Total quantity 0.00 59.04 77.76 93.48 10.78 62.53 0.00 24.60 57.40 0.00 0.00 83.22 2.00 22.80 173.20 0.00
Units
Estimated quantity in various condition states 1 0.00 57.56 73.87 77.12 10.78 53.15 0.00 24.60 57.40 0.00 0.00 62.42 2.00 12.80 173.20 0.00 A 2 0.00 1.48 3.89 0.00 0.00 9.38 0.00 0.00 0.00 0.00 0.00 20.81 0.00 0.00 0.00 0.00 E 4.00 3 Severity: Medium 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 10.00 0.00 0.00 R 3.00 4 Severity: High 0.00 0.00 0.00 16.36 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 I 3.00 No damage Severity: Low
ESCI (Eq1) 0.000 1.025 1.050 1.525 1.000 1.150 0.000 1.000 1.000 0.000 0.000 1.250 1.000 1.877 1.000 0.000
Si
Mi
ESCI*Si*Mi
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16
each m2 m2 m
2
3 2 2 3 4 4 4 1 1 1 1 1 1 1 1 4
1 2 2 2 2 2 2 3 3 2 3 3 3 2 2 2
0 4.10 4.20 9.15 8.00 9.20 0.00 3.00 3.00 0.00 0.00 3.75 3.00 3.75 2.00 0.00 53.154386
0 1 1 1 1 1 0 1 1 0 0 1 1 1 1 0
Year of construction Road type Number of span Each span length (m) Outer width of bridge (m) Total plan area (m2) Number of pier Top width of pier (m) Bottom width of pier (m) Height of pier (m) Length of return/wing wall (m) Number of bearings Thickness of superstructure (m) Width of bridge between kerbs Thickness of caps Depth of girder
MDR 2 5.7 8.2 93.48 1 1 1.4 3.1 5.4 0 0.5 7.3 0.3 0 0
m2 m2 m2 m m
2
m2 each m2 each m m m
2 2
4.00
3.53
17.064
16<SHI<81
OSCI = 3
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18
2.3
Clearing and uprooting rank vegetation, bushes, shrubs, saplings etc including removal and disposal. Cleaning and Greasing of Metallic bearings complete as per Technical specification Applying epoxy mortar over leached, honey combed and spalled concrete surface and exposed steel reinforcement complete as per Technical specification (10mm thick) Guniting concrete surface with cement mortar applied with compressor after cleaning surface and spraying with epoxy complete as per Technical specification (25mm thick) Patching of damaged concrete surface with polymer concrete and curing compounds, initiator and promoter, available in present formulations, to be applied as per instructions of manufacturer and as approved by the Engineer. Jacketing of concrete surface and exposed steel reinforcement complete as per Technical specification using 200mm thick M 30 grade concrete including reinforcement(@ 40 kg per m3), formwork etc and all accessories to complete the work. Supplying ,hoisting, fixing steel joists in superstructure including painting and all required materials complete. Supplying, fitting and placing HYSD bar reinforcement complete as per drawing and technical specifications Drilling of holes in existing concrete and fixing new reinforcement with epoxy mortar grout but excluding cost of reinforcement
10 1 093 537 1 157 2 580 2 203 75 000 68 793 423 663 5 083 5 165 3 588 40 101 501 66 925
LS 0 0 16 0 0 0 1 0 0 0 0 0 0 15 0 0 0
14.2
16.11 Epoxy bonding of new concrete to old concrete 12.5 13.1 13.4 13.2 13.5 16.4 16.5 16.7 Brick masonry work in cement mortar 1:3 in foundation complete excluding pointing and plastering, as per drawing and technical specifications Brick masonry work in 1:3 in sub-structure complete excluding pointing and plastering, as per drawing and Technical Specifications Stone masonry work in cement mortar 1:3 for substructure complete as per drawing and Technical Specifications Pointing with cement mortar (1:3 ) on brick work/stone work in substructure as per Technical specifications Plastering with cement mortar (1:3 ) on brick work in sub-structure as per Technical specifications Providing and inserting nipples with approved fixing compound after drilling holes for grouting as per Technical Specifications including subsequent cutting/removal and sealing of the hole as necessary of nipples after completion of grouting with Cement/Epoxy Sealing of crack / porous concrete with cement grout by injection process through nipples / grouting complete as per clause 2803.1. Sealing of crack / porous concrete with Epoxy Grout by injection through nipples complete as per clause 2803.1.
