NO
I.
BAHAN / MATERIAL
SATUAN
KODE
/ m3
M 001
Rp
108,000
/m
M 002
Rp
150,000
/m
M 003
Rp
150,000
M 004
Rp
130,000
BAHAN / MATERIAL
1
2
3
Batu belah 15 - 20 cm
Batu pecah 5 - 7 cm
Batu pecah 4 - 6 cm
Batu pecah 3 - 5 cm
/m
Batu pecah 2 - 3 cm
/ m3
M 005
Rp
173,000
Batu pecah 1 - 2 cm
/ m3
M 006
Rp
195,000
/m
M 007
Rp
180,000
M 008
Rp
170,000
Abu batu
/m
/ m3
M 009
Rp
63,000
/ m3
M 010
Rp
63,000
/m
M 011
Rp
63,000
M 012
Rp
63,000
10
11
12
Sirtu royalti
/m
13
/ m3
M 013
Rp
88,200
14
Hurugan pilihan
/ m3
M 014
Rp
25,200
15
Minyak tanah
/ ltr
M 016
Rp
9,450
/ bj
M 018
Rp
550
/ bj
M 019
Rp
650
10
Batu tempel 10 x 20 cm
/ m2
M 020
Rp
97,900
11
Batu tempel 20 x 20 cm
/ m2
M 021
Rp
102,500
/m
M 022
Rp
37,800
M 023
Rp
75,600
12
Batu lempeng
13
/m
10
/ m3
M 024
Rp
210,000
11
/ m3
M 025
Rp
137,500
/m
M 026
Rp
18,900
M 027
Rp
25,200
12
Tanah hurug
13
Tanah padas
/m
14
Sirtu
/ m3
M 028
Rp
63,000
15
Sirlak
/ kg
M 029
Rp
110,000
16
Spritus
/ ltr
M 030
Rp
10,920
14
S e m e n ( PC )
/ kg
M 031
Rp
1,638
15
Semen PC type II
/ kg
M 032
Rp
1,890
16
Semen PC warna
/ kg
M 033
Rp
8,100
17
Kapur
/ m3
M 034
Rp
495,000
18
/ kg
M 035
Rp
45,400
19
Cat kayu
/ kg
M 036
Rp
44,100
20
/ kg
M 037
Rp
78,200
21
/ kg
M 038
Rp
53,000
22
/ kg
M 039
Rp
55,100
23
/ kg
M 040
Rp
62,500
15
/ kg
M 041
Rp
19,500
16
Plamur
/ kg
M 044
Rp
12,500
17
Amplas
/ lbr
M 045
Rp
3,360
NO
BAHAN / MATERIAL
SATUAN
KODE
18
Meni
/ kg
M 046
Rp
23,940
19
Kawat Galvanis 3 mm
/ kg
M 047
Rp
21,420
20
Kawat Galvanis 4 mm
/ kg
M 048
Rp
21,500
21
Baut Baja
/ kg
M 049
Rp
20,160
22
/ kg
M 050
Rp
12,000
23
/ kg
M 051
Rp
10,000
24
/ kg
M 052
Rp
16,200
25
/ kg
M 053
Rp
16,800
26
Multiplek 9 mm (90x220)
/ lbr
M 054
Rp
151,500
27
/ lbr
M 055
Rp
58,300
28
Triplek 6 mm (90x220)
/ lbr
M 056
Rp
98,700
29
Triplek 9 mm (90x220)
/ lbr
M 057
Rp
144,000
30
/ lbr
M 058
Rp
90,900
31
Teakwood
/ lbr
M 059
Rp
118,800
32
Lem kayu
/ kg
M 060
Rp
15,300
33
Tir
/ kg
M 061
Rp
12,700
34
Afduners
/ ltr
M 062
Rp
9,300
35
Tegel wafel 20 x 20 cm
/ bj
M 063
Rp
1,300
36
/ bj
M 064
Rp
1,100
37
/ bj
M 065
Rp
1,500
38
Tegel warna 30 x 30 cm
/ bj
M 066
Rp
2,000
39
Tegel warna 20 x 20 cm
/ bj
M 067
Rp
1,300
40
/ bj
M 068
Rp
1,900
41
/ bj
M 069
Rp
2,000
42
/ bj
M 070
Rp
2,000
43
/ bh
M 071
Rp
29,800
44
/ bh
M 072
Rp
6,600
45
/ bh
M 073
Rp
8,900
19
/ bh
M 074
Rp
3,130
20
/ bh
M 075
Rp
850
21
/ bh
M 076
Rp
1,900
22
/ bh
M 077
Rp
3,750
M 078
Rp
237,800
23
Ubin granit
/m
24
Porselin
/ m2
M 079
Rp
48,900
25
/ m2
M 080
Rp
37,800
/m
M 081
Rp
39,500
M 082
Rp
50,300
26
27
/m
28
/ m2
M 083
Rp
57,300
29
/ m2
M 084
Rp
63,500
/m
M 085
Rp
93,000
M 086
Rp
106,000
30
31
/m
32
Kaca ryben 5 mm
/ m2
M 087
Rp
100,000
33
/ m'
M 088
Rp
40,600
34
/ m'
M 089
Rp
63,750
NO
BAHAN / MATERIAL
SATUAN
KODE
35
/ m'
M 090
Rp
128,000
36
/ m'
M 091
Rp
209,375
37
/ m'
M 092
Rp
220,000
38
Buis beton U 15
/ m'
M 093
Rp
20,600
39
Buis beton U 20
/ m'
M 094
Rp
25,000
21
Buis beton U 30
/ m'
M 095
Rp
32,500
M 096
Rp
154,000
22
/m
23
/ bh
M 097
Rp
3,125
24
/ bh
M 098
Rp
134,000
25
/ bh
M 099
Rp
472,500
26
/ bh
M 100
Rp
1,375,000
27
/ bh
M 101
Rp
1,595,000
28
Urinoir
/ bh
M 102
Rp
349,800
29
Wastafel
/ bh
M 103
Rp
330,000
30
/ bh
M 104
Rp
235,000
31
/ bh
M 105
Rp
45,000
32
Floor drain
/ bh
M 106
Rp
10,000
/m
M 107
Rp
55,900
/m
M 108
Rp
12,280
M 109
Rp
15,540
33
34
Seng BJLS 30
Eternit kerang super
35
/m
36
Asbes plat tb 4 mm
/ m2
M 110
Rp
21,000
37
Harplek plat tb 4 mm
/ m2
M 111
Rp
18,300
38
/ bh
M 112
Rp
780
39
/ bh
M 113
Rp
2,100
40
/ bh
M 114
Rp
4,800
41
/ bh
M 115
Rp
3,400
42
/ bh
M 116
Rp
17,400
43
/ bh
M 117
Rp
16,700
44
/ bh
M 118
Rp
6,900
45
Genteng beton
/ lbr
M 119
Rp
6,200
46
/ lbr
M 120
Rp
7,600
47
Genteng keramik
/ bh
M 121
Rp
7,600
48
/ bh
M 122
Rp
24,400
49
/ m3
M 123
Rp
5,355,000
50
Kayu hutan
/ m3
M 124
Rp
4,273,500
Kayu randu
/m
M 125
Rp
976,500
M 126
Rp
5,625,000
51
52
/m
53
Kayu bengkirai
/ m3
M 128
Rp
9,625,000
54
Kayu kanfer
/ m3
M 129
Rp
10,080,000
/m
M 130
Rp
15,592,500
M 131
Rp
18,000,000
55
56
/m
57
/ m3
M 132
Rp
2,142,000
58
/ m3
M 133
Rp
4,273,000
M 134
Rp
10,080,000
59
/m
NO
BAHAN / MATERIAL
SATUAN
KODE
60
/ m'
M 135
Rp
5,000
61
Bambu
/ btg
M 136
Rp
12,500
62
Tali ijuk
/ kg
M 137
Rp
21,000
63
/ m2
M 138
Rp
8,500
/m
M 139
Rp
75,000
/m
M 140
Rp
65,000
M 141
Rp
57,000
64
65
Kaca bening 5 mm
Kaca bening 3 mm
66
Seng aluminium
/m
67
Kasa
/ m2
M 142
Rp
26,900
68
/ bh
M 143
Rp
19,300
69
/ bh
M 144
Rp
10,900
70
Engsel Angin
/ set
M 145
Rp
14,700
71
Engsel jendela
/ set
M 146
Rp
15,000
72
/ bh
M 147
Rp
110,000
73
/ bh
M 148
Rp
8,400
74
/ bh
M 149
Rp
57,750
75
/ bh
M 150
Rp
6,000
76
/ bh
M 151
Rp
13,400
77
Door Closer
/ bh
M 152
Rp
220,000
78
/ bh
M 153
Rp
275,000
79
Kran stainlesteel
/ bh
M 154
Rp
36,000
80
/ mata
M 155
Rp
51,000
81
/ m'
M 156
Rp
48,500
82
/ m'
M 157
Rp
70,400
83
/ m'
M 158
Rp
125,400
84
/ m'
M 159
Rp
275,000
85
/ m'
M 160
Rp
330,000
86
/ m'
M 161
Rp
134,000
M 162
Rp
34,900
87
/m
88
/ m2
M 163
Rp
44,100
89
/ lbr
M 164
Rp
84,700
90
/ lbr
M 165
Rp
79,300
91
/ lbr
M 166
Rp
56,000
92
/ lbr
M 167
Rp
64,000
93
/ m'
M 168
Rp
83,000
94
/ m'
M 169
Rp
81,900
95
Skrup fizzer
/ bh
M 170
Rp
6,900
96
Sealant
/ tube
M 171
Rp
44,100
97
/ m2
M 172
Rp
441,000
98
/ m2
M 173
Rp
567,000
/m
M 174
Rp
346,500
M 175
Rp
378,000
99
100
/m
101
Alumunium strip
/ m2
M 176
Rp
35,000
102
Profil alumunium
/ m'
M 177
Rp
104,900
M 178
Rp
17,400
103
Besi Strip 2 cm
/m
NO
BAHAN / MATERIAL
SATUAN
KODE
104
/ unit
M 179
Rp
285,500
105
/ unit
M 180
Rp
372,600
106
/ unit
M 181
Rp
750,000
107
/ unit
M 182
Rp
180,000
108
/ unit
M 183
Rp
310,000
109
/ unit
M 184
Rp
125,000
110
/ unit
M 185
Rp
225,000
111
Glass blox
/ bj
M 186
Rp
23,000
112
/ bj
M 187
Rp
1,500
113
/ lbr
M 188
Rp
84,000
114
/ lbr
M 189
Rp
78,500
115
/ lbr
M 190
Rp
40,000
116
/ lbr
M 191
Rp
45,000
/m
M 192
Rp
407,000
M 193
Rp
539,000
117
118
/m
119
/ m2
M 194
Rp
671,000
120
/ m2
M 195
Rp
244,800
/m
M 196
Rp
81,900
Besi L 50 x 50 x 5
/m
'
M 197
Rp
38,400
Air
/ liter
M 199
Rp
17
121
122
22
INSTALASI LISTRIK
206
/ 100 m'
M 250
Rp
170,900
207
/ 100 m'
M 251
Rp
252,000
208
/ 100 m'
M 252
Rp
415,800
209
/ 100 m'
M 253
Rp
693,000
210
50m'
M 254
Rp
680,400
211
50m'
M 255
Rp
850,500
212
50m'
M 256
Rp
737,100
213
50m'
M 257
Rp
932,400
214
50m'
M 258
Rp
510,300
215
50m'
M 259
Rp
680,400
216
50m'
M 260
Rp
630,000
217
50m'
M 261
Rp
567,000
218
50m'
M 262
Rp
693,000
219
50m'
M 263
Rp
819,000
220
50m'
M 264
Rp
1,052,100
221
bh
M 265
Rp
15,750
222
bh
M 266
Rp
11,300
223
bh
M 267
Rp
13,200
224
bh
M 268
Rp
9,400
225
bh
M 269
Rp
30,200
226
bh
M 270
Rp
50,400
227
bh
M 271
Rp
73,000
NO
BAHAN / MATERIAL
SATUAN
KODE
228
Steker Biasa
bh
M 272
Rp
1,250
229
Steker Arde
bh
M 273
Rp
5,000
230
Steker T biasa
bh
M 274
Rp
3,150
231
Steker T dg arde
bh
M 275
Rp
15,100
232
Fitting Floan
bh
M 276
Rp
7,500
233
Fitting Gantung
bh
M 277
Rp
1,250
234
Fitting Kap
bh
M 278
Rp
6,300
235
Fitting Kombinasi
bh
M 279
Rp
5,600
236
bh
M 280
Rp
12,600
237
bh
M 281
Rp
5,600
238
Stopkontak Arde IB
bh
M 282
Rp
11,900
239
bh
M 283
Rp
16,300
240
bh
M 284
Rp
5,520,000
241
bh
M 285
Rp
5,993,000
242
bh
M 286
Rp
4,410,000
243
KONTAKTOR
bh
M 287
Rp
630,000
244
KOMPAS GEOLOGI
bh
M 288
Rp
6,300,000
245
PLANIMETER
bh
M 289
Rp
10,080,000
bh
M 290
Rp
4,788,000
bh
M 291
Rp
3,528,000
bh
M 292
Rp
7,686,000
DQL -8
bh
M 293
Rp
18,900,000
E3-22P
bh
M 294
Rp
756,000
E3-20BLC
bh
M 295
Rp
756,000
bh
M 296
Rp
8,190,000
b.
c.
KOMPAS GEOLOGI
PALU GEOLOGI
PLANIMETER
Placom KP-90N
b.
/ m'
M 300
Rp
5,900
/ m'
M 301
Rp
7,200
/ m'
M 302
Rp
10,700
/ m'
M 303
Rp
18,600
/ m'
M 304
Rp
26,500
/ m'
M 305
Rp
60,900
/ m'
M 306
Rp
80,600
/ m'
M 308
Rp
22,100
/ m'
M 309
Rp
28,800
/ m'
M 310
Rp
44,400
NO
c.
d.
e.
f.
g.
h.
i.
BAHAN / MATERIAL
SATUAN
KODE
/ m'
M 311
Rp
66,700
/ m'
M 312
Rp
88,900
/ m'
M 313
Rp
144,600
/ m'
M 314
Rp
211,400
/ m'
M 315
Rp
344,900
/ m'
M 317
Rp
11,800
/ m'
M 318
Rp
24,600
/ m'
M 319
Rp
39,600
/ m'
M 320
Rp
52,300
/ m'
M 321
Rp
78,800
/ m'
M 322
Rp
117,900
/ m'
M 323
Rp
248,300
/ Bh
M 325
Rp
39,000
/ Bh
M 326
Rp
65,000
/ Bh
M 327
Rp
112,800
/ Bh
M 328
Rp
190,900
/ Bh
M 330
Rp
494,800
/ Bh
M 331
Rp
633,700
/ Bh
M 332
Rp
1,127,800
/ Bh
M 334
Rp
187,400
/ Bh
M 335
Rp
101,900
Diameter nominal 75 x 50 mm
/ Bh
M 336
Rp
64,200
Diameter nominal 50 x 40 mm
/ Bh
M 337
Rp
49,100
Diameter nominal 40 x 25 mm
/ Bh
M 338
Rp
29,400
Diameter nominal 25 x 20 mm
/ Bh
M 339
Rp
15,600
/ Bh
M 341
Rp
198,900
Diameter nominal 75 x 75 mm
/ Bh
M 342
Rp
123,100
Diameter nominal 50 x 50 mm
/ Bh
M 343
Rp
74,600
Diameter nominal 40 x 40 mm
/ Bh
M 344
Rp
12,800
Diameter nominal 25 x 25 mm
/ Bh
M 345
Rp
8,800
/ Bh
M 347
Rp
40,500
/ Bh
M 348
Rp
30,000
Diameter nominal 40 mm
/ Bh
M 349
Rp
5,900
Diameter nominal 25 mm
/ Bh
M 350
Rp
3,700
Diameter nominal 20 mm
/ Bh
M 351
Rp
2,300
/ Bh
M 353
Rp
11,500
/ Bh
M 354
Rp
9,200
NO
j.
k.
l.
m.
n.
o.
p.
q.
r.
