Anda di halaman 1dari 218

Data: Codul culorilor

05.11.2012 ATR emise de: Transelectrica Enel Dobrogea E.ON Moldova Electrica Transilvania Electrica Transilvania CEZ Electrica Muntenia Nord Enel Muntenia Enel Banat ATR Expirate ATR Noi

Nr. crt

Denumire investitor

Denumire centrale electrice eoliene

Judetul

Putere instalata (MW) 99

Energia Mileniului III SRL 1 SC Eolica Dobrogea SRL 2 SC BTWM Mitoc 3 SC Eolica Vaslui SRL 4 SC Compania Eoliana SA 5 SC Biota Wind Power SRL 6 SC AVELLANA COM SRL 7 SC DANUBE GREEN POWER SRL 8 SC ELECTRICE RENOVATA VISION SRL 9

Casimcea

Tulcea

Eolica(Cogealac) etapa Constanta 2

600

Mitoc

Botosani

40

Bunesti Averesti

Vaslui

297

Smardan

Galati

42

Tulcea 2

Tulcea

11.5

Tulcea 1

Tulcea

11.5

Somova-1

Tulcea

30

Somova-2

Tulcea

33

SC ELECTRICE RENOVATA VISION SOMOVA SRL 10

Somova-3

Tulcea

33

SC ELECTRICE RENOVATA VISION SOMOVA ENERGIE SRL 11

Somova-4

Tulcea

33

SC DANUBE GREEN ENERGY SRL

Somova-5

Tulcea

33

12 SC Compania Eoliana SA 13 SC Beidaud Energie Eoliana SRL 14 Beidaud Tulcea 54 Frecatei Tulcea 87

BAIA Energie Eoliana 15 SC Targusor Wind Farm SA 16

Baia

Tulcea

63

Nicolae Balcescu Targusor

Constanta

82.8

South Wind SRL 17 South Wind Viroaga SRL 18

South Wind

Constanta

117

South Wind Viroaga

Constanta

117

South Wind Cerchezu SRL 19 South Wind Dumbraveni SRL 20

South Wind Cerchezu

Constanta

117

South Wind Dumbraveni Constanta

51

Samowind SRL 21 International Wind Energy Botosani SRL 22 Energy Sky SRL 23

Beidaud

Tulcea

300

Mitoc

Botosani

100

Frecatei

Tulcea

141

Gamesa Energy Romania SRL 24

Baraganu

Constanta

98

Gamesa Energy Romania SRL 25 Top Wind SRL 26 Wind Flor Topalu SRL 27 Arca Green Energy SRL 28 29 30 31 32 33 34 35 36 37 38 SEA Wind Renergys SRL Wind SOL Power Energy SRL SC Wind Energy Management SRL SC Wind Energy Expertise SRL

Independenta

Constanta

88

Top Wind Wind Flor Topalu AGE Crucea Ciocarlia Ciprian Porumbescu 1 Ilisesti Horodniceni-1

Constanta Constanta Constanta Constanta Suceava Suceava Suceava Suceava Suceava Suceava Suceava Suceava Suceava

84 81 84 50 27 39 51 21 24 51 72 15 45

SC Wind Energy Power Service IS SRL Capu Campului SC Wind Energy Distribution SRL SC WIND ENERGY CONCEPT SRL Berchisesti Ciprian Porumbescu 2

SC WIND ENERGY POWER BUSINESS Horodniceni-2 CL SRL SC Wind Energy Omnia SRL SC Wind Energy Construction SRL Dragoiesti-2 Moara

39 40 41 42 43 44 45 46 47 48 49 50 51 52 53 54 55 56 57 58 59 60 61 62

SC Wind Energy Smart SRL SC WIND ENERGY PROJECT SRL SC Delta Green Energy SRL SC Delta Park SRL

Stroiesti Dragoiesti-1 Daeni-1 Daeni-2 Lupeni-1 Lupeni-2 Beidaud Scanteiesti Stalpu Facaeni Viisoara Tulcea Valea Nucarilor 1 Valea Nucarilor 2 Garoafa 1 Maraseti Ciocile Rosiori Largu Rusetu-1 Rusetu-2 Ulmu Crucea-Baltagesti Baraganu-3