no. kg kg
2 of 27
19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35
16.17 Replacement of Expansion Joints complete as per drawings 15.4 15.5 Providing and laying Pitching on slopes laid over prepared filter media including boulder apron laid dry in front of toe of embankment complete as per drawing and Technical specifications. Providing and laying Filter material underneath pitching in slopes complete as per drawing and Technical specification. Construction of masonry toe wall for batter protection. 15.11 Flexible Apron: Construction of flexible apron 1 m thick comprising of loose stone boulders weighing not less than 40 kg beyond curtain wall. Construction of Cut off wall for bed protection with m15 grade cement concrete Providing and laying rubble stone flooring laid in cement mortar 1:3 as per drawing and technical specification laid over cement concrete bedding. Removal of existing asphaltic wearing coat comprising of 50 mm thick asphaltic concrete laid over 12 mm thick mastic asphalt including disposal with all lift and lead upto 1000m. Providing and laying in position 65 mm thick wearing coat consisting of 25mm thick layer of mastic asphalt over 40 mm bituminous concrete over deck slab after applying prime coat complete as per drawings and technical specification sections 500 and 2700 or as directed by the Engineer. Providing and laying Cement concrete wearing coat M-30 grade including reinforcement complete as per drawing and Technical Specifications Providing new guard post in both side of carriage way as per technical specifications 16.18 Replacement of Damaged Concrete Railing. 16.22 Repair of RCC Railing 14.9 8.3 Providing Drainage Spouts complete as per drawing and Technical specification Printing new letter and figures of any shade (Printing new letter and figures of any shade with synthetic enamel paint black or any other approved colour to give an even shade) Safety measures, traffic regulation, scaffolding and other logistic arrangement for execution of works Provision for miscellaneous items not accounted for
m m3 m3 m
3
2 642 1 376 1 117 3 588 1 328 4 952 4 944 47 1 356 11 538 800 2 031 122 1 114 611 10 000
0 0 0 0 0 0 0 21 21 0 0 0 10 0 2 LS LS
NA NA NA NA NA NA NA
NA NA NA
NA
Total Cost : 155 841 Cost of Bridge per m2 of plan area 1 667
3 of 27
ESCI (Eq1)
Si
Mi
ESCI*Si*Mi
0.00 30.42 22.82 71.76 6.74 27.64 0.00 23.40 54.60 32.30 0.00 64.40 2.00 18.40 0.00 0.00
29.727
16<SHI<81
OSCI = 3
Poor 6m-30m
Rate a 10 1 093 537 1 152 2 580 2 232 75 000 Amount Quantity a LS 0 0 13 0 30 0 1 000 0 0 14 855 0 67 897 0 3 127 0 0 0 0 28 152 2 022 0 0 0 0 NA NA NA NA NA NA NA NA NA NA NA NA Remarks
no. kg kg
5 of 27
Poor 6m-30m
Rate a 2 599 1 359 1 099 3 588 1 312 4 848 4 841 47 1 355 12 012 800 2 173 129 1 114 611 10 000 Amount Quantity a 0 10 5 9 0 0 0 11 11 0 0 0 0 0 2 LS LS 0 13 170 5 325 32 971 0 0 0 530 15 271 0 0 0 0 0 1 222 10 000 20 000 NA NA NA NA NA NA NA NA Remarks NA Stone pitching Filter material
16.17 Replacement of Expansion Joints complete as per drawings 15.4 15.5 Providing and laying Pitching on slopes laid over prepared filter media including boulder apron laid dry in front of toe of embankment complete as per drawing and Technical specifications. Providing and laying Filter material underneath pitching in slopes complete as per drawing and Technical specification. Construction of masonry toe wall for batter protection. Flexible Apron: Construction of flexible apron 1 m thick comprising of loose stone boulders weighing not less than 40 kg beyond curtain wall. Construction of Cut off wall for bed protection with m15 grade cement concrete Providing and laying rubble stone flooring laid in cement mortar 1:3 as per drawing and technical specification laid over cement concrete bedding. Removal of existing asphaltic wearing coat comprising of 50 mm thick asphaltic concrete laid over 12 mm thick mastic asphalt including disposal with all lift and lead upto 1000m. Providing and laying in position 65 mm thick wearing coat consisting of 25mm thick layer of mastic asphalt over 40 mm bituminous concrete over deck slab after applying prime coat complete as per drawings and technical specification sections 500 and 2700 or as directed by the Engineer. Providing and laying Cement concrete wearing coat M-30 grade including reinforcement complete as per drawing and Technical Specifications Providing new guard post in both side of carriage way as per technical specifications 16.18 Replacement of Damaged Concrete Railing. 16.22 Repair of RCC Railing 14.9 8.3 Providing Drainage Spouts complete as per drawing and Technical specification Printing new letter and figures of any shade (Printing new letter and figures of any shade with synthetic enamel paint black or any other approved colour to give an even shade) Safety measures, traffic regulation, scaffolding and other logistic arrangement for execution of works Provision for miscellaneous items not accounted for
