Installation and Setup Instructions

32xx Systems

Prepare for installation


1

Find in the box:


ACCESSORY TRAY

Network cables

Storage cables

HA cables

Power cables

Serial cable

You need to provide:

Rack space
The FAS32xx system requires 3U or 6U of rack space as well as power and network connectivity

Screwdriver
For securing hardware into your racks

Additional network cables


For connecting your storage to your network switches.

Serial console connection


Connection to D89 serial console port or USB-to-D89 converter to laptop

HELPFUL LINKS ON PAGE 4


2 1 0 - 0 6 1 0 3 +A0

Install hardware
1 2 3 4 5

FRONT VIEW OF SYSTEM


FAS3270

HA interconnect ports (c0a, c0b)


c0a
0a
LNK
LNK

Fiber channel ports (0c, 0d)

ACP port (locked wrench icon)

Remote/Node Management port (wrench icon)

Console port (Setting: 9600 N-8-1)

NVMEM LED
0c
0b
LNK

e0a

Gigabit c0a Ethernet ports (2)

0c

e0a

1 2

PCM Attention LED

c0b

0d

e0b

c0b

0d

e0b

Bezel

Power LED

Controller A and B status LED Attention LED

c0a

0c

e0a

0a
LNK

0b
LNK

3
c0b 0d e0b

5 6

4
3 4
0a
LNK

5 6

0b
LNK

BACK VIEW OF SYSTEM


SAS ports (2)

Slots for NIC and storage cards

Install system
Rack the system.
- Rail kit: follow instructions in rail kit. - System cabinet: install in system cabinet.

CAUTION

LIFTING HAZARD

Place the bezel over the front of the system.

37 kg (82 lbs.)

OPTIONAL 2-POST MID-MOUNT BRACKETS

Cable controller to switches


A 7-Mode, HA
1
Attach cable management arm
Network cables
1 2
c0a 0c e0a

(Choose option A or B below)

B Cluster-Mode
4
c0a 0c e0a

1 2

0a
LNK

0b
LNK

c0b

0d

e0b

Attach cable management arm


Network cables
1

c0a

0c

e0a

1 2

ACT A

ACT B

LNK A

ACT A

ACT B

LNK A

LNK B

LNK B

X1 1 1 7 A

ACT A

ACT A

ACT B

ACT B

LNK A

LNK A

LNK B

0a
LNK

0b
LNK

LNK B

X1 1 1 7 A

c0b

0d

e0b

3 4

5 6

3 4

5 6

Cable c0a to c0a ports and c0b to c0b ports on both controllers.
HA cables

3
1 2
c0b 0d e0b
ACT A ACT B LNK A LNK B
X1 1 1 7 A

2
ACT A ACT B LNK A LNK B
X1 1 1 7 A

0a
LNK

0b
LNK

3 4

5 6

Cable c0a to c0a ports and c0b to c0b ports on both controllers.
HA cables

2
c0a 0c e0a

3
1 2
c0b 0d e0b

4
ACT A ACT B LNK A LNK B
X1 1 1 7 A X1 1 1 7 A

ACT A

ACT B

LNK A

0a
LNK

0b
LNK

3 4

5 6

11

13

15

3 4

SPD LNK /

Cable wrench ports to the switch. Connect e0a ports to the switch.

SPD LNK /

11

13

15

1 2
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16

3 4

Cable wrench ports to the Management switches. Connect e1a and e2a to Cluster switches.
SPD LNK /

1000/100/10M LNK / 1000/100/10M LNK /

10

12

14

16

10

12

14

16

11

13

15

11

13

15

1000/100/10M LNK / 1000/100/10M LNK /

10

12

14

16

10

12

14

16

SPD LNK /

1 2
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16

SPD LNK /

SPD LNK /

See your network administrator for help connecting to your switch.

1 2
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16

Connect power cords


Power cords

1 2

Cable both power supplies for each chassis.


DO NOT power on system at this point.
ALL power cords MUST be used for all units.
Use retaining clips Use retaining clips

HELPFUL LINKS ON PAGE 4

LNK B

X1 1 1 7 A

X1 1 1 7 A

D D

C C

B B

A A

D D

C C

B B

A A

3
A

Cable storage

(Choose option A or B below)

Dual chassis HA with DS424x disk shelves


Storage cables

1 2 3

Daisy chain SAS ports Cable rst SAS ports Cable last SAS ports

c0a

0c

e0a

1 2

c0a

0c

e0a

1 2

ACT/LNKB 10=OFF 100=GRN 1000=ORG

ACT/LNKB 10=OFF 100=GRN 1000=ORG ACT/LNKB 10=OFF 100=GRN 1000=ORG

ACT/LNKA

ACT/LNKA ACT/LNKA

Intel* PRO

Intel* PRO Intel* PRO

X1 0 3 7 A X1 0 3 7 A

X1 0 3 7 A

ACT/LNKB 10=OFF 100=GRN 1000=ORG

ACT/LNKA

Intel* PRO

X1 0 3 7 A

0a
LNK

0b
LNK

0a
LNK

0b
LNK

c0b

0d

e0b

c0b

0d

e0b

3 4

5 6

3 4

5 6

N
LINK LINK

Network cables

IOM3
1 3 2 4

N
LINK LINK

IOM3

1 3

2 4

Disconnect all supply power for complete isolation.

Disconnect all supply power for complete isolation.

N
1 3 2 4

IOM3
1 3 2 4

IOM3

Disconnect all supply power for complete isolation.

Disconnect all supply power for complete isolation.

N
LINK LINK
1 3 2 4

IOM3
1 3 2 4

N
LINK LINK

IOM3

Disconnect all supply power for complete isolation.

Disconnect all supply power for complete isolation.

