Anda di halaman 1dari 5

Project: Provision for 2 AC VALDEL LLC, Muscat, Sultanate of Oman Rooms A/C Oman Methanol Company Discipline: Civil

& Structures and Electrical Statement of Work: Design Engineering of 2 AC Rooms for FM 200 System Design Engineering Services for 2 AC Rooms with the following dimensions: 1. Room 1 - size 5ft x 10ft 2. Room 2 - size 5ft x 23ft Scope of Services include the following: a. Civil & Structural Work b. Electrical Work (Lighting & Split ACs)

CTR No: 001

Inputs: 1.0 Soil Report 2.0 Wind Force 3.0 Building Co-ordinates 4.0 Existing as-built drawings for interfaces for electrical 5.0 Existing Client specifications to be provided at beginning of project.

Deliverables: 1.0 Architectural Drawing 2.0 Structural Drawing including Bar Bending Schedule 3.0 Calculation Report 4.0 Electrical Lighting layout, cable routing drawings

Exclusions: 1.0 Cadding of any existing drawings, Client to provide all required plant drawings in Auto-Cad format 2.0 Authority approvals, design deliverables included in the scope 3.0 Electrical feeder modification works, tie-ins will be within existing spare feeders 4.0 Any services related to mechanical, piping, process, utilities, F&G system engineering and C&A

Resource Lead Engineer Engineer Designer Draftsman Software Cost Travel Cost Total Cost: RO

Location Muscat Muscat Muscat

Man-hours 20 390 560 970

Cost in RO

Amount in RO -

Total

Total

Revision: 0 CTR Originator: Kannappan Contractor Valdel LLC Proposal No 009/2012

Date: Client

4/10/2012

Special Technical Services LLC

Project: Provision for 2 AC VALDEL LLC, Muscat, Sultanate of Oman Rooms A/C Oman Methanol Company Discipline: Civil & Structures Statement of Work: Design Engineering of 2 AC Rooms for FM 200 System Design Engineering Services for 2 AC Rooms with the following dimensions: 1. Room 1 - size 5ft x 10ft 2. Room 2 - size 5ft x 23ft

CTR No: 001

Inputs: 1.0 Soil Report 2.0 Wind Force 3.0 Building Co-ordinates Deliverables: 1.0 Architectural Drawing 2.0 Structural Drawing including Bar Bending Schedule 3.0 Calculation Report Exclusions:

Resource Lead Engineer Engineer Designer Draftsman Software Cost Travel Cost Total Cost:

Location

Man-hours 90 160 0 250

Cost in RO

Amount in RO

Total

Total

Revision: 0 CTR Originator: Kannappan Contractor Valdel LLC Proposal No 009/2012

Date: Client Special Technical Services LLC

4/8/2012

Project: Provision of EPC for Power Supply to Daleel Camp

VALDEL LLC, Muscat, Sultanate of Oman

CTR No:

Discipline: Electrical Statement of Work: Design Engineering of EPC Power Supply to Old and New Camp Design Engineering of EPC Power Supply to Old and New Camp 1, 2 Nos Electrical Switchroom buildings (One for Old camp & One for New Camp) 2. 3 Nos of Indoor switchboards (New Camp + Old Camp & Common Switchboards) 3. Two power transformers of 1.6 mVA, 33/0.433kV 4. Feeder Pillers 2 Nos 5. HV power cables 100mts (33kV) 6. LV power cables 2500 Mtrs 7. Relay Coordination Inputs: Refer the Bid document D-12-083 from STS

Deliverables: Single Line diagram RFQ for LV Switchboards, Feeder Pillers, transformer, DC and UPS system, HV system Cable sizing and Cable routing layouts Electrical room layouts Transformer Yard layouts Lighting calculations & Lighting layouts Earthing Calculations and Earthing and lightning protection layouts Relay setting calculations Demolition drawings Exclusions: Site Surveys

Resource Lead Engineer Engineer Designer Draftsman Software Cost Travel Cost Total Cost: Revision: 0 CTR Originator: CVV Contractor Valdel LLC

Location

Man-hours 300

Cost in RO

Amount in RO

CTR No: 001 380

Total

680

Total

Date: Client Proposal No 009/2012 Special Technical Services LLC

4/8/2012

Project: Provision for 2 AC VALDEL LLC, Muscat, Sultanate of Oman Rooms A/C Oman Methanol Company Discipline: Project management Statement of Work: Design Engineering of 2 AC Rooms for FM 200 System Design Engineering Services for 2 AC Rooms with the following dimensions: 1. Room 1 - size 5ft x 10ft 2. Room 2 - size 5ft x 23ft

CTR No: 001

Inputs: Refer RFQ

Deliverables:

Exclusions: Statutory approvals

Resource Project Manager Engineer / Planning Designer Document controller Software Cost Travel Cost Total Cost: Revision: 0 CTR Originator: CVV Contractor Valdel LLC

Location

Man-hours 20

Cost in RO

Amount in RO

20

Total

40

Total

Date: Client Proposal No 009/2012 Special Technical Services LLC

4/8/2012

39.9783

31.54524