Anda di halaman 1dari 128

Project

33/11kV Package Unit Substation in Sir Baniyas


Client
ADDC
Main
RANYA CONTRACTING ESTABLISHMENT
DERBY DESIGN Contractor
Reference 33/11 KV Package Unit Substation
Abu Dhabi

Date

26-Apr Ref. No.

Made By

SKS

Checked By

PSK

Rev. No.

Approved By

SAK

Drg. Ref.

INDEX
DESCRIPTION

PAGE NO.

1.0 INTRODUCTION

1 - 2

2.0 WIND LOAD CALCULATION

3 - 8

3.0 33/11kV SWITCHGEAR


3.1

LOAD CALCULATION

10 - 12

3.2

STAAD ANALYSIS

13 - 22

3.3

BEARING PRESSURE CHECK

23 - 25

3.4

SETTLEMENT CHECK

26 - 27

3.5

BASE SLAB DESIGN

28 - 37

3.6

DESIGN OF OUTER RC WALL

38 - 47

3.7

DESIGN OF INNER RC WALL

48 - 57

4.0 PACKAGE UNIT FOUNDATION- POWER TRANSFORMER


4.1

LOAD CALCULATION

59 - 61

4.2

STAAD ANALYSIS (POWER TRANSFORMER)

62 - 71

4.3

BEARING PRESSURE CHECK

72 - 74

4.4

SETTLEMENT CHECK

75 - 76

4.5

BASE SLAB DESIGN

77 - 86

4.6

RC WALL DESIGN

87 - 96

5.0 AUX. TRANSFORMER


5.1

LOAD CALCULATION

98 - 99

6.0 GRATING DESIGN

100 - 103

7.0 DESIGN OF SUPPORTING STEEL BEAM

104 - 109

8.0 ANCHOR BOLT DESIGN

110 - 115

9.0 INPUT DRAWINGS

116 - 120

10.0 SOIL REPORT

121 - 122

11.0 STRUCTURAL DRAWINGS

123 - 127

Page 1

INTRODUCTION

Page 2
Project
33/11kV Package Unit Substation in Sir Baniyas
ADDC
Client
Main
RANYA CONTRACTING ESTABLISHMENT
DERBY DESIGN Contractor
Structure
33/11 KV Package Unit Substation
Abu Dhabi

Date

25-Apr Ref. No.

Made By

SKS

Checked By

PSK

Rev. No.

Approved By

SAK

Drg. Ref.

INTRODUCTION

This Document covers the structural analysis and design calculations for 33/11kV Package unit,
15/20 Mva Power Transformer and 100 kva Auxiliary Transformer. The foundations has been
designed for all possible loadings including earth pressure, surcharge pressure, wind loads and their
combinations.

Net Allowable Bearing Capacity = 90 KN / m2


Modulus of Subgrade Reaction = (90/0.025) x 3
= 10,800 KN / m3

Page 3

WIND LOAD CALCULATION

33/11kV PACKAGE UNIT IN SIR BANIYAS


POWER TRANSFORMER

Page:
Made by:
Date:
Ref No:
Office:

Page 4
1
SKS
21.04.2011

1328

WIND LOADS: in accordance with BS6399 : Part 2: 1995


Location: Wind loads to BS6399: Part2 : 1995
Dynamic Augmentation Factor.
Chosen site is the country or terrain not defined as sea or town
Building Height
H=3.8 m
Effective Height
He=3.8 m
Building type factor

Kb=2

Chosen building type is a portal shed or similar light structure with


few internal walls
Dimensionless constant
Logarithm of height factor

ho=0.1 m
lh=LOG(H/ho)/LOG(10)
=LOG(3.8/0.1)/LOG(10)
=1.58
Dynamic Augmentation Factor
Cr=(Kb*(H/ho)^0.75)/800/lh
=(2*(3.8/0.1)^0.75)/800/1.58
=0.02422
Since Dynamic Augmentation Factor Cr is less than or equal to 0.25
then this structure is not dynamic.
Standard wind loads.
Basic wind speed
Vb=25 m/sec
Structure is not located at the crest of a hill or escarpment and the
topography is not significant.
Site altitude above mean sea level deltaS=10 m
Altitude factor
Sa=1+0.001*deltaS
=1+0.001*10
=1.01
Direction factor
Sd=1
The building is permanent or exposed to the wind for a continuous
period of more than 6 months.
Seasonal factor
Ss=1.0
The basic wind speed has an annual risk of being exceeded of Q=0.02
Probability factor
Sp=1
Since site is in the country with the closest distance to the sea
being 10 Km, then
From Table 4 Terrain & building factor Sb=1.482
Site wind speed @ height He

Vs=Vb*Sa*Sd*Ss*Sp
=25*1.01*1*1*1
=25.25 m/sec

33/11kV PACKAGE UNIT IN ICAD III


POWER TRANSFORMER

Effective wind speed


Dynamic pressure at height He

DESIGN
SUMMARY

Page:
Made by:
Date:
Ref No:

2
Page 5
SKS
28.02.11

Office: 1328
Ve=Vs*Sb=25.25*1.482=37.42 m/sec
qs=0.613*Ve^2/1000
=0.613*37.42^2/1000
=0.8584 kN/m 2
Effective height
Altitude factor
Sa
Direction factor
Sd
Seasonal factor
Ss
Probability factor
Sp
Dynamic wind pressure

3.8 m
1.01
1
1
1
qs 0.8584 kN/m 2
No702

Page 6

33/11kV PACKAGE UNIT SUBSTATION IN SIR BANIYAS

Date

25-Apr-11

ADDC

Made

SKS

Checked

PSK

RANYA CONTRACTING ESTABLISHMENT

Rev. No.

Approved

SAK

33/11kV SWITCHGEAR

Rev.Date

Page

Project
Client
Main
contractor
DERBY DESIGN Structure

Wind Load
kN/m2
m
m
m

Design wind pressure (Conservatively)


Width of building in x-direction
Width of building in z-direction
Height of the building

=
=
=
=

1.25
8.45
10.5
3.8

1). Wind along X-direction


Width of the building along z-direction
Height of the building

=
=

10.5 m
3.8 m

D =
H =
D/H =

8.45 m
3.8 m
2.22

Fig 12 BS-6399-2

From Table 5 BS-6399-2


Cpe - windward
Conservatively consider
Cpe - leeward

=
=
=

From Table 16 BS-6399-2


Cpi

= +0.2 or -0.3

0.6
0.85
-0.5

(pressure)
(pressure)
(suction)

(i). Wind Load acting along +X direction:


+X

Wind

+Z

Wind

0.2
0.85

0.3

0.3

0.5

Case -1 with -0.3 (suction)

0.85

0.2

Case -2 with +0.2 (pressure)


Case-1

Wind-ward side
Net pressure
Therefore max wind pressure coefficient
on wind-ward side
Max wind pressure on wind-ward side

Lee-ward side
Net pressure

Therefore max wind pressure coefficient


on Lee-ward side
Max wind pressure on lee-ward side

= 0.85 + 0.3
= 1.15
= 1.15

Case-2

Net pressure

= 0.85-0.2
= 0.65

Net pressure

= 0.2 + 0.5
= 0.70

= 1.15 x 1.25
=
1.438 kN/m2

= 0.5 - 0.3
= 0.20
= 0.70
= 0.7 x 1.25
=
0.88 kN/m2

0.5

Page 7

33/11kV PACKAGE UNIT SUBSTATION IN SIR BANIYAS

Date

25-Apr-11

Page

ADDC

Made

SKS

Checked

PSK

RANYA CONTRACTING ESTABLISHMENT

Rev. No.

Approved

SAK

33/11kV SWITCHGEAR

Rev.Date

Project
Client
Main
contractor
DERBY DESIGN Structure

(ii). Wind Load acting along -X direction:


+X

+Z
Wind

Wind

0.2

0.5

0.3

0.3

0.85

Case -1 with -0.3 (suction)

0.5

0.2

Case -2 with +0.2 (pressure)

Case-1

Wind-ward side
Net pressure
Therefore max wind pressure coefficient
Max wind pressure on wind-ward side
Lee-ward side
Net pressure
Therefore max wind pressure coefficient
Max wind pressure

Case-2

=
=
=
=
=

0.85+0.3
1.15
1.15
1.15 x 1.25
1.438 kN/m2

Net pressure

= 0.85-0.2
= 0.650

=
=
=
=
=

0.5-0.3
0.20
0.70
0.7 x 1.25
0.88 kN/m2

Net pressure

= 0.5+0.2
= 0.70

2). Wind along Z-direction

Width of the building along x-direction


Height of the building

Fig 12 BS-6399-2

From Table 5 BS-6399-2


Cpe - windward
Cpe - leeward

=
=

8.45 m
3.8 m

D =
H =
D/H =

10.5 m
3.8 m
2.76

=
=

0.85
-0.5

(pressure)
(suction)

From Table 16 BS-6399-2


Cpi

= +0.2 or -0.3

(ii). Wind Load acting along +Z direction:


+X

+Z
0.5

0.5

0.3

0.2

0.3

0.2

0.85

0.85

Case -1 with -0.3 (suction)

Case -2 with +0.2 (pressure)

0.85

Page 8

33/11kV PACKAGE UNIT SUBSTATION IN SIR BANIYAS

Date

25-Apr-11

Page

ADDC

Made

SKS

Checked

PSK

RANYA CONTRACTING ESTABLISHMENT

Rev. No.

Approved

SAK

33/11kV SWITCHGEAR

Rev.Date

Project
Client
Main
contractor
DERBY DESIGN Structure

Wind-ward side
Net pressure

Case-1
= 0.85+0.3

(Factors considerded on conservative side)

= 1.15

Therefore max wind pressure coefficient


Max wind pressure

= 1.15
= 1.15 x 1.25
=
1.438 kN/m2

Lee-ward side
Net pressure

= 0.5-0.3

(Factors considerded on conservative side)

= 0.20

Therefore max wind pressure coefficient


Max wind pressure

= 0.70
= 0.7 x 1.25
=
0.875 kN/m2

Net pressure

Case-2
= 0.85-0.2
= 0.65

Net pressure

= 0.2+0.5
= 0.70

(ii). Wind Load acting along -Z direction:


+X

+Z

0.85

0.85

0.3

0.2

0.3

0.2

0.5

0.5

Case -1 with -0.3 (suction)

Case -2 with +0.2 (pressure)

Wind-ward side
Net pressure

Case-1
= 0.85+0.3

(Factors considerded on conservative side)

= 1.15

Therefore max wind pressure coefficient


Max wind pressure

= 1.15
= 1.15 x 1.25
=
1.438 kN/m2

Lee-ward side
Net pressure

= 0.5-0.3

(Factors considerded on conservative side)

= 0.20

Therefore max wind pressure coefficient


Max wind pressure

= 0.70
= 0.7 x 1.25
=
0.875 kN/m2

Net pressure

Case-2
= 0.85-0.2
= 0.65

Net pressure

= 0.2+0.5
= 0.70

Page 9

33/11kV SWITCHGEAR

Page 10

LOAD CALCULATION

DERBY DESIGN

25-Apr

Page 11

Project:

33/11kV PACKAGE UNIT SUBSTATION IN SIR BANIYAS

Date

Client:

ADDC

Page

Design

SKS

Checked

PSK

Main
contractor:

RANYA CONTRACTING ESTABLISHMENT

Rev No.

Approved

SAK

Structure:

33/11KV SWITCHGEAR

Rev Date

LOAD CALCULATION
a) DEAD LOAD
Dead Loads are considerd by the program itself.
b) LIVE LOAD
Load of equipment (160+140+90kN = 390 KN, Say = 400 KN) is applied on top of wall as a UDL
(See Attached Input)
2.703 kN Each node
400 / 148 Nodes
=
c) EARTH PRESSURE
Earth Pressure due to Soil

18.9

kN/m2

0.5 x 18 x 2.1

0.5 x 33.33

= 16.67 kN/m2

=
=
=
=
=

2.5 x Ca x I x W / R
2.5 x 0.12x1 x W /5.5
0.0545 W
400 x 0.0545 / 148
0.147 kN Each node

=
=
=
=
=
=
=
=

1.438 x 8.45 x 3.8


46.17 kN
0.88 x 8.45 x 3.8
28.26 kN
(46.17 + 28.26) x 3.8/2
141.42 kNm
141.42 / 10.50
13.47 kN

Horizontal load per node on


windward direction

=
=
=
=

13.47 / 24
0.56 kN
46.17 / 24
1.92 kN

Horizontal load per node om


leeward direction

=
=

28.26 / 24
1.18 kN

d) SURCHARGE PRESSURE
Surcharge pressure from SLW60 loading
e) SEISMIC LOAD
Seismic Loads to UBC 1997
Maximum base Shear, Vmax

f) WIND LOAD
Wind load on X-direction
Load on windward direction
Load on leeward direction
Moment
Vertical push/pull due to the moment

Vertical load per node

Wind load on Z-direction


Load on windward direction

Page 12

=
=
=
=
=
=
=
=

1.438 x 10.50 x 3.8


57.38 kN
0.88 x 10.50 x 3.8
35.11 kN
(57.38 + 35.11) x 3.8/2
175.73 kNm
175.73 / 8.45
20.79 kN

Horizontal load per node


on windward direction

=
=
=
=

20.79 / 30
0.69 kN
57.38 / 30
1.91 kN

Horizontal load per node


on leeward direction

=
=

35.11 / 30
1.17 kN

Load on leeward direction


Moment
Vertical push/pull due to the moment

Vertical load per node

Base Shear due to wind is more than seismic.


Hence, Wind load is governing and considered in analysis.

Check for Overturning in X direction


Overturning Moment

=
=

(46.17+28.26) x (3.8/2+2.4)
320.05 kNm

Selfweight of the structure


(Base slab+walls)

=
=

(8.75x10.8x0.35x25)+(2x10.5x0.25x2.25x25)+
(4x8.45x0.25x2.25x25)
1597.5 kN

Resisting Moment

=
=

1597.5 x 10.50 / 2
8387 kNm

Factor of safety

=
=

8387 / 320.05
26.2
>
1.5
Hence Safe

Overturning Moment

=
=

(57.38+35.11) x (3.8/2+2.4)
397.71 kNm

Selfweight of the building

1597.5 kN

Resisting Moment

=
=

1597.5 x 8.45 / 2
6750 kNm

Factor of safety

=
=

6750 / 397.71
16.97
>
Hence Safe

Check for Overturning in Z direction

1.5

Page 13

STAAD ANALYSIS

Page 14

Job Title

33/11kV PACKAGE UNIT SUBSTATION

Job No

Software licensed to [LZ0 + LND]

Part 33/11kV

33/11kV Package Unit Substation in Sir Baniyas

ADDC

Rev

SWITCHGEAR

Ref
By

Client

Sheet No

File

SKS
33kv.std

Date19

Jan-11
Date/Time

Chd

PSK

21-Apr-2011 16:14

Y
X
Z

33/11kV PACKAGE UNIT SUBSTATION

Print Time/Date: 25/04/2011 11:59

STAAD.Pro for Windows Release 2005

Print Run 1 of 4

Page 15

Job Title

33/11kV PACKAGE UNIT SUBSTATION

Job No

Software licensed to [LZ0 + LND]

Part 33/11kV

33/11kV Package Unit Substation in Sir Baniyas

ADDC

Rev

SWITCHGEAR

Ref
By

Client

Sheet No

File

SKS
33kv.std

Date19

Chd

Jan-11
Date/Time

PSK

21-Apr-2011 16:14

Y
X
Z

Load 2

LIVE LOAD

Print Time/Date: 25/04/2011 11:59

STAAD.Pro for Windows Release 2005

Print Run 2 of 4

Page 16

Job Title

33/11kV PACKAGE UNIT SUBSTATION

Job No

Software licensed to [LZ0 + LND]

Part 33/11kV

33/11kV Package Unit Substation in Sir Baniyas

ADDC

Rev

SWITCHGEAR

Ref
By

Client

Sheet No

File

SKS
33kv.std

Date19

Chd

Jan-11
Date/Time

PSK

21-Apr-2011 16:14

Y
X
Z

Load 3

EARTH PRESSURE

Y
X
Z

Load 4

SURCHARGE PRESSURE

Print Time/Date: 25/04/2011 11:59

STAAD.Pro for Windows Release 2005

Print Run 3 of 4

Page 17

Job Title

33/11kV PACKAGE UNIT SUBSTATION

Job No

Software licensed to [LZ0 + LND]

Part 33/11kV

33/11kV Package Unit Substation in Sir Baniyas

ADDC

Rev

SWITCHGEAR

Ref
By

Client

Sheet No

File

SKS
33kv.std

Date19

Chd

Jan-11
Date/Time

PSK

21-Apr-2011 16:14

Y
X
Z

Load 5

WIND LOAD IN X- DIRECTION

Y
X
Z

Load 7

WIND LOAD IN Z- DIRECTION

Print Time/Date: 25/04/2011 11:59

STAAD.Pro for Windows Release 2005

Print Run 4 of 4

D:\SAHIRA\PU-SIR BANIYAS\33-11kV SWITCH GEAR\STAAD\33kv.anl

Page 1 of 13

Monday, April 25, 2011, 12:00 PM

1. STAAD SPACE
INPUT FILE: 33kv.STD
2. START JOB INFORMATION
3. JOB NAME 33/11KV PACKAGE UNIT SUBSTATION IN SIR BANIYAS
4. JOB CLIENT ADDC
5. JOB PART 33/11KV SWITCHGEAR
6. JOB REV 0
7. ENGINEER NAME SKS
8. CHECKER NAME PSK
9. APPROVED NAME SAK
10. ENGINEER DATE 19 JAN-11
11. END JOB INFORMATION
12. INPUT WIDTH 79
13. SET ECHO OFF
1246. START GROUP DEFINITION
1247. ELEMENT
1248. _BASESLAB 1 TO 70 155 TO 416 429 TO 529 608 TO 841 2205 TO 2312
1249. _WALL 842 TO 897 912 TO 939 954 TO 961 964 TO 967 970 TO 1021 1035 TO 1060 1250. 1074 TO 1125 1139 TO 1164 1178 TO 1185 1188 TO 1191 1194 TO 1249 1251. 1264 TO 1291 1306 TO 1310 1317 TO 1339 1346 TO 1368 1375 TO 1397 1252. 1404 TO 1421 1451 TO 1455 1462 TO 1484 1491 TO 1508 1538 TO 1555 1253. 1562 TO 1584 1591 TO 1613 1620 TO 1642 1649 TO 1653 1683 TO 1700 1254. 1707 TO 1729 1736 TO 1740 1770 TO 1787 1794 TO 1816 1823 TO 1845 1255. 1852 TO 1874 1881 TO 1885 1915 TO 1932 1939 TO 1961 1968 TO 1972 1256. 2002 TO 2019 2026 TO 2048 2055 TO 2077 2084 TO 2106 2113 TO 2117 1257. 2147 TO 2164 2171 TO 2193 2200 TO 2204
1258. END GROUP DEFINITION
1259. ELEMENT PROPERTY
1260. 1 TO 70 155 TO 416 429 TO 529 608 TO 841 2205 TO 2312 THICKNESS 0.35
1261. 842 TO 897 912 TO 939 954 TO 961 964 TO 967 970 TO 1021 1035 TO 1060 1074 1262. 1075 TO 1125 1139 TO 1164 1178 TO 1185 1188 TO 1191 1194 TO 1249 1264 TO 1291 1263. 1306 TO 1310 1317 TO 1339 1346 TO 1368 1375 TO 1397 1404 TO 1421 1264. 1451 TO 1455 1462 TO 1484 1491 TO 1508 1538 TO 1555 1562 TO 1584 1265. 1591 TO 1613 1620 TO 1642 1649 TO 1653 1683 TO 1700 1707 TO 1729 1266. 1736 TO 1740 1770 TO 1787 1794 TO 1816 1823 TO 1845 1852 TO 1874 1267. 1881 TO 1885 1915 TO 1932 1939 TO 1961 1968 TO 1972 2002 TO 2019 1268. 2026 TO 2048 2055 TO 2077 2084 TO 2106 2113 TO 2117 2147 TO 2164 1269. 2171 TO 2193 2200 TO 2204 THICKNESS 0.25
1270. DEFINE MATERIAL START
1271. ISOTROPIC CONCRETE
1272. E 2.7E+007

****************************************************
*
*
*
STAAD.Pro
*
*
Version 2005
Bld 1001.US
*
*
Proprietary Program of
*
*
Research Engineers, Intl.
*
*
Date=
APR 21, 2011
*
*
Time=
16:15:28
*
*
*
*
USER ID: [ LZ0 + LND ]
*
****************************************************

PAGE NO.

-- PAGE NO.