BAHAN / MATERIAL
SATUAN
KODE
/ Bh
M 355
Rp
6,000
/ Bh
M 356
Rp
3,400
/ Bh
M 358
Rp
26,000
/ Bh
M 359
Rp
17,300
/ Bh
M 360
Rp
13,700
/ Bh
M 361
Rp
13,700
Diameter nominal 50 mm
/ Bh
M 363
Rp
17,300
Diameter nominal 40 mm
/ Bh
M 364
Rp
7,400
Diameter nominal 25 mm
/ Bh
M 365
Rp
3,400
Diameter nominal 20 mm
/ Bh
M 366
Rp
2,300
Diameter nominal 75 mm
/ Bh
M 368
Rp
109,100
/ Bh
M 369
Rp
146,600
/ Bh
M 370
Rp
269,300
Diameter nominal 50 mm
/ Bh
M 372
Rp
17,300
Diameter nominal 40 mm
/ Bh
M 373
Rp
7,400
Diameter nominal 25 mm
/ Bh
M 374
Rp
3,400
Diameter nominal 20 mm
/ Bh
M 375
Rp
2,300
/ Bh
M 377
Rp
26,900
Diameter nominal 75 mm
/ Bh
M 378
Rp
15,700
Diameter nominal 50 mm
/ Bh
M 379
Rp
7,400
Diameter nominal 40 mm
/ Bh
M 380
Rp
5,900
Diameter nominal 25 mm
/ Bh
M 381
Rp
3,700
Diameter nominal 20 mm
/ Bh
M 382
Rp
2,300
/ Bh
M 384
Rp
1,353,800
/ Bh
M 385
Rp
1,030,800
/ Bh
M 386
Rp
383,600
/ Bh
M 387
Rp
120,100
/ Bh
M 389
Rp
525,800
/ Bh
M 390
Rp
676,900
/ Bh
M 391
Rp
1,165,300
/ Bh
M 393
Rp
99,600
/ Bh
M 394
Rp
137,800
/ Bh
M 395
Rp
222,100
/ Bh
M 397
Rp
127,800
/ Bh
M 398
Rp
120,100
NO
s.
t.
u.
BAHAN / MATERIAL
SATUAN
KODE
/ Bh
M 400
Rp
27,900
/ Bh
M 401
Rp
34,000
/ Bh
M 403
Rp
1,900
/ Bh
M 404
Rp
5,100
/ Bh
M 405
Rp
2,800
/ Bh
M 406
Rp
20,600
/ Bh
M 407
Rp
9,200
/ Bh
M 408
Rp
3,600
/ Bh
M 409
Rp
2,800
/ Bh
M 410
Rp
5,900
/ Bh
M 411
Rp
3,700
/ Unit
M 412
Rp
32,786,600
/ Unit
M 413
Rp
59,617,600
/ Unit
M 414
Rp
3,182,800
/ Unit
M 415
Rp
5,209,300
Unit
M 416
Rp
24,806,200
Unit
M 417
Rp
2,480,600
Bh
M 418
Rp
23,700
Bh
M 419
Rp
19,800
Bh
M 420
Rp
220,500
Unit
M 421
Rp
330,700
Speed Kran DN 20 mm
Bh
M 422
Rp
20,600
Gate Valev DN 50 mm
Bh
M 423
Rp
187,400
Bh
M 424
Rp
110,200
set
M 425
Rp
40,000
set
M 426
Rp
565,800
Filter Grevel
m3
M 427
Rp
200,000
Grouting
M 428
Rp
533,600
"Accessories"
/ m'
M 429
Rp
4,398,900
/ m'
M 430
Rp
5,209,300
Solar
/ ltr
M 432
Rp
5,500
Olie
/ ltr
M 433
Rp
33,600
Bentonite
/ kg
M 434
Rp
12,600
Veet/grease
/ kg
M 435
Rp
36,700
Gravel pack
/ m3
M 436
Rp
193,200
Kawat las
/ btg
M 437
Rp
900
/ m'
M 438
Rp
642,600
/ m'
M 439
Rp
359,100
/ m'
M 440
Rp
344,400
/ m'
M 441
Rp
315,000
/ m'
M 442
Rp
1,911,000
NO
BAHAN / MATERIAL
SATUAN
/ m'
KODE
M 443
Rp
1,312,500
NO
BAHAN / MATERIAL
SATUAN
KODE
NO
SATUAN
KODE
Mandor
1 hari
L 061
Rp
50,000
1 hari
L 062
Rp
50,000
1 hari
L 063
Rp
35,000
1 hari
L 064
Rp
55,000
Tukang batu
1 hari
L 065
Rp
47,500
1 hari
L 066
Rp
40,000
1 hari
L 067
Rp
50,000
1 hari
L 068
Rp
40,000
Tukang kayu
1 hari
L 069
Rp
50,000
10
1 hari
L 070
Rp
50,000
11
Tukang besi
1 hari
L 071
Rp
47,500
12
1 hari
L 072
Rp
40,000
13
1 hari
L 073
Rp
55,000
14
Tukang cat
1 hari
L 074
Rp
50,000
15
1 hari
L 075
Rp
45,000
22
Mandor pipa
1 hari
L 082
Rp
45,000
23
Tukang pipa
1 hari
L 083
Rp
40,000
24
1 hari
L 084
Rp
350,000
33
Site manager
1 hari
L 093
Rp
60,000
34
Geologist
1 hari
L 094
Rp
55,000
L 095
Rp
40,000
35
Administrasi
1 hari
36
Logistik
1 hari
L 096
Rp
40,000
37
Operator pemboran
1 hari
L 097
Rp
35,000
38
Mekanik
1 hari
L 098
Rp
35,000
39
Crew
1 hari
L 099
Rp
30,000
40
Buruh lokal
1 hari
L 100
Rp
30,000
41
Jaga malam
1 hari
L 101
Rp
25,000
42
Pengemudi
1 hari
L 102
Rp
30,000
KET
KET
KET
KET
KET
KET
KET
KET
KET
KET
KET
SNI
KODE
KOEF
SAT.
URAIAN PEKERJAAN
03-2835-2002
PS. 2
PS. 3
PS. 4
PS. 5
PS. 6
PS. 7
PS. 8
PS. 9
PS. 10
DT 91-0006
2007
JUMLAH
8=4x7
PEKERJAAN PERSIAPAN
PS. 1
II
HARGA BAHAN/
UPAH
7
1.0000
0.0120
0.0200
0.0070
m'
m3
kg
m3
0.1000
0.1000
0.0100
0.0050
OH
OH
OH
OH
tukang kayu
pekerja
kepala tukang
mandor
51,282.00
324.00
6,835.50
50,000.00
40,000.00
50,000.00
50,000.00
5,000.00
4,000.00
500.00
250.00
1.0000 m2
0.1000 OH
0.0500 OH
4,000.00
2,500.00
1.0000 m3
6.6670 OH
0.3330 OH
40,000.00
50,000.00
266,680.00
16,650.00
1.0000 m3
membongkar dinding bata merah
6.6670 OH pekerja
0.0330 OH mandor
40,000.00
50,000.00
266,680.00
1,650.00
1.0000 m2
mengupas plesteran
0.0500 OH pekerja
0.0025 OH mandor
40,000.00
50,000.00
2,000.00
125.00
1.0000 m2
0.0250 OH
0.0025 OH
0.0500 OH
0.0050 OH
50,000.00
50,000.00
40,000.00
50,000.00
1,250.00
125.00
2,000.00
250.00
1.0000 m3
6.0000 OH
0.6000 OH
4.0000 OH
0.2000 OH
membongkar kuda-kuda
Tukang kayu
Kepala tukang kayu
pekerja
mandor
50,000.00
50,000.00
40,000.00
50,000.00
300,000.00
30,000.00
160,000.00
10,000.00
40,000.00
50,000.00
10,000.00
1,250.00
1.0000 m2
galian tanah keras/mengupas permukaan aspal
1.0000 OH pekerja
40,000.00
0.0330 OH mandor
50,000.00
40,000.00
1,650.00
1.0000
1.0000
0.2500
12,500.00
16,200.00
12,500.00
4,050.00
0.1700
0.2500
0.0020
0.0013
OH
OH
OH
OH
tukang kayu
pekerja
kepala tukang
mandor
50,000.00
40,000.00
50,000.00
50,000.00
8,500.00
10,000.00
100.00
65.00
1.0000 m3
0.7500 OH
0.0250 OH
35,000.00
50,000.00
26,250.00
1,250.00
1.0000 OH
0.0320 OH
35,000.00
50,000.00
35,000.00
1,600.00
1.0000 m3
1.5000 OH
0.0500 OH
35,000.00
50,000.00
52,500.00
2,500.00
1.0000 m3
1.5000 OH
35,000.00
52,500.00
1.0000 m2
membongkar plafond eternit
0.2500 OH pekerja
0.0250 OH mandor
PEKERJAAN TANAH
T.1
T.2
T.3
T.4
NO
SNI
KODE
KOEF
SAT.
URAIAN PEKERJAAN
HARGA BAHAN/
UPAH
7
JUMLAH
8=4x7
0.0600 OH
mandor
50,000.00
3,000.00
1.0000 m3
1.2000 OH
0.0450 OH
35,000.00
50,000.00
42,000.00
2,250.00
1.0000 m2
0.0500 OH
0.0050 OH
35,000.00
50,000.00
1,750.00
250.00
1.0000 m3
0.3300 OH
0.0100 OH
35,000.00
50,000.00
11,550.00
500.00
T.8
1.0000 m3
T.9
1.0000 m3
T.10
1.2000
1.2000
0.0714
0.0178
0.0178
0.2289
0.0061
0.0100
0.0070
1.0000
m3
m3
jam
jam
jam
jam
jam
jam
jam
ls
22,680.00
2,499.00
890.00
3,426.50
16,366.35
1,442.65
1,705.00
577.50
1,500.00
1.2000
1.2000
0.0714
0.0178
0.0178
0.2289
0.0061
0.0100
0.0070
1.0000
m3
m3
jam
jam
jam
jam
jam
jam
jam
ls
30,240.00
2,499.00
890.00
3,426.50
16,366.35
1,442.65
1,705.00
577.50
1,500.00
T.5
T.6
T.7
T.11
T.12
T.13
T.14
T.15
T.16
T.17
T.18
T.19
T.20
1.0000 m3
0.3000 OH
0.0100 OH
35,000.00
50,000.00
10,500.00
500.00
1.0000 m3
0.2500 OH
0.0083 OH
Urugan Kembali
pekerja
mandor
35,000.00
50,000.00
8,750.00
416.67
1.0000
1.2000
0.3000
0.0100
m3
m3
OH
OH
75,600.00
35,000.00
50,000.00
90,720.00
10,500.00
500.00
1.0000
1.2000
0.2500
0.0250
m3
m3
OH
OH
63,000.00
40,000.00
50,000.00
75,600.00
10,000.00
1,250.00
1.0000
1.2000
0.3000
0.0100
m3
m3
OH
OH
165,000.00
10,500.00
500.00
1.0000 m2
0.1500 OH
0.0100 OH
1.0000 m2
/ 10
/ 10
1.0000 m2
1.0000 m2
5,250.00
500.00
NO
SNI
KODE
KOEF
SAT.
URAIAN PEKERJAAN
6
Rp
8=4x7
########
1.0000 m2
T.22
1.0000 m3
0.0190 OH
0.0019 OH
0.0196
0.0185
0.0157
0.0314
1.0000
Buldozer
Excavator
Roler vibrator
Dump truck
Alat bantu
T.24
T.25
DT 91-0007
2007
JUMLAH
T.21
T.23
III
5,750.00 +
HARGA BAHAN/
UPAH
7
jam
jam
jam
jam
ls
665.00
95.00
236,500.00
275,000.00
170,500.00
71,500.00
2,000.00
4,635.40
5,087.50
2,676.85
2,245.10
2,000.00
1.0000 ttk
0.1250 OH
0.0125 OH
5,000.00
625.00
1.0000 btg
0.1000 jam
0.0165 jam
Bambu
alat pancang
alat bantu
12,500.00
9,000.00
250.00
12,500.00
900.00
4.13
1.0000 m3
0.0100 OH
0.0010 OH
40,000.00
50,000.00
400.00
50.00
1.0000 bh
1.0000 m3
1.0000 ls
Karung
Pasir urug
alat bantu
3,000.00
75,600.00
500.00
3,000.00
75,600.00
500.00
1.0000 m2
0.0600 OH
0.0060 OH
40,000.00
50,000.00
2,400.00
300.00
1.1000 m2
Sesek bambu
8,500.00
9,350.00
108,000.00
75,600.00
129,600.00
32,659.20
40,000.00
50,000.00
55,000.00
50,000.00
31,200.00
19,500.00
2,145.00
1,950.00
PEKERJAAN PONDASI
Pd.1
Pd.2
Pd.3
Pd.4
1.0000 m3
1.2000 m3
0.4320 m3
0.7800
0.3900
0.0390
0.0390
OH
OH
OH
OH
pekerja
tukang batu
kepala tukang
mandor
1.0000
15.0000
0.7333
0.6000
0.0267
1.0000
1.5000
0.0250
m3
kg
OH
OH
OH
m3
OH
OH
322,500.00
34,833.33
24,000.00
1,333.33
108,000.00
60,000.00
1,250.00
1.0000
1.2000
91.0000
0.5840
m3
m3
kg
m3
129,600.00
149,058.00
80,300.00
1.5000
0.7500
0.0750
0.0750
OH
OH
OH
OH
pekerja
tukang batu
kepala tukang
mandor
40,000.00
47,500.00
55,000.00
50,000.00
60,000.00
35,625.00
4,125.00
3,750.00
1.0000
1.2000
202.0000
0.4850
m3
m3
kg
m3
129,600.00
330,876.00
66,687.50
NO
SNI
KODE
KOEF
SAT.
URAIAN PEKERJAAN
Pd.5
Pd.5.b
Pd.6
Pd.7
Pd.8
Pd.9
HARGA BAHAN/
UPAH
7
8=4x7
1.5000
0.6000
0.0600
0.0750
OH
OH
OH
OH
pekerja
tukang batu
kepala tukang
mandor
1.0000
1.2000
163.0000
0.5220
m3
m3
kg
m3
1.5000
0.6000
0.0600
0.0750
OH
OH
OH
OH
pekerja
tukang batu
kepala tukang
mandor
1.0000
1.2000
163.0000
0.5220
m3
m3
kg
m3
1.5000
0.6000
0.0600
0.0750
OH
OH
OH
OH
pekerja
tukang batu
kepala tukang
mandor
40,000.00
47,500.00
55,000.00
50,000.00
60,000.00
28,500.00
3,300.00
3,750.00
1.0000
1.2000
136.0000
0.5440
m3
m3
kg
m3
129,600.00
222,768.00
74,800.00
1.5000
0.6000
0.0600
0.0750
OH
OH
OH
OH
pekerja
tukang batu
kepala tukang
mandor
1.0000
500.0000
156.0000
0.3300
m3
m3
kg
m3
4.5000
1.5000
0.1500
0.2250
OH
OH
OH
OH
pekerja
tukang batu
kepala tukang
mandor
1.0000 m'
0.3410 m'
0.0180
0.0020
Pasang suling-suling
Pipa PVC 2"
Pekerja
mandor
1.0000 m3
1.8000
1.0450
Pekerjaan pancang
Pekerja
mandor
40,000.00
47,500.00
55,000.00
50,000.00
JUMLAH
40,000.00
47,500.00
55,000.00
50,000.00
40,000.00
47,500.00
55,000.00
50,000.00
60,000.00
28,500.00
3,300.00
3,750.00
60,000.00
28,500.00
3,300.00
3,750.00
60,000.00
28,500.00
3,300.00
3,750.00
40,000.00
47,500.00
55,000.00
50,000.00
180,000.00
71,250.00
8,250.00
11,250.00
26,500.00
350,000.00
50,000.00
9,036.50
6,300.00
100.00
35,000.00
50,000.00
63,000.00
52,250.00
DT 91-0009
2007
PEKERJAAN DINDING
D.1
D.2
1.0000
150.0000
26.5500
0.0930
m2
bh
kg
m3
0.6000
0.2000
0.0200
0.0300
OH
OH
OH
OH
pekerja
tukang batu
kepala tukang
mandor
1.0000 m2
150.0000 bh
10.0800 kg
40,000.00
47,500.00
55,000.00
50,000.00
24,000.00
9,500.00
1,100.00
1,500.00
NO
SNI
KODE
KOEF
SAT.
