RELEASED Com
All rights reserved. Passing on and copying of this document, use and communication of its contents not permitted without written authorization from Alcatel-Lucent.
2 / 54
Contents
Contents
Preface . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 1 Overview . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 1.1 Presentation . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 1.1.1 Hardware Description - Racks Configuration . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 1.1.2 Cases . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 1.1.3 Options . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 1.1.4 Initial State . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 1.1.5 Final State . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 1.1.6 Restrictions . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 1.1.7 Grouped Task Sequence . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 1.2 Preparation . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 1.2.1 Prerequisites . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 1.2.2 Site-Specific Information . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 1.3 Scheduling . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 1.4 Resources . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 1.4.1 Tools . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 1.4.2 Supplies . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 1.4.3 Applicable Documents . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . Commissioning Tests . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 2.1 Before Going On Site . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 2.2 Before You Start . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 2.2.1 Checks . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 2.2.2 Required Knowledge . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 2.3 Check Hardware . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 2.4 Check Power Supply and Power Up . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 2.4.1 Check the Fuse Ratings . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 2.4.2 Discharge Capacitors in Racks . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 2.4.3 Check Polarity of Power Supply Line, Branch A . . . . . . . . . . . . . . . . . . . . . . . . . . . . 2.4.4 Check Polarity of Power Supply Line, Branch B . . . . . . . . . . . . . . . . . . . . . . . . . . . . 2.4.5 Power Up BSC Racks . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 2.5 Install BSC Terminal and X.25 Board . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 2.5.1 Install X.25 Communication Board and BSC Terminal Software . . . . . . . . . . . . . 2.5.2 Install the Craft Terminal . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 2.5.3 Install the BSS Software . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 2.6 Commissioning Tests . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 2.6.1 Relocate System-CPRCs . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 2.6.2 Load and Activate BSC Software . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 2.6.3 Check Battery Backup of S-CPRC Boards . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 2.6.4 Correct BSC Date and Time . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 2.6.5 Test External Alarms (O1) . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 2.7 BSC Hardware Test (C1) . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 2.7.1 Reboot BSC in Off-Line Test Mode . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 2.7.2 Network Test . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 2.7.3 Broadcast Test . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 2.7.4 Clock Test . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 2.7.5 Reboot BSC in OPERATIONAL Mode . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 2.8 Check BSC-TC Link (O2) . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 2.8.1 Remove Ater Mux Loops . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 2.8.2 Check Alarms on the ASMB Boards . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 2.8.3 Check Status of A Trunk SBLs . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 2.9 Set and Check BSC - 9153 OMC-R Link . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 2.9.1 Connect Modem to CPRC Board . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 2.9.2 Test the Communication Link . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 5 7 8 8 15 15 15 16 16 17 18 18 18 19 20 20 20 21 23 24 25 25 25 26 27 27 27 27 28 28 29 29 29 29 31 31 31 41 42 42 43 43 44 44 45 45 46 46 46 47 48 48 48
3 / 54
Contents
Before You Leave . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . Supplemental Tasks . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 2.11.1 Connect Inter-Rack Cables (Example) . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 2.11.2 Disable / Enable Alarm Reports . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 2.12 Workaround: Exit / Connect WinBSC Terminal . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . Appendix A : Abbreviations . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
2.10 2.11
48 49 49 51 52 53
4 / 54
Preface
Preface
Purpose Whats New
This document describes the commissioning procedure for the 9120 BSC, release B10, of the Alcatel-Lucent BSS.
In Edition 03
Update for new equipment naming.
In Edition 02
Update of system title.
In Edition 01
First official delivery of the document for B10 release.
Audience
This document is intended for: Site administrators Project managers Field service technician Supervisors Occasional users (e.g. subcontractors).
Assumed Knowledge
You must have a basic understanding of the following: Alcatel-Lucent Operations & Maintenance concepts for the Base Station Subsystem Commissioning tools Personal Computers using the Windows 2000/XP environment.
5 / 54
Preface
6 / 54
1 Overview
1 Overview
This Overview gives information needed by projet managers and foremen, for presentation to the customer and for site planning.
