165.900
164.200
1.700
Difference in elevation
165.9 - 164.2
1
=
Bed fall
1.7 / 1000 =
say
1000
0.0017
1 in
588.2
in
600
146912493.xlsx.ms_office146912493.xlsx.ms_office
m
m
Km
m
146912493.xlsx.ms_office146912493.xlsx.ms_office
164.200
162.200
2.000
Difference in elevation
164.2 - 162.2
1
=
Bed fall
1000
2 / 1000 =
0.002
1 in
say
in
500.000
500
146912493.xlsx.ms_office146912493.xlsx.ms_office
m
m
m
Km
m
146912493.xlsx.ms_office146912493.xlsx.ms_office
b
1 in
+
1 in
n
20
1.5
164.200
500
0.025
164.775
m
(z)
m
RWL = + 164.775
1
0.572 m
1.5
+ 164.200
20.00
Area of flow
Wetted Perimeter P =
Hydraulic Radius R =
Bed slope
S =
Velocity of flow
V =
Discharge
Q =
(b+zy) y
=
=
=
=
1 / 500
1 / n x R2/3 x S1/2 =
=
A*V
=
=
OR
500 cusecs
Bed level + y
164.2 + 0.572
164.775 m
Gwall/lnattar/rwl
Design Discharge
Crest Level
165.100 m
Assume FMFL
165.882 m
164.625 m
164.200 m
165.885 m
164.200 m
165.882 - 165.1
500 c/s
0.78 m
20 m
20 m
0.45 m
0.675 m
Hence provide Narrow crested weir
h
crest+165.1
NC Weir
Where L =
h
h1
bed level+164.2
effective length
FMFL - RMFL
20 m
165.882 - 164.625 =
=
164.625 - 165.1
1.257 m
-0.475 m
3
14.158 m /sec
3
14.158 m /sec
3
14.158 m /sec
146912493.xlsx.ms_officeFMFL(drown)
Design Discharge
Crest Level
165.100 m
Assume FMFL
165.332 m
164.775 m
164.200 m
165.335 m
164.200 m
165.332 - 165.1
500 c/s
0.23 m
20 m
0.45 m
0.675 m
Hence provide Broadcrested weir
= 1.704 * L * h^1.5
FMFL+165.335
h
crest+165.1
RWL+164.775
BC Weir
Where L =
h
Q
bed level+164.2
effective length
=
20 m
165.332 - 165.1 =
0.557 m
= 1.704 * L * h^1.5
= 1.704 * 20 * 0.557 ^1.5
=
3
14.158 m /sec
3
14.158 m /sec
3
14.158 m /sec
146912493.xlsx.ms_officeFMFL(free)
Construction
of Check dam
146912493.xlsx.ms_office
Stability Analysis of bodywall
(For Drowned weirs)
HYDRAULIC PARTICULARS
Maximum flood discharge
Top of crest
FMFL
RWL
Upstream bed level
Downstream Bed level
Down stream side slope
Upstream side slope
Top width
Unit weight of concrete
+
+
+
+
+
14.16
165.100
165.885
164.625
164.200
164.200
0.3
0
0.45
2.4
m3/sec
m
m
m
m
500 c/s
H to 1 V
H to 1 V
m
t/m2
The stability of body wall of the anicut was checked for the following conditions
1 Reservoir empty
2 Reservoir at MWL,with tailwater
3 Reservoir at FRL, no tail water
165.885
0.785
164.625
165.100
a
165.1
0
i
0.3
1
0.9 1
ii
3
O
0.9
0.785
0.000
0.45
164.200
0.270
0.450
0.720
Stability analysis:
1.Reservoir empty
S.NO
DESCRIPTION
Co-eff
Length
Depth
Area
Unit wt.
