Page: 1 of 2
4.309
0.350
0.300
20 o
2.50
2.000
0.500
0.200
2.000 x
FIG. 1.
2.000
Main Column
t
t-m
t-m
t
t
=
=
=
=
=
D+W
1.482
0.000
9.030
1.200
0.000
D+L
2.450
0.000
2.554
0.294
0.000
t
t
=
=
20.825
0.000
2.450
0.000
m
m
m
m
m
m
m
m
=
=
=
=
=
=
=
=
2.500
0.300
0.500
0.350
0.200
0.500
2.000
2.000
2.500
0.300
0.500
0.350
0.200
0.500
2.000
2.000
Angle of repose
30
30
t/m2
12.2
12.2
m
t/m3
15.000
15
1.76
1.76
t/m3
2.4
2.4
t-m
t-m
=
=
3
9.03
0.735
2.554
m
m
=
=
2.000
2.000
2.000
2.000
4.309
4.309
m
m2
4.309
4.309
m
m
=
=
cum
cum
t
t-m
t-m
=
=
=
=
=
=
=
t-m
t-m
=
=
=
=
t
2.4 t
t
1.70 x
t
t
t
t-m
t-m
m2
=
=
=
1.76 =
=
=
=
=
=
PLx
Ply
Density of soil
Density of concrete
1.3 CHECK FOR OVERTURNING
Total BM along X-axis
=
0.000 +
1.200 x
2.500
Total BM along Y-axis
=
9.030 +
0.000 x
2.500
To resist the structure against overturning soil frutum formed from the edge of slab at an
angle of f (Angle of repose), half the frutum so formed will resist the overturning
Side of soil frustum at bottom along conductor
Side of soil frustum at bottom across conductor
Side of soil frustum at top along conductor
=
2.000 +
2 x{
2.000 x tan
(
30 )}
Side of soil frustum at top across conductor
=
2.000 +
2 x{
2.000 x tan
(
30 )}
Area of frustum at bottom
A1
2.000 x
A2
=
4.309
h
= h
x( A1
=
2.000 x(
4
Volume of half frustum
= 20.79316 /
2
Weight of half frustum
= 10.39658 x
1.76
Resisting moment
= 18.29798 x
2.000
Overturning moment along x-axis due to soil frustum
Factor of safety
= 18.29798 /
3
Permissible factor of safety
Resisting moment
= 18.29798 x
Overturning moment along y-axis
Factor of safety
= 18.29798 /
Permissible factor of safety
1.4 CHECKING FOR SOIL PRESSURE
Dead load of Base slab
=
2.000
Dead load of Trap. Slab
=
0.300
Dead load of pedestals
=
1
Dead load of soil
=(
2.000
Total dead load on foundation
Load from columns
Total vertical load
Max. B. M. at base along x-axis
Max. B. M. at base along y-axis
2.000
4.309
+ A2
+ sqrt(A1 x A2 )} / 3
+ 18.57094 + 8.618802 )/
3
2.000 /
9.03
x
x(
x
x
=
2.000
4
0.500
2.000
1.920
x
+
x
+
0.200
0.7225
0.350
4
1.541
14.175 +
1.482
Area of base
2.000 x
2.000
2.000 x
2.000 x
18.5709376 18.5709376
2.000
2.000
20.7931599
10.3965799
18.2979807
18.2979807
3
6.09932689
1.5
Hence OK
18.2979807
9.030
2.02635445
1.5
Hence OK
20.7931599
10.3965799
18.2979807
18.2979807
0.735
24.8952118
1.5
Hence OK
18.2979807
2.554
7.16444036
1.5
Hence OK
1.920
1.541
0.840
9.874
14.175
1.482
15.657
0.000
9.030
1.920
1.260
4.800
8.976
16.956
2.45
19.406
0.000
2.554
4.000
4.000
x
+
x
x
+
2.4
1.7
2.0
0.500
0.840
2.000 /
m3
1.33333333 1.33333333
1.33333333 1.33333333
)/
x
x
+
3 x
2.4
0.350 )x
9.874
2.000 x
2.000 x
15.657 /
4.000
t/m2
3.914
4.852
0.000 /
1.333333
t/m2
0.000
0.000
9.030 /
1.333333
t/m2
6.773
1.916
10.687
-22.528
#VALUE!
t/m
33.215
#VALUE!
t/m2
=
=
=
3.914 +
1.76 x(
10.687 -
2.000 /
0.000 +
2.20 -
t/m
6.773
t/m
15 )
-22.528
6.767
11
11
#VALUE!
#VALUE!
1
#VALUE!
0.75
0.75
Unsafe
1.5 DESIGN OF BASE SLAB
Neglecting soil pressure, net pressure
Consider width of foundation
Upward load
Cantilever along X-axis
Cantilever across Y-axis
Maximum b.m. along x-axis
Maximum b.m. along y-axis
Maximum of above two
=
33.215
=(
2.000
=(
2.000
= wll/2
= 33.21475
= 33.21475
x
-
1
0.850 )/
0.350 )/
x
x
0.575 x
0.825 x
2
2
0.575 /
0.825 /
2
2
t/m2
m
t/m
m
m
=
=
=
=
=
33.215
1
33.21475
0.575
0.825
t-m
t-m
t-m
kg-m
=
=
=
=
5.49081336
11.3033946
11.3033946
11303.3946
#VALUE!