7 / 54
1 Overview
1.1 Presentation
1.1.1 Hardware Description - Racks Configuration
The layout of the equipment fitted in each rack for each BSC configuration is given in the sections below. Figures are provided to assist the visual check procedure. The key used in the figures is as follows: CE number at a CPRC unit. = Network address AB = OSI- CPRC AC= SYS- CPRC AA= BC- CPRC number at a DTCC unit number at a TCUC unit = Network address = Network address
NE
number at an QA unit
= Qmux address
SWCH
AS = Access Switch Number GS1/n = Group Switch Stage 1/Plane +Switch Element Number GS2/n = Group Switch Stage 2/Plane +Switch Element Number
8 / 54
1 Overview
CB A01 . . . . . . . . . . . CB A09
S W C H S W C H S W C H S W C H S W C H S W C H S W C H S D D W C C C Fuse H A01 S W C H
CB B71 . . . . . . . . . . . . . CB B78
S W C H S W C H S W C H S W C H S W C H S W C H D D C C Fuse B72
SAU 01
SAU 02
GS2/1 . . . . . . . . . . . GS2/1
0 1 2 3 4 5 6 7
B GSATO
GS2/2 . . . . . . . . . . . GS2/2
0 1 2 3 4 5 6 7
B GSATO
GS2/3 . . . . . . . . . . GS2/3
0 1 2 3 4 5 6 7
B GSATO
D D C C Fuse A02
N+1
SAU 03
A TERTO
SAU 04
air baffle
01 03 05 07 09 11 13 15 17 19 21 23 25 27 29 31 33 35 37 39 41 43 45 47 49 51 53 55 57 59 61 63 A S M B
SAU 05
D C
D C
Fuse A05
S W C H
S W C H
D T C C
D T C C
D T C C
D T C C
A S M B
D T C C
D T C C
D T C C
D T C C
A D D S C C M Fuse B B75
S W C H
S W C H
D T C C
D T C C
D T C C
D T C C
A S M B
D T C C
D T C C
D T C C
D T C C
SAU 06
QA4
QA5
QA6
AS7
AS3
A TERTO
A TERTO
S W C H
S W C H
S W C H
S W C H
S W C H
S W C H
S W C H
S D D W C C C Fuse H A06
D D C C Fuse A07
N+1
B I U A
T C U C
T C U C
T C U C
T C U C
T C U C
T C U C
T C U C
T C U C
S W C H
S D D W C C C Fuse H A08
D D C C Fuse B76
036 037
B C L A B C L A
030
034
032
033
035
031
B C L A
QA7
B C L A
AS6
AS2
026 027
020
024
022
023
025
021
GS1/0 . . . . . . . . . . . GS1/0
QA2
0 1 2 T S C A 3 4 5 6 7
B GSA TO ABIS TO
017 AS1
010
012
014
016
013
015
011
AS5
SYS RACK M S M S
BSCY05
SAU 07
D D C C Fuse A09
C P R C
C P R C
C P R C
C P R C
C P R C
C P R C
S W C H
S D D W C C C Fuse H B77
S W C H
S W C H
S W C H
S W C H
S W C H
S W C H
S W C H
S D D W C C C Fuse H B78
GS2/0 . . . . . . . . . . . GS2/0
AS5 000 002 AS1 004 003 005 001
0
SYSA TO
SAU 08
SYSB00
7
B GSA TO
9 / 54
1 Overview
CB A01 . . . . . . . . . . . CB A09
S W C H S W C H S W C H S W C H S W C H S W C H S W C H S D D W C C C Fuse H A01 S W C H
CB B71 . . . . . . . . . . . . . CB B78
S W C H S W C H S W C H S W C H S W C H S W C H D D C C Fuse B72
SAU 01
SAU 02
GS2/1 . . . . . . . . . . . GS2/1
0 1 2 3 4 5 6 7
B GSATO
GS2/2 . . . . . . . . . . . GS2/2
0 1 2 3 4 5 6 7
B GSATO
GS2/3 . . . . . . . . . . . GS2/3
0 1 2 3 4 5 6 7
B GSATO
D D C C Fuse A02
N+1
S W C H
S W C H
S W C H
S W C H
D T C C
D T C C
D T C C
D T C C
A S M B
D T C C
D T C C
D T C C
D T C C
A D D S C C M Fuse B B73
S W C H
S W C H
S W C H
S W C H
T C U C
T C U C
T C U C
T C U C
T C U C
T C U C
T C U C
T C U C
B I U A
GS1/1
QA12 QA13 AS10 AS14 120 123 124 126 127 122 125 121 4 5
GBISTO
GS1/1
QA14 AS15 AS11 130 134 136 137 132 133 135 131 6 7
SAU 03
A TERTO
D D C C Fuse A03
N+1
B I U A
T C U C
T C U C
T C U C
T C U C
T C U C
T C U C
T C U C
T C U C
S W C H
S D D W C C C Fuse H A04
B I U A
T C U C
T C U C
T C U C
T C U C
T C U C
T C U C
T C U C
T C U C
S W C H
S D D W C C C Fuse H B74
SAU 04
QA10
AS12
A BISTO
A BISTO
AS13
QA8
AS8
AS9
100
104
106
107
102
103
105
110
114
116
117
112
113
115
101
111
air baffle
01 03 05 07 09 11 13 15 17 19 21 23 25 27 29 31 33 35 37 39 41 43 45 47 49 51 53 55 57 59 61 63 A S M B
SAU 05
D C
D C
Fuse A05
S W C H
