Anda di halaman 1dari 20

Aggregate Impact Value [ IS : 2386 (Part-4)]

Name of Work :: ______ ______ ______ ______ ______ ______ ______ _____ _____ _____ _____ _____ ______ _____ _____ _____ ______ ______ ______ ______ ______ ______ _

S.No 1
1 2 3 4 5 6 7 8 9

DESCRIPTION 2 Item of Work Date Location Weight of Empty Measuring cup Wt. of Empty measuring cup + Wt. of Aggregate (passing 12.5 mm & retaining on 10 mm sieve ) Wt. of Aggregate (passing 12.5 mm & retaining on 10 mm sieve ) Wt. of Impacted Aggregate ( retained on 2.36 mm )2.36 mm sieve ) Wt. of Fines (passing A. I. V.

Notation - Units 3

Sample Sample Sample Sample Sample

COARSE AGGREGATE (20 mm size Graded metal)

W1 gm W2 gm (W2-W1)=W3 W4 (W3-W4)=W5 100*W5/W3 gm gm gm %

10 Remarks 11 Asst. Executive Engineer / 12 Dy. Executive Engineer/

Flakiness Test of Aggregate ( IS : 2386 Part - 1 )


Name of Work :: ______ ______ ______ ______ ______ ______ ______ _____ _____ _____ _____ _____ ______ _____ _____ _____ ______ ______ ______ ______ ______ ______ _ COARSE AGGREGATE (20 mm size Graded metal) Road Section at KM :: Date :: Sample No:: Weight :: gm Size of Aggregate Wt. of the Thickness fraction of at Wt. of aggregate in gauge Passing Through Retained on least each fraction passing Remarks size IS Sieve IS Sieve 200 pieces thickness gauge (gm) ( mm ) ( mm) ( mm) (gm ) 2 63 50 40 31.5 25 20 16 12.5 10 999 Total ( gm ) 3 50 40 31.5 25 20 16 12.5 10 6.3 999 W= 4 100 100 100 100 100 100 100 100 100 999 1000 5 33.9 27 19.5 16.95 13.5 10.8 8.55 6.75 4.89 999 w= 6 100 100 100 100 100 100 100 100 100 999 1000 F.L=(100*w/W)= 7 100 100 100 100 100 100 100 100 100 999 pc

Sno

1 1 2 3 4 5 6 7 8 9 999

Elangation Test of Aggregate ( IS : 2386 Part - 1 )


COARSE AGGREGATE (20 mm size Graded metal) Road Section at KM :: Date :: Sample No:: Weight :: Size of Aggregate Wt. of the Thickness fraction of at Wt. of aggregate in gauge Passing Through Retained on least each fraction passing size IS Sieve IS Sieve 200 pieces thickness gauge (gm) ( mm ) ( mm) ( mm) (gm ) 2 50 40 25 20 16 12.5 10 999 Total ( gm ) 3 40 25 20 16 12.5 10 6.3 999 W= 4 100 100 100 100 100 100 100 999 1000 5 81 58.5 40.5 32.4 25.6 20.2 14.7 999 w= 6 100 100 100 100 100 100 100 999 1000 E.I. = (100*w/W) = F.I + E.I=

gm

Sno

Remarks

1 1 2 3 4 5 6 7 999

7 100 100 100 100 100 100 100 999 pc pc

AEE/

DEE/

Data Sheet for Sieve Analysis of Aggregate ( IS : 2386 Part - 1 ) COARSE AGGREGATE (20 mm size Graded metal) Name of Work :: ______ ______ ______ ______ ______ ______ ______ _____ _____ _____ _____ _____ ______ _____ _____ _____ ______ ______ ______ ______ ______ ______ _ Road Section at KM :: Sample No:: I.S. Sieve designation Weight of sample retained (gm) 3 100 100 100 100 999 gm Cumulative Per cent of per cent of weight weight retained retained (%) (%) 4 5 100 100 100 100 999 Over Size= 100 100 100 100 999 % Date :: Weight of Sample :: gm Cumulative per cent of Permissible Limits weight As Per MoRT&H Remarks passing Specification TABLE 1000-1 (%) 7 6 8 100 100 95 - 100 100 100 25 - 55 100 100 0 - 10 100 100 200 200 100 999 999 999 999 Under Size= %

