Name of Work :: ______ ______ ______ ______ ______ ______ ______ _____ _____ _____ _____ _____ ______ _____ _____ _____ ______ ______ ______ ______ ______ ______ _
S.No 1
1 2 3 4 5 6 7 8 9
DESCRIPTION 2 Item of Work Date Location Weight of Empty Measuring cup Wt. of Empty measuring cup + Wt. of Aggregate (passing 12.5 mm & retaining on 10 mm sieve ) Wt. of Aggregate (passing 12.5 mm & retaining on 10 mm sieve ) Wt. of Impacted Aggregate ( retained on 2.36 mm )2.36 mm sieve ) Wt. of Fines (passing A. I. V.
Notation - Units 3
Sno
1 1 2 3 4 5 6 7 8 9 999
gm
Sno
Remarks
1 1 2 3 4 5 6 7 999
AEE/
DEE/
Data Sheet for Sieve Analysis of Aggregate ( IS : 2386 Part - 1 ) COARSE AGGREGATE (20 mm size Graded metal) Name of Work :: ______ ______ ______ ______ ______ ______ ______ _____ _____ _____ _____ _____ ______ _____ _____ _____ ______ ______ ______ ______ ______ ______ _ Road Section at KM :: Sample No:: I.S. Sieve designation Weight of sample retained (gm) 3 100 100 100 100 999 gm Cumulative Per cent of per cent of weight weight retained retained (%) (%) 4 5 100 100 100 100 999 Over Size= 100 100 100 100 999 % Date :: Weight of Sample :: gm Cumulative per cent of Permissible Limits weight As Per MoRT&H Remarks passing Specification TABLE 1000-1 (%) 7 6 8 100 100 95 - 100 100 100 25 - 55 100 100 0 - 10 100 100 200 200 100 999 999 999 999 Under Size= %
SNo
1 1 2 3 4 5 999
40 20 10 4.75 In 999
AEE/
DEE/
1 1 2 3 4 5 999
40 20 10 4.75 In 999
Road Section at KM :: Sample No:: 2 4 3 mm 100 mm 100 100 mm 100 100 mm 100 100 Pan 100 999 999 999 Over Size= Total = gm
Date :: Weight of Sample :: 7 6 100 100 95 - 100 100 25 - 55 100 0 - 10 100 200 200 999 999 999 Under Size= %
AEE/
DEE/
S.No 1
1 2 3 4 5 6 7 8 9
DESCRIPTION 2 Item of Work Date Location Weight of Empty Measuring cup Wt. of Empty measuring cup + Wt. of Aggregate (passing 12.5 mm & retaining on 10 mm sieve ) Wt. of Aggregate (passing 12.5 mm & retaining on 10 mm sieve ) Wt. of Impacted Aggregate ( retained on 2.36 mm )2.36 mm sieve ) Wt. of Fines (passing A. I. V.
Notation - Units 3
Sno
1 1 2 3 4 5 999
gm
Sno
Remarks
1 1 2 3 4 5 999
AEE/
DEE/
Data Sheet for Sieve Analysis of Aggregate ( IS : 2386 Part - 1 ) COARSE AGGREGATE (40 mm size Graded metal) Name of Work :: ______ ______ ______ ______ ______ ______ ______ _____ _____ _____ _____ _____ ______ _____ _____ _____ ______ ______ ______ ______ ______ ______ _ Road Section at KM :: Sample No:: I.S. Sieve designation Weight of sample retained (gm) 3 100 100 100 100 100 999 gm Cumulative Per cent of per cent of weight weight retained retained (%) (%) 4 5 100 100 100 100 100 999 Over Size= 100 100 100 100 100 999 % Date :: Weight of Sample :: gm Cumulative per cent of Permissible Limits weight As Per MoRT&H Remarks passing Specification TABLE 1000-1 (%) 7 6 8 100 100 95 - 100 100 100 30 - 70 100 100 10 - 35 100 100 0-5 100 100 200 200 100 999 999 999 999 Under Size= %
SNo
1 1 2 3 4 5 6 999
63 40 20 10 4.75 In 999
AEE/
DEE/
1 1 2 3 4 5 6 999
63 40 20 10 4.75 In 999
Road Section at KM :: Sample No:: 2 4 3 mm 100 mm 100 100 mm 100 100 mm 100 100 mm 100 100 Pan 100 999 999 999 Total = gm Over Size=
Date :: Weight of Sample :: 7 6 100 100 95 - 100 100 30 - 70 100 10 - 35 100 0-5 100 200 200 999 999 999 Under Size= %
AEE/
DEE/
DESCRIPTION 2
Notation - Units 3
Sample 4
Sample 4
Sample 4
Sample 4
Sample 4
Grade of Concrete Date Location Initial Height of Slump cone ( Concrete mould ) Height of Concrete after subsidence SLUMP = Reduction if Heigh of Concrete Remarks h1 mm h2 mm (h2-h1)=S mm
