Anda di halaman 1dari 21

Sheet 1 of 21

BAR BENDING SCHEDULE


Contract:

Department:

Name of Work:- Reinforcement Detail of P.C. Girder

Contractor:

Mark

Dia
(mm)

No. of
Bars

Total
Bars

Cut Length Total Length


(m)
(m)

Spacing
(mm)

Lap
(m)

Unit Wt
(Kg/m)

Total Weight
(Kg)

Shape

Remarks

3000

0.393

10

0.614

12

0.884

12000

16

1.572

4570

20

2.456

12000

25

3.838

850
5470

1025

1420

32

200 c/c

6.287

12000

40

200 c/c

9.824

2410

Sheet 2 of 21

BAR BENDING SCHEDULE


Contract:

Department:

Name of Work:- Reinforcement Detail of P.C. Girder

Contractor:

Mark

Dia
(mm)

No. of
Bars

Total
Bars

Cut Length Total Length


(m)
(m)

Spacing
(mm)

Lap
(m)

Unit Wt
(Kg/m)

Total Weight
(Kg)

Shape

Remarks

5170
850

12000

470
50

1600

193-378 avg
50

1600

100
50

1600

100
50

1600

265
120
470

Sheet 3 of 21

BAR BENDING SCHEDULE


Contract:

Department:

Name of Work:- Reinforcement Detail of P.C. Girder

Contractor:

Mark

Dia
(mm)

No. of
Bars

Total
Bars

Cut Length Total Length


(m)
(m)

Spacing
(mm)

Lap
(m)

Unit Wt
(Kg/m)

Total Weight
(Kg)

Shape

Remarks

265
170
210

975

350

150

1515
135

Total:

0.00

Sheet 4 of 21

BAR BENDING SCHEDULE


Contract:

Department:

Name of Work:- Reinforcement Detail of Right Abutment

Contractor:

Mark

Dia
(mm)

No. of
Bars

Total
Bars

Cut Length Total Length


(m)
(m)

101

20

38x2

76

8.645

102

20

60x2

120

6.000

Spacing
(mm)

Lap
(mm)

Unit
(Kg/m)

Total Weight
(Kg)

657.020

120 c/c

--

2.470

1622.84

720.000

120 c/c

--

2.470

1778.40

Shape
(mm)
7145
750

750
4500

103

12

3x2

4.460

26.760

--

--

0.888

23.76

104

12

3x2

8.605

51.630

--

--

0.888

45.85

4460

750
7105

105

12

29x1

29

1.960

56.840

200 c/c

750

0.888

50.47

300
1960

105a

12

38x1

38

1.960

74.480

150 c/c

750

0.888

66.14

106

20

2x4

2.410

19.280

--

1200

2.470

47.62

1960

300

300
2110

107

12

17x1

17

7.365

125.210

150 c/c

--

0.888

111.19

600
6165

Remarks

Sheet 5 of 21

BAR BENDING SCHEDULE


Contract:

Department:

Name of Work:- Reinforcement Detail of Right Abutment

Contractor:

Mark

Dia
(mm)

No. of
Bars

Total
Bars

108

12

38x1

38

Cut Length Total Length


(m)
(m)
3.206

121.830

Spacing
(mm)

Lap
(mm)

Unit
(Kg/m)

150 c/c

--

0.888

Total Weight
(Kg)

Shape
(mm)

Remarks

183

108.19
3023
3060

109

12

29x1

29

4.330

125.570

200 c/c

--

0.888

111.51

110

20

2x4

3.182

25.460

--

--

2.470

62.89

1270

159
3023

111

25

8+8

16

7.365

117.840

--

--

3.860

454.86

600
6165

112

12

13x1

13

7.365

95.750

200 c/c

--

0.888

85.03

600
6165
2570

113

16

3x1

4.090

12.270

--

--

1.580

19.39

760

114

12

21x1

21

2.065

43.370

125 c/c

--

0.888

38.51

760

115

25

5x1

8.515

42.580

--

--

3.860

164.36

545

1200
6115

Sheet 6 of 21

BAR BENDING SCHEDULE


Contract:

Department:

Name of Work:- Reinforcement Detail of Right Abutment

Contractor:

Mark

Dia
(mm)

No. of
Bars

Total
Bars

115a

20

5x1

Cut Length Total Length


(m)
(m)

Spacing
(mm)

Lap
(mm)

Unit
(Kg/m)

--

--

2.470

Total Weight
(Kg)

Shape
(mm)

Remarks

6115

8.515

42.580

105.17

1200
200

116

29x1

29

3.599

104.370

200 c/c

--

check dia

#VALUE!

