D05_R04_CH - 0.

024 - (Nimapada Astaranga Road)


Item Element description Bearing Abutment & dirt wall Wing wall Concrete deck slab Abutment & pier caps Piers RCC/PSC/Steel girder Expansion joints Approach carriageway Batter protection General cleaning Wearing surface Waterway Parapet/Railing/Crash barrier Floor protection work Foundation
(ESCI*SI*CPIL)

Total quantity 0.00 59.04 77.76 93.48 10.78 62.53 0.00 24.60 57.40 0.00 0.00 83.22 2.00 22.80 173.20 0.00

Units

Estimated quantity in various condition states 1 0.00 57.56 73.87 77.12 10.78 53.15 0.00 24.60 57.40 0.00 0.00 62.42 2.00 12.80 173.20 0.00 A 2 0.00 1.48 3.89 0.00 0.00 9.38 0.00 0.00 0.00 0.00 0.00 20.81 0.00 0.00 0.00 0.00 E 4.00 3 Severity: Medium 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 10.00 0.00 0.00 R 3.00 4 Severity: High 0.00 0.00 0.00 16.36 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 I 3.00 No damage Severity: Low

ESCI (Eq1) 0.000 1.025 1.050 1.525 1.000 1.150 0.000 1.000 1.000 0.000 0.000 1.250 1.000 1.877 1.000 0.000

Si

Mi

ESCI*Si*Mi

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16

each m2 m2 m
2

3 2 2 3 4 4 4 1 1 1 1 1 1 1 1 4

1 2 2 2 2 2 2 3 3 2 3 3 3 2 2 2

0 4.10 4.20 9.15 8.00 9.20 0.00 3.00 3.00 0.00 0.00 3.75 3.00 3.75 2.00 0.00 53.154386

0 1 1 1 1 1 0 1 1 0 0 1 1 1 1 0

Year of construction Road type Number of span Each span length (m) Outer width of bridge (m) Total plan area (m2) Number of pier Top width of pier (m) Bottom width of pier (m) Height of pier (m) Length of return/wing wall (m) Number of bearings Thickness of superstructure (m) Width of bridge between kerbs Thickness of caps Depth of girder

MDR 2 5.7 8.2 93.48 1 1 1.4 3.1 5.4 0 0.5 7.3 0.3 0 0

m2 m2 m2 m m
2

m2 each m2 each m m m
2 2

11 No of girders per span

CF=0411 A+0 120E+0. 107R+0.362I SHI=CF*{(ESCI*SI*MI)/n

4.00

3.53

SHI = 53.1543859649123 X 3.531 / 11

17.064

OSCI=1 OSCI=2 OSCI=3 OSCI=4

when SHI=1 when 1<SHI =< 16 when 16<SHI<81 when 81<SHI<256

16<SHI<81

OSCI = 3

D05_R04_CH - 1.84 - (Nimapada Astaranga Road)


Sl. No. MORTH Ref. Item description Unit Rate a

Poor < 30m


Amount Quantity a Remarks

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18

2.3

Clearing and uprooting rank vegetation, bushes, shrubs, saplings etc including removal and disposal. Cleaning and Greasing of Metallic bearings complete as per Technical specification Applying epoxy mortar over leached, honey combed and spalled concrete surface and exposed steel reinforcement complete as per Technical specification (10mm thick) Guniting concrete surface with cement mortar applied with compressor after cleaning surface and spraying with epoxy complete as per Technical specification (25mm thick) Patching of damaged concrete surface with polymer concrete and curing compounds, initiator and promoter, available in present formulations, to be applied as per instructions of manufacturer and as approved by the Engineer. Jacketing of concrete surface and exposed steel reinforcement complete as per Technical specification using 200mm thick M 30 grade concrete including reinforcement(@ 40 kg per m3), formwork etc and all accessories to complete the work. Supplying ,hoisting, fixing steel joists in superstructure including painting and all required materials complete. Supplying, fitting and placing HYSD bar reinforcement complete as per drawing and technical specifications Drilling of holes in existing concrete and fixing new reinforcement with epoxy mortar grout but excluding cost of reinforcement

m2 no. m2 m2 m2 m2 tonne tonne no. m2 m3 m3 m3 m m


2 2

10 1 093 537 1 157 2 580 2 203 75 000 68 793 423 663 5 083 5 165 3 588 40 101 501 66 925

LS 0 0 16 0 0 0 1 0 0 0 0 0 0 15 0 0 0

5 000 0 0 18 927 0 0 0 68 793 0 0 0 0 0 0 1 489 0 0 0 NA NA NA NA NA NA NA NA NA NA NA NA NA NA

16.8 16.3 16.6

14.2

16.11 Epoxy bonding of new concrete to old concrete 12.5 13.1 13.4 13.2 13.5 16.4 16.5 16.7 Brick masonry work in cement mortar 1:3 in foundation complete excluding pointing and plastering, as per drawing and technical specifications Brick masonry work in 1:3 in sub-structure complete excluding pointing and plastering, as per drawing and Technical Specifications Stone masonry work in cement mortar 1:3 for substructure complete as per drawing and Technical Specifications Pointing with cement mortar (1:3 ) on brick work/stone work in substructure as per Technical specifications Plastering with cement mortar (1:3 ) on brick work in sub-structure as per Technical specifications Providing and inserting nipples with approved fixing compound after drilling holes for grouting as per Technical Specifications including subsequent cutting/removal and sealing of the hole as necessary of nipples after completion of grouting with Cement/Epoxy Sealing of crack / porous concrete with cement grout by injection process through nipples / grouting complete as per clause 2803.1. Sealing of crack / porous concrete with Epoxy Grout by injection through nipples complete as per clause 2803.1.

no. kg kg

2 of 27

D05_R04_CH - 1.84 - (Nimapada Astaranga Road)


Sl. No. MORTH Ref. Item description Unit Rate a

Poor < 30m


Amount Quantity a Remarks

19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35

16.17 Replacement of Expansion Joints complete as per drawings 15.4 15.5 Providing and laying Pitching on slopes laid over prepared filter media including boulder apron laid dry in front of toe of embankment complete as per drawing and Technical specifications. Providing and laying Filter material underneath pitching in slopes complete as per drawing and Technical specification. Construction of masonry toe wall for batter protection. 15.11 Flexible Apron: Construction of flexible apron 1 m thick comprising of loose stone boulders weighing not less than 40 kg beyond curtain wall. Construction of Cut off wall for bed protection with m15 grade cement concrete Providing and laying rubble stone flooring laid in cement mortar 1:3 as per drawing and technical specification laid over cement concrete bedding. Removal of existing asphaltic wearing coat comprising of 50 mm thick asphaltic concrete laid over 12 mm thick mastic asphalt including disposal with all lift and lead upto 1000m. Providing and laying in position 65 mm thick wearing coat consisting of 25mm thick layer of mastic asphalt over 40 mm bituminous concrete over deck slab after applying prime coat complete as per drawings and technical specification sections 500 and 2700 or as directed by the Engineer. Providing and laying Cement concrete wearing coat M-30 grade including reinforcement complete as per drawing and Technical Specifications Providing new guard post in both side of carriage way as per technical specifications 16.18 Replacement of Damaged Concrete Railing. 16.22 Repair of RCC Railing 14.9 8.3 Providing Drainage Spouts complete as per drawing and Technical specification Printing new letter and figures of any shade (Printing new letter and figures of any shade with synthetic enamel paint black or any other approved colour to give an even shade) Safety measures, traffic regulation, scaffolding and other logistic arrangement for execution of works Provision for miscellaneous items not accounted for

m m3 m3 m
3

2 642 1 376 1 117 3 588 1 328 4 952 4 944 47 1 356 11 538 800 2 031 122 1 114 611 10 000

0 0 0 0 0 0 0 21 21 0 0 0 10 0 2 LS LS

0 0 0 0 0 0 0 978 28 212 0 0 0 1 220 0 1 222 10 000 20 000

NA NA NA NA NA NA NA

m3 m3 m3 m2 m2 m3 no. m m no. Each bridge

16.2 5.14 14.4

NA NA NA

NA

Total Cost : 155 841 Cost of Bridge per m2 of plan area 1 667

3 of 27

D05_R04_CH - 1.84 - (Nimapada Astaranga Road)