Monday, April 25, 2011, 12:00 PM

POISSON 0.2
DENSITY 25
ALPHA 1E-005
DAMP 0.05
END DEFINE MATERIAL
CONSTANTS
MATERIAL CONCRETE MEMB 1 TO 70 155 TO 416 429 TO 529 608 TO 897 912 TO 939 954 TO 961 964 TO 967 970 TO 1021 1035 TO 1060 1074 TO 1125 1139 TO 1164 1178 TO 1185 1188 TO 1191 1194 TO 1249 1264 TO 1291 1306 TO 1310 1317 TO 1339 1346 TO 1368 1375 TO 1397 1404 TO 1421 1451 TO 1455 1462 TO 1484 1491 TO 1508 1538 TO 1555 1562 TO 1584 1591 TO 1613 1620 TO 1642 1649 TO 1653 1683 TO 1700 1707 TO 1729 1736 TO 1740 1770 TO 1787 1794 TO 1816 1823 TO 1845 1852 TO 1874 1881 TO 1885 1915 TO 1932 1939 TO 1961 1968 TO 1972 2002 TO 2019 2026 TO 2048 2055 TO 2077 2084 TO 2106 2113 TO 2117 2147 TO 2164 2171 TO 2193 2200 TO 2312
SUPPORTS
*SUBGRADE FROM SOIL REPORT = 8000 KN/M^3
1 TO 70 155 TO 416 429 TO 529 608 TO 841 2205 TO 2311 2312 PLATE MAT DIRECT Y SUBGRADE 10800
LOAD 1 DL
SELFWEIGHT Y -1
LOAD 2 LL
**LOAD OF EQUIPMENT (400KN) IS APPLIED ON TOP OF WALL AS UDL
*400/148 NODES = 2.702KN EACH
JOINT LOAD
999 TO 1013 1039 1040 1120 TO 1132 1229 TO 1242 1267 1268 1354 TO 1367 1549 1550 TO 1553 1560 TO 1576 1773 TO 1790 1797 TO 1800 1997 TO 2014 2021 TO 2024 2221 TO 2238 2245 TO 2248 FY -2.703
LOAD 3 EARTHPRESSURE
ELEMENT LOAD
*CONSIDER EARTH PRESSURE AT REST DUE TO SOIL.
*=0.50X20X2.1=21.0KN/M^2
842 TO 855 954 955 970 TO 982 1074 TO 1086 1178 1179 1194 TO 1207 1306 TO 1310 1317 TO 1334 1538 TO 1555 1562 TO 1566 TRAP Y 18.9 14.94
856 TO 869 956 957 983 TO 995 1087 TO 1099 1180 1181 1208 TO 1221 1335 TO 1339 1346 TO 1363 1567 TO 1584 1591 TO 1595 TRAP Y 14.94 10.98
870 TO 883 958 959 996 TO 1008 1100 TO 1112 1182 1183 1222 TO 1235 1364 TO 1368 1375 TO 1392 1596 TO 1613 1620 TO 1624 TRAP Y 10.98 7.11
884 TO 897 960 961 1009 TO 1021 1113 TO 1125 1184 1185 1236 TO 1249 1393 TO 1397 1404 TO 1421 1625 TO 1642 1649 TO 1653 TRAP Y 7.11 3.15
912 TO 925 964 965 1035 TO 1047 1139 TO 1151 1188 1189 1264 TO 1277 1451 TO 1455 1462 TO 1479 1683 TO 1700 1707 TO 1711 TRAP Y 3.15 0.01
*************************************
LOAD 4 SURCHARGE PRESSURE
ELEMENT LOAD
*SURCHARGE PRESSURE DUE TO SLW60 WHEEL LOADS
*0.5*33.333=16.667KN/M^2
1306 TO 1310 1317 TO 1339 1346 TO 1368 1375 TO 1397 1404 TO 1421 1451 TO 1455 1462 TO 1479 PR 16.67
1538 TO 1555 1562 TO 1584 1591 TO 1613 1620 TO 1642 1649 TO 1653 1683 TO 1700 1707 TO 1711 PR 16.67
1074 TO 1125 1139 TO 1151 1178 TO 1185 1188 1189 1194 TO 1249 1264 TO 1276 1277 PR 16.67
842 TO 897 912 TO 925 954 TO 961 964 965 970 TO 1021 1035 TO 1047 PR 16.67
LOAD 5 WL+ X

D:\SAHIRA\PU-SIR BANIYAS\33-11kV SWITCH GEAR\STAAD\33kv.anl

1273.
1274.
1275.
1276.
1277.
1278.
1279.
1280.
1281.
1282.
1283.
1284.
1285.
1286.
1287.
1288.
1289.
1290.
1291.
1292.
1293.
1294.
1295.
1296.
1297.
1298.
1299.
1300.
1301.
1302.
1303.
1304.
1305.
1306.
1307.
1308.
1309.
1310.
1311.
1312.
1313.
1314.
1315.
1316.
1317.
1318.
1319.
1320.
1321.
1322.
1323.
1324.
1325.
1326.
1327.
1328.

STAAD SPACE

Page 2 of 13

Page 18

-- PAGE NO.

JOINT LOAD
1000 1367 1549 TO 1553 1560 TO 1576 FX 1.92
1132 1230 1773 TO 1790 1797 TO 1800 FX 1.18
1000 1367 1549 TO 1553 1560 TO 1576 FY 0.56
1132 1230 1773 TO 1790 1797 TO 1800 FY -0.56
*CONSIDER A WIND LOAD OF 1.25KN/M^2 ON A CONSERVATIVE SIDE.
*TOTAL WIND ON CONTAINER=1.25X10.45X8.45=110.38KN
*LOAD ON EACH NODE=110.38/148 NODES = 0.745KN EACH
LOAD 6 WL- X
JOINT LOAD
1132 1230 1773 TO 1790 1797 TO 1800 FX -1.92
1000 1367 1549 TO 1553 1560 TO 1576 FX -1.18
1132 1230 1773 TO 1790 1797 TO 1800 FY 0.56
1000 1367 1549 TO 1553 1560 TO 1576 FY -0.56
LOAD 7 WL +Z
JOINT LOAD
999 TO 1013 1039 1040 1120 TO 1132 FZ 1.91
1229 TO 1242 1267 1268 1354 TO 1367 FZ 1.17
999 TO 1013 1039 1040 1120 TO 1132 FY 0.69
1229 TO 1242 1267 1268 1354 TO 1367 FY -0.69
LOAD 8 WL -Z
JOINT LOAD
1229 TO 1242 1267 1268 1354 TO 1367 FZ -1.91
999 TO 1013 1039 1040 1120 TO 1132 FZ -1.17
1229 TO 1242 1267 1268 1354 TO 1367 FY 0.69
999 TO 1013 1039 1040 1120 TO 1132 FY -0.69
******************************************************************
*LOAD COMBINATIONS
******************
*SERVICE LOAD COMBINATIONS
*
LOAD COMB 10 1.0DL+1.0LL
1 1.0 2 1.0
LOAD COMB 11 1.0DL+1.0LL+1.0EP
1 1.0 2 1.0 3 1.0
LOAD COMB 12 1.0DL+1.0LL+1.0EP+1.0SP
1 1.0 2 1.0 3 1.0 4 1.0
*
LOAD COMB 13 1.0DL+1.0LL+1.0EP+1.0WL+X
1 1.0 2 1.0 3 1.0 5 1.0
LOAD COMB 14 1.0DL+1.0LL+1.0EP+1.0WL-X
1 1.0 2 1.0 3 1.0 5 -1.0
LOAD COMB 15 1.0DL+1.0LL+1.0EP+1.0WL+Z
1 1.0 2 1.0 3 1.0 6 1.0
LOAD COMB 16 1.0DL+1.0LL+1.0EP+1.0WL-Z
1 1.0 2 1.0 3 1.0 6 -1.0
*
LOAD COMB 17 1.0DL+1.0LL+1.0EP+1.0SP+1.0WL+X
1 1.0 2 1.0 3 1.0 4 1.0 5 1.0
LOAD COMB 18 1.0DL+1.0LL+1.0EP+1.0SP+1.0WL-X
1 1.0 2 1.0 3 1.0 4 1.0 5 -1.0
LOAD COMB 19 1.0DL+1.0LL+1.0EP+1.0SP+1.0WL+Z
1 1.0 2 1.0 3 1.0 4 1.0 6 1.0
LOAD COMB 20 1.0DL+1.0LL+1.0EP+1.0SP+1.0WL-Z
1 1.0 2 1.0 3 1.0 4 1.0 6 -1.0
*************************************************

D:\SAHIRA\PU-SIR BANIYAS\33-11kV SWITCH GEAR\STAAD\33kv.anl

1329.
1330.
1331.
1332.
1333.
1334.
1335.
1336.
1337.
1338.
1339.
1340.
1341.
1342.
1343.
1344.
1345.
1346.
1347.
1348.
1349.
1350.
1351.
1352.
1353.
1354.
1355.
1356.
1357.
1358.
1359.
1360.
1361.
1362.
1363.
1364.
1365.
1366.
1367.
1368.
1369.
1370.
1371.
1372.
1373.
1374.
1375.
1376.
1377.
1378.
1379.
1380.
1381.
1382.
1383.
1384.

STAAD SPACE

Page 3 of 13

Monday, April 25, 2011, 12:00 PM

*ULTIMATE LOAD COMBINATIONS


*
LOAD COMB 51 1.2DL+1.2LL+1.2EP+1.2WL+X
1 1.2 2 1.2 3 1.2 5 1.2
LOAD COMB 52 1.2DL+1.2LL+1.2EP+1.2WL-X
1 1.2 2 1.2 3 1.2 5 -1.2
LOAD COMB 53 1.2DL+1.2LL+1.2EP+1.2WL+Z
1 1.2 2 1.2 3 1.2 6 1.2
LOAD COMB 54 1.2DL+1.2LL+1.2EP+1.2WL-Z
1 1.2 2 1.2 3 1.2 6 -1.2
*
LOAD COMB 55 1.2DL+1.2LL+1.2EP+1.2SP+1.2WL+X
1 1.2 2 1.2 3 1.2 4 1.2 5 1.2
LOAD COMB 56 1.2DL+1.2LL+1.2EP+1.2SP+1.2WL-X
1 1.2 2 1.2 3 1.2 4 1.2 5 -1.2
LOAD COMB 57 1.2DL+1.2LL+1.2EP+1.2SP+1.2WL+Z
1 1.2 2 1.2 3 1.2 4 1.2 6 1.2
LOAD COMB 58 1.2DL+1.2LL+1.2EP+1.2SP+1.2WL-Z
1 1.2 2 1.2 3 1.2 4 1.2 6 -1.2
*
LOAD COMB 59 1.4DL+1.4EP+1.4WL+X
1 1.4 3 1.4 5 1.4
LOAD COMB 60 1.4DL+1.4EP+1.4WL-X
1 1.4 3 1.4 5 -1.4
LOAD COMB 61 1.4DL+1.4EP+1.4WL+Z
1 1.4 3 1.4 6 1.4
LOAD COMB 62 1.4DL+1.4EP+1.4WL-Z
1 1.4 3 1.4 6 -1.4
*
LOAD COMB 63 1.0DL+1.0EP+1.4WL+X
1 1.0 3 1.0 5 1.4
LOAD COMB 64 1.0DL+1.0EP+1.4WL-X
1 1.0 3 1.0 5 -1.4
LOAD COMB 65 1.0DL+1.0EP+1.4WL+Z
1 1.0 3 1.0 6 1.4
LOAD COMB 66 1.0DL+1.0EP+1.4WL-Z
1 1.0 3 1.0 6 -1.4
*
LOAD COMB 67 1.4DL+1.4EP+1.6LL
1 1.4 2 1.6 3 1.4
LOAD COMB 68 1.4DL+1.4EP+1.6LL+1.6SP
1 1.4 2 1.6 3 1.4 4 1.6
*********************************************
PERFORM ANALYSIS PRINT STATICS CHECK

D:\SAHIRA\PU-SIR BANIYAS\33-11kV SWITCH GEAR\STAAD\33kv.anl

1385.
1386.
1387.
1388.
1389.
1390.
1391.
1392.
1393.
1394.
1395.
1396.
1397.
1398.
1399.
1400.
1401.
1402.
1403.
1404.
1405.
1406.
1407.
1408.
1409.
1410.
1411.
1412.
1413.
1414.
1415.
1416.
1417.
1418.
1419.
1420.
1421.
1422.
1423.
1424.
1425.
1426.
1427.
1428.

STAAD SPACE

-- PAGE NO.

Monday, April 25, 2011, 12:00 PM

Page 4 of 13

Page 19

-- PAGE NO.

D:\SAHIRA\PU-SIR BANIYAS\33-11kV SWITCH GEAR\STAAD\33kv.anl

NUMBER OF JOINTS/MEMBER+ELEMENTS/SUPPORTS = 1720/ 1675/


832
ORIGINAL/FINAL BAND-WIDTH= 1718/
90/
546 DOF
TOTAL PRIMARY LOAD CASES =
8, TOTAL DEGREES OF FREEDOM = 10320
SIZE OF STIFFNESS MATRIX =
5635 DOUBLE KILO-WORDS
REQRD/AVAIL. DISK SPACE =
82.2/ 10158.1 MB

P R O B L E M
S T A T I S T I C S
-----------------------------------

STAAD SPACE

Page 5 of 13

Monday, April 25, 2011, 12:00 PM

( KN
METE ) SUMMARY (LOADING
=
0.00
=
-1693.00
=
0.00

METE ) SUMMARY (LOADING


0.00
1693.00
0.00

1)

8925.88

1 )

-8925.88

1 )

( KN
=
=
=

METE ) SUMMARY (LOADING


0.00
-400.04
0.00

METE ) SUMMARY (LOADING


0.00
400.04
0.00

2 )

2135.83

2 )

-2135.83

D:\SAHIRA\PU-SIR BANIYAS\33-11kV SWITCH GEAR\STAAD\33kv.anl

SUMMATION OF MOMENTS AROUND THE ORIGINMX=


-1689.50 MY=
0.00 MZ=

***TOTAL REACTION LOAD( KN


SUMMATION FORCE-X =
SUMMATION FORCE-Y =
SUMMATION FORCE-Z =

SUMMATION OF MOMENTS AROUND THE ORIGINMX=


1689.50 MY=
0.00 MZ=

***TOTAL APPLIED LOAD


SUMMATION FORCE-X
SUMMATION FORCE-Y
SUMMATION FORCE-Z

STATIC LOAD/REACTION/EQUILIBRIUM SUMMARY FOR CASE NO.


LL

MAXIMUM DISPLACEMENTS ( CM /RADIANS) (LOADING


MAXIMUMS
AT NODE
X = -2.19322E-02
1566
Y = -1.79559E-01
2315
Z = 4.62582E-03
1331
RX= 1.04375E-04
44
RY= 7.75625E-05
1552
RZ= 1.54627E-04
277

SUMMATION OF MOMENTS AROUND THE ORIGINMX=


-7150.01 MY=
0.00 MZ=

***TOTAL REACTION LOAD( KN


SUMMATION FORCE-X =
SUMMATION FORCE-Y =
SUMMATION FORCE-Z =

SUMMATION OF MOMENTS AROUND THE ORIGINMX=


7150.01 MY=
0.00 MZ=

***TOTAL APPLIED LOAD


SUMMATION FORCE-X
SUMMATION FORCE-Y
SUMMATION FORCE-Z

-- PAGE NO.

STATIC LOAD/REACTION/EQUILIBRIUM SUMMARY FOR CASE NO.


DL

STAAD SPACE

Monday, April 25, 2011, 12:00 PM

Page 6 of 13

Page 20

2)

( KN
=
=
=

METE ) SUMMARY (LOADING


0.00
0.00
0.00

METE ) SUMMARY (LOADING


0.00
0.00
0.00

3)

0.00

3 )

0.00

3 )

( KN
=
=
=

METE ) SUMMARY (LOADING


0.00
0.00
0.00

D:\SAHIRA\PU-SIR BANIYAS\33-11kV SWITCH GEAR\STAAD\33kv.anl

SUMMATION OF MOMENTS AROUND THE ORIGINMX=


0.00 MY=
0.00 MZ=

***TOTAL APPLIED LOAD


SUMMATION FORCE-X
SUMMATION FORCE-Y
SUMMATION FORCE-Z

0.00

4 )

STATIC LOAD/REACTION/EQUILIBRIUM SUMMARY FOR CASE NO.


SURCHARGE PRESSURE

MAXIMUM DISPLACEMENTS ( CM /RADIANS) (LOADING


MAXIMUMS
AT NODE
X = 4.00333E-02
1566
Y = 6.41218E-03
2260
Z = -1.17945E-02
1359
RX= -7.52262E-05
1276
RY= -1.38952E-04
1552
RZ= -1.74239E-04
1425

SUMMATION OF MOMENTS AROUND THE ORIGINMX=


0.00 MY=
0.00 MZ=

***TOTAL REACTION LOAD( KN


SUMMATION FORCE-X =
SUMMATION FORCE-Y =
SUMMATION FORCE-Z =

SUMMATION OF MOMENTS AROUND THE ORIGINMX=


0.00 MY=
0.00 MZ=

***TOTAL APPLIED LOAD


SUMMATION FORCE-X
SUMMATION FORCE-Y
SUMMATION FORCE-Z

-- PAGE NO.

STATIC LOAD/REACTION/EQUILIBRIUM SUMMARY FOR CASE NO.


EARTHPRESSURE

MAXIMUM DISPLACEMENTS ( CM /RADIANS) (LOADING


MAXIMUMS
AT NODE
X = 1.01963E-02
1783
Y = -4.61646E-02
2315
Z = 2.17589E-03
1331
RX= 4.81266E-05
44
RY= 3.55334E-05
1552
RZ= 7.06910E-05
277

STAAD SPACE

Page 7 of 13

Monday, April 25, 2011, 12:00 PM

METE ) SUMMARY (LOADING


0.00
0.00
0.00

4)

0.00

4 )

( KN
=
=
=

METE ) SUMMARY (LOADING


74.40
0.00
0.00

METE ) SUMMARY (LOADING


-74.40
0.00
0.00

5)

174.96

5 )

-174.96

5 )

D:\SAHIRA\PU-SIR BANIYAS\33-11kV SWITCH GEAR\STAAD\33kv.anl

STATIC LOAD/REACTION/EQUILIBRIUM SUMMARY FOR CASE NO.


WL- X

MAXIMUM DISPLACEMENTS ( CM /RADIANS) (LOADING


MAXIMUMS
AT NODE
X = 8.28311E-02
1565
Y = 2.50481E-02
2260
Z = -7.77624E-03
1003
RX= -4.18800E-05
1002
RY= 2.49670E-04
1574
RZ= -4.18092E-04
1565

SUMMATION OF MOMENTS AROUND THE ORIGINMX=


0.00 MY=
-314.21 MZ=

***TOTAL REACTION LOAD( KN


SUMMATION FORCE-X =
SUMMATION FORCE-Y =
SUMMATION FORCE-Z =

SUMMATION OF MOMENTS AROUND THE ORIGINMX=


0.00 MY=
314.21 MZ=

***TOTAL APPLIED LOAD


SUMMATION FORCE-X
SUMMATION FORCE-Y
SUMMATION FORCE-Z

-- PAGE NO.

STATIC LOAD/REACTION/EQUILIBRIUM SUMMARY FOR CASE NO.


WL+ X

MAXIMUM DISPLACEMENTS ( CM /RADIANS) (LOADING


MAXIMUMS
AT NODE
X = 1.33256E-01
1566
Y = 1.70508E-02
2260
Z = -4.11394E-02
1359
RX= -2.08022E-04
1289
RY= 4.61971E-04
1573
RZ= -5.65908E-04
1454

SUMMATION OF MOMENTS AROUND THE ORIGINMX=


0.00 MY=
0.00 MZ=

***TOTAL REACTION LOAD( KN


SUMMATION FORCE-X =
SUMMATION FORCE-Y =
SUMMATION FORCE-Z =

STAAD SPACE

Monday, April 25, 2011, 12:00 PM

Page 8 of 13

Page 21

( KN
=
=
=

METE ) SUMMARY (LOADING


-74.40
0.00
0.00

METE ) SUMMARY (LOADING


74.40
0.00
0.00

6)

-174.96

6 )

174.96

6 )

( KN
=
=
=

METE ) SUMMARY (LOADING


0.00
0.00
92.40

METE ) SUMMARY (LOADING


0.00
0.00
-92.40

D:\SAHIRA\PU-SIR BANIYAS\33-11kV SWITCH GEAR\STAAD\33kv.anl

SUMMATION OF MOMENTS AROUND THE ORIGINMX=


-215.94 MY=
488.44 MZ=

***TOTAL REACTION LOAD( KN


SUMMATION FORCE-X =
SUMMATION FORCE-Y =
SUMMATION FORCE-Z =

SUMMATION OF MOMENTS AROUND THE ORIGINMX=


215.94 MY=
-488.44 MZ=

***TOTAL APPLIED LOAD


SUMMATION FORCE-X
SUMMATION FORCE-Y
SUMMATION FORCE-Z

0.00

7 )

0.00

7 )

-- PAGE NO.

STATIC LOAD/REACTION/EQUILIBRIUM SUMMARY FOR CASE NO.