2129

1270
2092

117

29x1

29

2.484

72.040

200 c/c

--

check dia

#VALUE!

118

2x4

2.484

19.870

--

--

check dia

#VALUE!

119

8x2

16

7.365

117.840

200 c/c

--

check dia

#VALUE!

120

14x1

14

2.210

30.940

200 c/c

1000

check dia

#VALUE!

200

2092
200

600
6165

300

1960

121

18x1

18

2.210

39.780

150 c/c

1000

check dia

#VALUE!

1960
300

Sheet 7 of 21

BAR BENDING SCHEDULE


Contract:

Department:

Name of Work:- Reinforcement Detail of Right Abutment

Contractor:

Mark

Dia
(mm)

No. of
Bars

Total
Bars

Cut Length Total Length


(m)
(m)

Spacing
(mm)

Lap
(mm)

Unit
(Kg/m)

Total Weight
(Kg)

122

20x1

20

4.170

83.400

150 c/c

--

check dia

#VALUE!

123

16x1

16

3.920

62.720

200 c/c

--

check dia

#VALUE!

124

8x1

4.894

39.150

200 c/c

--

check dia

#VALUE!

Shape
(mm)
1000

Remarks

2970
200

750

2970

200

300
4594

125

11x1

11

4.562

50.180

150 c/c

--

check dia

#VALUE!

126

7x1

3.110

21.770

150 c/c

--

check dia

#VALUE!

4562

300
2810

127

5x1

3.110

15.550

200 c/c

--

check dia

300

#VALUE!
2810

1000

128

8x1

3.970

31.760

150 c/c

--

check dia

#VALUE!

129

6x1

3.720

22.320

200 c/c

--

check dia

#VALUE!

1620/3920
200

750

1620/3920

200

Sheet 8 of 21

BAR BENDING SCHEDULE


Contract:

Department:

Name of Work:- Reinforcement Detail of Right Abutment

Contractor:

Mark

Dia
(mm)

No. of
Bars

Total
Bars

Cut Length Total Length


(m)
(m)

Spacing
(mm)

Lap
(mm)

Unit
(Kg/m)

Total Weight
(Kg)

Shape
(mm)

Remarks

1000

130

3x2

4.920

29.520

--

--

check dia

4x2

2.744

21.950

150 c/c

--

0.888

520

#VALUE!

3400

750

131

12

19.49

120
710

405

132

12

21x2

42

1.580

66.360

200 c/c

--

0.888

58.93

240

300
1000

133

12

21x2

42

1.966

82.570

200 c/c

576

0.888

73.32 1.04

134

20

3x2

5.664

33.980

--

--

2.470

83.93

135

12

5+5(2)

20

3.720

74.400

--

--

0.888

66.07

136

16

2x2

3.695

14.780

150 c/c

--

1.580

23.35

Sheet 9 of 21

BAR BENDING SCHEDULE


Contract:

Department:

Name of Work:- Reinforcement Detail of Right Abutment

Contractor:

Mark

Dia
(mm)

No. of
Bars

Total
Bars

Cut Length Total Length


(m)
(m)

Spacing
(mm)

Lap
(mm)

Unit
(Kg/m)

137

12

2x2

3.695

138

12

40x1

40

139

12

40x1

140

12

141

12

14.780

200 c/c

--

0.888

13.12

3.920

156.800

150 c/c

--

0.888

139.24

40

4.030

161.200

150 c/c

--

0.888

143.15

55x1

55

5.405

297.280

--

--

0.888

263.98

40x1

40

2.155

86.200

150 c/c

--

0.888

76.55

Total:

Total Weight
(Kg)

#VALUE!