Item Element description Total quantity Units 1 each m2 m2 m2 m2 m2 m2 m m2 m2 each m2 each m m2 m2 0.00 11.41 8.56 59.20 6.41 10.37 0.00 23.40 54.60 0.00 0.00 53.13 2.00 0.00 0.00 0.00 A CF=0411 A+0 120E+0. 107R+0.362I SHI=CF*{(ESCI*SI*MI)/n OSCI=1 OSCI=2 OSCI=3 OSCI=4 when SHI=1 when 1<SHI =< 16 when 16<SHI<81 when 81<SHI<256 4.00 Estimated quantity in various condition states 2 0.00 0.00 0.00 0.00 0.34 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 E 4.00 3 Sevirity: Medium 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 11.27 0.00 0.00 0.00 0.00 R 3.00 4 Sevirity: High 0.00 19.01 14.26 12.56 0.00 17.28 0.00 0.00 0.00 32.30 0.00 0.00 0.00 18.40 0.00 0.00 I 3.00 3.53 0.000 2.875 2.875 1.525 1.050 2.875 0.000 1.000 1.000 4.000 0.000 1.350 1.000 4.000 0.000 0.000 3 2 2 3 4 4 4 1 1 1 1 1 1 1 1 4 1 2 2 2 2 2 2 3 3 2 3 3 3 2 2 2 0 11.50 11.50 9.15 8.40 23.00 0.00 3.00 3.00 8.00 0.00 4.05 3.00 8.00 0.00 0.00 92.6 0 1 1 1 1 1 0 1 1 1 0 1 1 1 0 0 Year of construction Road type Number of Span Each span length(m) Outer width of bridge(m) Total plan area(m^2) Number of pier Top width of pier(m) Bottom width of pier(m) Height of pier(m) Length of return/wing wall(m) Number of bearings Thickness of superstructure (m) width of bridge between kerbs Thickness of caps Depth of girder MDR 2 4.6 7.8 71.76 1 0.8 1 1.5 2.925 0 0.45 7 0.2 0 0 No damage Sevirity: Low 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 Bearing Abutment & dirt wall Wing Wall Concrete deck Slab Abutment & pier caps Piers RCC / PSC/Steel girder Expansion joints Approach carriageway Batter protection General cleaning Wearing surface Waterway Parapet/Railing/Crash barrier Floor protection work Foundation
(ESCI*SI*CPIL)

ESCI (Eq1)

Si

Mi

ESCI*Si*Mi

0.00 30.42 22.82 71.76 6.74 27.64 0.00 23.40 54.60 32.30 0.00 64.40 2.00 18.40 0.00 0.00

11 No of girders per span

SHI = 92.6 X 3.531 / 11

29.727

16<SHI<81

OSCI = 3

D05_R04_CH - 1.84 - (Nimapada Astaranga Road)


Sl. MORTH No. Ref. 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 14.2 16.8 16.3 16.6 2.3 Item description Clearing and uprooting rank vegetation, bushes, shrubs, saplings etc including removal and disposal. Cleaning and Greasing of Metallic bearings complete as per Technical specification Applying epoxy mortar over leached, honey combed and spalled concrete surface and exposed steel reinforcement complete as per Technical specification (10mm thick) Guniting concrete surface with cement mortar applied with compressor after cleaning surface and spraying with epoxy complete as per Technical specification (25mm thick) Patching of damaged concrete surface with polymer concrete and curing compounds, initiator and promoter, available in present formulations, to be applied as per instructions of manufacturer and as approved by the Engineer. Jacketing of concrete surface and exposed steel reinforcement complete as per Technical specification using 200mm thick M 30 grade concrete including reinforcement(@ 40 kg per m3), formwork etc and all accessories to complete the work. Supplying ,hoisting, fixing steel joists in superstructure including painting and all required materials complete. Supplying, fitting and placing HYSD bar reinforcement complete as per drawing and technical specifications Drilling of holes in existing concrete and fixing new reinforcement with epoxy mortar grout but excluding cost of reinforcement 16.11 Epoxy bonding of new concrete to old concrete 12.5 13.1 13.4 13.2 13.5 16.4 16.5 16.7 Brick masonry work in cement mortar 1:3 in foundation complete excluding pointing and plastering, as per drawing and technical specifications Brick masonry work in 1:3 in sub-structure complete excluding pointing and plastering, as per drawing and Technical Specifications Stone masonry work in cement mortar 1:3 for substructure complete as per drawing and Technical Specifications Pointing with cement mortar (1:3 ) on brick work/stone work in substructure as per Technical specifications Plastering with cement mortar (1:3 ) on brick work in sub-structure as per Technical specifications Providing and inserting nipples with approved fixing compound after drilling holes for grouting as per Technical Specifications including subsequent cutting/removal and sealing of the hole as necessary of nipples after completion of grouting with Cement/Epoxy Sealing of crack / porous concrete with cement grout by injection process through nipples / grouting complete as per clause 2803.1. Sealing of crack / porous concrete with Epoxy Grout by injection through nipples complete as per clause 2803.1. Unit m2 no. m2 m2 m2 m2 tonne tonne no. m2 m3 m3 m3 m m
2 2

Poor 6m-30m
Rate a 10 1 093 537 1 152 2 580 2 232 75 000 Amount Quantity a LS 0 0 13 0 30 0 1 000 0 0 14 855 0 67 897 0 3 127 0 0 0 0 28 152 2 022 0 0 0 0 NA NA NA NA NA NA NA NA NA NA NA NA Remarks

68 793 0.045 466 663 5 044 5 124 3 519 40 99 501 66 925 0 0 0 0 8 51 0 0 0 0

no. kg kg

5 of 27

D05_R04_CH - 1.84 - (Nimapada Astaranga Road)


Sl. MORTH No. Ref. 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 16.2 5.14 14.4 15.11 Item description Unit m m3 m3 m
3

Poor 6m-30m
Rate a 2 599 1 359 1 099 3 588 1 312 4 848 4 841 47 1 355 12 012 800 2 173 129 1 114 611 10 000 Amount Quantity a 0 10 5 9 0 0 0 11 11 0 0 0 0 0 2 LS LS 0 13 170 5 325 32 971 0 0 0 530 15 271 0 0 0 0 0 1 222 10 000 20 000 NA NA NA NA NA NA NA NA Remarks NA Stone pitching Filter material

16.17 Replacement of Expansion Joints complete as per drawings 15.4 15.5 Providing and laying Pitching on slopes laid over prepared filter media including boulder apron laid dry in front of toe of embankment complete as per drawing and Technical specifications. Providing and laying Filter material underneath pitching in slopes complete as per drawing and Technical specification. Construction of masonry toe wall for batter protection. Flexible Apron: Construction of flexible apron 1 m thick comprising of loose stone boulders weighing not less than 40 kg beyond curtain wall. Construction of Cut off wall for bed protection with m15 grade cement concrete Providing and laying rubble stone flooring laid in cement mortar 1:3 as per drawing and technical specification laid over cement concrete bedding. Removal of existing asphaltic wearing coat comprising of 50 mm thick asphaltic concrete laid over 12 mm thick mastic asphalt including disposal with all lift and lead upto 1000m. Providing and laying in position 65 mm thick wearing coat consisting of 25mm thick layer of mastic asphalt over 40 mm bituminous concrete over deck slab after applying prime coat complete as per drawings and technical specification sections 500 and 2700 or as directed by the Engineer. Providing and laying Cement concrete wearing coat M-30 grade including reinforcement complete as per drawing and Technical Specifications Providing new guard post in both side of carriage way as per technical specifications 16.18 Replacement of Damaged Concrete Railing. 16.22 Repair of RCC Railing 14.9 8.3 Providing Drainage Spouts complete as per drawing and Technical specification Printing new letter and figures of any shade (Printing new letter and figures of any shade with synthetic enamel paint black or any other approved colour to give an even shade) Safety measures, traffic regulation, scaffolding and other logistic arrangement for execution of works Provision for miscellaneous items not accounted for

m3 m3 m3 m2 m2 m3 no. m m no. Each bridge

Total Cost : 215 542 Cost of Bridge per m2 of plan area 3 004

6 of 27

D05_R04_CH - 4.88 - (Nimapada Astaranga Road)


Item Element description Bearing Abutment & dirt wall Wing wall Concrete deck slab Abutment & pier caps Piers RCC/PSC/Steel girder Expansion joints Approach carriageway Batter protection General cleaning Wearing surface Waterway Parapet/Railing/Crash barrier Floor protection work Foundation
(ESCI*SI*CPIL)

Total quantity 0.00 42.84 39.02 292.32 34.01 209.39 0.00 58.80 58.80 55.24 6.00 245.34 6.00 69.60 520.32 0.00

Units

Estimated quantity in various condition states 1 0.00 42.84 39.02 275.27 32.31 207.29 0.00 0.00 58.80 0.00 6.00 245.34 6.00 69.60 429.26 0.00 A 2 0.00 0.00 0.00 0.00 0.00 0.00 0.00 58.80 0.00 55.24 0.00 0.00 0.00 0.00 91.06 0.00 E 4.00 3 Severity: Medium 0.00 0.00 0.00 17.05 1.70 2.09 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 R 3.00 4 Severity: High 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 I 3.00 No damage Severity: Low

ESCI (Eq1) 0.000 1.000 1.000 1.117 1.100 1.020 0.000 2.000 1.000 2.000 1.000 1.000 1.000 1.000 1.175 0.000

Si

Mi

ESCI*Si*Mi

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16

each m2 m2 m
2

3 2 2 3 4 4 4 1 1 1 1 1 1 1 1 4

1 2 2 2 2 2 2 3 3 2 3 2 3 2 2 2

0 4.00 4.00 6.70 8.80 8.16 0.00 6.00 3.00 4.00 3.00 2.00 3.00 2.00 2.35 0.00 57.01

