METHOD STATEMENT TREE FELLING

Work Method:
The following procedure shall be carried out in sequence:

1. Deployment
Once the lorry is in position, the operator will start to deploy his outrigger and do leveling for his lorry. At the same time, the workers will cordon off the area with safety cones with red/white tape to demark the tree felling area. Signage will display to warn other workers working within the site.

2. Tree Felling process


1. Two Lorries will be parking in the tree felling zone, as one of the vehicles is responsible for doing the tree cutting work and the other vehicle will be responsible for supporting of larger branches when cutting. 2. One of the Lorries will attach a cherry-picker to lift the worker up to the tree to cut the branches. 3. For dried and smaller branches, my worker will cut off and let it fall to the ground and the ground workers will collect those that fell out of the tree felling zone so as not to obstruct the traffic. As for larger branches, my worker will secure the branches with metal chain that is attached on a lorry crane which will support and prevent it from felling straight to the ground. Once the large branches are cut off, it will be hold back by the lorry crane and slowly lift down to the ground. 4. The ground workers will cut all the fallen branches into smaller pieces and stack them together and secured with a safety rope. 5. Once the debris is secured with the safety ropes, the lorry crane will load the stacked debris into the slip tank.

Office: 155-14 Mandai Road Singapore 779392 CO REG: 02917700J Email: tanhuan.treecutting@gmail.com

Tel: 6452 7682

Fax: 6282 4238

METHOD STATEMENT TREE FELLING

6.

Once all the branches are cleared from the tree, the worker will then secure the tree trunk with a metal chain which is attached on a lorry crane to prevent the tree from felling straight to the ground after it has been cut to ground level.

7.

After the tree has been cut to ground level, the tree trunk will then slowly being lift down to the ground by the lorry crane, then the ground workers will cut the tree trunk into smaller pieces and stack them together and secured it with a safety metal chain. The secured tree trucks will be loaded up to the slip tank by the lorry crane.

8. 9.

The process will be repeated till all the trees are fell in the work zone area. Once the tree felling zone area is completed, the worker will clear and tidy up the area before moving to the next work zone.

10. Once the slip tank is full with debris, the lorry driver will transport the debris to the woodchipping warehouse to do further process of the debris. 11. After the debris has been chipped, it will be then transported to Eco Resource Recovery Centre to make further processes.

3. Management of pedestrian movement (If working near to pedestrian foot path)


1. Signage will be display on each end of the pedestrian pathway to warn pedestrian that there is work ahead. 2. 2 workers will be assigned to guide the pedestrians and to direct the pedestrians. One worker will station at each end of the pedestrian pathway.

Office: 155-14 Mandai Road Singapore 779392 CO REG: 02917700J Email: tanhuan.treecutting@gmail.com

Tel: 6452 7682

Fax: 6282 4238

Anda mungkin juga menyukai