Anda di halaman 1dari 2

1.

Destination IK This document is a guide for: - Provides guidance on how to change the nature menenentukan content and process water discharge due to the change of vertical pressure on a particular type of soil. - To ensure that the implementation of the changing nature of work means menenentukan content and process water discharge due to changes in vertical pressure padasuatu type of soil to be more effective and efficient. - As the standardization of work, to ensure consistency in carrying out the work, and meet the standards ISO 9001: 2000. 2. Scope This procedure applies in the Department of Geology and needed by the Department Related to the interests of coordination: 3. References - Document KTD.QM.QMS.01: "Quality Manual PT. Kitadin " - Document KTD.SOP.MTM.01: "Geological Investigation" 4. Glossary & Definitions Preparation Preparing the sample to be tested and examined equipment inspected in good condition. Use of personal protective equipment Wearing personal protective equipment: masks, gloves, glasses. The Preparation And Equipment Used A set of tools con solidasi, watches with precision motion 0.01mmdan minimum 1.0 m length, weight, sample expenditures (extruder), sample cutter holder rings, balance with accuracy 0.1 grams, oven with temperature control 110 0c, stop watch. Objects Which Tested Rings cleaned and dried and then weighed. Before the sample is removed from the tube ends first smoothed with a knife. Ujungsample surface should be flat and perpendicular to the axis of the test. Rings mounted on the holder and then set so that the sharp end of the tube is 0.5cm from the sample. Sample removed from the tube and immediately inserted into the rings and the edges smoothed out. Alignment must be careful so as not to suppress the test object. Sample Testing Test specimen and the rings were weighed with a balance sheet. Porous stone placed at the top and bottom rings, so the test object that has been coated filter paper terapit by two porous stones, and then input into the consolidation cell. Tues consolidation which already contains the test object placed on the consolidation tool so that the pointed part of the plate touching the right fulcrum pad pembeban tool.

Tues consolidation which already contains the test object placed on the consolidation tool so that the pointed part of the plate touching the right fulcrum pad pembeban tool. Position the watch is set, then read and dicatat.Beban first installed so that the pressure in the test specimen of 0.25 kg / cm 2, and then watch reads at times of 9.6 ", 21.6", 38.4 ", 1", 2 ", 4" , 9 ", 16", 25 ", 36", 49 "and 24 hours. The burden is allowed to work until the reading of the watch fixed, usually enough for up to 24 hours, after the reading of 1menit, consolidation cell filled with water. After the reading shows the number fixed or after 24 hours, record the final reading of the watch. Then load the second set of 2xbeban first, so that the pressure becomes 2x nya.bacalah timepiece according diatas.Untuk time burdens is then performed in the same way, respectively: 0.25; 0, 50, 1.0, 2.0, 4.0; and 8 kg/cm2.Setelah maximum loading has been fixed the loading menjukan readings reduced in two steps, namely: 4 and 1 / 4 kgf / cm 2 (load rebound). At the time loading is reduced each load should be allowed to work for at least 5 jam.Arloji pointer need only be read after 5 hours is just before the load is reduced again. Immediately After making the final reading is recorded rings and the specimen removed from the consolidation cell and grab the stone from the top surface of the pore and bottom of the test object and then dried. Objects are removed from the test rings, put in the oven and set the dry weight Filling Computer

Anda mungkin juga menyukai