Bonafide certificate
Certified that this is a bonafide record of practical work titled BA9228 Business Application Software done by . (Register Number)....................................in the department laboratory during the academic year .
Staff-In charge
Director-DoMS
INTERNAL EXAMINAR
EXTERNAL EXAMINAR
Contents
S. No Date 1. 2. 3. 4. 5. 6. 7. 8. 9. 10. 11. 12. Experiment Page No. Signature
13.
Preparation of Resume using MS-Word Preparation of Covering Letter Using MS-Word Preparation of Company Advertisement using MS-Power Point Preparation of Mark sheet using MSExcel Preparation of Employee Pay Roll Using MS-Excel Creation of Web Page using HTML Graphical Method (LPP) using TORA Simplex Method (LPP) using TORA Big-M Method (LPP) using TORA Dual Simplex Method (LPP) using TORA Two Phase Method using TORA Critical Path Method (CPM) in Project planning using TORA Program Evaluation and Review Technique (PERT) in Project planning Using TORA Transportation Problem using TORA SQL- Creation of Table using DDL and DML commands One Sample T Test using SPSS Paired Sample T Test using SPSS Independent Sample T Test using SPSS Chi-square Analysis using SPSS Correlation Analysis using SPSS One way ANOVA using SPSS Creation of Balance Sheet using TALLY Preparation of Balance Sheet using TALLY
23.
PREPARATION OF RESUME
Expt. No: 1 Date:
AIM:
To prepare a resume using MS-Word.
PROCEDURE:
To go to MS-word click the MS-Word icon in the Desktop. Click New from the file menu to create a new document Bio data can be typed with the help of the key board Type the various details like Name, Address, Qualification, Hobby, etc.
FEATURES:
The fonts of the words can be changed through the FONT option in the Home Menu. BULLETS & NUMBERING can be used to type the details in an order. The paragraph can be aligned through ALIGNMENT option in the Tool bar. The spelling can be checked through SPELLING & GRAMMAR option in the Review menu. With the help of HEADER & FOOTER option in the Insert menu the page numbers can be set. The words can be given underlined or made bold with UNDERLINE & BOLD option in the Tool bar. The picture can be inserted with the help of PICTURE option in the Insert Menu. Table can be inserted with the help of TABLE option in the Insert Menu. Page borders can be inserted by BORDERS & SHADING option in the Page Layout Menu.
RESULT: Thus the resume has been created successfully in the MS Word.
AIM:
To prepare a covering letter for resume using MS-Word.
PROCEDURE:
To go to MS-word click the MS-Word icon in the Desktop. Click New from the file menu to create a new document Covering letter can be typed with the help of the key board Type the various details like Name, Address, body of the letter, etc.
FEATURES:
The fonts of the words can be changed through the FONT option in the Home Menu. The paragraph can be aligned through ALIGNMENT option in the Tool bar. The spelling can be checked through SPELLING & GRAMMAR option in the Review menu. The words can be given underlined or made bold with UNDERLINE & BOLD option in the Tool bar.
Covering Letter 28/18, Mariyappa Mudaliar street China Kadai Veethi Tiruchirappalli - 620002 February 09, 2012. To Mr. Arun Kumar S Ramco Technologies Spencer Road Cheenai - 600008 Sub: Application for the position of Project Analyst in Software Development Dear Mr. Arun Kumar S, With respect to your advertisement for the vacancy, posted on The Hindu on February 09, 2012, I am writing this letter to put forth my application for the post of Project Analyst in your prestigious organization. Pursuing my MBA degree in System Management, I have acquired extensive computer knowledge, technical skills and managerial skills essential for one to compete in project management. I have scored 77% in my academics, till 3rd Semester. I request you to go through my resume in order to find out more about my academic history as well as get a fair idea about my career goals and interests. Please find my contact details in my resume attached herewith. You may contact me anytime during the day in order to discuss my career interests thoroughly or to schedule an interview. Thank you very much for your consideration. Yours Truly,
RESULT: Thus the covering letter has been created successfully in the MS Word.
AIM:
To prepare the Company advertisement using MS - Power Point.
PROCEDURE:
Click new option from the Office Button to create a new document. Click the Design menu and from it click Apply Design Template. In the Design Templates we can type the details of the company The slides can be inserted through the New Slide option from the Insert Menu. The clip art can also be inserted through the picture option in the Insert Menu. The Custom Animation can be done with the option Custom Animation in the Animation Menu. Thus the Company Advertisement is created.