0 1 1 1 1 1 0 1 1 1 1 1 1 1 1 0

Year of construction Road type Number of span Each span length (m) Outer width of bridge (m) Total plan area (m2) Number of pier Top width of pier (m) Bottom width of pier (m) Height of pier (m) Length of return/wing wall (m) Number of bearings Thickness of superstructure (m) Width of bridge between kerbs Thickness of caps Depth of girder

MDR 6 5.8 8.4 292.32 5 0.8 1.2 2.1 3.825 0 0.45 7.05 0.3 0 0

m2 m2 m2 m m2 m each m2 each m m m
2 2 2

13 No of girders per span

CF=0411 A+0 120E+0. 107R+0.362I SHI=CF*{(ESCI*SI*MI)/n

4.00

3.53

SHI = 57.01 X 3.531 / 13

15.486

OSCI=1 OSCI=2 OSCI=3 OSCI=4

when SHI=1 when 1<SHI =< 16 when 16<SHI<81 when 81<SHI<256

16<SHI<81

OSCI = 2

D05_R04_CH - 4.88 - (Nimapada Astaranga Road)


Sl. MORTH No. Ref. 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 14.2 16.8 16.3 16.6 2.3 Item description Clearing and uprooting rank vegetation, bushes, shrubs, saplings etc including removal and disposal. Cleaning and Greasing of Metallic bearings complete as per Technical specification Applying epoxy mortar over leached, honey combed and spalled concrete surface and exposed steel reinforcement complete as per Technical specification (10mm thick) Guniting concrete surface with cement mortar applied with compressor after cleaning surface and spraying with epoxy complete as per Technical specification (25mm thick) Patching of damaged concrete surface with polymer concrete and curing compounds, initiator and promoter, available in present formulations, to be applied as per instructions of manufacturer and as approved by the Engineer. Jacketing of concrete surface and exposed steel reinforcement complete as per Technical specification using 200mm thick M 30 grade concrete including reinforcement(@ 40 kg per m3), formwork etc and all accessories to complete the work. Supplying ,hoisting, fixing steel joists in superstructure including painting and all required materials complete. Supplying, fitting and placing HYSD bar reinforcement complete as per drawing and technical specifications Drilling of holes in existing concrete and fixing new reinforcement with epoxy mortar grout but excluding cost of reinforcement 16.11 Epoxy bonding of new concrete to old concrete 12.5 13.1 13.4 13.2 13.5 16.4 16.5 16.7 Brick masonry work in cement mortar 1:3 in foundation complete excluding pointing and plastering, as per drawing and technical specifications Brick masonry work in 1:3 in sub-structure complete excluding pointing and plastering, as per drawing and Technical Specifications Stone masonry work in cement mortar 1:3 for substructure complete as per drawing and Technical Specifications Pointing with cement mortar (1:3 ) on brick work/stone work in substructure as per Technical specifications Plastering with cement mortar (1:3 ) on brick work in sub-structure as per Technical specifications Providing and inserting nipples with approved fixing compound after drilling holes for grouting as per Technical Specifications including subsequent cutting/removal and sealing of the hole as necessary of nipples after completion of grouting with Cement/Epoxy Sealing of crack / porous concrete with cement grout by injection process through nipples / grouting complete as per clause 2803.1. Sealing of crack / porous concrete with Epoxy Grout by injection through nipples complete as per clause 2803.1. Unit m2 no. m2 m2 m2 m2 tonne tonne no. m2 m3 m3 m3 m m
2 2

Poor >30m
Rate a 10 1 093 537 1 157 2 580 2 203 75 000 68 793 423 663 5 083 5 165 3 588 40 101 501 66 925 Amount Quantity a LS 0 126 17 0 0 0 0 0 0 0 0 0 0 0 0 0 0 3 000 0 67 723 19 729 0 0 0 0 0 0 0 0 0 0 0 0 0 0 NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA Remarks

no. kg kg

8 of 27

D05_R04_CH - 4.88 - (Nimapada Astaranga Road)


Sl. MORTH No. Ref. 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 16.2 5.14 14.4 15.11 Item description Unit m m3 m3 m
3

Poor >30m
Rate a 2 642 1 376 1 117 3 588 1 328 4 952 4 944 47 1 356 11 538 800 2 031 122 1 114 611 10 000 Amount Quantity a 0 18 9 0 12 0 41 0 0 0 0 0 0 0 2 LS LS 0 24 273 9 852 0 15 958 0 202 581 0 0 0 0 0 0 0 1 222 10 000 20 000 NA NA NA NA NA NA NA NA NA Remarks NA Stone pitching Filter material NA

16.17 Replacement of Expansion Joints complete as per drawings 15.4 15.5 Providing and laying Pitching on slopes laid over prepared filter media including boulder apron laid dry in front of toe of embankment complete as per drawing and Technical specifications. Providing and laying Filter material underneath pitching in slopes complete as per drawing and Technical specification. Construction of masonry toe wall for batter protection. Flexible Apron: Construction of flexible apron 1 m thick comprising of loose stone boulders weighing not less than 40 kg beyond curtain wall. Construction of Cut off wall for bed protection with m15 grade cement concrete Providing and laying rubble stone flooring laid in cement mortar 1:3 as per drawing and technical specification laid over cement concrete bedding. Removal of existing asphaltic wearing coat comprising of 50 mm thick asphaltic concrete laid over 12 mm thick mastic asphalt including disposal with all lift and lead upto 1000m. Providing and laying in position 65 mm thick wearing coat consisting of 25mm thick layer of mastic asphalt over 40 mm bituminous concrete over deck slab after applying prime coat complete as per drawings and technical specification sections 500 and 2700 or as directed by the Engineer. Providing and laying Cement concrete wearing coat M-30 grade including reinforcement complete as per drawing and Technical Specifications Providing new guard post in both side of carriage way as per technical specifications 16.18 Replacement of Damaged Concrete Railing. 16.22 Repair of RCC Railing 14.9 8.3 Providing Drainage Spouts complete as per drawing and Technical specification Printing new letter and figures of any shade (Printing new letter and figures of any shade with synthetic enamel paint black or any other approved colour to give an even shade) Safety measures, traffic regulation, scaffolding and other logistic arrangement for execution of works Provision for miscellaneous items not accounted for

m3 m3 m3 m2 m2 m3 no. m m no. Each bridge

Total Cost : 374 338

9 of 27

D05_R04_CH - 8.39 - (Nimapada Astaranga Road)


Item Element description Total quantity Units Estimated quantity in various condition states 1 2 No damage Sevirity: Low each m2 m2 m2 m2 m2 m2 m m2 m2 each m2 each m m2 m2 0.00 30.78 21.66 41.92 10.54 56.92 0.00 0.00 56.70 0.00 0.00 100.74 3.00 27.60 211.65 0.00 A CF=0411 A+0 120E+0. 107R+0.362I SHI=CF*{(ESCI*SI*MI)/n OSCI=1 OSCI=2 OSCI=3 OSCI=4 when SHI=1 when 1<SHI =< 16 when 16<SHI<81 when 81<SHI<256 4.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 32.40 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 E 4.00 3 Sevirity: Medium 0.00 0.00 0.00 0.00 0.00 1.46 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 R 3.00 4 Sevirity: High 0.00 0.00 0.00 69.86 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 I 3.00 3.53 ESCI (Eq1) Si Mi ESCI*Si*Mi

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16

Bearing Abutment & dirt wall Wing Wall Concrete deck Slab Abutment & pier caps Piers RCC / PSC/Steel girder Expansion joints Approach carriageway Batter protection General cleaning Wearing surface Waterway Parapet/Railing/Crash barrier Floor protection work Foundation
(ESCI*SI*CPIL)

0.00 30.78 21.66 111.78 10.54 58.37 0.00 32.40 56.70 0.00 0.00 100.74 3.00 27.60 211.65 0.00

0.000 1.000 1.000 2.875 1.000 1.050 0.000 2.000 1.000 0.000 0.000 1.000 1.000 1.000 1.000 0.000

3 2 2 3 4 4 4 1 1 1 1 1 1 1 1 4

1 2 2 2 2 2 2 3 3 2 3 2 3 2 2 2

0 4.00 4.00 17.25 8.00 8.40 0.00 6.00 3.00 0.00 0.00 2.00 3.00 2.00 2.00 0.00 59.65

0 1 1 1 1 1 0 1 1 0 0 1 1 1 1 0

Year of construction Road type Number of Span Each span length(m) Outer width of bridge(m) Total plan area(m^2) Number of pier Top width of pier(m) Bottom width of pier(m) Height of pier(m) Length of return/wing wall(m) Number of bearings Thickness of superstructure (m) width of bridge between kerbs Thickness of caps Depth of girder

MDR 3 4.6 8.1 111.78 2 0.65 0.65 1.6 2.85 0 0.3 7.3 0.2 0 0

11 No of girders per span

SHI = 59.65 X 3.531 / 11

19.149

16<SHI<81

OSCI = 3

D05_R04_CH - 8.39 - (Nimapada Astaranga Road)