Total Cost : 215 542 Cost of Bridge per m2 of plan area 3 004
6 of 27
Total quantity 0.00 42.84 39.02 292.32 34.01 209.39 0.00 58.80 58.80 55.24 6.00 245.34 6.00 69.60 520.32 0.00
Units
Estimated quantity in various condition states 1 0.00 42.84 39.02 275.27 32.31 207.29 0.00 0.00 58.80 0.00 6.00 245.34 6.00 69.60 429.26 0.00 A 2 0.00 0.00 0.00 0.00 0.00 0.00 0.00 58.80 0.00 55.24 0.00 0.00 0.00 0.00 91.06 0.00 E 4.00 3 Severity: Medium 0.00 0.00 0.00 17.05 1.70 2.09 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 R 3.00 4 Severity: High 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 I 3.00 No damage Severity: Low
ESCI (Eq1) 0.000 1.000 1.000 1.117 1.100 1.020 0.000 2.000 1.000 2.000 1.000 1.000 1.000 1.000 1.175 0.000
Si
Mi
ESCI*Si*Mi
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16
each m2 m2 m
2
3 2 2 3 4 4 4 1 1 1 1 1 1 1 1 4
1 2 2 2 2 2 2 3 3 2 3 2 3 2 2 2
0 4.00 4.00 6.70 8.80 8.16 0.00 6.00 3.00 4.00 3.00 2.00 3.00 2.00 2.35 0.00 57.01
0 1 1 1 1 1 0 1 1 1 1 1 1 1 1 0
Year of construction Road type Number of span Each span length (m) Outer width of bridge (m) Total plan area (m2) Number of pier Top width of pier (m) Bottom width of pier (m) Height of pier (m) Length of return/wing wall (m) Number of bearings Thickness of superstructure (m) Width of bridge between kerbs Thickness of caps Depth of girder
MDR 6 5.8 8.4 292.32 5 0.8 1.2 2.1 3.825 0 0.45 7.05 0.3 0 0
m2 m2 m2 m m2 m each m2 each m m m
2 2 2
4.00
3.53
15.486
16<SHI<81
OSCI = 2
Poor >30m
Rate a 10 1 093 537 1 157 2 580 2 203 75 000 68 793 423 663 5 083 5 165 3 588 40 101 501 66 925 Amount Quantity a LS 0 126 17 0 0 0 0 0 0 0 0 0 0 0 0 0 0 3 000 0 67 723 19 729 0 0 0 0 0 0 0 0 0 0 0 0 0 0 NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA Remarks
no. kg kg
8 of 27
Poor >30m
Rate a 2 642 1 376 1 117 3 588 1 328 4 952 4 944 47 1 356 11 538 800 2 031 122 1 114 611 10 000 Amount Quantity a 0 18 9 0 12 0 41 0 0 0 0 0 0 0 2 LS LS 0 24 273 9 852 0 15 958 0 202 581 0 0 0 0 0 0 0 1 222 10 000 20 000 NA NA NA NA NA NA NA NA NA Remarks NA Stone pitching Filter material NA
16.17 Replacement of Expansion Joints complete as per drawings 15.4 15.5 Providing and laying Pitching on slopes laid over prepared filter media including boulder apron laid dry in front of toe of embankment complete as per drawing and Technical specifications. Providing and laying Filter material underneath pitching in slopes complete as per drawing and Technical specification. Construction of masonry toe wall for batter protection. Flexible Apron: Construction of flexible apron 1 m thick comprising of loose stone boulders weighing not less than 40 kg beyond curtain wall. Construction of Cut off wall for bed protection with m15 grade cement concrete Providing and laying rubble stone flooring laid in cement mortar 1:3 as per drawing and technical specification laid over cement concrete bedding. Removal of existing asphaltic wearing coat comprising of 50 mm thick asphaltic concrete laid over 12 mm thick mastic asphalt including disposal with all lift and lead upto 1000m. Providing and laying in position 65 mm thick wearing coat consisting of 25mm thick layer of mastic asphalt over 40 mm bituminous concrete over deck slab after applying prime coat complete as per drawings and technical specification sections 500 and 2700 or as directed by the Engineer. Providing and laying Cement concrete wearing coat M-30 grade including reinforcement complete as per drawing and Technical Specifications Providing new guard post in both side of carriage way as per technical specifications 16.18 Replacement of Damaged Concrete Railing. 16.22 Repair of RCC Railing 14.9 8.3 Providing Drainage Spouts complete as per drawing and Technical specification Printing new letter and figures of any shade (Printing new letter and figures of any shade with synthetic enamel paint black or any other approved colour to give an even shade) Safety measures, traffic regulation, scaffolding and other logistic arrangement for execution of works Provision for miscellaneous items not accounted for
9 of 27
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16
Bearing Abutment & dirt wall Wing Wall Concrete deck Slab Abutment & pier caps Piers RCC / PSC/Steel girder Expansion joints Approach carriageway Batter protection General cleaning Wearing surface Waterway Parapet/Railing/Crash barrier Floor protection work Foundation
(ESCI*SI*CPIL)
0.00 30.78 21.66 111.78 10.54 58.37 0.00 32.40 56.70 0.00 0.00 100.74 3.00 27.60 211.65 0.00
0.000 1.000 1.000 2.875 1.000 1.050 0.000 2.000 1.000 0.000 0.000 1.000 1.000 1.000 1.000 0.000
3 2 2 3 4 4 4 1 1 1 1 1 1 1 1 4
1 2 2 2 2 2 2 3 3 2 3 2 3 2 2 2
0 4.00 4.00 17.25 8.00 8.40 0.00 6.00 3.00 0.00 0.00 2.00 3.00 2.00 2.00 0.00 59.65
0 1 1 1 1 1 0 1 1 0 0 1 1 1 1 0
Year of construction Road type Number of Span Each span length(m) Outer width of bridge(m) Total plan area(m^2) Number of pier Top width of pier(m) Bottom width of pier(m) Height of pier(m) Length of return/wing wall(m) Number of bearings Thickness of superstructure (m) width of bridge between kerbs Thickness of caps Depth of girder