WL +Z

MAXIMUM DISPLACEMENTS ( CM /RADIANS) (LOADING


MAXIMUMS
AT NODE
X = -8.22530E-02
1784
Y = 2.45225E-02
2316
Z = -7.58101E-03
1128
RX= -4.04014E-05
1129
RY= -2.47733E-04
1775
RZ= 4.16335E-04
1784

SUMMATION OF MOMENTS AROUND THE ORIGINMX=


0.00 MY=
314.21 MZ=

***TOTAL REACTION LOAD( KN


SUMMATION FORCE-X =
SUMMATION FORCE-Y =
SUMMATION FORCE-Z =

SUMMATION OF MOMENTS AROUND THE ORIGINMX=


0.00 MY=
-314.21 MZ=

***TOTAL APPLIED LOAD


SUMMATION FORCE-X
SUMMATION FORCE-Y
SUMMATION FORCE-Z

STAAD SPACE

Page 9 of 13

Monday, April 25, 2011, 12:00 PM

7)

( KN
=
=
=

METE ) SUMMARY (LOADING


0.00
0.00
-92.40

METE ) SUMMARY (LOADING


0.00
0.00
92.40

8)

0.00

8 )

0.00

8 )

D:\SAHIRA\PU-SIR BANIYAS\33-11kV SWITCH GEAR\STAAD\33kv.anl

1429. FINISH

************ END OF DATA FROM INTERNAL STORAGE ************

MAXIMUM DISPLACEMENTS ( CM /RADIANS) (LOADING


MAXIMUMS
AT NODE
X = -5.37254E-03
1552
Y = 2.94022E-02
2297
Z = -4.49250E-02
1360
RX= -2.32117E-04
1360
RY= 1.49694E-04
1365
RZ= 2.79784E-05
1552

SUMMATION OF MOMENTS AROUND THE ORIGINMX=


215.94 MY=
-488.44 MZ=

***TOTAL REACTION LOAD( KN


SUMMATION FORCE-X =
SUMMATION FORCE-Y =
SUMMATION FORCE-Z =

SUMMATION OF MOMENTS AROUND THE ORIGINMX=


-215.94 MY=
488.44 MZ=

***TOTAL APPLIED LOAD


SUMMATION FORCE-X
SUMMATION FORCE-Y
SUMMATION FORCE-Z

-- PAGE NO.

STATIC LOAD/REACTION/EQUILIBRIUM SUMMARY FOR CASE NO.


WL -Z

MAXIMUM DISPLACEMENTS ( CM /RADIANS) (LOADING


MAXIMUMS
AT NODE
X = -5.37255E-03
1573
Y = 2.94022E-02
2353
Z = 4.49249E-02
1006
RX= 2.32117E-04
1006
RY= -1.49694E-04
1001
RZ= 2.79785E-05
1573

STAAD SPACE

10

Monday, April 25, 2011, 12:00 PM

Page 10 of 13

Page 22

Page 23

BEARING PRESSURE CHECK

Page 24

Job Title

33/11kV PACKAGE UNIT SUBSTATION

Job No

Software licensed to [LZ0 + LND]

Part 33/11kV

Rev

SWITCHGEAR

Ref

33/11kV Package Unit Substation in Sir Baniyas

By
Client

Sheet No

File

ADDC

SKS
33kv.std

Date19

Jan-11
Date/Time

Chd

PSK

21-Apr-2011 16:14

Base Pressure Summary


Node

L/C

FX

FY

FZ

(kN/m2)

(kN/m2)

(kN/m2)

Max FX

10:1.0DL+1.0LL

0.000

23.213

0.000

Min FX

10:1.0DL+1.0LL

23.213

0.000

Max FY

2315

16:1.0DL+1.0LL

0.000
0.000

26.414

0.000

Min FY

2261

17:1.0DL+1.0LL

0.000

0.000

Max FZ

10:1.0DL+1.0LL

0.000

18.334
23.213

Min FZ

10:1.0DL+1.0LL

0.000

23.213

0.000

0.000

Allowable net SBC of soil = 90 kN/m


Maximum bearing pressure from staad = 26.414 kN/m
As 26.414 kN/m
<
90 kN/m
Hence Safe

Print Time/Date: 25/04/2011 12:02

STAAD.Pro for Windows Release 2005

Print Run 1 of 1

Page 25

Job Title

33/11kV PACKAGE UNIT SUBSTATION

Job No

Software licensed to [LZ0 + LND]

Part 33/11kV

33/11kV Package Unit Substation in Sir Baniyas

SWITCHGEAR

Ref

File

ADDC

Rev

By
Client

Sheet No

SKS
33kv.std

Date19

Jan-11
Date/Time

Chd

PSK

21-Apr-2011 16:14

Base Pressure
Y
kN/m2
<= 18.9
19.4
19.8
20.3
20.8
21.2
21.7
22.2
22.6
23.1
23.6
24.1
24.5
25
25.5
25.9
>= 26.4

Load 16

BASE PRESSURE

Print Time/Date: 25/04/2011 12:04

STAAD.Pro for Windows Release 2005

Print Run 1 of 1

Page 26

SETTLEMENT CHECK

Page 27

Job Title

33/11kV PACKAGE UNIT SUBSTATION

Job No

Software licensed to [LZ0 + LND]

Part 33/11kV

Rev

SWITCHGEAR

Ref

33/11kV Package Unit Substation in Sir Baniyas

By
Client

Sheet No

File

ADDC

Date19

SKS

Jan-11
Date/Time

33kv.std

Chd

PSK

21-Apr-2011 16:14

Node Displacement Summary


Node

L/C

Resultant

rX

rY

rZ

(mm)

(mm)

(mm)

(mm)

(rad)

(rad)

(rad)

Max X

1566

17:1.0DL+1.0LL

2.242

-1.782

-0.000

2.864

-0.000

0.000

Min X

1783

19:1.0DL+1.0LL

-1.887

-0.000

2.919

-0.000

-0.000

0.001

Max Y

2260

17:1.0DL+1.0LL

-2.227
0.000

-1.698

-0.000

1.698

0.000

-0.000

-0.000
-0.000

-0.001

Min Y

2315

16:1.0DL+1.0LL

-0.000

2.446

0.000

-0.000

1006

18:1.0DL+1.0LL

-0.057

-2.446
-2.170

-0.000

Max Z

0.510

2.230

0.000

-0.000

0.000

Min Z

1360

18:1.0DL+1.0LL

-0.057

-2.170

2.230

-0.000

0.000

0.000

Max rX

931

18:1.0DL+1.0LL

-0.018

-2.167

-0.510
0.153

2.173

0.000

-0.000

0.000

Min rX

1290

18:1.0DL+1.0LL

-0.018

-2.167

-0.153

2.173

0.000

0.000

Max rY

1798

19:1.0DL+1.0LL

-0.756

-1.896

-0.000

2.041

-0.000
0.000

0.001

0.000

Min rY

1775

19:1.0DL+1.0LL

-0.756

-1.896

0.000

2.041

-0.000

0.000

Max rZ

1783

19:1.0DL+1.0LL

-2.227

-1.887

-0.000

2.919

-0.000

-0.001
-0.000

Min rZ

1565

17:1.0DL+1.0LL

2.242

-1.782

0.000

2.864

0.000

-0.000

Max Rst

1783

19:1.0DL+1.0LL

-2.227

-1.887

-0.000

2.919

-0.000

-0.000

-0.001
0.001

0.001

Allowable settlement = 25 mm
Maximum support settlement from staad = 2.446 mm
As 2.446 mm < 25 mm
Hence Safe

Print Time/Date: 25/04/2011 12:04

STAAD.Pro for Windows Release 2005

Print Run 1 of 1

Page 28

BASE SLAB DESIGN

Page 29

Job Title

33/11kV PACKAGE UNIT SUBSTATION

Job No

Software licensed to [LZ0 + LND]

Part 33/11kV

Rev

SWITCHGEAR

Ref

33/11kV Package Unit Substation in Sir Baniyas

By
Client

Sheet No

File

ADDC

Date19

SKS

Chd

Jan-11
Date/Time

33kv.std

PSK

21-Apr-2011 16:14

Plate Centre Stress Summary for Base Slab


Shear
Plate

L/C

Qx

Qy

Sx

Membrane
Sy

Sxy

Mx

Bending
My

Mxy

(N/mm2)

(N/mm2)

(N/mm2)

(N/mm2)

(N/mm2)

(kNm/m)

(kNm/m)

(kNm/m)

Max Qx

239

68:1.4DL+1.4E

0.154

0.000

-0.000

-0.000

0.000

-49.828

-9.611

-0.000

Min Qx

698

68:1.4DL+1.4E

0.000

-0.000

-0.000

-0.000

-49.242

-9.528

-0.000

0.122

-0.000

-0.000

0.000

-5.522

-28.530

-0.752

-0.122
0.000

-0.000

-0.000

-0.000

-5.522

-28.530

0.752

0.000

0.000

-0.000

-0.027

0.662

-0.000

Max Qy

68:1.4DL+1.4E

-0.155
-0.002

Min Qy

400

68:1.4DL+1.4E

-0.002

Max Sx

2269

68:1.4DL+1.4E

0.003

Min Sx

698

68:1.4DL+1.4E

-0.155

0.000

-0.000

-49.242

-9.528

-0.000

2235

68:1.4DL+1.4E

-0.007

-0.005

-0.000
0.000

-0.000

Max Sy

0.000

-0.000

0.151

-0.153

-0.416

Min Sy

68:1.4DL+1.4E

-0.002

0.122

-0.000

0.000

-5.522

-28.530

-0.752

Max Sxy

2278

68:1.4DL+1.4E

0.008

-0.063

0.000

-0.000
0.000

0.000

-0.451

-1.152

3.743

Min Sxy

2260

68:1.4DL+1.4E

0.008

0.063

0.000

0.000

-0.450

-1.152

-3.743

Max Mx

245

67:1.4DL+1.4E

0.006

0.000

0.000

-0.000

-0.000
-0.000

Min Mx

239

68:1.4DL+1.4E

0.154

0.000

-0.000

-0.000

0.000

Max My

217

52:1.2DL+1.2LL

-0.001

0.004

0.000

-0.000

Min My

400

68:1.4DL+1.4E

-0.002

-0.122

-0.000

-0.000

Max Mxy

366

52:1.2DL+1.2LL

0.025

-0.009

-0.000

0.000

0.000

Min Mxy

30

52:1.2DL+1.2LL

0.025

0.009

-0.000

0.000

-0.000

Print Time/Date: 25/04/2011 12:06

STAAD.Pro for Windows Release 2005

21.230

9.844

-0.000

-9.611

-0.000

-0.000

-49.828
19.844

-0.000

-5.522

10.045

-0.119

0.186

-28.530
-0.214

8.223

0.186

-0.214

-8.223

0.752

Print Run 1 of 1

Page 30

DERBY DESIGN

Project:

33/11kV Package Unit Substation in Sir Baniyas

Date

Client:

ADDC

Design

SKS

Checked

PSK

Rev No.

Approved

SAK

Main
RANYA CONTRACTING ESTABLISHMENT
contractor:
Structure: 33/11kV SWITCHGEAR

25-Apr Page

Rev Date

BASE SLAB DESIGN


Location

MAIN REINFORCEMENT

OUTER / INNER
Mx DIRECTION

Section Design for Maximum moment

Main Steel
2

Characteristic strength of concrete

fcu

35

N/mm

Characteristic strength of steel

fy

420

N/mm2

Mu

50

kNm

b
D
c

= 1000 mm
= 350 mm
=
75
mm

Diameter of main reinforcement

dm

16

mm

Diameter of secondary reinforcement

ds

16

mm

Effective depth

= D-c-dm/2
= 267 mm

Factored bending moment


Plate no:
239
Width of Raft
Thickness of Raft
Clear cover

Load case :

68

2
K = M / ( b x d x fcu )

= 0.020

z = d x [0.5 +SQRT (0.25 - K / 0.9)]

= 260.92 mm

0.95 x d
Since 0.95xd,

is less than z, value of z is

Reinforcement required Ast = M / ( 0.87 x fy x z )


Min reinf. each face per table 3.25 BS 8110-1 = 0.13%
Main reinforcement
16 @
+ Extra reinforcement
0@
Area of reinforcement provided

200
200

= 253.65 mm
= 253.65
2

539

mm

=
mm c/c
mm c/c

455

mm

1005 mm

Hence OK.
Reinforcement Summary:
Provide horizontal reinforcement T16 @ 200 mm c/c.

Page 31

Job Title

33/11kV PACKAGE UNIT SUBSTATION

Job No

Software licensed to [LZ0 + LND]

Part 33/11kV

33/11kV Package Unit Substation in Sir Baniyas

SWITCHGEAR

Ref

File

ADDC

Rev

By
Client

Sheet No

SKS

Date19

Jan-11
Date/Time

33kv.std

Chd

PSK

21-Apr-2011 16:14

MX
kNm/m
<= -49.8
-45.7
-41.7
-37.6
-33.5
-29.4
-25.4
-21.3
-17.2
-13.1
-9.04
-4.96
-0.883
3.2
7.27
11.4
>= 15.4

Load 68

Mx

Print Time/Date: 21/04/2011 17:02

STAAD.Pro for Windows Release 2005

Print Run 1 of 1

Page 32

DERBY DESIGN

Project:

33/11kV Package Unit Substation in Sir Baniyas

Date

Client:

ADDC

Design

SKS

Checked

PSK

Rev No.

Approved

SAK

Main
RANYA CONTRACTING ESTABLISHMENT
contractor:
Structure: 33/11kV SWITCHGEAR

25-Apr

Page

Rev Date

BASE SLAB DESIGN


Location

SECONDARY REINFORCEMENT

OUTER / INNER
My DIRECTION

Section Design for Maximum moment

Secondary Steel
2

Characteristic strength of concrete

fcu

35

N/mm

Characteristic strength of steel

fy

420

N/mm2

Mu

29

kNm

b
D
c

=
=
=

1000
75

mm
mm
mm

Diameter of main reinforcement

dm

16

mm

Diameter of secondary reinforcement

ds

16

mm

Effective depth

= D-c-dm-ds/2
=
251
mm

Factored bending moment


Plate no:
400
Width of Raft
Thickness of Raft
Clear cover

Load case :

68
350

2
K = Mu / ( b x d x fcu )

z = d x [0.5 +SQRT (0.25 - K / 0.9)]

= 247.28 mm

0.95 x d
Since 0.95xd,

is less than z, value of z is

Reinforcement required Ast = M / ( 0.87 x fy x z )


Min reinf. each face per table 3.25 BS 8110-1 = 0.13%
Main reinforcement
16 @
+ Extra reinforcement
0@
Area of reinforcement provided

200
200

0.013

= 238.45 mm
= 238.45
2

333

mm

=
mm c/c
mm c/c

455

mm

1005 mm

Hence OK.
Reinforcement Summary:
Provide vertical reinforcement T16 @ 200 mm c/c.

Page 33

Job Title

33/11kV PACKAGE UNIT SUBSTATION

Job No

Software licensed to [LZ0 + LND]

Part 33/11kV

33/11kV Package Unit Substation in Sir Baniyas

SWITCHGEAR

Ref

File

ADDC

Rev

By
Client

Sheet No

SKS
33kv.std

Date19

Jan-11
Date/Time

Chd

PSK

21-Apr-2011 16:14

MY
kNm/m
<= -28.5
-26.3
-24.1
-21.9
-19.7
-17.5
-15.3
-13.1
-10.8
-8.64
-6.43
-4.22
-2.01
0.205
2.42
4.63
>= 6.84

Load 68

My

Print Time/Date: 21/04/2011 17:02

STAAD.Pro for Windows Release 2005

Print Run 1 of 1

Page 34

DERBY DESIGN

Project:

33/11kV Package Unit Substation in Sir Baniyas

Date

Client:

ADDC

Design

SKS

Checked

PSK

Main
contractor:

RANYA CONTRACTING ESTABLISHMENT

Rev No.

Approved

SAK

Structure:

33/11kV SWITCHGEAR

Rev Date

Main steel

SHEAR CHECK FOR BASE SLAB


( For SQx Value Refer attached STAAD output sheets )

0.155 N/mm

Max shear stress from STAAD Output, V =


Plate no:

Load case:

698

Thickness of Raft

Clear cover

25-Apr Page

68

350 mm

75 mm

Diameter of main reinforcement

Spacing of main reinforcement

16 mm
200 mm c/c
16 mm

Diameter of secondary reinforcement

Spacing of secondary reinforcement

200 mm c/c

267 mm

Effective depth

Grade of concrete , fcu

% of steel provided

=
=

Design shear strength


of concrete

As

0.155 N/mm

35 N/mm

0.38 %

= 0.79x(0.38)^1/3 x(400/267)^1/4x1/1.25 x (35/25)^1/3


2
=
0.57 N/mm

<

0.57 N/mm

SAFE

Page 35

Job Title

33/11kV PACKAGE UNIT SUBSTATION

Job No

Software licensed to [LZ0 + LND]

Part 33/11kV

33/11kV Package Unit Substation in Sir Baniyas

ADDC

Rev

SWITCHGEAR

Ref
By

Client

Sheet No

File

SKS
33kv.std

Date19

Jan-11
Date/Time

Chd

PSK

21-Apr-2011 16:14

SQX
N/mm2
<= -0.155
-0.136
-0.117
-0.097
-0.078
-0.059
-0.039
-0.020
-0.001
0.019
0.038
0.057
0.077
0.096
0.115
0.135
>= 0.154

Load 68

SQx

Print Time/Date: 21/04/2011 17:02

STAAD.Pro for Windows Release 2005

Print Run 1 of 1

Page 36

DERBY DESIGN

Project:

33/11kV Package Unit Substation in Sir Baniyas

Date

Client:

ADDC

Design

SKS

Checked

PSK

Main
contractor:

RANYA CONTRACTING ESTABLISHMENT

Rev No.

Approved

SAK

Structure:

33/11kV SWITCHGEAR

Rev Date

Secondary steel

SHEAR CHECK FOR BASE SLAB


( For SQy Value Refer attached STAAD output sheets )

0.122 N/mm

Max shear stress from STAAD Output, V =


Plate no:

Load case:

Thickness of Raft

Clear cover

25-Apr Page

68

350 mm

75 mm

Diameter of main reinforcement

Spacing of main reinforcement

16 mm
200 mm c/c
16 mm

Diameter of secondary reinforcement

Spacing of secondary reinforcement

200 mm c/c

251 mm

Effective depth

Grade of concrete , fcu

% of steel provided

=
=

Design shear strength


of concrete

As

0.122 N/mm

35 N/mm

0.40 %

= 0.79x(0.4)^1/3 x(400/251)^1/4x1/1.25 x (35/25)^1/3


2
=
0.59 N/mm

<

0.59 N/mm

SAFE

Page 37

Job Title

33/11kV PACKAGE UNIT SUBSTATION

Job No

Software licensed to [LZ0 + LND]

Part 33/11kV

33/11kV Package Unit Substation in Sir Baniyas

SWITCHGEAR

Ref

File

ADDC

Rev

By
Client

Sheet No

SKS

Date19

Jan-11
Date/Time

33kv.std

Chd

PSK

21-Apr-2011 16:14

SQY
N/mm2
<= -0.122
-0.107
-0.092
-0.076
-0.061
-0.046
-0.031
-0.015
0
0.015
0.031
0.046
0.061
0.076
0.092
0.107
>= 0.122

Load 68

SQy

Print Time/Date: 21/04/2011 17:03

STAAD.Pro for Windows Release 2005

Print Run 1 of 1

Page 38

DESIGN OF OUTER RC WALL

Page 39

Job Title

33/11kV PACKAGE UNIT SUBSTATION

Job No

Software licensed to [LZ0 + LND]

Part 33/11kV

Rev

SWITCHGEAR

Ref

33/11kV Package Unit Substation in Sir Baniyas

By
Client

Sheet No

File

ADDC

Date19

SKS

Chd

Jan-11
Date/Time

33kv.std

PSK

21-Apr-2011 16:14

Plate Centre Stress Summary for Outer Wall


Shear
Plate

L/C

Qx

Qy

Sx

Membrane
Sy

Sxy

Mx

Bending
My

Mxy

(N/mm2)

(N/mm2)

(N/mm2)

(N/mm2)

(N/mm2)

(kNm/m)

(kNm/m)

(kNm/m)

Max Qx

1480

55:1.2DL+1.2LL

0.281

-0.050

-0.152

-0.022

-0.024

-32.346

-4.897

Min Qx

1508

55:1.2DL+1.2LL

-0.050

-0.152

-0.022

0.024

-32.346

-4.897

4.873

Max Qy

1323

68:1.4DL+1.4E

-0.281
0.000

0.290

-0.046

-0.224

-0.000

-8.471

-44.149

0.000

-4.873

Min Qy

1683

57:1.2DL+1.2LL

0.153

-0.042

0.038

-27.604

-6.469

-5.721

1955

67:1.4DL+1.4E

0.000

-0.147
0.001

-0.163

Max Sx

0.213

-0.058

-0.000

-0.972

-0.113

-0.000
0.516

Min Sx

1190

68:1.4DL+1.4E

-0.020

0.012

0.015

-14.494

-1.536

1306

52:1.2DL+1.2LL

-0.013

0.062

-0.436
0.041

-0.082

Max Sy

0.059

0.010

0.333

-1.362

1.093

Min Sy

1549

68:1.4DL+1.4E

-0.000

0.289

-0.045

-0.000

-8.390

-43.888

-0.000

0.148

-3.093

-16.661

-5.236

-0.148
-0.006

-3.093

-16.661

5.236

13.072

1.924

-0.300

Max Sxy

1541

68:1.4DL+1.4E

-0.057

0.154

-0.044

-0.226
-0.120

Min Sxy

1563

68:1.4DL+1.4E

0.057

0.154

-0.044

-0.120

Max Mx

933

68:1.4DL+1.4E

0.004

-0.024

-0.297

-0.056

Min Mx

1291

55:1.2DL+1.2LL

-0.158

0.090

-0.351

-0.094

-0.030

-2.119

891

68:1.4DL+1.4E

0.000

0.026

-0.197

-0.102

-0.021

-35.508
9.604

-3.795

Max My

8.281

-0.298

Min My

1323

68:1.4DL+1.4E

0.000

0.290

-0.046

-0.224

-0.000

-8.471

Max Mxy

1708

57:1.2DL+1.2LL

-0.036

-0.009

-0.098

-0.038

-0.037

0.410

-44.149
-0.731

11.874

Min Mxy

1686

57:1.2DL+1.2LL

0.036

-0.009

-0.098

-0.038

0.037

0.410

-0.731

-11.874

Print Time/Date: 25/04/2011 12:14

STAAD.Pro for Windows Release 2005

0.000

Print Run 1 of 1

Page 40

DERBY DESIGN

Project:

33/11kV Package Unit Substation in Sir Baniyas

Date

Client:

ADDC

Design

SKS

Checked

PSK

Rev No.