FORCE
V
H
L.A
+
MOMENT
+
-
Weight of masonry
1
2
3
0.5
1
0.5
0.000
0.45
0.270
0.900
0.900
0.900
0.000
0.405
0.122
2.4
2.4
2.4
SV=
Base width
X=
Eccentricity
Maximum stress
b =
0.720 m
SM / SV
e = b/2-X
6e/b
= SV
0
0.972
0.29
1.264
2/3 *b =
0.720
0.495
0.180
SM=
0.48 m
1/3 *b =
0.000
0.481
0.052
0.534
0.24 m
0.534 / 1.264 =
0.422 m
Falls within the middle third
0.72 /2 - 0.422
6 * -0.062 / 0.72
=
=
-0.062 m
0.519 m
/ b * (1 + 6e/b)
= 1.264 / 0.72
* ( 1 + 0.519 )
=
146912493.xlsx.ms_office
= SV/ b * (1 - 6e/b)
= 1.264 / 0.72 * ( 1 - 0.519 )
=
Minimum stress
2
2.666 t/m
2
0.844 t/m
DESCRIPTION
Co-eff
Length
Depth
Area
Weight of masonry
1
2
3
0.5
1
0.5
0.000
0.45
0.270
0.900
0.900
0.900
Water Pressure
i
1
ii
0.5
0.785
0.9
0.9
0.9
Unit wt.
0.000
0.405
0.122
1.4
1.4
1.4
0
0.567
0.17
1
1
b =
X=
Eccentricity
0.720 m
SM / SV
e = b/2-X
6e/b
Maximum stress
=
=
=
=
Minimum stress
2/3 *b =
0.48 m
SV / b * (1 + 6e/b)
1.264 / 0.72 * ( 1 + 4.449 )
SV/ b * (1 - 6e/b)
1.264 / 0.72 * ( 1 - 4.449 )
MOMENT
+
-
0.720
0.495
0.180
0
0.281
0.031
0.45
0.3
SM=
0.737
0.72 /2 - -0.174
6 * 0.534 / 0.72
L.A
0.71
0.41
SV=
Base width
FORCE
H
0.318
0.122
0.311
1/3 *b =
0.439
0.24 m
-0.174 m
=
=
0.534 m
4.449 m
2
9.563 t/m
2
-6.053 t/m
Uplift
DESCRIPTION
S.NO
Co-eff
Length
Weight of masonry
1
0.5
2
1
3
0.5
weight of water
a
0.5
Water Pressure
i
0.5
Uplift
0.5
Depth
0.000
0.45
0.270
0.900
0.900
0.900
0.000
Area
Unit wt.
0.000
0.405
0.122
FORCE
H
L.A
MOMENT
+
-
2.4
2.4
2.4
0
0.972
0.29
0.720
0.495
0.180
0.000
0.481
0.052
0.9
0.000
0.000
0.0000
0.9
0.9
0.720
0.900
0.324
1
SV=
0.41
-0.324
0.940
0.3
0.122
0.48
0.156
SM=
0.534
0.277
146912493.xlsx.ms_office
Base width
b =
X=
Eccentricity
Maximum stress
Minimum stress
S.No
0.720 m
SM / SV
e = b/2-X
6e/b
=
=
=
=
2/3 *b =
1/3 *b =
0.273 m
0.72 /2 - 0.273
6 * 0.087 / 0.72
=
=
0.087 m
0.724 m
2
3.026 t/m
2
0.484 t/m
SV / b * (1 + 6e/b)
1.264 / 0.72 * ( 1 + 0.724 )
SV/ b * (1 - 6e/b)
1.264 / 0.72 * ( 1 - 0.724 )
Condition
0.48 m
Maximum
stress in t/m2
Minimum
stress in t/m2
Empty condition
2.666
0.844
MWL condition
9.563
-6.053
FRL condition
3.026
0.484
0.24 m
146912493.xlsx.ms_office
Cond. 1
Cond. 2
Cond. 3
empty
MWL
FRL
max
2.666
9.563
3.026
min
0.844
-6.053
0.484
Construction
of Check dam
146912493.xlsx.ms_office
Stability Analysis of bodywall ( for Free flow weirs)
HYDRAULIC PARTICULARS
Maximum flood discharge
Top of crest
FMFL
RWL
Upstream bed level
Downstream Bed level
Down stream side slope
Upstream side slope
Top width
Unit weight of concrete
+
+
+
+
+
14.16
165.100
165.335
164.775
164.200
164.200
0.4
0
0.45
2.4
m3/sec
m
m
m
m
500 c/s
H to 1 V
H to 1 V
m
t/m2
The stability of body wall of the anicut was checked for the following conditions
1 Reservoir empty
2 Reservoir at MWL,with tailwater
3 Reservoir at FRL, no tail water
165.335
0.235
165.100
x
a
165.1
0
i
0.325
z
164.775
0.4
1
0.9 1
ii
3
O
0.9
0.235
0.000
0.45
164.200
0.360
0.450
0.810
Stability analysis:
1.Reservoir empty
S.NO
DESCRIPTION
Co-eff
Length
Depth
Area
Unit wt.