4/4/2012
Mission
Our Roadmap starts with our mission, wh1ch is enduring. It declares our purpose as a company and serves as the standard agair.st which we weigh our actions and dl!'cisions. To refrE"sh the world .. To inspire moments of optim ism and happmess.. To create value and make a diffprence.
Vision
Our vis on serves as the framework for our Roadmap and i
Fact Sheet
II began as the -earens- at 1990. Jn1995 the name changed as CAFEXS BEVER.\ .CES.
Initially Started at t;SA, With 250 employees. !r. 8. Surtndhar \qts the first CE-neral l\lanttger. lr. P. Suresh was the first chairman followed by Sikkan. l\laint3ined a phenomenal growth o\erthe ye<trs
guides every aspect of our business by describing what we need to accomplish in order to continue achieving sustainable, quality growth.
Products
Cool and wa,e - Energiztr
U>mono fresh - Cool l1non Drink
Caftns Utrget auditnet a nl0$th let'n$ and voung ad\tll$ and their adwrti.sing ?fleets this in -ery possible way.
!Jte oompanr chang its ad\'tl1ising strtllegy e-nd image to fle-et the target's
mt tr ts. Cafens makes sure that the at:h-e-11isements reflect to the target audience's interests and nostalgia. The ad,'trtising StrAte includes eool, hip promos to attrAet 1110rt of the target audiE-nce. The ad,-ertising is mostly c ati\ e and has difftrtl)t elenents lil:t musicand sports. cafe!ls.com al .plays an impor :a.nt Je in adwrtising and atlia s tar_get auc,hen('t &Mng a ss tO ophons hke dO\\'nloads, gaming. mostc mixul& applatationsetc..
4/4/201 2
Cost-Leadership Strategy
At GLOBA L Market
Advertising and innovative promotion. Optimal outsourcing for production und vertical integration. Improvingproduction efficiencies through Kaizen.
3 -5
3
2.5
1 .5
' o.s
0
1995
2005
Contact Details
9951At1anticSivd ,450
1ck50nviUeFL.3222S. Toll t ' :8ii.s-<AFE... (Si638) Toll FI"P.f! :87i"Si5 '638 llhOII"' :91)4724?340 F11x :904rnS396 Yoke l .f0'7"94i"0909 [. m 11il r amCcaf n.rom : Cafens
C.I-NW.I-1".-
d.IJ
10 ..
RESULT: Thus the company advertisement presentation has been created successfully in the MS Power point.
AIM:
To prepare a Mark List for a Class.
PROCEDURE:
To open MS-Excel window click MS-Excel from the Programs Click new document from the Office button to create a new spreadsheet. Type the mark sheet in the columns and rows The mark sheet may have the details like Name, S.no, Subject, marks obtained in various subjects The total marks can be averaged through the formula bar. Find the Result using the Marks If Mark1,Mark2,Mark3>=50 then Result is Pass Else Result is Fail The details of the student name can be sorted through the sort option in the Home menu The graphical representation can be done for the mark through the chart option from the Insert menu
FEATURES:
Auto sum can be done through the auto sum option The average can be find through the formula bar option The chart can be drawn through the option Chart option from the Insert menu
The sorting can be done through the sort option from the Home menu
RESULT:
Thus the mark list has been created successfully in the MS Excel.
AIM:
To prepare a Payroll Statement using MS-Excel.
PROCEDURE:
To open MS-Excel, click MS-Excel from the Programs. Click new document from the Office button to create a new spread sheet. Type the Payroll statement in the columns and rows. The Payroll statement may have the details like E.no, Employee name, basic pay, HRA, TA, DA, LIC, and PF etc. Find the HRA, TA, and DA of each employee using the field Basic pay. HRA = Basic pay of 20/100 TA = Basic pay of 15/100 DA = Basic pay of 10/100 The Gross Pay can be calculated by using Basic Pay, HRA, TA, and DA Gross Pay = HRA+TA+DA The details of the Employee name can be sorted through the sort option in the Home menu. The graphical representation can be done for the mark through the chart option from the Insert menu.
FEATURES:
Auto sum can be done through the auto sum option The average can be find through the formula bar option The chart can be drawn through the option Chart option from the Insert menu The sorting can be done through the sort option from the Home menu For E.no continuous numbering can be done through selecting the dragging the first two numbers to other column.
