Department of Management Studies

BA9228 - BUSINESS APPLICATION SOFTWARE Laboratory Record MAY 2012

NAME: REG. NO: CLASS:

J. J. College of Engineering & Technology


(Approved by AICTE, New Delhi & Affiliated to Anna University, Chennai, NBA Accredited and ISO 9001-2008 Certified)

Ammapettai, Tiruchirappalli- 620 009

Department of Management Studies

Bonafide certificate
Certified that this is a bonafide record of practical work titled BA9228 Business Application Software done by . (Register Number)....................................in the department laboratory during the academic year .

Staff-In charge

Director-DoMS

Submitted for the University Practical Examination held on .

INTERNAL EXAMINAR

EXTERNAL EXAMINAR

Contents
S. No Date 1. 2. 3. 4. 5. 6. 7. 8. 9. 10. 11. 12. Experiment Page No. Signature

13.

14. 15. 16. 17. 18. 19. 20. 21. 22.

Preparation of Resume using MS-Word Preparation of Covering Letter Using MS-Word Preparation of Company Advertisement using MS-Power Point Preparation of Mark sheet using MSExcel Preparation of Employee Pay Roll Using MS-Excel Creation of Web Page using HTML Graphical Method (LPP) using TORA Simplex Method (LPP) using TORA Big-M Method (LPP) using TORA Dual Simplex Method (LPP) using TORA Two Phase Method using TORA Critical Path Method (CPM) in Project planning using TORA Program Evaluation and Review Technique (PERT) in Project planning Using TORA Transportation Problem using TORA SQL- Creation of Table using DDL and DML commands One Sample T Test using SPSS Paired Sample T Test using SPSS Independent Sample T Test using SPSS Chi-square Analysis using SPSS Correlation Analysis using SPSS One way ANOVA using SPSS Creation of Balance Sheet using TALLY Preparation of Balance Sheet using TALLY

23.

PREPARATION OF RESUME
Expt. No: 1 Date:

AIM:
To prepare a resume using MS-Word.

PROCEDURE:
To go to MS-word click the MS-Word icon in the Desktop. Click New from the file menu to create a new document Bio data can be typed with the help of the key board Type the various details like Name, Address, Qualification, Hobby, etc.

FEATURES:
The fonts of the words can be changed through the FONT option in the Home Menu. BULLETS & NUMBERING can be used to type the details in an order. The paragraph can be aligned through ALIGNMENT option in the Tool bar. The spelling can be checked through SPELLING & GRAMMAR option in the Review menu. With the help of HEADER & FOOTER option in the Insert menu the page numbers can be set. The words can be given underlined or made bold with UNDERLINE & BOLD option in the Tool bar. The picture can be inserted with the help of PICTURE option in the Insert Menu. Table can be inserted with the help of TABLE option in the Insert Menu. Page borders can be inserted by BORDERS & SHADING option in the Page Layout Menu.

RESULT: Thus the resume has been created successfully in the MS Word.

PREPARATION OF COVERING LETTER


Expt. No: 2 Date:

AIM:
To prepare a covering letter for resume using MS-Word.

PROCEDURE:
To go to MS-word click the MS-Word icon in the Desktop. Click New from the file menu to create a new document Covering letter can be typed with the help of the key board Type the various details like Name, Address, body of the letter, etc.

FEATURES:
The fonts of the words can be changed through the FONT option in the Home Menu. The paragraph can be aligned through ALIGNMENT option in the Tool bar. The spelling can be checked through SPELLING & GRAMMAR option in the Review menu. The words can be given underlined or made bold with UNDERLINE & BOLD option in the Tool bar.

Covering Letter 28/18, Mariyappa Mudaliar street China Kadai Veethi Tiruchirappalli - 620002 February 09, 2012. To Mr. Arun Kumar S Ramco Technologies Spencer Road Cheenai - 600008 Sub: Application for the position of Project Analyst in Software Development Dear Mr. Arun Kumar S, With respect to your advertisement for the vacancy, posted on The Hindu on February 09, 2012, I am writing this letter to put forth my application for the post of Project Analyst in your prestigious organization. Pursuing my MBA degree in System Management, I have acquired extensive computer knowledge, technical skills and managerial skills essential for one to compete in project management. I have scored 77% in my academics, till 3rd Semester. I request you to go through my resume in order to find out more about my academic history as well as get a fair idea about my career goals and interests. Please find my contact details in my resume attached herewith. You may contact me anytime during the day in order to discuss my career interests thoroughly or to schedule an interview. Thank you very much for your consideration. Yours Truly,

RESULT: Thus the covering letter has been created successfully in the MS Word.

PREPARATION OF COMPANY ADVERTISEMENT


Expt. No: 3 Date:

AIM:
To prepare the Company advertisement using MS - Power Point.

PROCEDURE:
Click new option from the Office Button to create a new document. Click the Design menu and from it click Apply Design Template. In the Design Templates we can type the details of the company The slides can be inserted through the New Slide option from the Insert Menu. The clip art can also be inserted through the picture option in the Insert Menu. The Custom Animation can be done with the option Custom Animation in the Animation Menu. Thus the Company Advertisement is created.

4/4/2012

Mission
Our Roadmap starts with our mission, wh1ch is enduring. It declares our purpose as a company and serves as the standard agair.st which we weigh our actions and dl!'cisions. To refrE"sh the world .. To inspire moments of optim ism and happmess.. To create value and make a diffprence.