URAIAN PEKERJAAN
D.3
D.4
D.5
D.6
D.7
D.8
D.9
HARGA BAHAN/
UPAH
7
JUMLAH
8=4x7
0.0925 m3
0.0275 m3
pasir pasang
kapur
137,500.00
495,000.00
12,718.75
13,612.50
0.6000
0.2000
0.0200
0.0300
OH
OH
OH
OH
pekerja
tukang batu
kepala tukang
mandor
40,000.00
47,500.00
55,000.00
50,000.00
24,000.00
9,500.00
1,100.00
1,500.00
1.0000
75.0000
18.9500
0.0380
m2
bh
kg
m3
0.3000
0.1000
0.0100
0.0150
OH
OH
OH
OH
pekerja
tukang batu
kepala tukang
mandor
1.0000
75.0000
14.3700
0.0400
m2
bh
kg
m3
0.3000
0.1000
0.0100
0.0150
OH
OH
OH
OH
pekerja
tukang batu
kepala tukang
mandor
1.0000
75.0000
6.5000
0.0500
m2
bh
kg
m3
0.3000
0.1000
0.0100
0.0150
OH
OH
OH
OH
pekerja
tukang batu
kepala tukang
mandor
1.0000
130.0000
26.5500
0.0930
m2
bh
kg
m3
84,500.00
43,488.90
12,787.50
0.6000
0.2000
0.0200
0.0300
OH
OH
OH
OH
pekerja
tukang batu
kepala tukang
mandor
24,000.00
9,500.00
1,100.00
1,500.00
1.0000
130.0000
10.0800
0.0950
0.0275
m2
bh
kg
m3
m3
0.6000
0.2000
0.0200
0.0300
OH
OH
OH
OH
pekerja
tukang batu
kepala tukang
mandor
1.0000
65.0000
18.9500
0.0380
m2
bh
kg
m3
42,250.00
31,040.10
5,225.00
0.3000
0.1000
0.0100
0.0150
OH
OH
OH
OH
pekerja
tukang batu
kepala tukang
mandor
12,000.00
4,750.00
550.00
750.00
1.0000 m2
65.0000 bh
14.3700 kg
40,000.00
47,500.00
55,000.00
50,000.00
40,000.00
47,500.00
55,000.00
50,000.00
40,000.00
47,500.00
55,000.00
50,000.00
40,000.00
47,500.00
55,000.00
50,000.00
40,000.00
47,500.00
55,000.00
50,000.00
40,000.00
47,500.00
55,000.00
50,000.00
12,000.00
4,750.00
550.00
750.00
12,000.00
4,750.00
550.00
750.00
12,000.00
4,750.00
550.00
750.00
24,000.00
9,500.00
1,100.00
1,500.00
42,250.00
23,538.06
NO
SNI
KODE
KOEF
SAT.
URAIAN PEKERJAAN
D.10
D.11
DT 91-0010
2007
HARGA BAHAN/
UPAH
7
JUMLAH
8=4x7
0.0400 m3
pasir pasang
137,500.00
5,500.00
0.3000
0.1000
0.0100
0.0150
OH
OH
OH
OH
pekerja
tukang batu
kepala tukang
mandor
40,000.00
47,500.00
55,000.00
50,000.00
12,000.00
4,750.00
550.00
750.00
1.0000
65.0000
6.5000
0.0500
m2
bh
kg
m3
42,250.00
10,647.00
6,875.00
0.3000
0.1000
0.0100
0.0150
OH
OH
OH
OH
pekerja
tukang batu
kepala tukang
mandor
40,000.00
47,500.00
55,000.00
50,000.00
12,000.00
4,750.00
550.00
750.00
1.0000
30.0000
14.0000
0.0320
m2
bh
kg
m3
93,750.00
22,932.00
4,400.00
0.3000
0.1000
0.0100
0.0150
OH
OH
OH
OH
pekerja
tukang batu
kepala tukang
mandor
40,000.00
47,500.00
55,000.00
50,000.00
12,000.00
4,750.00
550.00
750.00
1,638.00
137,500.00
10,647.00
2,667.50
PEKERJAAN PLESTERAN
PL.1
PL.2
PL.3
PL.4
1.0000 m2
6.5000 kg
0.0194 m3
Plesteran 1 Pc : 3 Ps
semen/PC
pasir pasang
0.4000 OH
0.2000 OH
pekerja
tukang batu
40,000.00
47,500.00
16,000.00
9,500.00
0.0200 OH
0.0200 OH
kepala tukang
mandor
55,000.00
50,000.00
1,100.00
1,000.00
1.0000 m2
7.1860 kg
0.0280 m3
Plesteran 1 Pc : 8 Ps di aci PC
semen/PC
pasir pasang
1,638.00
137,500.00
11,770.67
3,850.00
0.3000
0.1500
0.0150
0.0150
pekerja
tukang batu
kepala tukang
mandor
40,000.00
47,500.00
55,000.00
50,000.00
12,000.00
7,125.00
825.00
750.00
1,638.00
137,500.00
10,384.92
1,650.00
40,000.00
47,500.00
55,000.00
50,000.00
8,000.00
7,125.00
825.00
500.00
1.0000 m2
9.3000 kg
0.0180 m3
15,233.40
2,475.00
0.2000 OH
0.1500 OH
pekerja
tukang batu
OH
OH
OH
OH
1.0000 m2
6.3400 kg
0.0120 m3
0.2000
0.1500
0.0150
0.0100
pekerja
tukang batu
kepala tukang
mandor
OH
OH
OH
OH
40,000.00
47,500.00
8,000.00
7,125.00
NO
SNI
KODE
KOEF
SAT.
URAIAN PEKERJAAN
PL.5
VI
DT 91-0011
2007
0.0150 OH
0.0100 OH
kepala tukang
mandor
1.0000 m2
4.3200 kg
0.0060 m3
Plesteran Ciprat 1 Pc : 2 Ps
semen
pasir pasang
0.2500
0.1000
0.0100
0.0130
OH
OH
OH
OH
m3
OH
OH
OH
OH
HARGA BAHAN/
UPAH
7
JUMLAH
8=4x7
55,000.00
50,000.00
825.00
500.00
1,638.00
137,500.00
7,076.16
825.00
pekerja
tukang batu
kepala tukang
mandor
40,000.00
47,500.00
55,000.00
50,000.00
10,000.00
4,750.00
550.00
650.00
gantungan pyan
tukang kayu
tukang kepala
pekerja
mandor
50,000.00
50,000.00
40,000.00
50,000.00
750,000.00
75,000.00
200,000.00
12,500.00
PEKERJAAN KAYU
KY.1
KY.2
KY.3
KY.4
KY.5
KY.6
1.0000
15.0000
1.5000
5.0000
0.2500
1.1000 m3
0.1500 kg
kayu kruing
paku
5,625,000.00
16,200.00
6,187,500.00
2,430.00
1.0000
1.2000
1.2500
1.0000
m3
m3
kg
kg
11,550,000.00
20,250.00
15,300.00
6.0000
20.0000
2.0000
0.3000
OH
OH
OH
OH
pekerja
tukang kayu
kepala tukang
mandor
40,000.00
50,000.00
55,000.00
50,000.00
240,000.00
1,000,000.00
110,000.00
15,000.00
1.0000
1.1000
1.2500
1.0000
m3
m3
kg
kg
17,151,750.00
20,250.00
15,300.00
6.0000
20.0000
2.0000
0.3000
OH
OH
OH
OH
pekerja
tukang kayu
kepala tukang
mandor
40,000.00
50,000.00
55,000.00
50,000.00
240,000.00
1,000,000.00
110,000.00
15,000.00
1.0000
1.2000
1.2500
1.0000
m3
m3
kg
kg
12,096,000.00
20,250.00
15,300.00
6.0000
18.0000
2.0000
0.3000
OH
OH
OH
OH
pekerja
tukang kayu
kepala tukang
mandor
40,000.00
50,000.00
55,000.00
50,000.00
240,000.00
900,000.00
110,000.00
15,000.00
1.0000
0.1000
0.0100
0.1000
0.0050
m2
OH
OH
OH
OH
50,000.00
50,000.00
40,000.00
50,000.00
5,000.00
500.00
4,000.00
250.00
9,625,000.00
5,625,000.00
16,200.00
134,750.00
320,625.00
4,050.00
50,000.00
50,000.00
40,000.00
50,000.00
5,000.00
500.00
4,000.00
250.00
9,625,000.00
5,625,000.00
134,750.00
320,625.00
0.0140 m3
0.0570 m3
0.2500 kg
1.0000
0.1000
0.0100
0.1000
0.0050
m2
OH
OH
OH
OH
0.0140 m3
0.0570 m3
NO
SNI
KODE
KOEF
SAT.
URAIAN PEKERJAAN
KY.7
KY.8
KY.9
KY.10
KY.11
KY.12
KY.13
KY.13.b
HARGA BAHAN/
UPAH
7
JUMLAH
8=4x7
0.2500 kg
paku reng
16,200.00
4,050.00
1.0000 m2
0.0120 m3
0.1500 kg
67,500.00
2,430.00
0.1000
0.1000
0.0100
0.0050
pekerja
tukang kayu
kepala tukang
mandor
OH
OH
OH
OH
40,000.00
50,000.00
55,000.00
50,000.00
4,000.00
5,000.00
550.00
250.00
1.0000 m2
0.0120 m3
0.1500 kg
115,500.00
2,430.00
0.1000
0.1000
0.0100
0.0050
pekerja
tukang kayu
kepala tukang
mandor
OH
OH
OH
OH
40,000.00
50,000.00
55,000.00
50,000.00
4,000.00
5,000.00
550.00
250.00
1.0000 m2
0.0030 m3
0.1500 kg
28,875.00
2,430.00
0.1000
0.1000
0.0100
0.0050
pekerja
tukang kayu
kepala tukang
mandor
OH
OH
OH
OH
40,000.00
50,000.00
55,000.00
50,000.00
4,000.00
5,000.00
550.00
250.00
1.0000 m2
0.0120 m3
0.1500 kg
120,960.00
2,430.00
0.1000
0.1000
0.0100
0.0050
OH
OH
OH
OH
pekerja
tukang kayu
kepala tukang
mandor
40,000.00
50,000.00
55,000.00
50,000.00
4,000.00
5,000.00
550.00
250.00
1.0000
1.1000
15.0000
5.6000
m3
m3
kg
kg
10,587,500.00
302,400.00
90,720.00
4.0000
12.0000
1.2000
0.2000
OH
OH
OH
OH
pekerja
tukang kayu
kepala tukang
mandor
40,000.00
50,000.00
55,000.00
50,000.00
160,000.00
600,000.00
66,000.00
10,000.00
1.0000
1.1000
15.0000
5.6000
m3
m3
kg
kg
17,151,750.00
302,400.00
90,720.00
4.0000
12.0000
1.2000
0.2000
OH
OH
OH
OH
pekerja
tukang kayu
kepala tukang
mandor
40,000.00
50,000.00
55,000.00
50,000.00
160,000.00
600,000.00
66,000.00
10,000.00
1.0000
1.1000
15.0000
5.6000
m3
m3
kg
kg
6,187,500.00
302,400.00
90,720.00
4.0000
12.0000
1.2000
0.2000
OH
OH
OH
OH
pekerja
tukang kayu
kepala tukang
mandor
1.0000 m3
1.1000 m3
40,000.00
50,000.00
55,000.00
50,000.00
160,000.00
600,000.00
66,000.00
10,000.00
4,180,000.00
NO
SNI
KODE
KOEF
SAT.
URAIAN PEKERJAAN
KY.14
KY.17
KY.18
KY.19
KY.20
8=4x7
baut / angkur
paku
20,160.00
16,200.00
302,400.00
90,720.00
4.0000
12.0000
1.2000
0.2000
pekerja
tukang kayu
kepala tukang
mandor
40,000.00
50,000.00
55,000.00
50,000.00
160,000.00
600,000.00
66,000.00
10,000.00
5,625,000.00
20,160.00
6,187,500.00
161,280.00
40,000.00
50,000.00
55,000.00
50,000.00
240,000.00
900,000.00
99,000.00
15,000.00
9,625,000.00
118,800.00
10,587,500.00
950,400.00
40,000.00
50,000.00
55,000.00
50,000.00
240,000.00
900,000.00
99,000.00
15,000.00
1.0000 m2
0.0600 m3
0.1500 kg
604,800.00
2,430.00
0.5000
2.0000
0.2000
0.0250
pekerja
tukang kayu
kepala tukang
mandor
40,000.00
50,000.00
55,000.00
50,000.00
20,000.00
100,000.00
11,000.00
1,250.00
1.0000 m2
0.0600 m3
0.1500 kg
577,500.00
2,430.00
0.5000
2.0000
0.2000
0.0250
pekerja
tukang kayu
kepala tukang
mandor
40,000.00
50,000.00
55,000.00
50,000.00
20,000.00
100,000.00
11,000.00
1,250.00
1.0000 m2
0.0600 m3
0.1500 kg
935,550.00
2,430.00
0.5000
2.0000
0.2000
0.0250
pekerja
tukang kayu
kepala tukang
mandor
40,000.00
50,000.00
55,000.00
50,000.00
20,000.00
100,000.00
11,000.00
1,250.00
1.0000 m2
0.0600 m3
0.1500 kg
337,500.00
2,430.00
0.5000
2.0000
0.2000
0.0250
OH
OH
OH
OH
pekerja
tukang kayu
kepala tukang
mandor
20,000.00
100,000.00
11,000.00
1,250.00
1.0000
0.0140
0.2500
0.0500
m2
m3
lbr
kg
Bikin daun pintu rangka kayu jati tb 3,5 cm panil multiplek tb 9mm
kayu jati kl III
15,592,500.00
218,295.00
multiplek
151,500.00
37,875.00
paku
16,200.00
810.00
OH
OH
OH
OH
1.0000 m3
1.1000 m3
8.0000 kg
OH
OH
OH
OH
1.0000 m3
1.1000 m3
8.0000 kg
6.0000
18.0000
1.8000
0.3000
KY.16
JUMLAH
15.0000 kg
5.6000 kg
6.0000
18.0000
1.8000
0.3000
KY.15
HARGA BAHAN/
UPAH
7
OH
OH
OH
OH
OH
OH
OH
OH
OH
OH
OH
OH
OH
OH
OH
OH
2.5000 OH
7.5000 OH
0.7500 OH
pekerja
tukang kayu
kepala tukang
40,000.00
50,000.00
55,000.00
50,000.00
40,000.00
50,000.00
55,000.00
100,000.00
375,000.00
41,250.00
NO
SNI
KODE
KOEF
SAT.