S. No
Employe Narnc
I Ramcsh 2 Ramya S cc 3 Ranjith Kumar 4 Rubini 5 Sangcctha 6 Santhosh 7 Santhosh S 8 Saratha Priya 9 Saravanan I 0 Sarugcswar i
I I Suhish
20 Sundoos 21 Surcndhar
22 S urcsh U
23 Surcsh P
Basi c Pay 10000 10000 0 15000 20000 18000 25000 15000 20000 24000 32000 15000 12000 16500 10000 20500 32000 16500 16500 18500 25000 20500 2 1000 16500 17000 18000 23000 24000
H RA
TA
DA
I000
2000 2000 0 3000 4000 3600 5000 3000 4000 4800 6400 3000 2400 3300 2000 4 100 6400 3300 3300 3700 5000 4 100 4200 3300 3400 3600 4600 4800
1500 1500
0
2250 3000 2700 3750 2250 3000 3600 4800 2250 1 800 2475 1500 3075 4800 2475 2475 2775 3750 3075 3150 2475 2550 2700 3450 3600
1000 0 1 500 2000 1 800 2500 1 500 2000 2400 3200 1 500 1200 1 650 1000 2050 3200 1 650 1 650 1 850 2500 2050 2 1 00 1 650 1 700 1 800 2300 2400
Gross Pay 14500 14500 0 2 1 750 29000 26 100 36250 2 1 750 29000 34800 46400 2 1 750 1 7400 23925 14500 29725 46400 23925 23925 26825 36250 29725 30450 23925 24650 26 100 33350 34800
LIC
1 500 1 500 0 2250 3000 2700 3750 2250 3000 3600 4800 2250 1 800 2475 1500 3075 4800 2475 2475 2775 3750 3075 3 1 50 2475 2550 2700 3450 3600
PF er 1250 1250 0 1875 2500 2250 31 25 1875 2500 3000 4000 1875 1500 2062.5 I250 2562 .5 4000 2062.5 2062 .5 23 12.5 31 25 2562 .5 2625 2062 .5 2 1 25 2250 2875 3000
Deduct Net Pay 2750 I 1750 2750 II750 0 0 41 25 1 7625 5500 23500 4950 2 1 150 6875 29375 4125 17625 5500 23500 6600 28200 8800 37600 41 25 1 7625 3300 14100 4537.5 1 9387.5 2750 II750 5637.5 24087.5 8800 37600 4537 .5 1 9387.5 4537.5 1 9387.5 5087.5 2 1 737.5 6875 29375 5637.5 24087.5 5775 24675 4537 .5 1 9387.5 4675 19975 4950 2 I I 50 6325 27025 6600 28200
29 Veera Vinothkumar 30 Vdlainayagarn 31 Vijayakumar 32 Vijalakshm i 33 Vinoth 34 Vinoth J 35 Williams Total Average
Gross Pay
50000 40000 30000 20000
1 0000 Gross Pay 3% 3%
2%
0 %
Net Pay
Ramesh Ramya Sree Ranjit h Kumar
2%2% 3% 3%
2%
4 4 4%._
3% 3%
Rubini
Sangeetha
RESULT: Thus the payroll statement has been created successfully in the MS Excel.
HTML
Expt. No: 6 Date:
AIM:
To create a webpage using HTML programming language.
PROCEDURE:
tag On the next line after <head> tag, put a <title> tag. After the title tag, write the title Open Notepad. Click File->Save As. Choose all files from the file type menu.
Save your file as file.html. HTML (hypertext markup language) use tags. Tags are basically some text inside
of <angle brackets>. The first tag of a webpage is usually the <html> tag. The next tag is the <head> tag. Between the <head> and </head> tags are the title
of your website. Now end the title by typing </title> Now end your head by typing </head> Type <body but leave the tag open. <body bgcolor="blue" text="orange">Between
the two body tags goes the content of your webpage, what the user sees. Let's start with a header. A header is a section of large text, and is specified in
HTML with <h1> through <h6>, with <h1> being the largest. So at the top of your webpage, after the body tag, might be something like <h1>Welcome to my site!</h1> p> tag, or paragraph tag. <p>I'm learning how to make a website! </p>. If you want a new line in your site, use the <br> tag, or break tag. Formatting tags. <b> for bold text, <i> for italics, and <u> for underlining. Use the <img> tag to insert the picture. <imgsrc="dog.jpg" width="200"
height="200" alt="dog"> To create links, use: <a href="otherpage.html">Another page</a> To finish up, you need to end your body with </body>, and entire webpage
with </html>
Save the work and open the *.html file in the web browser.