Vision
Our vis on serves as the framework for our Roadmap and i

Fact Sheet
II began as the -earens- at 1990. Jn1995 the name changed as CAFEXS BEVER.\ .CES.
Initially Started at t;SA, With 250 employees. !r. 8. Surtndhar \qts the first CE-neral l\lanttger. lr. P. Suresh was the first chairman followed by Sikkan. l\laint3ined a phenomenal growth o\erthe ye<trs

guides every aspect of our business by describing what we need to accomplish in order to continue achieving sustainable, quality growth.

Products
Cool and wa,e - Energiztr
U>mono fresh - Cool l1non Drink

Caftns Utrget auditnet a nl0$th let'n$ and voung ad\tll$ and their adwrti.sing ?fleets this in -ery possible way.

!Jte oompanr chang its ad\'tl1ising strtllegy e-nd image to fle-et the target's
mt tr ts. Cafens makes sure that the at:h-e-11isements reflect to the target audience's interests and nostalgia. The ad,'trtising StrAte includes eool, hip promos to attrAet 1110rt of the target audiE-nce. The ad,-ertising is mostly c ati\ e and has difftrtl)t elenents lil:t musicand sports. cafe!ls.com al .plays an impor :a.nt Je in adwrtising and atlia s tar_get auc,hen('t &Mng a ss tO ophons hke dO\\'nloads, gaming. mostc mixul& applatationsetc..

Orange day -Colors.

4/4/201 2

Cost-Leadership Strategy

At GLOBA L Market
Advertising and innovative promotion. Optimal outsourcing for production und vertical integration. Improvingproduction efficiencies through Kaizen.

At now there are more than 2:0 nations our produ ct is


now served.

More than 50000 employees get benefited through out


the world

Global Locations Growth


5 4-5
4

3 -5
3
2.5

Cool&WaY Lemon'ofm h Orange

1 .5

' o.s
0

1995

2005

Contact Details
9951At1anticSivd ,450
1ck50nviUeFL.3222S. Toll t ' :8ii.s-<AFE... (Si638) Toll FI"P.f! :87i"Si5 '638 llhOII"' :91)4724?340 F11x :904rnS396 Yoke l .f0'7"94i"0909 [. m 11il r amCcaf n.rom : Cafens

C.I-NW.I-1".-

d.IJ

10 ..

RESULT: Thus the company advertisement presentation has been created successfully in the MS Power point.

PREPARATION OF MARK SHEET


Expt. No: 4 Date:

AIM:
To prepare a Mark List for a Class.

PROCEDURE:
To open MS-Excel window click MS-Excel from the Programs Click new document from the Office button to create a new spreadsheet. Type the mark sheet in the columns and rows The mark sheet may have the details like Name, S.no, Subject, marks obtained in various subjects The total marks can be averaged through the formula bar. Find the Result using the Marks If Mark1,Mark2,Mark3>=50 then Result is Pass Else Result is Fail The details of the student name can be sorted through the sort option in the Home menu The graphical representation can be done for the mark through the chart option from the Insert menu

FEATURES:
Auto sum can be done through the auto sum option The average can be find through the formula bar option The chart can be drawn through the option Chart option from the Insert menu

The sorting can be done through the sort option from the Home menu

RESULT:
Thus the mark list has been created successfully in the MS Excel.

PREPARATION OF PAYROLL STATEMENT


Expt. No: 5 Date:

AIM:
To prepare a Payroll Statement using MS-Excel.

PROCEDURE:
To open MS-Excel, click MS-Excel from the Programs. Click new document from the Office button to create a new spread sheet. Type the Payroll statement in the columns and rows. The Payroll statement may have the details like E.no, Employee name, basic pay, HRA, TA, DA, LIC, and PF etc. Find the HRA, TA, and DA of each employee using the field Basic pay. HRA = Basic pay of 20/100 TA = Basic pay of 15/100 DA = Basic pay of 10/100 The Gross Pay can be calculated by using Basic Pay, HRA, TA, and DA Gross Pay = HRA+TA+DA The details of the Employee name can be sorted through the sort option in the Home menu. The graphical representation can be done for the mark through the chart option from the Insert menu.

FEATURES:
Auto sum can be done through the auto sum option The average can be find through the formula bar option The chart can be drawn through the option Chart option from the Insert menu The sorting can be done through the sort option from the Home menu For E.no continuous numbering can be done through selecting the dragging the first two numbers to other column.

S. No

Employe Narnc
I Ramcsh 2 Ramya S cc 3 Ranjith Kumar 4 Rubini 5 Sangcctha 6 Santhosh 7 Santhosh S 8 Saratha Priya 9 Saravanan I 0 Sarugcswar i
I I Suhish

1 2 Sathish M 1 3 Sathriyan 1 4 Sclv i 1 5 Shanth i 1 6 S ikkan 1 7 S ri Priya 1 8 S uganya 1 9 Suja tha

20 Sundoos 21 Surcndhar
22 S urcsh U
23 Surcsh P

24 Suriya 25 Udhaya 26 Uma Dcvi 27 Va i ramut hu M 28 Vandhana

Basi c Pay 10000 10000 0 15000 20000 18000 25000 15000 20000 24000 32000 15000 12000 16500 10000 20500 32000 16500 16500 18500 25000 20500 2 1000 16500 17000 18000 23000 24000

H RA

TA

DA
I000

2000 2000 0 3000 4000 3600 5000 3000 4000 4800 6400 3000 2400 3300 2000 4 100 6400 3300 3300 3700 5000 4 100 4200 3300 3400 3600 4600 4800