Sl. MORTH No. Ref. 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 14.2 16.8 16.3 16.6 2.3 Item description Clearing and uprooting rank vegetation, bushes, shrubs, saplings etc including removal and disposal. Cleaning and Greasing of Metallic bearings complete as per Technical specification Applying epoxy mortar over leached, honey combed and spalled concrete surface and exposed steel reinforcement complete as per Technical specification (10mm thick) Guniting concrete surface with cement mortar applied with compressor after cleaning surface and spraying with epoxy complete as per Technical specification (25mm thick) Patching of damaged concrete surface with polymer concrete and curing compounds, initiator and promoter, available in present formulations, to be applied as per instructions of manufacturer and as approved by the Engineer. Jacketing of concrete surface and exposed steel reinforcement complete as per Technical specification using 200mm thick M 30 grade concrete including reinforcement(@ 40 kg per m3), formwork etc and all accessories to complete the work. Supplying ,hoisting, fixing steel joists in superstructure including painting and all required materials complete. Supplying, fitting and placing HYSD bar reinforcement complete as per drawing and technical specifications Drilling of holes in existing concrete and fixing new reinforcement with epoxy mortar grout but excluding cost of reinforcement 16.11 Epoxy bonding of new concrete to old concrete 12.5 13.1 13.4 13.2 13.5 16.4 16.5 16.7 Brick masonry work in cement mortar 1:3 in foundation complete excluding pointing and plastering, as per drawing and technical specifications Brick masonry work in 1:3 in sub-structure complete excluding pointing and plastering, as per drawing and Technical Specifications Stone masonry work in cement mortar 1:3 for substructure complete as per drawing and Technical Specifications Pointing with cement mortar (1:3 ) on brick work/stone work in substructure as per Technical specifications Plastering with cement mortar (1:3 ) on brick work in sub-structure as per Technical specifications Providing and inserting nipples with approved fixing compound after drilling holes for grouting as per Technical Specifications including subsequent cutting/removal and sealing of the hole as necessary of nipples after completion of grouting with Cement/Epoxy Sealing of crack / porous concrete with cement grout by injection process through nipples / grouting complete as per clause 2803.1. Sealing of crack / porous concrete with Epoxy Grout by injection through nipples complete as per clause 2803.1. Unit m2 no. m2 m2 m2 m2 tonne tonne no. m2 m3 m3 m3 m m
2 2

Poor <30m
Rate a 10 1 093 537 1 152 2 580 2 232 75 000 68 793 466 663 5 044 5 124 3 519 40 99 501 66 925 Amount Quantity a LS 0 0 112 0 0 0 1.3 0 0 0 0 0 0 1 0 0 0 1 200 0 0 128 771 0 0 0 90 119 0 0 0 0 0 0 144 0 0 0 NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA Remarks

no. kg kg

11 of 27

D05_R04_CH - 8.39 - (Nimapada Astaranga Road)


Sl. MORTH No. Ref. 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 16.2 5.14 14.4 15.11 Item description Unit m m3 m3 m
3

Poor <30m
Rate a 2 599 1 359 1 099 3 588 1 312 4 848 4 841 47 1 355 12 012 800 2 173 129 1 114 611 10 000 Amount Quantity a 0 0 0 0 0 0 0 0 0 0 0 0 0 0 2 LS LS 0 0 0 0 0 0 0 0 0 0 0 0 0 0 1 222 10 000 50 000 Remarks NA NA NA NA NA NA NA NA NA NA NA NA NA NA

16.17 Replacement of Expansion Joints complete as per drawings 15.4 15.5 Providing and laying Pitching on slopes laid over prepared filter media including boulder apron laid dry in front of toe of embankment complete as per drawing and Technical specifications. Providing and laying Filter material underneath pitching in slopes complete as per drawing and Technical specification. Construction of masonry toe wall for batter protection. Flexible Apron: Construction of flexible apron 1 m thick comprising of loose stone boulders weighing not less than 40 kg beyond curtain wall. Construction of Cut off wall for bed protection with m15 grade cement concrete Providing and laying rubble stone flooring laid in cement mortar 1:3 as per drawing and technical specification laid over cement concrete bedding. Removal of existing asphaltic wearing coat comprising of 50 mm thick asphaltic concrete laid over 12 mm thick mastic asphalt including disposal with all lift and lead upto 1000m. Providing and laying in position 65 mm thick wearing coat consisting of 25mm thick layer of mastic asphalt over 40 mm bituminous concrete over deck slab after applying prime coat complete as per drawings and technical specification sections 500 and 2700 or as directed by the Engineer. Providing and laying Cement concrete wearing coat M-30 grade including reinforcement complete as per drawing and Technical Specifications Providing new guard post in both side of carriage way as per technical specifications 16.18 Replacement of Damaged Concrete Railing. 16.22 Repair of RCC Railing 14.9 8.3 Providing Drainage Spouts complete as per drawing and Technical specification Printing new letter and figures of any shade (Printing new letter and figures of any shade with synthetic enamel paint black or any other approved colour to give an even shade) Safety measures, traffic regulation, scaffolding and other logistic arrangement for execution of works Provision for miscellaneous items not accounted for

m3 m3 m3 m2 m2 m3 no. m m no. Each bridge

Total Cost : 281 456 Cost of Bridge per m2 of plan area 2 518

12 of 27

Bridge unique id : D05_R04_CH - 7.09 - (Nimapada Astaranga Road)


Item Element description Bearing Abutment & dirt wall Wing wall Concrete deck slab Abutment & pier caps Piers RCC/PSC/Steel girder Expansion joints Approach carriageway Batter protection General cleaning Wearing surface Waterway Parapet/Railing/Crash barrier Floor protection work Foundation
(ESCI*SI*CPIL)

Total quantity 0.00 23.20 12.62 57.60 6.81 18.04 0.00 24.00 56.00 0.00 0.00 51.84 2.00 14.40 110.00 0.00

Units

Estimated quantity in various condition states 1 0.00 23.20 12.62 51.12 6.81 18.04 0.00 24.00 46.20 0.00 0.00 42.77 2.00 14.40 110.00 0.00 A 2 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 E 4.00 3 Severity: Medium 0.00 0.00 0.00 6.48 0.00 0.00 0.00 0.00 9.80 0.00 0.00 9.07 0.00 0.00 0.00 0.00 R 3.00 4 Severity: High 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 I 3.00 No damage Severity: Low

ESCI (Eq1) 0.000 1.000 1.000 1.225 1.000 1.000 0.000 1.000 1.350 0.000 0.000 1.350 1.000 1.000 1.000 0.000

Si

Mi

ESCI*Si*Mi

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16

each m2 m2 m
2

3 2 2 3 4 4 4 1 1 1 1 1 1 1 1 4

1 2 2 2 2 2 2 3 3 2 3 2 3 2 2 2

0 4.00 4.00 7.35 8.00 8.00 0.00 3.00 4.05 0.00 0.00 2.70 3.00 2.00 2.00 0.00 48.1

0 1 1 1 1 1 0 1 1 0 0 1 1 1 1 0

Year of construction Road type Number of span Each span length (m) Outer width of bridge (m) Total plan area (m2) Number of pier Top width of pier (m) Bottom width of pier (m) Height of pier (m) Length of return/wing wall (m) Number of bearings Thickness of superstructure (m) Width of bridge between kerbs Thickness of caps Depth of girder

MDR 2 3.6 8 57.6 1 0.65 0.65 1 2.175 0 0.45 7.2 0.2 0 0

m2 m2 m2 m m2 m each m2 each m m m
2 2 2

11 No of girders per span

CF=0411 A+0 120E+0. 107R+0.362I SHI=CF*{(ESCI*SI*MI)/n

4.00

3.53

SHI = 48.1 X 3.531 / 11

15.441

OSCI=1 OSCI=2 OSCI=3 OSCI=4

when SHI=1 when 1<SHI =< 16 when 16<SHI<81 when 81<SHI<256

16<SHI<81

OSCI = 2

D05_R04_CH - 8.39 - (Nimapada Astaranga Road)


Sl. MORTH No. Ref. 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 14.2 16.8 16.3 16.6 2.3 Item description Clearing and uprooting rank vegetation, bushes, shrubs, saplings etc including removal and disposal. Cleaning and Greasing of Metallic bearings complete as per Technical specification Applying epoxy mortar over leached, honey combed and spalled concrete surface and exposed steel reinforcement complete as per Technical specification (10mm thick) Guniting concrete surface with cement mortar applied with compressor after cleaning surface and spraying with epoxy complete as per Technical specification (25mm thick) Patching of damaged concrete surface with polymer concrete and curing compounds, initiator and promoter, available in present formulations, to be applied as per instructions of manufacturer and as approved by the Engineer. Jacketing of concrete surface and exposed steel reinforcement complete as per Technical specification using 200mm thick M 30 grade concrete including reinforcement(@ 40 kg per m3), formwork etc and all accessories to complete the work. Supplying ,hoisting, fixing steel joists in superstructure including painting and all required materials complete. Supplying, fitting and placing HYSD bar reinforcement complete as per drawing and technical specifications Drilling of holes in existing concrete and fixing new reinforcement with epoxy mortar grout but excluding cost of reinforcement 16.11 Epoxy bonding of new concrete to old concrete 12.5 13.1 13.4 13.2 13.5 16.4 16.5 16.7 Brick masonry work in cement mortar 1:3 in foundation complete excluding pointing and plastering, as per drawing and technical specifications Brick masonry work in 1:3 in sub-structure complete excluding pointing and plastering, as per drawing and Technical Specifications Stone masonry work in cement mortar 1:3 for substructure complete as per drawing and Technical Specifications Pointing with cement mortar (1:3 ) on brick work/stone work in substructure as per Technical specifications Plastering with cement mortar (1:3 ) on brick work in sub-structure as per Technical specifications Providing and inserting nipples with approved fixing compound after drilling holes for grouting as per Technical Specifications including subsequent cutting/removal and sealing of the hole as necessary of nipples after completion of grouting with Cement/Epoxy Sealing of crack / porous concrete with cement grout by injection process through nipples / grouting complete as per clause 2803.1. Sealing of crack / porous concrete with Epoxy Grout by injection through nipples complete as per clause 2803.1. Unit m2 no. m2 m2 m2 m2 tonne tonne no. m2 m3 m3 m3 m m
2 2