RESULT:
Thus the webpage has been created successfully and viewed in web browser.
GRAPHICAL METHOD
Expt. No: 7 Date:
AIM:
To solve the problem in TORA software by Graphical Method.
PROCEDURE:
Go to TORA software; click the TORA icon in the desktop. Then select Linear Programming in the main menu. Select Enter New Problem, and remaining leave as it is, and Go To Input Screen. Input the Problem title, No. of Variables, and No. of Constraints. Then press enter. Enter the objective functions as Max and the value 3, 4 as variables. Enter 5,4 as the values for variables and 200 as the value of constraint for constraint 1 Enter 3,5 as the values for variables and 150 as the value of constraint for constraint 2 Enter 5,4 as the values for variables and 100 as the value of constraint for constraint 3 Enter 8,4 as the values for variables and 80 as the value of constraint for constraint 4 To solve the problem, press Solve Menu button, then save the data in the folder. Then go to Solve Problem and click graphical method. Then click Go TO Output Screen. Then click the constraints, and then click objective functions. Thus the problem is solved, make note of the value of the variables. In case, to view or to edit the input data, go to View/ Modify Input Data button.
RESULT:
Thus the problem has been solved successfully in the TORA software.
SIMPLEX METHOD
Expt. No: 8 Date:
AIM:
To solve the problem by TORA software by simplex method.
PROCEDURE:
Go to TORA software; click the TORA icon in the desktop. Then select Linear Programming in the main menu. Select Enter New Problem, and remaining leave as it is, and Go To Input Screen. Input the Problem title, No. of Variables, and No. of Constraints. Then press enter. Enter the objective functions as Max and the value 3, 2 as variables. Enter -2,1 as the values for variables and 1 as the value of constraint for constraint 1 Enter 1,1 as the values for variables and 3 as the value of constraint for constraint 2 To solve the problem, press Solve Menu button, then save the data in the folder. Then go to Solve Problem and select Algebraic, then click Final Solution. Then click Go To Output Screen to see the output. Thus the problem is solved, make note of the value of the variables. In case, to view or to edit the input data, go to View/ Modify Input Data button.
RESULT: Thus the problem has been solved successfully in the TORA software.
BIG M METHOD
Expt. No: 9 Date:
AIM:
To solve the problem in TORA software by Big - M Method.
PROCEDURE:
Go to TORA software; click the TORA icon in the desktop. Then select Linear Programming in the main menu. Select Enter New Problem, and remaining leave as it is, and Go To Input Screen. Input the Problem title, No. of Variables, and No. of Constraints. Then press enter. Enter the objective functions as Max and the value 1,2,3,-1 as variables. Enter 1,2,3,0 as the values for variables and 15 as the value of constraint for constraint 1 Enter 2,1,5,0 as the values for variables and 20 as the value of constraint for constraint 2 Enter 1,2,1,1 as the values for variables and 10 as the value of constraint for constraint 3 Then go to Solve Problem and select Algebraic, then click Iterations, then click M method. To see the optimum result click all iterations. Thus the problem is solved, make note of the value of the variables. In case, to view or to edit the input data, go to View/ Modify Input Data button.
TORA Optimization System. Windows-version 2.00 Copyrigh.t 2000 -2007 Hamdy A. Taha. All Rights Reserved Thursday, March 29.2012 14:50
Maximize SUJbject to ( 1)
( 2) ( 3)
(M-Method)
lt rcttion 1 Basic
z (rn"x)
Rx5 Rx6 Rx7
x2
-502. 00
2.00
x4
R)(5
Rx6
o.oo
n
o.oo
n
Rx7 () 00 0.00 0.00 1.00
n
SolutiOr'l
z (max) Rx5
Rx6
-4 500.00
15.00
Rx7
Iteration 2
20.00 10. 00
Basic
z (max ) RxS x3 Rx7
Lower Bound Upper Bound
x4
Un r<:."Slr"d (y/n)?
Basic z (rr' laX)
Rx5
,.,
,.,
Rx7
Solution
0.00
0.00
x3 Rx7
Iteration 3 B sic ;o: (n">nx)
0.00 1.00
X'l
x2
(} (}( )
x3
0 O()
x4
RxS
Rx6
x2 x3 Rx7
Lower- Sound Upper Sound
229 ! 37
0.71 -0.14
-1.29
42 86 .