1500 1500
0

2250 3000 2700 3750 2250 3000 3600 4800 2250 1 800 2475 1500 3075 4800 2475 2475 2775 3750 3075 3150 2475 2550 2700 3450 3600

1000 0 1 500 2000 1 800 2500 1 500 2000 2400 3200 1 500 1200 1 650 1000 2050 3200 1 650 1 650 1 850 2500 2050 2 1 00 1 650 1 700 1 800 2300 2400

Gross Pay 14500 14500 0 2 1 750 29000 26 100 36250 2 1 750 29000 34800 46400 2 1 750 1 7400 23925 14500 29725 46400 23925 23925 26825 36250 29725 30450 23925 24650 26 100 33350 34800

LIC

1 500 1 500 0 2250 3000 2700 3750 2250 3000 3600 4800 2250 1 800 2475 1500 3075 4800 2475 2475 2775 3750 3075 3 1 50 2475 2550 2700 3450 3600

PF er 1250 1250 0 1875 2500 2250 31 25 1875 2500 3000 4000 1875 1500 2062.5 I250 2562 .5 4000 2062.5 2062 .5 23 12.5 31 25 2562 .5 2625 2062 .5 2 1 25 2250 2875 3000

Deduct Net Pay 2750 I 1750 2750 II750 0 0 41 25 1 7625 5500 23500 4950 2 1 150 6875 29375 4125 17625 5500 23500 6600 28200 8800 37600 41 25 1 7625 3300 14100 4537.5 1 9387.5 2750 II750 5637.5 24087.5 8800 37600 4537 .5 1 9387.5 4537.5 1 9387.5 5087.5 2 1 737.5 6875 29375 5637.5 24087.5 5775 24675 4537 .5 1 9387.5 4675 19975 4950 2 I I 50 6325 27025 6600 28200

29 Veera Vinothkumar 30 Vdlainayagarn 31 Vijayakumar 32 Vijalakshm i 33 Vinoth 34 Vinoth J 35 Williams Total Average

2 1000 14500 15000 16000 17000 2 1000 30000


646000 18457.1 4

4200 2900 3000 3200 3400 4200 6000


129200 3691

3 1 50 2 175 2250 2400 2550 3 150 4500


96900 2769

2 100 1450 1500 1600 1700 2 100 3000


64600 1846

30450 2 1025 2 1750 23200 24650 30450 43500


936700 26763

3150 2 175 2250 2400 2550 3150 4500


96900 2769

2625 1812.5 1875 2000 2 125 2625 3750


80750 2307

5775 3987.5 4 125 4400 4675 5775 8250


177650 5076

24675 17037.5 17625 18800 19975 24675 35250


759050 21687

Gross Pay
50000 40000 30000 20000
1 0000 Gross Pay 3% 3%

2%

0 %

Net Pay
Ramesh Ramya Sree Ranjit h Kumar

2%2% 3% 3%

2%

4 4 4%._
3% 3%

Rubini
Sangeetha

RESULT: Thus the payroll statement has been created successfully in the MS Excel.

HTML
Expt. No: 6 Date:

AIM:
To create a webpage using HTML programming language.

PROCEDURE:
tag On the next line after <head> tag, put a <title> tag. After the title tag, write the title Open Notepad. Click File->Save As. Choose all files from the file type menu.

Save your file as file.html. HTML (hypertext markup language) use tags. Tags are basically some text inside

of <angle brackets>. The first tag of a webpage is usually the <html> tag. The next tag is the <head> tag. Between the <head> and </head> tags are the title

of your website. Now end the title by typing </title> Now end your head by typing </head> Type <body but leave the tag open. <body bgcolor="blue" text="orange">Between

the two body tags goes the content of your webpage, what the user sees. Let's start with a header. A header is a section of large text, and is specified in

HTML with <h1> through <h6>, with <h1> being the largest. So at the top of your webpage, after the body tag, might be something like <h1>Welcome to my site!</h1> p> tag, or paragraph tag. <p>I'm learning how to make a website! </p>. If you want a new line in your site, use the <br> tag, or break tag. Formatting tags. <b> for bold text, <i> for italics, and <u> for underlining. Use the <img> tag to insert the picture. <imgsrc="dog.jpg" width="200"

height="200" alt="dog"> To create links, use: <a href="otherpage.html">Another page</a> To finish up, you need to end your body with </body>, and entire webpage

with </html>

Save the work and open the *.html file in the web browser.

RESULT:
Thus the webpage has been created successfully and viewed in web browser.

GRAPHICAL METHOD
Expt. No: 7 Date:

AIM:
To solve the problem in TORA software by Graphical Method.

PROCEDURE:
Go to TORA software; click the TORA icon in the desktop. Then select Linear Programming in the main menu. Select Enter New Problem, and remaining leave as it is, and Go To Input Screen. Input the Problem title, No. of Variables, and No. of Constraints. Then press enter. Enter the objective functions as Max and the value 3, 4 as variables. Enter 5,4 as the values for variables and 200 as the value of constraint for constraint 1 Enter 3,5 as the values for variables and 150 as the value of constraint for constraint 2 Enter 5,4 as the values for variables and 100 as the value of constraint for constraint 3 Enter 8,4 as the values for variables and 80 as the value of constraint for constraint 4 To solve the problem, press Solve Menu button, then save the data in the folder. Then go to Solve Problem and click graphical method. Then click Go TO Output Screen. Then click the constraints, and then click objective functions. Thus the problem is solved, make note of the value of the variables. In case, to view or to edit the input data, go to View/ Modify Input Data button.