Approved

SAK

Main
RANYA CONTRACTING ESTABLISHMNET
contractor:
Structure: 33/11kV SWITCHGEAR

25-Apr

Page

Rev Date

WALL DESIGN
Location

VERTICAL REINFORCEMENT

OUTER / INNER
My DIRECTION

Section Design for Maximum moment

Main Steel
2

Characteristic strength of concrete

fcu

35

N/mm

Characteristic strength of steel

fy

420

N/mm2

Mu

45

kNm

b
D
c

=
=
=

1000
75

mm
mm
mm

Diameter of main reinforcement

dm

16

mm

Diameter of secondary reinforcement

ds

16

mm

Effective depth

= D-c-dm/2
=
167
mm

Factored bending moment


Plate no:
1323
Width of wall
Thickness of wall
Clear cover

Load case :

68
250

2
K = Mu / ( b x d x fcu )

z = d x [0.5 +SQRT (0.25 - K / 0.9)]

= 157.96 mm

0.95 x d
Since 0.95xd,

is greater than z, value of z is

Reinforcement required Ast = M / ( 0.87 x fy x z )


Min reinf. each face per table 3.25 BS 8110-1 = 0.2%
Main reinforcement
16 @
+ Extra reinforcement
0@
Area of reinforcement provided

150
150

0.046

= 158.65 mm
= 157.96
2

780

mm

=
mm c/c
mm c/c

500

mm

1340 mm

Hence OK.
Reinforcement Summary:
Provide vertical reinforcement T16 @ 150 mm c/c.

Page 41

Job Title

33/11kV PACKAGE UNIT SUBSTATION

Job No

Software licensed to [LZ0 + LND]

Part 33/11kV

33/11kV Package Unit Substation in Sir Baniyas

ADDC

Rev

SWITCHGEAR

Ref
By

Client

Sheet No

File

SKS
33kv.std

Date19

Jan-11
Date/Time

Chd

PSK

26-Apr-2011 14:43

MY
kNm/m
<= -44.1
-40.9
-37.6
-34.3
-31
-27.8
-24.5
-21.2
-17.9
-14.7
-11.4
-8.1
-4.83
-1.55
1.73
5
>= 8.28

Y
X
Z

Load 68

My

Print Time/Date: 26/04/2011 15:01

STAAD.Pro for Windows Release 2005

Print Run 1 of 1

Page 42

DERBY DESIGN

Project:

33/11kV Package Unit Substation in Sir Baniyas

Date

Client:

ADDC

Design

SKS

Checked

PSK

Rev No.

Approved

SAK

Main
RANYA CONTRACTING ESTABLISHMNET
contractor:
Structure: 33/11kV SWITCHGEAR

25-Apr Page

Rev Date

WALL DESIGN
Location

HORIZONTAL REINFORCEMENT

Section Design for Maximum moment

OUTER / INNER
Mx DIRECTION
Secondary Steel
2

Characteristic strength of concrete

fcu

35

N/mm

Characteristic strength of steel

fy

420

N/mm2

Mu

36

kNm

b
D
c

= 1000 mm
= 250 mm
=
75
mm

Diameter of main reinforcement

dm

16

mm

Diameter of secondary reinforcement

ds

16

mm

Effective depth

= D-c-dm-ds/2
= 151 mm

Factored bending moment


Plate no:
1291
Width of wall
Thickness of wall
Clear cover

Load case :

55

2
K = M / ( b x d x fcu )

= 0.045

z = d x [0.5 +SQRT (0.25 - K / 0.9)]

= 143.01 mm

0.95 x d
Since 0.95xd,

is greater than z, value of z is

Reinforcement required Ast = M / ( 0.87 x fy x z )


Min reinf. each face per Section 3.12.7.4.b. BS 8110-1 = 0.125%
Main reinforcement
16 @
150
+ Extra reinforcement
0@
150
Area of reinforcement provided

= 143.45 mm
= 143.01
=

689

mm

= 312.5 mm2
mm c/c
mm c/c
=

1340 mm

Hence OK.
Reinforcement Summary:
Provide horizontal reinforcement T16 @ 150 mm c/c.

Page 43

Job Title

33/11kV PACKAGE UNIT SUBSTATION

Job No

Software licensed to [LZ0 + LND]

Part 33/11kV

33/11kV Package Unit Substation in Sir Baniyas

ADDC

Rev

SWITCHGEAR

Ref
By

Client

Sheet No

File

SKS
33kv.std

Date19

Jan-11
Date/Time

Chd

PSK

26-Apr-2011 14:43

MX
kNm/m
<= -35.5
-32.5
-29.6
-26.6
-23.6
-20.6
-17.7
-14.7
-11.7
-8.73
-5.76
-2.78
0.193
3.17
6.14
9.12
>= 12.1

Y
X
Z

Load 55

Mx

Print Time/Date: 26/04/2011 15:02

STAAD.Pro for Windows Release 2005

Print Run 1 of 1

Page 44

DERBY DESIGN

Project:

33/11kV Package Unit Substation in Sir Baniyas

Date

Client:

ADDC

Design

SKS

Checked

PSK

Main
contractor:

RANYA CONTRACTING ESTABLISHMNET

Rev No.

Approved

SAK

Structure:

33/11kV SWITCHGEAR

Rev Date

Main steel

SHEAR CHECK FOR WALL


( For SQy Value Refer attached STAAD output sheets )

0.29 N/mm

Max shear stress from STAAD Output, V =


Plate no:

Load case:

1323

Thickness of Wall

Clear cover

25-Apr Page

68

250 mm

75 mm

Diameter of main reinforcement

Spacing of main reinforcement

16 mm
150 mm c/c
16 mm

Diameter of secondary reinforcement

Spacing of secondary reinforcement

150 mm c/c

167 mm

Effective depth

Grade of concrete , fcu

% of steel provided

=
=

Design shear strength


of concrete

As

0.290 N/mm

35 N/mm

0.80 %

= 0.79x(0.8)^1/3 x(400/167)^1/4x1/1.25 x (35/25)^1/3


2
=
0.82 N/mm

<

0.82 N/mm

SAFE

Page 45

Job Title

33/11kV PACKAGE UNIT SUBSTATION

Job No

Software licensed to [LZ0 + LND]

Part 33/11kV

33/11kV Package Unit Substation in Sir Baniyas

ADDC

Rev

SWITCHGEAR

Ref
By

Client

Sheet No

File

SKS
33kv.std

Date19

Jan-11
Date/Time

Chd

PSK

26-Apr-2011 14:43

SQY
N/mm2
<= -0.104
-0.079
-0.055
-0.030
-0.005
0.019
0.044
0.068
0.093
0.118
0.142
0.167
0.191
0.216
0.241
0.265
>= 0.290

Y
X
Z

Load 68

SQy

Print Time/Date: 26/04/2011 15:02

STAAD.Pro for Windows Release 2005

Print Run 1 of 1

Page 46

DERBY DESIGN

Project:

33/11kV Package Unit Substation in Sir Baniyas

Date

Client:

ADDC

Design

SKS

Checked

PSK

Main
contractor:

RANYA CONTRACTING ESTABLISHMNET

Rev No.

Approved

SAK

Structure:

33/11kV SWITCHGEAR

Rev Date

Secondary steel

SHEAR CHECK FOR WALL


( For SQx Value Refer attached STAAD output sheets )

0.281 N/mm

Max shear stress from STAAD Output, V =


Plate no:

Load case:

1480

Thickness of Wall

Clear cover

25-Apr Page

55

250 mm

75 mm

Diameter of main reinforcement

Spacing of main reinforcement

16 mm
150 mm c/c
16 mm

Diameter of secondary reinforcement

Spacing of secondary reinforcement

150 mm c/c

151 mm

Effective depth

Grade of concrete , fcu

% of steel provided

=
=

Design shear strength


of concrete

As

0.281 N/mm

35 N/mm

0.89 %

= 0.79x(0.89)^1/3 x(400/151)^1/4x1/1.25 x (35/25)^1/3


2
=
0.87 N/mm

<

0.87 N/mm

SAFE

Page 47

Job Title

33/11kV PACKAGE UNIT SUBSTATION

Job No

Software licensed to [LZ0 + LND]

Part 33/11kV

33/11kV Package Unit Substation in Sir Baniyas

ADDC

Rev

SWITCHGEAR

Ref
By

Client

Sheet No

File

SKS
33kv.std

Date19

Jan-11
Date/Time

Chd

PSK

26-Apr-2011 14:43

SQX
N/mm2
<= -0.281
-0.246
-0.211
-0.176
-0.141
-0.105
-0.070
-0.035
0
0.035
0.070
0.105
0.141
0.176
0.211
0.246
>= 0.281

Y
X
Z

Load 55

SQx

Print Time/Date: 26/04/2011 15:02

STAAD.Pro for Windows Release 2005

Print Run 1 of 1

Page 48

DESIGN OF INNER RC WALL

Page 49

Job Title

33/11kV PACKAGE UNIT SUBSTATION

Job No

Software licensed to [LZ0 + LND]

Part 33/11kV

Rev

SWITCHGEAR

Ref

33/11kV Package Unit Substation in Sir Baniyas

By
Client

Sheet No

File

ADDC

Date19

SKS

Chd

Jan-11
Date/Time

33kv.std

PSK

26-Apr-2011 14:43

Plate Centre Stress Summary for Inner wall


Shear
Plate

L/C

Qx

Qy

Sx

Membrane
Sy

Sxy

Mx

Bending
My

Mxy

(N/mm2)

(N/mm2)

(N/mm2)

(N/mm2)

(N/mm2)

(kNm/m)

(kNm/m)

(kNm/m)

Max Qx

1915

68:1.4DL+1.4E

0.017

0.024

-0.219

-0.060

-0.012

-4.279

-0.879

1.085

Min Qx

1943

68:1.4DL+1.4E

0.024

-0.219

-0.060

0.012

-4.279

-0.879

-1.085
0.539

Max Qy

1770

53:1.2DL+1.2LL

-0.017
-0.015

Min Qy

1771

58:1.2DL+1.2LL

0.008

Max Sx

1955

67:1.4DL+1.4E

0.000

0.025

0.013

-0.006

0.078

0.461

-0.419

-0.021
0.001

-0.036

-0.021

0.039

0.059

1.284

0.683

0.213

-0.058

-0.000

-0.972

-0.113

-0.000
-1.291

Min Sx

1885

68:1.4DL+1.4E

-0.016

0.023

0.001

-4.010

-0.938

2204

65:1.0DL+1.0E

-0.001

-0.003

-0.229
0.023

-0.075

Max Sy

0.007

0.014

0.468

0.124

0.107

Min Sy

1781

67:1.4DL+1.4E

-0.000

0.002

-0.029

0.000

-0.466

-1.923

-0.000

0.112

-0.009

-0.552

0.814

-0.009

-0.552

-0.814

4.065

0.875

0.838

-0.879

-1.085

1.661

-0.871
0.315
-1.580

Max Sxy

1801

67:1.4DL+1.4E

-0.006

0.005

-0.008

-0.214
-0.092

Min Sxy

1825

67:1.4DL+1.4E

0.006

0.005

-0.008

-0.092

Max Mx

2175

68:1.4DL+1.4E

0.016

-0.019

-0.176

-0.052

-0.112
0.036

Min Mx

1943

68:1.4DL+1.4E

-0.017

0.024

-0.219

-0.060

0.012

Max My

1796

68:1.4DL+1.4E

-0.001

-0.019

-0.043

-0.047

-0.084

-4.279
0.234

Min My

1779

52:1.2DL+1.2LL

0.000

0.003

-0.025

-0.188

0.035

-0.515

Max Mxy

1829

68:1.4DL+1.4E

0.011

-0.014

-0.185

-0.047

0.034

-1.924

-2.120
-0.514

Min Mxy

1855

68:1.4DL+1.4E

-0.011

-0.014

-0.185

-0.047

-0.034

-1.924

-0.514

Print Time/Date: 26/04/2011 15:03

STAAD.Pro for Windows Release 2005

1.580

Print Run 1 of 1

Page 50

DERBY DESIGN

Project:

33/11kV Package Unit Substation in Sir Baniyas

Date

Client:

ADDC

Design

SKS

Checked

PSK

Rev No.

Approved

SAK

Main
RANYA CONTRACTING ESTABLISHMNET
contractor:
Structure: 33/11kV SWITCHGEAR

26-Apr

Page

Rev Date

WALL DESIGN
Location

VERTICAL REINFORCEMENT

OUTER / INNER
My DIRECTION

Section Design for Maximum moment

Main Steel
2

Characteristic strength of concrete

fcu

35

N/mm

Characteristic strength of steel

fy

420

N/mm2

Mu

kNm

b
D
c

=
=
=

1000
50

mm
mm
mm

Diameter of main reinforcement

dm

12

mm

Diameter of secondary reinforcement

ds

12

mm

Effective depth

= D-c-dm/2
=
194
mm

Factored bending moment


Plate no:
1779
Width of wall
Thickness of wall
Clear cover

Load case :

52
250

2
K = Mu / ( b x d x fcu )

z = d x [0.5 +SQRT (0.25 - K / 0.9)]

= 193.51 mm

0.95 x d
Since 0.95xd,

is less than z, value of z is

Reinforcement required Ast = M / ( 0.87 x fy x z )


Min reinf. each face per table 3.25 BS 8110-1 = 0.2%
Main reinforcement
12 @
+ Extra reinforcement
0@
Area of reinforcement provided

150
150

0.002

184.3

mm

= 184.30
2

45

mm

=
mm c/c
mm c/c

500

mm

754 mm

Hence OK.
Reinforcement Summary:
Provide vertical reinforcement T12 @ 150 mm c/c.

Page 51

Job Title

33/11kV PACKAGE UNIT SUBSTATION

Job No

Software licensed to [LZ0 + LND]

Part 33/11kV

33/11kV Package Unit Substation in Sir Baniyas

ADDC

Rev

SWITCHGEAR

Ref
By

Client

Sheet No

File

SKS
33kv.std

Date19

Jan-11
Date/Time

Chd

PSK

26-Apr-2011 14:43

MY
kNm/m
<= -2.12
-1.95
-1.78
-1.62
-1.45
-1.28
-1.11
-0.947
-0.78
-0.612
-0.444
-0.277
-0.109
0.058
0.226
0.393
>= 0.561

Y
X
Z

Load 52

My

Print Time/Date: 26/04/2011 15:08

STAAD.Pro for Windows Release 2005

Print Run 1 of 1

Page 52

DERBY DESIGN

Project:

33/11kV Package Unit Substation in Sir Baniyas

Date

Client:

ADDC

Design

SKS

Checked

PSK

Rev No.

Approved

SAK

Main
RANYA CONTRACTING ESTABLISHMNET
contractor:
Structure: 33/11kV SWITCHGEAR

26-Apr Page

Rev Date

WALL DESIGN
Location

HORIZONTAL REINFORCEMENT

Section Design for Maximum moment

OUTER / INNER
Mx DIRECTION
Secondary Steel
2

Characteristic strength of concrete

fcu

35

N/mm

Characteristic strength of steel

fy

420

N/mm2

Mu

b
D
c

= 1000 mm
= 250 mm
=
50
mm

Diameter of main reinforcement

dm

12

mm

Diameter of secondary reinforcement

ds

12

mm

Effective depth

= D-c-dm-ds/2
= 182 mm

Factored bending moment


Plate no:
1943
Width of wall
Thickness of wall
Clear cover

Load case :

kNm

68

2
K = M / ( b x d x fcu )

= 0.004

z = d x [0.5 +SQRT (0.25 - K / 0.9)]

= 181.12 mm

0.95 x d
Since 0.95xd,

is less than z, value of z is

Reinforcement required Ast = M / ( 0.87 x fy x z )


Min reinf. each face per Section 3.12.7.4.b. BS 8110-1 = 0.125%
Main reinforcement
12 @
150
+ Extra reinforcement
0@
150
Area of reinforcement provided

= 172.9 mm
= 172.90
=

79

mm

= 312.5 mm2
mm c/c
mm c/c
=

754 mm

Hence OK.
Reinforcement Summary:
Provide horizontal reinforcement T12 @ 150 mm c/c.

Page 53

Job Title

33/11kV PACKAGE UNIT SUBSTATION

Job No

Software licensed to [LZ0 + LND]

Part 33/11kV

33/11kV Package Unit Substation in Sir Baniyas

ADDC

Rev

SWITCHGEAR

Ref
By

Client

Sheet No

File

SKS
33kv.std

Date19

Jan-11
Date/Time

Chd

PSK

26-Apr-2011 14:43

MX
kNm/m
<= -4.28
-3.76
-3.24
-2.71
-2.19
-1.67
-1.15
-0.629
-0.107
0.414
0.936
1.46
1.98
2.5
3.02
3.54
>= 4.06

Y
X
Z

Load 68

Mx

Print Time/Date: 26/04/2011 15:09

STAAD.Pro for Windows Release 2005

Print Run 1 of 1

Page 54

DERBY DESIGN

Project:

33/11kV Package Unit Substation in Sir Baniyas

Date

Client:

ADDC

Design

SKS

Checked

PSK

Main
contractor:

RANYA CONTRACTING ESTABLISHMNET

Rev No.

Approved

SAK

Structure:

33/11kV SWITCHGEAR

Rev Date

Main steel

SHEAR CHECK FOR WALL


( For SQy Value Refer attached STAAD output sheets )

0.025 N/mm

Max shear stress from STAAD Output, V =


Plate no:

Load case:

1770

Thickness of Wall

Clear cover

26-Apr Page

53

250 mm

50 mm

Diameter of main reinforcement

Spacing of main reinforcement

12 mm
150 mm c/c
12 mm

Diameter of secondary reinforcement

Spacing of secondary reinforcement

150 mm c/c

194 mm

Effective depth

Grade of concrete , fcu

% of steel provided

=
=

Design shear strength


of concrete

As

0.025 N/mm

35 N/mm

0.39 %

= 0.79x(0.39)^1/3 x(400/194)^1/4x1/1.25 x (35/25)^1/3


2
=
0.62 N/mm

<

0.62 N/mm

SAFE

Page 55

Job Title

33/11kV PACKAGE UNIT SUBSTATION

Job No

Software licensed to [LZ0 + LND]

Part 33/11kV

33/11kV Package Unit Substation in Sir Baniyas

ADDC

Rev

SWITCHGEAR

Ref
By

Client

Sheet No

File

SKS
33kv.std

Date19

Jan-11
Date/Time

Chd

PSK

26-Apr-2011 14:43

SQY
N/mm2
<= -0.004
-0.003
-0.001
0.001
0.003
0.005
0.006
0.008
0.010
0.012
0.014
0.016
0.017
0.019
0.021
0.023
>= 0.025

Y
X
Z

Load 53

SQy

Print Time/Date: 26/04/2011 15:09

STAAD.Pro for Windows Release 2005

Print Run 1 of 1

Page 56

DERBY DESIGN

Project:

33/11kV Package Unit Substation in Sir Baniyas

Date

Client:

ADDC

Design

SKS

Checked

PSK

Main
contractor:

RANYA CONTRACTING ESTABLISHMNET

Rev No.

