TRANSFORMERS INC. SWEDEN United States-N/A BELGIUM United Kingdom SWITZERLAND United States SWITZERLAND FRANCE Croatia/Hrvatska--
Applicable Standards:
Yes Yes Yes Yes Yes Yes Yes Yes Yes
50-TMSS-01
All Type, Special, Routine tests per SEC Standards and IEC to be performed at KONCAR-Electrical Institute Inc. as independent and accredited testing laboratory. Extended guarantee/warrenty for 10 years. RING/SPLIT CORE TYPE RING TYPE . RING/SPLIT CORE TYPE Type test required in first supply;10 Years Warranty from the date of PAC is required. RING/SPLIT CORE TYPE
Page 82 of 101
SER
MANUFACTURER
FACTORY LOCATION
United States ITALY ITALY-N/A
REMARKS
. RING/SPLIT CORE TYPE PREVIOUSLY AS VA TECH (NOUVA MAGRINI GALILEO); OIL TYPE Total = 18
TRENCH ITALIA
35 . 3
35. 3. 0
Applicable Standards:
Yes Yes Yes Yes Yes Yes Yes
50-TMSS-01
All Type, Special, Routine tests per SEC Standards and IEC to be performed at KONCAR-Electrical Institute Inc. as independent and accredited testing laboratory. Extended guarantee/warrenty for 10 years. RING/SPLIT CORE TYPE RING TYPE . RING/SPLIT CORE TYPE Type test required in first supply;10 Years Warranty from the date of PAC is required. RING/SPLIT CORE TYPE RING/SPLIT CORE TYPE PREVIOUSLY AS VA TECH (NOUVA MAGRINI GALILEO); OIL TYPE Total = 15
KUHLMAN ELECTRIC CORPORATION KWK MESWANDLER NISSIN PFIFFNER RITZ SADTEM STE TRENCH ITALIA
United States GERMANY JAPAN SWITZERLAND United States FRANCE ITALY ITALY-N/A
35 . 4
35. 4. 0
230KV CTS
230KV CTS ABB SWEDEN
Applicable Standards:
Yes
50-TMSS-01
Page 83 of 101
SER
MANUFACTURER
ABB ( T& D) ALSTOM (T & D) BALTEAU SA (NV) AREVA HAEFELY-TRENCH ELECTRIC HAEFELY-TRENCH ELECTRIC KUHLMAN ELECTRIC CORPORATION KWK MESWANDLER NISSIN PFIFFNER RITZ SADTEM STE TRENCH ITALIA
FACTORY LOCATION
United States-N/A BELGIUM United Kingdom SWITZERLAND FRANCE United States GERMANY JAPAN SWITZERLAND United States FRANCE ITALY ITALY-N/A
Pre-Qualified Manufacturers By SEC Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes RING/SPLIT CORE TYPE RING TYPE . RING/SPLIT CORE TYPE
REMARKS
Type test required in first supply;10 Years Warranty from the date of PAC is required. RING/SPLIT CORE TYPE RING/SPLIT CORE TYPE PREVIOUSLY AS VA TECH (NOUVA MAGRINI GALILEO); OIL TYPE Total = 14
35 . 5
35. 5. 0
380KV CTS
380KV CTS ABB ABB ( T& D) ALSTOM (T & D) BALTEAU SA (NV) AREVA HAEFELY-TRENCH ELECTRIC HAEFELY-TRENCH ELECTRIC KUHLMAN ELECTRIC CORPORATION KWK MESWANDLER NISSIN SWEDEN United States-N/A BELGIUM United Kingdom FRANCE SWITZERLAND United States GERMANY JAPAN
Applicable Standards:
Yes Yes Yes Yes Yes Yes Yes Yes Yes
50-TMSS-01
Page 84 of 101
SER
MANUFACTURER
FACTORY LOCATION
SWITZERLAND
REMARKS
Based on TS&SD letter# 09-01105-03032301 dated 24th June 2009, it is pre-qualified for CT & CVT rated up to 380kV as confirming to SEC specification # 50-TMSS-01, rev.0 & # 50-TMSS-02, rev.0 respectively with the following conditions: All type, routine & special tests including the load test shall be carried out on the first batch to be supplied to SEC in securing an order in an independent testing laboratory in the presence of three (3) SEC engineers & one (1) approved independent inspection agency Inspector. Ten (10) years warranty from the date of PAC of the turnkey project in case of contract award or date of delivery in case of direct material supply order. Type test required in first supply;10 Years Warranty from the date of PAC is required. RING/SPLIT CORE TYPE RING/SPLIT CORE TYPE PREVIOUSLY AS VA TECH (NOUVA MAGRINI GALILEO); OIL TYPE Total = 14
36
36 . 1
36. 1. 0
POTENTIAL TRANSFORMER
Applicable Standards:
United States-N/A CZECH REPUBLIC BELGIUM United Kingdom SWITZERLAND United States FRANCE SWITZERLAND Croatia/Hrvatska-Yes Yes Yes Yes Yes Yes Yes Yes Yes
50-TMSS-03
All Type, Special, Routine tests per SEC Standards and IEC to be performed at KONCAR-Electrical Institute Inc. as independent and accredited testing laboratory. Extended guarantee/warrenty for 10 years. BLOCK TYPE PTs UP TO 36kV.