S W C H
S W C H
S W C H
D T C C
D T C C
D T C C
D T C C
A S M B
D T C C
D T C C
D T C C
D T C C
A D D S C C M Fuse B B75
S W C H
S W C H
S W C H
S W C H
D T C C
D T C C
D T C C
D T C C
A S M B
D T C C
D T C C
D T C C
D T C C
GS1/1
QA4 QA5 AS6 AS2 026 027 020 024 022 023 025 021
A TERTO A TERTO
GS1/1
QA6 AS7 AS3 036 037 030 034 032 033 035 031 2 3 QA7
B C L A
SAU 06
0
S W C H
S W C H
S W C H
1
S W C H
S W C H
S W C H
S W C H
S D D W C C C Fuse H A06
D D C C Fuse A07
N+1
B I U A
T C U C
T C U C
T C U C
T C U C
T C U C
T C U C
T C U C
T C U C
S W C H
S D D W C C C Fuse H A08
D D C C Fuse B76
B C L A
B C L A
B C L A
GS1/0 . . . . . . . . . . . GS1/0
QA2
0 1 2 T S C A 3 4 5 6 7
B GSA TO ABIS TO
AS5
017 AS1
010
014
016
012
013
015
SYS M S
BSCY05
RACK M S
SAU 07
011
D D C C Fuse A09
C P R C
C P R C
C P R C
C P R C
C P R C
C P R C
S W C H
S D D W C C C Fuse H B77
S W C H
S W C H
S W C H
S W C H
S W C H
S W C H
S W C H
S D D W C C C Fuse H B78
GS2/0 . . . . . . . . . . . GS2/0
AS0 AS4 000 004 002 003 005 001
0
SYSA TO
SAU 08
SYSB00
7
B GSA TO
10 / 54
1 Overview
CB A01 . . . . . . . . . . . CB A09
S W C H S W C H S W C H S W C H S W C H S W C H S W C H S D D W C C C Fuse H A01 S W C H
CB B71 . . . . . . . . . . . . . CB B78
S W C H S W C H S W C H S W C H S W C H S W C H D D C C Fuse B72
SAU 01
SAU 02
GS2/5 . . . . . . . . . . . GS2/5
0 1 2 3 4 5 6 7
BGSATO
GS2/6 . . . . . . . . . . . GS2/6
0 1 2 3 4 5 6 7
BGSATO
GS2/7 . . . . . . . . . . . GS2/7
0 1 2 3 4 5 6 7
BGSATO
D D C C Fuse A02
N+1
SAU 03
A TERTO
SAU 04
air baffle
01 03 05 07 09 11 13 15 17 19 21 23 25 27 29 31 33 35 37 39 41 43 45 47 49 51 53 55 57 59 61 63
SAU 05
D D C C Fuse A05
S W C H
S W C H
D T C C
D T C C
D T C C
D T C C
A S M B
D T C C
D T C C
D T C C
D T C C
A S M B
D D C C Fuse B75
S W C H
S W C H
D T C C
D T C C
D T C C
D T C C
A S M B
D T C C
D T C C
D T C C
D T C C
A S M B
AS18
AS19
AS22
AS23
GS1/3
A TERTO
GS1/3
QA4 QA6 QA5
A TERTO
SAU 06
S W C H
S W C H
S W C H
S W C H
S W C H
S W C H
S W C H
S D D W C C C Fuse H A06
D D C C Fuse A07
N+1
B I U A
T C U C
T C U C
T C U C
T C U C
T C U C
T C U C
T C U C
T C U C
S W C H
B C L A
QA7
B C L A
226
236
220
224
227
230
234
237
222
223
225
232
233
235
221
231
GS1/2 . . . . . . . . . . . GS1/2
AS17 121
0 1 2 T S C A 3 4 5 6 7
B GSA TO ABIS TO
AS21
QA2
RACK M S
BSCY05
SAU 07
216
210
214
217
212
213
215
D D C C Fuse A09
B I U A
T C U C
T C U C
T C U C
T C U C
T C U C
T C U C
T C U C
T C U C
S W C H
S D D W C C C Fuse H B77
S W C H
S W C H
S W C H
S W C H
S W C H
S W C H
S W C H
S D D W C C C Fuse H B78
AS16
AS20
GS2/4 . . . . . . . . . . . GS2/4
0
SYSA TO
SAU 08
QA0
206
200
204
207
202
203
205
201
7
B GSA TO
SYSB00
11 / 54
1 Overview
CB A01 . . . . . . . . . . . CB A09
S W C H S W C H S W C H S W C H S W C H S W C H S W C H S D D W C C C Fuse H A01 S W C H
CB B71 . . . . . . . . . . . . . CB B78
S W C H S W C H S W C H S W C H S W C H S W C H D D C C Fuse B72
SAU 01
SAU 02
GS2/5 . . . . . . . . . . . GS2/5
0 1 2 3 4 5 6 7
B GSATO
GS2/6 . . . . . . . . . . . GS2/6
0 1 2 3 4 5 6 7
B GSATO
GS2/7 . . . . . . . . . . . GS2/7
0 1 2 3 4 5 6 7
B GSATO
D D C C Fuse A02
N+1
S W C H
S W C H
S W C H
S W C H
D T C C
D T C C
D T C C
D T C C
A S M B
D T C C
D T C C
D T C C
D T C C
A D D S C C M Fuse B B73
S W C H
S W C H
S W C H
S W C H
T C U C
T C U C
T C U C
T C U C
T C U C
T C U C
T C U C
T C U C
B I U A
GS1/3 . . . . . . . . . . . GS1/3
QA12 QA13 AS26 AS30 320 324 326 327 322 323 325 321 4 5
GBISTO
GS1/3 . . . . . . . . . . . GS1/3
QA14 AS27 AS31 330 334 336 337 332 333 335 331 6 7
SAU 03
A TERTO
D D C C Fuse A03
N+1
B I U A
T C U C