FAIR <30m
Rate a 10 1 093 537 1 157 2 580 2 203 75 000 68 793 423 663 5 083 5 165 3 588 40 101 501 66 925 Amount Quantity a LS 0 0 6 0 0 0 0 0 0 0 0 0 0 0 0 0 0 5 000 0 0 7 497 0 0 0 0 0 0 0 0 0 0 0 0 0 0 NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA Remarks

no. kg kg

14 of 27

D05_R04_CH - 8.39 - (Nimapada Astaranga Road)


Sl. MORTH No. Ref. 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 16.2 5.14 14.4 15.11 Item description Unit m m3 m3 m
3

FAIR <30m
Rate a 2 642 1 376 1 117 3 588 1 328 4 952 4 944 47 1 356 11 538 800 2 031 122 1 114 611 10 000 Amount Quantity a 0 0 0 0 0 0 0 19 19 0 0 0 0 0 2 LS LS 0 0 0 0 0 0 0 887 25 590 0 0 0 0 0 1 222 10 000 20 000 NA NA NA NA NA Remarks NA NA NA NA NA NA NA

16.17 Replacement of Expansion Joints complete as per drawings 15.4 15.5 Providing and laying Pitching on slopes laid over prepared filter media including boulder apron laid dry in front of toe of embankment complete as per drawing and Technical specifications. Providing and laying Filter material underneath pitching in slopes complete as per drawing and Technical specification. Construction of masonry toe wall for batter protection. Flexible Apron: Construction of flexible apron 1 m thick comprising of loose stone boulders weighing not less than 40 kg beyond curtain wall. Construction of Cut off wall for bed protection with m15 grade cement concrete Providing and laying rubble stone flooring laid in cement mortar 1:3 as per drawing and technical specification laid over cement concrete bedding. Removal of existing asphaltic wearing coat comprising of 50 mm thick asphaltic concrete laid over 12 mm thick mastic asphalt including disposal with all lift and lead upto 1000m. Providing and laying in position 65 mm thick wearing coat consisting of 25mm thick layer of mastic asphalt over 40 mm bituminous concrete over deck slab after applying prime coat complete as per drawings and technical specification sections 500 and 2700 or as directed by the Engineer. Providing and laying Cement concrete wearing coat M-30 grade including reinforcement complete as per drawing and Technical Specifications Providing new guard post in both side of carriage way as per technical specifications 16.18 Replacement of Damaged Concrete Railing. 16.22 Repair of RCC Railing 14.9 8.3 Providing Drainage Spouts complete as per drawing and Technical specification Printing new letter and figures of any shade (Printing new letter and figures of any shade with synthetic enamel paint black or any other approved colour to give an even shade) Safety measures, traffic regulation, scaffolding and other logistic arrangement for execution of works Provision for miscellaneous items not accounted for

m3 m3 m3 m2 m2 m3 no. m m no. Each bridge

Total Cost : 70 197 Cost of Bridge per m2 of plan area 1 219

15 of 27

Bridge unique id : D05_R04_CH - 20.06 - (Nimapada Astaranga Road)


Item Element description Bearing Abutment & dirt wall Wing wall Concrete deck slab Abutment & pier caps Piers RCC/PSC/Steel girder Expansion joints Approach carriageway Batter protection General cleaning Wearing surface waterway Parapet/Railing/Crash barrier Floor protection work Foundation
(ESCI*SI*CPIL)

Total quantity 30.00 104.58 238.14 892.25 51.55 373.88 1322.25 49.80 58.10 337.18 0.00 779.38 5.00 215.00 0.00 0.00

Units

Estimated quantity in various condition states 1 27.00 104.58 238.14 874.41 49.49 372.01 1309.03 0.00 58.10 337.18 0.00 779.38 5.00 204.25 0.00 0.00 A 2 0.00 0.00 0.00 17.85 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 10.75 0.00 0.00 E 4.00 3 Severity: Medium 0.00 0.00 0.00 0.00 2.06 0.00 13.22 49.80 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 R 3.00 4 Severity: High 3.00 0.00 0.00 0.00 0.00 1.87 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 I 3.00 No damage Severity: Low

ESCI (Eq1) 1.300 1.000 1.000 1.020 1.080 1.015 1.020 3.000 1.000 1.000 0.000 1.000 1.000 1.050 0.000 0.000

Si

Mi

ESCI*Si*Mi

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16

each m2 m2 m
2

3 2 2 3 4 4 4 1 1 1 1 1 1 1 1 4

1 2 2 2 2 2 2 3 3 2 3 2 3 2 2 2

3.9 4.00 4.00 6.12 8.64 8.12 8.16 9.00 3.00 2.00 0.00 2.00 3.00 2.10 0.00 0.00 64.04

1 1 1 1 1 1 1 1 1 1 0 1 1 1 0 0

Year of construction Road type Number of span Each span length (m) Outer width of bridge (m) Total plan area (m2) Number of pier Top width of pier (m) Bottom width of pier (m) Height of pier (m) Length of return/wing wall (m) Number of bearings Thickness of superstructure (m) Width of bridge between kerbs Thickness of caps Depth of girder

1968 MDR 5 21.5 8.3 892.25 4 1.6 2 4.20 9.45 30 2.1 7.25 0.5 1.9 3

m2 m2 m2 m m2 m each m2 each m m m
2 2 2

13 No of girders per span

CF=0411 A+0 120E+0. 107R+0.362I SHI=CF*{(ESCI*SI*MI)/n

4.00

3.53

SHI = 64.04 X 3.531 / 13

17.396

OSCI=1 OSCI=2 OSCI=3 OSCI=4

when SHI=1 when 1<SHI =< 16 when 16<SHI<81 when 81<SHI<256

16<SHI<81

OSCI = 3

D05_R04_CH - 20.06 - (Nimapada Astaranga Road)


Sl. MORTH No. Ref. 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 14.2 16.8 16.3 16.6 2.3 Item description Clearing and uprooting rank vegetation, bushes, shrubs, saplings etc including removal and disposal. Cleaning and Greasing of Metallic bearings complete as per Technical specification Applying epoxy mortar over leached, honey combed and spalled concrete surface and exposed steel reinforcement complete as per Technical specification (10mm thick) Guniting concrete surface with cement mortar applied with compressor after cleaning surface and spraying with epoxy complete as per Technical specification (25mm thick) Patching of damaged concrete surface with polymer concrete and curing compounds, initiator and promoter, available in present formulations, to be applied as per instructions of manufacturer and as approved by the Engineer. Jacketing of concrete surface and exposed steel reinforcement complete as per Technical specification using 200mm thick M 30 grade concrete including reinforcement(@ 40 kg per m3), formwork etc and all accessories to complete the work. Supplying ,hoisting, fixing steel joists in superstructure including painting and all required materials complete. Supplying, fitting and placing HYSD bar reinforcement complete as per drawing and technical specifications Drilling of holes in existing concrete and fixing new reinforcement with epoxy mortar grout but excluding cost of reinforcement 16.11 Epoxy bonding of new concrete to old concrete 12.5 13.1 13.4 13.2 13.5 16.4 16.5 16.7 Brick masonry work in cement mortar 1:3 in foundation complete excluding pointing and plastering, as per drawing and technical specifications Brick masonry work in 1:3 in sub-structure complete excluding pointing and plastering, as per drawing and Technical Specifications Stone masonry work in cement mortar 1:3 for substructure complete as per drawing and Technical Specifications Pointing with cement mortar (1:3 ) on brick work/stone work in substructure as per Technical specifications Plastering with cement mortar (1:3 ) on brick work in sub-structure as per Technical specifications Providing and inserting nipples with approved fixing compound after drilling holes for grouting as per Technical Specifications including subsequent cutting/removal and sealing of the hole as necessary of nipples after completion of grouting with Cement/Epoxy Sealing of crack / porous concrete with cement grout by injection process through nipples / grouting complete as per clause 2803.1. Sealing of crack / porous concrete with Epoxy Grout by injection through nipples complete as per clause 2803.1. Unit m2 no. m2 m2 m2 m2 tonne tonne no. m2 m3 m3 m3 m m
2 2