NISSIN SADTEM
JAPAN FRANCE
Yes Yes
Page 85 of 101
SER
MANUFACTURER
FACTORY LOCATION
GERMANY
REMARKS
Total =
12
36 . 2
36. 2. 0
69 KV POTENTIAL TRANSFORMERS
69 KV POTENTIAL TRANSFORMERS ABB ABB ( T& D) ALSTOM (T & D) BALTEAU SA (NV) AREVA E. PFIFFNER HAEFELY-TRENCH ELECTRIC HAEFELY-TRENCH ELECTRIC KONCAR INSTRUMENT TRANSFORMERS INC. SWEDEN United States-N/A BELGIUM United Kingdom SWITZERLAND SWITZERLAND FRANCE Croatia/Hrvatska--
Applicable Standards:
Yes Yes Yes Yes Yes Yes Yes Yes
50-TMSS-03
All Type, Special, Routine tests per SEC Standards and IEC to be performed at KONCAR-Electrical Institute Inc. as independent and accredited testing laboratory. Extended guarantee/warrenty for 10 years. Type test required in first supply;10 Years Warranty from the date of PAC is required. Total = 10
NISSIN RITZ
Yes Yes
36 . 3
36. 3. 0
Applicable Standards:
Yes Yes Yes Yes Yes Yes Yes
50-TMSS-02,50-TMSS-03
All Type, Special, Routine tests per SEC Standards and IEC to be performed at KONCAR-Electrical Institute Inc. as independent and accredited testing laboratory. Extended guarantee/warrenty for 10 years.
Page 86 of 101
SER
MANUFACTURER
FACTORY LOCATION
JAPAN SWITZERLAND-Hirschthal
REMARKS
Based on TS&SD letter # 11-01326-02-03032301 dated 04/12/2011, it is pre-qualified for Inductive Voltage Transformers from 110kV up to 230kV as confirming to SEC specification # 50-TMSS-03, Rev.0 with the following conditions: All type, special, routine and sample tests as per SEC specifications/standards shall be carried out on the first unit of Inductive Voltage Transformers to be supplied to SEC in case of securing an order in the presence of three (3) SEC Engineers & one (1) approved independent inspection agency Inspector in an independent testing laboratory or at the manufacturers testing laboratory. All the related costs for witnessing the tests will be borne by the manufacturer. This was confirmed by PFIFFNER Instrument Transformers Ltd through letter # P/900-17052011 dated 17 May 2011. Ten (10) years extended warranty from the date of PAC of the turnkey project in case of contract award or date of delivery in case of direct material supply order. This was confirmed by PFIFFNER Instrument Transformers Ltd through letter # P/90025112010 dated 22 March 2011.