SNo

1 1 2 3 4 5 999

40 20 10 4.75 In 999

2 mm mm mm mm Pan 999 Total =

AEE/

DEE/

1 1 2 3 4 5 999

40 20 10 4.75 In 999

Road Section at KM :: Sample No:: 2 4 3 mm 100 mm 100 100 mm 100 100 mm 100 100 Pan 100 999 999 999 Over Size= Total = gm

5 100 100 100 100 999 %

Date :: Weight of Sample :: 7 6 100 100 95 - 100 100 25 - 55 100 0 - 10 100 200 200 999 999 999 Under Size= %

gm 8 100 100 100 100 999

AEE/

DEE/

Aggregate Impact Value [ IS : 2386 (Part-4)]


Name of Work :: ______ ______ ______ ______ ______ ______ ______ _____ _____ _____ _____ _____ ______ _____ _____ _____ ______ ______ ______ ______ ______ ______ _

S.No 1
1 2 3 4 5 6 7 8 9

DESCRIPTION 2 Item of Work Date Location Weight of Empty Measuring cup Wt. of Empty measuring cup + Wt. of Aggregate (passing 12.5 mm & retaining on 10 mm sieve ) Wt. of Aggregate (passing 12.5 mm & retaining on 10 mm sieve ) Wt. of Impacted Aggregate ( retained on 2.36 mm )2.36 mm sieve ) Wt. of Fines (passing A. I. V.

Notation - Units 3

Sample Sample Sample Sample Sample

COARSE AGGREGATE (40 mm size Graded metal)

W1 gm W2 gm (W2-W1)=W3 W4 (W3-W4)=W5 100*W5/W3 gm gm gm %

10 Remarks 11 Asst. Executive Engineer / 12 Dy. Executive Engineer/

Flakiness Test of Aggregate ( IS : 2386 Part - 1 )


Name of Work :: ______ ______ ______ ______ ______ ______ ______ _____ _____ _____ _____ _____ ______ _____ _____ _____ ______ ______ ______ ______ ______ ______ _ COARSE AGGREGATE (40 mm size Graded metal) Road Section at KM :: Date :: Sample No:: Weight :: gm Size of Aggregate Wt. of the Thickness fraction of at Wt. of aggregate in gauge Passing Through Retained on least each fraction passing Remarks size IS Sieve IS Sieve 200 pieces thickness gauge (gm) ( mm ) ( mm) ( mm) (gm ) 2 25 20 16 12.5 10 999 Total ( gm ) 3 20 16 12.5 10 6.3 999 W= 4 100 100 100 100 100 999 1000 5 13.5 10.8 8.55 6.75 4.89 999 w= 6 100 100 100 100 100 999 1000 F.L=(100*w/W)= 7 100 100 100 100 100 999 pc

Sno

1 1 2 3 4 5 999

Elangation Test of Aggregate ( IS : 2386 Part - 1 )


COARSE AGGREGATE (40 mm size Graded metal) Road Section at KM :: Date :: Sample No:: Weight :: Size of Aggregate Wt. of the Thickness fraction of at Wt. of aggregate in gauge Passing Through Retained on least each fraction passing size IS Sieve IS Sieve 200 pieces thickness gauge (gm) ( mm ) ( mm) ( mm) (gm ) 2 25 20 16 12.5 10 999 Total ( gm ) 3 20 16 12.5 10 6.3 999 W= 4 100 100 100 100 100 999 1000 5 40.5 32.4 25.6 20.2 14.7 999 w= 6 100 100 100 100 100 999 1000 E.I. = (100*w/W) = F.I + E.I=