9 10
COMPRESSIVE STRENGTH
Name of Work :: ______ ______ ______ ______ ______ ______ ______ _____ _____ _____ _____ _____ ______ _____ _____ _____ ______ ______ ______ ______ ______ ______ _ S.No 1 1 2 3 4 5 6 7 DESCRIPTION 2 Item of Work Grade of Concrete :: Date Location Date of Casting Number of Cubes cast 7 days Compressive strength Test Date Compressive strength of Cube 1 Compressive strength of Cube 2 Compressive strength of Cube 3 Average 8 28 days Compressive strength Test Date Compressive strength of Cube 4 Compressive strength of Cube 5 Compressive strength of Cube 6 Average 9 10 11 Remarks Asst. Executive Engineer / Dy. Executive Engineer /
N/mm2 N/mm2 N/mm2 N/mm2
Units 3
Sample 4
Sample 4
Sample 4
Sample 4
Sample 4
Sample 4
no
DESCRIPTION 2
Notation - Units 3
Sample 4
Sample 4
Sample 4
Sample 4
Sample 4
Grade of Concrete Date Location Initial Height of Slump cone ( Concrete mould ) Height of Concrete after subsidence SLUMP = Reduction if Heigh of Concrete Remarks h1 mm h2 mm (h2-h1)=S mm
9 10
COMPRESSIVE STRENGTH
Name of Work :: ______ ______ ______ ______ ______ ______ ______ _____ _____ _____ _____ _____ ______ _____ _____ _____ ______ ______ ______ ______ ______ ______ _ S.No 1 1 2 3 4 5 6 7 DESCRIPTION 2 Item of Work Grade of Concrete :: Date Location Date of Casting Number of Cubes cast 7 days Compressive strength Test Date Compressive strength of Cube 1 Compressive strength of Cube 2 Compressive strength of Cube 3 Average 8 28 days Compressive strength Test Date Compressive strength of Cube 4 Compressive strength of Cube 5 Compressive strength of Cube 6 Average 9 10 11 Remarks Asst. Executive Engineer / Dy. Executive Engineer /
N/mm2 N/mm2 N/mm2 N/mm2
Units 3
Sample 4
Sample 4
Sample 4
Sample 4
Sample 4
Sample 4
no
SNo
GRADING ZONES AS PER TABLE Cumulative Weight of Per cent of 1000-2 of MoRT&H. per cent of Percentage sample weight weight passing retained retained Grading Grading Grading retained (%) Zone I Zone II Zone III (gm) (%) (%)
Remarks
1 1 2 3 4 5 6 7
2 3 10.00 mm 4.75 mm 2.36 mm 1.18 mm 600 micron 300 micron 150 micron Total of Col.(4):: Fineness Modulus ::
7 100 90 - 100 60 - 95 30 - 70
10
15 - 34
5 - 20 0 - 10
35 - 59
8 - 30 0 - 10
60 - 79
12 - 40 0 - 10
Remarks ::
AEE/
Dy.EE/
Road Section at KM :: Sample No:: 1 1 2 3 4 5 6 7 2 3 10.00 mm 4.75 mm 2.36 mm 1.18 mm 600 micron 300 micron 150 micron Total of Col.(4):: Fineness Modulus :: 4 5 6
7 100 90 - 100 60 - 95 30 - 70
10
15 - 34
5 - 20 0 - 10
35 - 59
8 - 30 0 - 10
60 - 79
12 - 40 0 - 10
Remarks ::
AEE/
Dy.EE/
S.No 1 1 2 3 4 5 6 7 8 9 10 11 12
DESCRIPTION 2 Item of Work Date Location Initial Volume of Sand Final Volume of Sand in water Bulking of Sand Bulkage (%) Volume of Deleterious Materials Percentage of Deleterious Materials
Remarks Asst. Executive Engineer Dy. Executive Engineer
Notation - Units 3
Sample 4
Sample 4
Sample 4
Sample 4
Sample 4
Sample 4
DESCRIPTION 2
Notation - Units 3
Sample 4
Sample 4
Sample 4
Sample 4
Sample 4
Grade of Concrete Date Location Initial Height of Slump cone ( Concrete mould ) Height of Concrete after subsidence SLUMP = Reduction if Heigh of Concrete Remarks h1 mm h2 mm (h2-h1)=S mm
9 10
COMPRESSIVE STRENGTH