RESULT:
Thus the problem has been solved successfully in the TORA software.

SIMPLEX METHOD
Expt. No: 8 Date:

AIM:
To solve the problem by TORA software by simplex method.

PROCEDURE:
Go to TORA software; click the TORA icon in the desktop. Then select Linear Programming in the main menu. Select Enter New Problem, and remaining leave as it is, and Go To Input Screen. Input the Problem title, No. of Variables, and No. of Constraints. Then press enter. Enter the objective functions as Max and the value 3, 2 as variables. Enter -2,1 as the values for variables and 1 as the value of constraint for constraint 1 Enter 1,1 as the values for variables and 3 as the value of constraint for constraint 2 To solve the problem, press Solve Menu button, then save the data in the folder. Then go to Solve Problem and select Algebraic, then click Final Solution. Then click Go To Output Screen to see the output. Thus the problem is solved, make note of the value of the variables. In case, to view or to edit the input data, go to View/ Modify Input Data button.

RESULT: Thus the problem has been solved successfully in the TORA software.

BIG M METHOD
Expt. No: 9 Date:

AIM:
To solve the problem in TORA software by Big - M Method.

PROCEDURE:
Go to TORA software; click the TORA icon in the desktop. Then select Linear Programming in the main menu. Select Enter New Problem, and remaining leave as it is, and Go To Input Screen. Input the Problem title, No. of Variables, and No. of Constraints. Then press enter. Enter the objective functions as Max and the value 1,2,3,-1 as variables. Enter 1,2,3,0 as the values for variables and 15 as the value of constraint for constraint 1 Enter 2,1,5,0 as the values for variables and 20 as the value of constraint for constraint 2 Enter 1,2,1,1 as the values for variables and 10 as the value of constraint for constraint 3 Then go to Solve Problem and select Algebraic, then click Iterations, then click M method. To see the optimum result click all iterations. Thus the problem is solved, make note of the value of the variables. In case, to view or to edit the input data, go to View/ Modify Input Data button.

TORA Optimization System. Windows-version 2.00 Copyrigh.t 2000 -2007 Hamdy A. Taha. All Rights Reserved Thursday, March 29.2012 14:50

LINEAR PROGRAM-- ORIGINAL DATA


Title: bi m

Maximize SUJbject to ( 1)
( 2) ( 3)

x1 1.00 1.00 2.00 1.00 0.00 infinity n

x2 2.00 2.00 1.00 2.00 0.00 infinity n

x3 3.00 3.00 5.00 1.00 0.00 infinity n

x4 -1.00 0.00 0.00 1.00 0.00 infinity n

15.00 20.00 10.00

Lower Bound Upper Bound Unrestr'd (y/n)?

SIMPLEX TABLEAUS -Title: big m

(M-Method)

lt rcttion 1 Basic

z (rn"x)
Rx5 Rx6 Rx7

Lower Sound Upper Sound unrestrd (y/n).. ;, Basic

x1 -401 .00 1.00 2.00 1 .00 0.00


infinity

x2

-502. 00

2.00

1.00 2.00 0.00


infinity

x3 -903.00 3.00 5.00 1.00 0.00


infinity

x4

R)(5

Rx6

->19.00 0.00 1.00 0.00


infinity

o.oo
n

0.00 1.00 0.00

o.oo

0.00 0.00 1.00 0.00

n
Rx7 () 00 0.00 0.00 1.00

n
SolutiOr'l

z (max) Rx5
Rx6

-4 500.00
15.00

Rx7
Iteration 2

20.00 10. 00

Basic
z (max ) RxS x3 Rx7
Lower Bound Upper Bound

X1 -39.80 180.60 -0.20 0 40 0.60 0.00


infinity

x2 -321.40 1.40 0 2Cl 1.80 0.00


infinity

x::l 0.00 0.00 1.00 0.00 0.00


infinity n

x4

-99.00 0.00 000 1.00 0.00


infinity n

R x5 0.00 1.00 0.00 0.00

Rx6 -0. 60 0.20 -0.20

Un r<:."Slr"d (y/n)?
Basic z (rr' laX)
Rx5

,.,

,.,

Rx7

Solution

0.00
0.00

x3 Rx7
Iteration 3 B sic ;o: (n">nx)

0.00 1.00

-000.00 3 00 4.00 6.00

X'l

x2
(} (}( )

x3
0 O()

x4

RxS

Rx6

x2 x3 Rx7
Lower- Sound Upper Sound

-A $ 71 -0.14 0.43 0.86 0.00


inf1nity

1. 00 0.00 0.00 0.00


1 nfinity n Solvtion

0.00 1.00 0.00 0.00


infinity

-9r-l .OO 0. 00 0.00 1.00 0.00


inf1nity

229 ! 37
0.71 -0.14
-1.29

42 86 .
-0.43

0. 29 0.57

Unrestr'd (y/n)? ea ic-:


z (n-.ax)

n
R x7 0.00 0.00 1.00

-'1 99.29
2.. 14

x2 X3 Rx7

o.oo

3.57
2.14

RESULT:
Thus the problem has been solved successfully in the TORA software.

DUAL SIMPLEX METHOD


Expt. No: 10 Date:

AIM:
To solve the problem in TORA software by Dual simplex method.