gm

Sno

Remarks

1 1 2 3 4 5 999

7 100 100 100 100 100 999 pc pc

AEE/

DEE/

Data Sheet for Sieve Analysis of Aggregate ( IS : 2386 Part - 1 ) COARSE AGGREGATE (40 mm size Graded metal) Name of Work :: ______ ______ ______ ______ ______ ______ ______ _____ _____ _____ _____ _____ ______ _____ _____ _____ ______ ______ ______ ______ ______ ______ _ Road Section at KM :: Sample No:: I.S. Sieve designation Weight of sample retained (gm) 3 100 100 100 100 100 999 gm Cumulative Per cent of per cent of weight weight retained retained (%) (%) 4 5 100 100 100 100 100 999 Over Size= 100 100 100 100 100 999 % Date :: Weight of Sample :: gm Cumulative per cent of Permissible Limits weight As Per MoRT&H Remarks passing Specification TABLE 1000-1 (%) 7 6 8 100 100 95 - 100 100 100 30 - 70 100 100 10 - 35 100 100 0-5 100 100 200 200 100 999 999 999 999 Under Size= %

SNo

1 1 2 3 4 5 6 999

63 40 20 10 4.75 In 999

2 mm mm mm mm mm Pan 999 Total =

AEE/

DEE/

1 1 2 3 4 5 6 999

63 40 20 10 4.75 In 999

Road Section at KM :: Sample No:: 2 4 3 mm 100 mm 100 100 mm 100 100 mm 100 100 mm 100 100 Pan 100 999 999 999 Total = gm Over Size=

5 100 100 100 100 100 999 %

Date :: Weight of Sample :: 7 6 100 100 95 - 100 100 30 - 70 100 10 - 35 100 0-5 100 200 200 999 999 999 Under Size= %

gm 8 100 100 100 100 100 999

AEE/

DEE/

SLUMP TEST ( IS:1199)


Name of Work :: ______ ______ ______ ______ ______ ______ ______ _____ _____ _____ _____ _____ ______ _____ _____ _____ ______ ______ ______ ______ ______ ______ _

S.No 1 1 2 3 4 5 6 7 8 Item of Work

DESCRIPTION 2

Notation - Units 3

Sample 4

Sample 4

Sample 4

Sample 4

Sample 4

CEMENT CONCRETE :PCC Grade M15 (40 mm size Graded metal)

Grade of Concrete Date Location Initial Height of Slump cone ( Concrete mould ) Height of Concrete after subsidence SLUMP = Reduction if Heigh of Concrete Remarks h1 mm h2 mm (h2-h1)=S mm

9 10

Asst. Executive Engineer Dy. Executive Engineer

COMPRESSIVE STRENGTH
Name of Work :: ______ ______ ______ ______ ______ ______ ______ _____ _____ _____ _____ _____ ______ _____ _____ _____ ______ ______ ______ ______ ______ ______ _ S.No 1 1 2 3 4 5 6 7 DESCRIPTION 2 Item of Work Grade of Concrete :: Date Location Date of Casting Number of Cubes cast 7 days Compressive strength Test Date Compressive strength of Cube 1 Compressive strength of Cube 2 Compressive strength of Cube 3 Average 8 28 days Compressive strength Test Date Compressive strength of Cube 4 Compressive strength of Cube 5 Compressive strength of Cube 6 Average 9 10 11 Remarks Asst. Executive Engineer / Dy. Executive Engineer /
N/mm2 N/mm2 N/mm2 N/mm2

Units 3

Sample 4

Sample 4

Sample 4

Sample 4

Sample 4

Sample 4

CEMENT CONCRETE :PCC Grade M15 (40 mm size Graded metal)

no

N/mm2 N/mm2 N/mm2 N/mm2

SLUMP TEST ( IS:1199)


Name of Work :: ______ ______ ______ ______ ______ ______ ______ _____ _____ _____ _____ _____ ______ _____ _____ _____ ______ ______ ______ ______ ______ ______ _