Shape
(mm)

Remarks

Sheet 10 of 21

BAR BENDING SCHEDULE


Contract:

Department:

Name of Work:- Reinforcement Detail of Left Abutment

Contractor:

Mark

Dia
(mm)

No. of
Bars

Total
Bars

Cut Length Total Length


(m)
(m)

Spacing
(mm)

Lap
(mm)

Unit
(Kg/m)

101

20

38x2

76

8.645

102

20

60x2

120

103

12

3x2

104

12

105

Total Weight
(Kg)

657.020

120 c/c

--

2.470

1622.84

6.000

720.000

120 c/c

--

2.470

1778.40

4.460

26.760

--

--

0.888

23.76

3x2

8.605

51.630

--

--

0.888

45.85

12

29x1

29

4.715

136.740

200 c/c

--

0.888

121.43

106

20

2x4

2.410

19.280

--

--

2.470

47.62

107

12

11x1

11

7.365

81.020

150 c/c

--

0.888

71.95

108

12

38x1

38

3.604

136.950

150 c/c

--

0.888

121.61

Shape
(mm)

Remarks

Sheet 11 of 21

BAR BENDING SCHEDULE


Contract:

Department:

Name of Work:- Reinforcement Detail of Left Abutment

Contractor:

Mark

Dia
(mm)

No. of
Bars

Total
Bars

Cut Length Total Length


(m)
(m)

Spacing
(mm)

Lap
(mm)

Unit
(Kg/m)

109

25

5x1

8.515

110

20

2x4

111

25

8+8

112

12

113

Total Weight
(Kg)

42.580

--

--

3.860

164.36

2.431

19.450

--

--

2.470

48.04

16

7.365

117.840

--

--

3.860

454.86

9x1

7.665

68.990

200 c/c

--

0.888

61.26

16

3x1

3.770

11.310

--

--

1.580

17.87

114

12

21x1

21

1.845

38.750

125 c/c

--

0.888

34.41

115

25

5x1

8.515

42.580

--

--

3.860

164.36

116

12

29x1

29

3.595

104.260

200 c/c

--

0.888

92.58

Shape
(mm)

Remarks

Sheet 12 of 21

BAR BENDING SCHEDULE


Contract:

Department:

Name of Work:- Reinforcement Detail of Left Abutment

Contractor:

Mark

Dia
(mm)

No. of
Bars

Total
Bars

Cut Length Total Length


(m)
(m)

Spacing
(mm)

Lap
(mm)

Unit
(Kg/m)

117

10

29x1

29

2.484

118

20

2x4

119

10

8x2

120

12

121

Total Weight
(Kg)

72.040

200 c/c

--

0.620

44.66

2.484

19.870

--

--

2.470

49.08

16

7.365

117.840

200 c/c

--

0.620

73.06

8x1

2.210

17.680

200 c/c

--

0.888

15.70

16

11x1

11

2.210

24.310

150 c/c

--

1.580

38.41

122

16

15x1

15

4.266

63.990

150 c/c

--

1.580

101.10

123

12

11x1

11

4.016

44.180

200 c/c

--

0.888

39.23

124

12

8x1

4.069

32.550

200 c/c

--

0.888

28.90

Shape
(mm)

Remarks

Sheet 13 of 21

BAR BENDING SCHEDULE


Contract:

Department:

Name of Work:- Reinforcement Detail of Left Abutment

Contractor:

Mark

Dia
(mm)

No. of
Bars

Total
Bars

Cut Length Total Length


(m)
(m)

Spacing
(mm)

Lap
(mm)

Unit
(Kg/m)

125

16

11x1

11

3.737

126

16

7x2

14

127

12

5x2

128

16

129

Total Weight
(Kg)