PROCEDURE:
Go to TORA software; click the TORA icon in the desktop. Then select Linear Programming in the main menu. Select Enter New Problem, and remaining leave as it is, and Go To Input Screen. Input the Problem title, No. of Variables, and No. of Constraints. Then press enter. Enter the objective functions as Max and the value 6,8 as variables. Enter 5,2 as the values for variables and 20as the value of constraint for constraint 1 Enter 1,2 as the values for variables and 10 as the value of constraint for constraint 2 To solve the problem, press Solve Menu button, then save the data in the folder. Then go to Solve Problem and select Algebraic, then click Iterations, then click Dual Simplex. To see the optimum result click all iterations. Thus the problem is solved, make note of the value of the variables. In case, to view or to edit the input data, go to View/ Modify Input Data button.

RESULT:
Thus the problem has been solved successfully in the TORA software.

TWO PHASE METHOD


Expt. No: 11 Date:

AIM:
To solve the problem in TORA software by Two Phase Method.

PROCEDURE:
Go to TORA software; click the TORA icon in the desktop. Then select Linear Programming in the main menu. Select Enter New Problem, and remaining leave as it is, and Go To Input Screen. Input the Problem title, No. of Variables, and No. of Constraints. Then press enter. Enter the objective functions as Max and the value 5,-4,3 as variables. Enter 2,1,-6 as the values for variables and 20as the value of constraint for constraint 1 Enter 6,5,10 as the values for variables and 76 as the value of constraint for constraint 2 Enter 8,-3,6 as the values for variables and 50 as the value of constraint for constraint 3 To solve the problem, press Solve Menu button, then save the data in the folder. Then go to Solve Problem and select Algebraic, then click Iterations, then click Two- phase method. Then click Go To Output Screen. To see the optimum result click all iterations. Thus the problem is solved, make note of the value of the variables. In case, to view or to edit the input data, go to View/ Modify Input Data button.

TORA Optimization System, Windows-ve rs ion 2.00 Copyright C 200()...2007 Hamdy A.Taha. All Righ ts Reserved Thursday, March 29.2012 15:04

LINEAR PROGRAM-- ORIGINAL DATA


Title: 2 hase

Maximize Subject to ( 1) ( 2) ( 3) Lower Bound Upper Bound Unrestr'd (y/n)?

x1 5.00 2.00 6.00 8.00 0 00 infinity n

x2 -4.00 1.00 5.00 -3.00 0.00 infinity n

x3 3.00 -6.00 10.00 6.00 0.00 infinity n

<= <=

( 1) ( 2) ( 3)

20.00 76.00 50.00

SIMPLEX TABLEAUS -Title: 2 hase

(Two-Phase Method)

Phase 1 (Iter 1 Baste z (min) Rx4 sx5 sx6


Lower Bound

Upper Bound
Unr-estr-'d (y/n)?

x1 2.00 2.00 6.00 8.00 0. 00 infinity

x2
1 . 00 1.00 5. 00 -3.00 0. 00 infinity

x3 -6.00 -6.00 10 . 00 6.00 0.00 infinity

Rx4 0.00 1 .00 0.00 0.00

Basic

z (min) Rx4 sx5 sx6 Phase 1 (Iter 2


Basic

sx5 0.00 0.00 1 no 0.00

x6 0.00 0. 00 0 DO 1 . 00

Solution

20.00 20.00 76 00 50.00

z (min) Rx4 sx5 x1


Lowe.- Bound

Upper Bound Unreslr"d (y/n)? Baste


z (min)

x1 0.00 0.00 0 00 1 .00 0.00 inflnity n sx5 0.00 0.00 1 .0 0 0.00

x2 1.75 1 .75 7 25 -0. 38 0. 00 infinity n sx6 -0. 25 -0. 25 -0.75 0.13

x3 -7.50 -7.50 5 50 0.75 0. 00 infinit y

Rx4 0.00 1 .00 0 00 0.00

SoIutton

Rx4 sx5 x1
Phase 1 (Iter 3 Basic

7.50 7.50 38.50 6. 25

z (min)
x2

sx5 x1
Lower- Bound

Upper

Bound

x1 0.00 0.00 0.00 1.00 0.00 inflnity

x2

Unr-cstr'd (y/n)?

0.00 1 . 00 0.00 0.00 0. 00 infinity n sx6 0. 00 -0. 14 0. 29 0.07

x3 0.00 -4. 29 36.57 -0.86 0. 00 infinity n


Solu t:t on

Rx4 -1.00 0.57 --4.14 0.21

Bast e z (min) x2 sx5 x1

sx5 0.00 0.00 1.00 0. 00

0. 00 4.29 7. 43 7.86

RESULT:
Thus the problem has been solved successfully in the TORA software.

CRITICAL PATH METHOD


Expt. No: 12 Date:

AIM:
To find the Shortest Path using Critical Path Method in TORA software.

PROCEDURE:
Go to TORA software; click the TORA icon in the desktop. Then select Project Planning, and select Critical Path method. Select Enter New Problem, and remaining leave as it is, and Go To Input Screen. Input the Problem title, and then press enter. Then input starting node and leaving node, and input the appropriate duration. Activity 1-2 1-3 2-3 2-5 3-4 3-6 4-5 4-6 5-6 6-7 Duration 15 15 03 05 08 12 01 14 03 14

To solve the problem, press Solve Menu button, then save the data in the folder. Then go to Solve Problem Then click Go TO Output Screen. Then select output options CPM Bar Chart and CPM Calculation. In CPM Calculation, to see the final result click All Steps. Thus the problem is solved, make note of the values. In case, to view or to edit the input data, go to View/ Modify Input Data button.

RESULT:
Thus the problem has been solved successfully in the TORA software.