T C U C
T C U C
T C U C
T C U C
T C U C
T C U C
T C U C
S W C H
S D D W C C C Fuse H A04
B I U A
T C U C
T C U C
T C U C
T C U C
T C U C
T C U C
T C U C
T C U C
S W C H
S D D W C C C Fuse H B74
SAU 04
QA10
AS24
AS28
A BISTO
A BISTO
AS29
AS25
QA8
300
304
306
307
302
303
305
310
314
316
317
312
313
315
301
311
air baffle
01 03 05 07 09 11 13 15 17 19 21 23 25 27 29 31 33 35 37 39 41 43 45 47 49 51 53 55 57 59 61 63 A S M B
SAU 05
D C
D C
Fuse A05
S W C H
S W C H
S W C H
S W C H
D T C C
D T C C
D T C C
D T C C
A S M B
D T C C
D T C C
D T C C
D T C C
A D D S C C M Fuse B B75
S W C H
S W C H
S W C H
S W C H
D T C C
D T C C
D T C C
D T C C
A S M B
D T C C
D T C C
D T C C
D T C C
GS1/3
AS18 AS22 QA4 QA5 226 227 220 224 222 223 225 221
A TERTO A TERTO
GS1/3
AS19 AS23 QA6 236 237 230 234 232 233 235 231 2 3 QA7
B C L A
SAU 06
0
S W C H
S W C H
S W C H
1
S W C H
S W C H
S W C H
S W C H
S D D W C C C Fuse H A06
D D C C Fuse A07
N+1
B I U A
T C U C
T C U C
T C U C
T C U C
T C U C
T C U C
T C U C
T C U C
S W C H
S D D W C C C Fuse H A08
D D C C Fuse B76
B C L A
GS1/2 . . . . . . . . . . . GS1/2
217 AS17 QA2 210 212 214
0 1 2 T S C A 3 4 5 6 7
B GSA TO ABIS TO
216
213
215
211
AS21
RACK M S
BSCY05
SAU 07
D D C C Fuse A09
B I U A
T C U C
T C U C
T C U C
T C U C
T C U C
T C U C
T C U C
T C U C
S W C H
S D D W C C C Fuse H B77
S W C H
S W C H
S W C H
S W C H
S W C H
S W C H
S W C H
S D D W C C C Fuse H B78
AS16
AS20
GS2/4 . . . . . . . . . . . GS2/4
0
SYSA TO
SAU 08
QA0
205 206
200
202
203
204
201
207
SYSB00
7
B GSA TO
12 / 54
1 Overview
CB A01 . . . . . . . . . . . CB A09
CB B71 . . . . . . . . . . . . . CB B78
SAU 01
SAU 02
SAU 03
SAU 04
air baffle
01 03 05 07 09 11 13 15 17 19 21 23 25 27 29 31 33 35 37 39 41 43 45 47 49 51 53 55 57 59 61 63 A S M B
SAU 05
D C
D C
Fuse A05
S W C H
S W C H
D T C C
D T C C
D T C C
D T C C
A S M B
D T C C
D T C C
D T C C
D T C C
A D D S C C M Fuse B B75
S W C H
S W C H
D T C C
D T C C
D T C C
D T C C
A S M B
D T C C
D T C C
D T C C
D T C C
GS1/5
AS34 AS38 QA4 QA5 426 427 420 424 422 423 425 421
A TERTO A TERTO
GS1/5
AS39 AS35 QA6 536 437 430 434 432 433 435 431 QA7
B C L A
SAU 06
S W C H
S W C H
S W C H
S W C H
S W C H
S W C H
S W C H
S D D W C C C Fuse H A06
D D C C Fuse A07
N+1
B I U A
T C U C
T C U C
T C U C
T C U C
T C U C
T C U C
T C U C
T C U C
S W C H
B C L A
GS1/4 . . . . . . . . . . . GS1/4
0 1 2 T S C A 3 4 5 6 7
B GSA TO ABIS TO
413
417 AS33
QA2
410
412
416
414
415
411
AS37
RACK M S
BSCY05
SAU 07
D D C C Fuse A09
B I U A
T C U C
T C U C
T C U C
T C U C
T C U C
T C U C
T C U C
T C U C
S W C H
S D D W C C C Fuse H B77
SAU 08
SYSB00
AS36
AS32
QA0
405 406
400
402
404
403
401
407
SYSA TO
13 / 54
1 Overview
CB A01 . . . . . . . . . . . CB A09
CB B71 . . . . . . . . . . . . . CB B78
SAU 01
SAU 02
D D C C Fuse A02
N+1
S W C H
S W C H
S W C H
S W C H
D T C C
D T C C
D T C C
D T C C
A S M B
D T C C
D T C C
D T C C
D T C C
A D D S C C M Fuse B B73
S W C H
S W C H
S W C H
S W C H
T C U C
T C U C
T C U C
T C U C
T C U C
T C U C
T C U C
T C U C
B I U A
GS1/5
QA12 QA13 AS47 AS42 520 524 526 527 522 523 525 521 4 5
GBISTO
GS1/5
QA14 AS47 AS43 530 534 536 537 532 533 535 531 6 7
SAU 03
A TERTO
D D C C Fuse A03
N+1
B I U A
T C U C
T C U C
T C U C
T C U C
T C U C
T C U C
T C U C
T C U C
S W C H
S D D W C C C Fuse H A04
B I U A
T C U C
T C U C
T C U C
T C U C
T C U C
T C U C
T C U C
T C U C
S W C H
S D D W C C C Fuse H B74
SAU 04
QA10
AS40
AS44
A BISTO
A BISTO
AS45
AS41
QA8
500
504
506
507
502
503
505
510
514
516
517
512
513
515
501
511
air baffle
01 03 05 07 09 11 13 15 17 19 21 23 25 27 29 31 33 35 37 39 41 43 45 47 49 51 53 55 57 59 61 63 A S M B