POOR >30m
Rate a 10 1 093 537 1 157 2 580 2 203 75 000 68 793 423 663 5 083 5 165 3 588 40 101 501 66 925 Amount Quantity a LS 30 0 35 0 0 0 0 0 0 0 0 0 0 0 0 0 19 10 000 32 790 0 40 494 0 0 0 0 0 0 0 0 0 0 0 0 0 17 908 NA NA NA NA NA NA NA NA NA NA NA NA NA NA Remarks

no. kg kg

17 of 27

D05_R04_CH - 20.06 - (Nimapada Astaranga Road)


Sl. MORTH No. Ref. 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 16.2 5.14 14.4 15.11 Item description Unit m m3 m3 m
3

POOR >30m
Rate a 2 642 1 376 1 117 3 588 1 328 4 952 4 944 47 1 356 11 538 800 2 031 122 1 114 611 10 000 Amount Quantity a 50 0 0 0 0 0 0 0 0 0 0 0 11 0 2 LS LS 131 572 0 0 0 0 0 0 0 0 0 0 0 1 312 0 1 222 10 000 20 000 NA NA NA NA NA NA NA NA NA NA NA NA Remarks

16.17 Replacement of Expansion Joints complete as per drawings 15.4 15.5 Providing and laying Pitching on slopes laid over prepared filter media including boulder apron laid dry in front of toe of embankment complete as per drawing and Technical specifications. Providing and laying Filter material underneath pitching in slopes complete as per drawing and Technical specification. Construction of masonry toe wall for batter protection. Flexible Apron: Construction of flexible apron 1 m thick comprising of loose stone boulders weighing not less than 40 kg beyond curtain wall. Construction of Cut off wall for bed protection with m15 grade cement concrete Providing and laying rubble stone flooring laid in cement mortar 1:3 as per drawing and technical specification laid over cement concrete bedding. Removal of existing asphaltic wearing coat comprising of 50 mm thick asphaltic concrete laid over 12 mm thick mastic asphalt including disposal with all lift and lead upto 1000m. Providing and laying in position 65 mm thick wearing coat consisting of 25mm thick layer of mastic asphalt over 40 mm bituminous concrete over deck slab after applying prime coat complete as per drawings and technical specification sections 500 and 2700 or as directed by the Engineer. Providing and laying Cement concrete wearing coat M-30 grade including reinforcement complete as per drawing and Technical Specifications Providing new guard post in both side of carriage way as per technical specifications 16.18 Replacement of Damaged Concrete Railing. 16.22 Repair of RCC Railing 14.9 8.3 Providing Drainage Spouts complete as per drawing and Technical specification Printing new letter and figures of any shade (Printing new letter and figures of any shade with synthetic enamel paint black or any other approved colour to give an even shade) Safety measures, traffic regulation, scaffolding and other logistic arrangement for execution of works Provision for miscellaneous items not accounted for

m3 m3 m3 m2 m2 m3 no. m m no. Each bridge

Total Cost : 265 297

18 of 27

Bridge unique id : D05_R04_CH - 22.13 - (Nimapada Astaranga Road)


Item Element description Bearing Abutment & dirt wall Wing wall Concrete deck slab Abutment & pier caps Piers RCC/PSC/Steel girder Expansion joints Approach carriageway Batter protection General cleaning Wearing surface Waterway Parapet/Railing/Crash barrier Floor protection work Foundation
(ESCI*SI*CPIL)

Total quantity 0.00 22.01 10.94 74.98 6.96 18.50 0.00 24.45 57.05 0.00 2.00 67.16 2.00 18.40 142.88 0.00

Units

Estimated quantity in various condition states 1 0.00 22.01 10.94 71.23 6.96 18.50 0.00 0.00 57.05 0.00 2.00 33.58 2.00 18.40 142.88 0.00 A 2 0.00 0.00 0.00 0.00 0.00 0.00 0.00 24.45 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 E 4.00 3 Severity: Medium 0.00 0.00 0.00 3.75 0.00 0.00 0.00 0.00 0.00 0.00 0.00 33.58 0.00 0.00 0.00 0.00 R 3.00 4 Severity: High 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 I 3.00 No damage Severity: Low

ESCI (Eq1) 0.000 1.000 1.000 1.100 1.000 1.000 0.000 2.000 1.000 0.000 1.000 2.000 1.000 1.000 1.000 0.000

Si

Mi

ESCI*Si*Mi

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16

each m2 m2 m
2

3 2 2 3 4 4 4 1 1 1 1 1 1 1 1 4

1 2 2 2 2 2 2 3 3 2 3 2 3 2 2 2

0 4.00 4.00 6.60 8.00 8.00 0.00 6.00 3.00 0.00 3.00 4.00 3.00 2.00 2.00 0.00 53.6

0 1 1 1 1 1 0 1 1 0 1 1 1 1 1 0

Year of construction Road type Number of span Each span length (m) Outer width of bridge (m) Total plan area (m2) Number of pier Top width of pier (m) Bottom width of pier (m) Height of pier (m) Length of return/wing wall (m) Number of bearings Thickness of superstructure (m) Width of bridge between kerbs Thickness of caps Depth of girder

MDR 2 4.6 8.15 74.98 1 0.7 0.7 1 2.025 0 0.35 7.3 0.2 0 0

m2 m2 m2 m m2 m each m2 each m m m
2 2 2

12 No of girders per span

CF=0411 A+0 120E+0. 107R+0.362I SHI=CF*{(ESCI*SI*MI)/n

4.00

3.53

SHI = 53.6 X 3.531 / 12

15.773

OSCI=1 OSCI=2 OSCI=3 OSCI=4

when SHI=1 when 1<SHI =< 16 when 16<SHI<81 when 81<SHI<256

16<SHI<81

OSCI = 2

D05_R04_CH - 22.13 - (Nimapada Astaranga Road)


Sl. No. MORTH Ref. Item description Unit Rate a

FAIR < 30m


Amount Quantity a Remarks

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18

2.3

Clearing and uprooting rank vegetation, bushes, shrubs, saplings etc including removal and disposal. Cleaning and Greasing of Metallic bearings complete as per Technical specification Applying epoxy mortar over leached, honey combed and spalled concrete surface and exposed steel reinforcement complete as per Technical specification (10mm thick) Guniting concrete surface with cement mortar applied with compressor after cleaning surface and spraying with epoxy complete as per Technical specification (25mm thick) Patching of damaged concrete surface with polymer concrete and curing compounds, initiator and promoter, available in present formulations, to be applied as per instructions of manufacturer and as approved by the Engineer. Jacketing of concrete surface and exposed steel reinforcement complete as per Technical specification using 200mm thick M 30 grade concrete including reinforcement(@ 40 kg per m3), formwork etc and all accessories to complete the work. Supplying ,hoisting, fixing steel joists in superstructure including painting and all required materials complete. Supplying, fitting and placing HYSD bar reinforcement complete as per drawing and technical specifications Drilling of holes in existing concrete and fixing new reinforcement with epoxy mortar grout but excluding cost of reinforcement

m2 no. m2 m2 m2 m2 tonne tonne no. m2 m3 m3 m3 m m


2 2

10 1 093 537 1 157 2 580 2 203 75 000 68 793 423 663 5 083 5 165 3 588 40 101 501 66 925

LS 0 0 4 0 0 0 0 0 0 0 0 0 0 0 0 0 0

1 000 0 0 4 338 0 0 0 0 0 0 0 0 0 0 0 0 0 0 NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA

16.8 16.3 16.6

14.2

16.11 Epoxy bonding of new concrete to old concrete 12.5 13.1 13.4 13.2 13.5 16.4 16.5 16.7 Brick masonry work in cement mortar 1:3 in foundation complete excluding pointing and plastering, as per drawing and technical specifications Brick masonry work in 1:3 in sub-structure complete excluding pointing and plastering, as per drawing and Technical Specifications Stone masonry work in cement mortar 1:3 for substructure complete as per drawing and Technical Specifications Pointing with cement mortar (1:3 ) on brick work/stone work in substructure as per Technical specifications Plastering with cement mortar (1:3 ) on brick work in sub-structure as per Technical specifications Providing and inserting nipples with approved fixing compound after drilling holes for grouting as per Technical Specifications including subsequent cutting/removal and sealing of the hole as necessary of nipples after completion of grouting with Cement/Epoxy Sealing of crack / porous concrete with cement grout by injection process through nipples / grouting complete as per clause 2803.1. Sealing of crack / porous concrete with Epoxy Grout by injection through nipples complete as per clause 2803.1.

no. kg kg

20 of 27

D05_R04_CH - 22.13 - (Nimapada Astaranga Road)