Name of Work :: ______ ______ ______ ______ ______ ______ ______ _____ _____ _____ _____ _____ ______ _____ _____ _____ ______ ______ ______ ______ ______ ______ _ S.No 1 1 2 3 4 5 6 7 DESCRIPTION 2 Item of Work Grade of Concrete :: Date Location Date of Casting Number of Cubes cast 7 days Compressive strength Test Date Compressive strength of Cube 1 Compressive strength of Cube 2 Compressive strength of Cube 3 Average 8 28 days Compressive strength Test Date Compressive strength of Cube 4 Compressive strength of Cube 5 Compressive strength of Cube 6 Average 9 10 11 Remarks Asst. Executive Engineer / Dy. Executive Engineer /
N/mm2 N/mm2 N/mm2 N/mm2
Units 3
Sample 4
Sample 4
Sample 4
Sample 4
Sample 4
Sample 4
no
DESCRIPTION 2
Notation - Units 3
Sample 4
Sample 4
Sample 4
Sample 4
Sample 4
Grade of Concrete Date Location Initial Height of Slump cone ( Concrete mould ) Height of Concrete after subsidence SLUMP = Reduction if Heigh of Concrete Remarks h1 mm h2 mm (h2-h1)=S mm
9 10
COMPRESSIVE STRENGTH
Name of Work :: ______ ______ ______ ______ ______ ______ ______ _____ _____ _____ _____ _____ ______ _____ _____ _____ ______ ______ ______ ______ ______ ______ _ S.No 1 1 2 3 4 5 6 7 DESCRIPTION 2 Item of Work Grade of Concrete :: Date Location Date of Casting Number of Cubes cast 7 days Compressive strength Test Date Compressive strength of Cube 1 Compressive strength of Cube 2 Compressive strength of Cube 3 Average 8 28 days Compressive strength Test Date Compressive strength of Cube 4 Compressive strength of Cube 5 Compressive strength of Cube 6 Average 9 10 11 Remarks Asst. Executive Engineer / Dy. Executive Engineer /
N/mm2 N/mm2 N/mm2 N/mm2
Units 3
Sample 4
Sample 4
Sample 4
Sample 4
Sample 4
Sample 4
no
DESCRIPTION 2
Notation - Units 3
Sample 4
Sample 4
Sample 4
Sample 4
Sample 4
Grade of Concrete Date Location Initial Height of Slump cone ( Concrete mould ) Height of Concrete after subsidence SLUMP = Reduction if Heigh of Concrete Remarks h1 mm h2 mm (h2-h1)=S mm
9 10
COMPRESSIVE STRENGTH
Name of Work :: ______ ______ ______ ______ ______ ______ ______ _____ _____ _____ _____ _____ ______ _____ _____ _____ ______ ______ ______ ______ ______ ______ _ S.No 1 1 2 3 4 5 6 7 DESCRIPTION 2 Item of Work Grade of Concrete :: Date Location Date of Casting Number of Cubes cast 7 days Compressive strength Test Date Compressive strength of Cube 1 Compressive strength of Cube 2 Compressive strength of Cube 3 Average 8 28 days Compressive strength Test Date Compressive strength of Cube 4 Compressive strength of Cube 5 Compressive strength of Cube 6 Average 9 10 11 Remarks Asst. Executive Engineer / Dy. Executive Engineer /
N/mm2 N/mm2 N/mm2 N/mm2
Units 3
Sample 4
Sample 4
Sample 4
Sample 4
Sample 4
Sample 4
no
DESCRIPTION 2
Notation - Units 3
Sample 4
Sample 4
Sample 4
Sample 4
Sample 4
Grade of Concrete Date Location Initial Height of Slump cone ( Concrete mould ) Height of Concrete after subsidence SLUMP = Reduction if Heigh of Concrete Remarks h1 mm h2 mm (h2-h1)=S mm
9 10
COMPRESSIVE STRENGTH
Name of Work :: ______ ______ ______ ______ ______ ______ ______ _____ _____ _____ _____ _____ ______ _____ _____ _____ ______ ______ ______ ______ ______ ______ _ S.No 1 1 2 3 4 5 6 7 DESCRIPTION 2 Item of Work Grade of Concrete :: Date Location Date of Casting Number of Cubes cast 7 days Compressive strength Test Date Compressive strength of Cube 1 Compressive strength of Cube 2 Compressive strength of Cube 3 Average 8 28 days Compressive strength Test Date Compressive strength of Cube 4 Compressive strength of Cube 5 Compressive strength of Cube 6 Average 9 10 11 Remarks Asst. Executive Engineer / Dy. Executive Engineer /
N/mm2 N/mm2 N/mm2 N/mm2
Units 3
Sample 4
Sample 4
Sample 4
Sample 4
Sample 4
Sample 4
no