FORCE
V
H
L.A
+
MOMENT
+
-
Weight of masonry
1
2
3
0.5
1
0.5
0.000
0.45
0.360
0.900
0.900
0.900
0.000
0.405
0.162
2.4
2.4
2.4
SV=
Base width
X=
Eccentricity
Maximum stress
b =
0.810 m
SM / SV
e = b/2-X
6e/b
= SV
0
0.972
0.39
1.361
2/3 *b =
0.810
0.585
0.240
SM=
0.54 m
1/3 *b =
0.000
0.569
0.093
0.662
0.27 m
0.662 / 1.361 =
0.486 m
Falls within the middle third
0.81 /2 - 0.486
6 * -0.081 / 0.81
=
=
-0.081 m
0.603 m
/ b * (1 + 6e/b)
= 1.361 / 0.81
* ( 1 + 0.603 )
=
146912493.xlsx.ms_office
= SV/ b * (1 - 6e/b)
= 1.361 / 0.81 * ( 1 - 0.603 )
=
Minimum stress
2
2.693 t/m
2
0.667 t/m
DESCRIPTION
Co-eff
Length
Depth
Area
Weight of masonry
1
0.5
0.000
2
1
0.45
3
0.5
0.360
Add Weight of masonry
x
0.5
0
y
1
0.45
z
0.5
0.13
Water Pressure
i
1
ii
0.5
Unit wt.
X=
Eccentricity
0
0.567
0.23
0.810
0.585
0.240
0
0.332
0.054
0.325
0.325
0.325
0.000
0.146
0.021
1
1
1
0
0.146
0.021
0.81
0.585
0.317
0.000
0.086
0.007
0.9
0.9
1
1
0.810 m
=
e = b/2-X
6e/b
=
=
=
=
Minimum stress
MOMENT
+
-
1.4
1.4
1.4
SM / SV
Maximum stress
L.A
0.000
0.405
0.162
0.235
0.9
b =
FORCE
H
0.900
0.900
0.900
SV=
Base width
0.21
0.41
SM=
0.961
2/3 *b =
0.45
0.3
0.54 m
0.272 m
0.81 /2 - 0.272
6 * 0.133 / 0.81
=
=
0.133 m
0.983 m
2
3.332 t/m
2
0.028 t/m
SV / b * (1 + 6e/b)
1.361 / 0.81 * ( 1 + 0.983 )
SV/ b * (1 - 6e/b)
1.361 / 0.81 * ( 1 - 0.983 )
0.478
1/3 *b =
0.095
0.122
0.217
0.27 m
S.NO
Uplift
DESCRIPTION
Co-eff
Length
Weight of masonry
1
0.5
2
1
3
0.5
weight of water
a
0.5
Water Pressure
i
0.5
Depth
0.000
0.45
0.360
0.900
0.900
0.900
0.000
0.9
Area
0.000
0.405
0.162
Unit wt.
FORCE
H
L.A
MOMENT
+
-
2.4
2.4
2.4
0
0.972
0.39
0.810
0.585
0.240
0.000
0.569
0.093
0.9
0.000
0.000
0.0000
0.9
0.41
0.3
0.122
Uplift
0.5
0.810
0.900146912493.xlsx.ms_office
0.3645
1
-0.3645
SV=
Base width
b =
X=
Eccentricity
Maximum stress
Minimum stress
S.No
0.810 m
SM / SV
e = b/2-X
6e/b
=
=
=
=
SM=
0.996
2/3 *b =
0.54 m
1/3 *b =
0.345 m
0.81 /2 - 0.345
6 * 0.06 / 0.81
=
=
0.06 m
0.445 m
2
2.428 t/m
2
0.932 t/m
SV / b * (1 + 6e/b)
1.361 / 0.81 * ( 1 + 0.445 )
SV/ b * (1 - 6e/b)
1.361 / 0.81 * ( 1 - 0.445 )
Condition
0.54
Maximum
stress in t/m2
Minimum
stress in t/m2
Empty condition
2.693
0.667
MWL condition
3.332
0.028
FRL condition
2.428
0.932
0.197
0.662
0.318
0.27 m
146912493.xlsx.ms_office
Cond. 1
Cond. 2
Cond. 3
empty
MWL
FRL
max
2.693
3.332
2.428
min
0.667
0.028
0.932
146912493.xlsx.ms_office