-0.43
0. 29 0.57
n
R x7 0.00 0.00 1.00
-'1 99.29
2.. 14
x2 X3 Rx7
o.oo
3.57
2.14
RESULT:
Thus the problem has been solved successfully in the TORA software.
AIM:
To solve the problem in TORA software by Dual simplex method.
PROCEDURE:
Go to TORA software; click the TORA icon in the desktop. Then select Linear Programming in the main menu. Select Enter New Problem, and remaining leave as it is, and Go To Input Screen. Input the Problem title, No. of Variables, and No. of Constraints. Then press enter. Enter the objective functions as Max and the value 6,8 as variables. Enter 5,2 as the values for variables and 20as the value of constraint for constraint 1 Enter 1,2 as the values for variables and 10 as the value of constraint for constraint 2 To solve the problem, press Solve Menu button, then save the data in the folder. Then go to Solve Problem and select Algebraic, then click Iterations, then click Dual Simplex. To see the optimum result click all iterations. Thus the problem is solved, make note of the value of the variables. In case, to view or to edit the input data, go to View/ Modify Input Data button.
RESULT:
Thus the problem has been solved successfully in the TORA software.
AIM:
To solve the problem in TORA software by Two Phase Method.
PROCEDURE:
Go to TORA software; click the TORA icon in the desktop. Then select Linear Programming in the main menu. Select Enter New Problem, and remaining leave as it is, and Go To Input Screen. Input the Problem title, No. of Variables, and No. of Constraints. Then press enter. Enter the objective functions as Max and the value 5,-4,3 as variables. Enter 2,1,-6 as the values for variables and 20as the value of constraint for constraint 1 Enter 6,5,10 as the values for variables and 76 as the value of constraint for constraint 2 Enter 8,-3,6 as the values for variables and 50 as the value of constraint for constraint 3 To solve the problem, press Solve Menu button, then save the data in the folder. Then go to Solve Problem and select Algebraic, then click Iterations, then click Two- phase method. Then click Go To Output Screen. To see the optimum result click all iterations. Thus the problem is solved, make note of the value of the variables. In case, to view or to edit the input data, go to View/ Modify Input Data button.
TORA Optimization System, Windows-ve rs ion 2.00 Copyright C 200()...2007 Hamdy A.Taha. All Righ ts Reserved Thursday, March 29.2012 15:04
<= <=
( 1) ( 2) ( 3)
(Two-Phase Method)
Upper Bound
Unr-estr-'d (y/n)?
x2
1 . 00 1.00 5. 00 -3.00 0. 00 infinity
Basic
x6 0.00 0. 00 0 DO 1 . 00
Solution
SoIutton
Rx4 sx5 x1
Phase 1 (Iter 3 Basic
z (min)
x2
sx5 x1
Lower- Bound
Upper
Bound
x2
Unr-cstr'd (y/n)?
0. 00 4.29 7. 43 7.86
RESULT:
Thus the problem has been solved successfully in the TORA software.
AIM:
To find the Shortest Path using Critical Path Method in TORA software.
PROCEDURE:
Go to TORA software; click the TORA icon in the desktop. Then select Project Planning, and select Critical Path method. Select Enter New Problem, and remaining leave as it is, and Go To Input Screen. Input the Problem title, and then press enter. Then input starting node and leaving node, and input the appropriate duration. Activity 1-2 1-3 2-3 2-5 3-4 3-6 4-5 4-6 5-6 6-7 Duration 15 15 03 05 08 12 01 14 03 14
To solve the problem, press Solve Menu button, then save the data in the folder. Then go to Solve Problem Then click Go TO Output Screen. Then select output options CPM Bar Chart and CPM Calculation. In CPM Calculation, to see the final result click All Steps. Thus the problem is solved, make note of the values. In case, to view or to edit the input data, go to View/ Modify Input Data button.
RESULT:
Thus the problem has been solved successfully in the TORA software.
AIM:
To find the Shortest Path using Program Evaluation and Review Technique in TORA software.
PROCEDURE:
Go to TORA software; click the TORA icon in the desktop. Then select Project Planning, and select Program Evaluation and Review Technique. Select Enter New Problem, and remaining leave as it is, and Go To Input Screen. Input the Problem title, and then press enter. Then input starting node and leaving node, and input the variables a, m, and b. Activity 1-2 1-6 2-3 2-4 3-5 4-5 6-7 5-8 7-8 a 1 2 2 2 7 5 5 3 8 m 7 5 14 5 10 5 8 3 17 b 13 14 26 8 19 17 29 9 32
To solve the problem, press Solve Menu button, then save the data in the folder. Then go to Solve Problem Then click Go TO Output Screen. Then select output options Activity Mean/Var and PERT Calculation.