RITZ
United States
Yes
Type test required in first supply;10 Years Warranty from the date of PAC is required. Total = 10
36 . 4
36. 4. 0
Applicable Standards:
Yes Yes Yes Yes Yes Yes Yes Yes
50-TMSS-02,50-TMSS-03
Page 87 of 101
SER
MANUFACTURER
PFIFFNER Instrument Transformers Ltd
FACTORY LOCATION
SWITZERLAND-Hirschthal
REMARKS
Based on TS&SD letter # 11-01326-02-03032301 dated 04/12/2011, it is pre-qualified for Inductive Voltage Transformers from 110kV up to 230kV as confirming to SEC specification # 50-TMSS-03, Rev.0 with the following conditions: All type, special, routine and sample tests as per SEC specifications/standards shall be carried out on the first unit of Inductive Voltage Transformers to be supplied to SEC in case of securing an order in the presence of three (3) SEC Engineers & one (1) approved independent inspection agency Inspector in an independent testing laboratory or at the manufacturers testing laboratory. All the related costs for witnessing the tests will be borne by the manufacturer. This was confirmed by PFIFFNER Instrument Transformers Ltd through letter # P/900-17052011 dated 17 May 2011. Ten (10) years extended warranty from the date of PAC of the turnkey project in case of contract award or date of delivery in case of direct material supply order. This was confirmed by PFIFFNER Instrument Transformers Ltd through letter # P/90025112010 dated 22 March 2011.
RITZ
United States
Yes
Type test required in first supply;10 Years Warranty from the date of PAC is required. Total = 10
36 . 5
36. 5. 0
Applicable Standards:
Yes Yes Yes Yes Yes Yes Yes Yes
50-TMSS-02,50-TMSS-03
Type test required in first supply;10 Years Warranty from the date of PAC is required. Total = 8
37
INSULATING OIL
Page 88 of 101
SER 37 . 1
37. 1. 1
MANUFACTURER
FACTORY LOCATION
REMARKS
Applicable Standards:
Yes
54-TMSS-01
CT, PT, POWER TRANSFORMER MANUFACTURERS CAN PROCURE OIL MEETING ALL THE REQUIREMENTS OF APPLICABLE STANDARD FROM ANY REPUTED OIL MANUFACTURERS. Based on TS&SD letter # 11-00152-1-03032301 dated 22/01/2011, it is pre-qualified for Uninhibited Naphthenic Mineral Insulating Oil type POWEROIL TO 1020 (60U) as conforming to SEC specification # 54-TMSS-01, Rev.01 with the following condition: Five (5) years extended warranty from the date of PAC of the turnkey project in case of contract award or date of delivery in case of direct material supply order.
INDIA-RABLE-NEW MUMBAI
Yes
Yes Yes Yes Previously "PETROLUBE", the name has been change to PETROMIN CORPORATION (Petrolube) - Saudi Arabia based on PETROMIN CORPORATION letter # Nil dated 30/06/2010.
SAVITA SHELL
INDIA FRANCE
37 . 2
37. 2. 0
Applicable Standards:
Yes Yes Yes Yes Yes Total = 5
38
38 . 1
MOBILE SUBSTATION
Page 89 of 101
SER
38. 1. 0
MANUFACTURER
FACTORY LOCATION
REMARKS
Applicable Standards:
SWEDEN ITALY GERMANY Yes Yes Yes Total = 3
39
39 . 1
39. 1. 0
TELECOMMUNICATION EQUIPMENT
Applicable Standards:
Yes Yes
48-TMSS-06
Based on TADD letter# 09-0576-030225, SCADA letter# SOCW/DIV/97 and Telecomunication Dep. letter# 09-136-03040001.