MDR 3 4.6 8.1 111.78 2 0.65 0.65 1.6 2.85 0 0.3 7.3 0.2 0 0
19.149
16<SHI<81
OSCI = 3
Poor <30m
Rate a 10 1 093 537 1 152 2 580 2 232 75 000 68 793 466 663 5 044 5 124 3 519 40 99 501 66 925 Amount Quantity a LS 0 0 112 0 0 0 1.3 0 0 0 0 0 0 1 0 0 0 1 200 0 0 128 771 0 0 0 90 119 0 0 0 0 0 0 144 0 0 0 NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA Remarks
no. kg kg
11 of 27
Poor <30m
Rate a 2 599 1 359 1 099 3 588 1 312 4 848 4 841 47 1 355 12 012 800 2 173 129 1 114 611 10 000 Amount Quantity a 0 0 0 0 0 0 0 0 0 0 0 0 0 0 2 LS LS 0 0 0 0 0 0 0 0 0 0 0 0 0 0 1 222 10 000 50 000 Remarks NA NA NA NA NA NA NA NA NA NA NA NA NA NA
16.17 Replacement of Expansion Joints complete as per drawings 15.4 15.5 Providing and laying Pitching on slopes laid over prepared filter media including boulder apron laid dry in front of toe of embankment complete as per drawing and Technical specifications. Providing and laying Filter material underneath pitching in slopes complete as per drawing and Technical specification. Construction of masonry toe wall for batter protection. Flexible Apron: Construction of flexible apron 1 m thick comprising of loose stone boulders weighing not less than 40 kg beyond curtain wall. Construction of Cut off wall for bed protection with m15 grade cement concrete Providing and laying rubble stone flooring laid in cement mortar 1:3 as per drawing and technical specification laid over cement concrete bedding. Removal of existing asphaltic wearing coat comprising of 50 mm thick asphaltic concrete laid over 12 mm thick mastic asphalt including disposal with all lift and lead upto 1000m. Providing and laying in position 65 mm thick wearing coat consisting of 25mm thick layer of mastic asphalt over 40 mm bituminous concrete over deck slab after applying prime coat complete as per drawings and technical specification sections 500 and 2700 or as directed by the Engineer. Providing and laying Cement concrete wearing coat M-30 grade including reinforcement complete as per drawing and Technical Specifications Providing new guard post in both side of carriage way as per technical specifications 16.18 Replacement of Damaged Concrete Railing. 16.22 Repair of RCC Railing 14.9 8.3 Providing Drainage Spouts complete as per drawing and Technical specification Printing new letter and figures of any shade (Printing new letter and figures of any shade with synthetic enamel paint black or any other approved colour to give an even shade) Safety measures, traffic regulation, scaffolding and other logistic arrangement for execution of works Provision for miscellaneous items not accounted for
Total Cost : 281 456 Cost of Bridge per m2 of plan area 2 518
12 of 27
Total quantity 0.00 23.20 12.62 57.60 6.81 18.04 0.00 24.00 56.00 0.00 0.00 51.84 2.00 14.40 110.00 0.00
Units
Estimated quantity in various condition states 1 0.00 23.20 12.62 51.12 6.81 18.04 0.00 24.00 46.20 0.00 0.00 42.77 2.00 14.40 110.00 0.00 A 2 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 E 4.00 3 Severity: Medium 0.00 0.00 0.00 6.48 0.00 0.00 0.00 0.00 9.80 0.00 0.00 9.07 0.00 0.00 0.00 0.00 R 3.00 4 Severity: High 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 I 3.00 No damage Severity: Low
ESCI (Eq1) 0.000 1.000 1.000 1.225 1.000 1.000 0.000 1.000 1.350 0.000 0.000 1.350 1.000 1.000 1.000 0.000
Si
Mi
ESCI*Si*Mi
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16
each m2 m2 m
2
3 2 2 3 4 4 4 1 1 1 1 1 1 1 1 4
1 2 2 2 2 2 2 3 3 2 3 2 3 2 2 2
0 4.00 4.00 7.35 8.00 8.00 0.00 3.00 4.05 0.00 0.00 2.70 3.00 2.00 2.00 0.00 48.1
0 1 1 1 1 1 0 1 1 0 0 1 1 1 1 0
Year of construction Road type Number of span Each span length (m) Outer width of bridge (m) Total plan area (m2) Number of pier Top width of pier (m) Bottom width of pier (m) Height of pier (m) Length of return/wing wall (m) Number of bearings Thickness of superstructure (m) Width of bridge between kerbs Thickness of caps Depth of girder
m2 m2 m2 m m2 m each m2 each m m m
2 2 2
4.00
3.53
15.441
16<SHI<81
OSCI = 2
FAIR <30m
Rate a 10 1 093 537 1 157 2 580 2 203 75 000 68 793 423 663 5 083 5 165 3 588 40 101 501 66 925 Amount Quantity a LS 0 0 6 0 0 0 0 0 0 0 0 0 0 0 0 0 0 5 000 0 0 7 497 0 0 0 0 0 0 0 0 0 0 0 0 0 0 NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA Remarks
no. kg kg
14 of 27
FAIR <30m
Rate a 2 642 1 376 1 117 3 588 1 328 4 952 4 944 47 1 356 11 538 800 2 031 122 1 114 611 10 000 Amount Quantity a 0 0 0 0 0 0 0 19 19 0 0 0 0 0 2 LS LS 0 0 0 0 0 0 0 887 25 590 0 0 0 0 0 1 222 10 000 20 000 NA NA NA NA NA Remarks NA NA NA NA NA NA NA
