advanced sensing and monitoring technology that enables our clients to optimize the design, construction and operation of the nations transportation infrastructure.
Reduce
Results
Think
Improve
Wireless
Real-Time
NO TEST PILE PROGRAM NO PILE DRIVING CRITERIA EVEN HIGHER RESISTANCE FACTORS
collaborative engineering.
Long-term data storage for
BOR
EOD
Capacity
Hammer Energy
Blow Count
Validated Match at pile tip using EDC data overlay.. Highest soil model confidence (without assumptions)
Signal Matching
Soil Freeze Contribution
the point where they meet resistance and elevation requirements simply to meet a blow count
Over driven piles = broken
piles = COST
Over driven piles =
Improving Safety
Climbing leads creates liability for contractors
Driving rate governed by MEASURED stresses Minimizes pile cushion changes Eliminates hammer operation related production delays No wasted blows or time driving to displacement/refusal criteria Higher quality foundation using tip data, much more data Separate Tip and Skin Capacity in real-time Set Checks and Re- Strikes/Drives are faster and easier o No need to add/remove gages, ever! (theyre embedded) o Accounts for unrealized capacity using Top only gauges o Saves on unnecessary driving, pile lengths, and splices Eliminates layers of estimations and assumptions by measuring data and applying a Closed Loop Analysis approach Safe by staying out of the way Efficient time is money
Cylinder Piles
Drilled Shafts
Caissons
Retaining Walls
19
20