Liebherr developed a new derrick. This derrick is able to dismantle crane parts up to 10t. Even the 355HC-L, with the 500HCtower, can be dismantled with it. Its components have the dimentions and weights which allow that its components can be transported in a elevator.
Copyright Liebherr 2006
General drawing
7,4t
Jib
Stiff leg
Strut
For lifting loads with the mast only (only for erection or dismantling of derrick parts)
The derrick has a luffing jib with a working radius from 5,06m to 25m. Slewing platform radius = 5,6m. Slewing angle = n x 360
5,06m
to 201,88
mt
with stifflegs
Climbing inside the building on the 132HC tower. Tower height around 30m. Climbing step 10m. Windspeed. In service, up to 72Km/h Out of service, up to 165 Km/h
Copyright Liebherr 2006
10
Out of
11
The Struts and the jib can be erected and dismantled with the mast. Derrick parts can be lowered to the ground
Mast
12
Drives
Hoist gear 45KW Luffing gear 37KW
Switchgear cabinets
S1 S2 S4 S2 S1
Switchgear cabinet, PLC control, EMS-2 Switchgear cabinet S2, hoist gear Switchgear cabinet S4, luffing gear.
S4
Each switchgear cabinet has its own resistors. The derrick mast can be moved with the dismantled S1 and S2 switchgear cabinets.
14
15
16
JL 320m
JL
17
18
The derrick can be connected directly to the floor, if it is able to transmit the corner forces.
Derrick 200 DR 5-10, 03.2008
19
20
Jib positions + +
21
22
23
24
25
JL
JL
320m
26
The forces D/C, d/c, a/b and A/B must be considered and taken from the tables shown before (Outrigger corner pressures).
27
X/YH
X/YH
The forces X/YH and X/Y out of the stiff-legs are transmitted directly to the floor
The forces D/C, d/c, a/b and A/B must be considered and taken from the tables shown before (Outrigger corner pressures).
Derrick 200 DR 5-10, 03.2008
Copyright Liebherr 2006
28
29
30
31
32
Connection conditions
33
34
Threaded rod, the lenght must be adjusted before bolted to the outrigger and slewing ring support..
35
36
37
38
39
Safety devices
Angle transmitter
40
Safety devices
Load moment measuring axle
41
Safety devices
42
Safety devices
43
Safety
Walkway
Copyright Liebherr 2006
44
Safety
45
Safety
46
Safety
47
Dismantling
48
Dismantling
49
Dismantling
Mast
50
Dismantling
51
Dismantling
52
Dismantling
53
Dismantling
54
Dismantling
55
Dismantling
56