16.17 Replacement of Expansion Joints complete as per drawings 15.4 15.5 Providing and laying Pitching on slopes laid over prepared filter media including boulder apron laid dry in front of toe of embankment complete as per drawing and Technical specifications. Providing and laying Filter material underneath pitching in slopes complete as per drawing and Technical specification. Construction of masonry toe wall for batter protection. Flexible Apron: Construction of flexible apron 1 m thick comprising of loose stone boulders weighing not less than 40 kg beyond curtain wall. Construction of Cut off wall for bed protection with m15 grade cement concrete Providing and laying rubble stone flooring laid in cement mortar 1:3 as per drawing and technical specification laid over cement concrete bedding. Removal of existing asphaltic wearing coat comprising of 50 mm thick asphaltic concrete laid over 12 mm thick mastic asphalt including disposal with all lift and lead upto 1000m. Providing and laying in position 65 mm thick wearing coat consisting of 25mm thick layer of mastic asphalt over 40 mm bituminous concrete over deck slab after applying prime coat complete as per drawings and technical specification sections 500 and 2700 or as directed by the Engineer. Providing and laying Cement concrete wearing coat M-30 grade including reinforcement complete as per drawing and Technical Specifications Providing new guard post in both side of carriage way as per technical specifications 16.18 Replacement of Damaged Concrete Railing. 16.22 Repair of RCC Railing 14.9 8.3 Providing Drainage Spouts complete as per drawing and Technical specification Printing new letter and figures of any shade (Printing new letter and figures of any shade with synthetic enamel paint black or any other approved colour to give an even shade) Safety measures, traffic regulation, scaffolding and other logistic arrangement for execution of works Provision for miscellaneous items not accounted for
15 of 27
Total quantity 30.00 104.58 238.14 892.25 51.55 373.88 1322.25 49.80 58.10 337.18 0.00 779.38 5.00 215.00 0.00 0.00
Units
Estimated quantity in various condition states 1 27.00 104.58 238.14 874.41 49.49 372.01 1309.03 0.00 58.10 337.18 0.00 779.38 5.00 204.25 0.00 0.00 A 2 0.00 0.00 0.00 17.85 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 10.75 0.00 0.00 E 4.00 3 Severity: Medium 0.00 0.00 0.00 0.00 2.06 0.00 13.22 49.80 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 R 3.00 4 Severity: High 3.00 0.00 0.00 0.00 0.00 1.87 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 I 3.00 No damage Severity: Low
ESCI (Eq1) 1.300 1.000 1.000 1.020 1.080 1.015 1.020 3.000 1.000 1.000 0.000 1.000 1.000 1.050 0.000 0.000
Si
Mi
ESCI*Si*Mi
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16
each m2 m2 m
2
3 2 2 3 4 4 4 1 1 1 1 1 1 1 1 4
1 2 2 2 2 2 2 3 3 2 3 2 3 2 2 2
3.9 4.00 4.00 6.12 8.64 8.12 8.16 9.00 3.00 2.00 0.00 2.00 3.00 2.10 0.00 0.00 64.04
1 1 1 1 1 1 1 1 1 1 0 1 1 1 0 0
Year of construction Road type Number of span Each span length (m) Outer width of bridge (m) Total plan area (m2) Number of pier Top width of pier (m) Bottom width of pier (m) Height of pier (m) Length of return/wing wall (m) Number of bearings Thickness of superstructure (m) Width of bridge between kerbs Thickness of caps Depth of girder
1968 MDR 5 21.5 8.3 892.25 4 1.6 2 4.20 9.45 30 2.1 7.25 0.5 1.9 3
m2 m2 m2 m m2 m each m2 each m m m
2 2 2
4.00
3.53
17.396
16<SHI<81
OSCI = 3
POOR >30m
Rate a 10 1 093 537 1 157 2 580 2 203 75 000 68 793 423 663 5 083 5 165 3 588 40 101 501 66 925 Amount Quantity a LS 30 0 35 0 0 0 0 0 0 0 0 0 0 0 0 0 19 10 000 32 790 0 40 494 0 0 0 0 0 0 0 0 0 0 0 0 0 17 908 NA NA NA NA NA NA NA NA NA NA NA NA NA NA Remarks
no. kg kg
17 of 27
POOR >30m
Rate a 2 642 1 376 1 117 3 588 1 328 4 952 4 944 47 1 356 11 538 800 2 031 122 1 114 611 10 000 Amount Quantity a 50 0 0 0 0 0 0 0 0 0 0 0 11 0 2 LS LS 131 572 0 0 0 0 0 0 0 0 0 0 0 1 312 0 1 222 10 000 20 000 NA NA NA NA NA NA NA NA NA NA NA NA Remarks
16.17 Replacement of Expansion Joints complete as per drawings 15.4 15.5 Providing and laying Pitching on slopes laid over prepared filter media including boulder apron laid dry in front of toe of embankment complete as per drawing and Technical specifications. Providing and laying Filter material underneath pitching in slopes complete as per drawing and Technical specification. Construction of masonry toe wall for batter protection. Flexible Apron: Construction of flexible apron 1 m thick comprising of loose stone boulders weighing not less than 40 kg beyond curtain wall. Construction of Cut off wall for bed protection with m15 grade cement concrete Providing and laying rubble stone flooring laid in cement mortar 1:3 as per drawing and technical specification laid over cement concrete bedding. Removal of existing asphaltic wearing coat comprising of 50 mm thick asphaltic concrete laid over 12 mm thick mastic asphalt including disposal with all lift and lead upto 1000m. Providing and laying in position 65 mm thick wearing coat consisting of 25mm thick layer of mastic asphalt over 40 mm bituminous concrete over deck slab after applying prime coat complete as per drawings and technical specification sections 500 and 2700 or as directed by the Engineer. Providing and laying Cement concrete wearing coat M-30 grade including reinforcement complete as per drawing and Technical Specifications Providing new guard post in both side of carriage way as per technical specifications 16.18 Replacement of Damaged Concrete Railing. 