MENANCIO
Permanent Address & Contact Detail: Block 1 Lot 8 Felicias Village Brgy. Banlic, Cabuyao, Laguna Philippines 4025 Tel. No.: +63-49-8322341 Mobile No. 0915-1119436
Professional Qualification:
Registered Mechanical Engineer RME #24485, April 1983 Professional Regulation Commission Manila, Philippines
Piping Supervisor Sanko Engineering Corporation Pulau Ayer Merbau, Singapore Project Engineer Australian Consolidated Industries Calamba. Laguna, Philippines Planner Turnaround Projects Al Yusr Townsend and Bottum Co. Ltd. Jubail, Saudi Arabia Mechanical Engineer Engineering and Construction Corp. of Asia Pasig, Metro-Manila, Philippines Site Engineer HM Al Barghash Establishment Al Thoqbah, Saudi Arabia Piping Chargehand Engineering Equipment Inc. Fahil, Kuwait Mechanical Engineer Engineering Equipment Inc. Pasig, Metro-Manila, Philippines
Saudi Aramco Karan Sulfur and Manifa Gas Project Karan Sulfur and Manifa Gas Facilities Project Inspection Unit Khursaniyah, Saudi Arabia Saudi Aramco Khursaniyah Oil Producing Facilities Project Saudi Aramco Khursaniyah Gas Plant Project Khursaniyah Oil Producing Facilities and Gas Projects Inspection Units Khursaniyah, Saudi Arabia
Sanko Engineering Corp. Palau Ayer Merbau, Singapore Capital Expenditures Projects (CAPEX Projects) Australian Consolidated Industries Insulation (Phils), Inc. Laguna, Philippines Safety & Security Improvements Project, PBI 8312, CT 95606 Dhahran Bulk Loading Plant & Terminal Oil Storage Areas Petromin Marketing Dhahran, Saudi Arabia Mina Abdullah Refinery Modernization Project Kuwait National Petroleum Co. State of Kuwait
Al Yusr Townsend and Bottum Co., Ltd. Jubail, Saudi Arabia Projects Involved with: Annual Turnaround of Seawater Intakes System Saline Water Conversion Corporation (SWCC) Jubail, Saudi Arabia Annual Maintenance of Port Bulk Loading Arms National Methanol Co. (Ar-Razi) Jubail Industrial Port, Saudi Arabia Re-tubing of Furnace # 1 Arabian Petrochemical Co (Petrokemya) Jubail Industrial City, Saudi Arabia Plants Equipment and Piping Modification Works (Testing & PreCommissioning Support) National Titanium Dioxide Co., Ltd. (Cristal) Yanbu Industrial City, Saudi Arabia Major Shutdown 1991 Petromin-Shell Refinery Co. (Petromin-Shell) Jubail Industrial City, Saudi Arabia Annual Turnaround of Air Separation Units 21 & 22 National Gas Co. (GAS) Jubail Industrial City, Saudi Arabia 1992 Annual Maintenance Saudi Arabian Fertilizer Co (SAFCO) Dammam Industrial City, Saudi Arabia 1992 & 1993 Quarterly Shutdown of PVC-VCM Plants Arabian Petrochemical Co (IBN HAYYAN) Jubail Industrial City, Saudi Arabia 1993 Major Turnaround Saudi Petrochemical Co (SADAF) Jubail Industrial City, Saudi Arabia Sep 1990 to Dec 1990 Engineering and Construction Corporation of Asia Engineering Department Pasig City, Philippines Projects Involved with: Construction of 5-Megawatt Diesel Power Plant Kimberly Clark Phils, Incorporated San Pedro, Laguna, Philippines Construction of Telecommunication Facilities & Relay Stations for Luzon and Visayas Grids DOTC-Alcatel Project Philippines Mar 1983 to Feb 1984 Engineering Equipment Incorporated Petrochemical Section/Energy Construction Division/Engineering Department Pasig City, Metro-Manila, Philippines Domestic/Local Projects Handled/Involved:
Revamp of CDU-2 Fractionation Column Trays and Piping System Caltex Philippines Batangas Refinery Re-shelling and re-painting of Cone Roofed Oil Storage Tank (TK501) Caltex Phils PICOP Depot Bislig, Surigao del Sur Design, Fabrication and Delivery of Five- (5) Units 1000 Gal capacity Bullet type LPG Tanks Pilipinas Shell Petroleum Corp Batangas Refinery Design, Fabrication and Installation of Three (3) Twin Units of 40 000, 50 000 and 60 000 Gal capacity Liquid Carbon Dioxide Bullet type Tanks Petrophil Metro-Manila Depots Fabrication and Installation of Miscellaneous Spool Piping Petrophil Lube Oil Refinery Pililla, Rizal Fabrication, Installation and Commissioning of Centralized A/C System of New Offices and Laboratory Buildings Columbian Carbon Philippines Inc. Limay, Bataan Overseas Projects Involved with: Fabrication and Delivery of 25 Units Miscellaneous Process Vessels Esso Malaysia FOB Sijingkat Fabrication, Installation and Commissioning of Centralized A/C System of New Buildings and Offices of New Sijingkat Shipyard Co. Jurong Engineering-New Sijinkat Shipyard Project Sijinkat, Malaysia
Personal Data:
Date of Birth: Place of Birth: Sex: Civil Status: Height: Educational Attainment: June 8, 1958 Sta. Cruz, Laguna, Philippines Male Married 167 cm B.S. Mechanical Engineering Graduate October 1979, National University Manila, Philippines ASNT Level II Examiner RT, UT, LPT, MPT Organization / Leadership Role: Saudi Aramco Project Management Team SuperintendentRiyadh Refinery Sulphur Recovery Plant Project PetroRabigh Project Management Team Lead Engineer/Site Superintendent-Refining Plants Projects Saudi Aramco Projects Inspection Division Engineer IIKhursaniyah Oil and Gas Plants Projects, Manifa Gas Processing and Karan Sulfur Facilities Projects LSTK-2 Computer Literacy / Operation:
Microsoft Windows, Office Definity by Intermat ESP4 by Saudi Aramco Seminars/Training Courses Attended: Courses Title: ASNT NDT Level II RT, UT, LPT, MPT Date/Venue: May June 2010 / Jubail, Saudi Arabia Resource/Sponsor: Axis Testing Technology Beyond Safety October 2009 / Saudi Aramco Dammam Offices Building Randy Smith / Saudi Aramco Management Course for Supervisors October December 1985 / ATMI Calamba Plant R.C. Tuazon / Asia Textile Mills, Incorporated Fire Safety-Basic First Aide Course November 1983 / EEI Technology Center EEI Safety Training Staff / Engineering Equipment, Incorporated Integrated Engineers Development Program March - June 1983 / EEI Technology Center EEI Training Staff / Engineering Equipment, Incorporated Basic Management System April 1982, Development Academy of the Philippines F.R. Barrientos & Associates / Tri Union Industrial Corporation