URAIAN PEKERJAAN
KY.21
KY.22
KY.23
KY.24
KY.26
KY.27
KY.28
8=4x7
mandor
1.0000 m2
0.0090 m3
0.2500 lbr
0.0500 kg
1.0000
0.0140
0.2500
0.0500
m2
m3
lbr
kg
Bikin daun pintu rangka kayu bengkirai tb 3,5 cm panil multiplek tb 9mm
kayu bengkirai
9,625,000.00
134,750.00
mulitplek
151,500.00
37,875.00
paku
16,200.00
810.00
2.5000
7.5000
0.7500
0.1250
OH
OH
OH
OH
pekerja
tukang kayu
kepala tukang
mandor
1.0000
0.0250
1.0000
0.0300
0.5000
m2
m3
lbr
kg
kg
0.6000
2.0000
0.2000
0.0300
OH
OH
OH
OH
pekerja
tukang kayu
kepala tukang
mandor
1.0000 m2
m3
lbr
m2
kg
kg
50,000.00
JUMLAH
0.1250 OH
0.0250
1.0000
1.0000
0.0300
0.3000
KY.25
HARGA BAHAN/
UPAH
7
40,000.00
50,000.00
55,000.00
50,000.00
40,000.00
50,000.00
55,000.00
50,000.00
6,250.00
100,000.00
375,000.00
41,250.00
6,250.00
24,000.00
100,000.00
11,000.00
1,500.00
Bikin daun pintu double teakwood rangka kayu bengkirai tb 3 cm dilapisi seng aluminium
Upah tenaga
kayu bengkirai
9,625,000.00
240,625.00
triplek 9 mm
144,000.00
144,000.00
seng aluminium
57,000.00
57,000.00
paku
16,200.00
486.00
lem
15,300.00
4,590.00
1.0000 m2
0.0400 m3
0.5000 kg
403,200.00
7,650.00
1.0000
2.5000
0.2500
0.0500
pekerja
tukang kayu
kepala tukang
mandor
40,000.00
50,000.00
55,000.00
50,000.00
40,000.00
125,000.00
13,750.00
2,500.00
1.0000 m2
0.0400 m3
0.5000 kg
623,700.00
7,650.00
1.0000
2.5000
0.2500
0.0500
pekerja
tukang kayu
kepala tukang
mandor
40,000.00
125,000.00
13,750.00
2,500.00
OH
OH
OH
OH
OH
OH
OH
OH
40,000.00
50,000.00
55,000.00
50,000.00
1.0000 m2
0.0240 m3
0.3000 kg
241,920.00
4,590.00
0.8000
2.0000
0.2000
0.0400
pekerja
tukang kayu
kepala tukang
mandor
40,000.00
50,000.00
50,000.00
50,000.00
32,000.00
100,000.00
10,000.00
2,000.00
1.0000 m2
0.0240 m3
0.3000 kg
374,220.00
4,590.00
0.8000 OH
2.0000 OH
0.2000 OH
pekerja
tukang kayu
kepala tukang
32,000.00
100,000.00
11,000.00
OH
OH
OH
OH
40,000.00
50,000.00
55,000.00
NO
SNI
KODE
KOEF
SAT.
URAIAN PEKERJAAN
KY.29
KY.30
KY.30.b
KY.31
KY.32
KY.33
KY.34
KY.35
HARGA BAHAN/
UPAH
7
0.0400 OH
mandor
1.0000 m2
0.0110 m3
0.2000 kg
0.0600
1.8000
0.1800
0.3000
pekerja
tukang kayu
kepala tukang
mandor
OH
OH
OH
OH
JUMLAH
8=4x7
50,000.00
2,000.00
15,592,500.00
16,200.00
171,517.50
3,240.00
40,000.00
50,000.00
55,000.00
50,000.00
2,400.00
90,000.00
9,900.00
15,000.00
118,800.00
16,200.00
130,680.00
8,100.00
1.0000 m2
1.1000 m2
0.5000 kg
0.0250
0.0750
0.0075
0.0013
pekerja
tukang kayu
kepala tukang
mandor
40,000.00
50,000.00
55,000.00
50,000.00
1,000.00
3,750.00
412.50
65.00
1.0000 m2
1.0000 lbr
0.5000 kg
58,300.00
16,200.00
58,300.00
8,100.00
0.0250
0.0750
0.0075
0.0013
pekerja
tukang kayu
kepala tukang
mandor
40,000.00
50,000.00
55,000.00
50,000.00
1,000.00
3,750.00
412.50
65.00
1.0000 m'
0.0108 m3
0.1000 kg
168,399.00
1,620.00
0.1000
0.2000
0.0250
0.0050
pekerja
tukang kayu
kepala tukang
mandor
OH
OH
OH
OH
OH
OH
OH
OH
OH
OH
OH
OH
40,000.00
50,000.00
55,000.00
50,000.00
4,000.00
10,000.00
1,375.00
250.00
1.0000 m'
0.0110 m3
0.0500 kg
171,517.50
810.00
0.1000
0.2000
0.0200
0.0050
pekerja
tukang kayu
kepala tukang
mandor
OH
OH
OH
OH
40,000.00
50,000.00
55,000.00
50,000.00
4,000.00
10,000.00
1,100.00
250.00
1.0000 m'
0.0108 m3
0.1000 kg
103,950.00
1,620.00
0.0100
0.2000
0.0250
0.0050
pekerja
tukang kayu
kepala tukang
mandor
OH
OH
OH
OH
40,000.00
50,000.00
55,000.00
50,000.00
400.00
10,000.00
1,375.00
250.00
1.0000 m'
0.0110 m3
0.0500 kg
105,875.00
810.00
0.1000
0.2000
0.0200
0.0050
pekerja
tukang kayu
kepala tukang
mandor
OH
OH
OH
OH
1.0000 m'
0.0050 m3
0.0500 kg
40,000.00
50,000.00
55,000.00
50,000.00
4,000.00
10,000.00
1,100.00
250.00
5,625,000.00
16,200.00
28,125.00
810.00
NO
SNI
KODE
KOEF
SAT.
URAIAN PEKERJAAN
0.1000
0.1000
0.0100
0.0500
VII
DT 91-0008
2007
HARGA BAHAN/
UPAH
7
40,000.00
50,000.00
55,000.00
50,000.00
JUMLAH
8=4x7
OH
OH
OH
OH
pekerja
tukang kayu
kepala tukang
mandor
4,000.00
5,000.00
550.00
2,500.00
1.0000
247.0000
0.6210
0.7400
215.0000
m3
kg
m3
m3
ltr
1.6500
0.2750
0.0280
0.0830
OH
OH
OH
OH
pekerja
tukang batu
kepala tukang
mandor
1.0000
326.0000
0.6514
0.7622
215.0000
m3
kg
m3
m3
ltr
1.6500
0.2500
0.0250
0.0800
OH
OH
OH
OH
pekerja
tukang batu
kepala tukang
mandor
40,000.00
47,500.00
55,000.00
50,000.00
66,000.00
11,875.00
1,375.00
4,000.00
1.0000
371.0000
0.5983
0.7756
215.0000
m3
kg
m3
m3
ltr
607,698.00
125,640.00
151,233.33
3,655.00
1.6500
0.2500
0.0250
0.0800
OH
OH
OH
OH
pekerja
tukang batu
kepala tukang
mandor
40,000.00
47,500.00
55,000.00
50,000.00
66,000.00
11,875.00
1,375.00
4,000.00
1.0000
406.0000
0.5863
0.7600
215.0000
m3
kg
m3
m3
ltr
665,028.00
123,120.00
148,200.00
3,655.00
1.6500
0.2500
0.0300
0.0800
OH
OH
OH
OH
pekerja
tukang batu
kepala tukang
mandor
40,000.00
47,500.00
55,000.00
50,000.00
66,000.00
11,875.00
1,650.00
4,000.00
1.0000
413.0000
0.5837
0.7563
215.0000
m3
kg
m3
m3
ltr
676,494.00
122,580.00
147,477.78
3,655.00
1.6500
0.2500
0.0250
0.0800
OH
OH
OH
OH
pekerja
tukang batu
kepala tukang
mandor
40,000.00
47,500.00
55,000.00
50,000.00
66,000.00
11,875.00
1,375.00
4,000.00
1.0000 kg
1.0500 kg
0.0150 kg
10,000.00
16,800.00
10,500.00
252.00
0.0070
0.0070
0.0007
0.0004
pekerja
tukang besi
kepala tukang
mandor
40,000.00
47,500.00
50,000.00
50,000.00
280.00
332.50
35.00
20.00
PEKERJAAN BETON
B.1
B.2
B.3
B.4
B.5
B.6
OH
OH
OH
OH
40,000.00
47,500.00
55,000.00
50,000.00
404,586.00
130,410.00
144,300.00
3,655.00
66,000.00
13,062.50
1,540.00
4,150.00
533,988.00
136,800.00
148,633.33
3,655.00
NO
SNI
KODE
KOEF
SAT.
URAIAN PEKERJAAN
B.7
B.8
B.9
B.10
B.11
1.0000
0.0020
0.0100
3.0000
0.4500
4.0000
0.0060
0.0090
m'
m3
kg
kg
kg
kg
m3
m3
0.1800
0.0200
0.0200
0.0200
0.0060
0.0090
OH
OH
OH
OH
OH
OH
pekerja
tukang batu
tukang kayu
tukang besi
kepala tukang
mandor
1.0000
0.0030
0.0200
3.6000
0.0500
5.5000
0.0090
0.0150
HARGA BAHAN/
UPAH
7
JUMLAH
8=4x7
976,500.00
16,200.00
10,000.00
16,800.00
1,638.00
210,000.00
195,000.00
1,953.00
162.00
30,000.00
7,560.00
6,552.00
1,260.00
1,755.00
40,000.00
47,500.00
50,000.00
47,500.00
55,000.00
50,000.00
7,200.00
950.00
1,000.00
950.00
330.00
450.00
m'
m3
kg
kg
kg
kg
m3
m3
2,929.50
324.00
36,000.00
840.00
9,009.00
1,890.00
2,925.00
0.2970
0.0330
0.0330
0.0330
0.0100
0.0150
OH
OH
OH
OH
OH
OH
pekerja
tukang batu
tukang kayu
tukang besi
kepala tukang
mandor
35,000.00
47,500.00
50,000.00
47,500.00
55,000.00
50,000.00
10,395.00
1,567.50
1,650.00
1,567.50
550.00
750.00
1.0000
0.0400
0.4000
0.0150
0.3500
3.0000
m2
m3
kg
m3
lbr
btg
976,500.00
16,200.00
976,500.00
58,300.00
12,500.00
39,060.00
6,480.00
14,647.50
20,405.00
37,500.00
0.6600
0.3300
0.0330
0.0330
OH
OH
OH
OH
pekerja
tukang kayu
kepala tukang
mandor
40,000.00
50,000.00
50,000.00
50,000.00
26,400.00
16,500.00
1,650.00
1,650.00
1.0000
0.4000
0.0150
2.0000
m2
kg
m3
btg
16,200.00
976,500.00
12,500.00
6,480.00
14,647.50
25,000.00
0.2500
0.1700
0.0020
0.0013
OH
OH
OH
OH
pekerja
tukang kayu
kepala tukang
mandor
40,000.00
50,000.00
50,000.00
50,000.00
10,000.00
8,500.00
100.00
65.00
1.0000 m2
0.0220 m3
0.4000 kg
21,483.00
6,480.00
0.5000
0.0500
0.2000
0.0100
tukang kayu
tukang kepala
pekerja
mandor
50,000.00
50,000.00
40,000.00
50,000.00
25,000.00
2,500.00
8,000.00
500.00
3,750.00
400.00
OH
OH
OH
OH
1.0000 m2
0.0750 OH
0.0080 OH
NO
SNI
KODE
KOEF
SAT.
URAIAN PEKERJAAN
0.1500 OH
0.0080 OH
25.0000 bj
PA.2
1.0000
0.0600
0.0060
0.1500
0.0080
m2
OH
OH
OH
OH
18.0000 bj
PA.3
1.0000 m2
14.0000 bj
PA.4
1.0000 m2
25.0000 bj
PA.5
1.0000 m2
25.0000 bj
PA.6
1.0000 m2
25.0000 bj
PA.7
PA.8
1.0000
0.2000
0.0200
0.4000
0.0020
m'
OH
OH
OH
OH
PA.11
PA.12
40,000.00
50,000.00
8=4x7
6,000.00
400.00
2,100.00
3,400.00
4,800.00
3,000.00
300.00
6,000.00
400.00
780.00
950.00
47,500.00
55,000.00
40,000.00
50,000.00
9,500.00
1,100.00
16,000.00
100.00
semen / PC
pasir
krepus
1,638.00
137,500.00
16,700.00
13,104.00
4,400.00
58,450.00
1.0000 m'
5,896.80
4,125.00
60,900.00
1,638.00
137,500.00
6,900.00
5,896.80
4,125.00
24,150.00
6,200.00
16,200.00
68,200.00
486.00
40,000.00
50,000.00
50,000.00
50,000.00
8,000.00
5,000.00
500.00
400.00
7,600.00
16,200.00
1,638.00
137,500.00
8,100.00
26,600.00
810.00
17,690.40
4,400.00
8,100.00
1.0000 m'
3.6000 kg
0.0300 m3
3.5000 bj
PA.10
pekerja
mandor
JUMLAH
8.0000 kg
0.0320 m3
3.5000 bj
3.6000 kg
0.0300 m3
3.5000 bj
PA.9
HARGA BAHAN/
UPAH
7
1.0000 m2
11.0000 bh
0.0300 kg
0.2000
0.1000
0.0100
0.0080
OH
OH
OH
OH
pekerja
tukang kayu
kepala tukang
mandor
1.0000
3.5000
0.0500
10.8000
0.0320
1.0000
m2
bh
kg
kg
m3
kg
0.4000
0.2000
0.0200
0.0200
OH
OH
OH
OH
pekerja
tukang kayu
kepala tukang
mandor
40,000.00
50,000.00
50,000.00
50,000.00
16,000.00
10,000.00
1,000.00
1,000.00
83,000.00
91,300.00
1.0000 m'
1.1000 m'
NO
SNI
KODE
KOEF
SAT.
URAIAN PEKERJAAN
PA.13
PA.14
PA.15
PA.16
PA.17
PA.18
PA.19
PA.20
HARGA BAHAN/
UPAH
7
JUMLAH
8=4x7
4.0000
0.2500
0.0250
0.2500
0.0125
bj
OH
OH
OH
OH
paku kait
tukang kayu
tukang kepala
pekerja
mandor
1,500.00
50,000.00
50,000.00
40,000.00
50,000.00
6,000.00
12,500.00
1,250.00
10,000.00
625.00
1.0000
0.4200
0.3750
0.0375
0.0250
0.0110
m'
lbr
OH
OH
OH
OH
55,900.00
47,500.00
50,000.00
40,000.00
50,000.00
23,478.00
17,812.50
1,875.00
1,000.00
550.00
1.0000 m2
0.5500 lbr
0.1200 kg
0.1400
0.0750
0.0080
0.0080
pekerja
tukang kayu
kepala tukang
mandor
OH
OH
OH
OH
40,000.00
50,000.00
50,000.00
50,000.00
1.0000 m2
0.6000 lbr
0.1200 kg
0.1400
0.0700
0.0070
0.0070
pekerja
tukang kayu
kepala tukang
mandor
OH
OH
OH
OH
46,585.00
180.00
5,600.00
3,750.00
400.00
400.00
47,580.00
180.00
40,000.00
50,000.00
50,000.00
50,000.00
5,600.00
3,500.00
350.00
350.00
1.0000 m2
0.6500 lbr
0.1200 kg
36,400.00
180.00
0.1400
0.0700
0.0070
0.0070
pekerja
tukang kayu
kepala tukang
mandor
OH
OH
OH
OH
40,000.00
50,000.00
50,000.00
50,000.00
5,600.00
3,500.00
350.00
350.00
1.0000 m2
0.5000 lbr
0.1200 kg
32,000.00
180.00
0.1400
0.6700
0.0070
0.0070
pekerja
tukang kayu
kepala tukang
mandor
40,000.00
50,000.00
50,000.00
50,000.00
5,600.00
33,500.00
350.00
350.00
1.0000 m2
0.7000 lbr
0.0200 kg
84,000.00
1,500.00
58,800.00
30.00
0.1200
0.0600
0.0060
0.0060
pekerja
tukang kayu
tukang kepala
mandor
40,000.00
50,000.00
50,000.00
50,000.00
4,800.00
3,000.00
300.00
300.00
1.0000 m'
0.3000 lbr
0.0400 kg
40,000.00
16,200.00
12,000.00
648.00
0.1500
0.0700
0.0080
0.0060
OH
OH
OH
OH
pekerja
tukang kayu
tukang kepala
mandor
40,000.00
50,000.00
50,000.00
50,000.00
6,000.00
3,500.00
400.00
300.00
1.0000
1.0000
4.0000
0.2500
0.0250
m'
m'
bj
OH
OH
81,900.00
1,500.00
50,000.00
50,000.00
81,900.00
6,000.00
12,500.00
1,250.00
OH
OH
OH
OH
OH
OH
OH
OH
NO
SNI
KODE
KOEF
SAT.