16.22 Repair of RCC Railing 14.9 8.3 Providing Drainage Spouts complete as per drawing and Technical specification Printing new letter and figures of any shade (Printing new letter and figures of any shade with synthetic enamel paint black or any other approved colour to give an even shade) Safety measures, traffic regulation, scaffolding and other logistic arrangement for execution of works Provision for miscellaneous items not accounted for
18 of 27
Total quantity 0.00 22.01 10.94 74.98 6.96 18.50 0.00 24.45 57.05 0.00 2.00 67.16 2.00 18.40 142.88 0.00
Units
Estimated quantity in various condition states 1 0.00 22.01 10.94 71.23 6.96 18.50 0.00 0.00 57.05 0.00 2.00 33.58 2.00 18.40 142.88 0.00 A 2 0.00 0.00 0.00 0.00 0.00 0.00 0.00 24.45 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 E 4.00 3 Severity: Medium 0.00 0.00 0.00 3.75 0.00 0.00 0.00 0.00 0.00 0.00 0.00 33.58 0.00 0.00 0.00 0.00 R 3.00 4 Severity: High 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 I 3.00 No damage Severity: Low
ESCI (Eq1) 0.000 1.000 1.000 1.100 1.000 1.000 0.000 2.000 1.000 0.000 1.000 2.000 1.000 1.000 1.000 0.000
Si
Mi
ESCI*Si*Mi
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16
each m2 m2 m
2
3 2 2 3 4 4 4 1 1 1 1 1 1 1 1 4
1 2 2 2 2 2 2 3 3 2 3 2 3 2 2 2
0 4.00 4.00 6.60 8.00 8.00 0.00 6.00 3.00 0.00 3.00 4.00 3.00 2.00 2.00 0.00 53.6
0 1 1 1 1 1 0 1 1 0 1 1 1 1 1 0
Year of construction Road type Number of span Each span length (m) Outer width of bridge (m) Total plan area (m2) Number of pier Top width of pier (m) Bottom width of pier (m) Height of pier (m) Length of return/wing wall (m) Number of bearings Thickness of superstructure (m) Width of bridge between kerbs Thickness of caps Depth of girder
MDR 2 4.6 8.15 74.98 1 0.7 0.7 1 2.025 0 0.35 7.3 0.2 0 0
m2 m2 m2 m m2 m each m2 each m m m
2 2 2
4.00
3.53
15.773
16<SHI<81
OSCI = 2
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18
2.3
Clearing and uprooting rank vegetation, bushes, shrubs, saplings etc including removal and disposal. Cleaning and Greasing of Metallic bearings complete as per Technical specification Applying epoxy mortar over leached, honey combed and spalled concrete surface and exposed steel reinforcement complete as per Technical specification (10mm thick) Guniting concrete surface with cement mortar applied with compressor after cleaning surface and spraying with epoxy complete as per Technical specification (25mm thick) Patching of damaged concrete surface with polymer concrete and curing compounds, initiator and promoter, available in present formulations, to be applied as per instructions of manufacturer and as approved by the Engineer. Jacketing of concrete surface and exposed steel reinforcement complete as per Technical specification using 200mm thick M 30 grade concrete including reinforcement(@ 40 kg per m3), formwork etc and all accessories to complete the work. Supplying ,hoisting, fixing steel joists in superstructure including painting and all required materials complete. Supplying, fitting and placing HYSD bar reinforcement complete as per drawing and technical specifications Drilling of holes in existing concrete and fixing new reinforcement with epoxy mortar grout but excluding cost of reinforcement
10 1 093 537 1 157 2 580 2 203 75 000 68 793 423 663 5 083 5 165 3 588 40 101 501 66 925
LS 0 0 4 0 0 0 0 0 0 0 0 0 0 0 0 0 0
1 000 0 0 4 338 0 0 0 0 0 0 0 0 0 0 0 0 0 0 NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA
14.2
16.11 Epoxy bonding of new concrete to old concrete 12.5 13.1 13.4 13.2 13.5 16.4 16.5 16.7 Brick masonry work in cement mortar 1:3 in foundation complete excluding pointing and plastering, as per drawing and technical specifications Brick masonry work in 1:3 in sub-structure complete excluding pointing and plastering, as per drawing and Technical Specifications Stone masonry work in cement mortar 1:3 for substructure complete as per drawing and Technical Specifications Pointing with cement mortar (1:3 ) on brick work/stone work in substructure as per Technical specifications Plastering with cement mortar (1:3 ) on brick work in sub-structure as per Technical specifications Providing and inserting nipples with approved fixing compound after drilling holes for grouting as per Technical Specifications including subsequent cutting/removal and sealing of the hole as necessary of nipples after completion of grouting with Cement/Epoxy Sealing of crack / porous concrete with cement grout by injection process through nipples / grouting complete as per clause 2803.1. Sealing of crack / porous concrete with Epoxy Grout by injection through nipples complete as per clause 2803.1.
