Anda di halaman 1dari 3

Engr.

Muhammad Adnan
: adnan_889@hotmail.com,
th

00923455237393, ,DOB: 29
Objectives

August 1984

To continue my career as an engineer, I am seeking a challenging position to further my knowledge and skills in Electrical Engineering with fast growing field of telecom industry 2010feb2013 Oct2010

Education MS(Electrical Engineering) FAST University CCNA security Cisco certified network Associate ID:CSCO11645513 CCNA Cisco certified network Associate ID:CSCO11645513 ZTE GSM BSS Training Level B Related course work: GSM ,BSC Configuration, BTS configuration in BSC and BTS installation and maintenance/trouble shooting ZTE university centre ,UET Lahore Bachelor of Electrical Engineering (Telecommunication) COMSATS Institute of Information Technology, Islamabad.

Oct2009 Nov 2008

20022007

Huawei (MS Project PMCL, AMS Dept) March 2013 to Present Manage and reduce the OPEX and Capex Identify and plan the HOTO of the project. Manage KCPs and DRs of fueling and power. Design the SOPs of fueling and power bill. Identify faulty dry contact alarms and escalate to teams. Allocate fuel as per running hours. Manage fueling teams. Manage emergency fueling. Interface with the customer for reconciliation of fuel and power bills. Manage power cube alarms. ZTE(NOC Manager PMCL FLM project) March 2012 to Feb 2012 Making daily KPIs of network and calculating network availability, site fluctuation and escalate and bts KPIs and escalate to FLM teams and get the feedback Escalate the feed to management and follow-up the issue Make site fluctuation report and sites outage report Manage the escalation of sites to cluster owner through team provided Manage aging SMS and other SMS generated from technical NOC Manage on call help from technical NOC which include loop test site status. Interfacing the Customer regarding network issues Manage fueling NOC. Manage fueling NOC team, which include fuel allocation to sites. Make fuel consumption report and fuel pouring report on daily basis. Managing Security NOC and design SOPs for security NOC for smooth operations ZTE (ZTE/Zong Managed services Project Lahore) Team Lead ZTE OMCR December 2008 to December2010 As team lead I have to manage the procedure of Open , close ,escalate TT of down sites and alarms and take feed back Manage on call support to site engineers. ( Loop test, Alarm information and sites status etc) Work order escalation and clearance Making monthly KPIs for expected KPI according to SLA Designed a full procedure to inform all kinds of problem related to BTS sites using my experience Manage ,make and analyze the reporting of fluctuating BTS sites , down BTS sites ,outage per BTS(OMT) ,Pie chart of BTS outage reasons, Alarm fluctuations of BTS sites and Alarms on BTS sites, SDCCH outage ,TCH CDR of BTS sites, Traffic on BTS sites, cell outage using BSC client ,TT report and support field engineer on call for checking BTS site status, history and transmission NMS report. Create and reconfigure sites when required.

Field Engineer/ Team lead March 2008 to December 2008 Manage, audit and lead Fops and managed services teams and give level II support to sub con teams and interface with CMPAK as Team lead Perform Corrective and preventive maintenance and installations as Field engineer on ZTE BTS, Ericsson minilink and microwave links, Alcatel and DG telecom microwave and power equipment. Check sub con of DG and AC performing Corrective and preventive maintenance. Maintain and investigate issues related to sites like theft and guard and owner payment issues and report it to customer and generate work order to minimize outage. Loop testing, media issue and patch from site to BSC. Identify fault and trouble shoot of microwave link. Myson Engineering System (Mobilink/Myson microwave project Lahore) February 2007 to February 2008 As project coordinator I have to fully manage microwave Bracing project and report to PM my responsibility included assigning areas using Map info ,and take daily feedback, manage their resources, solve their issues and report un solved issues to PM. As filed engineer I my duties was to deploy NEC microwave links and perform basic NMS activities using NCT and PMNT. Tools used in this process are Map info, GPS and PNMT Configuration and deployment of NEC Pasolink Microwave links as per transmission plan

Achievements

Took over first site from CMPAK in front of all higher management on ZTE behalf Did the PM 1st time on behalf of ZTE as field engineer Did 1st trouble shoot on behalf of ZTE as field engineer Pioneer of ZTE managed services Project Pakistan Started ZTE OMCR in Lahore as Team lead

Permanent Address:

H. No. 747, Street No. 45-C Pak PWD housing society, Islamabad, H. No. 58-A New Muslim town Lahore Programming in Matlab, Cricket, Football, Martial arts, Kick Boxing, Stamp collection, Coin collection and video Gaming

Hobbies:
Inamullah Team Lead 00923145111174 Mr. Star Project Manager Ph:-00923134459179

Refenences

Anda mungkin juga menyukai