Construction Checkdam
Surface Flow Condition
Design Data:
Top of Check dam
165.1 m
164.775 m
FMFL
165.335 m
164.2 m
164.2 m
=
=
20 m
20 m
Concentration factor
0%
Exit gradient 1 in 6
=
Depth of U/s water (FMFL - U/s bed level)
Thickness of cut-off wall
0.17
1.135 m
0.45 m
500 c/s =
14.158 Cumecs
Regime Width:
= 4.83 Q
Looseness factor
18.17 m
say
19 m
= 20 / 19
=
Hence, the scour depth may be calculated as follows
1.053
>
Scour depth:
Assume silt factor
= 1.25
= 0.475 (Q / f) ^(1/3)
= 0.475 X ( 14.158 / 1.25 )^(1/3)
1.06675 m say
1.067 m
Energy level:
Depth of water in front of weir
1.135 m
Q/A
Page 16
surface flow
146912493.xlsx.ms_office
14.158 / ( 20 x 1.135 )
0.624 m/sec
0.624 ^2 / (2 X 9.81)
=
0.019846 m
say
0.020 m
= 165.335 + 0.02
D/s velocity (Vd)
= 1.187 ^2 / ( 2 X 9.81)
=
1.187 m/sec
0.07181 m
165.355 m
say
0.072 m
=
=
164.775 + 0.072
164.847 m
Item
1 Discharge intensity
2
0.708 m /sec
(q)
in m
164.775 m
in m
165.335 m
in m
164.847 m
in m
165.355 m
0.508 m
7 Postjump Depth D2
(Assume)
0.760 m
8 Velocity (V2) = q / D2
= 0.7079 / 0.76
0.931 m/sec
Ef2 = D2 + V22/2g
0.76 + 0.931 ^2 / (2 * 9.81)
10 Froude's Number F2
0.804 m
11 Prejump Depth
0.003
0.341
Page 17
surface flow
146912493.xlsx.ms_office
= 0.76 / 2 * ( -1 + sqrt (1+ 8 * 0.3411 ^2 ) )
12 Velocity (V1 ) = q / D1
0.148 m
= 0.7079 / 0.148
4.786 m/sec
2
13 U/s specific energy Ef1 = D1 + V1 / 2g
1.315 m
14 Ef1 - Ef2 - HL = 0
0.003 ~ 0
15 Level at which jump would form ( D/s Total Energy Lvl - Ef2)
164.040 m
3.06 m
=
=
=
=
=
=
=
164.2 m
164.2 m
4.00 m
0.44
0.00
0.45 m
0.91 m
1 slope
1 slope
=
=
=
=
164.2
164.04
0.16
0.2
164.000
m
m
m
m
m
5.80 m
5.80 m
Page 18
surface flow
146912493.xlsx.ms_office
Construction of Check dam
DESIGN OF CHECKDAM ON PERMABLE FOUNDATION
Sub surface Flow Condition (Koshla's Theory)
Design Data:
Maximum Flood Discharge
Crest level
MWL
Rear Water Level
Exit gradient 1 in
U/s bed level
14
165.100
165.335
164.775
6
164.200
20
0.45
0.45
165.100 m
165.335 m
164 m
0.2 m
1.14 m
Yu /3 + 0.6
0.978 m
1m
1m
m
m
m
m
0.6 m
3
2.4 t/m
3
1 t/m
500 Cusecs
0.17
164.200 m
Cumecs or
m
m
m
163.200 m
163.175 m
1.025 m
0.58 m
Page 19
146912493.xlsx.ms_office
Minimum depth of D/s cutoff
= 0.575 / 2 + 0.6
Depth of D/s cut off to be provided=
Provide a depth of D/s cutoff as
Yd /2 + 0.6
0.888 m
1.6 m
1.6 m
Bottom of D/s cut off = D/s bed level - Depth of D/s cutoff