ALCATEL
FRANCE
Yes
Page 90 of 101
SER
MANUFACTURER
Alcatel-Lucent-ShangHai Bell Alcatel Co.Ltd(ASB)
FACTORY LOCATION
CHINA-ShangHai
REMARKS
Based on TS&SD letter #10-03519/03-03032301 dated 17/04/2011, it is pre-qualified for Fiber Optic Communication Terminal type Optenix1660SM with the following conditions: The first batch of each type of Optenix 1660SM to be supplied to SEC shall be Type/Special & Routine/Sample tested in an independent testing laboratory in the presence of three (3) SEC engineers & one (1) SEC approved independent inspection agency Inspector and all cost pertaining to the tests shall be borne by Manufacturer. This was confirmed in writing by the Alcatel-Lucent (ASB)-China through letter # ALU/172/SI/2010 dated 12/12/2010. Ten (10) years extended warranty for the offered Optenix 1660SM from the date of PAC of the first turnkey project in case of contract award or date of first delivery in case of direct material supply order. This was confirmed in writing by A by the Alcatel-Lucent (ASB)-China through letter # ALU/170/SI/2010 dated 12/12/2010. Alcatel-lucent (ASB)-China has confirmed that after the successful resolution of the prequalification process, configuration as well as the drawings and details of the Trial Link to be installed in SEC Network shall be submitted for SEC review and approval. The places and dates of Trail Link installation will be sent to the manufacturer. ----------------------------------------------------------------------Based on TS&SD letter # 11-03458/02-03032301 dated 03/12/2011, it's prequalified for Fiber Optics Terminal Equipment 1511MAX Series conforming to SEC Specification # 48-TMSS-06 Rev.0 with the following conditions: Type, Special, sample & routine tests shall be conducted on the first batch of 1511MAX Series to be supplied to SEC, in the presence of three (3) SEC Engineers & one (1) SEC approved independent inspection agency Inspector in an independent testing laboratory. All the related costs for witnessing the tests will be borne by the manufacturer. This was confirmed by Alcatel Lucent (ASB) Shanghai China through response letter # ALU/25/SI/2011 dated 30/01/2011 and letter # Nil dated 27/04/2011. Ten (10) years extended warranty from the date of PAC of the first turnkey project in case of contract award or date of first delivery in case of direct material supply order. This was confirmed by Alcatel Lucent (ASB) Shanghai China through letter # Nil dated 30/01/2011.
Page 91 of 101
SER
MANUFACTURER
FACTORY LOCATION
REMARKS
Alcatel-lucent (ASB)-China has confirmed that after the successful resolution of the prequalification process, configuration as well as the drawings and details of the Trial Link to be installed in SEC Network shall be submitted for SEC review and approval. The places and dates of Trail Link installation will be sent to the manufacturer.
Saudi Arabia-Riyadh
Yes
Based on TS&SD letter # 11-F01302/03-03032301 dated 28/05/2011, it is prequalified for Telecommunication & Fiber Optic Passive Products (Frame, Box, Rack, etc.) with the following conditions: All type, special, routine and sample tests as per SEC specifications/standards for Telecommunication & Fiber Optic Passive Products (Frame, Box, Rack, etc.), shall be carried out in case of contract award or SEC direct purchase order at SEC approved independent laboratory in presence of three (3) SEC Engineers and one (1) SEC approved independent inspection agency. All the related costs for witnessing of the tests will be borne by the manufacturer. This was confirmed by Amwaj Telecom MFG. Co. letter dated 09/06/2010. Seven (7) years extended warranty from the date of PAC of the turnkey project in case of contract award or date of delivery in case of direct material supply order. This was confirmed by Amwaj Telecom MFG. Co. letter dated 09/06/2010.
Yes Yes Yes Based on TADD letter# 09-0297-030225 dated 28th March 2009; (Note: GE Industrial System, Canada has bought only the Lentronics business from Nortel, Canada that manufactures TN1U SHD Fiber Optic Terminal Equipment and MUX)
Page 92 of 101
SER
MANUFACTURER
HUAWEI TECHNOLOGIES CO.LTD.
FACTORY LOCATION
CHINA-Shenzhen
REMARKS
Based on TS&SD Letter # 10-F01736/02-03032301 dated 18/08/2010, it is pre-qualified for Communication Transmission Equipment (OSN Series:1500,2500,3500,7500,9500 and iManager T2000NMS) with the following conditions: All type/design, special & routine tests (for the first batch of proposed Communication Transmission Equipment (OSN Series and NMS) to be supplied to SEC shall be conducted in an independent testing laboratory in the presence of three (3) SEC engineers & one (1) SEC approved independent inspection agency Inspector, the relevant cost of which shall be borne by manufacturer. This was confirmed by the manufacturer as per Huawei letter # 70917174/MRK/SEC dated 26/04/2010G. Ten (10) years extended warranty for the proposed Communication Transmission Equipment (OSN Series and NMS) from the date of PAC of the turnkey project in case of contract award or date of delivery in case of direct material supply order. This was confirmed by the manufacturer as per Huawei letter # 70917174/MRK/SEC dated19/02/2008G.