Sl. No. MORTH Ref. Item description Unit Rate a

FAIR < 30m


Amount Quantity a Remarks

19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35

16.17 Replacement of Expansion Joints complete as per drawings 15.4 15.5 Providing and laying Pitching on slopes laid over prepared filter media including boulder apron laid dry in front of toe of embankment complete as per drawing and Technical specifications. Providing and laying Filter material underneath pitching in slopes complete as per drawing and Technical specification. Construction of masonry toe wall for batter protection. 15.11 Flexible Apron: Construction of flexible apron 1 m thick comprising of loose stone boulders weighing not less than 40 kg beyond curtain wall. Construction of Cut off wall for bed protection with m15 grade cement concrete Providing and laying rubble stone flooring laid in cement mortar 1:3 as per drawing and technical specification laid over cement concrete bedding. Removal of existing asphaltic wearing coat comprising of 50 mm thick asphaltic concrete laid over 12 mm thick mastic asphalt including disposal with all lift and lead upto 1000m. Providing and laying in position 65 mm thick wearing coat consisting of 25mm thick layer of mastic asphalt over 40 mm bituminous concrete over deck slab after applying prime coat complete as per drawings and technical specification sections 500 and 2700 or as directed by the Engineer. Providing and laying Cement concrete wearing coat M-30 grade including reinforcement complete as per drawing and Technical Specifications Providing new guard post in both side of carriage way as per technical specifications 16.18 Replacement of Damaged Concrete Railing. 16.22 Repair of RCC Railing 14.9 8.3 Providing Drainage Spouts complete as per drawing and Technical specification Printing new letter and figures of any shade (Printing new letter and figures of any shade with synthetic enamel paint black or any other approved colour to give an even shade) Safety measures, traffic regulation, scaffolding and other logistic arrangement for execution of works Provision for miscellaneous items not accounted for

m m3 m3 m
3

2 642 1 376 1 117 3 588 1 328 4 952 4 944 47 1 356 11 538 800 2 031 122 1 114 611 10 000

0 0 0 0 0 0 0 34 34 0 0 0 0 0 2 LS LS

0 0 0 0 0 0 0 1 578 45 534 0 0 0 0 0 1 222 10 000 20 000

NA NA NA

m3 m3 m3 m2 m2 m3 no. m m no. Each bridge

NA NA NA

16.2 5.14 14.4

NA NA NA NA NA

Total Cost : 83 672 Cost of Bridge per m2 of plan area 1 116

21 of 27

Bridge unique id : D05_R04_CH - 25.06 - (Nimapada Astaranga Road)


Item Element description Bearing Abutment & dirt wall Wing wall Concrete deck slab Abutment & pier caps Piers RCC/PSC/Steel girder Expansion joints Approach carriageway Batter protection General cleaning Wearing surface Waterway Parapet/Railing/Crash barrier/guard post Floor protection work Foundation
(ESCI*SI*CPIL)

Total quantity 0.00 44.50 37.50 242.08 15.37 121.88 0.00 44.50 62.30 0.00 4.00 217.60 4.00 36.00 0.00 0.00

Units

Estimated quantity in various condition states 1 0.00 42.28 37.50 229.98 15.37 115.79 0.00 44.50 62.30 0.00 2.00 217.60 4.00 12.00 0.00 0.00 A 2 0.00 2.23 0.00 12.10 0.00 6.09 0.00 0.00 0.00 0.00 2.00 0.00 0.00 24.00 0.00 0.00 E 4.00 3 Severity: Medium 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 R 3.00 4 Severity: High 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 I 3.00 No damage Severity: Low

ESCI (Eq1) 0.000 1.050 1.000 1.050 1.000 1.050 0.000 1.000 1.000 0.000 1.500 1.000 1.000 1.667 0.000 0.000

Si

Mi

ESCI*Si*Mi

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16

each m2 m2 m
2

3 2 2 3 4 4 4 1 1 1 1 1 1 1 1 4

1 2 2 2 2 2 2 3 3 2 3 2 3 2 2 2

0 4.20 4.00 6.30 8.00 8.40 0.00 3.00 3.00 0.00 4.50 2.00 3.00 3.33 0.00 0.00

0 1 1 1 1 1 0 1 1 0 1 1 1 1 0 0

Year of construction Road type Number of span Each span length (m) Outer width of bridge (m) Total plan area (m2) Number of pier Top width of pier (m) Bottom width of pier (m) Height of pier (m) Length of return/wing wall (m) Number of bearings Thickness of superstructure (m) Width of bridge between kerbs Thickness of caps Depth of girder

1980 MDR 4 6.8 8.9 242.08 3 0.6 1 2 3.75 0 0.5 8 0.2 0 0

m2 m2 m2 m m2 m each m2 each no m
2 2

m2

49.7333333 11 No of girders per span

CF=0411 A+0 120E+0. 107R+0.362I SHI=CF*{(ESCI*SI*MI)/n

4.00

3.53

SHI = 49.7333333333333 X 3.531 / 11

15.966

OSCI=1 OSCI=2 OSCI=3 OSCI=4

when SHI=1 when 1<SHI =< 16 when 16<SHI<81 when 81<SHI<256

16<SHI<81

OSCI = 2

D05_R04_CH - 25.06 - (Nimapada Astaranga Road)


Sl. No. MORTH Ref. Item description Unit Rate a

FAIR < 30m


Amount Quantity a Remarks

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18

2.3

Clearing and uprooting rank vegetation, bushes, shrubs, saplings etc including removal and disposal. Cleaning and Greasing of Metallic bearings complete as per Technical specification Applying epoxy mortar over leached, honey combed and spalled concrete surface and exposed steel reinforcement complete as per Technical specification (10mm thick) Guniting concrete surface with cement mortar applied with compressor after cleaning surface and spraying with epoxy complete as per Technical specification (25mm thick) Patching of damaged concrete surface with polymer concrete and curing compounds, initiator and promoter, available in present formulations, to be applied as per instructions of manufacturer and as approved by the Engineer. Jacketing of concrete surface and exposed steel reinforcement complete as per Technical specification using 200mm thick M 30 grade concrete including reinforcement(@ 40 kg per m3), formwork etc and all accessories to complete the work. Supplying ,hoisting, fixing steel joists in superstructure including painting and all required materials complete. Supplying, fitting and placing HYSD bar reinforcement complete as per drawing and technical specifications Drilling of holes in existing concrete and fixing new reinforcement with epoxy mortar grout but excluding cost of reinforcement

m2 no. m2 m2 m2 m2 tonne tonne no. m2 m3 m3 m3 m m


2 2

10 1 093 537 1 157 2 580 2 203 75 000 68 793 423 663 5 083 5 165 3 588 40 101 501 66 925

LS 0 8 12 0 0 0 0 0 0 0 0 0 0 0 0 0 0

5 000 0 4 467 14 004 0 0 0 0 0 0 0 0 0 0 0 0 0 0 NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA

16.8 16.3 16.6

14.2

16.11 Epoxy bonding of new concrete to old concrete 12.5 13.1 13.4 13.2 13.5 16.4 16.5 16.7 Brick masonry work in cement mortar 1:3 in foundation complete excluding pointing and plastering, as per drawing and technical specifications Brick masonry work in 1:3 in sub-structure complete excluding pointing and plastering, as per drawing and Technical Specifications Stone masonry work in cement mortar 1:3 for substructure complete as per drawing and Technical Specifications Pointing with cement mortar (1:3 ) on brick work/stone work in substructure as per Technical specifications Plastering with cement mortar (1:3 ) on brick work in sub-structure as per Technical specifications Providing and inserting nipples with approved fixing compound after drilling holes for grouting as per Technical Specifications including subsequent cutting/removal and sealing of the hole as necessary of nipples after completion of grouting with Cement/Epoxy Sealing of crack / porous concrete with cement grout by injection process through nipples / grouting complete as per clause 2803.1. Sealing of crack / porous concrete with Epoxy Grout by injection through nipples complete as per clause 2803.1.

no. kg kg

23 of 27

D05_R04_CH - 25.06 - (Nimapada Astaranga Road)


Sl. No. MORTH Ref. Item description Unit Rate a

FAIR < 30m


Amount Quantity a Remarks

19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35

16.17 Replacement of Expansion Joints complete as per drawings 15.4 15.5 Providing and laying Pitching on slopes laid over prepared filter media including boulder apron laid dry in front of toe of embankment complete as per drawing and Technical specifications. Providing and laying Filter material underneath pitching in slopes complete as per drawing and Technical specification. Construction of masonry toe wall for batter protection. 15.11 Flexible Apron: Construction of flexible apron 1 m thick comprising of loose stone boulders weighing not less than 40 kg beyond curtain wall. Construction of Cut off wall for bed protection with m15 grade cement concrete Providing and laying rubble stone flooring laid in cement mortar 1:3 as per drawing and technical specification laid over cement concrete bedding. Removal of existing asphaltic wearing coat comprising of 50 mm thick asphaltic concrete laid over 12 mm thick mastic asphalt including disposal with all lift and lead upto 1000m. Providing and laying in position 65 mm thick wearing coat consisting of 25mm thick layer of mastic asphalt over 40 mm bituminous concrete over deck slab after applying prime coat complete as per drawings and technical specification sections 500 and 2700 or as directed by the Engineer. Providing and laying Cement concrete wearing coat M-30 grade including reinforcement complete as per drawing and Technical Specifications

m m3 m3 m
3

2 642 1 376 1 117 3 588 1 328 4 952 4 944 47 1 356 11 538 800 2 031 122 1 114 611 10 000