no. kg kg
20 of 27
19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35
16.17 Replacement of Expansion Joints complete as per drawings 15.4 15.5 Providing and laying Pitching on slopes laid over prepared filter media including boulder apron laid dry in front of toe of embankment complete as per drawing and Technical specifications. Providing and laying Filter material underneath pitching in slopes complete as per drawing and Technical specification. Construction of masonry toe wall for batter protection. 15.11 Flexible Apron: Construction of flexible apron 1 m thick comprising of loose stone boulders weighing not less than 40 kg beyond curtain wall. Construction of Cut off wall for bed protection with m15 grade cement concrete Providing and laying rubble stone flooring laid in cement mortar 1:3 as per drawing and technical specification laid over cement concrete bedding. Removal of existing asphaltic wearing coat comprising of 50 mm thick asphaltic concrete laid over 12 mm thick mastic asphalt including disposal with all lift and lead upto 1000m. Providing and laying in position 65 mm thick wearing coat consisting of 25mm thick layer of mastic asphalt over 40 mm bituminous concrete over deck slab after applying prime coat complete as per drawings and technical specification sections 500 and 2700 or as directed by the Engineer. Providing and laying Cement concrete wearing coat M-30 grade including reinforcement complete as per drawing and Technical Specifications Providing new guard post in both side of carriage way as per technical specifications 16.18 Replacement of Damaged Concrete Railing. 16.22 Repair of RCC Railing 14.9 8.3 Providing Drainage Spouts complete as per drawing and Technical specification Printing new letter and figures of any shade (Printing new letter and figures of any shade with synthetic enamel paint black or any other approved colour to give an even shade) Safety measures, traffic regulation, scaffolding and other logistic arrangement for execution of works Provision for miscellaneous items not accounted for
m m3 m3 m
3
2 642 1 376 1 117 3 588 1 328 4 952 4 944 47 1 356 11 538 800 2 031 122 1 114 611 10 000
0 0 0 0 0 0 0 34 34 0 0 0 0 0 2 LS LS
NA NA NA
NA NA NA
NA NA NA NA NA
21 of 27
Total quantity 0.00 44.50 37.50 242.08 15.37 121.88 0.00 44.50 62.30 0.00 4.00 217.60 4.00 36.00 0.00 0.00
Units
Estimated quantity in various condition states 1 0.00 42.28 37.50 229.98 15.37 115.79 0.00 44.50 62.30 0.00 2.00 217.60 4.00 12.00 0.00 0.00 A 2 0.00 2.23 0.00 12.10 0.00 6.09 0.00 0.00 0.00 0.00 2.00 0.00 0.00 24.00 0.00 0.00 E 4.00 3 Severity: Medium 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 R 3.00 4 Severity: High 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 I 3.00 No damage Severity: Low
ESCI (Eq1) 0.000 1.050 1.000 1.050 1.000 1.050 0.000 1.000 1.000 0.000 1.500 1.000 1.000 1.667 0.000 0.000
Si
Mi
ESCI*Si*Mi
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16
each m2 m2 m
2
3 2 2 3 4 4 4 1 1 1 1 1 1 1 1 4
1 2 2 2 2 2 2 3 3 2 3 2 3 2 2 2
0 4.20 4.00 6.30 8.00 8.40 0.00 3.00 3.00 0.00 4.50 2.00 3.00 3.33 0.00 0.00
0 1 1 1 1 1 0 1 1 0 1 1 1 1 0 0
Year of construction Road type Number of span Each span length (m) Outer width of bridge (m) Total plan area (m2) Number of pier Top width of pier (m) Bottom width of pier (m) Height of pier (m) Length of return/wing wall (m) Number of bearings Thickness of superstructure (m) Width of bridge between kerbs Thickness of caps Depth of girder
m2 m2 m2 m m2 m each m2 each no m
2 2
m2
4.00
3.53
15.966
16<SHI<81
OSCI = 2
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18
2.3
Clearing and uprooting rank vegetation, bushes, shrubs, saplings etc including removal and disposal. Cleaning and Greasing of Metallic bearings complete as per Technical specification Applying epoxy mortar over leached, honey combed and spalled concrete surface and exposed steel reinforcement complete as per Technical specification (10mm thick) Guniting concrete surface with cement mortar applied with compressor after cleaning surface and spraying with epoxy complete as per Technical specification (25mm thick) Patching of damaged concrete surface with polymer concrete and curing compounds, initiator and promoter, available in present formulations, to be applied as per instructions of manufacturer and as approved by the Engineer. Jacketing of concrete surface and exposed steel reinforcement complete as per Technical specification using 200mm thick M 30 grade concrete including reinforcement(@ 40 kg per m3), formwork etc and all accessories to complete the work. Supplying ,hoisting, fixing steel joists in superstructure including painting and all required materials complete. Supplying, fitting and placing HYSD bar reinforcement complete as per drawing and technical specifications Drilling of holes in existing concrete and fixing new reinforcement with epoxy mortar grout but excluding cost of reinforcement
10 1 093 537 1 157 2 580 2 203 75 000 68 793 423 663 5 083 5 165 3 588 40 101 501 66 925
LS 0 8 12 0 0 0 0 0 0 0 0 0 0 0 0 0 0
14.2
16.11 Epoxy bonding of new concrete to old concrete 12.5 13.1 13.4 13.2 13.5 16.4 16.5 16.7 Brick masonry work in cement mortar 1:3 in foundation complete excluding pointing and plastering, as per drawing and technical specifications Brick masonry work in 1:3 in sub-structure complete excluding pointing and plastering, as per drawing and Technical Specifications Stone masonry work in cement mortar 1:3 for substructure complete as per drawing and Technical Specifications Pointing with cement mortar (1:3 ) on brick work/stone work in substructure as per Technical specifications Plastering with cement mortar (1:3 ) on brick work in sub-structure as per Technical specifications Providing and inserting nipples with approved fixing compound after drilling holes for grouting as per Technical Specifications including subsequent cutting/removal and sealing of the hole as necessary of nipples after completion of grouting with Cement/Epoxy Sealing of crack / porous concrete with cement grout by injection process through nipples / grouting complete as per clause 2803.1. Sealing of crack / porous concrete with Epoxy Grout by injection through nipples complete as per clause 2803.1.