Bottom of D/s cut off =
164.2 - 1.6
=
162.600 m
5.35
0.685
0.890
3.78
1
0.45
164.2
0.4
1
164.2
164
163.75
0.6
1m
163.4
1.6 m
0.910
4.44
162.6
2
163.2
1
Proposed Floor
Floor Length Required From Exit Gradient Considerations
Exit gradient
Taking head upto MFL
Static head H = FRL - D/S Bed level = 165.1 - 164.2
d = Depth of d/scutoff
Ge =
H
d
0.17
=
0.900 m
1.6 m
1.1541
_____
= (2 -1)2 -1
a
Length of floor required from exit gradient a d
=
Length of floor required (Exit gradient criteria)
Length of floor provided (hydraulic jump criteria)
0.843474
1.350
2
2
5.80
m
m
m
m
5.80 m
Page 20
146912493.xlsx.ms_office
Uplift Pressures:
for Pile
1
Total length of floor (b) =
Depth of pile (d)
=
5.80 m
1m
a = b/d
5.8 / 1
5.8
_____
=( 1 + 1+ a2 )/ 2
=
( 1 + sqrt(1 + 5.8 ^2) ) / 2
=
3.443
a =
a =
f c = 1 / p cos-1 (( - 2)/)
fc =
36.235 %
f D = 1 / p cos-1 (( - 1)/)
fD =
f C1 =
f C1 =
f D1 =
24.890 %
100-f c
63.765 %
100-f D
f D1 =
75.110 %
f E1 =
100 %
f E1 =
100 %
f D1 =
75 %
f C1 =
for Pile
2
Total length of floor (b) =
Depth of pile (d)
=
5.80 m
1.6 m
a = b/d
a =
5.8 / 1.6
a =
3.625
=( 1 + 1+ a2 )/ 2
=
( 1 + sqrt(1 + 3.625 ^2) ) / 2
=
2.3802
f E = 1 / p cos-1 (( - 2)/)
fE =
44.894 %
Page 21
146912493.xlsx.ms_office
f D = 1 / p cos-1 (( - 1)/)
fD =
Pile No
30.310 %
f C2 =
0%
f D2 =
30.310 %
f E2 =
44.894 %
f E2 =
45 %
f D2 =
30 %
f C2 =
0%
Pressure
1
Upstream pile
f E1 =
at the pt
f D1 =
2
Downstream pile
100 f E2 =
75 f D2 =
f C1 =
30
74 f C2 =
U/S water
D/S water
Unbalanced
Level
Level
Head
Static condition
165.100
45
0
Elevation of HGL
Pile1
f E1
f D1
f C1
Pile2
f E2
f D2
f C2
100
75
74
45
30
164.200
0.900
0.9
165.1
0.68
164.88
0.66
164.86
0.40
164.60
0.27
164.47
0
164.2
Dymanic condition
165.335
164.775
0.560
0.56
165.34
0.42
165.20
0.41
165.19
0.25
165.03
0.17
164.94
0.00
164.78
165.19
164.86
Dynamic HGL
165.14
165.335
Static HGL
164.79
165.1
0.953
Page 22
165.03
164.60
146912493.xlsx.ms_office
0.587
164.2
0.45
0.148
164.04
164.2
164
0.6
1m
0.02
1.6 m
162.6
163.2
2
1
0.685
0.89
5.35
3.78
Proposed Floor
Uplift Pressures
74
100
45 0
64
45
2 30
75 1
FLOOR THICKNESS
(Dynamic head)
At the point of formation of jump
Dynamic head unbalance
2/3 rd of head
Thickness required
Provide a depth of
(Static head)
the static head is calculated from d/s basin level.
Maximum ordinate for static condition is at toe of the anicut.