S.No 1 1 2 3 4 5 6 7 8 Item of Work

DESCRIPTION 2

Notation - Units 3

Sample 4

Sample 4

Sample 4

Sample 4

Sample 4

CEMENT CONCRETE :PCC Grade M20 (40 mm size Graded metal)

Grade of Concrete Date Location Initial Height of Slump cone ( Concrete mould ) Height of Concrete after subsidence SLUMP = Reduction if Heigh of Concrete Remarks h1 mm h2 mm (h2-h1)=S mm

9 10

Asst. Executive Engineer Dy. Executive Engineer

COMPRESSIVE STRENGTH
Name of Work :: ______ ______ ______ ______ ______ ______ ______ _____ _____ _____ _____ _____ ______ _____ _____ _____ ______ ______ ______ ______ ______ ______ _ S.No 1 1 2 3 4 5 6 7 DESCRIPTION 2 Item of Work Grade of Concrete :: Date Location Date of Casting Number of Cubes cast 7 days Compressive strength Test Date Compressive strength of Cube 1 Compressive strength of Cube 2 Compressive strength of Cube 3 Average 8 28 days Compressive strength Test Date Compressive strength of Cube 4 Compressive strength of Cube 5 Compressive strength of Cube 6 Average 9 10 11 Remarks Asst. Executive Engineer / Dy. Executive Engineer /
N/mm2 N/mm2 N/mm2 N/mm2

Units 3

Sample 4

Sample 4

Sample 4

Sample 4

Sample 4

Sample 4

CEMENT CONCRETE :PCC Grade M20 (40 mm size Graded metal)

no

N/mm2 N/mm2 N/mm2 N/mm2

Data Sheet for Sieve Analysis of Fine Aggregates ( IS : 2386 Part - 1 )


Name of Work ::

Item of Work :: Road Section at KM :: Sample No::

FINE AGGREGATE / SAND Date :: Weight of Sample ::

SNo

I.S. Sieve designation

GRADING ZONES AS PER TABLE Cumulative Weight of Per cent of 1000-2 of MoRT&H. per cent of Percentage sample weight weight passing retained retained Grading Grading Grading retained (%) Zone I Zone II Zone III (gm) (%) (%)

Remarks

1 1 2 3 4 5 6 7

2 3 10.00 mm 4.75 mm 2.36 mm 1.18 mm 600 micron 300 micron 150 micron Total of Col.(4):: Fineness Modulus ::

7 100 90 - 100 60 - 95 30 - 70

8 100 90 - 100 75 - 100 55 - 90

9 100 90 - 100 85 - 100 75 - 100

10

15 - 34
5 - 20 0 - 10

35 - 59
8 - 30 0 - 10

60 - 79
12 - 40 0 - 10

Falling Zone ::________

Remarks ::

AEE/

Dy.EE/

Road Section at KM :: Sample No:: 1 1 2 3 4 5 6 7 2 3 10.00 mm 4.75 mm 2.36 mm 1.18 mm 600 micron 300 micron 150 micron Total of Col.(4):: Fineness Modulus :: 4 5 6
7 100 90 - 100 60 - 95 30 - 70

Date :: Weight of Sample ::


8 100 90 - 100 75 - 100 55 - 90 9 100 90 - 100 85 - 100 75 - 100

10

15 - 34
5 - 20 0 - 10

35 - 59
8 - 30 0 - 10

60 - 79
12 - 40 0 - 10

Falling Zone ::________

Remarks ::

AEE/

Dy.EE/

SAND BULK AGE & DELETERIOUS SUBSTANCES


Name of Work ::

S.No 1 1 2 3 4 5 6 7 8 9 10 11 12

DESCRIPTION 2 Item of Work Date Location Initial Volume of Sand Final Volume of Sand in water Bulking of Sand Bulkage (%) Volume of Deleterious Materials Percentage of Deleterious Materials
Remarks Asst. Executive Engineer Dy. Executive Engineer