Approved

SAK

Structure:

33/11kV SWITCHGEAR

Rev Date

Secondary steel

SHEAR CHECK FOR WALL


( For SQx Value Refer attached STAAD output sheets )

0.017 N/mm

Max shear stress from STAAD Output, V =


Plate no:

Load case:

1915

Thickness of Wall

Clear cover

26-Apr Page

68

250 mm

50 mm

Diameter of main reinforcement

Spacing of main reinforcement

12 mm
150 mm c/c
12 mm

Diameter of secondary reinforcement

Spacing of secondary reinforcement

150 mm c/c

182 mm

Effective depth

Grade of concrete , fcu

% of steel provided

=
=

Design shear strength


of concrete

As

0.017 N/mm

35 N/mm

0.41 %

= 0.79x(0.41)^1/3 x(400/182)^1/4x1/1.25 x (35/25)^1/3


2
=
0.64 N/mm

<

0.64 N/mm

SAFE

Page 57

Job Title

33/11kV PACKAGE UNIT SUBSTATION

Job No

Software licensed to [LZ0 + LND]

Part 33/11kV

33/11kV Package Unit Substation in Sir Baniyas

ADDC

Rev

SWITCHGEAR

Ref
By

Client

Sheet No

File

SKS
33kv.std

Date19

Jan-11
Date/Time

Chd

PSK

26-Apr-2011 14:43

SQX
N/mm2
<= -0.017
-0.015
-0.013
-0.011
-0.009
-0.006
-0.004
-0.002
0
0.002
0.004
0.006
0.009
0.011
0.013
0.015
>= 0.017

Y
X
Z

Load 68

SQx

Print Time/Date: 26/04/2011 15:09

STAAD.Pro for Windows Release 2005

Print Run 1 of 1

Page 58

PACKAGE UNIT FOUNDATION


(POWER TRANSFORMER)

Page 59

LOAD CALCULATION

DERBY DESIGN

25-Apr

Page 60

Project:

33/11kV Package Unit Substation in Sir Baniyas

Date

Client:

ADDC

Design

SKS

Page
Checked

PSK

Main
contractor:

RANYA CONTRACTING ESTABLISHMENT

Rev No.

Approved

SAK

Structure:

Power Transformer Load Calculation

Rev Date

LOAD CALCULATION
DEAD LOAD
Self Weight for Plinth

= 2.25 x 25

=
Say

Dead Load for grating


Dead Load for 200mm thick gravel
Total dead load from gravel and grating

= 0.2 x 20

=
=
=
Say

LIVE LOAD
Load of Transformer (conservatively)
Live Load for Plinth

= 450/(3.670 x 1.770)

=
=
Say

Live Load on Base slab other than plinth area


Oil load
Mass of insulation oil (conservatively)
Area of trench excluding plinth
Load on base slab
= 11000 / 13.45

=
=
=
=
Say

56.25 kN/m2
60 kN/m2
0.5 kN/m2
4 kN/m2
4.5 kN/m2
5 kN/m2

450
69.27
70
5

kN
kN/m2
kN/m2
2
kN/m

11000
13.45
817.84
8.5

Kg
m2
2
Kg/m
kN/m2

EARTH PRESSURE
Earth Pressure due to soil

= 0.5 x 18 x 2.1

18.9

kN/m

= 0.5 x 33.33

16.67

kN/m

SURCHARGE PRESSURE
Surcharge pressure due to SLW60 loading
SEISMIC LOAD
Seismic Loads to UBC 1997
Maximum base Shear, Vmax

=
=
=
=
=

2.5 x Ca x I x W / R
2.5 x 0.12x1 x W /5.5
0.0545 W
450 x 0.0545 / 60
0.409 kN Each node

Design wind pressure

1.25 kN/m2

Wind load acting on transformer


in X- direction

=
=

1.25 x 5.25 x 3.75


24.61 kN

Moment due to wind load in X-direction


at top of plinth

=
=

24.61 x (3.75/2+2.40)
105.21 kNm

Vertical load in X - direction

=
=

105.21 / 1.77
59.44 kN

WIND LOAD

Page 61

Pressure on X - direction

=
=

59.44 / (1.77/2*3.67)
18.3 kN/m2

Wind load acting on transformer


in Z - direction

=
=

1.25 x 4.24 x 3.75


19.875 kN

Moment due to wind load in Z - direction

=
=

19.875 x (3.750/2+2.40)
84.97 kNm

Vertical load in Z - direction

=
=

84.97 / 3.670
23.15 kN

Pressure on Z - direction

=
=
Base Shear due to wind is more than seismic.

23.15 / (3.67/2*1.77)
7.13 kN/m2

Hence, Wind load is governing


Check for Overturning in X direction
Overturning Moment

105.21 kNm

Selfweight of the structure


(Base Slab+Walls+Plinth)

=
=

(6.72x4.17x0.35x25)+(2x3.87x0.25x2.25x25)+
(2x6.42x0.25x2.25x25)+(3.67x1.77x2.25x25)
900 kN

Resisting Moment

=
=

900x 3.870 / 2
1741.5 kNm

Factor of safety

=
=

1741.5 / 105.21
16.55
> 1.5
Hence Safe

Overturning Moment

84.97 kNm

Selfweight of the structure

900 kN

Resisting Moment

=
=

900x 6.420 / 2
2889 kNm

Factor of safety

=
=

2889 / 84.97
34 > 1.5
Hence Safe

Check for Overturning in Z direction

Page 62

STAAD ANALYSIS
(POWER TRANSFORMER)

Page 63

Job Title

POWER TRANSFORMER

Job No

Software licensed to [LZ0 + LND]

Part Power

33/11kV Package Unit Substation in Sir Baniyas

ADDC

Rev

Transformer

Ref
By

Client

Sheet No

File

SKS
Pwr Txr.std

Date19-Jan-11
Date/Time

Chd

PSK

25-Apr-2011 11:54

Y
X
Z

POWER TRANSFORMER

Print Time/Date: 25/04/2011 12:29

STAAD.Pro for Windows Release 2005

Print Run 1 of 4

Page 64

Job Title

POWER TRANSFORMER

Job No

Software licensed to [LZ0 + LND]

Part Power

33/11kV Package Unit Substation in Sir Baniyas

ADDC

Rev

Transformer

Ref
By

Client

Sheet No

File

SKS
Pwr Txr.std

Date19-Jan-11
Date/Time

Chd

PSK

25-Apr-2011 11:54

Y
X
Z

Load 1

DEAD LOAD

Y
X
Z

Load 2

LIVE LOAD
Print Time/Date: 25/04/2011 12:29

STAAD.Pro for Windows Release 2005

Print Run 2 of 4

Page 65

Job Title

POWER TRANSFORMER

Job No

Software licensed to [LZ0 + LND]

Part Power

33/11kV Package Unit Substation in Sir Baniyas

ADDC

Rev

Transformer

Ref
By

Client

Sheet No

File

SKS
Pwr Txr.std

Date19-Jan-11
Date/Time

Chd

PSK

25-Apr-2011 11:54

Y
X
Z

Load 3

EARTH PRESSURE

Y
X
Z

Load 4

SURCHARGE PRESSURE
Print Time/Date: 25/04/2011 12:29

STAAD.Pro for Windows Release 2005

Print Run 3 of 4

Page 66

Job Title

POWER TRANSFORMER

Job No

Software licensed to [LZ0 + LND]

Part Power

33/11kV Package Unit Substation in Sir Baniyas

ADDC

Rev

Transformer

Ref
By

Client

Sheet No

File

SKS
Pwr Txr.std

Date19-Jan-11
Date/Time

Chd

PSK

25-Apr-2011 11:54

Y
X
Z

Load 5

WIND LOAD IN X- DIRECTION

Y
X
Z

Load 6

WIND LOAD IN Z- DIRECTION


Print Time/Date: 25/04/2011 12:29

STAAD.Pro for Windows Release 2005

Print Run 4 of 4

D:\SAHIRA\PU-SIR BANIYAS\POWER TRANSFORMER\STAAD\Pwr Txr.anl

Page 1 of 11

Monday, April 25, 2011, 12:30 PM

1. STAAD SPACE
INPUT FILE: Pwr Txr.STD
2. START JOB INFORMATION
3. JOB NAME 33/11KV PACKAGE UNIT SUBSTATION IN SIR BANIYAS
4. JOB CLIENT ADDC
5. JOB PART POWER TRANSFORMER
6. JOB REV 0
7. ENGINEER NAME SKS
8. CHECKER NAME PSK
9. APPROVED NAME SAK
10. ENGINEER DATE 19-JAN-11
11. END JOB INFORMATION
12. INPUT WIDTH 79
13. SET ECHO OFF
478. START GROUP DEFINITION
479. ELEMENT
480. _BASESLAB 1 TO 6 10 TO 20 24 TO 34 38 TO 48 52 TO 62 66 TO 70 155 TO 160 164 481. 165 TO 174 178 TO 188 192 TO 202 206 TO 210 267 TO 272 276 TO 286 290 TO 300 482. 304 TO 314 318 TO 328 332 TO 342 346 TO 356 360 TO 370 374 TO 384 483. 388 TO 398 402 TO 406 2018 TO 2036
484. _WALL 842 TO 847 851 TO 861 865 TO 875 879 TO 889 893 TO 903 907 TO 917 921 485. 922 TO 925 1194 TO 1198 1202 TO 1212 1216 TO 1226 1230 TO 1240 1244 TO 1254 486. 1258 TO 1268 1272 TO 1277 1306 TO 1310 1317 TO 1320 1325 TO 1339 487. 1346 TO 1349 1354 TO 1368 1375 TO 1378 1383 TO 1397 1404 TO 1407 488. 1412 TO 1426 1433 TO 1436 1441 TO 1455 1462 TO 1465 1470 TO 1479 489. 1770 TO 1779 1784 TO 1787 1794 TO 1808 1813 TO 1816 1823 TO 1837 490. 1842 TO 1845 1852 TO 1866 1871 TO 1874 1881 TO 1895 1900 TO 1903 491. 1910 TO 1924 1929 TO 1932 1939 TO 1949 1953 TO 1962 1966 TO 1980 492. 1985 TO 2004 2009 TO 2017
493. _PAD 60 TO 62 66 67 158 TO 160 164 165 172 TO 174 178 179 186 TO 188 192 193 494. 200 TO 202 206 207 270 TO 272 276 277 284 TO 286 290 291 298 TO 300 304 305 495. 312 TO 314 318 319 326 TO 328 332 333 340 TO 342 346 347
496. END GROUP DEFINITION
497. ELEMENT PROPERTY
498. 1 TO 6 10 TO 20 24 TO 34 38 TO 48 52 TO 62 66 TO 70 155 TO 160 164 TO 174 499. 178 TO 188 192 TO 202 206 TO 210 267 TO 272 276 TO 286 290 TO 300 500. 304 TO 314 318 TO 328 332 TO 342 346 TO 356 360 TO 370 374 TO 384 501. 388 TO 398 402 TO 406 2018 TO 2081 THICKNESS 0.35
502. 842 TO 847 851 TO 861 865 TO 875 879 TO 889 893 TO 903 907 TO 917 921 TO 925 503. 1194 TO 1198 1202 TO 1212 1216 TO 1226 1230 TO 1240 1244 TO 1254 504. 1258 TO 1268 1272 TO 1277 1306 TO 1310 1317 TO 1320 1325 TO 1339 -

****************************************************
*
*
*
STAAD.Pro
*
*
Version 2005
Bld 1001.US
*
*
Proprietary Program of
*
*
Research Engineers, Intl.
*
*
Date=
APR 25, 2011
*
*
Time=
12:21:55
*
*
*
*
USER ID: [ LZ0 + LND ]
*
****************************************************

PAGE NO.

-- PAGE NO.

Monday, April 25, 2011, 12:30 PM

1346 TO 1349 1354 TO 1368 1375 TO 1378 1383 TO 1397 1404 TO 1407 1412 TO 1426 1433 TO 1436 1441 TO 1455 1462 TO 1465 1470 TO 1479 1770 TO 1779 1784 TO 1787 1794 TO 1808 1813 TO 1816 1823 TO 1837 1842 TO 1845 1852 TO 1866 1871 TO 1874 1881 TO 1895 1900 TO 1903 1910 TO 1924 1929 TO 1932 1939 TO 1949 1953 TO 1962 1966 TO 1980 1985 TO 2004 2009 TO 2017 THICKNESS 0.25
DEFINE MATERIAL START
ISOTROPIC CONCRETE
E 2.7E+007
POISSON 0.2
DENSITY 25
ALPHA 1E-005
DAMP 0.05
END DEFINE MATERIAL
CONSTANTS
MATERIAL CONCRETE MEMB 1 TO 6 10 TO 20 24 TO 34 38 TO 48 52 TO 62 66 TO 70 155 TO 160 164 TO 174 178 TO 188 192 TO 202 206 TO 210 267 TO 272 276 TO 286 290 TO 300 304 TO 314 318 TO 328 332 TO 342 346 TO 356 360 TO 370 374 TO 384 388 TO 398 402 TO 406 842 TO 847 851 TO 861 865 TO 875 879 TO 889 893 TO 903 907 TO 917 921 TO 925 1194 TO 1198 1202 1203 TO 1212 1216 TO 1226 1230 TO 1240 1244 TO 1254 1258 TO 1268 1272 TO 1277 1306 TO 1310 1317 TO 1320 1325 TO 1339 1346 TO 1349 1354 TO 1368 1375 TO 1378 1383 TO 1397 1404 TO 1407 1412 TO 1426 1433 TO 1436 1441 TO 1455 1462 TO 1465 1470 TO 1479 1770 TO 1779 1784 TO 1787 1794 TO 1808 1813 TO 1816 1823 TO 1837 1842 TO 1845 1852 TO 1866 1871 TO 1874 1881 TO 1895 1900 TO 1903 1910 TO 1924 1929 TO 1932 1939 TO 1949 1953 TO 1962 1966 TO 1980 1985 TO 2004 2009 TO 2081
SUPPORTS
1 TO 6 10 TO 20 24 TO 34 38 TO 48 52 TO 62 66 TO 70 155 TO 160 164 TO 174 178 TO 188 192 TO 202 206 TO 210 267 TO 272 276 TO 286 290 TO 300 304 TO 314 318 TO 328 332 TO 342 346 TO 356 360 TO 370 374 TO 384 388 TO 398 402 TO 406 2018 TO 2081 PLATE MAT DIRECT Y SUBGRADE 10800
LOAD 1 DL
SELFWEIGHT Y -1
ELEMENT LOAD
*SELFWEIGHT OF PLINTH = 1.65 X 25 = 42 KN/SQM
**GRATING / GRAVEL AREA
****SELFWEIGHT OF GRATINGS/GRAVEL
****100X40THK GRATING = .5 KN/M^2(MAX)
****200MM THK GRAVEL = 0.2X20 = 4KN/M^2
****TOTAL = .5 + 4 =5KN/M^2 APPROX
1 TO 6 10 TO 20 24 TO 34 38 TO 48 52 TO 59 68 TO 70 155 TO 157 166 TO 171 180 TO 185 194 TO 197 199 208 TO 210 267 TO 269 278 TO 283 292 TO 297 306 307 TO 311 320 TO 325 334 TO 339 348 TO 356 360 TO 370 374 TO 384 388 TO 398 402 TO 406 PR GY -5
60 TO 62 66 67 158 TO 160 164 165 172 TO 174 178 179 186 TO 188 192 193 200 201 TO 202 206 207 270 TO 272 276 277 284 TO 286 290 291 298 TO 300 304 305 312 TO 314 318 319 326 TO 328 332 333 340 TO 342 346 347 PR GY -60
LOAD 2 LL
ELEMENT LOAD
* TOTAL LOAD ON THE PLINTH=460KN
* PRESSURE ACTING ON THE PLINTH=460/(4.45*2.06)=50.2KN/M2.
SAY 55KN/M2.
60 TO 62 66 67 158 TO 160 164 165 172 TO 174 178 179 186 TO 188 192 193 200 201 TO 202 206 207 270 TO 272 276 277 284 TO 286 290 291 298 TO 300 304 305 312 TO 314 318 319 326 TO 328 332 333 340 TO 342 346 347 PR GY -70
*LIVE LOAD ON BASE SLAB= 5KN/M2.

D:\SAHIRA\PU-SIR BANIYAS\POWER TRANSFORMER\STAAD\Pwr Txr.anl

505.
506.
507.
508.
509.
510.
511.
512.
513.
514.
515.
516.
517.
518.
519.
520.
521.
522.
523.
524.
525.
526.
527.
528.
529.
530.
531.
532.
533.
534.
535.
536.
537.
538.
539.
540.
541.
542.
543.
544.
545.
546.
547.
548.
549.
550.
551.
552.
553.
554.
555.
556.
557.
558.
559.
560.

STAAD SPACE

Page 2 of 11

Page 67

-- PAGE NO.

Page 3 of 11

Monday, April 25, 2011, 12:30 PM

1 TO 6 10 TO 20 24 TO 34 38 TO 48 52 TO 59 68 TO 70 155 TO 157 166 TO 171 180 TO 185 194 TO 199 208 TO 210 267 TO 269 278 TO 283 292 TO 297 306 TO 311 320 TO 325 334 TO 339 348 TO 356 360 TO 370 374 TO 384 388 TO 398 402 TO 406 PR GY -5
*OIL LOAD
*MASS OF INSULATION OIL = 10530 KG
*AREA OF TRENCH EXCLUDING PLINTH = 28.53 M2
*LOAD ON BASE SLAB = 10530/28.53 = 369 KG/M2
SAY 4 KN/M2
1 TO 6 10 TO 20 24 TO 34 38 TO 48 52 TO 59 68 TO 70 155 TO 157 166 TO 171 180 TO 185 194 TO 199 208 TO 210 267 TO 269 278 TO 283 292 TO 297 306 TO 311 320 TO 325 334 TO 339 348 TO 356 360 TO 370 374 TO 384 388 TO 398 402 TO 406 PR GY -8.5
LOAD 3 EARTHPRESSURE
ELEMENT LOAD
* EARTH PRESSURE DUE TO SOIL=0.5*20*1.65=16.5KN/M2.
912 TO 917 921 TO 925 1264 TO 1268 1272 TO 1277 1451 TO 1455 1462 TO 1465 1470 TO 1479 1915 TO 1924 1929 TO 1932 1939 TO 1943 TRAP Y 3.15 0.01
898 TO 903 907 TO 911 1250 TO 1254 1258 TO 1263 1422 TO 1426 1433 TO 1436 1441 TO 1450 1886 TO 1895 1900 TO 1903 1910 TO 1914 TRAP Y 6.3 3.15
884 TO 889 893 TO 897 1236 TO 1240 1244 TO 1249 1393 TO 1397 1404 TO 1407 1412 TO 1421 1857 TO 1866 1871 TO 1874 1881 TO 1885 TRAP Y 9.45 6.3
870 TO 875 879 TO 883 1222 TO 1226 1230 TO 1235 1364 TO 1368 1375 TO 1378 1383 TO 1392 1828 TO 1837 1842 TO 1845 1852 TO 1856 TRAP Y 12.6 9.45
856 TO 861 865 TO 869 1208 TO 1212 1216 TO 1221 1335 TO 1339 1346 TO 1349 1354 TO 1363 1799 TO 1808 1813 TO 1816 1823 TO 1827 TRAP Y 15.75 12.6
842 TO 847 851 TO 855 1194 TO 1198 1202 TO 1207 1306 TO 1310 1317 TO 1320 1325 TO 1334 1770 TO 1779 1784 TO 1787 1794 TO 1798 TRAP Y 18.9 15.75
***********************************
LOAD 4 SURCHARGEPRESSURE
ELEMENT LOAD
*SURCHARGE PRESSURE DUE TO SLW60 WHEEL LOADS
*0.5*33.333=16.667KN/M^2
842 TO 847 851 TO 861 865 TO 875 879 TO 889 893 TO 903 907 TO 917 921 TO 924 925 PR 16.67
1194 TO 1198 1202 TO 1212 1216 TO 1226 1230 TO 1240 1244 TO 1254 1258 TO 1268 1272 TO 1277 PR 16.67
1770 TO 1779 1784 TO 1787 1794 TO 1808 1813 TO 1816 1823 TO 1837 1842 TO 1845 1852 TO 1866 1871 TO 1874 1881 TO 1895 1900 TO 1903 1910 TO 1924 1929 TO 1932 1939 TO 1943 PR 16.67
1306 TO 1310 1317 TO 1320 1325 TO 1339 1346 TO 1349 1354 TO 1368 1375 TO 1378 1383 TO 1397 1404 TO 1407 1412 TO 1426 1433 TO 1436 1441 TO 1455 1462 TO 1465 1470 TO 1479 PR 16.67
LOAD 5 WL X
ELEMENT LOAD
60 61 158 159 172 173 186 187 200 201 270 271 284 285 298 299 312 313 326 327 340 341 PR GY 18.3
1972 TO 1980 1985 TO 2004 2009 TO 2017 PR GX 1.25
62 66 67 160 164 165 174 178 179 188 192 193 202 206 207 272 276 277 286 290 291 300 304 305 314 318 319 328 332 333 342 346 347 PR GY -18.3
* DESIGN WIND PRESSURE=1.25KN/M2.
* LOAD ON EACH NODE=1.25*7.95*5.56/74=0.75KN.
LOAD 6 WL Z
ELEMENT LOAD
60 TO 62 66 67 158 TO 160 164 165 172 TO 174 178 179 186 TO 188 192 193 200 201 TO 202 206 207 270 TO 272 276 277 PR GY -7.13
272 284 TO 286 290 291 298 TO 300 304 305 312 TO 314 318 319 326 TO 328 332 -

D:\SAHIRA\PU-SIR BANIYAS\POWER TRANSFORMER\STAAD\Pwr Txr.anl

561.
562.
563.
564.
565.
566.
567.
568.
569.
570.
571.
572.
573.
574.
575.
576.
577.
578.
579.
580.
581.
582.
583.
584.
585.
586.
587.
588.
589.
590.
591.
592.
593.
594.
595.
596.
597.
598.
599.
600.
601.
602.
603.
604.
605.
606.
607.
608.
609.
610.
611.
612.
613.
614.
615.
616.