SAU 05
D C
D C
Fuse A05
S W C H
S W C H
S W C H
S W C H
D T C C
D T C C
D T C C
D T C C
A S M B
D T C C
D T C C
D T C C
D T C C
A D D S C C M Fuse B B75
S W C H
S W C H
S W C H
S W C H
D T C C
D T C C
D T C C
D T C C
A S M B
D T C C
D T C C
D T C C
D T C C
GS1/5
AS34 AS38 QA4 QA5 426 427 420 424 422 223 425 421
A TERTO A TERTO
GS1/5
AS39 AS35 QA6 436 437 430 434 432 433 435 431 2 3 QA7
B C L A
SAU 06
0
S W C H
S W C H
S W C H
1
S W C H
S W C H
S W C H
S W C H
S D D W C C C Fuse H A06
D D C C Fuse A07
N+1
B I U A
T C U C
T C U C
T C U C
T C U C
T C U C
T C U C
T C U C
T C U C
S W C H
S D D W C C C Fuse H A08
D D C C Fuse B76
B C L A
GS1/4 . . . . . . . . . . . GS1/4
0 1 2 T S C A 3 4 5 6 7
B GSA TO ABIS TO
AS37
417 AS33
QA2
410
414
416
412
413
415
RACK M S
BSCY05
SAU 07
D D C C Fuse A09
B I U A
T C U C
T C U C
T C U C
T C U C
T C U C
411
T C U C
T C U C
T C U C
S W C H
S D D W C C C Fuse H B77
SAU 08
SYSB00
AS36
AS32
QA0
400
404
405 406
407
402
403
401
SYSA TO
14 / 54
1 Overview
1.1.2 Cases
The following case applies: C1: The BSC is in configuration is 3 or higher so the hardware is tested.
1.1.3 Options
The following options apply: O1: External alarm cables are installed so they are tested. O2: The TC is installed and connected at the DDF on the BSC site so the BSC-TC link is checked.
15 / 54
1 Overview
1.1.6 Restrictions
None.
16 / 54
1 Overview
Check Hardware
Diskettes /CDROM
Install BSC Software from Dikettes or CDROM
Load and Activate BSC Software Check Battery Backup of SCPRC Boards
No
No
17 / 54
1 Overview
1.2 Preparation
1.2.1 Prerequisites
The following prerequisites must be fulfilled: The site must comply with the safety rules as given in the BSS Methods Handbook At least two Ater Mux PCM links must be available.
18 / 54
1 Overview
1.3 Scheduling
Time based on technical constraints The number of resources shown in the following table does not take into account individual customer or safety requirements.
Grouped Task
Before Going on Site Before You Start Check Hardware(1) Check Power Supply and Power Up(1) Install BSC Terminal and BSS Software Install BSC Terminal Software and X.25 Communication Board Install Craft Terminal Install BSS Software Perform Commissioning Tests Relocate S-CPRCs Load and Activate BSC Software Check Battery Backup of S-CPRC Boards Correct BSC Date and Time Test External Alarms (O1) BSC Hardware Test (C1) Check BSC - TC link (O2) Set and Check BSC - 9153 OMC-R Link Before You Leave Total
45 min.
45 min.
10 min. 10 - 20 min.
(3)
10 min. 10 - 20 min.
2 min. 1 h 30 min. 30 min. 2 min. 10 min. 40 min. 20 min. 30 min. 20 min. 6 h 24 min. / 7 h 24 min.
2 min. 1 h 30 min. 30 min. 2 min. 20 min. 40 min. 20 min. 30 min. 20 min. 7 h 50 min. / 9 h 40 min.
: Commissioner : Tasks where two people are mandatory for execution : Depending on the BSC configuration (1-6) : 10 minutes from IOMEGA zip, 20 minutes from diskettes
19 / 54
1 Overview
1.4 Resources
1.4.1 Tools
The following sections describe the necessary hardware tools, software tools and forms.
1.4.1.3 Forms
None.
1.4.2 Supplies
None.
20 / 54
1 Overview
3DF 00300 0004 UAZZA 3BK 17430 0002 RJZZA 3BK 21220 AAAA PCZZA 3BK 21257 AAAA PCZZA 3BK 20458 0001 RJZZA 8BL 00704 0018 DRBRA
8BL 00704 0016 DRBRA 8BL 00704 0015 DRBRA 3BK 17430 3001 QZZZA 3BK 17257 0001 RJZZA Depends on the software version requested by the customer.
21 / 54
1 Overview
22 / 54
2 Commissioning Tests
2 Commissioning Tests
This section presents all checks needed before starting the Commissioning, and all detailed tasks to be performed on site.