N
1 3 2 4

IOM3
1 3 2 4

IOM3

Disconnect all supply power for complete isolation.

Disconnect all supply power for complete isolation.

N
LINK LINK
1 3 2 4

IOM3
1 3 2 4

N
LINK LINK

IOM3

Disconnect all supply power for complete isolation.

Disconnect all supply power for complete isolation.

N
1 3 2 4

IOM3
1 3 2 4

IOM3

Disconnect all supply power for complete isolation.

Disconnect all supply power for complete isolation.

Single chassis HA with either DS424x or DS2246 disk shelves


Storage cables
c0a 0c e0a

1 2

c0a

0c

e0a

1 2

1 2 3

Daisy chain SAS ports Cable rst SAS ports Cable last SAS ports
Network cables

0a
LNK

0b
LNK

0a
LNK

0b
LNK

c0b

0d

e0b

c0b

0d

e0b

c0a

0c

e0a

1 2

c0a

0c

e0a

1 2

0a
LNK

0b
LNK

0a
LNK

0b
LNK

c0b

0d

e0b

c0b

0d

e0b

N
LINK LINK
1 3 2 4

IOM3

IOM3

Disconnect all supply power for complete isolation.

N
1 3 2 4

IOM3

Disconnect all supply power for complete isolation.

AC

N
LINK LINK
1 3 2 4

IOM3

Disconnect all supply power for complete isolation.

IOM3

AC

N
1 3 2 4

IOM3

Disconnect all supply power for complete isolation.

N
LINK LINK
1 3 2 4

IOM3

Disconnect all supply power for complete isolation.

N
1 3 2 4

IOM3

Disconnect all supply power for complete isolation.

HELPFUL LINKS ON PAGE 4

For additional congurations, see HELPFUL LINKS.

IOM3

IOM3

IOM3

IOM3

Disconnect all supply power for complete isolation.

Disconnect all supply power for complete isolation.

Disconnect all supply power for complete isolation.

Disconnect all supply power for complete isolation.

Disconnect all supply power for complete isolation.

Disconnect all supply power for complete isolation.

Cable ACP connections


LINK LINK

AC

AC

IOM3

AC

AC

Disconnect all supply power for complete isolation.

Disconnect all supply power for complete isolation.

Disconnect all supply power for complete isolation.

Disconnect all supply power for complete isolation.

Disconnect all supply power for complete isolation.

Disconnect all supply power for complete isolation.

IOM3

IOM3

IOM3

IOM3

IOM3

IOM3

IOM3

Disconnect all supply power for complete isolation.

Cable ACP connections


LINK LINK

IOM3
Disconnect all supply power for complete isolation. Disconnect all supply power for complete isolation. Disconnect all supply power for complete isolation. Disconnect all supply power for complete isolation. Disconnect all supply power for complete isolation. 3 1 3 1 3 1 3 1 3 1 3 1 4 2 4 2 4 2 4 2 4 2 4 2 4 2 4 2 4 2 4 2 4 2

IOM3 IOM3 IOM3


LINK LINK

LINK

LINK LINK

LINK

IOM3 IOM3
LINK LINK

LINK

LINK

IOM3 IOM3 IOM3 IOM3


LINK LINK

IOM3

LINK LINK LINK

LINK LINK LINK

LINK LINK LINK

LINK LINK LINK

IOM3

IOM3

IOM3 IOM3
LINK LINK

IOM3

Complete System Setup


1

Complete conguration worksheet


Complete conguration worksheet from
NetApp System Installation Workbook
System Installation Workbook

Cable serial console


A

c0a

0c

e0a

1 2

0a
LNK

0b
LNK

c0b

0d

e0b

3 4

5 6

Power on your system


DC

AC
LNK LNK

c0a

0c

e0a

1 2

LNK

LNK

IOM6

IOM6

0a
LNK

0b
LNK

c0b

0d

e0b

Power on disk shelves


2
DC AC
x2
2

ALL power supplies MUST be powered on.


2

Complete initial network conguration


Enter the values from the conguration worksheet when prompted by setup script.

Complete Conguration
1

Register at support.netapp.com
Create an account. Register your system. Get your license keys.

Validate storage conguration


Run Conguration Checker from support.netapp.com

Download OnCommand System Manager


Provision storage. Congure protocols and data protection. Set up Service Processor and Remote Support Agent.

HELPFUL LINKS Visit the NetApp web site for more information.
Site Requirements Guide: https://library.netapp.com/ecm/ecm_get_le/ECMP1112530 Controller and conguration examples: https://library.netapp.com/ecm/ecm_get_le/ECMP1124782 NetApp System Installation Workbook: https://eldportal.netapp.com/search/?searchTerm=Installation+Workbook# OnCommand System Manager documentation set: http://support.netapp.com/documentation/productlibrary/index.html?productID=61372 Data ONTAP 8 library: http://support.netapp.com/documentation/productlibrary/index.html?productID=30092 Licenses: http://support.netapp.com/eservice/agree.do?moduleName=PROTOCOL

LEARN MORE
Getting Started and training videos: https://communities.netapp.com/community/netapp_university/getting_started NetApp solutions: http://www.netapp.com/us/solutions/ Technical reports: http://www.netapp.com/us/library/technical-reports.html General information: http://www.netapp.com/us/library/
Site Requirements Guide NetApp System Installation Workbook

IOM6

IOM6

x2
2

DC

AC

2
2

Power on controller
ALL power supplies MUST be powered on.

3 4

5 6

x2

HELPFUL LINKS Visit the NetApp web site for more information.
Conguration Examples for FAS32xx systems Data ONTAP library
Storage Management Guide Logical Storage Management Guide File Access & Protocols Management Guide Data Protection Guide

OnCommand System Manager documentation set

License site for your system

Anda mungkin juga menyukai