STAAD SPACE
333 340 TO 342 346 347 PR GY 7.13
1944 TO 1949 1953 TO 1962 1966 TO 1971 PR GZ 1.25
* DESIGN WIND PRESSURE=1.25KN/M2.
* LOAD ON EACH NODE=1.25*7.95*5.56/74=0.75KN.
********************************************
*LOAD COMBINATIONS
******************
*SERVICE LOAD COMBINATIONS
*
LOAD COMB 10 1.0DL+1.0LL
1 1.0 2 1.0
LOAD COMB 11 1.0DL+1.0LL+1.0EP
1 1.0 2 1.0 3 1.0
LOAD COMB 12 1.0DL+1.0LL+1.0EP+1.0SP
1 1.0 2 1.0 3 1.0 4 1.0
*
LOAD COMB 13 1.0DL+1.0LL+1.0EP+1.0WL+X
1 1.0 2 1.0 3 1.0 5 1.0
LOAD COMB 14 1.0DL+1.0LL+1.0EP+1.0WL-X
1 1.0 2 1.0 3 1.0 5 -1.0
LOAD COMB 15 1.0DL+1.0LL+1.0EP+1.0WL+Z
1 1.0 2 1.0 3 1.0 6 1.0
LOAD COMB 16 1.0DL+1.0LL+1.0EP+1.0WL-Z
1 1.0 2 1.0 3 1.0 6 -1.0
*
LOAD COMB 17 1.0DL+1.0LL+1.0EP+1.0SP+1.0WL+X
1 1.0 2 1.0 3 1.0 4 1.0 5 1.0
LOAD COMB 18 1.0DL+1.0LL+1.0EP+1.0SP+1.0WL-X
1 1.0 2 1.0 3 1.0 4 1.0 5 -1.0
LOAD COMB 19 1.0DL+1.0LL+1.0EP+1.0SP+1.0WL+Z
1 1.0 2 1.0 3 1.0 4 1.0 6 1.0
LOAD COMB 20 1.0DL+1.0LL+1.0EP+1.0SP+1.0WL-Z
1 1.0 2 1.0 3 1.0 4 1.0 6 -1.0
**************************************************
*ULTIMATE LOAD COMBINATIONS
*
LOAD COMB 51 1.2DL+1.2LL+1.2EP+1.2WL+X
1 1.2 2 1.2 3 1.2 5 1.2
LOAD COMB 52 1.2DL+1.2LL+1.2EP+1.2WL-X
1 1.2 2 1.2 3 1.2 5 -1.2
LOAD COMB 53 1.2DL+1.2LL+1.2EP+1.2WL+Z
1 1.2 2 1.2 3 1.2 6 1.2
LOAD COMB 54 1.2DL+1.2LL+1.2EP+1.2WL-Z
1 1.2 2 1.2 3 1.2 6 -1.2
*
LOAD COMB 55 1.2DL+1.2LL+1.2EP+1.2SP+1.2WL+X
1 1.2 2 1.2 3 1.2 4 1.2 5 1.2
LOAD COMB 56 1.2DL+1.2LL+1.2EP+1.2SP+1.2WL-X
1 1.2 2 1.2 3 1.2 4 1.2 5 -1.2
LOAD COMB 57 1.2DL+1.2LL+1.2EP+1.2SP+1.2WL+Z
1 1.2 2 1.2 3 1.2 4 1.2 6 1.2
LOAD COMB 58 1.2DL+1.2LL+1.2EP+1.2SP+1.2WL-Z
1 1.2 2 1.2 3 1.2 4 1.2 6 -1.2
*
LOAD COMB 59 1.4DL+1.4EP+1.4WL+X
1 1.4 3 1.4 5 1.4

D:\SAHIRA\PU-SIR BANIYAS\POWER TRANSFORMER\STAAD\Pwr Txr.anl

617.
618.
619.
620.
621.
622.
623.
624.
625.
626.
627.
628.
629.
630.
631.
632.
633.
634.
635.
636.
637.
638.
639.
640.
641.
642.
643.
644.
645.
646.
647.
648.
649.
650.
651.
652.
653.
654.
655.
656.
657.
658.
659.
660.
661.
662.
663.
664.
665.
666.
667.
668.
669.
670.
671.
672.

STAAD SPACE

-- PAGE NO.

Monday, April 25, 2011, 12:30 PM

Page 4 of 11

Page 68

P R O B L E M
S T A T I S T I C S
-----------------------------------

LOAD COMB 60 1.4DL+1.4EP+1.4WL-X


1 1.4 3 1.4 5 -1.4
LOAD COMB 61 1.4DL+1.4EP+1.4WL+Z
1 1.4 3 1.4 6 1.4
LOAD COMB 62 1.4DL+1.4EP+1.4WL-Z
1 1.4 3 1.4 6 -1.4
*
LOAD COMB 63 1.0DL+1.0EP+1.4WL+X
1 1.0 3 1.0 5 1.4
LOAD COMB 64 1.0DL+1.0EP+1.4WL-X
1 1.0 3 1.0 5 -1.4
LOAD COMB 65 1.0DL+1.0EP+1.4WL+Z
1 1.0 3 1.0 6 1.4
LOAD COMB 66 1.0DL+1.0EP+1.4WL-Z
1 1.0 3 1.0 6 -1.4
*
LOAD COMB 67 1.4DL+1.4EP+1.6LL
1 1.4 2 1.6 3 1.4
LOAD COMB 68 1.4DL+1.4EP+1.6LL+1.6SP
1 1.4 2 1.6 3 1.4 4 1.6
*************************************************
PERFORM ANALYSIS PRINT STATICS CHECK

-- PAGE NO.

D:\SAHIRA\PU-SIR BANIYAS\POWER TRANSFORMER\STAAD\Pwr Txr.anl

NUMBER OF JOINTS/MEMBER+ELEMENTS/SUPPORTS =
728/
693/
308
ORIGINAL/FINAL BAND-WIDTH=
726/
41/
252 DOF
TOTAL PRIMARY LOAD CASES =
6, TOTAL DEGREES OF FREEDOM =
4368
SIZE OF STIFFNESS MATRIX =
1101 DOUBLE KILO-WORDS
REQRD/AVAIL. DISK SPACE =
27.7/ 10124.3 MB

673.
674.
675.
676.
677.
678.
679.
680.
681.
682.
683.
684.
685.
686.
687.
688.
689.
690.
691.
692.
693.
694.

STAAD SPACE

Page 5 of 11

Monday, April 25, 2011, 12:30 PM

( KN
METE ) SUMMARY (LOADING
=
0.00
=
-1024.15
=
0.00

METE ) SUMMARY (LOADING


0.00
1024.15
0.00

1)

3575.91

1 )

-3575.91

1 )

( KN
=
=
=

METE ) SUMMARY (LOADING


0.00
-660.88
0.00

METE ) SUMMARY (LOADING


0.00
660.88
0.00

2 )

2308.34

2 )

-2308.34

D:\SAHIRA\PU-SIR BANIYAS\POWER TRANSFORMER\STAAD\Pwr Txr.anl

SUMMATION OF MOMENTS AROUND THE ORIGINMX=


-3108.26 MY=
0.00 MZ=

***TOTAL REACTION LOAD( KN


SUMMATION FORCE-X =
SUMMATION FORCE-Y =
SUMMATION FORCE-Z =

SUMMATION OF MOMENTS AROUND THE ORIGINMX=


3108.26 MY=
0.00 MZ=

***TOTAL APPLIED LOAD


SUMMATION FORCE-X
SUMMATION FORCE-Y
SUMMATION FORCE-Z

STATIC LOAD/REACTION/EQUILIBRIUM SUMMARY FOR CASE NO.


LL

MAXIMUM DISPLACEMENTS ( CM /RADIANS) (LOADING


MAXIMUMS
AT NODE
X = 8.87997E-03
2035
Y = -3.48349E-01
313
Z = -3.29684E-03
2002
RX= -7.15897E-05
87
RY= -2.89497E-05
2052
RZ= -9.26275E-05
234

SUMMATION OF MOMENTS AROUND THE ORIGINMX=


-4822.85 MY=
0.00 MZ=

***TOTAL REACTION LOAD( KN


SUMMATION FORCE-X =
SUMMATION FORCE-Y =
SUMMATION FORCE-Z =

SUMMATION OF MOMENTS AROUND THE ORIGINMX=


4822.85 MY=
0.00 MZ=

***TOTAL APPLIED LOAD


SUMMATION FORCE-X
SUMMATION FORCE-Y
SUMMATION FORCE-Z

-- PAGE NO.

STATIC LOAD/REACTION/EQUILIBRIUM SUMMARY FOR CASE NO.


DL

STAAD SPACE

Monday, April 25, 2011, 12:30 PM

Page 6 of 11

Page 69

2)

( KN
=
=
=

METE ) SUMMARY (LOADING


0.00
0.00
0.00

METE ) SUMMARY (LOADING


0.00
0.00
0.00

3)

0.00

3 )

0.00

3 )

( KN
=
=
=

METE ) SUMMARY (LOADING


0.00
0.00
0.00

D:\SAHIRA\PU-SIR BANIYAS\POWER TRANSFORMER\STAAD\Pwr Txr.anl

SUMMATION OF MOMENTS AROUND THE ORIGINMX=


0.00 MY=
0.00 MZ=

***TOTAL APPLIED LOAD


SUMMATION FORCE-X
SUMMATION FORCE-Y
SUMMATION FORCE-Z

0.00

4 )

STATIC LOAD/REACTION/EQUILIBRIUM SUMMARY FOR CASE NO.


SURCHARGEPRESSURE

MAXIMUM DISPLACEMENTS ( CM /RADIANS) (LOADING


MAXIMUMS
AT NODE
X = -2.63827E-02
2058
Y = 4.04801E-03
2100
Z = 2.97765E-03
944
RX= 3.80004E-05
914
RY= 1.18335E-04
2068
RZ= 1.28865E-04
1866

SUMMATION OF MOMENTS AROUND THE ORIGINMX=


0.00 MY=
0.00 MZ=

***TOTAL REACTION LOAD( KN


SUMMATION FORCE-X =
SUMMATION FORCE-Y =
SUMMATION FORCE-Z =

SUMMATION OF MOMENTS AROUND THE ORIGINMX=


0.00 MY=
0.00 MZ=

***TOTAL APPLIED LOAD


SUMMATION FORCE-X
SUMMATION FORCE-Y
SUMMATION FORCE-Z

-- PAGE NO.

STATIC LOAD/REACTION/EQUILIBRIUM SUMMARY FOR CASE NO.


EARTHPRESSURE

MAXIMUM DISPLACEMENTS ( CM /RADIANS) (LOADING


MAXIMUMS
AT NODE
X = 1.91405E-02
2035
Y = -2.38045E-01
313
Z = -4.08463E-03
2003
RX= -1.32041E-04
72
RY= -7.61527E-05
2052
RZ= -1.96213E-04
234

STAAD SPACE

Page 7 of 11

Monday, April 25, 2011, 12:30 PM

METE ) SUMMARY (LOADING


0.00
0.00
0.00

4)

0.00

4 )

( KN
=
=
=

METE ) SUMMARY (LOADING


7.71
-23.27
0.00

METE ) SUMMARY (LOADING


-7.71
23.27
0.00

5)

147.75

5 )

-147.75

5 )

D:\SAHIRA\PU-SIR BANIYAS\POWER TRANSFORMER\STAAD\Pwr Txr.anl

STATIC LOAD/REACTION/EQUILIBRIUM SUMMARY FOR CASE NO.


WL Z

MAXIMUM DISPLACEMENTS ( CM /RADIANS) (LOADING


MAXIMUMS
AT NODE
X = 4.32126E-02
2035
Y = -3.84456E-02
2110
Z = -4.88763E-04
2000
RX= -1.13741E-05
77
RY= -1.94327E-05
2029
RZ= -1.72179E-04
2035

SUMMATION OF MOMENTS AROUND THE ORIGINMX=


-109.13 MY=
-36.41 MZ=

***TOTAL REACTION LOAD( KN


SUMMATION FORCE-X =
SUMMATION FORCE-Y =
SUMMATION FORCE-Z =

SUMMATION OF MOMENTS AROUND THE ORIGINMX=


109.13 MY=
36.41 MZ=

***TOTAL APPLIED LOAD


SUMMATION FORCE-X
SUMMATION FORCE-Y
SUMMATION FORCE-Z

-- PAGE NO.

STATIC LOAD/REACTION/EQUILIBRIUM SUMMARY FOR CASE NO.


WL X

MAXIMUM DISPLACEMENTS ( CM /RADIANS) (LOADING


MAXIMUMS
AT NODE
X = -7.94559E-02
2058
Y = 9.05784E-03
2100
Z = -6.02713E-03
1320
RX= 7.03560E-05
914
RY= 3.56318E-04
2068
RZ= 3.50403E-04
1894

SUMMATION OF MOMENTS AROUND THE ORIGINMX=


0.00 MY=
0.00 MZ=

***TOTAL REACTION LOAD( KN


SUMMATION FORCE-X =
SUMMATION FORCE-Y =
SUMMATION FORCE-Z =

STAAD SPACE

Monday, April 25, 2011, 12:30 PM

Page 8 of 11

Page 70

( KN
=
=
=

METE ) SUMMARY (LOADING


0.00
-4.11
4.52

METE ) SUMMARY (LOADING


0.00
4.11
-4.52

6)

14.36

6 )

-14.36

6 )

-- PAGE NO.

D:\SAHIRA\PU-SIR BANIYAS\POWER TRANSFORMER\STAAD\Pwr Txr.anl

695. FINISH

************ END OF DATA FROM INTERNAL STORAGE ************

MAXIMUM DISPLACEMENTS ( CM /RADIANS) (LOADING


MAXIMUMS
AT NODE
X = 5.76182E-04
2031
Y = -1.61155E-02
2121
Z = 1.28438E-02
2017
RX= 5.81771E-05
312
RY= -9.82856E-06
2025
RZ= -9.37105E-06
189

SUMMATION OF MOMENTS AROUND THE ORIGINMX=


-71.28 MY=
15.76 MZ=

***TOTAL REACTION LOAD( KN


SUMMATION FORCE-X =
SUMMATION FORCE-Y =
SUMMATION FORCE-Z =

SUMMATION OF MOMENTS AROUND THE ORIGINMX=


71.28 MY=
-15.76 MZ=

***TOTAL APPLIED LOAD


SUMMATION FORCE-X
SUMMATION FORCE-Y
SUMMATION FORCE-Z

STAAD SPACE

Page 9 of 11

Monday, April 25, 2011, 12:30 PM

D:\SAHIRA\PU-SIR BANIYAS\POWER TRANSFORMER\STAAD\Pwr Txr.anl

STAAD SPACE

-- PAGE NO.

10

Monday, April 25, 2011, 12:30 PM

Page 10 of 11

Page 71

Page 72

BEARING PRESSURE CHECK

Page 73

Job Title

POWER TRANSFORMER

Job No

Software licensed to [LZ0 + LND]

Part Power

Rev

Transformer

Ref

33/11kV Package Unit Substation in Sir Baniyas

By
Client

Sheet No

File

ADDC

SKS
Pwr Txr.std

Date19-Jan-11
Date/Time

Chd

PSK

25-Apr-2011 12:31

Base Pressure Summary


Node

L/C

FX

FY

FZ

(kN/m2)

(kN/m2)

(kN/m2)

Max FX

10:1.0DL+1.0LL

0.000

59.223

0.000

Min FX

10:1.0DL+1.0LL

59.223

0.000

Max FY

317

17:1.0DL+1.0LL

0.000
0.000

66.037

0.000

Min FY

2099

18:1.0DL+1.0LL

0.000

0.000

Max FZ

10:1.0DL+1.0LL

0.000

53.335
59.223

Min FZ

10:1.0DL+1.0LL

0.000

59.223

0.000

0.000

Allowable net SBC of soil = 90 kN/m


Maximum bearing pressure from staad = 66.037 kN/m
As 66.037 kN/m
<
90 kN/m
Hence Safe

Print Time/Date: 25/04/2011 12:33

STAAD.Pro for Windows Release 2005

Print Run 1 of 1

Page 74

Job Title

POWER TRANSFORMER

Job No

Software licensed to [LZ0 + LND]

Part Power

33/11kV Package Unit Substation in Sir Baniyas

Transformer

Ref

File

ADDC

Rev

By
Client

Sheet No

Date19-Jan-11

SKS
Pwr Txr.std

Date/Time

Chd

PSK

25-Apr-2011 12:31

Base Pressure
Y
kN/m2
<= 54.1
54.8
55.6
56.3
57.1
57.8
58.6
59.3
60.1
60.8
61.6
62.3
63
63.8
64.5
65.3
>= 66

Load 17

BASE PRESSURE

Print Time/Date: 25/04/2011 12:35

STAAD.Pro for Windows Release 2005

Print Run 1 of 1

Page 75

SETTLEMENT CHECK

Page 76

Job Title

POWER TRANSFORMER

Job No

Software licensed to [LZ0 + LND]

Part Power

Rev

Transformer

Ref

33/11kV Package Unit Substation in Sir Baniyas

By
Client

Sheet No

File

ADDC

Date19-Jan-11

SKS

Date/Time

Pwr Txr.std

Chd

PSK

25-Apr-2011 12:31

Node Displacement Summary


Node

L/C

Resultant

rX

rY

rZ

(mm)

(mm)

(mm)

(mm)

(rad)

(rad)

(rad)

Max X

2035

17:1.0DL+1.0LL

1.771

-5.188

-0.050

5.482

-0.000

-0.000

-0.001

Min X

2058

18:1.0DL+1.0LL

-5.105

-0.047

5.369

-0.000

0.000

0.001

Max Y

2099

18:1.0DL+1.0LL

-1.663
-0.000

-4.938

0.000

4.938

-0.000

0.000

0.001

Min Y

317

17:1.0DL+1.0LL

-0.000

-0.000

6.114

0.000

-0.000

0.000

Max Z

2024

19:1.0DL+1.0LL

0.053

-6.114
-5.473

0.137

5.475

0.000

-0.000

-0.000

Min Z

1999

20:1.0DL+1.0LL

0.053

-5.561

-0.000

0.000

-0.000

387

19:1.0DL+1.0LL

0.000

-5.649

-0.231
0.000

5.566

Max rX

5.649

0.000

-0.000

-0.000

Min rX

72

20:1.0DL+1.0LL

0.000

-5.565

-0.000

5.565

0.000

-0.000

Max rY

2046

17:1.0DL+1.0LL

0.905

-5.218

-0.030

5.296

-0.000
-0.000

0.001

-0.000

Min rY

2029

17:1.0DL+1.0LL

0.916

-5.136

-0.067

5.218

-0.000

-0.000
-0.001
0.000

Max rZ

1866

18:1.0DL+1.0LL

-0.496

-5.108

-0.013

5.132

-0.000

-0.001
0.000

Min rZ

1423

17:1.0DL+1.0LL

0.529

-5.191

-0.013

5.218

-0.000

-0.000

Max Rst

317

17:1.0DL+1.0LL

-0.000

-6.114

-0.000

6.114

0.000

-0.000

0.001

Allowable settlement = 25mm


Maximum support settlement from staad = 6.114mm
As 6.114mm < 25mm
Hence Safe

Print Time/Date: 25/04/2011 12:35

STAAD.Pro for Windows Release 2005

Print Run 1 of 1

Page 77

BASE SLAB DESIGN

Page 78

Job Title

POWER TRANSFORMER

Job No

Software licensed to [LZ0 + LND]

Part Power

Rev

Transformer

Ref

33/11kV Package Unit Substation in Sir Baniyas

By
Client

Sheet No

File

ADDC

Date19-Jan-11

SKS

Chd

Date/Time

Pwr Txr.std

PSK

25-Apr-2011 12:31

Plate Centre Stress Summary for Base Slab


Shear
Plate

L/C

Qx

Qy

Sx

Membrane
Sy

Sxy

Mx

Bending
My

Mxy

(N/mm2)

(N/mm2)

(N/mm2)

(N/mm2)

(N/mm2)

(kNm/m)

(kNm/m)

(kNm/m)

Max Qx

278

67:1.4DL+1.4E

0.202

0.002

-0.000

0.000

-0.000

-22.326

-17.728

0.450

Min Qx

269

67:1.4DL+1.4E

0.001

-0.000

0.000

0.000

-22.573

-17.958

-0.452

Max Qy

2040

68:1.4DL+1.4E

-0.201
0.024

0.279

0.000

-0.000

-0.000

-1.159

-0.823

-17.082

Min Qy

2052

68:1.4DL+1.4E

0.025

0.000

-0.000

0.000

-1.298

-0.998

17.348

Max Sx

2046

68:1.4DL+1.4E

-0.006

-0.282
-0.009

0.000

-0.000

-0.000

1.323

-0.209

0.536

Min Sx

280

68:1.4DL+1.4E

0.077

0.001

0.000

-0.000

-20.266

-8.214

0.808

Max Sy

2037

68:1.4DL+1.4E

0.137

0.139

-0.000
-0.000

0.000

-0.000

-6.320

-9.715

-7.816

Min Sy

68:1.4DL+1.4E

0.000

-0.031

0.000

-1.897

9.870

-0.141

2080

68:1.4DL+1.4E

-0.060

0.047

-0.000

-0.000
-0.000

0.000

Max Sxy

0.000

-5.616

-4.900

-3.482

Min Sxy

2081

68:1.4DL+1.4E

0.060

0.048

-0.000

-0.000

-4.934

3.504

280

67:1.4DL+1.4E

0.105

0.000

-0.000

0.000

-0.000
0.000

-5.656

Max Mx

3.295

-2.762

0.527

Min Mx

272

68:1.4DL+1.4E

0.001

0.003

-0.000

0.000

0.000

-41.157

0.000

Max My

384

67:1.4DL+1.4E

0.000

0.057

0.000

-0.000

0.000

-73.074
-5.758

12.214

0.099

Min My

272

68:1.4DL+1.4E

0.001

0.003

-0.000

0.000

0.000

-73.074

Max Mxy

364

68:1.4DL+1.4E

-0.027

0.022

-0.000

-0.000

0.000

-12.622

-41.157
-3.043

25.750

Min Mxy

351

68:1.4DL+1.4E

0.027

0.022

-0.000

-0.000

-0.000

-12.568

-3.040

-25.585

Print Time/Date: 25/04/2011 12:37

STAAD.Pro for Windows Release 2005

0.000

Print Run 1 of 1

Page 79

DERBY DESIGN

Project:

33/11kV Package Unit Substation in Sir Baniyas

Date

Client:

ADDC

Design

SKS

Checked

PSK

Rev No.

