MPL - 2 x 135MW COAL BASED THERMAL POWER PLANT CONTROL & INSTRUMENTATION COMMENTS ON M/s.

INDUSTRIAL DEVICES (INDIA) PVT. LTD (IDI) OFFER FOR CHLORINATION PLANT.

GAS CHLORINATION SYSTEM, LEAK ABSORPTION SYSTEM & CHEMICAL DOSING SYSTEM:
Sl. No Specification Reference (Sec/Cl.no) Bid document/ Offer Reference (Sec/Cl.no) MADHUCON / DASTURCO Comments IDIs Reply

Section-III

General

IDI to submit clause wise confirmation for Section-III of Technical specification No. MPL32-WTS-0005. IDI to submit the technical details of Relay based Local control panel for Gas chlorination system & Leak absorption system. IDI to confirm that Sealed diaphragm pressure gauges shall be provided for the pressure measurement in corrosive medium. IDI to include the supply & engineering of the following instruments in their scope. One (1) no. Flow transmitter with totaliser at the solution line to cold water fore bay. One (1) no. Flow switch at the discharge line of Booster pumps. One (1) no. Residual chlorine online monitoring unit with 2NO+2 NC potential free contacts for continuous monitoring of chlorine leak in the chlorination

Section-III, Cl.no.3.2 Section-III, Cl.no.4.3 Section-III, Cl.no.4.3

---

---

Annexure-B

Page 1 of 3

MPL - 2 x 135MW COAL BASED THERMAL POWER PLANT CONTROL & INSTRUMENTATION COMMENTS ON M/s. INDUSTRIAL DEVICES (INDIA) PVT. LTD (IDI) OFFER FOR CHLORINATION PLANT.

system. 5 Section-III, Cl.no.4.3 Annexure-B Instrument erection hardware such as impulse pipes, isolation valves, elbows, unions, fittings and connectors etc.., shall be included in Tenderers scope supply. Confirm compliance. 6 Section-III, Cl.no.4.3 Annexure-B Supply, laying & termination of signal, control and power cables, cable trays, supports & cabling accessories like glands, clamps and termination kits etc.., from field instruments to field junction boxes & from field junction boxes to respective local control panels be included in Tenderers scope. Confirm compliance. 7 Section-III, Cl.no.4.3 Annexure-B Cabling for hardwired signal exchange between gas chlorination control panel and Remote IO cabinet of DCS shall also be included in Tenderers scope. Confirm compliance. 8 Section-III, Cl.no.5.0 Annexure-2 --IDI to note that the remote I/O cabinet of the Plant DCS will be located at the Pump house control room. The make of Instruments, Cables and associated instrumentation items shall be as

---

Page 2 of 3

MPL - 2 x 135MW COAL BASED THERMAL POWER PLANT CONTROL & INSTRUMENTATION COMMENTS ON M/s. INDUSTRIAL DEVICES (INDIA) PVT. LTD (IDI) OFFER FOR CHLORINATION PLANT.

per Annexure-2, of technical speciation no. MPL-32-WTS-005. Confirm compliance 10 General --IDI to furnish the following documents along with the technical offer. Type, range & all other technical details of the offered instruments. Data sheet for Local control panel, Chlorine Leak detector & Residual chlorine online monitoring unit. List of preferred makes of Instruments. List of Operational spares.

11 Section-III, Cl.no.3.3 Leak absorption system. ---

IDI to include the supply of Chemical dosing system with Local power distribution cum control boxes in their scope. IDI to indicate motorised dampers at the suction & delivery side of the Blower instead of manual dampers.