3.78 m
(a)
Unbalanced head at
2
m from center of d/s pile
0.701
Thickness required
0.501 m
Provide a depth of
0.600 m
(d)
Unbalanced head at
Thickness required
3.78
Page 23
146912493.xlsx.ms_office
Provide a depth of
Static dominates the flow
Provided thickness at toe
0.600 m
0.600 m
Page 24
146912493.xlsx.ms_office
Page 25
146912493.xlsx.ms_office
Page 26
146912493.xlsx.ms_office
Page 27
146912493.xlsx.ms_office
Page 28
146912493.xlsx.ms_office
Page 29
146912493.xlsx.ms_office
Page 30
146912493.xlsx.ms_office
Page 31
146912493.xlsx.ms_office
Page 32
146912493.xlsx.ms_office
Page 33
146912493.xlsx.ms_office
Page 34
146912493.xlsx.ms_office
Page 35
146912493.xlsx.ms_office
Page 36
146912493.xlsx.ms_office
Page 37
146912493.xlsx.ms_office
Page 38
146912493.xlsx.ms_office
Page 39
146912493.xlsx.ms_office
Page 40
146912493.xlsx.ms_office
Page 41
146912493.xlsx.ms_office
Page 42
146912493.xlsx.ms_office
Page 43
146912493.xlsx.ms_office
Page 44
146912493.xlsx.ms_office
Page 45
146912493.xlsx.ms_office
Page 46
146912493.xlsx.ms_office
Page 47
146912493.xlsx.ms_office
Page 48
146912493.xlsx.ms_office
Page 49
146912493.xlsx.ms_office
Page 50
146912493.xlsx.ms_office
Page 51
146912493.xlsx.ms_office
Page 52
146912493.xlsx.ms_office
Page 53
146912493.xlsx.ms_office
Page 54
146912493.xlsx.ms_office
Page 55
146912493.xlsx.ms_office
Page 56
146912493.xlsx.ms_office
Page 57
146912493.xlsx.ms_office
Page 58
146912493.xlsx.ms_office
Page 59
146912493.xlsx.ms_office
Page 60
146912493.xlsx.ms_office
Page 61
146912493.xlsx.ms_office
Page 62
146912493.xlsx.ms_office
Page 63
146912493.xlsx.ms_office
Page 64
146912493.xlsx.ms_office
Page 65
146912493.xlsx.ms_office
Page 66
146912493.xlsx.ms_office
Page 67
146912493.xlsx.ms_office
Page 68
146912493.xlsx.ms_office
Page 69
146912493.xlsx.ms_office
Page 70
146912493.xlsx.ms_office
Page 71
146912493.xlsx.ms_office
Page 72
146912493.xlsx.ms_office
Page 73
146912493.xlsx.ms_office
Page 74
146912493.xlsx.ms_office
Page 75
146912493.xlsx.ms_office
Page 76
146912493.xlsx.ms_office
Page 77
146912493.xlsx.ms_office
Page 78
146912493.xlsx.ms_office
Page 79
146912493.xlsx.ms_office
Page 80
146912493.xlsx.ms_office
Page 81
146912493.xlsx.ms_office
Page 82
146912493.xlsx.ms_office
Page 83
146912493.xlsx.ms_office
Page 84
146912493.xlsx.ms_office
Page 85
146912493.xlsx.ms_office
Page 86
146912493.xlsx.ms_office
Page 87
146912493.xlsx.ms_office
Page 88
146912493.xlsx.ms_office
Page 89
146912493.xlsx.ms_office
Page 90
146912493.xlsx.ms_office
Page 91
146912493.xlsx.ms_office
Page 92
146912493.xlsx.ms_office
Page 93
146912493.xlsx.ms_office
Page 94
146912493.xlsx.ms_office
Page 95
146912493.xlsx.ms_office
Page 96
146912493.xlsx.ms_office
Page 97
146912493.xlsx.ms_office
Page 98
146912493.xlsx.ms_office
Page 99
146912493.xlsx.ms_office
Page 100
146912493.xlsx.ms_office
Page 101
146912493.xlsx.ms_office
Page 102
146912493.xlsx.ms_office
Page 103
146912493.xlsx.ms_office
Page 104
146912493.xlsx.ms_office
Page 105
146912493.xlsx.ms_office
Page 106
146912493.xlsx.ms_office
Page 107
146912493.xlsx.ms_office
Page 108
146912493.xlsx.ms_office
Page 109
146912493.xlsx.ms_office
Page 110
146912493.xlsx.ms_office
Page 111
146912493.xlsx.ms_office
Page 112
146912493.xlsx.ms_office
Page 113
146912493.xlsx.ms_office
Page 114
146912493.xlsx.ms_office
Page 115
146912493.xlsx.ms_office
Page 116
146912493.xlsx.ms_office
Page 117
146912493.xlsx.ms_office
Page 118
146912493.xlsx.ms_office
Page 119