41.110

150 c/c

--

1.580

64.95

3.604

50.460

150 c/c

--

1.580

79.73

10

4.045

40.450

200 c/c

--

0.888

35.92

8x2

16

4.285

68.560

150 c/c

--

1.580

108.32

12

7x2

14

4.035

56.490

200 c/c

--

0.888

50.16

130

25

3x2

4.764

28.580

--

--

3.860

110.32

131

12

13x2

26

2.807

72.980

150 c/c

--

0.888

64.81

132

12

21x2

42

1.580

66.360

200 c/c

--

0.888

58.93

Shape
(mm)

Remarks

Sheet 14 of 21

BAR BENDING SCHEDULE


Contract:

Department:

Name of Work:- Reinforcement Detail of Left Abutment

Contractor:

Mark

Dia
(mm)

No. of
Bars

Total
Bars

Cut Length Total Length


(m)
(m)

Spacing
(mm)

Lap
(mm)

Unit
(Kg/m)

133

12

21x2

42

1.966

134

20

3x2

135

12

5+5(2)

136

16

137

Total Weight
(Kg)

82.570

200 c/c

576

0.888

73.32

5.664

33.980

--

--

2.470

83.93

20

3.920

78.400

--

--

0.888

69.62

2x2

3.695

14.780

150 c/c

--

1.580

23.35

12

2x2

3.695

14.780

200 c/c

--

0.888

13.12

138

12

40x1

40

3.920

156.800

150 c/c

--

0.888

139.24

139

12

40x1

40

4.030

161.200

150 c/c

--

0.888

143.15

140

12

55x1

55

5.405

297.280

--

--

0.888

263.98

Shape
(mm)

Remarks

Sheet 15 of 21

BAR BENDING SCHEDULE


Contract:

Department:

Name of Work:- Reinforcement Detail of Left Abutment

Contractor:

Mark

Dia
(mm)

No. of
Bars

Total
Bars

Cut Length Total Length


(m)
(m)

Spacing
(mm)

Lap
(mm)

Unit
(Kg/m)

141

12

40x1

40

2.155

142

25

10x8

80

143

25

14x8

144

10

110x8

86.200

150 c/c

--

0.888

76.55

8.000

640.000

--

1500

3.860

2470.40

112

9.900

1,108.800

--

1500

3.860

4279.97

880

1.917

1,686.960

150 c/c

19170

0.620

1045.92

Total:

Total Weight
(Kg)

14517.03

Shape
(mm)

Remarks

Sheet 16 of 21

BAR BENDING SCHEDULE


Contract:

Department:

Name of Work:- Reinforcement Detail of Abutment Pile & Pier Pile

Contractor:

Mark

Dia
(mm)

No. of
Bars

Total
Bars

Cut Length Total Length


(m)
(m)

Spacing
(mm)

Lap
(mm)

Unit
(Kg/m)

101

20

9x2x2

36

5.620

102

12

31x2

62

103

12

31x2

104

16

105

Total Weight
(Kg)

202.320

--

--

2.470

499.73

4.780

296.360

150 c/c

--

0.888

263.17

62

3.290

203.980

150 c/c

--

0.888

181.13

4x2x2

16

4.090

65.440

--

--

1.580

103.40

12

19x2x2

76

1.815

137.940

150 c/c

--

0.888

122.49

106

12

2x2x2

6.120

48.960

--

--

0.888

43.48

107

12

2x2x2

1.670

13.360

--

--

0.888

11.86

108

25

10x4

40

10.500

420.000

--

1500

3.860

1621.20

Shape
(mm)

Remarks

Sheet 17 of 21

BAR BENDING SCHEDULE


Contract:

Department:

Name of Work:- Reinforcement Detail of Abutment Pile & Pier Pile

Contractor:

Mark

Dia
(mm)

No. of
Bars

Total
Bars

Cut Length Total Length


(m)
(m)

109

25

14x4

56

12.350

691.600

110

10

144x4

576

1.917

1,104.190

Total:

Spacing
(mm)

Lap
(mm)

Unit
(Kg/m)

Total Weight
(Kg)

--

1500

3.860

2669.58

150 c/c

19170

0.620

684.60

6200.64

Shape
(mm)