39 . 2
39. 2. 0
Applicable Standards:
FRANCE-TURGI United States CANADA GERMANY Yes Yes Yes Yes Total = 4
39 . 3
Page 93 of 101
SER
39. 3. 0
MANUFACTURER
FACTORY LOCATION
REMARKS
Applicable Standards:
SWEDEN FRANCE-TURGI FRANCE United States-LYNCHBURG, NORWAY GERMANY Yes Yes Yes Yes Yes Yes Total = 6
39 . 4
39. 4. 0
Applicable Standards:
Yes Yes Yes Based on TS&SD Letters# 09-01439-2-03032301 dated 7th July 2009 & 10-00845-1-03032301 dated April 04, 2010. It is prequalified for Tele-protection Equipment type TPU-1 with the following conditions: Five (5) years Extended Warranty.
SIEMENS
GERMANY
Yes Total = 4
39 . 5
39. 5. 0
Applicable Standards:
CANADA-MONTREAL Yes Total = 1
39 . 6
39. 6. 1
Applicable Standards:
United States-CA Yes Total = 1
Page 94 of 101
SER
39. 6. 2
MANUFACTURER
FACTORY LOCATION
REMARKS
PABXS TELEPHONE SETS, COMMUNICATION CABLES AND ACCESSORIES ALCATEL NV AT & T NORTHERN TELECOM PHILIPS SIEMENS
Applicable Standards:
FRANCE-PARIS United States-NEW YORK CANADA HOLLAND GERMANY Yes Yes Yes Yes Yes Total = 5
39. 6. 3
Applicable Standards:
Yes Total = 1
39. 6. 4
Applicable Standards:
Yes Total = 1
39 . 7
39. 7. 0
VF INTERFACE EQPT.
VF INTERFACE EQPT. ABB INFOCOM LTD. TELLABS INC.
Applicable Standards:
SWITZERLAND-TURGI United States-N/A Yes Yes Total = 2
39 . 8
39. 8. 0
DC POWER SYSTEMS
DC POWER SYSTEMS EXIDE CORP. HARMER & SIMMONS LORAIN PRODUCTS INTERNATIONAL SALES SAFT POWER SYSTEMS SAS
Applicable Standards:
United States-PA United Kingdom-ESSEX United States-LOARIN FRANCE Yes Yes Yes Yes Previously SAFT-NIFE Total = 4
Page 95 of 101
SER 39 . 9
39. 9. 0
MANUFACTURER
FACTORY LOCATION
REMARKS
TEST EQUIPMENT
TEST EQUIPMENT ACTERNA ANDO ELECTRIC CO. LTD HEWLETT PACKARD CO. IFR PHILIPS ROHDE & SCHWARZ TREND WANDEL & GOLTERMAN GMBH CO. United States JAPAN-TOKYO United States United States-N/A United Kingdom-CAMBRIDGE GERMANY-N/A SPAIN WEST GERMANY
Applicable Standards:
Yes Yes Yes Yes Yes Yes Yes Yes Total = 8
39 . 10
39. 10. 0
Applicable Standards:
Yes Total = 1
39 . 11
39. 11. 0
Applicable Standards:
United States-SOLON United Kingdom-N/A Yes Yes Total = 2
39 . 12
39. 12. 0
Applicable Standards:
Yes Total = 1
Page 96 of 101
SER 39 . 13
39. 13. 0
MANUFACTURER
FACTORY LOCATION
REMARKS
Applicable Standards:
Saudi Arabia-AL-KHOBAR United States-N/A CANADA- BC United States-CALIFORNIA United States-SCHAMBURG IL United States FINLAND United Kingdom-CAMBRIDGE Yes Yes Yes Yes Yes Yes Yes Yes Total = 8
39 . 14
39. 14. 0
Applicable Standards:
United States-DALLAS TEXAS United States- IL United States- DALLAS TEXAS United States United States-DALLAS TEXAS United States-N/A Yes Yes Yes Yes Yes Yes
39 . 15
39. 15. 0
UHF RADIO