URAIAN PEKERJAAN
0.2500 OH
0.0125 OH
IX
DT 91-0013
2007
LL.2
LL.3
LL.4
LL.5
8=4x7
40,000.00
50,000.00
10,000.00
625.00
1.0000 m2
1.1000 lbr
0.0100 kg
23,100.00
162.00
0.0300
0.0700
0.0070
0.0015
OH
OH
OH
OH
pekerja
tukang kayu
kepala tukang
mandor
40,000.00
50,000.00
50,000.00
50,000.00
1,200.00
3,500.00
350.00
75.00
1.0000
0.4000
0.0400
0.1400
0.0070
m2
OH
OH
OH
OH
50,000.00
50,000.00
40,000.00
50,000.00
20,000.00
2,000.00
5,600.00
350.00
16,200.00
5,625,000.00
12,280.00
3,240.00
39,375.00
12,280.00
50,000.00
50,000.00
40,000.00
50,000.00
20,000.00
2,000.00
5,600.00
350.00
16,200.00
5,625,000.00
15,540.00
3,240.00
39,375.00
15,540.00
50,000.00
50,000.00
40,000.00
50,000.00
20,000.00
2,000.00
5,600.00
350.00
16,200.00
5,625,000.00
18,300.00
3,240.00
39,375.00
18,300.00
0.2000 kg
0.0070 m3
1.0000 m2
paku
kayu kruing 4/6 + 5/7
eternit kerang super
1.0000
0.4000
0.0400
0.1400
0.0070
m2
OH
OH
OH
OH
0.2000 kg
0.0070 m3
1.0000 m2
paku
kayu kruing 4/6 + 5/7
eternit atrisco
1.0000
0.4000
0.0400
0.1400
0.0070
m2
OH
OH
OH
OH
0.2000 kg
0.0070 m3
1.0000 m2
paku
kayu kruing 4/6 + 5/7
harplek plat
1.0000
0.1000
0.0500
0.0050
0.0050
40,000.00
50,000.00
50,000.00
50,000.00
4,000.00
2,500.00
250.00
250.00
Gypsum board
Paku sekrup
90,900.00
16,200.00
33,087.60
1,782.00
472,500.00
472,500.00
472,500.00
28,350.00
40,000.00
47,500.00
55,000.00
50,000.00
132,000.00
52,250.00
55.00
8,000.00
1.0000 unit
1.0000 bh
0.0600
1,375,000.00
82,500.00
3.3000
1.1000
0.0010
0.1600
pekerja
tukang batu
kepala tukang
mandor
m2
OH
OH
OH
OH
0.3640 Lbr
0.1100 kg
03-
pekerja
mandor
JUMLAH
PEKERJAAN LANGIT-LANGIT
LL.1
HARGA BAHAN/
UPAH
7
PEKERJAAN SANITASI
S.1
S.1.b
1.0000 unit
1.0000 bh
0.0600
3.3000
1.1000
0.0010
0.1600
pekerja
tukang batu
kepala tukang
mandor
OH
OH
OH
OH
OH
OH
OH
OH
40,000.00
47,500.00
55,000.00
50,000.00
132,000.00
52,250.00
55.00
8,000.00
NO
SNI
KODE
KOEF
SAT.
URAIAN PEKERJAAN
S.2
S.3
S.4
S.5
S.6
XI
DT 91-0014
2007
HARGA BAHAN/
UPAH
7
1.0000
1.0000
6.0000
0.0100
unit
bh
kg
m3
1.0000
1.5000
1.5000
0.1600
OH
OH
OH
OH
pekerja
tukang batu
kepala tukang
mandor
1.0000
1.0000
0.3000
6.0000
0.0100
unit
bh
kg
m3
Memasang Urinoir
urinoir
perlengkapan 30%
pc
pasir pasang
1.0000
1.0000
0.1000
0.1000
OH
OH
OH
OH
pekerja
tukang batu
kepala tukang
mandor
1.0000
1.0000
0.3000
6.0000
0.0100
unit
bh
kg
m3
Memasang Wastafel
wastafel
perlengkapan 30%
pc
pasir pasang
1.0000
1.0000
0.1000
0.1000
OH
OH
OH
OH
pekerja
tukang batu
kepala tukang
mandor
JUMLAH
8=4x7
134,000.00
9,828.00
1,375.00
40,000.00
47,500.00
55,000.00
50,000.00
40,000.00
71,250.00
82,500.00
8,000.00
349,800.00
349,800.00
1,638.00
137,500.00
349,800.00
104,940.00
9,828.00
1,375.00
40,000.00
47,500.00
55,000.00
50,000.00
40,000.00
47,500.00
5,500.00
5,000.00
330,000.00
330,000.00
1,638.00
137,500.00
330,000.00
99,000.00
9,828.00
1,375.00
40,000.00
47,500.00
55,000.00
50,000.00
40,000.00
47,500.00
5,500.00
5,000.00
1.0000 unit
1.0000 bh
0.3000 set
235,000.00
70,500.00
1.0000
1.0000
0.1000
0.1000
pekerja
tukang batu
kepala tukang
mandor
OH
OH
OH
OH
40,000.00
47,500.00
55,000.00
50,000.00
40,000.00
47,500.00
5,500.00
5,000.00
10,000.00
10,000.00
0.0100
0.1000
0.0100
0.0050
40,000.00
47,500.00
55,000.00
50,000.00
400.00
4,750.00
550.00
250.00
OH
OH
OH
OH
pekerja
tukang batu
kepala tukang
mandor
BS.2
BS.3
1.0000 kg
1.1500 bh
12,000.00
13,800.00
0.0600
0.0600
0.0060
0.0030
pekerja
tukang besi
kepala tukang
mandor
40,000.00
47,500.00
50,000.00
50,000.00
2,400.00
2,850.00
300.00
150.00
441,000.00
441,000.00
40,000.00
47,500.00
50,000.00
50,000.00
17,600.00
20,900.00
2,200.00
1,100.00
346,500.00
346,500.00
OH
OH
OH
OH
1.0000 m2
1.0000 m2
0.4400
0.4400
0.0440
0.0220
pekerja
tukang besi
kepala tukang
mandor
OH
OH
OH
OH
1.0000 m2
1.0000 m2
NO
SNI
KODE
KOEF
SAT.
URAIAN PEKERJAAN
1.2000
1.2000
0.1200
0.0060
BS.4
BS.5
BS.6
BS.7
BS.8
BS.9
BS.10
BS.11
OH
OH
OH
OH
pekerja
tukang besi
kepala tukang
mandor
1.0000 m2
1.0000 m2
1.2000
1.2000
0.1200
0.0060
OH
OH
OH
OH
pekerja
tukang besi
kepala tukang
mandor
1.0000
1.1000
2.0000
0.0600
m1
m1
bh
tube
0.0430
0.0430
0.0043
0.0021
OH
OH
OH
OH
pekerja
tukang besi
kepala tukang
mandor
1.0000 m2
4.4000 m1
14.6000
HARGA BAHAN/
UPAH
7
JUMLAH
8=4x7
40,000.00
47,500.00
50,000.00
50,000.00
48,000.00
57,000.00
6,000.00
300.00
378,000.00
378,000.00
40,000.00
47,500.00
50,000.00
50,000.00
48,000.00
57,000.00
6,000.00
300.00
104,900.00
6,900.00
44,100.00
115,390.00
13,800.00
2,646.00
40,000.00
47,500.00
50,000.00
50,000.00
1,720.00
2,042.50
215.00
105.00
104,900.00
35,000.00
461,560.00
511,000.00
0.0850
0.0850
0.0085
0.0050
OH
OH
OH
OH
pekerja
tukang besi
kepala tukang
mandor
47,500.00
47,500.00
50,000.00
40,000.00
4,037.50
4,037.50
425.00
200.00
1.0000
1.1000
0.0200
0.0250
m2
m2
kg
m2
51,000.00
16,200.00
17,400.00
56,100.00
324.00
435.00
0.2000
0.2000
0.0200
0.0010
OH
OH
OH
OH
pekerja
tukang kayu
kepala tukang
mandor
40,000.00
50,000.00
50,000.00
50,000.00
8,000.00
10,000.00
1,000.00
50.00
1.0000
0.5000
0.0150
0.0190
m'
lbr
kg
m3
20,000.00
243.00
106,875.00
0.2000
0.4000
0.0250
0.0100
OH
OH
OH
OH
pekerja
tukang kayu
kepala tukang
mandor
40,000.00
50,000.00
50,000.00
50,000.00
8,000.00
20,000.00
1,250.00
500.00
1.0000
0.5000
0.0150
0.0190
m'
lbr
kg
m3
20,000.00
243.00
106,875.00
0.2000
0.4000
0.0250
0.0013
OH
OH
OH
OH
pekerja
tukang kayu
kepala tukang
mandor
40,000.00
50,000.00
50,000.00
50,000.00
8,000.00
20,000.00
1,250.00
62.50
1.0000
1.1000
0.0900
0.0300
0.0900
kg
kg
OH
OH
OH
Baut-baut / angkur
baut baja
tukang besi
tukang kepala
pekerja
20,160.00
47,500.00
50,000.00
40,000.00
22,176.00
4,275.00
1,500.00
3,600.00
1.0000
0.2500
0.0100
0.6500
m'
lbr
kg
m1
10,000.00
162.00
11,310.00
NO
SNI
KODE
KOEF
SAT.
URAIAN PEKERJAAN
0.1500
0.3000
0.0300
0.0080
XII
03-
OH
OH
OH
OH
HARGA BAHAN/
UPAH
7
pekerja
tukang besi
kepala tukang
mandor
JUMLAH
8=4x7
40,000.00
47,500.00
50,000.00
50,000.00
6,000.00
14,250.00
1,500.00
400.00
110,000.00
110,000.00
KK.2
KK.3
KK.4
KK.5
KK.6
KK.7
KK.8
1.0000 bh
1.0000 bh
0.0100
0.5000
0.0100
0.0050
pekerja
tukang kayu
kepala tukang
mandor
40,000.00
50,000.00
50,000.00
50,000.00
400.00
25,000.00
500.00
250.00
1.0000 bh
1.0000 bh
57,750.00
57,750.00
0.0050
0.5000
0.0050
0.0025
pekerja
tukang kayu
kepala tukang
mandor
40,000.00
50,000.00
50,000.00
50,000.00
200.00
25,000.00
250.00
125.00
1.0000 bh
1.0000 bh
19,300.00
19,300.00
0.0150
0.1500
0.0150
0.0008
pekerja
tukang kayu
kepala tukang
mandor
40,000.00
50,000.00
50,000.00
50,000.00
600.00
7,500.00
750.00
37.50
1.0000 set
1.0000 set
15,000.00
15,000.00
0.0100
0.1000
0.0100
0.0050
pekerja
tukang kayu
kepala tukang
mandor
40,000.00
50,000.00
50,000.00
50,000.00
400.00
5,000.00
500.00
250.00
1.0000 set
1.0000 set
14,700.00
14,700.00
0.0200
0.2000
0.0200
0.0100
pekerja
tukang kayu
kepala tukang
mandor
40,000.00
50,000.00
50,000.00
50,000.00
800.00
10,000.00
1,000.00
500.00
6,000.00
6,000.00
40,000.00
50,000.00
50,000.00
50,000.00
600.00
7,500.00
750.00
37.50
220,000.00
220,000.00
40,000.00
50,000.00
50,000.00
50,000.00
2,000.00
25,000.00
2,500.00
125.00
8,400.00
8,400.00
40,000.00
50,000.00
50,000.00
800.00
10,000.00
1,000.00
OH
OH
OH
OH
OH
OH
OH
OH
OH
OH
OH
OH
OH
OH
OH
OH
OH
OH
OH
OH
1.0000 bh
1.0000 bh
0.0150
0.1500
0.0150
0.0008
pekerja
tukang kayu
kepala tukang
mandor
OH
OH
OH
OH
1.0000 bh
1.0000 bh
0.0500
0.5000
0.0500
0.0025
pekerja
tukang kayu
kepala tukang
mandor
OH
OH
OH
OH
1.0000 bh
1.0000 bh
0.0200 OH
0.2000 OH
0.0200 OH
pekerja
tukang kayu
kepala tukang
NO
SNI
KODE
KOEF
SAT.
URAIAN PEKERJAAN
KK.9
KK.10
KK.11
XIII
DT 91-0012
2007
0.0010 OH
mandor
1.0000 bh
1.0000 bh
0.0600
0.6000
0.0600
0.0030
HARGA BAHAN/
UPAH
7
JUMLAH
8=4x7
50,000.00
50.00
275,000.00
275,000.00
pekerja
tukang kayu
kepala tukang
mandor
40,000.00
50,000.00
50,000.00
50,000.00
2,400.00
30,000.00
3,000.00
150.00
1.0000 m2
1.1000 bh
65,000.00
71,500.00
0.0150
0.1500
0.0150
0.0008
pekerja
tukang kayu
kepala tukang
mandor
40,000.00
50,000.00
50,000.00
50,000.00
600.00
7,500.00
750.00
37.50
1.0000 m2
1.1000 bh
75,000.00
82,500.00
0.0150
0.1500
0.0150
0.0008
pekerja
tukang kayu
kepala tukang
mandor
40,000.00
50,000.00
50,000.00
50,000.00
600.00
7,500.00
750.00
37.50
OH
OH
OH
OH
OH
OH
OH
OH
OH
OH
OH
OH
L.2
L.3
L.4
1.0000
26.5000
10.4000
0.0450
m2
bh
kg
m3
29,150.00
17,035.20
6,187.50
0.2700
0.1300
0.0130
0.0140
OH
OH
OH
OH
pekerja
tukang batu
kepala tukang
mandor
40,000.00
47,500.00
55,000.00
50,000.00
10,800.00
6,175.00
715.00
700.00
1.0000
6.6300
9.8000
0.0450
1.3000
m2
bh
kg
m3
kg
197,574.00
16,052.40
6,187.50
10,530.00
0.2500
0.1200
0.0120
0.0125
OH
OH
OH
OH
pekerja
tukang batu
kepala tukang
mandor
40,000.00
47,500.00
55,000.00
50,000.00
10,000.00
5,700.00
660.00
625.00
1.0000
6.6300
9.8000
0.0450
1.3000
m2
bh
kg
m3
kg
43,758.00
16,052.40
6,187.50
10,530.00
0.2500
0.1250
0.0125
0.0125
OH
OH
OH
OH
pekerja
tukang batu
kepala tukang
mandor
40,000.00
47,500.00
55,000.00
50,000.00
10,000.00
5,937.50
687.50
625.00
1.0000
6.6300
9.8000
0.0450
1.3000
m2
bh
kg
m3
kg
59,007.00
16,052.40
6,187.50
10,530.00
0.2500
0.1200
0.0120
0.0125
OH
OH
OH
OH
pekerja
tukang batu
kepala tukang
mandor
10,000.00
5,700.00
660.00
625.00
40,000.00
47,500.00
55,000.00
50,000.00
NO
SNI
KODE
KOEF
SAT.