23 / 54
2 Commissioning Tests
24 / 54
2 Commissioning Tests
25 / 54
2 Commissioning Tests
26 / 54
2 Commissioning Tests
3. Using the multimeter, check the presence of -48V DC between BAT A and BATRET for all racks (basic and extensions). 4. Check that no voltage is present between BAT B and BATRET for all racks. 5. Switch all the rack circuit breakers to ON. The DC/DC converters A01-A09 for all racks are powered up. The DC/DC converters B71-B78 for all racks are not powered up. Note: Converters B72 and B78 are removed starting from rack variant 3BK 06796 AAAC. 6. Switch all the rack circuit breakers to OFF. No board in the racks is powered up. 7. At the customer power panel, disconnect the -48 V power supply (branch A) at the fuse holder. Branch A is disconnected.
27 / 54
2 Commissioning Tests
4. Using the multimeter, check the presence of -48V DC between BAT B and BATRET for all racks (basic and extensions). 5. Check that no voltage is present between BAT A and BATRET for all racks. 6. Switch all the rack circuit breakers to ON. The DC/DC converters B71-B78 for all racks are powered up. The DC/DC converters A01-A09 for all racks are not powered up. Note: Converters B72 and B78 are removed starting from rack variant 3BK 06796 AAAC. 7. Switch all the rack circuit breakers to OFF. No board in the racks is powered up. 8. At the customer power panel, disconnect the -48 V power supply (branch B) at the fuse holder. Branch B is disconnected.
28 / 54
2 Commissioning Tests
2. Copy all the build delivery compressed files (gzip) from the diskettes or the CD-ROM to the newly-created directory (all files in same directory). 3. Copy gzip.exe from C:\Program Files\Alcatel\WINBSC\B10 to
C:\BUILDBSS\B10\<Name of customer build>
4. Open a command prompt window: Start > Programs > Command Prompt 5. In the command prompt window, enter the following commands: cd \BUILDBSS\B10\Name of customer build gzip -dvN *.gz Note: *.gz means all the files in the current directory with the extension gz. All the gzip files are uncompressed. 6. Using a text editor (e.g. Notepad) open the CONTENTS.LST file. 7. Check the BSC master file (i.e., bscmxXxx) version specified in CONTENTS.LST against the requested customer version. Refer to the BSS Software List.
29 / 54
2 Commissioning Tests
2. Copy all the build delivery files from the IOMEGA ZIP disk to the newly-created directory. 3. Copy gzip.exe from C:\Program Files\Alcatel\WINBSC\B10 to
C:\BUILDBSS\B10\<Name of customer build>
4. Open a command prompt window: Start > Programs > Command Prompt 5. In the command prompt window, enter the following commands: cd \BUILDBSS\B10\Name of customer build gzip -dvN *.gz Note: *.gz means all the files in the current directory with the extension gz. All the gzip files are uncompressed. 6. Using a text editor (e.g., Notepad), open the CONTENTS.LST file. 7. Check the BSC master file (i.e., bscmxXxx) version specified in CONTENTS.LST against the requested customer version. Refer to the BSS Software List.
30 / 54
2 Commissioning Tests
31 / 54
2 Commissioning Tests
3. In the BSC Communication Control window, select a serial connection and Logging and click on [ Connect ]. 4. In the Windows BSC Terminal window, follow the menu path: Utilities -> Minibuild Loading The Minibuild Loading window opens:
5. Enter the path of the minibuild directory in the Directory field (as shown in the figure), using the [ Browse... ] button. 6. In the Available field, select the bssmini.* files and click on [ Go! ]. Refer to the BSS Methods Handbook to monitor the progress of the download by observing the LEDs on the CPRC PBA. The files are automatically downloaded. When the download is complete, a successful report message appears. Check the lower right corner in the Windows BSC Terminal windows to monitor communication between the PC and the BSC equipment. Check for the message has been sent to BSC... and that a reply has been received). 7. Click on the shortcut exit button (top right corner in the Windows BSC terminal window). 8. Click on[ Yes ] to confirm the close connection message.
32 / 54
2 Commissioning Tests
LED 4 (Red)
Push Button
Turnbutton Latch
33 / 54
2 Commissioning Tests
The following table gives the possible LEDs status. The status of the LEDs is correct taken in account if the BSC is new and no download was done to CPRA-SYS. If the BSC is IT, the TCU terminating the TSL should be disabled (For rack 1: TCU(1), for rack 2: TCU(41), for rack 3: TCU(81)).
Status Lower LED (LED1) is blinking slow (300ms ON / 300 ms OFF) Lower 2 LEDs (LED1 and LED2) are toggling (like TCU/DTC) Middle LED (LED2) is blinking slow (4 blinks ON, 1 skipped)
Action TSCA is in B5 mode and needs to be migrated TSCA is in B5 mode and needs to be migrated TSCA is in B6 mode and does not need to be migrated
If after the LEDs check the TSCA board must be migrated continue with the following steps. 2. Connect the LMT Terminal to the first TSCA PBA using the LMT-CT Terminal/MMI cable. 3. Start the Craft Terminal B8 (lmctavxx) by double-clicking on the LMT Terminal SW icon. 4. When the password window appears, click on [ OK ]. The Main Menu appears:
5. In the Main Menu, select: TSC -> Download Migration Software If the connection is not established, close the Craft terminal and try to establish the connection again. If after the LEDs check the upgrade must be performed but following more attempts the connection is still not possible it could be due to a failing RS232 interface. Make sure that the serial interface is ok. If afterwards (after BSC SW loading and init) it is still not ok, an alarm will be raised on the TSCA (Access failure).