RESULT: Thus the problem has been solved successfully in the TORA software.
TRANSPORTATION PROBLEM
Expt. No: 14 Date:
AIM:
To solve the problem using Transportation Problem in TORA software.
PROCEDURE:
Go to TORA software; click the TORA icon in the desktop. Then select Transportation model, Select Enter New Problem, and remaining leave as it is, and Go To Input Screen. Input the Problem title, and input the No of Sources and Destination Then input destination, sources, demand and supply. D 1 S1 S2 S3 Demand 1 1 0 8 5 5 2 3 0 6 1 2 1 5 1 D 3 9 2 4 5 5 D 4 3 8 7 4 D Supply 70 55 70
To solve the problem, press Solve Menu button, then save the data in the folder. Then go to Solve Problem Then click Go TO Output Screen. Then select final solutions. Thus the problem is solved, make note of the values. In case, to view or to edit the input data, go to View/ Modify Input Data button.
RESULT:
Thus the problem has been solved successfully in the TORA software.
SQLDDL COMMANDS
Expt. No: 15 Date:
AIM:
To create an Employee Database using Microsoft SQL server application.
PROCEDURE:
On the Windows desktop, choose Start > All Programs > Microsoft SQL Server > Enterprise Manager. In the Details (left) pane, navigate to the Databases folder of the server you're using. SQL Server Enterprise Manager displays a list of databases in the Details pane. Then select Database, right click it and select New Database. Then give name of the database, and save the table with the table name. Then open the table to create the attributes, which are Employee Name- (varchar), Emp. No. (int), D.O.B. (dobirth), etc.., save and close. Open the table, and enter details of the employee one by one.
RESULT: Thus the database has been created successfully by using Microsoft SQL server.
AIM:
To calculate statistical operation Single Mean T Test by SPSS software.
PROCEDURE:
Open SPSS software, by clicking SPSS icon on the desktop. Select the Vaiable View at the bottom of the window. Input the Name, and select the variable type, select the size of the width, and input the no. of columns and rows. Select the Data view at the bottom of the window. And input the various weights. Go to Analyze in the Menu, and choose Compare means, and select One Samples T Test. Select Weights as Test Variable. Then press OK button to see the Output.
T-Test
Paired Samples Statistics Std. Error Mean 3.59166 3.20936
Pair 1
Before After
N 5 5
Paired Samples Correlations N Pair 1 Before & After 5 Correlation .746 Sig. .148
Paired Samples Test Paired Differences Std. Error Mean 2.44949 95% Confidence Interval of the Difference Lower Upper -8.80087 4.80087
Pair 1
Before - After
Mean -2.00000
t -.816
Page 1
AIM:
To calculate statistical operation Paired(Dependent) Samples T Test by SPSS software.
PROCEDURE:
Open SPSS software, by clicking SPSS icon on the desktop. Select the Vaiable View at the bottom of the window. Input the Name, and select the variable type, select the size of the width, and input the no. of columns and rows. Select the Data view at the bottom of the window. And input the various Beforeand After variables. Go to Analyze in the Menu, and choose Compare means, and select Paired Samples T Test. Select Paired variabes from Before to After. Then press OK button to see the Output.
GET FILE='C:\Users\Arun\Desktop\SPSS data sheet\Paired t test.sav'. DATASET NAME DataSet0 WINDOW=FRONT. T-TEST PAIRS=Before WITH After (PAIRED) /CRITERIA=CI(.9500) /MISSING=ANALYSIS.
T-Test
Paired Samples Correlations N Pair 1 Before & After 5 Correlation .746 Sig. .148
Paired Samples Test Paired Differences 95% Confidence Interval of the Difference Mean -2.00000 Std. Deviation 5.47723 Std. Error Mean 2.44949 Lower -8.80087 Upper 4.80087 t -.816
Pair 1
Before - After
Page 1
RESULT:
Thus the hypothesis is tested successfully using SPSS software.
AIM:
To calculate statistical operation Independent Samples T Test by SPSS software.