PROGRAM EVALUATION & REVIEW TECHNIQUE


Expt. No: 13 Date:

AIM:
To find the Shortest Path using Program Evaluation and Review Technique in TORA software.

PROCEDURE:
Go to TORA software; click the TORA icon in the desktop. Then select Project Planning, and select Program Evaluation and Review Technique. Select Enter New Problem, and remaining leave as it is, and Go To Input Screen. Input the Problem title, and then press enter. Then input starting node and leaving node, and input the variables a, m, and b. Activity 1-2 1-6 2-3 2-4 3-5 4-5 6-7 5-8 7-8 a 1 2 2 2 7 5 5 3 8 m 7 5 14 5 10 5 8 3 17 b 13 14 26 8 19 17 29 9 32

To solve the problem, press Solve Menu button, then save the data in the folder. Then go to Solve Problem Then click Go TO Output Screen. Then select output options Activity Mean/Var and PERT Calculation.

RESULT: Thus the problem has been solved successfully in the TORA software.

TRANSPORTATION PROBLEM
Expt. No: 14 Date:

AIM:
To solve the problem using Transportation Problem in TORA software.

PROCEDURE:
Go to TORA software; click the TORA icon in the desktop. Then select Transportation model, Select Enter New Problem, and remaining leave as it is, and Go To Input Screen. Input the Problem title, and input the No of Sources and Destination Then input destination, sources, demand and supply. D 1 S1 S2 S3 Demand 1 1 0 8 5 5 2 3 0 6 1 2 1 5 1 D 3 9 2 4 5 5 D 4 3 8 7 4 D Supply 70 55 70

To solve the problem, press Solve Menu button, then save the data in the folder. Then go to Solve Problem Then click Go TO Output Screen. Then select final solutions. Thus the problem is solved, make note of the values. In case, to view or to edit the input data, go to View/ Modify Input Data button.

RESULT:
Thus the problem has been solved successfully in the TORA software.

SQLDDL COMMANDS
Expt. No: 15 Date:

AIM:
To create an Employee Database using Microsoft SQL server application.

PROCEDURE:
On the Windows desktop, choose Start > All Programs > Microsoft SQL Server > Enterprise Manager. In the Details (left) pane, navigate to the Databases folder of the server you're using. SQL Server Enterprise Manager displays a list of databases in the Details pane. Then select Database, right click it and select New Database. Then give name of the database, and save the table with the table name. Then open the table to create the attributes, which are Employee Name- (varchar), Emp. No. (int), D.O.B. (dobirth), etc.., save and close. Open the table, and enter details of the employee one by one.

RESULT: Thus the database has been created successfully by using Microsoft SQL server.

SPSS SINGLE MEAN T TEST


Expt. No: 16 Date:

AIM:
To calculate statistical operation Single Mean T Test by SPSS software.

PROCEDURE:
Open SPSS software, by clicking SPSS icon on the desktop. Select the Vaiable View at the bottom of the window. Input the Name, and select the variable type, select the size of the width, and input the no. of columns and rows. Select the Data view at the bottom of the window. And input the various weights. Go to Analyze in the Menu, and choose Compare means, and select One Samples T Test. Select Weights as Test Variable. Then press OK button to see the Output.

T-Test
Paired Samples Statistics Std. Error Mean 3.59166 3.20936

Pair 1

Before After

Mean 122.0000 124.0000

N 5 5

Std. Deviation 8.03119 7.17635

Paired Samples Correlations N Pair 1 Before & After 5 Correlation .746 Sig. .148

Paired Samples Test Paired Differences Std. Error Mean 2.44949 95% Confidence Interval of the Difference Lower Upper -8.80087 4.80087

Pair 1

Before - After

Mean -2.00000

Std. Deviation 5.47723

t -.816

Paired Samples Test

df Pair 1 Before - After 4

Sig. (2-tailed) .460

Page 1

RESULT: Thus the hypothesis is tested successfully using SPSS software.

SPSS DEPENDENT SAMPLE T TEST


Expt. No: 17 Date:

AIM:
To calculate statistical operation Paired(Dependent) Samples T Test by SPSS software.

PROCEDURE:
Open SPSS software, by clicking SPSS icon on the desktop. Select the Vaiable View at the bottom of the window. Input the Name, and select the variable type, select the size of the width, and input the no. of columns and rows. Select the Data view at the bottom of the window. And input the various Beforeand After variables. Go to Analyze in the Menu, and choose Compare means, and select Paired Samples T Test. Select Paired variabes from Before to After. Then press OK button to see the Output.

GET FILE='C:\Users\Arun\Desktop\SPSS data sheet\Paired t test.sav'. DATASET NAME DataSet0 WINDOW=FRONT. T-TEST PAIRS=Before WITH After (PAIRED) /CRITERIA=CI(.9500) /MISSING=ANALYSIS.

T-Test

[DataSet1] C:\Users\Arun\Desktop\SPSS data sheet\Paired t test.sav


Paired Samples Statistics Mean Pair 1 Before After 1.2200E2 1.2400E2 N 5 5 Std. Deviation 8.03119 7.17635 Std. Error Mean 3.59166 3.20936

Paired Samples Correlations N Pair 1 Before & After 5 Correlation .746 Sig. .148

Paired Samples Test Paired Differences 95% Confidence Interval of the Difference Mean -2.00000 Std. Deviation 5.47723 Std. Error Mean 2.44949 Lower -8.80087 Upper 4.80087 t -.816

Pair 1

Before - After

Paired Samples Test

df Pair 1 Before - After 4

Sig. (2-tailed) .460

Page 1

RESULT:
Thus the hypothesis is tested successfully using SPSS software.