Suceava Suceava Tulcea Tulcea Hunedoara Hunedoara Constanta Galati Buzau Ialomita Botosani Tulcea Tulcea Tulcea Vrancea Vrancea Braila Braila Braila Buzau Buzau Braila Constanta Constanta

60 24 54 51 99 99 105 249 399 300 471 9 5 5 79.8 84 120 84 84 45 33 114 90 36

SC Wind Power Experts Group SRL SC Wind Power Experts Group SRL SC The Way of Energy SRL SC AMPLUS ENERGO SRL SC TECON SRL SC IALOMITA POWER SRL SC TERRA ROMANIA SPV ONE SRL SC Eoliene Albastre SRL SC Wind Wings SRL SC Eurosoft Comunication SRL SC Wind Garoafa Development SRL SC Marasesti Wind SRL SC Wind Energy Strategy SRL SC Wind Energy Supply SRL SC Wind Energy Advance Tech SRL SC Wind Energy Green Project SRL SC Wind Energy Green Project SRL SC Van Consult Energy SRL SC Energy Hermannstadt SRL Gamesa Energy Romania SRL

63 64 65 66 67 68 69 70 71

Gamesa Energy Romania SRL Gamesa Energy Romania SRL SC Wind Energy Equipment SRL SC ELECTRICOM SA

Osmancea Topraisar Dudesti Giurgeni

Constanta Constanta Braila Ialomita Ialomita Ialomita Ialomita Ialomita Constanta Ialomita

112.5 103.5 84 33 90 51 102 57 51 52

SC RENEWABLE Slobozia Nord SRL Giurgeni Nord-2 SC RENEWABLE Slobozia Vest SRL SC RENEWABLE Slobozia Est SRL Giurgeni Vest Giurgeni Est

SC RENEWABLE Slobozia Nord SRL Giurgeni Nord-1 SC Eolian-Med SRL BOGARIS ENERGY ROM Valea Dacilor Facaeni, Vladeni

72 HARSOVA 40 S.R.L. 73 Eoliene SRL 74 75 76 77 EAST DATA S.R.L. FEFRAN REAL ESTATES SRL EVN WIND POWER&CONSTRUCTION Tataru Deleni Satu Nou Constanta Constanta Constanta 8 45 9 Dulcesti Constanta 5 Harsova Constanta 40