146912493.xlsx.ms_office
Page 120
146912493.xlsx.ms_office
Page 121
146912493.xlsx.ms_office
Page 122
146912493.xlsx.ms_office
Page 123
146912493.xlsx.ms_office
Page 124
146912493.xlsx.ms_office
Page 125
146912493.xlsx.ms_office
Page 126
146912493.xlsx.ms_office
Page 127
146912493.xlsx.ms_office
Page 128
146912493.xlsx.ms_office
Page 129
146912493.xlsx.ms_office
Page 130
146912493.xlsx.ms_office
Page 131
146912493.xlsx.ms_office
Page 132
146912493.xlsx.ms_office
Page 133
146912493.xlsx.ms_office
Page 134
146912493.xlsx.ms_office
Page 135
146912493.xlsx.ms_office
Page 136
146912493.xlsx.ms_office
Page 137
146912493.xlsx.ms_office
Page 138
146912493.xlsx.ms_office
Page 139
146912493.xlsx.ms_office
Page 140
146912493.xlsx.ms_office
Page 141
146912493.xlsx.ms_office
Page 142
146912493.xlsx.ms_office
Page 143
146912493.xlsx.ms_office
Page 144
146912493.xlsx.ms_office
Page 145
146912493.xlsx.ms_office
Page 146
146912493.xlsx.ms_office
Page 147
146912493.xlsx.ms_office
Page 148
146912493.xlsx.ms_office
Page 149
146912493.xlsx.ms_office
Page 150
146912493.xlsx.ms_office
Page 151
146912493.xlsx.ms_office
Page 152
146912493.xlsx.ms_office
Page 153
146912493.xlsx.ms_office
Page 154
146912493.xlsx.ms_office
Page 155
146912493.xlsx.ms_office
Page 156
146912493.xlsx.ms_office
Page 157
146912493.xlsx.ms_office
Page 158
146912493.xlsx.ms_office
Page 159
146912493.xlsx.ms_office
Page 160
146912493.xlsx.ms_office
Page 161
146912493.xlsx.ms_office
Page 162
146912493.xlsx.ms_office
Page 163
146912493.xlsx.ms_office
Page 164
146912493.xlsx.ms_office
Page 165
146912493.xlsx.ms_office
Page 166
146912493.xlsx.ms_office
Page 167
146912493.xlsx.ms_office
Page 168
146912493.xlsx.ms_office
Page 169
146912493.xlsx.ms_office
Page 170
146912493.xlsx.ms_office
Page 171
146912493.xlsx.ms_office
Page 172
146912493.xlsx.ms_office
Page 173
146912493.xlsx.ms_office
Page 174
146912493.xlsx.ms_office
Page 175
146912493.xlsx.ms_office
Page 176
146912493.xlsx.ms_office
Page 177
146912493.xlsx.ms_office
Page 178
146912493.xlsx.ms_office
Page 179
146912493.xlsx.ms_office
Page 180
146912493.xlsx.ms_office
Page 181
146912493.xlsx.ms_office
Page 182
146912493.xlsx.ms_office
Page 183
146912493.xlsx.ms_office
Page 184
146912493.xlsx.ms_office
Page 185
146912493.xlsx.ms_office
Page 186
146912493.xlsx.ms_office
Page 187
146912493.xlsx.ms_office
Page 188
146912493.xlsx.ms_office
Page 189
146912493.xlsx.ms_office
Page 190
146912493.xlsx.ms_office
Page 191
146912493.xlsx.ms_office
Page 192
146912493.xlsx.ms_office
Page 193
146912493.xlsx.ms_office
Page 194
146912493.xlsx.ms_office
Page 195
146912493.xlsx.ms_office
Page 196
146912493.xlsx.ms_office
Page 197
146912493.xlsx.ms_office
Page 198
146912493.xlsx.ms_office
Page 199
146912493.xlsx.ms_office
Page 200
146912493.xlsx.ms_office
Page 201
146912493.xlsx.ms_office
Page 202
146912493.xlsx.ms_office
Page 203
146912493.xlsx.ms_office
Page 204
146912493.xlsx.ms_office
Page 205
2.1 m
1.250 m
2
Length of launching =
2.154 m
Quantity of pitching required to be laid per m width in the launched
slope length of
2.154 m with thickness
1.25 m
=
3
2.693 m
This should be laid in the length of
2m
Quantity of pitching required for the thickness(T)=
Inner Thickness of loose apron =
Provide an inner thickness of
Balance quantity of pitching=
This should be laid in the wedge portion
Thickness of wedge portion=
Outer thickness required=
Provide an outer thickness=
Quantity of pitching provided =
1.10
?