SPSS INDEPENDENT SAMPLE T TEST


Expt. No: 18 Date:

AIM:
To calculate statistical operation Independent Samples T Test by SPSS software.

PROCEDURE:
Open SPSS software, by clicking SPSS icon on the desktop. Select the Vaiable View at the bottom of the window. Input the Name, and select the variable type, select the size of the width, and input the no. of columns and rows. Select the Data view at the bottom of the window. And input the various diets and weights. Go to Analyze in the Menu, and choose Compare means, and select Independent Samples T Test. Select Diet as Grouping Variable, Weights as Test Variable. Then go to option, and enter the Confidence interval. Then select the Define Groups, and enter value of Group1 and Group 2. Then press OK button to see the Output.

T-Test
Group Statistics Std. Error Mean 2.51661 1.97203

Weights

Diet 1.00 2.00

N 7 10

Mean 27.0000 32.0000

Std. Deviation 6.65833 6.23610

Independent Samples Test Levene's Test for Equality of Variances

F Weights Equal variances assumed Equal variances not assumed .083

Sig. .777

Page 1

Independent Samples Test

t-test for Equality of Means Mean Difference -5.00000 -5.00000

t Weights Equal variances assumed Equal variances not assumed -1.583 -1.564

df 15 12.491

Sig. (2-tailed) .134 .143

Page 2

Independent Samples Test

t-test for Equality of Means 95% Confidence Interval of the Difference Std. Error Difference Lower Upper Weights Equal variances assumed Equal variances not assumed 3.15806 3.19722 -11.73124 -11.93590 1.73124 1.93590

Page 3

RESULT:
Thus the hypothesis is tested successfully using SPSS software.

SPSS CHI SQUARE TEST


Expt. No: 19 Date:

AIM:
To calculate statistical operation Chi Square Test by SPSS software.

PROCEDURE:
Open SPSS software, by clicking SPSS icon on the desktop. Select the Vaiable View at the bottom of the window. Input the Name, and select the variable type, select the size of the width, and input the no. of columns and rows. Select the Data view at the bottom of the window. And input the various savings and income. Go to Analyze in the Menu, and choose Data Reduction, and select Correspondance Analysis. Select income as row, and saving as columns. And define the range for them. Then press OK button to see the Output.

Correspondence
Credit CORRESPONDENCE Version 1.1 by Data Theory Scaling System Group (DTSS) Faculty of Social and Behavioral Sciences Leiden University, The Netherlands

Correspondence Table Total Saving Total Income upto 20000 20001-30000 30001-40000 40001-50000 50001 and above Active Margin upto 5000 67 89 25 8 7 196 5001-10000 42 80 32 21 9 184 10001-15000 13 42 26 10 19 110 15001-20000 2 6 15 11 7 41 20001 and above 0 2 5 4 10 21 Active Margin 124 219 103 54 52 552

Summary

Proportion of Inertia Singular Value .438 .176 .087 .048

Dimension 1 2 3 4 Total

Inertia .192 .031 .008 .002 .233

Chi Square

Sig.

128.683

.000a

Accounted for .824 .133 .033 .010 1.000

Cumulative .824 .957 .990 1.000 1.000

Summary

Confidence Singular Value Standard Deviation .037 .059 Correlation 2 .216

Dimension 1 2 3 4 Total

a. 16 degrees of freedom

Page 1

Overview Row Pointsa Score in Dimension Contribution Of Point to Inertia of Dimension 1 2 .240 .024 .112 .012 .090 .128 .129 .383 .430 .453 1.000 1.000

Total Income upto 20000 20001-30000 30001-40000 40001-50000 50001 and above Active Total

Mass .225 .397 .187 .098 .094 1.000

1 -.685 -.351 .459 .760 1.414

2 .138 .072 -.347 -.830 .920

Inertia .051 .025 .023 .038 .097 .233

Overview Row Pointsa Contribution Of Dimension to Inertia of Point 1 2 Total .913 .015 .928 .868 .014 .882 .753 .173 .925 .648 .311 .959 .853 .145 .999

Total Income upto 20000 20001-30000 30001-40000 40001-50000 50001 and above Active Total

a. Symmetrical normalization Overview Column Pointsa Score in Dimension Contribution Of Point to Inertia of Dimension 1 2 .271 .076 .021 .139 .101 .074 .246 .419 .361 .291 1.000 1.000

Total Saving upto 5000 5001-10000 10001-15000 15001-20000 20001 and above Active Total

Mass .355 .333 .199 .074 .038 1.000

1 -.578 -.167 .472 1.205 2.039

2 .194 -.270 .256 -.997 1.161

Inertia .056 .010 .026 .061 .080 .233

Page 2

Overview Column Pointsa Contribution Of Dimension to Inertia of Point 1 2 Total .930 .042 .972 .422 .443 .865 .749 .088 .837 .770 .211 .981 .866 .113 .979

Total Saving upto 5000 5001-10000 10001-15000 15001-20000 20001 and above Active Total

a. Symmetrical normalization

Row and Column Points

Symmetrical Normalization
Total Income Total Saving

1.5 20001 and above 1.0 50001 and above 0.5 upto 5000 0.0 upto 20000 20001-30000 30001-40000 -0.5 5001-10000 40001-50000 15001-20000 -1.0 -1 0 1 2 10001-15000

Dimension 1

Page 3

RESULT:
Thus the hypothesis is tested successfully using SPSS software.