no. kg kg
23 of 27
19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35
16.17 Replacement of Expansion Joints complete as per drawings 15.4 15.5 Providing and laying Pitching on slopes laid over prepared filter media including boulder apron laid dry in front of toe of embankment complete as per drawing and Technical specifications. Providing and laying Filter material underneath pitching in slopes complete as per drawing and Technical specification. Construction of masonry toe wall for batter protection. 15.11 Flexible Apron: Construction of flexible apron 1 m thick comprising of loose stone boulders weighing not less than 40 kg beyond curtain wall. Construction of Cut off wall for bed protection with m15 grade cement concrete Providing and laying rubble stone flooring laid in cement mortar 1:3 as per drawing and technical specification laid over cement concrete bedding. Removal of existing asphaltic wearing coat comprising of 50 mm thick asphaltic concrete laid over 12 mm thick mastic asphalt including disposal with all lift and lead upto 1000m. Providing and laying in position 65 mm thick wearing coat consisting of 25mm thick layer of mastic asphalt over 40 mm bituminous concrete over deck slab after applying prime coat complete as per drawings and technical specification sections 500 and 2700 or as directed by the Engineer. Providing and laying Cement concrete wearing coat M-30 grade including reinforcement complete as per drawing and Technical Specifications
m m3 m3 m
3
2 642 1 376 1 117 3 588 1 328 4 952 4 944 47 1 356 11 538 800 2 031 122 1 114 611 10 000
0 0 0 0 0 0 0 0 0 0 24 0 0 0 2 LS LS
NA NA NA NA NA NA NA NA NA NA
16.21 Providing and fixing guard post 16.18 Replacement of Damaged Concrete Railing. 16.22 Repair of RCC Railing 14.9 8.3 Providing Drainage Spouts complete as per drawing and Technical specification Printing new letter and figures of any shade (Printing new letter and figures of any shade with synthetic enamel paint black or any other approved colour to give an even shade) Safety measures, traffic regulation, scaffolding and other logistic arrangement for execution of works Provision for miscellaneous items not accounted for
NA NA NA
24 of 27
Total quantity 0.00 23.25 0.00 63.00 6.41 21.30 0.00 22.50 52.50 20.41 0.00 56.28 2.00 16.80 125.33 0.00
Units
Estimated quantity in various condition states 1 0.00 23.25 0.00 51.98 6.41 21.30 0.00 0.00 52.50 15.31 0.00 56.28 2.00 15.96 125.33 0.00 A 2 0.00 0.00 0.00 0.00 0.00 0.00 0.00 22.50 0.00 0.00 0.00 0.00 0.00 0.84 0.00 0.00 E 4.00 3 Severity: Medium 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 R 3.00 4 Severity: High 0.00 0.00 0.00 11.03 0.00 0.00 0.00 0.00 0.00 5.10 0.00 0.00 0.00 0.00 0.00 0.00 I 3.00 No damage Severity: Low
ESCI (Eq1) 0.000 1.000 0.000 1.525 1.000 1.000 0.000 2.000 1.000 1.750 0.000 1.000 1.000 1.050 1.000 0.000
Si
Mi
ESCI*Si*Mi
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16
each m2 m2 m
2
3 2 2 3 4 4 4 1 1 1 1 1 1 1 1 4
1 2 2 2 2 2 2 3 3 2 3 3 3 2 2 2
0 4.00 0.00 9.15 8.00 8.00 0.00 6.00 3.00 3.50 0.00 3.00 3.00 2.10 2.00 0.00 51.75
0 1 0 1 1 1 0 1 1 1 0 1 1 1 1 0
Year of construction Road type Number of span Each span length (m) Outer width of bridge (m) Total plan area (m2) Number of pier Top width of pier (m) Bottom width of pier (m) Height of pier (m) Length of return/wing wall (m) Number of bearings Thickness of superstructure (m) Width of bridge between kerbs Thickness of caps Depth of girder
MDR 2 4.2 7.5 63 1 0.65 0.65 1.25 2.325 0 0.3 6.7 0.2 0 0
m2 m2 m2 m m2 m each m2 each m m m
2 2 2
4.00
3.53
16.613
16<SHI<81
OSCI = 3
no. kg kg
26 of 27
16.17 Replacement of Expansion Joints complete as per drawings 15.4 15.5 Providing and laying Pitching on slopes laid over prepared filter media including boulder apron laid dry in front of toe of embankment complete as per drawing and Technical specifications. Providing and laying Filter material underneath pitching in slopes complete as per drawing and Technical specification. Construction of masonry toe wall for batter protection. Flexible Apron: Construction of flexible apron 1 m thick comprising of loose stone boulders weighing not less than 40 kg beyond curtain wall. Construction of Cut off wall for bed protection with m15 grade cement concrete Providing and laying rubble stone flooring laid in cement mortar 1:3 as per drawing and technical specification laid over cement concrete bedding. Removal of existing asphaltic wearing coat comprising of 50 mm thick asphaltic concrete laid over 12 mm thick mastic asphalt including disposal with all lift and lead upto 1000m. Providing and laying in position 65 mm thick wearing coat consisting of 25mm thick layer of mastic asphalt over 40 mm bituminous concrete over deck slab after applying prime coat complete as per drawings and technical specification sections 500 and 2700 or as directed by the Engineer. Providing and laying Cement concrete wearing coat M-30 grade including reinforcement complete as per drawing and Technical Specifications
16.21 Providing and fixing guard post 16.18 Replacement of Damaged Concrete Railing. 16.22 Repair of RCC Railing 14.9 8.3 Providing Drainage Spouts complete as per drawing and Technical specification Printing new letter and figures of any shade (Printing new letter and figures of any shade with synthetic enamel paint black or any other approved colour to give an even shade) Safety measures, traffic regulation, scaffolding and other logistic arrangement for execution of works Provision for miscellaneous items not accounted for
27 of 27