A.- DATOS
gc=
2.4 t/m3
El
20.00 cm
f =
24
le
3.00 m.
0.00 cm
fc =
210 kg/cm2
Ea
fy =
4200 kg/cm2
ga=
st =
0.79 kg/cm2
Er
FSD =
1.5
FSV =
1.75
gm =
2 t/m3
0.00 cm.
1.80 t/m3
S/C
480 Kg/ml
Asfalto =
0 Kg/ml
Relleno =
0 Kg/ml
WD=
WDu = 1.5*WD =
Mpp=Wdu*le2/8=
810 Kg/ml
480 Kg/ml
720 Kg/ml
8000
E=1.219+.06*le
m
Kg-m/m
6000 Kg-m
E=
1.399
Ms/c=P*le*/(4*E)=
4288.78
I=
0.30
MIu=Ms/c*
MIu=
1800
Kg-m
8610
Kg-m
15.21
cm
Mu = f b d 2 fc w (1-0.59w) .............1
Considerando :
f=
0.9
b=
100 cm
fc =
210 kg/cm2
Si w 0
=.0787308
r=w f`c/ fy=
rb=
0.021
rmax=0.75*rb=
0.016
Si fc y fy son conocidos
As= p*b*d =
OK
0.0039
2
5.99 cm
>r
OK
f 3/8" @ =
f 1/2" @ =
f 5/8" @ =
12 cm
21 cm
33 cm
2
3.04 cm
23 cm
42 cm
65 cm
2
3.60 cm
20 cm
35 cm
55 cm
DISEO ALCANTARILLA
A.- PREDIMENSIONAMIENTO
Luz de Alcantarilla L =
2 m
16.66666667 cm
Espesor h=
20 cm
2.4 t/m3
le
2.20 m.
fc =
210 kg/cm2
24
Ea
5.00 cm
fy =
4200 kg/cm2
ga=
st =
0.79 kg/cm2
Er
FSD =
1.5
FSV =
1.75
gm =
2 t/m3
0.00 cm.
1.80 t/m3
S/C
480 Kg/ml
Asfalto =
100 Kg/ml
Relleno =
WD=
WDu = 1.5*WD =
Mpp=Wdu*le2/8=
0 Kg/ml
526.35 Kg/ml
580 Kg/ml
870 Kg/ml
8000
E=1.219+.06*le
m
Kg-m/m
4400 Kg-m
E=
1.351
Ms/c=P*le*/(4*E)=
3256.85
I=
0.30
MIu=Ms/c*
MIu=
1320
Kg-m
6246.35
Kg-m
15.21
cm
Mu = f b d 2 fc w (1-0.59w) .............1
Considerando :
f=
0.9
b=
100 cm
fc =
210 kg/cm2
Si w 0
=.0787308
r=w f`c/ fy=
Si fc y fy son conocidos
0.021
OK
rmax=0.75*rb=
As= p*b*d =
f 3/8" @ =
f 1/2" @ =
f 5/8" @ =
2
5.99 cm
12 cm
21 cm
33 cm
2
3.04 cm
23 cm
42 cm
65 cm
0.016
2
3.60 cm
20 cm
35 cm
55 cm
>r
OK