SPSS CORRELATION
Expt. No: 20 Date:

AIM:
To calculate statistical operation Correlationby SPSS software.

PROCEDURE:
Open SPSS software, by clicking SPSS icon on the desktop. Select the Vaiable View at the bottom of the window. Input the Name, and select the variable type, select the size of the width, and input the no. of columns and rows. Select the Data view at the bottom of the window. And input the various savings and income. Go to Analyze in the Menu, and choose Correlate, and select Bivariate Select income and saving as Variables. Then press OK button to see the Output.

Correlations
Correlations Total Income 1 Total Saving .428** .000 552 552 .428** 1 .000 552 552

Total Income

Total Saving

Pearson Correlation Sig. (2-tailed) N Pearson Correlation Sig. (2-tailed) N

**. Correlation is significant at the 0.01 level (2-tailed).

Page 1

RESULT:
Thus the hypothesis is tested successfully using SPSS software.

SPSS ANNOVA
Expt. No: 21 Date:

AIM:
To calculate statistical operation Annova by SPSS software.

PROCEDURE:
Open SPSS software, by clicking SPSS icon on the desktop. Select the Vaiable View at the bottom of the window. Input the Name, and select the variable type, select the size of the width, and input the no. of columns and rows. Select the Data view at the bottom of the window. And input the various savings and income. Go to Analyze in the Menu, and choose Compare Means, and select One - Way Annova Select income as factor and saving as dependent list. Then go to Hoc Multiple Comparisons, and check Duncan, then press continue Then press OK button to see the Output.

Oneway
ANOVA Total monthly saving Sum of Square s 4E+009 1E+010 2E+010

df 4 547 551

Between Groups Within Groups Total

Mean Square 905926861.7 25995830.505

F 34.849

Sig. .000

Post Hoc Tests Homogeneous Subsets


Total monthly saving Duncan
a,b

Total Income upto 20000 20001-30000 30001-40000 40001-50000 50001 and above Sig.

N 124 219 103 54 52

1 5310.48

Subset for alpha = .05 2 3 7064.87 10007.20 11195.37

1.000

1.000

.133

13545.67 1.000

Means for groups in homogeneous subsets are displayed. a. Uses Harmonic Mean Sample Size = 83.210. b. The group sizes are unequal. The harmonic mean of the group sizes is used. Type I error levels are not guaranteed.

Page 1

RESULT:
Thus the hypothesis is tested successfully using SPSS software.

CREATION OF BALANCE SHEET


Expt. No: 22 Date:

AIM:
To prepare a balance sheet for Rajesh traders using Tally package for the following information.

PROCEDURE:
If the Tally package was present in the desktop window double click the icon To open it, else select START>PROGRAM>TALLY In the company info. Select create company to create a new company. [CREATION OF LEDGER] In gate way of Tally select Acco.Info. Select Ledger Select single ledger create Then type the name Capital, Sbi Bank, Credit purchase, Credit Sales, Cash in Hand, Machinery, Pravin traders, Krishna Traders, Tavi & co, Kumar & co, Rent, Salaries, Wages, Carriage Inwards, Building. On pressing F11 (function key), it will display the features of the company and Select the choices give yes to maintain bill wise details, Yes to Allow cash Entries in journal, Yes to Use Dr/Cr instead of To/By [CREATION OF VOUCHER] In Gateway of Tally select voucher Entry F4 For contra Select Contra Voucher F5 For Payment Select Contra Voucher F6 For Receipt Select Contra Voucher F7 For Journal Select Contra Voucher F8 For Sales Select Contra Voucher F9 For Purchase Select Contra Voucher [TO DISPLAY THE BALANCE SHEET] In Gateway of tally select Balance sheet It will display the Balance sheet. Exit

RESULT:
Thus the balance sheet is prepared successfully using TALLY software.

PREPARATION OF BALANCE SHEET USING TALLY


Expt. No: 23 Date:

AIM: To prepare Balance sheet using TALLY for the following information. Capital Rs.1, 00,000 is introduced into the Business Salary Rs. 10,000 is paid Cash sales made Rs. 10, 00,000 Sold goods to Mr.Murugan for Rs. 30,000 Sold goods to Mr.Kandan for Rs. 25,000 Cash received from Mr.kandan Rs. 10,000 Cash purchases made for Rs. 1, 25,000 and no closing stock PROCEDURE: Enter in to TALLY by double clicking Go to company Menu and select the New company Enter the company name, short name, address and press Enter button Enter the Starting date and ending date of the fiscal year of the creating Company and press Enter button Enter the Business Type and select TRADER option from the Dropdown list and And press NEXT button From the Activities menu , Select Enter Documents and select journal voucher From the dropdown list and press Ok button Enter the date and enter the following information in the journal voucher

NARRATION Being capital introduced

PARTICULARS Cash a/c To Capital a/c Being Salary paid Salary a/c To Cash a/c Being cash sales made Cash a/c To Sales a/c Being sales made to Murugan a/c murugan To Sales a/c Being sales made to Kandan a/c kandan To Sales a/c Being cash received Cash a/c from kannan To Kandan a/c Being goods Purchase a/c purchased To Cash a/c

DEBIT 1,00,000

CREDIT

1,00,000 10,000 10,000 10,00,000 10,00,000 30,000 30,000 25,000 25,000 10,000 10,000 1,25,000 1,25,000

To view the Balance sheet, from the Report menu, select Balance sheet/standard Select the option from the options window and press ok button.

RESULT:
Thus the balance sheet is prepared successfully using TALLY software.