EVN WIND POWER&CONSTRUCTION

Mircea Voda

Constanta

78

COMPLEX DELTA SRL

CASIMCEA

Tulcea

27

79

START GEOVIL

Targusor

Constanta

18

80 ENERGO INVEST 81 Platonesti Ialomita 40

EOL INDUSTRIES SRL 82

Baia

Tulcea

33

Pecineaga 83 EOLIAN PECINEAGA SRL

Constanta

77.5

Dorobantu

Constanta

54

84

OMV PETROM WIND POWER SRL Rasova Constanta 10

85 86

GENERAL CONCRETE CERNAVODA SRL ITALENERGY & TRADE SRL Crucea Constanta 9

TOPRAISAR 87 R.A.J.D.P. CTA

Constanta

0.02

PNE WIND ROMANIA SRL

Poarta Alba

Constanta

84

88

Oras Negru Voda 89

Negru Voda

Constanta

0.2

PRIMARIA COMUNEI CORBU

Corbu

Constanta

0.2

90 BODICONSTRUCT GRUP SRL 91 Gheorghe Doja Calarasi 54

IDU CORNELIU

Eforie Nord

Constanta

0.01

92

MINAGRO SRL

Satu Nou

Tulcea

93 ZAR TWINS ENERGY SRL 94 Siminoc Constanta 45

COMUNA TUZLA 95

Tuzla

Constanta

0.2

COMUNA OSTROV 96 COMUNA CUMPANA 97

Ostrov

Constanta

0.2

Cumpana

Constanta

0.2

98

SC HERMES ENERGY INTERNATIONL Homoraciu SRL

Prahova

30

SC ENVICONS WIND SRL 99

Beresti Meria

Galati

30

SOCOMIZO CONSTRUCT SRL 100 GREEN ENERGY CONSULTANCY & INVESTMENTS 101 GENERACION EOLICA DACIA SRL 102

Tataru

Prahova

2.5

Naeni

Buzau

2.5

Cudalbi

Galati

60

BRAILA WINDS EXPERT SRL 103

Scortaru Nou

Braila

PANC ENERGY SRL 104 SIX WINGS SRL 105

Panciu

Vrancea

10

Pechea

Galati

6.2

VECTOR WIND EXPERT SRL 106 107 SC DUCIPAL ELECTRIC SRL 108 SC ACK SRL 109 S.C. NORTH BRIDGE FOUR S.R.L.

Frumusita Siretel-Vanatori (CEE Vanatori 2) Sticlaria Oltenesti

Galati

Iasi Iasi Vaslui

9 40 51

Banca 110 S.C. JDER ENERGY S.R.L. Falciu 111 S.C. NORTH BRIDGE ONE S.R.L. Ruginoasa 112 S.C. MOLDOVA EOLIAN S.R.L. 113 S.C. INTO ENERGY S.R.L. 114 S.C. MOLDREGENERABILE S.A. Popesti MIROSLOVESTI Iasi Iasi Iasi 60 9 48 Vaslui 51 Vaslui 30

SC VIENTOS SRL

Racordare centrala eoliana Mehedinti Livezile, judetul Mehedinti

45.00

115

Ciclova 116 SIFEE ENERGY SRL

Caras-Severin

75

Vladimirescu 117 ENI ROMANIA S.R.L.

Arad

0.02

Rsuceni 118 SURAKI SRL

Giurgiu

30

RADU BUJOREL 119

Bucuresti

0.0032

SC SIFEE WIND

ENERGY SRL - Etapa I

Cristian-Rasinari Poplaca

Sibiu

87.000

120 121

SC ENERGO PROIECT SRL

Curcubata Mare

Bihor

11.5

SC COMPANIA EOLIANA SA

Eoliana Salonta

Bihor

9.72

122 TOTAL ATR VALABILE 8039.57

U(kV)

Staia de racord

Comentariu

400

Racordare in noua statie 110/400 kV denumita RahmanuCasimcea, in urmatoarea solutie: Rahmanu-Casimcea - statie noua de 400/110 kV Rahmanu-Casimcea ; - LES 400kV de cca. 0,3 km de racord a noii statii 400/110kV Tariverde Se racordeaza la RET prin intermediul unei statii 400/220 Tariverde prin intermedfiul a 2 AT 550MVA (in final 3x550) Statia este rcaordata i/e in LEA 400kV Cta Nord - Tulcea Vest Se racordeaza la RET printr-o LEA 110kV de cca.96 km la bara de 110 kV a statiei Suceava. Racordare la reeaua electric de transport in statia 220kV Munteni. Lucrarile necesare pentru racordarea CEE 297MW Bunesti Averesti sunt : se racordeaz la reeaua electric de transport, prin intermediul unei LEA 110 kV s.c., in lungime de cca 4 km, in statia 400/110kV Smardan racordarea prin LEA/LES L=5km, la bara statiei 110 kV Tulcea Vest racordarea prin LEA/LES L=5km, la bara statiei 110 kV Tulcea Vest

400

110

Suceava

220

Munteni

110

Smardan

110

Tulcea Vest

110

Tulcea Vest

400

Statie noua 400kV

Se racordeaza la RET printr-o statie noua 400/110 kV.Statia 400/110 kV este racordata intrare-iesire in linia 400kV TulceaTariverde. Se racordeaza la RET printr-o statie noua 400/110 kV.Statia 400/110 kV este racordata intrare-iesire in linia 400kV TulceaTariverde.

400

Statie noua 400kV

400

Statie noua 400kV

Se racordeaza la RET printr-o statie noua 400/110 kV.Statia 400/110 kV este racordata intrare-iesire in linia 400kV TulceaTariverde.

400

Statie noua 400kV

Se racordeaza la RET printr-o statie noua 400/110 kV.Statia 400/110 kV este racordata intrare-iesire in linia 400kV TulceaTariverde.