Remarks

Sheet 18 of 21

BAR BENDING SCHEDULE


Contract:

Department:

Name of Work:- Reinforcement Detail of Deck Slab and Diaphragms

Contractor:

Mark

Dia
(mm)

No. of
Bars

Total
Bars

Cut Length Total Length


(m)
(m)

Spacing
(mm)

Lap
(mm)

Unit
(Kg/m)

101

12

11x4

44

9.120

102

12

11x4

44

101a

10

10x4

102a

10

103

Total Weight
(Kg)

Shape
(mm)

401.280

125 c/c

800

0.888

356.34

12.400

545.600

125 c/c

--

0.888

484.49

40

9.070

362.800

125 c/c

750

0.620

224.94

12000

10x4

40

12.400

496.000

125 c/c

--

0.620

307.52

4570

12

11x2

22

9.520

209.440

125 c/c

800+40
0

0.888

185.98

4570

104

12

11x2

22

12.400

272.800

125 c/c

--

0.888

242.25

103a

10

10x2

20

9.470

189.400

125 c/c

750+40
0

0.620

117.43

104a

10

10x2

20

12.400

248.000

125 c/c

--

0.620

153.76

3000

850
5470

Remarks

Sheet 19 of 21

BAR BENDING SCHEDULE


Contract:

Department:

Name of Work:- Reinforcement Detail of Deck Slab and Diaphragms

Contractor:

Mark

Dia
(mm)

No. of
Bars

Total
Bars

Cut Length Total Length


(m)
(m)

Spacing
(mm)

Lap
(mm)

Unit
(Kg/m)

105

12

42x2

84

6.000

106

12

42x3

126

107

20

42x2

108

16

109

Total Weight
(Kg)

504.000

150 c/c

--

0.888

447.55

9.870

1,243.620

150 c/c

800+75
0

0.888

1104.33

84

12.000

1,008.000

150 c/c

--

2.470

2489.76

396

396

6.295

2,492.820

150 c/c

--

1.580

3938.66

16

479

479

6.295

3,015.310

125 c/c

--

1.580

4764.19

110

12

50x2

100

1.590

159.000

125 c/c

--

0.888

141.19

111

16

2x2

5.995

23.980

--

--

1.580

37.89

112

12

2x2

5.995

23.980

--

--

0.888

21.29

Shape
(mm)

Remarks

Sheet 20 of 21

BAR BENDING SCHEDULE


Contract:

Department:

Name of Work:- Reinforcement Detail of Deck Slab and Diaphragms

Contractor:

Mark

Dia
(mm)

No. of
Bars

Total
Bars

Cut Length Total Length


(m)
(m)

Spacing
(mm)

Lap
(mm)

Unit
(Kg/m)

113

25

4x2

3.100

114

12

6x2(2)

24

115

12

20x2

116

20

117

Total Weight
(Kg)

24.800

--

--

3.860

95.73

3.700

88.800

250 c/c

--

0.888

78.85

40

3.830

153.200

200 c/c

--

0.888

136.04

4x2

6.295

50.360

--

--

2.470

124.39

25

4x2

3.100

24.800

--

--

3.860

95.73

118

12

6x2(2)

24

3.700

88.800

250 c/c

--

0.888

78.85

119

12

20x2

40

3.830

153.200

200 c/c

--

0.888

136.04

120

25

3x2

6.295

37.770

--

--

3.860

145.79

Shape
(mm)

Remarks

Sheet 21 of 21

BAR BENDING SCHEDULE


Contract:

Department:

Name of Work:- Reinforcement Detail of Deck Slab and Diaphragms

Contractor:

Mark

Dia
(mm)

No. of
Bars

Total
Bars

25

2x2x2

Cut Length Total Length


(m)
(m)
3.750

30.000

Total:

Spacing
(mm)

Lap
(mm)

Unit
(Kg/m)

--

--

3.860

Total Weight
(Kg)
115.80

16024.79

Shape
(mm)

Remarks

Anda mungkin juga menyukai