34 / 54
2 Commissioning Tests
6. Upgrade the TSCA firmware to firmware B6.2, if applicable. (see Site-Specific Information). For details refer to Upgrade TSCA Firmware from B5 to B6 (If Necessary) (Section 2.6.2.4).
2.6.2.4 Upgrade TSCA Firmware from B5 to B6 (If Necessary) Install the Software on the PC
To install the TSCA firmware on the PC: 1. Create the directory TSC_FW on the PC. 2. Copy the firmware delivery for release B6 (TSCSAQxx.0xx - , see the BSS Software List) from diskettes into the TSC_FW directory. 3. Leave the diskettes for the installed software in the site documentation.
If the Craft Terminal sets up the connection with the TSCA board: 1. Then, following the command already given on the LMT CT B8, select: TSC -> Download Migration Software The following messages appear: Waiting for Download Request from TSC... Download of Both Code and Data Requested. Proceed? 2. Click on [ OK ]. The program asks for the TSC CODE file. 3. Select the file that you installed in the TSC_FW directory: C:/TSC_FW/TSCSAQxx.0xx 4. Click on [ OK ]. The following message appears: TSC is currently erasing a page of memory. And then the download starts. 5. When Download of Data Requested. [ OK ].
Proceed? appears, click on
6. Select the file with data from the LMT CT directory: .../LMT_CT/B8/Settings/g2/tsca/empty_db.tsc 7. Click on [ OK ]. 8. Wait for the TSCA to download successfully. After the TSCA board has been downloaded, wait approximately 10 minutes. During this time the TSCA will erase and reprogram the bootstrap flash. During this process, either there is NO LED ON, or ONE LED STATIC ON. Do not power OFF the BSC rack. Do not remove the TSCA. Do not push the reset button on the TSCA. Be patient, wait for the process to finish and the auto-reset of the TSCA. 9. After the bootstrap has been replaced, the TSCA will auto-reset and come up in B6 mode. This will be visible due to the middle LED (LED 2) blinking slow, 4 times ON, one time OFF. This indicates that the TSCA is trying to establish the TSL to the BSC in the new mode (B6 and up). The TSCA will continue like this until the BSC application SW has been downloaded and the BSC becomes operational. 10. If the TCU was disabled in Check TSCA Board Firmware Version (Section 2.6.2.3), using the BSC terminal, initialize it again.
35 / 54
2 Commissioning Tests
When the TCU is initialized, the TSCA establishes the connection with the BSC. If the BSC is operational, in most cases the bootstrap and the TSC application software will be upgraded by the BSC. 11. Apply the same procedure for each TSCA board.
3. Click on [ Connect ]. If an X.25 Link error message window appears, verify the link with the BSC equipment and repeat the last two steps. 4. From the Windows BSC Terminal window main menu, select: Commands -> Disk operations -> Format SSD The Format SSD window opens. 5. In the Directory field, enter the full path to the BSS directory using the [ Browse... ] button (e.g., C:\BUILDBSS\BSSS8). 6. Select [ Disk A. ] A list of files that can be used to format the SSD appears. 7. Select the BSS-masterfile xxxMxWxx . xxx. 8. Click on [ Enter ]. 9. Click on [ Go! ] to initiate SSD formatting. When SSD formatting is complete, a report appears showing the result of the formatting.
36 / 54
2 Commissioning Tests
2. In the Directory field, enter the full path to the BSS directory using the [ Browse... ] button (e.g., C:\BUILDBSS\BSSS9). 3. Select the BSS-masterfile xxxMxWxx . xxx. 4. Click on [ Enter ]. 5. Enter Disk A in the Destination field. In the Files To Transfer pane, the files to be transferred are displayed. 6. Click on [ Go! ] to initiate the file transfer (Start Download). 7. Check the reports.
37 / 54
2 Commissioning Tests
3. Click on [ OK ]. 4. In the Windows BSC Terminal window, check the command reports. 5. Compare the contents of disk A, shown in the reports window, with the CONTENTS.LST file.
2. Select the parameters as shown in the System Initialization window above. 3. Click on [ OK. ] All BSC boards, including NE and TSCA, upload the software stored in the CPRC board. The loading procedure is indicated by the LEDs on the board front panels. Refer to the BSS Methods Handbook for a description of the various LED states for the different boards. After the system initialization command, the BSC Terminal loses the X.25 connection with the BSC. 4. After about five minutes, re-establish the link by closing and re-opening the BSC Terminal. 5. Wait about 20 minutes for the successful report. The BSC is successfully initialized. 6. Verify that all CEs are equipped. If a CE is missing, run Hardware Tests to investigate.
38 / 54
2 Commissioning Tests
3. In the "Unit number" field, enter the parameter number of the corresponding BTSs. (see Site-Specific Information (Section 1.2.2)). 4. Click on [ OK ] and wait for the successful report.