Notation - Units 3

Sample 4

Sample 4

Sample 4

Sample 4

Sample 4

Sample 4

FINE AGGREGATE / SAND

V1 ml V2 ml (V1-V2)=V3 ml 100*V3/V2 % V4 ml 100*V4/V2 %

SLUMP TEST ( IS:1199)


Name of Work :: ______ ______ ______ ______ ______ ______ ______ _____ _____ _____ _____ _____ ______ _____ _____ _____ ______ ______ ______ ______ ______ ______ _

S.No 1 1 2 3 4 5 6 7 8 Item of Work

DESCRIPTION 2

Notation - Units 3

Sample 4

Sample 4

Sample 4

Sample 4

Sample 4

CEMENT CONCRETE :RCC Grade M20 (20 mm size Graded metal)

Grade of Concrete Date Location Initial Height of Slump cone ( Concrete mould ) Height of Concrete after subsidence SLUMP = Reduction if Heigh of Concrete Remarks h1 mm h2 mm (h2-h1)=S mm

9 10

Asst. Executive Engineer Dy. Executive Engineer

COMPRESSIVE STRENGTH
Name of Work :: ______ ______ ______ ______ ______ ______ ______ _____ _____ _____ _____ _____ ______ _____ _____ _____ ______ ______ ______ ______ ______ ______ _ S.No 1 1 2 3 4 5 6 7 DESCRIPTION 2 Item of Work Grade of Concrete :: Date Location Date of Casting Number of Cubes cast 7 days Compressive strength Test Date Compressive strength of Cube 1 Compressive strength of Cube 2 Compressive strength of Cube 3 Average 8 28 days Compressive strength Test Date Compressive strength of Cube 4 Compressive strength of Cube 5 Compressive strength of Cube 6 Average 9 10 11 Remarks Asst. Executive Engineer / Dy. Executive Engineer /
N/mm2 N/mm2 N/mm2 N/mm2

Units 3

Sample 4

Sample 4

Sample 4

Sample 4

Sample 4

Sample 4

CEMENT CONCRETE :RCC Grade M20 (20 mm size Graded metal)

no

N/mm2 N/mm2 N/mm2 N/mm2

SLUMP TEST ( IS:1199)


Name of Work :: ______ ______ ______ ______ ______ ______ ______ _____ _____ _____ _____ _____ ______ _____ _____ _____ ______ ______ ______ ______ ______ ______ _

S.No 1 1 2 3 4 5 6 7 8 Item of Work

DESCRIPTION 2

Notation - Units 3

Sample 4

Sample 4

Sample 4

Sample 4

Sample 4

CEMENT CONCRETE :RCC Grade M25 (20 mm size Graded metal)

Grade of Concrete Date Location Initial Height of Slump cone ( Concrete mould ) Height of Concrete after subsidence SLUMP = Reduction if Heigh of Concrete Remarks h1 mm h2 mm (h2-h1)=S mm

9 10

Asst. Executive Engineer Dy. Executive Engineer

COMPRESSIVE STRENGTH
Name of Work :: ______ ______ ______ ______ ______ ______ ______ _____ _____ _____ _____ _____ ______ _____ _____ _____ ______ ______ ______ ______ ______ ______ _ S.No 1 1 2 3 4 5 6 7 DESCRIPTION 2 Item of Work Grade of Concrete :: Date Location Date of Casting Number of Cubes cast 7 days Compressive strength Test Date Compressive strength of Cube 1 Compressive strength of Cube 2 Compressive strength of Cube 3 Average 8 28 days Compressive strength Test Date Compressive strength of Cube 4 Compressive strength of Cube 5 Compressive strength of Cube 6 Average 9 10 11 Remarks Asst. Executive Engineer / Dy. Executive Engineer /
N/mm2 N/mm2 N/mm2 N/mm2