2.154
2.5: 1
3
2.154 m
1.077 m
1.1 m
3
0.539 m
0.539 m
1.639 m
1.7 m
3
2.8 m
2
1.10
<
14
1.70
3
2.693 m
Pales/Prot
Hence O.K
15
Pales/Prot
16
Pales/Prot
17
Pales/Prot
0.75
7.72
0.28
11
31
o
o
0.5
1.566
2
0.5
Cos2( f-a)
Cos a * Cos(d+a)
0.408
1.785
Ca=
Cos2( f-a)
Cos a *
Cos(d+a)
2
= 1.785 * 0.408
1
Sin(f+d)*Sin(f-i)
1+
Cos(a-i)*Cos(d+a)
=
2
^0.5
0.7280
146912493.xlsx.ms_officeus wing
Ca
0.7280
2
Pa = Pa =1/2*w*h *Ca =
0.5 * 2 * 1.885 ^2 * 0.728
=
Earth pressure:
Vertical component= Pa* Sin(a+d) =
2.587 * Sin ( 31 + 11 )
Horizontal component Pa* Cos(a+d)
2.587 * Cos( 31 + 11 )
2.587 t
t
t
Moments
(m)
t-m
0.450
a
1.730
1.923
=
=
166.085
0.6
d
Pa
1.885
O
Coeff.
0.450
Unit.wt.
1.131
Forces(t)
V
Weight of concrete
1
1
0.5
1
0.5
1
0.450
1.131
0
1.885
1.885
1.885
2.4
2.4
2.4
X=
Eccentricity
Maximum stress
Minimum stress
Maximum stress=
Minimum stress=
2.036
2.558
0.000
1.730
SV=
Base width b =
1.581 m
SM / SV
2/3 *b =
=
e = b/2-X
6e/b
=
=
=
=
6.324
6.324
1.923
1.923
2.761
1.929
0.000
0.377
0.628
0.652
1.209
6.550
6.550
SM=
1.054 m
1/3 *b = 0.527
6.55 / 6.324 =
Falls within the middle third
1.036 m
1.581 /2 - 1.036
6 * -0.245 / 1.581
=
=
SV / b * (1 + 6e/b)
6.324 / 1.581 * ( 1 + 0.931 )
SV/ b * (1 - 6e/b)
6.324 / 1.581 * ( 1 - 0.931 )
1.356
0.754
1.581
-0.245 m
0.931 m
2
7.723 t/m
2
0.276 t/m
2
7.723 t/m
2
0.276 t/m
146912493.xlsx.ms_officeus wing
0.75
5.41
0.34
11
27
o
o
0.5
1.536
2
0.5
Cos2( f-a)
Cos a * Cos(d+a)
0.424
1.567
Ca=
Cos2( f-a)
Cos a *
Cos(d+a)
2
= 1.567 * 0.424
1
Sin(f+d)*Sin(f-i)
1+
Cos(a-i)*Cos(d+a)
=
2
^0.5
0.6638
146912493.xlsx.ms_officeds wing
Ca
0.6638
2
Pa = Pa =1/2*w*h *Ca =
0.5 * 2 * 1.325 ^2 * 0.664
=
Earth pressure:
Vertical component= Pa* Sin(a+d) =
1.165 * Sin ( 27 + 11 )
Horizontal component Pa* Cos(a+d)
1.165 * Cos( 27 + 11 )
1.165 t
t
t
Moments
(m)
t-m
0.450
a
0.710
0.924
=
=
165.525
0.5
d
Pa
1.325
O
Coeff.
0.450
Unit.wt.
0.663
Forces(t)
V
Weight of concrete
1
1
0.5
1
0.5
1
0.450
0.6625
0
1.325
1.325
1.325
2.4
2.4
2.4
X=
Eccentricity
Maximum stress
Minimum stress
Maximum stress=
Minimum stress=
1.431
1.053
0.000
0.710
SV=
Base width b =
1.113 m
SM / SV
=
=
=
=
0.221
0.442
0.157
0.408
2.300
2.300
1/3 *b = 0.37083
2.3 / 3.195 =
Falls within the middle third
0.720 m
1.113 /2 - 0.72
6 * -0.164 / 1.113
=
=
SV / b * (1 + 6e/b)
3.195 / 1.113 * ( 1 + 0.883 )
SV/ b * (1 - 6e/b)
3.195 / 1.113 * ( 1 - 0.883 )
1.270
0.465
0.000
SM=
2/3 *b = 0.7416667 m
=
e = b/2-X
6e/b
3.195
3.195
0.924
0.924
0.888
0.442
1.113
-0.164 m
0.883 m
2
5.407 t/m
2
0.336 t/m
2
5.407 t/m
2
0.336 t/m
146912493.xlsx.ms_officeds wing