Approved

SAK

Main
RANYA CONTRACTING ESTABLISHMENT
contractor:
Structure: POWER TRANSFORMER

25-Apr Page

Rev Date

BASE SLAB DESIGN


Location

MAIN REINFORCEMENT

OUTER / INNER
Mx DIRECTION

Section Design for Maximum moment

Main Steel
2

Characteristic strength of concrete

fcu

35

N/mm

Characteristic strength of steel

fy

420

N/mm2

Mu

74

kNm

b
D
c

= 1000 mm
= 350 mm
=
75
mm

Diameter of main reinforcement

dm

16

mm

Diameter of secondary reinforcement

ds

16

mm

Effective depth

= D-c-dm/2
= 267 mm

Factored bending moment


Plate no:
272
Width of raft
Thickness of raft
Clear cover

Load case :

68

2
K = M / ( b x d x fcu )

= 0.030

z = d x [0.5 +SQRT (0.25 - K / 0.9)]

= 257.89 mm

0.95 x d
Since 0.95xd,

is less than z, value of z is

Reinforcement required Ast = M / ( 0.87 x fy x z )


Min reinf. each face per table 3.25 BS 8110-1 = 0.13%
Main reinforcement
16 @
+ Extra reinforcement
0@
Area of reinforcement provided

200
200

= 253.65 mm
= 253.65
2

798

mm

=
mm c/c
mm c/c

455

mm

1005 mm

Hence OK.
Reinforcement Summary:
Provide main reinforcement T16 @ 200 mm c/c.

Page 80

Job Title

POWER TRANSFORMER

Job No

Software licensed to [LZ0 + LND]

Part Power

33/11kV Package Unit Substation in Sir Baniyas

Transformer

Ref

File

ADDC

Rev

By
Client

Sheet No

SKS
Pwr Txr.std

Date19-Jan-11
Date/Time

Chd

PSK

25-Apr-2011 12:31

MX
kNm/m
<= -73.1
-68.4
-63.8
-59.1
-54.5
-49.8
-45.2
-40.5
-35.9
-31.2
-26.6
-21.9
-17.3
-12.6
-7.97
-3.32
>= 1.33

Load 68

Mx

Print Time/Date: 25/04/2011 12:42

STAAD.Pro for Windows Release 2005

Print Run 1 of 1

Page 81

DERBY DESIGN

Project:

33/11kV Package Unit Substation in Sir Baniyas

Date

Client:

ADDC

Design

SKS

Checked

PSK

Rev No.

Approved

SAK

Main
RANYA CONTRACTING ESTABLISHMENT
contractor:
Structure: POWER TRANSFORMER

25-Apr

Page

Rev Date

BASE SLAB DESIGN


Location

SECONDARY REINFORCEMENT

OUTER / INNER
My DIRECTION

Section Design for Maximum moment

Secondary Steel
2

Characteristic strength of concrete

fcu

35

N/mm

Characteristic strength of steel

fy

420

N/mm2

Mu

42

kNm

b
D
c

=
=
=

1000
75

mm
mm
mm

Diameter of main reinforcement

dm

16

mm

Diameter of secondary reinforcement

ds

16

mm

Effective depth

= D-c-dm-ds/2
=
251
mm

Factored bending moment


Plate no:
272
Width of raft
Thickness of raft
Clear cover

Load case :

68
350

2
K = Mu / ( b x d x fcu )

z = d x [0.5 +SQRT (0.25 - K / 0.9)]

= 245.57 mm

0.95 x d
Since 0.95xd,

is less than z, value of z is

Reinforcement required Ast = M / ( 0.87 x fy x z )


Min reinf. each face per table 3.25 BS 8110-1 = 0.13%
Main reinforcement
16 @
+ Extra reinforcement
0@
Area of reinforcement provided

200
200

0.019

= 238.45 mm
= 238.45
2

482

mm

=
mm c/c
mm c/c

455

mm

1005 mm

Hence OK.
Reinforcement Summary:
Provide seconday reinforcement T16 @ 200 mm c/c.

Page 82

Job Title

POWER TRANSFORMER

Job No

Software licensed to [LZ0 + LND]

Part Power

33/11kV Package Unit Substation in Sir Baniyas

Transformer

Ref

File

ADDC

Rev

By
Client

Sheet No

SKS
Pwr Txr.std

Date19-Jan-11
Date/Time

Chd

PSK

25-Apr-2011 12:31

MY
kNm/m
<= -41.2
-37.9
-34.7
-31.5
-28.3
-25.1
-21.8
-18.6
-15.4
-12.2
-8.95
-5.72
-2.5
0.718
3.94
7.16
>= 10.4

Load 68

My

Print Time/Date: 25/04/2011 12:42

STAAD.Pro for Windows Release 2005

Print Run 1 of 1

Page 83

DERBY DESIGN

Project:

33/11kV Package Unit Substation in Sir Baniyas

Date

Client:

ADDC

Design

SKS

Checked

PSK

Main
contractor:

RANYA CONTRACTING ESTABLISHMENT

Rev No.

Approved

SAK

Structure:

POWER TRANSFORMER

Rev Date

Main steel

SHEAR CHECK FOR BASE SLAB


( For SQx Value Refer attached STAAD output sheets )

0.202 N/mm

Max shear stress from STAAD Output, V =


Plate no:

Load case:

278

Thickness of Raft

Clear cover

25-Apr Page

67

350 mm

75 mm

Diameter of main reinforcement

Spacing of main reinforcement

16 mm
200 mm c/c
16 mm

Diameter of secondary reinforcement

Spacing of secondary reinforcement

200 mm c/c

267 mm

Effective depth

Grade of concrete , fcu

% of steel provided

=
=

Design shear strength


of concrete

As

0.202 N/mm

35 N/mm

0.38 %

= 0.79x(0.38)^1/3 x(400/267)^1/4x1/1.25 x (35/25)^1/3


2
=
0.57 N/mm

<

0.57 N/mm

SAFE

Page 84

Job Title

POWER TRANSFORMER

Job No

Software licensed to [LZ0 + LND]

Part Power

33/11kV Package Unit Substation in Sir Baniyas

Transformer

Ref

File

ADDC

Rev

By
Client

Sheet No

SKS
Pwr Txr.std

Date19-Jan-11
Date/Time

Chd

PSK

25-Apr-2011 12:31

SQX
N/mm2
<= -0.201
-0.176
-0.151
-0.125
-0.100
-0.075
-0.050
-0.025
0
0.026
0.051
0.076
0.101
0.126
0.151
0.176
>= 0.202

Load 67

SQx

Print Time/Date: 25/04/2011 12:42

STAAD.Pro for Windows Release 2005

Print Run 1 of 1

Page 85

DERBY DESIGN

Project:

33/11kV Package Unit Substation in Sir Baniyas

Date

Client:

ADDC

Design

SKS

Checked

PSK

Main
contractor:

RANYA CONTRACTING ESTABLISHMENT

Rev No.

Approved

SAK

Structure:

POWER TRANSFORMER

Rev Date

Secondary steel

SHEAR CHECK FOR BASE SLAB


( For SQy Value Refer attached STAAD output sheets )

0.282 N/mm

Max shear stress from STAAD Output, V =


Plate no:

Load case:

2052

Thickness of Raft

Clear cover

25-Apr Page

68

350 mm

75 mm

Diameter of main reinforcement

Spacing of main reinforcement

16 mm
200 mm c/c
16 mm

Diameter of secondary reinforcement

Spacing of secondary reinforcement

200 mm c/c

251 mm

Effective depth

Grade of concrete , fcu

% of steel provided

=
=

Design shear strength


of concrete

As

0.282 N/mm

35 N/mm

0.40 %

= 0.79x(0.4)^1/3 x(400/251)^1/4x1/1.25 x (35/25)^1/3


2
=
0.59 N/mm

<

0.59 N/mm

SAFE

Page 86

Job Title

POWER TRANSFORMER

Job No

Software licensed to [LZ0 + LND]

Part Power

33/11kV Package Unit Substation in Sir Baniyas

Transformer

Ref

File

ADDC

Rev

By
Client

Sheet No

SKS

Date19-Jan-11
Date/Time

Pwr Txr.std

Chd

PSK

25-Apr-2011 12:31

SQY
N/mm2
<= -0.282
-0.247
-0.212
-0.177
-0.142
-0.107
-0.072
-0.037
-0.002
0.033
0.068
0.103
0.138
0.173
0.208
0.244
>= 0.279

Load 68

SQy

Print Time/Date: 25/04/2011 12:42

STAAD.Pro for Windows Release 2005

Print Run 1 of 1

Page 87

WALL DESIGN

Page 88

Job Title

POWER TRANSFORMER

Job No

Software licensed to [LZ0 + LND]

Part Power

Rev

Transformer

Ref

33/11kV Package Unit Substation in Sir Baniyas

By
Client

Sheet No

File

ADDC

Date19-Jan-11

SKS

Chd

Date/Time

Pwr Txr.std

PSK

25-Apr-2011 12:31

Plate Centre Stress Summary for RC Wall


Shear
Plate

L/C

Qx

Qy

Sx

Membrane
Sy

Sxy

Mx

Bending
My

Mxy

(N/mm2)

(N/mm2)

(N/mm2)

(N/mm2)

(N/mm2)

(kNm/m)

(kNm/m)

(kNm/m)

Max Qx

1236

68:1.4DL+1.4E

0.233

0.051

-0.245

-0.213

-0.029

-25.686

-4.142

3.010

Min Qx

897

68:1.4DL+1.4E

0.052

-0.246

-0.217

0.030

-25.818

-4.161

-3.017

Max Qy

1320

68:1.4DL+1.4E

-0.234
-0.002

0.231

-0.030

0.061

-0.019

-1.345

-14.494

-2.076

Min Qy

1770

68:1.4DL+1.4E

0.072

-0.234

-0.541

-0.021

-4.513

2.416

-5.056

0.001

-0.005

0.011

-4.079

-0.530

0.626

-0.003

-0.001

21.025

2.763

-0.311

0.085

-0.003

2.039

5.803

-0.188

-0.021

-4.513

2.416

-5.056

0.142

-3.992

4.483

1.300

-3.899

4.512

-1.350

Max Sx

1994

66:1.0DL+1.0E

-0.029

-0.225
-0.005

Min Sx

2004

68:1.4DL+1.4E

0.005

-0.029

Max Sy

1779

67:1.4DL+1.4E

0.000

0.053

-0.407
-0.014

Min Sy

1770

68:1.4DL+1.4E

0.072

-0.225

-0.234

Max Sxy

855

68:1.4DL+1.4E

-0.114

-0.122

-0.199

-0.541
-0.492

Min Sxy

842

68:1.4DL+1.4E

0.113

-0.121

-0.199

-0.479

Max Mx

2004

68:1.4DL+1.4E

0.005

-0.029

-0.407

-0.003

-0.140
-0.001

Min Mx

1957

68:1.4DL+1.4E

-0.104

0.128

-0.258

-0.066

-0.023

Max My

861

68:1.4DL+1.4E

-0.000

0.040

-0.156

0.041

Min My

1325

68:1.4DL+1.4E

0.001

0.230

-0.030

0.067

Max Mxy

1360

68:1.4DL+1.4E

-0.018

0.063

-0.176

Min Mxy

1802

68:1.4DL+1.4E

0.018

0.063

-0.176

Print Time/Date: 25/04/2011 12:43

21.025

2.763

-0.311

-3.237

-3.696

-0.000

-31.750
6.744

0.001

-1.385

-0.078

0.051

-0.079

-0.053

STAAD.Pro for Windows Release 2005

12.533

0.061

1.431

-14.560
1.379

12.801

1.436

1.410

-12.829

0.359

Print Run 1 of 1

Page 89

DERBY DESIGN

Project:

33/11kV Package Unit Substation in Sir Baniyas

Date

Client:

ADDC

Design

SKS

Checked

PSK

Rev No.

Approved

SAK

Main
RANYA CONTRACTING ESTABLISHMENT
contractor:
Structure: POWER TRANSFORMER

25-Apr

Page

Rev Date

WALL DESIGN
Location

VERTICAL REINFORCEMENT

OUTER / INNER
My DIRECTION

Section Design for Maximum moment

Main Steel
2

Characteristic strength of concrete

fcu

35

N/mm

Characteristic strength of steel

fy

420

N/mm2

Mu

15

kNm

b
D
c

=
=
=

1000
75

mm
mm
mm

Diameter of main reinforcement

dm

16

mm

Diameter of secondary reinforcement

ds

16

mm

Effective depth

= D-c-dm/2
=
167
mm

Factored bending moment


Plate no:
1325
Width of wall
Thickness of wall
Clear cover

Load case :

68
250

2
K = Mu / ( b x d x fcu )

z = d x [0.5 +SQRT (0.25 - K / 0.9)]

= 164.10 mm

0.95 x d
Since 0.95xd,

is less than z, value of z is

Reinforcement required Ast = M / ( 0.87 x fy x z )


Min reinf. each face per Section 3.12.7.4.b. BS 8110-1 = 0.125%
Main reinforcement
16 @
150
+ Extra reinforcement
0@
150
Area of reinforcement provided

0.015

= 158.65 mm
= 158.65
=
=
mm c/c
mm c/c
=

259

mm

312.5

mm

1340 mm

Hence OK.
Reinforcement Summary:
Provide vertical reinforcement T16 @ 150 mm c/c.

Page 90

Job Title

POWER TRANSFORMER

Job No

Software licensed to [LZ0 + LND]

Part Power

33/11kV Package Unit Substation in Sir Baniyas

ADDC

Rev

Transformer

Ref
By

Client

Sheet No

File

SKS
Pwr Txr.std

Date19-Jan-11
Date/Time

Chd

PSK

25-Apr-2011 12:31

MY
kNm/m
<= -14.6
-12.9
-11.2
-9.48
-7.79
-6.09
-4.4
-2.71
-1.01
0.68
2.37
4.07
5.76
7.45
9.15
10.8
>= 12.5

Y
X
Z

Load 68

My

Print Time/Date: 25/04/2011 12:47

STAAD.Pro for Windows Release 2005

Print Run 1 of 1

Page 91

DERBY DESIGN

Project:

33/11kV Package Unit Substation in Sir Baniyas

Date

Client:

ADDC

Design

SKS

Checked

PSK

Rev No.

Approved

SAK

Main
RANYA CONTRACTING ESTABLISHMENT
contractor:
Structure: POWER TRANSFORMER

25-Apr Page

Rev Date

WALL DESIGN
Location

HORIZONTAL REINFORCEMENT

OUTER / INNER
Mx DIRECTION

Section Design for Maximum moment

Secondary Steel
2

Characteristic strength of concrete

fcu

35

N/mm

Characteristic strength of steel

fy

420

N/mm2

Mu

32

kNm

b
D
c

= 1000 mm
= 250 mm
=
75
mm

Diameter of main reinforcement

dm

16

mm

Diameter of secondary reinforcement

ds

16

mm

Effective depth

= D-c-dm-ds/2
= 151 mm

Factored bending moment


Plate no:
1957
Width of wall
Thickness of wall
Clear cover

Load case :

68

2
K = M / ( b x d x fcu )

= 0.040

z = d x [0.5 +SQRT (0.25 - K / 0.9)]

= 143.94 mm

0.95 x d
Since 0.95xd,

is less than z, value of z is

Reinforcement required Ast = M / ( 0.87 x fy x z )


Min reinf. each face per table 3.25 BS 8110-1 = 0.2%
Main reinforcement
16 @
+ Extra reinforcement
0@
Area of reinforcement provided

150
150

= 143.45 mm
= 143.45
2

610

mm

=
mm c/c
mm c/c

500

mm

1340 mm

Hence OK.
Reinforcement Summary:
Provide horizontal reinforcement T16 @ 150 mm c/c.

Page 92

Job Title

POWER TRANSFORMER

Job No

Software licensed to [LZ0 + LND]

Part Power

33/11kV Package Unit Substation in Sir Baniyas

ADDC

Rev

Transformer

Ref
By

Client

Sheet No

File

SKS
Pwr Txr.std

Date19-Jan-11
Date/Time

Chd

PSK

25-Apr-2011 12:31

MX
kNm/m
<= -31.8
-28.5
-25.2
-21.9
-18.6
-15.3
-12
-8.66
-5.36
-2.06
1.23
4.53
7.83
11.1
14.4
17.7
>= 21

Y
X
Z

Load 68

Mx

Print Time/Date: 25/04/2011 12:47

STAAD.Pro for Windows Release 2005

Print Run 1 of 1

Page 93

DERBY DESIGN

Project:

33/11kV Package Unit Substation in Sir Baniyas

Date

Client:

ADDC

Design

SKS

Checked

PSK

Main
contractor:

RANYA CONTRACTING ESTABLISHMENT

Rev No.

Approved

SAK

Structure:

POWER TRANSFORMER

Rev Date

Main steel

SHEAR CHECK FOR WALL


( For SQy Value Refer attached STAAD output sheets )

0.231 N/mm

Max shear stress from STAAD Output, V =


Plate no:

Load case:

1320

Thickness of Raft

Clear cover

25-Apr Page

68

250 mm

75 mm

Diameter of main reinforcement

Spacing of main reinforcement

16 mm
150 mm c/c
16 mm

Diameter of secondary reinforcement

Spacing of secondary reinforcement

150 mm c/c

167 mm

Effective depth

Grade of concrete , fcu

% of steel provided

=
=

Design shear strength


of concrete

As

0.231 N/mm

35 N/mm

0.80 %

= 0.79x(0.8)^1/3 x(400/167)^1/4x1/1.25 x (35/25)^1/3


2
=
0.82 N/mm

<

0.82 N/mm

SAFE

Page 94

Job Title

POWER TRANSFORMER

Job No

Software licensed to [LZ0 + LND]

Part Power

33/11kV Package Unit Substation in Sir Baniyas

ADDC

Rev

Transformer

Ref
By

Client

Sheet No

File

SKS
Pwr Txr.std

Date19-Jan-11
Date/Time

Chd

PSK

25-Apr-2011 12:31

SQY
N/mm2
<= -0.225
-0.196
-0.168
-0.139
-0.111
-0.082
-0.054
-0.025
0.003
0.032
0.060
0.089
0.117
0.146
0.174
0.203
>= 0.231

Y
X
Z

Load 68

SQy

Print Time/Date: 25/04/2011 12:47

STAAD.Pro for Windows Release 2005

Print Run 1 of 1

Page 95

DERBY DESIGN

Project:

33/11kV Package Unit Substation in Sir Baniyas

Date

Client:

ADDC

Design

SKS

Checked

PSK

Main
contractor:

RANYA CONTRACTING ESTABLISHMENT

Rev No.