#VALUE!
#VALUE!
#VALUE!
Status: 5/9/2013
Page: 2 of 2
c
m
n1
= 66.66667
=
14
= n/d
=
14
=
1
=
0.5
a1
q
=
0.5
1.52 CHECKING FOR DEPTH OF SLAB
Effective depth required
= Sqrt
= Sqrt
Overall depth of slab
Clear Cover
Dia of main Reinforcement along x-axis
Dia of main Reinforcement along y-axis
Effective depth provided =
500
kg/cm2
=
x
x
x
=
=
2
2300 kg/cm
m c /( m c + t )
66.66667 /(
n1
/
a1
x n1
0.90378 x
14 x 66.66667 +
3
x c
0.28866 x
66.66667
{ BM
/( q
x B
{ 11303.39 / 8.696166 x
50 -
MFe-
20
415
2300 )=
=
=
0.28866
0.90378
2
8.696166 kg/cm
)}
1 )}
cm
mm
mm
mm
mm
mm
cm
cm
=
=
=
=
=
=
=
=
36.05
500
50
10
10
445
44.5
36.05
Hence OK
2300 )
cm2 / m
5.94
100
cm / m
6.675
cm2 / m
cm c/c
mm c/c
=
=
=
6.675
11.7662646
110
mm c/c
mm c/c
1335
110
1335
#VALUE!
2300 )
cm2 / m
12.22
#VALUE!
100
cm / m
6.675
cm2 / m
cm c/c
mm c/c
=
=
=
12.2196364
6.4273448
60
mm c/c
mm c/c
1335
60
1335
#VALUE!
t
t
t-m
t-m
t
t
kg/cm2
=
=
=
=
=
=
5.206
0.000
0.000
9.030
5.21
0.00
0.613
0.000
0.000
2.554
0.61
0.00
2.0825
0.245
kg/cm2
cm2
mm
nos.
cm2
=
=
=
mm
mm
mm
mm
mm c/c
=
=
=
=
=
t
cm2
kg/cm2
=
=
=
#VALUE!
kg/cm2
2300
2300
#VALUE! Hence OK
Cum
Cum
Cum
Cum
Cum
=
=
=
d reqd.
1.53 Reinforcement Design along x-axis
Area of steel reqd.
= BM
=
=
/( a1
549081.3 /(
0.15 %
0.15 x
=
=
44.5 x
0.15 x
100 /
445
x d
0.90378 x
44.5 x
= 78.53982 /
6.675
3 x d
3 x
110 mm c/c
/( a1
1130339 /(
0.15 %
x t
44.5 x
= 78.53982 /
=
=
So provide
10 mm bars @
1.54 Reinforcement Design y-axis
Area of steel reqd.
= BM
x d
0.90378 x
#VALUE!
500
50
10
10
445
44.5
#VALUE!
#VALUE!
x t
#VALUE!
6.675
#VALUE!
#VALUE!
#VALUE!
44.5 x
100 /
12.21964
=
3 x d
=
3 x
445
So provide
10 mm bars @
60 mm c/c
1.6 DESIGN OF PEDESTAL
To accommodate the Anchor bolts & bearing plate, the size of pedestal is decided as
1.61 Check in Compression
Maximum Compressive force on main leg
Maximum Tensile force on main leg
Max BM along x-axis
Max BM along y-axis
Max compression per leg
=
5 /
1
Maximum tension per leg
=
0 /
1
6.675
#VALUE!
#VALUE!
#VALUE!
5206 /(
50 x
500 x
50 )
53.3333333 53.3333333
Hence OK
Hence OK
0.8 %
0.008 x
5 x
50 x
50
500
2.01
20
16
5
20
16
10
8
500
256
300
250
20.11
Hence OK
8
500
256
300
250
=
Hence OK
0 /
0.000
0.000
20.11
0
-x-x-x-xBill of Quantities
Base slab
Tapered Slab
Pedestals
2.000 x
2.000 x
0.500 x
2.000 x
2.000 x
0.500 x
0.200
0.18
2.000 x
1
say
Jal Reinforcement
Bar dia along x-axis
Spacing of bars along x-axis
Bar dia along y-ayis
Spacing of bars along y-ayis
Pedestals
No. of Main bars
Dia of main bars
Dia of rings
Spacing of rings
mm
mm
mm
mm
0.8
0.72
0.5
2.02
2.5
10
110
10
60
5
16
8
250
0.8
0.72
0.5
2.02
2.5
Adopt
10
10
#VALUE! #VALUE!
10
10
#VALUE! #VALUE!
10
16
8
250
-x-x-x-x-
Status: 5/9/2013