URAIAN PEKERJAAN
L.5
L.6
L.7
L.8
L.9
L.10
L.11
HARGA BAHAN/
UPAH
7
JUMLAH
8=4x7
1.0000
7.2600
9.8000
0.0450
1.3000
m2
bh
kg
m3
kg
64,614.00
16,052.40
6,187.50
10,530.00
0.2500
0.1200
0.0120
0.0125
OH
OH
OH
OH
pekerja
tukang batu
kepala tukang
mandor
40,000.00
47,500.00
55,000.00
50,000.00
10,000.00
5,700.00
660.00
625.00
1.0000
26.5000
10.4000
0.0450
1.6200
m2
bh
kg
m3
kg
1,900.00
1,638.00
137,500.00
8,100.00
50,350.00
17,035.20
6,187.50
13,122.00
0.2500
0.1200
0.0120
0.0125
OH
OH
OH
OH
pekerja
tukang batu
kepala tukang
mandor
40,000.00
47,500.00
55,000.00
50,000.00
10,000.00
5,700.00
660.00
625.00
1.0000
11.8700
10.0000
0.0450
1.5000
m2
bh
kg
m3
kg
44,512.50
16,380.00
6,187.50
12,150.00
0.2600
0.1300
0.0130
0.0130
OH
OH
OH
OH
pekerja
tukang batu
kepala tukang
mandor
40,000.00
47,500.00
55,000.00
50,000.00
10,400.00
6,175.00
715.00
650.00
1.0000
11.8700
10.0000
0.0450
1.5000
m2
bh
kg
m3
kg
3,130.00
1,638.00
137,500.00
8,100.00
37,153.10
16,380.00
6,187.50
12,150.00
0.2600
0.1300
0.0130
0.0130
OH
OH
OH
OH
pekerja
tukang batu
kepala tukang
mandor
40,000.00
47,500.00
55,000.00
50,000.00
10,400.00
6,175.00
715.00
650.00
1.0000
12.1000
10.0000
0.0450
1.5000
m2
bh
kg
m3
kg
45,375.00
16,380.00
6,187.50
12,150.00
0.2600
0.1300
0.0130
0.0130
OH
OH
OH
OH
pekerja
tukang batu
kepala tukang
mandor
40,000.00
47,500.00
55,000.00
50,000.00
10,400.00
6,175.00
715.00
650.00
1.0000
53.0000
9.3000
0.0180
2.7500
m2
bh
kg
m3
kg
850.00
1,638.00
137,500.00
8,100.00
45,050.00
15,233.40
2,475.00
22,275.00
0.9000
0.4500
0.0450
0.0450
OH
OH
OH
OH
pekerja
tukang batu
kepala tukang
mandor
40,000.00
47,500.00
55,000.00
50,000.00
36,000.00
21,375.00
2,475.00
2,250.00
1,900.00
1,638.00
50,350.00
15,233.40
1.0000 m2
26.5000 bh
9.3000 kg
NO
SNI
KODE
KOEF
SAT.
URAIAN PEKERJAAN
L.12
L.13
L.14
L.16
JUMLAH
8=4x7
0.0180 m3
1.9400 kg
pasir pasang
semen warna
137,500.00
8,100.00
2,475.00
15,714.00
0.9000
0.4500
0.0450
0.0450
OH
OH
OH
OH
pekerja
tukang batu
kepala tukang
mandor
40,000.00
47,500.00
55,000.00
50,000.00
36,000.00
21,375.00
2,475.00
2,250.00
1.0000
1.1000
11.7000
0.0350
m2
bh
kg
m3
97,900.00
1,638.00
137,500.00
107,690.00
19,164.60
4,812.50
0.7000
0.3500
0.0350
0.0350
OH
OH
OH
OH
pekerja
tukang batu
kepala tukang
mandor
350,000.00
40,000.00
45,000.00
55,000.00
245,000.00
14,000.00
1,575.00
1,925.00
1.0000
0.1600
0.0160
0.4000
0.0250
m2
OH
OH
OH
OH
47,500.00
55,000.00
40,000.00
50,000.00
7,600.00
880.00
16,000.00
1,250.00
30.0000
3.6000
0.0080
0.0600
bh
kg
m3
m3
batu merah
semen/PC
kapur
pasir
550.00
1,638.00
495,000.00
137,500.00
16,500.00
5,896.80
3,960.00
8,250.00
1.0000
1.0000
0.1000
1.5000
0.0750
m'
OH
OH
OH
OH
47,500.00
55,000.00
40,000.00
50,000.00
47,500.00
5,500.00
60,000.00
3,750.00
116,750.00
tegel plint
semen/PC
pasir
1,900.00
1,638.00
137,500.00
9,500.00
2,047.50
275.00
495,000.00
137,500.00
1,100.00
1,638.00
9,652.50
5,362.50
12,100.00
3,276.00
47,500.00
55,000.00
40,000.00
50,000.00
7,125.00
825.00
20,000.00
1,250.00
495,000.00
137,500.00
2,000.00
8,100.00
9,652.50
5,362.50
22,000.00
16,200.00
9,652.50
5,362.50
22,000.00
16,200.00
5.0000 bj
1.2500 kg
0.0020 m3
L.15
HARGA BAHAN/
UPAH
7
1.0000
0.0130
0.0260
11.0000
2.0000
m2
m3
m3
bh
kg
0.1500
0.0150
0.5000
0.0250
OH
OH
OH
OH
tukang batu
tukang kepala
pekerja
mandor
1.0000
0.0130
0.0260
11.0000
2.0000
m2
m3
m3
bh
kg
L.17
1.0000
0.0130
0.0260
11.0000
2.0000
m2
m3
m3
bh
kg
Upah tenaga
L.18
1.0000 m2
0.0050 m3
1.0000 m2
210,000.00
37,800.00
1,050.00
37,800.00
NO
SNI
KODE
KOEF
SAT.
URAIAN PEKERJAAN
L.19
1.0000 m2
0.0050 m3
1.0000 m2
HARGA BAHAN/
UPAH
7
JUMLAH
8=4x7
210,000.00
39,500.00
1,050.00
39,500.00
495,000.00
137,500.00
1,300.00
8,100.00
9,652.50
5,362.50
32,500.00
16,200.00
495,000.00
137,500.00
1,300.00
8,100.00
9,652.50
5,362.50
32,500.00
16,200.00
1,050.00
63,500.00
Upah tenaga
L.20
1.0000
0.0130
0.0260
25.0000
2.0000
m2
m3
m3
bh
kg
L.21
1.0000
0.0130
0.0260
25.0000
2.0000
m2
m3
m3
bh
kg
L.22
1.0000 m2
0.0050 m3
1.0000 m2
Upah tenaga
L.23
1.0000 m2
0.0050 m3
1.0000 m2
1,050.00
93,000.00
Upah tenaga
L.24
1.0000 m2
0.0050 m3
1.0000 m2
210,000.00
50,300.00
1,050.00
50,300.00
210,000.00
57,300.00
1,050.00
57,300.00
1,638.00
137,500.00
951,022.80
130,625.00
37,800.00
1,081,647.80
8,100.00
37,800.00
10,816.48
8,100.00
47,500.00
55,000.00
40,000.00
50,000.00
21,375.00
2,475.00
24,000.00
1,500.00
Upah tenaga
L.25
1.0000 m2
0.0050 m3
1.0000 m2
L.26
L.27
L.28
L.29
XIV
03-
-2002
1.0000 m3
580.6000 kg
0.9500 m3
perekat portland 1 : 2
semen / PC
pasir
1.0000
1.0000
0.0100
1.0000
m2
m2
m3
kg
0.4500
0.0450
0.6000
0.0300
OH
OH
OH
OH
tukang batu
tukang kepala
pekerja
mandor
1.0000
1.0000
0.1310
0.5000
0.0200
m'
m'
m3
m2
m3
25,000.00
846,653.00
40,914.50
101,720.00
7,500.00
25,000.00
110,911.54
20,457.25
2,034.40
7,500.00
1.0000
1.0000
0.1310
0.5000
0.0200
m'
m'
m3
m2
m3
32,500.00
846,653.00
40,914.50
101,720.00
7,500.00
32,500.00
110,911.54
20,457.25
2,034.40
7,500.00
PEKERJAAN PENGECATAN
NO
SNI
KODE
KOEF
SAT.
URAIAN PEKERJAAN
C.1
C.1.b
C.2
C.2.b
C.3
C.4
C.5
C.5.b
HARGA BAHAN/
UPAH
7
JUMLAH
8=4x7
1.0000
0.2600
0.1740
0.0600
0.0750
0.2000
m2
kg
ltr
kg
kg
lbr
mengecat kayu 3 x
cat
afduner
plamur
meni
amplas
44,100.00
9,300.00
12,500.00
23,940.00
3,360.00
11,466.00
1,618.20
750.00
1,795.50
672.00
0.0750
0.0075
0.0500
0.0025
OH
OH
OH
OH
tukang cat
tukang kepala
pekerja
mandor
50,000.00
55,000.00
45,000.00
50,000.00
3,750.00
412.50
2,250.00
125.00
1.0000
0.1730
0.1160
0.0400
0.2000
m2
kg
ltr
kg
lbr
mengecat kayu 2 x
cat
afduner
plamur
amplas
44,100.00
9,300.00
12,500.00
3,360.00
7,629.30
1,078.80
500.00
672.00
0.0500
0.0050
0.0330
0.0016
OH
OH
OH
OH
tukang cat
tukang kepala
pekerja
mandor
50,000.00
55,000.00
45,000.00
50,000.00
2,500.00
275.00
1,485.00
80.00
1.0000
0.2600
0.2500
0.1740
m2
kg
m2
ltr
mengecat trotoir 3 x
cat Beebrand dan sejenisnya
amplas
afduner
45,400.00
3,360.00
9,300.00
11,804.00
840.00
1,618.20
0.0750
0.0075
0.0500
0.0025
OH
OH
OH
OH
tukang cat
tukang kepala
pekerja
mandor
50,000.00
55,000.00
45,000.00
50,000.00
3,750.00
412.50
2,250.00
125.00
1.0000 m2
0.1300 kg
0.0870 ltr
45,400.00
9,300.00
5,902.00
809.10
0.0375
0.0038
0.0250
0.0013
OH
OH
OH
OH
tukang cat
tukang kepala
pekerja
mandor
50,000.00
55,000.00
45,000.00
50,000.00
1,875.00
206.25
1,125.00
62.50
1.0000
0.2600
0.1740
0.0750
0.2000
m2
kg
ltr
kg
lbr
mengecat besi 3 x
cat
afduner
meni
amplas
45,400.00
9,300.00
23,940.00
3,360.00
11,804.00
1,618.20
1,795.50
672.00
0.0750
0.0075
0.0500
0.0025
OH
OH
OH
OH
tukang cat
tukang kepala
pekerja
mandor
50,000.00
55,000.00
45,000.00
50,000.00
3,750.00
412.50
2,250.00
125.00
1.0000
0.2000
0.2250
0.2500
0.0750
0.0075
0.0500
0.0025
m2
kg
kg
lbr
OH
OH
OH
OH
10,600.00
2,812.50
840.00
3,750.00
412.50
2,250.00
122.50
1.0000
0.3500
0.2250
0.2500
0.0750
0.0075
0.0500
0.0025
m2
kg
kg
lbr
OH
OH
OH
OH
27,370.00
2,812.50
840.00
3,750.00
412.50
2,250.00
125.00
1.0000 m2
NO
SNI
KODE
KOEF
SAT.