UHF RADIO ALCATEL ASCOM SIMOCO FRANCE United Kingdom United Kingdom
Applicable Standards:
Yes Yes Yes
Page 97 of 101
SER
MANUFACTURER
FACTORY LOCATION
REMARKS
Total = 3
39 . 16
39. 16. 0
Applicable Standards:
Yes Yes Yes . . Total = 3
39 . 17
39. 17. 0
Applicable Standards:
Yes Yes Yes Total = 3
40
40 . 1
40. 1. 1
FM 200 SYSTEM
GAS CYLINDERS & ACCCESSORIES DUEPOINT GREAT LAKES United States United States
Applicable Standards:
Yes Yes Total = 2
40. 1. 2
EQUIPMENT
Applicable Standards:
Yes Based on TS&SD Letter # 10-2425/02-03032301 dated 31/08/2010, it is pre-qualified for HFC227ea system (FM 200) as confirming to SEC specification # TES-B-106.05. LOCAL AGENT AL-BILAD LOCAL AGENT HEBA LOCAL AGENT ENERGY HOUSE
Page 98 of 101
SER
MANUFACTURER
FACTORY LOCATION
United States United States United States United States United States United States-Buffalo Grove
REMARKS
Based on TS&SD Letter # 10-2425/02-03032301 dated 31/08/2010, it is pre-qualified for HFC227ea system (FM 200) as confirming to SEC specification # TES-B-106.05, Rev.0 Total = 10
40 . 2
40. 2. 1
Applicable Standards:
Yes Yes Yes Yes Yes Total = 5 LOCAL AGENT AL-BILAD LOCAL AGENT AL-BILAD
40 . 3
40. 3. 1
Applicable Standards:
Yes Yes Yes Yes Yes LOCAL AGENT ENERGY HOUSE Total = 5 LOCAL AGENT HEBA LOCAL AGENT HEBA ...
40 . 4
40. 4. 1
Applicable Standards:
Page 99 of 101
SER
MANUFACTURER
FACTORY LOCATION
United States United States United States United States United States United States United States United States
Pre-Qualified Manufacturers By SEC Yes Yes Yes Yes Yes Yes Yes Yes
REMARKS
LOCAL AGENT SAUDI PUMP >= 500 GPM LOCAL AGENT SAUDI PUMP >=500GPM
40 . 5
40. 5. 1
FOAM SYSTEM
FOAM SYSTEM & ACCESSORIES ANGUS CHEMGUARD NATIONAL FOAM
Applicable Standards:
United Kingdom United States United States Yes Yes Yes LOCAL AGENT NAFISCO LOCAL AGENT HEBA Total = 3
40 . 6
40. 6. 1
FIRE EXTINGUISHER
PORTABLE / MOBILE HEBA SFFECO Saudi Arabia Saudi Arabia
Applicable Standards:
Yes Yes Total = 2
40. 6. 2
PORTABLE FIRE EXTINGUISHER, CO2 TYPE ANSUL KIDDE SENTRY United States United States United States
Applicable Standards:
Yes Yes Yes LOCAL AGENT AL-BILAD >=5 LBS >=5 LBS LOCAL AGENT AL-BILAD >=5 LBS Total = 3
40. 6. 3
Applicable Standards:
SER
MANUFACTURER
FACTORY LOCATION
United States United States
REMARKS
LOCAL AGENT AL-BILAD >=2 LBS LOCAL AGENT AL-BILAD >=2 LBS Total = 2
40. 6. 4
Applicable Standards:
Yes LOCAL AGENT AL-BILAD >=2.5 LBS Total = 1
40 . 7
40. 7. 1
Applicable Standards:
Yes Yes Yes Yes Yes LOCAL AGENT -NAFISCO Originaly was PYROTRONICS from USA. Local Agents are: Siemens Building Technologies (SBT) & SASEEQ LOCAL AGENT NAFISCO LOCAL AGENT AL-BILAD
SIMPLEX THORN
Yes Yes
Total =