3. Click on [ OK ]. 4. In the Windows BSC Terminal window, check the reports to verify that all the CPR, DTC, TCU, TSC and SWITCH SBLs of the BSC are "In Traffic". They should not appear in the State List command report. The State List command displays the states of all SBLs that are not "In Traffic". In the Windows BSC Terminal window, use the mouse to double-click on the compressed report message any time you want a Full Report View.
39 / 54
2 Commissioning Tests
3. In the Format Duplex SSD window, enter the Source - Destination parameter. 4. Click on [ OK ]. 5. Check the reports to see if the action was successful. 6. Wait for the final report, FILE TRANSFER RESULT.
2. Enter the Source and Destination disk parameters and select All Files. 3. Click on [ OK ]. 4. In the Windows BSC Terminal window, check the reports (check to see that the BOOTROOT file already exists on disk B).
40 / 54
2 Commissioning Tests
2. Click on [ OK ]. 3. Enable Alarm Reports (See Disable / Enable Alarm Reports (Section 2.11.2)). 4. Check the message report.
41 / 54
2 Commissioning Tests
3. Click on [ OK ].
42 / 54
2 Commissioning Tests
2. Select the parameters as shown in the BSC System Test Init window above. 3. Click on [ OK ]. A message indicating that the command has been sent to the BSC appears in the lower left corner of the Windows BSC Terminal window. 4. Wait about 20 minutes for BSC to run in the test mode. (Wait about five minutes, exit and reconnect the BSC Terminal). When the BSC is in test mode, both top LEDs are blinking fast. To ensure the reliability of the offline test results, it is imperative that all CEs of the BSC have been activated in offline test mode.
43 / 54
2 Commissioning Tests
3. Click on [ OK ]. 4. Wait for the report message and try to fix the problem, if there is one by: Noting down the given address Finding the given address in the Inter Rack Cable List Checking the corresponding cables for their addresses on both racks. Use the mouse to double-click on the compressed report message any time you want a Full Report View. If one or more BSC test reports are not successful, the report provides the identities of the network addresses of the links on which the most errors were detected. Refer to the BSS Methods Handbook for cable and plug descriptions. See Connect Inter-Rack Cables (Example) (Section 2.11.1).
44 / 54
2 Commissioning Tests
3. Click on [ OK ]. 4. Wait for the successful report message. If a hardware test fails, try to identify the problem and fix it. Repeat all the hardware tests if necessary. If the failure persists, check the cabling between the racks (see the BSS Methods Handbook).
3. Click on [ OK ]. A message indicating that the command has been sent to the BSC appears in the lower left corner of the Windows BSC Terminal window. 4. Wait about 15 minutes for the BSC to run in operational mode. (Exit and reconnect the BSC Terminal). When the BSC is in operational mode, both bottom LEDs are blinking fast. 5. Check the board status. (See Check Board Status (Section 2.6.2.10)). The CPR, DTC, TCU, TSC and SWITCH SBLs are IT.
45 / 54
2 Commissioning Tests
46 / 54
2 Commissioning Tests
(corresponding to the number of the A trunk connected to the MSC or looped at the TC). SbNbr:
> 255
3. Click on [ OK ]. 4. Check that the ATR SBL is In Traffic in the report window. 5. Repeat steps 1 to 4 for all the A trunks connected to the MSC (corresponding to the Ater Mux PCMs connected to the TC).
47 / 54
2 Commissioning Tests
48 / 54
2 Commissioning Tests
5. Return the completed forms and the inventory files relating to the operation to base.
1 2 3
A = Rack A B = Rack B
49 / 54
2 Commissioning Tests
1. Run the interconnection loom at the rear of the racks (see the above figure). Use the addresses written on the end cable labels (as shown). 2. Connect the cables to the rear of the racks. The addresses locate a locking latch (1), and the connector must be plugged just below it (2) (see Figure Locking Latch Address (3) below). 3. Tie the cables to the racks. Example (shown below): 03::36BA03 Subrack Slot Board connector Locking latch address 03 36 BA 03
01 04 07 10 13 16
AA
19 22 25 28 31
01 03 07 10 13 16
1 2
BA
19 22 25 28 31
50 / 54
2 Commissioning Tests
3. Click on [ OK ]. 4. In the Windows BSC Terminal window, check the report message.
3. Click on [ OK ]. 4. In the Windows BSC Terminal window, check the report message.
51 / 54
2 Commissioning Tests
2. To close the connection, choose [ Yes ]. 3. To reconnect the BSC Terminal B10, from the Taskbar select: Start -> Programs -> WinBSC -> B10 -> Windows BSC Terminal B10 The following window appears.
4. In the BSC Communication Control window, select X.25 for Link Selection and the Logging option. 5. Click on [ Connect ]. If an X25 Link error message window appears, verify the link with the BSC equipment and repeat the last three steps again.
52 / 54
Appendix A : Abbreviations
Appendix A: Abbreviations
ASMC Ater BSC BSS CCL CPRC DDF GSM ITL-PRO IO NE PCM SAU SR TC Ater submultiplexer C Interface link between TC and BSC Base Station Controller Base Station Subsystem Completion Check List Control Processor Board Digital Distribution Frame Global System for Mobile communications Procedure technical and support information Instruction Operation Network Elements (i.e.: BIUA, ASMB ...) Pulse Code Modulation Subrack Unit Subrack Transcoder
53 / 54
Appendix A : Abbreviations
54 / 54