URAIAN PEKERJAAN
HARGA BAHAN/
UPAH
7
JUMLAH
8=4x7
1/2 x C.5
C.6
1.0000
0.3000
0.2250
0.2500
0.0750
0.0075
0.0500
0.0025
m2
kg
kg
lbr
OH
OH
OH
OH
19,500.00
12,500.00
3,360.00
50,000.00
55,000.00
45,000.00
50,000.00
5,850.00
2,812.50
840.00
3,750.00
412.50
2,250.00
125.00
C.7
1.0000 m2
C.8
1.0000
0.2000
0.0750
0.0075
0.0500
0.0025
m2
kg
OH
OH
OH
OH
19,500.00
50,000.00
55,000.00
45,000.00
50,000.00
3,900.00
3,750.00
412.50
2,250.00
125.00
1.0000
0.4000
0.2000
0.0100
m2
kg
OH
OH
mengetir 2 kali
tir arang
pekerja
mandor
12,700.00
45,000.00
50,000.00
5,080.00
9,000.00
500.00
C.9
58,441.50
9,750.00
68,191.50
6,500.00
283,330.00
268,330.00
2,125.00
3,625.00
500,000.00
11,250.00
41,650.00
16,550.00
18,665.00
35,215.00
27,500.00
36,600.00
55,000.00
JUMLAH TOTAL
9
55,500.00
44,250.00
2,000.00
12,050.00
41,363.64
39,550.00
51,087.00
58,647.00
11,000.00
9,166.67
101,720.00
86,850.00
176,000.00
5,750.00
1,205.00
4,136.36
JUMLAH TOTAL
9
6,955.00
760.00
16,644.85
17,404.85
5,625.00
13,404.13
19,029.13
450.00
79,100.00
79,550.00
2,700.00
9,350.00
12,050.00
162,259.20
54,795.00
217,054.20
551,916.67
358,958.00
103,500.00
462,458.00
527,163.50
JUMLAH TOTAL
9
95,550.00
622,713.50
506,214.00
95,550.00
601,764.00
468,369.00
95,550.00
563,919.00
427,168.00
95,550.00
522,718.00
575,903.00
270,750.00
846,653.00
15,436.50
115,250.00
28,812.50
138,776.40
36,100.00
174,876.40
JUMLAH TOTAL
9
125,342.29
36,100.00
161,442.29
77,515.10
18,050.00
95,565.10
70,288.06
18,050.00
88,338.06
58,772.00
18,050.00
76,822.00
140,776.40
36,100.00
176,876.40
127,686.04
36,100.00
163,786.04
78,515.10
18,050.00
96,565.10
JUMLAH TOTAL
9
71,288.06
18,050.00
89,338.06
59,772.00
18,050.00
77,822.00
121,082.00
18,050.00
139,132.00
13,314.50
27,600.00
40,914.50
15,620.67
20,700.00
36,320.67
12,034.92
16,450.00
28,484.92
17,708.40
JUMLAH TOTAL
9
16,450.00
34,158.40
7,901.16
15,950.00
23,851.16
1,037,500.00
6,189,930.00
7,227,430.00
11,585,550.00
1,365,000.00
12,950,550.00
17,187,300.00
1,365,000.00
18,552,300.00
12,131,550.00
1,265,000.00
13,396,550.00
9,750.00
459,425.00
469,175.00
9,750.00
JUMLAH TOTAL
9
459,425.00
469,175.00
69,930.00
9,800.00
79,730.00
117,930.00
9,800.00
127,730.00
31,305.00
9,800.00
41,105.00
123,390.00
9,800.00
133,190.00
10,980,620.00
836,000.00
11,816,620.00
17,544,870.00
836,000.00
18,380,870.00
6,580,620.00
836,000.00
7,416,620.00
JUMLAH TOTAL
9
4,573,120.00
836,000.00
5,409,120.00
6,348,780.00
1,254,000.00
7,602,780.00
11,537,900.00
1,254,000.00
12,791,900.00
607,230.00
132,250.00
739,480.00
579,930.00
132,250.00
712,180.00
937,980.00
132,250.00
1,070,230.00
339,930.00
132,250.00
472,180.00
256,980.00
JUMLAH TOTAL
9
522,500.00
779,480.00
522,500.00
179,017.50
701,517.50
kin daun pintu rangka kayu bengkirai tb 3,5 cm panil multiplek tb 9mm
173,435.00
522,500.00
695,935.00
367,561.00
136,500.00
367,561.00
kin daun pintu double teakwood rangka kayu bengkirai tb 3 cm dilapisi seng aluminium
136,500.00
446,701.00
583,201.00
410,850.00
181,250.00
592,100.00
631,350.00
181,250.00
812,600.00
246,510.00
144,000.00
390,510.00
378,810.00
JUMLAH TOTAL
9
145,000.00
523,810.00
174,757.50
117,300.00
174,757.50
138,780.00
5,227.50
144,007.50
66,400.00
5,227.50
71,627.50
170,019.00
15,625.00
185,644.00
172,327.50
15,350.00
187,677.50
105,570.00
12,025.00
117,595.00
106,685.00
15,350.00
122,035.00
28,935.00
JUMLAH TOTAL
9
12,050.00
40,985.00
682,951.00
84,752.50
767,703.50
823,076.33
83,250.00
906,326.33
888,226.33
83,250.00
971,476.33
940,003.00
83,525.00
1,023,528.00
950,206.78
83,250.00
1,033,456.78
10,752.00
667.50
JUMLAH TOTAL
9
11,419.50
49,242.00
10,880.00
60,122.00
53,917.50
16,480.00
70,397.50
118,092.50
46,200.00
164,292.50
46,127.50
18,665.00
64,792.50
27,963.00
36,000.00
63,963.00
JUMLAH TOTAL
9
10,550.00
52,500.00
63,050.00
9,700.00
61,200.00
70,900.00
10,550.00
67,200.00
77,750.00
10,550.00
52,500.00
63,050.00
10,550.00
19,500.00
30,050.00
10,550.00
23,750.00
34,300.00
26,700.00
75,954.00
102,654.00
26,700.00
70,921.80
97,621.80
26,700.00
34,171.80
60,871.80
68,686.00
13,900.00
82,586.00
57,600.40
28,000.00
85,600.40
JUMLAH TOTAL
9
121,675.00
44,715.50
46,765.00
10,150.00
56,915.00
47,760.00
9,800.00
57,560.00
36,580.00
9,800.00
46,380.00
32,180.00
39,800.00
71,980.00
58,830.00
8,400.00
67,230.00
12,648.00
10,200.00
22,848.00
JUMLAH TOTAL
9
112,275.00
23,262.00
5,125.00
28,387.00
27,950.00
54,895.00
82,845.00
27,950.00
58,155.00
86,105.00
27,950.00
60,915.00
88,865.00
7,000.00
34,869.60
41,869.60
500,850.00
192,305.00
693,155.00
1,457,500.00
192,305.00
JUMLAH TOTAL
9
1,649,805.00
145,203.00
201,750.00
346,953.00
465,943.00
98,000.00
563,943.00
440,203.00
98,000.00
538,203.00
305,500.00
98,000.00
403,500.00
10,000.00
5,950.00
15,950.00
13,800.00
5,700.00
19,500.00
441,000.00
41,800.00
482,800.00
346,500.00
JUMLAH TOTAL
9
111,300.00
457,800.00
378,000.00
111,300.00
489,300.00
115,390.00
4,082.50
119,472.50
461,560.00
8,700.00
470,260.00
56,859.00
19,050.00
75,909.00
127,118.00
29,750.00
156,868.00
127,118.00
29,312.50
156,430.50
31,551.00
JUMLAH TOTAL
9
21,472.00
22,150.00
43,622.00
110,000.00
26,150.00
136,150.00
57,750.00
25,575.00
83,325.00
19,300.00
8,887.50
28,187.50
15,000.00
6,150.00
21,150.00
14,700.00
12,300.00
27,000.00
6,000.00
8,887.50
14,887.50
220,000.00
29,625.00
249,625.00
8,400.00
JUMLAH TOTAL
9
11,850.00
20,250.00
275,000.00
35,550.00
310,550.00
71,500.00
8,887.50
80,387.50
82,500.00
8,887.50
91,387.50
52,372.70
18,390.00
70,762.70
230,343.90
16,985.00
247,328.90
76,527.90
17,250.00
93,777.90
91,776.90
JUMLAH TOTAL
9
16,985.00
108,761.90
97,383.90
16,985.00
114,368.90
86,694.70
16,985.00
103,679.70
79,230.00
17,940.00
97,170.00
71,870.60
17,940.00
89,810.60
80,092.50
17,940.00
98,032.50
85,033.40
62,100.00
147,133.40
JUMLAH TOTAL
9
83,772.40
62,100.00
145,872.40
131,667.10
262,500.00
394,167.10
25,730.00
34,606.80
60,336.80
23,350.00
11,822.50
35,172.50
30,391.00
29,200.00
59,591.00
53,215.00
29,200.00
82,415.00
53,215.00
29,200.00
82,415.00
38,850.00
29,200.00
68,050.00
JUMLAH TOTAL
9
40,550.00
29,200.00
69,750.00
63,715.00
29,200.00
92,915.00
63,715.00
29,200.00
92,915.00
64,550.00
29,200.00
93,750.00
94,050.00
29,200.00
123,250.00
51,350.00
29,200.00
80,550.00
58,350.00
29,200.00
87,550.00
1,081,647.80
56,716.48
49,350.00
106,066.48
165,903.19
173,403.19
JUMLAH TOTAL
9
16,301.70
6,537.50
22,839.20
9,880.10
4,340.00
14,220.10
14,262.20
6,537.50
20,799.70
6,711.10
3,268.75
9,979.85
15,889.70
6,537.50
22,427.20
20,787.50
37,560.00
JUMLAH TOTAL
9
18,780.00
16,040.00
8,020.00
10,437.50
14,580.00
Jenis pekerjaan
NO
URAIAN
UPAH
Site manager
Operator pemboran
Crew pengeboran
Pengemudi
II.
PERALATAN
1 Sewa kendaraan
angkut ( truk )
SATUAN
KUANTITAS
HARGA SAT.
JUML. HARGA
1
2
3
4
Hari
Hari
Hari
Hari
1.00
1.00
4.00
2.00
x
x
x
x
1.00
1.00
1.00
2.00
60,000.00
35,000.00
30,000.00
30,000.00
60,000.00
35,000.00
120,000.00
120,000.00
Hari
2.00
2.00
250,000.00
1,000,000.00
JUMLAH
1,335,000.00
An.2
Jenis pekerjaan
NO
URAIAN
I
1
2
3
4
5
6
7
8
II.
1
2
3
4
III.
UPAH
Site manager
Geologist
Keuangan
Logistik
Operator pemboran
Mekanik
Crew pengeboran
Buruh lokal
PERALATAN
Solar
Olie mesin
Veet
Bentonite
PERALATAN
Peralatan pemboran
KUANTITAS
HARGA SAT.
Hari
Hari
Hari
Hari
Hari
Hari
Hari
Hari
1.00
1.00
1.00
1.00
1.00
1.00
2.00
2.00
x
x
x
x
x
x
x
x
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
60,000.00
55,000.00
40,000.00
40,000.00
35,000.00
35,000.00
30,000.00
30,000.00
60,000.00
55,000.00
40,000.00
40,000.00
35,000.00
35,000.00
60,000.00
60,000.00
Ltr
Ltr
Kg
Kg
70.00
5.00
2.00
40.00
x
x
x
x
1.00
1.00
1.00
1.00
5,500.00
33,600.00
36,700.00
12,600.00
385,000.00
168,000.00
73,400.00
504,000.00
Unit
1.00
1.00
400,000.00
400,000.00
JUMLAH
1 HARI RATA-RATA 10 M' ----> JADI PER METER
An.3
Jenis pekerjaan
NO
URAIAN
I
1
2
3
4
5
6
7
8
II.
1
2
3
4
III.
UPAH
Site manager
Geologist
Keuangan
Logistik
Operator pemboran
Mekanik
Crew pengeboran
Buruh lokal
PERALATAN
Solar
Olie mesin
Veet
Bentonite
PERALATAN
JUML. HARGA
1,915,400.00
191,540.00
KUANTITAS
HARGA SAT.
JUML. HARGA
Hari
Hari
Hari
Hari
Hari
Hari
Hari
Hari
1.00
1.00
1.00
1.00
1.00
1.00
2.00
2.00
x
x
x
x
x
x
x
x
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
60,000.00
55,000.00
40,000.00
40,000.00
35,000.00
35,000.00
30,000.00
30,000.00
60,000.00
55,000.00
40,000.00
40,000.00
35,000.00
35,000.00
60,000.00
60,000.00
Ltr
Ltr
Kg
Kg
75.00
5.00
2.00
50.00
x
x
x
x
1.00
1.00
1.00
1.00
5,500.00
33,600.00
36,700.00
12,600.00
412,500.00
168,000.00
73,400.00
630,000.00
Peralatan pemboran
Unit
JUMLAH
1 HARI RATA-RATA 10 M' ----> JADI PER METER
1.00
1.00
375,000.00
375,000.00
2,043,900.00
204,390.00
An.4
Jenis pekerjaan
NO
URAIAN
I
1
2
3
4
5
6
7
8
II.
1
2
3
4
III.
UPAH
Site manager
Geologist
Keuangan
Logistik
Operator pemboran
Mekanik
Crew pengeboran
Buruh lokal
PERALATAN
Solar
Olie mesin
Veet
Bentonite
PERALATAN
Peralatan pemboran
KUANTITAS
HARGA SAT.
Hari
Hari
Hari
Hari
Hari
Hari
Hari
Hari
1.00
1.00
1.00
1.00
1.00
1.00
2.00
2.00
x
x
x
x
x
x
x
x
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
60,000.00
55,000.00
40,000.00
40,000.00
35,000.00
35,000.00
30,000.00
30,000.00
60,000.00
55,000.00
40,000.00
40,000.00
35,000.00
35,000.00
60,000.00
60,000.00
Ltr
Ltr
Kg
Kg
85.00
6.00
3.00
60.00
x
x
x
x
1.00
1.00
1.00
1.00
5,500.00
33,600.00
36,700.00
12,600.00
467,500.00
201,600.00
110,100.00
756,000.00
Unit
1.00
1.00
375,000.00
375,000.00
JUMLAH
1 HARI RATA-RATA 10 M' ----> JADI PER METER
An.5
Jenis pekerjaan
NO
URAIAN
I
1
2
3
4
5
6
7
8
II.
1
2
3
4
III.
UPAH
Site manager
Geologist
Keuangan
Logistik
Operator pemboran
Mekanik
Crew pengeboran
Buruh lokal
PERALATAN
Solar
Olie mesin
Veet
Bentonite
PERALATAN
Peralatan pemboran
2,295,200.00
229,520.00
: Pekerjaan reaming, 0 -- 65 m
SATUAN
KUANTITAS
HARGA SAT.
Jenis pekerjaan
NO
URAIAN
I
1
2
3
4
5
6
7
8
UPAH
Site manager
Geologist
Keuangan
Logistik
Operator pemboran
Mekanik
Crew pengeboran
Buruh lokal
JUML. HARGA
Hari
Hari
Hari
Hari
Hari
Hari
Hari
Hari
1.00
1.00
1.00
1.00
1.00
1.00
2.00
2.00
x
x
x
x
x
x
x
x
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
60,000.00
55,000.00
40,000.00
40,000.00
35,000.00
35,000.00
30,000.00
30,000.00
60,000.00
55,000.00
40,000.00
40,000.00
35,000.00
35,000.00
60,000.00
60,000.00
Ltr
Ltr
Kg
Kg
60.00
4.00
2.00
40.00
x
x
x
x
1.00
1.00
1.00
1.00
5,500.00
33,600.00
36,700.00
12,600.00
330,000.00
134,400.00
73,400.00
504,000.00
Unit
1.00
1.00
375,000.00
375,000.00
JUMLAH
1 HARI RATA-RATA 10 M' ----> JADI PER METER
An.6
JUML. HARGA
1,801,800.00
180,180.00
Hari
Hari
Hari
Hari
Hari
Hari
Hari
Hari
KUANTITAS
1.00
1.00
1.00
1.00
1.00
1.00
2.00
2.00
x
x
x
x
x
x
x
x
HARGA SAT.
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
60,000.00
55,000.00
40,000.00
40,000.00
35,000.00
35,000.00
30,000.00
30,000.00
JUML. HARGA
60,000.00
55,000.00
40,000.00
40,000.00
35,000.00
35,000.00
60,000.00
60,000.00
II.
1
2
3
4
III.
PERALATAN
Solar
Olie mesin
Veet
Bentonite
PERALATAN
Peralatan pemboran
Ltr
Ltr
Kg
Kg
75.00
6.00
3.00
55.00
x
x
x
x
1.00
1.00
1.00
1.00
5,500.00
33,600.00
36,700.00
12,600.00
412,500.00
201,600.00
110,100.00
693,000.00
Unit
1.00
1.00
375,000.00
375,000.00
JUMLAH
1 HARI RATA-RATA 10 M' ----> JADI PER METER
2,177,200.00
217,720.00
An.7
Jenis pekerjaan
NO
URAIAN
UPAH
Site manager
Geologist
Operator pemboran
Crew pengeboran
II.
PERALATAN
1 Recorder paper
2 Alat tulis
III.
PERALATAN
Mesin peralatan logging
Tranportasi peralatan logging
: Electric logging
SATUAN
KUANTITAS
HARGA SAT.
JUML. HARGA
1
2
3
4
Hari
Hari
Hari
Hari
1.00
1.00
1.00
2.00
x
x
x
x
1.00
1.00
1.00
1.00
60,000.00
55,000.00
35,000.00
30,000.00
60,000.00
55,000.00
35,000.00
60,000.00
Unit
Unit
1.00
1.00
x
x
1.00
1.00
20,000.00
15,000.00
20,000.00
15,000.00
Unit
Unit
1.00
1.00
x
x
1.00
1.00
700,000.00
150,000.00
700,000.00
150,000.00
JUMLAH
1 HARI RATA-RATA 50 M' ----> JADI PER METER
An.8
Jenis pekerjaan
NO
URAIAN
I
1
2
3
4
5
II.
1
2
3
4
III.
UPAH
Site manager
Operator pemboran
Mekanik
Crew pengeboran
Penjaga malam
PERALATAN
Solar
Olie mesin
Veet
Kawat las
Pipa jambang diameter 8"
PERALATAN
Peralatan pemboran
Sewa mesin las
1,095,000.00
21,900.00
KUANTITAS
HARGA SAT.
JUML. HARGA
Hari
Hari
Hari
Hari
Hari
1.00
1.00
1.00
3.00
2.00
x
x
x
x
x
1.00
1.00
1.00
1.00
1.00
60,000.00
35,000.00
35,000.00
30,000.00
25,000.00
60,000.00
35,000.00
35,000.00
90,000.00
50,000.00
Ltr
Ltr
Kg
Btg
Mtr
120.00
3.00
2.00
120.00
60.00
x
x
x
x
x
1.00
1.00
1.00
1.00
5,500.00
33,600.00
36,700.00
900.00
642,600.00
660,000.00
100,800.00
73,400.00
108,000.00
38,556,000.00
Unit
Unit
1.00
1.00
x
x
1.00
1.00
375,000.00
50,000.00
375,000.00
50,000.00
JUMLAH
1 HARI RATA-RATA 60 M' ----> JADI PER METER
DIBULATKAN
An.9
Jenis pekerjaan
NO
URAIAN
I
1
2
3
4
5
II.
1
2
3
4
5
III.
UPAH
Site manager
Operator pemboran
Mekanik
Crew pengeboran
Penjaga malam
PERALATAN
Solar
Olie mesin
Veet
Kawat las
Pipa buta diameter 6"
PERALATAN
Peralatan pemboran
Sewa mesin las
40,193,200.00
669,886.67
669,000.00
KUANTITAS
Hari
Hari
Hari
Hari
Hari
1.00
1.00
1.00
3.00
2.00
x
x
x
x
x
Ltr
Ltr
Kg
Btg
Mtr
40.00
1.00
0.60
60.00
30.00
x
x
x
x
x
Unit
Unit
1.00
1.00
x
x
HARGA SAT.