Units 3

Sample 4

Sample 4

Sample 4

Sample 4

Sample 4

Sample 4

CEMENT CONCRETE :RCC Grade M25 (20 mm size Graded metal)

no

N/mm2 N/mm2 N/mm2 N/mm2

SLUMP TEST ( IS:1199)


Name of Work :: ______ ______ ______ ______ ______ ______ ______ _____ _____ _____ _____ _____ ______ _____ _____ _____ ______ ______ ______ ______ ______ ______ _

S.No 1 1 2 3 4 5 6 7 8 Item of Work

DESCRIPTION 2

Notation - Units 3

Sample 4

Sample 4

Sample 4

Sample 4

Sample 4

CEMENT CONCRETE :RCC Grade M30 (20 mm size Graded metal)

Grade of Concrete Date Location Initial Height of Slump cone ( Concrete mould ) Height of Concrete after subsidence SLUMP = Reduction if Heigh of Concrete Remarks h1 mm h2 mm (h2-h1)=S mm

9 10

Asst. Executive Engineer Dy. Executive Engineer

COMPRESSIVE STRENGTH
Name of Work :: ______ ______ ______ ______ ______ ______ ______ _____ _____ _____ _____ _____ ______ _____ _____ _____ ______ ______ ______ ______ ______ ______ _ S.No 1 1 2 3 4 5 6 7 DESCRIPTION 2 Item of Work Grade of Concrete :: Date Location Date of Casting Number of Cubes cast 7 days Compressive strength Test Date Compressive strength of Cube 1 Compressive strength of Cube 2 Compressive strength of Cube 3 Average 8 28 days Compressive strength Test Date Compressive strength of Cube 4 Compressive strength of Cube 5 Compressive strength of Cube 6 Average 9 10 11 Remarks Asst. Executive Engineer / Dy. Executive Engineer /
N/mm2 N/mm2 N/mm2 N/mm2

Units 3

Sample 4

Sample 4

Sample 4

Sample 4

Sample 4

Sample 4

CEMENT CONCRETE :RCC Grade M30 (20 mm size Graded metal)

no

N/mm2 N/mm2 N/mm2 N/mm2

SLUMP TEST ( IS:1199)


Name of Work :: ______ ______ ______ ______ ______ ______ ______ _____ _____ _____ _____ _____ ______ _____ _____ _____ ______ ______ ______ ______ ______ ______ _

S.No 1 1 2 3 4 5 6 7 8 Item of Work

DESCRIPTION 2

Notation - Units 3

Sample 4

Sample 4

Sample 4

Sample 4

Sample 4

CEMENT CONCRETE :RCC/PSC Grade M35 (20 mm size Graded metal)

Grade of Concrete Date Location Initial Height of Slump cone ( Concrete mould ) Height of Concrete after subsidence SLUMP = Reduction if Heigh of Concrete Remarks h1 mm h2 mm (h2-h1)=S mm

9 10

Asst. Executive Engineer Dy. Executive Engineer

COMPRESSIVE STRENGTH
Name of Work :: ______ ______ ______ ______ ______ ______ ______ _____ _____ _____ _____ _____ ______ _____ _____ _____ ______ ______ ______ ______ ______ ______ _ S.No 1 1 2 3 4 5 6 7 DESCRIPTION 2 Item of Work Grade of Concrete :: Date Location Date of Casting Number of Cubes cast 7 days Compressive strength Test Date Compressive strength of Cube 1 Compressive strength of Cube 2 Compressive strength of Cube 3 Average 8 28 days Compressive strength Test Date Compressive strength of Cube 4 Compressive strength of Cube 5 Compressive strength of Cube 6 Average 9 10 11 Remarks Asst. Executive Engineer / Dy. Executive Engineer /
N/mm2 N/mm2 N/mm2 N/mm2

Units 3

Sample 4

Sample 4

Sample 4

Sample 4

Sample 4

Sample 4

CEMENT CONCRETE :RCC/PSC Grade M35 (20 mm size Graded metal)

no

N/mm2 N/mm2 N/mm2 N/mm2

Anda mungkin juga menyukai