Approved

SAK

Structure:

POWER TRANSFORMER

Rev Date

Secondary steel

SHEAR CHECK FOR WALL


( For SQx Value Refer attached STAAD output sheets )

0.234 N/mm

Max shear stress from STAAD Output, V =


Plate no:

Load case:

897

Thickness of Raft

Clear cover

25-Apr Page

68

250 mm

75 mm

Diameter of main reinforcement

Spacing of main reinforcement

16 mm
150 mm c/c
16 mm

Diameter of secondary reinforcement

Spacing of secondary reinforcement

150 mm c/c

151 mm

Effective depth

Grade of concrete , fcu

% of steel provided

=
=

Design shear strength


of concrete

As

0.234 N/mm

35 N/mm

0.89 %

= 0.79x(0.89)^1/3 x(400/151)^1/4x1/1.25 x (35/25)^1/3


2
=
0.87 N/mm

<

0.87 N/mm

SAFE

Page 96

Job Title

POWER TRANSFORMER

Job No

Software licensed to [LZ0 + LND]

Part Power

33/11kV Package Unit Substation in Sir Baniyas

ADDC

Rev

Transformer

Ref
By

Client

Sheet No

File

SKS
Pwr Txr.std

Date19-Jan-11
Date/Time

Chd

PSK

25-Apr-2011 12:31

SQX
N/mm2
<= -0.234
-0.205
-0.176
-0.147
-0.117
-0.088
-0.059
-0.030
-0.001
0.029
0.058
0.087
0.116
0.145
0.175
0.204
>= 0.233

Y
X
Z

Load 68

SQx

Print Time/Date: 25/04/2011 12:48

STAAD.Pro for Windows Release 2005

Print Run 1 of 1

Page 97

PACKAGE UNIT FOUNDATION


(AUX. TRANSFORMER)

Page 98

LOAD CALCULATIONS

Page 99

DERBY DESIGN

Project:

33/11kV Package Unit Substation in Sir Baniyas

Date

Client:

ADDC

25-Apr

Page

Design

SKS

Checked

PSK

Main
contractor:

RANYA CONTRACTING ESTABLISHMENT

Rev No.

Approved

SAK

Structure:

AUXILIARY TRANSFORMER

Rev Date

Load calculation
Weight of Transformer

20 kN

91 kN

Total vertical Load

111 kN

Wind Pressure

1.00 kN/m2

Allowable net SBC of soil


Allowable SBC o soil with 25% extra for wind load case

=
=

90 kN/m2
90 x 1.25

Self weight of foundation

=(1.0x1.4x2.6)x25

=
Dimension of the tank =

1.0 m x 1.4m x 2.6m

Maximum wind load

1.40 m x 1.25m x 1.00

kN/m2

1.75 kN
5.64 kNm

Moment at Base Due to Wind Load

=1.753.225

Eccentricity

=5.64375/111

e=M/P

112.5

0.051 m

Since e < 1.0/6=0.17m Pressure distribution is Trapezoidal


P max

=P/A M/Z
=111/(11.4)+(5.64375/(1.41^2/6))

103.47 kN/m

Since Pmax is <112.5 kN/m2


Hence safe
Reinforcement:
Provide Shrinkage Reinforcement on all faces
=0.35% of surface zone (250mm)
=0.00352501000

875

mm2

Provide T12+ @ 200 Both Ways on all Faces


Check for overturning:
overturning moment

5.64

kNm

Resisting moment

77.70

kNm

14

Factor of safety

=78/6

Hence ok

Page 100

DESIGN OF GRATING

Page 101
Project

Date

33/11kv Package Unit Substation at Sir Baniyas


Client
ADDC
Main
RANYA CONTRACTING ESTABLISHMENT
DERBY DESIGN Contractor
Reference POWER TRANSFORMER
Abu Dhabi

25-Apr Ref. No.

Made By

SKS

Checked By

PSK

Rev. No.

Approved By

SAK

Drg. Ref.

i ) Grating Design
Thickness of gravel

Weight of gravel

=
=

Live Load

5.00

kN/m2

Total Load

9.00

kN/m2

Grating type

For a span of 1.27m, allowable service load

Allowable load

>

200.00

mm

(200 / 1000) x 20
4.00 kN/m2

(30 x 100) / (40 x 4.5)


kN/m2

16.55
Actual load

Hence OK

ii ) Check for Deflection


As per civil design basis, permissible deflection

L / 200

L
=
L / 200 =

1270.00
6.35

mm
mm

7.50

mm

Max. deflection 'd' at centre as per manufacturer's data


2
for a load of 16.55 kN/m

2
For actual load of 9.0 kN/m , deflection

Actual deflection

=
=
<

(7.50 / 16.55) x 9
4.08 mm
Allowable deflection
Hence OK

As per manufacturer's data, "Deflection does not exceed L / 200 or 10mm"

(From manufacturer's data)

Page 102

Page 103

Page 104

DESIGN OF SUPPORTING STEEL BEAM

Page 105
Project
Client
Main
DERBY DESIGN Contractor
Structure
Abu Dhabi

25-Apr Ref. No.

33/11kv Package Unit Substation at Sir Baniyas


ADDC

Date
Made By

SKS

Checked By

PSK

RANYA CONTRACTING ESTABLISHMENT

Rev. No.

Approved By

SAK

POWER TRANSFORMER

Drg. Ref.

LOAD CALCULATION FOR STEEL BEAM SUPPORTING GRATING


LOAD ACTING ON BEAM
Dead Load
Load due to gravel

0.2 x 20 =

4.00

kN/m2

Load due to grating

0.50

kN/m2

Total Load

4.50

kN/m

Max.Spacing of grating support beams

= 1.27/2+1.05/2 =

1.16

Dead Load on beam with 1.16m spacing

= 4.5 x 1.16

5.22

kN/m

0.23

kN/m

=
say =

5.45
5.50

kN/m
kN/m

=
say =

5.80
6.00

kN/m
kN/m

Self weight of UB 203 x 102 x 23


Total dead load on beam

Live Load
Live load on beam for 1.16m spacing

= 5 x 1.16

DL= 5.50 kN/m


LL= 6.00 kN/m

1.125 m

B
BEAM

33/11kV PACKAGE UNIT SUBSTATION


POWER TRANSFORMER

Page:
Made by:
Date:
Ref No:
Office:

1
Page 106
SKS
25.04.11

1328

Location: Example 2, 'Steelwork Design Guide'


Simply supported steel beam

<

>

Beam span
Young's modulus

L=1.125 m
E=205 kN/mm 2

Section properties
Section size
203 x 102 x 23 Universal Beam
Depth of steel section
D=203.2 mm
Width of steel section
B=101.8 mm
Thickness of web
t=5.4 mm
Thickness of flange
T=9.3 mm
Root radius
r=7.6 mm
Inertia about major axis
Ix=2105 cm 4
Inertia about minor axis
Iy=164 cm 4
Plastic modulus about major axis Sx=234 cm 3
Torsional constant
J=7.02 cm 4
Area of section
A=29.4 cm 2
Radius gyration about minor axis ry=SQR(Iy/A)=SQR(164/29.4)=2.3618 cm
Dead load factor
Imposed load factor

gamd=1.4
gami=1.6

All loads are positive downwards, reactions are positive upwards,


sagging moments are positive.
Unfactored loads
<
<

Lau

Lbu
>

>

Gku Unfactored dead UDL


Qku Unfactored imposed UDL

Distances are measured


from left hand support
Uniformly distributed load 1 of 1
Dist. from left support to start
Distance from left support to end
Unfactored dead load
Unfactored imposed load

Lau(1)=0 m
Lbu(1)=1.125 m
Gku(1)=5.5 kN/m
Qku(1)=6 kN/m

33/11kV PACKAGE UNIT SUBSTATION


POWER TRANSFORMER

Page:
Made by:
Date:
Ref No:

Office:
BMs at 20th points, from left to right (sagging is positive)

2
Page 107
SKS
25.04.11

0.52001
0.98529
2.299
2.4906
2.7095
2.6274
1.7516
1.3958
Maximum span bending moment

1.3958
2.6274
2.4906
0.98529
2.7369 kNm

1.7516
2.7095
2.299
0.52001

1328

2.0527
2.7369
2.0527
0

End shears
Shear force at left hand end
Shear force at right hand end
Shear force

9.7313 kN
9.7313 kN
Fv=Rlhe=9.7313 kN

Unfactored
Unfactored
Unfactored
Unfactored

3.0938 kN
3.375 kN
3.0938 kN
3.375 kN

dead shear at
imposed shear
dead shear at
imposed shear

LHE
at LHE
RHE
at RHE

Midspan deflections
Unfactored dead load deflection
Unfactored imposed load deflectn
Total DL & imposed deflection
Span:defln ratio for dead load
Span:defln ratio for imposed load
Span:defln ratio for total load
From Table 5
Limiting deflection (non-brittle)

0.026583 mm
0.029 mm
0.055583 mm
42320
38793
20240

DELlim=L*1000/200
=1.125*1000/200
=5.625 mm
Since imposed load deflection <= DELlim ( 0.029 mm <=5.625 mm )
deflection within limiting value.
Strength of steel

Clause 3.1.1

For thickness of 9.3 mm


Design strength (Grade 43 )

py=275 N/mm 2

Section classification
Constant (Table 7 Note 3)

e=(275/py)^0.5
=(275/275)^0.5
=1
Outstand
b=B/2=101.8/2=50.9 mm
Ratio
b'T=b/T=50.9/9.3=5.4731
Compact limiting value of ratio
b'Tlim=9.5*e=9.5*1=9.5
b/T ratio within limiting value of 9.5e.
Compact limiting value of ratio
d'tlim=98*e=98*1=98

33/11kV PACKAGE UNIT SUBSTATION


POWER TRANSFORMER

Page:
Made by:
Date:
Ref No:

Office:
d=D-2*(T+r)
=203.2-2*(9.3+7.6)
=169.4 mm
Ratio
d't=d/t=169.4/5.4=31.37
d/t ratio within limiting value of 98e.
Therefore section is compact.

3
Page 108
SKS
25.04.11

1328

Depth between fillets

Buckling resistance
Since the beam is subject to possible lateral torsional buckling, the
buckling resistance moment Mb is first considered rather than the
moment capacity Mc as a guide to selection. A conservative analysis
is adopted, taking the worst moment with the greatest effective length.
Equivalent uniform moment
Mbar=M=2.7369 kNm
Greatest effective length
Le=1.125 m
Slenderness of section
lambda=(Le*1000)/(ry*10)
=(1.125*1000)/(2.3618*10)
=47.633
Torsional index
x=0.566*((D-T)/10)*(A/J)^0.5
=0.566*((203.2-9.3)/10)*(29.4
/7.02)^0.5
=22.459
Ratio
ratio=lambda/x=47.633/22.459=2.1208
Factor
N=0.5
Slenderness factor
v=TABLE 14 for ratio=2.1208, N=0.5
=0.95396
Factor from Table 13
n=1.0
Appendix B.2 is used to calculate the buckling resistance moment.
Buckling parameter
u=(4*Sx^2*(1-Iy/Ix)/(A^2*((D-T)
/10)^2))^0.25
=(4*234^2*(1-164/2105)/(29.4^2
*((203.2-9.3)/10)^2))^0.25
=0.88788
Equivalent slenderness
lamlt=n*u*v*lambda
=1*0.88788*0.95396*47.633
=40.345
Bending strength
pb=TABLE 11 for lamlt=40.345, py=275
=261.17 N/mm 2
Buckling resistance
Mb=Sx*pb/10^3
=234*261.17/10^3
=61.114 kNm
Since Mbar<Mb ( 2.7369 kNm < 61.114 kNm ) section O.K. for
lateral torsional buckling resistance.

33/11kV PACKAGE UNIT SUBSTATION


POWER TRANSFORMER

Page:
Made by:
Date:
Ref No:
Office:

4
Page 109
SKS
25.04.11

1328

Shear capacity
Avx=D*t=203.2*5.4=1097.3 mm 2
Pv=0.6*py*Avx/1000
=0.6*275*1097.3/1000
=181.05 kN
Since Fv <= Pv ( 9.7313 kN <=181.05 kN ) shear force in web within
shear capacity.
Shear area
Shear capacity

Moment capacity
Elastic modulus

Zx=Ix/(D/20)
=2105/(203.2/20)
=207.19 cm 3

Since Fv < 0.6 Pv


Moment capacity for compact sec

Mc=py*Sx/10^3
=275*234/10^3
=64.35 kNm
Limiting value of moment capac
Mclim=1.2*py*Zx/1000
=1.2*275*207.19/1000
=68.371 kNm
Mc is within limiting value, therefore no reduction.
Since M <= Mc ( 2.7369 kNm <=64.35 kNm ) applied moment within
moment capacity.
N.B. Buckling resistance is less than moment capacity and therefore
buckling resistance controls the design.
UNIVERSAL BEAM
DESIGN
SUMMARY

203 x 102 x 23 UB Grade 43


Shear force
9.7313 kN
Shear capacity
181.05 kN
Applied moment
2.7369 kNm
Moment capacity
64.35 kNm
Buckling resistance
61.114 kNm
Unfactored DL defln
0.026583 mm
Unfactored LL defln
0.029 mm
Limiting deflection
5.625 mm
DL shear at LHE
3.0938 kN
Unfactored
LL shear at LHE
3.375 kN
end shears
DL shear at RHE
3.0938 kN
LL shear at RHE
3.375 kN
No408

Page 110

ANCHOR BOLT DESIGN

Page 111
Customer No.:

Anchor fastening design

Page:

Location:

Quotation:

Hilti AG
FL-9494 Schaan

Project:

1 of 4

GHANTOOT

List No.:

HAP v3.3c

Phone:

Date:

Resp.: PSK

Project name: 15MVA PWR. TXR.

Anchor fastening design for HSA-M12


As per ETAG Annex C method

Positioning
Anchoring plate:
lx=250 mm ly=300 mm
s1=150 mm s2=200 mm
s2

Anchor
Anchor in slotted hole

s1

Loads (design values)


Shear Load:
Vyd=-10.0 kN
1

3
Vy

Concrete
Compressive class: C35/45
Compression zone / uncracked concrete
Thickness of base material: 250 mm
no edge reinforcement
close reinforcement (close reinforcement (s <= 15 cm))

Data and results must be checked for agreement with the actual existing conditions and for plausibility!
HAP v3.3c 2003 Hilti AG, FL-9494 Schaan

Hilti is a registered Trademark of Hilti AG, Schaan

27-01-2009

Page 112
Customer No.:

2 of 4

Anchor fastening design

Page:

Location:

Quotation:

Hilti AG
FL-9494 Schaan

Project:

GHANTOOT

List No.:

HAP v3.3c

Phone:

Date:

27-01-2009

Resp.: PSK

Project name: 15MVA PWR. TXR.

HSA-M12

Tension Load N
Anchor
Design value of tension load

NSd,i

Design value of anchor group

NSd = NSd,i

1
0.0 kN

2
0.0 kN

3
0.0 kN

4
0.0 kN

n
g

= 0.0 kN

i=1

Steel failure
Characteristic value for one anchor
Partial safety factor

Design value of resistance

NRk,s = -- Ms = 1.00

NRd,s =

NRk,s
Ms

= ---

Check

NSd
= 0.00
NRd,s

Check

NSd
= 0.00
NRd,p

Pullout failure
Characteristic value for one anchor
Partial safety factor

Design value of resistance

NRk,p = -- Mp = 1.00

NRd,p =

NRk,p
Mp

= ---

Concrete cone failure


0

Initial value of the anchor resistance

NRk,c

= ---

Actual area of concrete cone

Ac,N

= ---

0
c,N

Reference area of concrete cone

= ---

Factor for disturbance of stressed distribution

s,N

= 1.00

Shell spalling factor

re,N = 1.00

Eccentricity of the resulting tensile load

eN,x

Factors for eccentrical loading

ec,N,x = 1.00

Factors for the position of the anchorage

ucr,N = 1.00

= 0 mm

eN,y

= 0 mm

ec,N,y = 1.00

Characteristic value for the anchor group


0

NRk,c = NRk,c

Ac,N
0

s,N re,N ec,N,x ec,N,y ucr,N = ---

Ac,N
Mc = 1.00

Partial safety factor

Design value of resistance

NRd,c =

NRk,c
Mc

Data and results must be checked for agreement with the actual existing conditions and for plausibility!
HAP v3.3c 2003 Hilti AG, FL-9494 Schaan

Hilti is a registered Trademark of Hilti AG, Schaan

= ---

Check

NSd
= 0.00
NRd,c

Page 113
Customer No.:

3 of 4

Anchor fastening design

Page:

Location:

Quotation:

Hilti AG
FL-9494 Schaan

Project:

GHANTOOT

List No.:

HAP v3.3c

Phone:

Date:

27-01-2009

Resp.: PSK

Project name: 15MVA PWR. TXR.

HSA-M12

Shear Load V
Anchor
Design value of shear in x

VSd,x,i

1
0.0 kN

2
0.0 kN

3
0.0 kN

4
0.0 kN

Design value of shear in y

VSd,y,i

-2.5 kN

-2.5 kN

-2.5 kN

-2.5 kN

Design value of anchor group

g
Sd,x

= VSd,x,i = 0.0 kN

g
Sd,y

= VSd,y,i = -10.0 kN

i=1

Resulting design value of shear

VSd,i

i=1

2.5 kN

2.5 kN

2.5 kN

2.5 kN

Steel failure without lever arm


Characteristic value for one anchor
Partial safety factor
Design value of resistance

VRk,s = 23.0 kN
Ms = 1.62
VRd,s =

VRk,s
Ms

= 14.2 kN

Check

VSd
= 0.18
VRd,s

Concrete edge failure


0

Initial value of the anchor resistance

VRk,c

= ---

Actual area of concrete cone

Ac,V

= 0 mm

0
c,V

Reference area of concrete cone

= 0 mm

Factor for disturbance of stressed distribution

s,V

= 1.00

Factor for member thickness

h,V

= 1.00

Factor for load direction

,V

= 1.00

Eccentricity of the resulting shear load

eV,x

= 0 mm

Factors for eccentrical loading

ec,V,x = 1.00

Factors for the position of the anchorage

ucr,V = 1.0

eV,y

= 0 mm

ec,V,y = 1.00

Characteristic value for the anchor group


0

VRk,c = VRk,c

Ac,V
0

s,V h,V ,V ec,V ucr,V

Mc= 1.00

VRk,c,x = ---

Ac,V
Design value of resistance

VRd,c =

VRk,c
Mc

Data and results must be checked for agreement with the actual existing conditions and for plausibility!
HAP v3.3c 2003 Hilti AG, FL-9494 Schaan

Hilti is a registered Trademark of Hilti AG, Schaan

= ---

Check

VSd
= 0.00
VRd,c

Page 114
Customer No.:

Page:

Location:

Quotation:

Hilti AG
FL-9494 Schaan
HAP v3.3c

Project:

GHANTOOT

List No.:
Phone:

Date:

Resp.: PSK

Project name: 15MVA PWR. TXR.

Concrete pryout failure


k= 2.0
NRk,c = 112.7 kN

Characteristic value for the anchor group


Partial safety factor

VRk,c = 225.3 kN
Mc = 1.80

Design value of resistance

27-01-2009

HSA-M12

Factor for short stiff anchors


Characteristic value for the anchor group

VRd,c =

VRk,c
Mc

Data and results must be checked for agreement with the actual existing conditions and for plausibility!
HAP v3.3c 2003 Hilti AG, FL-9494 Schaan

4 of 4

Anchor fastening design

Hilti is a registered Trademark of Hilti AG, Schaan

= 125.2 kN

Check

VSd
= 0.08
VRd,c

Page 115

DERBY DESIGN

Project:

33/11kv Package Unit Substation at Sir Baniyas Date

25-Apr

Client:

ADDC

Design

SKS

Checked

PSK

Main
contractor:

RANYA CONTRACTING ESTABLISHMENT

Rev No.

Approved

SAK

Structure:

POWER TRANSFORMER

Rev Date

DESIGN OF END BEARING PLATE


Check For Shear & Bearing capacity of plate
Ref : pg16/3 Design guide to BS5950
Shear force
No. of bolts in the shear direction in one row
Dia of bolt
Plate thick
Length of plate in shear direction
Edge distance of top bolt
Bearing strength of the plate

a) Shear
Basic requirement

V=
n=
db =
tp =

10
2

kN

12

mm

12

mm

lp =
e2 =

300

mm

50

mm

py =
Pbs =

275

N/mm2

460

N/mm2

Pvp =

0.6 py Av

Av =
=
Dh =
Av =

0.9Anet
0.9 tp (lp - 2 Dh)
14
mm

V/2 <= Pvp

Shear capacity of the plate,

Hole dia per Table 36 BS5950-1

Pvp =
V/2 =

2635.2
434.8

mm2
kN

V/2 < Pvp. Ok

b) Bearing
Basic requirement

V/2 <= Pbs

& For the top bolt

Pbs = db tp pbs <= 1/2 e2 tp pbs

For n rows of bolt

db tp pbs =
1/2 e2 tp pbs =
Check, db tp pbs <= 1/2 e2 tp pbs =

66.24

kN

138

kN

Pbs =
Pbs =
=
V/2 =

66.24

Check Ok.
kN

n Pbs
132.48
5

kN

V/2 < Sigma_Pbs. Ok

Page

Page 116

INPUT DRAWING

Page 117

Page 118

Page 119

Page 120

Page 121

SOIL REPORT

Page 122

Page 123

STRUCTURAL DRAWINGS

Page 124

Page 125

Page 126

Page 127

Anda mungkin juga menyukai