1.00
1.00
1.00
1.00
1.00
1.00
1.00
JUML. HARGA
60,000.00
35,000.00
35,000.00
30,000.00
25,000.00
60,000.00
35,000.00
35,000.00
90,000.00
50,000.00
5,500.00
33,600.00
36,700.00
900.00
344,400.00
220,000.00
33,600.00
22,020.00
54,000.00
10,332,000.00
375,000.00
50,000.00
375,000.00
50,000.00
JUMLAH
1 HARI RATA-RATA 30 M' ----> JADI PER METER
DIBULATKAN
11,356,620.00
378,554.00
378,000.00
An.10
Jenis pekerjaan
NO
URAIAN
I
1
2
3
4
5
II.
1
2
3
4
5
III.
UPAH
Site manager
Operator pemboran
Mekanik
Crew pengeboran
Penjaga malam
PERALATAN
Solar
Olie mesin
Veet
Kawat las
Screen stainless steel dia 6 :
PERALATAN
Peralatan pemboran
Sewa mesin las
KUANTITAS
Hari
Hari
Hari
Hari
Hari
1.00
1.00
1.00
3.00
2.00
x
x
x
x
x
Ltr
Ltr
Kg
Btg
Mtr
40.00
1.00
0.60
60.00
30.00
x
x
x
x
x
Unit
Unit
1.00
1.00
x
x
HARGA SAT.
1.00
1.00
1.00
1.00
1.00
1.00
1.00
60,000.00
35,000.00
35,000.00
30,000.00
25,000.00
60,000.00
35,000.00
35,000.00
90,000.00
50,000.00
5,500.00
33,600.00
36,700.00
900.00
1,911,000.00
220,000.00
33,600.00
22,020.00
54,000.00
57,330,000.00
375,000.00
50,000.00
375,000.00
50,000.00
JUMLAH
1 HARI RATA-RATA 30 M' ----> JADI PER METER
DIBULATKAN
An.8'
Jenis pekerjaan
NO
URAIAN
I
1
2
3
4
5
II.
1
2
3
4
5
III.
UPAH
Site manager
Operator pemboran
Mekanik
Crew pengeboran
Penjaga malam
PERALATAN
Solar
Olie mesin
Veet
Kawat las
Pipa jambang diameter 6"
PERALATAN
Peralatan pemboran
Sewa mesin las
58,354,620.00
1,945,154.00
1,945,000.00
KUANTITAS
HARGA SAT.
Jenis pekerjaan
NO
URAIAN
UPAH
Site manager
Operator pemboran
Mekanik
Crew pengeboran
Penjaga malam
II.
PERALATAN
1 Solar
2 Olie mesin
3 Veet
JUML. HARGA
Hari
Hari
Hari
Hari
Hari
1.00
1.00
1.00
3.00
2.00
x
x
x
x
x
1.00
1.00
1.00
1.00
1.00
60,000.00
35,000.00
35,000.00
30,000.00
25,000.00
60,000.00
35,000.00
35,000.00
90,000.00
50,000.00
Ltr
Ltr
Kg
Btg
Mtr
120.00
3.00
2.00
120.00
60.00
x
x
x
x
x
1.00
1.00
1.00
1.00
5,500.00
33,600.00
36,700.00
900.00
359,100.00
660,000.00
100,800.00
73,400.00
108,000.00
21,546,000.00
Unit
Unit
1.00
1.00
x
x
1.00
1.00
375,000.00
50,000.00
375,000.00
50,000.00
JUMLAH
1 HARI RATA-RATA 60 M' ----> JADI PER METER
DIBULATKAN
An.9'
JUML. HARGA
23,183,200.00
386,386.67
386,000.00
KUANTITAS
HARGA SAT.
JUML. HARGA
1
2
3
4
5
Hari
Hari
Hari
Hari
Hari
1.00
1.00
1.00
3.00
2.00
x
x
x
x
x
Ltr
Ltr
Kg
40.00
1.00
0.60
x
x
x
1.00
1.00
1.00
1.00
1.00
60,000.00
35,000.00
35,000.00
30,000.00
25,000.00
60,000.00
35,000.00
35,000.00
90,000.00
50,000.00
5,500.00
33,600.00
36,700.00
220,000.00
33,600.00
22,020.00
4 Kawat las
5 Pipa buta diameter 4"
III.
PERALATAN
Peralatan pemboran
Sewa mesin las
Btg
Mtr
60.00
30.00
x
x
Unit
Unit
1.00
1.00
x
x
JUMLAH
1 HARI RATA-RATA 30 M' ----> JADI PER METER
DIBULATKAN
1.00
1.00
900.00
315,000.00
54,000.00
9,450,000.00
375,000.00
50,000.00
375,000.00
50,000.00
10,474,620.00
349,154.00
349,000.00
An.10'
Jenis pekerjaan
NO
URAIAN
I
1
2
3
4
5
II.
1
2
3
4
5
III.
UPAH
Site manager
Operator pemboran
Mekanik
Crew pengeboran
Penjaga malam
PERALATAN
Solar
Olie mesin
Veet
Kawat las
Screen stainless steel dia 4" :
PERALATAN
Peralatan pemboran
Sewa mesin las
KUANTITAS
Hari
Hari
Hari
Hari
Hari
1.00
1.00
1.00
3.00
2.00
x
x
x
x
x
Ltr
Ltr
Kg
Btg
Mtr
40.00
1.00
0.60
60.00
30.00
x
x
x
x
x
Unit
Unit
1.00
1.00
x
x
JUMLAH
1 HARI RATA-RATA 30 M' ----> JADI PER METER
DIBULATKAN
HARGA SAT.
1.00
1.00
1.00
1.00
1.00
1.00
1.00
JUML. HARGA
60,000.00
35,000.00
35,000.00
30,000.00
25,000.00
60,000.00
35,000.00
35,000.00
90,000.00
50,000.00
5,500.00
33,600.00
36,700.00
900.00
1,312,500.00
220,000.00
33,600.00
22,020.00
54,000.00
39,375,000.00
375,000.00
50,000.00
375,000.00
50,000.00
40,399,620.00
1,346,654.00
1,346,000.00
NO
I
1
2
3
4
5
6
7
8
9
II
1
2
1
4
5
6
7
8
9
2
11
12
3
14
15
16
17
18
19
20
21
22
III
1
2
3
2
5
6
7
8
9
10
IV
1
2
3
1
5
6
7
8
9
10
11
V
1
2
3
4
5
VI
1
2
3
5
SATUAN
1 m'
1 m2
1 m3
KODE
ANALISA
HARGA SATUAN
PEKERJAAN
1m
1 m2
1 m3
1 m2
1 m2
1 m2
PS. 1
PS. 2
PS. 3
PS. 5 Rp.
PS. 6 Rp.
PS. 7 Rp.
PS. 8 Rp.
PS. 9
PS. 10
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
68,191.50
6,500.00
283,330.00
2,125.00
3,625.00
500,000.00
11,250.00
41,650.00
35,215.00
1 m3
1 m3
1 m3
1 m3
1 m3
1 m3
1 m3
1 m3
1 m3
1 m3
1 m3
1 m3
1 m3
1 m3
1 m3
1 m3
1 m2
1 m2
1 m3
1 ttk
1 m3
1 m2
T.1
T.2
T.3
T.4
T.5
T.6
T.7
T.8
T.9
T.10
T.11
T.12
T.13
T.14
T.15
T.16
T.20
T.21
T.22
T.23
T.24
T.25
Rp.
Rp.
Rp.
Rp.
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
27,500.00
36,600.00
55,000.00
55,500.00
44,250.00
2,000.00
12,050.00
41,363.64
39,550.00
51,087.00
58,647.00
11,000.00
9,166.67
101,720.00
86,850.00
176,000.00
6,955.00
9,886.36
17,404.85
19,029.13
79,550.00
12,050.00
1 m3
Pd.1
Rp. Rp
217,054.20
1 m3
1 m3
1 m3
1 m3
1 m3
1 m3
1 m3
1 m'
3
1m
Pd.2
Pd.3
Pd.4
Pd.5
Pd.5.b
Pd.6
Pd.7
Pd.8
Pd.9
Rp.
Rp.
Rp.
Rp.
Rp.
Rp
Rp
Rp
Rp
Rp
Rp
Rp. Rp
Rp
Rp
551,916.67
462,458.00
622,713.50
601,764.00
563,919.00
522,718.00
846,653.00
15,436.50
28,812.50
1 m2
1 m2
1 m2
1 m2
1 m2
1 m2
1 m2
1 m2
1 m2
1 m2
1 m2
D.1
D.2
D.3
D.4
D.5
D.6
D.7
D.8
D.9
D.10
D.11
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
174,876.40
161,442.29
95,565.10
88,338.06
76,822.00
176,876.40
163,786.04
96,565.10
89,338.06
77,822.00
139,132.00
1 m2
1 m2
1 m2
1 m2
1 m2
PL.1
PL.2
PL.3
PL.4
PL.5
Rp. Rp
Rp. Rp
Rp. Rp
Rp
Rp
40,914.50
36,320.67
28,484.92
34,158.40
23,851.16
1 m3
1 m3
KY.1
KY.2
KY.3
KY.4
Rp. Rp 7,227,430.00
Rp 12,950,550.00
Rp 18,552,300.00
Rp 13,396,550.00
1 m3
1 m3
Rp.
Rp.
Rp.
Rp.
Rp.
KETERANGAN
NO
7
8
9
10
10
11
12
13
14
15
15
17
18
19
20
21
22
23
25
26
27
28
29
30
31
32
33
34
35
36
37
VII
1
2
1
4
5
2
7
8
9
10
3
VIII
1
2
3
4
5
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
IX
1
2
3
4
URAIAN PEKERJAAN
SATUAN
KODE
ANALISA
HARGA SATUAN
PEKERJAAN
1 m2
1 m2
1 m2
2
1m
2
1m
2
1m
3
1m
3
1m
1 m3
1 m3
1 m3
1 m2
1 m2
1 m2
1 m2
1 m2
1 m2
1 m2
1 m2
1 m2
1 m2
1 m2
1 m2
1 m2
1 m2
1 m2
1m'
1m'
1m'
1m'
1m'
KY.5
KY.6
KY.7
KY.8
KY.9
KY.10
KY.11
KY.12
KY.13
KY.14
KY.15
KY.16
KY.17
KY.18
KY.19
KY.20
KY.21
KY.22
KY.23
KY.24
KY.25
KY.26
KY.27
KY.28
KY.29
KY.30
KY.31
KY.32
KY.33
KY.34
KY.35
1 m3
1 m3
1 m3
3
1m
3
1m
1 kg
1 m'
1 m'
1 m2
1 m2
1 m2
B.1
B.2
B.3
B.4
B.5
B.6
B.7
B.8
B.9
B.10
B.11
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
767,703.50
906,326.33
971,476.33
1,023,528.00
1,033,456.78
11,419.50
60,122.00
70,397.50
164,292.50
64,792.50
63,963.00
1 m2
1 m2
1 m2
1 m2
2
1m
2
1m
1m'
1 m'
1 m'
1 m2
1m'
1 m'
1 m'
1 m2
1 m2
1 m2
1 m2
1 m2
1m'
1 m'
PA.1
PA.2
PA.3
PA.4
PA.5
PA.6
PA.7
PA.8
PA.9
PA.10
PA.11
PA.12
PA.13
PA.14
PA.15
PA.16
PA.17
PA.18
PA.19
PA.20
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
63,050.00
70,900.00
77,750.00
63,050.00
30,050.00
34,300.00
102,654.00
97,621.80
60,871.80
82,586.00
85,600.40
121,675.00
44,715.50
56,915.00
57,560.00
46,380.00
71,980.00
67,230.00
22,848.00
112,275.00
1 m2
1 m2
1 m2
1 m2
LL.1
LL.2
LL.3
LL.4
Rp
Rp. Rp
Rp. Rp
Rp. Rp
28,387.00
82,845.00
86,105.00
88,865.00
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp
469,175.00
Rp
469,175.00
Rp
79,730.00
Rp
127,730.00
Rp
41,105.00
Rp
133,190.00
Rp 11,816,620.00
Rp 18,380,870.00
Rp 7,416,620.00
Rp 7,602,780.00
Rp 12,791,900.00
Rp
739,480.00
Rp
712,180.00
Rp 1,070,230.00
Rp
472,180.00
Rp
779,480.00
Rp
701,517.50
Rp
695,935.00
Rp
367,561.00
Rp
583,201.00
Rp
592,100.00
Rp
812,600.00
Rp
390,510.00
Rp
523,810.00
Rp
174,757.50
Rp
144,007.50
Rp
185,644.00
Rp
187,677.50
Rp
117,595.00
Rp
122,035.00
Rp
40,985.00
KETERANGAN
URAIAN PEKERJAAN
NO
SATUAN
KODE
ANALISA
HARGA SATUAN
PEKERJAAN
1 m2
LL.5
Rp
41,869.60
bh
bh
bh
bh
bh
bh
bh
S.1
S.1.b
S.2
S.3
S.4
S.5
S.6
Rp
Rp
Rp
Rp
Rp
Rp
Rp
693,155.00
1,649,805.00
346,953.00
563,943.00
538,203.00
403,500.00
15,950.00
1
2
3
4
5
6
7
8
9
10
11
XII
1
2
3
4
5
6
7
8
9
10
11
XIII
kg
1 m2
1 m2
1 m2
1 m1
1 m2
1 m2
1 m2
1 m2
1 kg
1 m1
BS.1
Rp
BS.2
Rp
BS.3
Rp
BS.4
Rp
BS.5
Rp
BS.6
Rp
BS.7
Rp
BS.8
Rp
BS.9
Rp
BS.10 Rp. Rp
BS.11 Rp. Rp
19,500.00
482,800.00
457,800.00
489,300.00
119,472.50
470,260.00
75,909.00
156,868.00
156,430.50
31,551.00
43,622.00
bh
bh
bh
set
set
bh
bh
bh
bh
1 m2
1 m2
KK.1
KK.2
KK.3
KK.4
KK.5
KK.6
KK.7
KK.8
KK.9
KK.10
KK.11
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
136,150.00
83,325.00
28,187.50
21,150.00
27,000.00
14,887.50
249,625.00
20,250.00
310,550.00
80,387.50
91,387.50
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
1
XIV
1
2
3
4
5
1 m2
1 m2
1 m2
1 m2
1 m2
1 m2
1 m2
1 m2
1 m2
1 m2
2
1m
1 m2
1 m2
1 m2
1 m2
1 m2
1 m2
1 m2
1 m2
1 m2
1 m2
1 m2
1 m2
2
1m
1 m2
1 m3
1 m2
1 m'
1 m'
L.1
L.2
L.3
L.4
L.5
L.6
L.7
L.8
L.9
L.10
L.11
L.12
L.13
L.14
L.15
L.16
L.17
L.18
L.19
L.20
L.21
L.22
L.23
L.24
L.25
L.26
L.27
L.28
L.29
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
70,762.70
247,328.90
93,777.90
108,761.90
114,368.90
103,679.70
97,170.00
89,810.60
98,032.50
147,133.40
145,872.40
394,167.10
60,336.80
35,172.50
59,591.00
82,415.00
82,415.00
68,050.00
69,750.00
92,915.00
92,915.00
93,750.00
123,250.00
80,550.00
87,550.00
1,081,647.80
106,066.48
165,903.19
173,403.19
1 m2
1 m2
1 m2
1 m2
1 m2
C.1
Rp. Rp
C.1.b
Rp
C.2
Rp. Rp
C.2.b
Rp
C.3
Rp. Rp
22,839.20
14,220.10
20,799.70
9,979.85
22,427.20
5
X
1
2
3
4
5
6
7
XI
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
KETERANGAN
NO
6
7
8
1
10
11
12
URAIAN PEKERJAAN
SATUAN
1 m2
1 m2
1 m2
2
1m
2
1m
2
1m
2
1m
KODE
ANALISA
C.4
C.5
C.5.b
C.6
C.7
C.8
C.9
HARGA SATUAN
PEKERJAAN
Rp. Rp
Rp. Rp
Rp
Rp. Rp
Rp. Rp
Rp. Rp
Rp. Rp
20,787.50
37,560.00
18,780.00
16,040.00
8,020.00
10,437.50
14,580.00
KETERANGAN