0 0 0 0 0 0 0 0 0 0 24 0 0 0 2 LS LS

0 0 0 0 0 0 0 0 0 0 19 200 0 0 0 1 222 10 000 20 000

NA NA NA NA NA NA NA NA NA NA

m3 m3 m3 m2 m2 m3 no. m m no. Each bridge

16.2 5.14 14.4

16.21 Providing and fixing guard post 16.18 Replacement of Damaged Concrete Railing. 16.22 Repair of RCC Railing 14.9 8.3 Providing Drainage Spouts complete as per drawing and Technical specification Printing new letter and figures of any shade (Printing new letter and figures of any shade with synthetic enamel paint black or any other approved colour to give an even shade) Safety measures, traffic regulation, scaffolding and other logistic arrangement for execution of works Provision for miscellaneous items not accounted for

NA NA NA

Total Cost : 73 894 Cost of Bridge per m2 of plan area 305

24 of 27

Bridge unique id : D05_R04_CH - 25.17 - (Nimapada Astaranga Road)


Item Element description Bearing Abutment & dirt wall Wing wall Concrete deck slab Abutment & pier caps Piers RCC/PSC/Steel girder Expansion joints Approach carriageway Batter protection General cleaning Wearing surface Waterway Parapet/Railing/Crash barrier Floor protection work Foundation
(ESCI*SI*CPIL)

Total quantity 0.00 23.25 0.00 63.00 6.41 21.30 0.00 22.50 52.50 20.41 0.00 56.28 2.00 16.80 125.33 0.00

Units

Estimated quantity in various condition states 1 0.00 23.25 0.00 51.98 6.41 21.30 0.00 0.00 52.50 15.31 0.00 56.28 2.00 15.96 125.33 0.00 A 2 0.00 0.00 0.00 0.00 0.00 0.00 0.00 22.50 0.00 0.00 0.00 0.00 0.00 0.84 0.00 0.00 E 4.00 3 Severity: Medium 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 R 3.00 4 Severity: High 0.00 0.00 0.00 11.03 0.00 0.00 0.00 0.00 0.00 5.10 0.00 0.00 0.00 0.00 0.00 0.00 I 3.00 No damage Severity: Low

ESCI (Eq1) 0.000 1.000 0.000 1.525 1.000 1.000 0.000 2.000 1.000 1.750 0.000 1.000 1.000 1.050 1.000 0.000

Si

Mi

ESCI*Si*Mi

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16

each m2 m2 m
2

3 2 2 3 4 4 4 1 1 1 1 1 1 1 1 4

1 2 2 2 2 2 2 3 3 2 3 3 3 2 2 2

0 4.00 0.00 9.15 8.00 8.00 0.00 6.00 3.00 3.50 0.00 3.00 3.00 2.10 2.00 0.00 51.75

0 1 0 1 1 1 0 1 1 1 0 1 1 1 1 0

Year of construction Road type Number of span Each span length (m) Outer width of bridge (m) Total plan area (m2) Number of pier Top width of pier (m) Bottom width of pier (m) Height of pier (m) Length of return/wing wall (m) Number of bearings Thickness of superstructure (m) Width of bridge between kerbs Thickness of caps Depth of girder

MDR 2 4.2 7.5 63 1 0.65 0.65 1.25 2.325 0 0.3 6.7 0.2 0 0

m2 m2 m2 m m2 m each m2 each m m m
2 2 2

11 No of girders per span

CF=0411 A+0 120E+0. 107R+0.362I SHI=CF*{(ESCI*SI*MI)/n

4.00

3.53

SHI = 51.75 X 3.531 / 11

16.613

OSCI=1 OSCI=2 OSCI=3 OSCI=4

when SHI=1 when 1<SHI =< 16 when 16<SHI<81 when 81<SHI<256

16<SHI<81

OSCI = 3

D05_R04_CH - 25.06 - (Nimapada Astaranga Road)


Sl. MORTH No. Ref. 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 14.2 16.8 16.3 16.6 2.3 Item description Clearing and uprooting rank vegetation, bushes, shrubs, saplings etc including removal and disposal. Cleaning and Greasing of Metallic bearings complete as per Technical specification Applying epoxy mortar over leached, honey combed and spalled concrete surface and exposed steel reinforcement complete as per Technical specification (10mm thick) Guniting concrete surface with cement mortar applied with compressor after cleaning surface and spraying with epoxy complete as per Technical specification (25mm thick) Patching of damaged concrete surface with polymer concrete and curing compounds, initiator and promoter, available in present formulations, to be applied as per instructions of manufacturer and as approved by the Engineer. Jacketing of concrete surface and exposed steel reinforcement complete as per Technical specification using 200mm thick M 30 grade concrete including reinforcement(@ 40 kg per m3), formwork etc and all accessories to complete the work. Supplying ,hoisting, fixing steel joists in superstructure including painting and all required materials complete. Supplying, fitting and placing HYSD bar reinforcement complete as per drawing and technical specifications Drilling of holes in existing concrete and fixing new reinforcement with epoxy mortar grout but excluding cost of reinforcement 16.11 Epoxy bonding of new concrete to old concrete 12.5 13.1 13.4 13.2 13.5 16.4 16.5 16.7 Brick masonry work in cement mortar 1:3 in foundation complete excluding pointing and plastering, as per drawing and technical specifications Brick masonry work in 1:3 in sub-structure complete excluding pointing and plastering, as per drawing and Technical Specifications Stone masonry work in cement mortar 1:3 for substructure complete as per drawing and Technical Specifications Pointing with cement mortar (1:3 ) on brick work/stone work in substructure as per Technical specifications Plastering with cement mortar (1:3 ) on brick work in sub-structure as per Technical specifications Providing and inserting nipples with approved fixing compound after drilling holes for grouting as per Technical Specifications including subsequent cutting/removal and sealing of the hole as necessary of nipples after completion of grouting with Cement/Epoxy Sealing of crack / porous concrete with cement grout by injection process through nipples / grouting complete as per clause 2803.1. Sealing of crack / porous concrete with Epoxy Grout by injection through nipples complete as per clause 2803.1. Unit m2 no. m2 m2 m2 m2 tonne tonne no. m2 m3 m3 m3 m m
2 2

POOR < 30m


Rate a 10 1 093 537 1 157 2 580 2 203 75 000 68 793 423 663 5 083 5 165 3 588 40 101 501 66 925 Amount Quantity a LS 0 1 0 11 0 0 0 0 0 0 0 0 0 0 4 1 22 1 000 0 269 0 28 445 0 0 0 0 0 0 0 0 0 0 2 004 66 19 980 NA NA NA NA NA NA NA NA NA NA NA NA Remarks

no. kg kg

26 of 27

D05_R04_CH - 25.06 - (Nimapada Astaranga Road)


Sl. MORTH No. Ref. 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 16.2 5.14 14.4 15.11 Item description Unit m m3 m3 m
3

POOR < 30m


Rate a 2 642 1 376 1 117 3 588 1 328 4 952 4 944 47 1 356 11 538 800 2 031 122 1 114 611 10 000 Amount Quantity a 0 0 0 0 0 0 0 0 0 0 0 0 0 0 2 LS LS 0 0 0 0 0 0 0 0 0 0 0 0 0 0 1 222 10 000 20 000 Remarks NA NA NA NA NA NA NA NA NA NA NA NA NA NA

16.17 Replacement of Expansion Joints complete as per drawings 15.4 15.5 Providing and laying Pitching on slopes laid over prepared filter media including boulder apron laid dry in front of toe of embankment complete as per drawing and Technical specifications. Providing and laying Filter material underneath pitching in slopes complete as per drawing and Technical specification. Construction of masonry toe wall for batter protection. Flexible Apron: Construction of flexible apron 1 m thick comprising of loose stone boulders weighing not less than 40 kg beyond curtain wall. Construction of Cut off wall for bed protection with m15 grade cement concrete Providing and laying rubble stone flooring laid in cement mortar 1:3 as per drawing and technical specification laid over cement concrete bedding. Removal of existing asphaltic wearing coat comprising of 50 mm thick asphaltic concrete laid over 12 mm thick mastic asphalt including disposal with all lift and lead upto 1000m. Providing and laying in position 65 mm thick wearing coat consisting of 25mm thick layer of mastic asphalt over 40 mm bituminous concrete over deck slab after applying prime coat complete as per drawings and technical specification sections 500 and 2700 or as directed by the Engineer. Providing and laying Cement concrete wearing coat M-30 grade including reinforcement complete as per drawing and Technical Specifications

m3 m3 m3 m2 m2 m3 no. m m no. Each bridge

16.21 Providing and fixing guard post 16.18 Replacement of Damaged Concrete Railing. 16.22 Repair of RCC Railing 14.9 8.3 Providing Drainage Spouts complete as per drawing and Technical specification Printing new letter and figures of any shade (Printing new letter and figures of any shade with synthetic enamel paint black or any other approved colour to give an even shade) Safety measures, traffic regulation, scaffolding and other logistic arrangement for execution of works Provision for miscellaneous items not accounted for

Total Cost : 82 985 Cost of Bridge per m2 of plan area 1 317