PROCEDURE:
Open SPSS software, by clicking SPSS icon on the desktop. Select the Vaiable View at the bottom of the window. Input the Name, and select the variable type, select the size of the width, and input the no. of columns and rows. Select the Data view at the bottom of the window. And input the various diets and weights. Go to Analyze in the Menu, and choose Compare means, and select Independent Samples T Test. Select Diet as Grouping Variable, Weights as Test Variable. Then go to option, and enter the Confidence interval. Then select the Define Groups, and enter value of Group1 and Group 2. Then press OK button to see the Output.
T-Test
Group Statistics Std. Error Mean 2.51661 1.97203
Weights
N 7 10
Sig. .777
Page 1
t Weights Equal variances assumed Equal variances not assumed -1.583 -1.564
df 15 12.491
Page 2
t-test for Equality of Means 95% Confidence Interval of the Difference Std. Error Difference Lower Upper Weights Equal variances assumed Equal variances not assumed 3.15806 3.19722 -11.73124 -11.93590 1.73124 1.93590
Page 3
RESULT:
Thus the hypothesis is tested successfully using SPSS software.
AIM:
To calculate statistical operation Chi Square Test by SPSS software.
PROCEDURE:
Open SPSS software, by clicking SPSS icon on the desktop. Select the Vaiable View at the bottom of the window. Input the Name, and select the variable type, select the size of the width, and input the no. of columns and rows. Select the Data view at the bottom of the window. And input the various savings and income. Go to Analyze in the Menu, and choose Data Reduction, and select Correspondance Analysis. Select income as row, and saving as columns. And define the range for them. Then press OK button to see the Output.
Correspondence
Credit CORRESPONDENCE Version 1.1 by Data Theory Scaling System Group (DTSS) Faculty of Social and Behavioral Sciences Leiden University, The Netherlands
Correspondence Table Total Saving Total Income upto 20000 20001-30000 30001-40000 40001-50000 50001 and above Active Margin upto 5000 67 89 25 8 7 196 5001-10000 42 80 32 21 9 184 10001-15000 13 42 26 10 19 110 15001-20000 2 6 15 11 7 41 20001 and above 0 2 5 4 10 21 Active Margin 124 219 103 54 52 552
Summary
Dimension 1 2 3 4 Total
Chi Square
Sig.
128.683
.000a
Summary
Dimension 1 2 3 4 Total
a. 16 degrees of freedom
Page 1
Overview Row Pointsa Score in Dimension Contribution Of Point to Inertia of Dimension 1 2 .240 .024 .112 .012 .090 .128 .129 .383 .430 .453 1.000 1.000
Total Income upto 20000 20001-30000 30001-40000 40001-50000 50001 and above Active Total
Overview Row Pointsa Contribution Of Dimension to Inertia of Point 1 2 Total .913 .015 .928 .868 .014 .882 .753 .173 .925 .648 .311 .959 .853 .145 .999
Total Income upto 20000 20001-30000 30001-40000 40001-50000 50001 and above Active Total
a. Symmetrical normalization Overview Column Pointsa Score in Dimension Contribution Of Point to Inertia of Dimension 1 2 .271 .076 .021 .139 .101 .074 .246 .419 .361 .291 1.000 1.000
Total Saving upto 5000 5001-10000 10001-15000 15001-20000 20001 and above Active Total
Page 2
Overview Column Pointsa Contribution Of Dimension to Inertia of Point 1 2 Total .930 .042 .972 .422 .443 .865 .749 .088 .837 .770 .211 .981 .866 .113 .979
Total Saving upto 5000 5001-10000 10001-15000 15001-20000 20001 and above Active Total
a. Symmetrical normalization
Symmetrical Normalization
Total Income Total Saving
1.5 20001 and above 1.0 50001 and above 0.5 upto 5000 0.0 upto 20000 20001-30000 30001-40000 -0.5 5001-10000 40001-50000 15001-20000 -1.0 -1 0 1 2 10001-15000
Dimension 1
Page 3
RESULT:
Thus the hypothesis is tested successfully using SPSS software.
SPSS CORRELATION
Expt. No: 20 Date:
AIM:
To calculate statistical operation Correlationby SPSS software.
PROCEDURE:
Open SPSS software, by clicking SPSS icon on the desktop. Select the Vaiable View at the bottom of the window. Input the Name, and select the variable type, select the size of the width, and input the no. of columns and rows. Select the Data view at the bottom of the window. And input the various savings and income. Go to Analyze in the Menu, and choose Correlate, and select Bivariate Select income and saving as Variables. Then press OK button to see the Output.
Correlations
Correlations Total Income 1 Total Saving .428** .000 552 552 .428** 1 .000 552 552
Total Income
Total Saving
Page 1
RESULT:
Thus the hypothesis is tested successfully using SPSS software.
SPSS ANNOVA
Expt. No: 21 Date:
AIM:
To calculate statistical operation Annova by SPSS software.
PROCEDURE:
Open SPSS software, by clicking SPSS icon on the desktop. Select the Vaiable View at the bottom of the window. Input the Name, and select the variable type, select the size of the width, and input the no. of columns and rows. Select the Data view at the bottom of the window. And input the various savings and income. Go to Analyze in the Menu, and choose Compare Means, and select One - Way Annova Select income as factor and saving as dependent list. Then go to Hoc Multiple Comparisons, and check Duncan, then press continue Then press OK button to see the Output.
Oneway
ANOVA Total monthly saving Sum of Square s 4E+009 1E+010 2E+010
df 4 547 551
F 34.849
Sig. .000
Total Income upto 20000 20001-30000 30001-40000 40001-50000 50001 and above Sig.
1 5310.48
1.000
1.000
.133
13545.67 1.000
Means for groups in homogeneous subsets are displayed. a. Uses Harmonic Mean Sample Size = 83.210. b. The group sizes are unequal. The harmonic mean of the group sizes is used. Type I error levels are not guaranteed.
Page 1
RESULT:
Thus the hypothesis is tested successfully using SPSS software.
AIM:
To prepare a balance sheet for Rajesh traders using Tally package for the following information.
PROCEDURE:
If the Tally package was present in the desktop window double click the icon To open it, else select START>PROGRAM>TALLY In the company info. Select create company to create a new company. [CREATION OF LEDGER] In gate way of Tally select Acco.Info. Select Ledger Select single ledger create Then type the name Capital, Sbi Bank, Credit purchase, Credit Sales, Cash in Hand, Machinery, Pravin traders, Krishna Traders, Tavi & co, Kumar & co, Rent, Salaries, Wages, Carriage Inwards, Building. On pressing F11 (function key), it will display the features of the company and Select the choices give yes to maintain bill wise details, Yes to Allow cash Entries in journal, Yes to Use Dr/Cr instead of To/By [CREATION OF VOUCHER] In Gateway of Tally select voucher Entry F4 For contra Select Contra Voucher F5 For Payment Select Contra Voucher F6 For Receipt Select Contra Voucher F7 For Journal Select Contra Voucher F8 For Sales Select Contra Voucher F9 For Purchase Select Contra Voucher [TO DISPLAY THE BALANCE SHEET] In Gateway of tally select Balance sheet It will display the Balance sheet. Exit
RESULT:
Thus the balance sheet is prepared successfully using TALLY software.
AIM: To prepare Balance sheet using TALLY for the following information. Capital Rs.1, 00,000 is introduced into the Business Salary Rs. 10,000 is paid Cash sales made Rs. 10, 00,000 Sold goods to Mr.Murugan for Rs. 30,000 Sold goods to Mr.Kandan for Rs. 25,000 Cash received from Mr.kandan Rs. 10,000 Cash purchases made for Rs. 1, 25,000 and no closing stock PROCEDURE: Enter in to TALLY by double clicking Go to company Menu and select the New company Enter the company name, short name, address and press Enter button Enter the Starting date and ending date of the fiscal year of the creating Company and press Enter button Enter the Business Type and select TRADER option from the Dropdown list and And press NEXT button From the Activities menu , Select Enter Documents and select journal voucher From the dropdown list and press Ok button Enter the date and enter the following information in the journal voucher
PARTICULARS Cash a/c To Capital a/c Being Salary paid Salary a/c To Cash a/c Being cash sales made Cash a/c To Sales a/c Being sales made to Murugan a/c murugan To Sales a/c Being sales made to Kandan a/c kandan To Sales a/c Being cash received Cash a/c from kannan To Kandan a/c Being goods Purchase a/c purchased To Cash a/c
DEBIT 1,00,000
CREDIT
1,00,000 10,000 10,000 10,00,000 10,00,000 30,000 30,000 25,000 25,000 10,000 10,000 1,25,000 1,25,000
To view the Balance sheet, from the Report menu, select Balance sheet/standard Select the option from the options window and press ok button.
RESULT:
Thus the balance sheet is prepared successfully using TALLY software.