400

Statie noua 400kV

Se racordeaza la RET printr-o statie noua 400/110 kV.Statia 400/110 kV este racordata intrare-iesire in linia 400kV TulceaTariverde.

110

Isaccea

Se racordeaza la RET printr-o LES 110kV in lungime de cca.25 km la bara 110kV a statiei 400/110 kV Isaccea Racordarea prin LES 400kV L=0.2km, in extinderea statiei Stupina bara 400kV.Racordare la reeaua electric de transport prin extinderea statiei Stupina incadrata intrare ieire n LEA 400 (750) kV Isaccea Medgidia Sud - Varna, Racordare la reeaua electric de transport prin extinderea statiei Stupina incadrata intrare ieire n LEA 400 (750) kV Isaccea Medgidia Sud - Varna, TR 250MVA 110/400kV, extindere bara 400kV Stupina.

400

Stupina

400

Stupina

400

Stupina

400

Deleni

se racordeaza la RET prin intermediul a 2 transformatoare 2X250MVA, 400/110 kV,in noua statie electrica 400/110kV Stupina (GIS) incadrata intrare -iesire in LEA 750 kV (400 kV) Isaccea - Medgidia Sud -Varna printr-o LEA 400kV d.c. de cca.0.5 km. Se racordeaza la RET prin intermediul a 2 transf 110/400 kV 250MVA in noua statie electrica 400kV ,incadrata intrareiesire in LEA 400(750)kV Isaccea-Medgidia Sud-Varna si in LEA 400kV Isaccea-Dobrudja Se racordeaza la RET prin intermediul a 2 transf 110/400 kV 250MVA in noua statie electrica 400kV ,incadrata intrareiesire in LEA 400(750)kV Isaccea-Medgidia Sud-Varna si in LEA 400kV Isaccea-Dobrudja Se racordeaza la RET prin intermediul a 2 transf 110/400 kV 250MVA in noua statie electrica 400kV ,incadrata intrareiesire in LEA 400(750)kV Isaccea-Medgidia Sud-Varna si in LEA 400kV Isaccea-Dobrudja Se racordeaza la RET prin intermediul a 2 transf 110/400 kV 250MVA in noua statie electrica 400kV ,incadrata intrareiesire in LEA 400(750)kV Isaccea-Medgidia Sud-Varna si in LEA 400kV Isaccea-Dobrudja

400

Deleni

400

Deleni

400

Deleni

400

Tariverde

se racordeaza la RET in statia 400kV Tariverde printr-o LEA 400 kV in lungime de aproximativ 15 km.Staia 400 kV Tariverde este racordat la RET, n sistem intrare ieire, n LEA 400 kV Constana Nord Tulcea Vest. Se racordeaza la RET printr-o LEA 110kV de cca.96 km la bara de 110 kV a statiei Suceava.

110

Suceava

400

Statie noua 400kV

Se racordeaza la RET printr-o statie noua 400/110 kV.Statia 400/110 kV este racordata intrare-iesire in linia 400kV TulceaTariverde.

400

Baraganu

Racordare in statie noua 400kV Baraganu racordata intrare iesire intr-o noua LEA 400kV Medgidia Sud - Constanta Nord

400

Baraganu

Racordare in statie noua 400kV Baraganu racordata intrare iesire intr-o noua LEA 400kV Medgidia Sud - Constanta Nord Racordare la RET prin intermediul unui transformator 400/110kV-275MVA in statia 400kV Stupina (extindere bara 400kV). Racordare la RET prin intermediul unui transformator 400/110kV-275MVA in statia 400kV Stupina (extindere bara 400kV). Racordare la RET prin intermediul unui transformator 400/110kV-275MVA in statia 400kV Stupina (extindere bara 400kV). Racordare intrare -iesire intr-o noua LEA 400kV Medgidia Sud-statie noua 400kV- Constanta Nord Racordare la RET prin intermediul a 2 transformatoare 400/110 kV ,250MVA in statia noua 400/110kV Horodniceni . Etapa I (inainte de realizarea LEA 400kV Suceava-Gadalin) Racordare la RET prin intermediul a 2 transformatoare 400/110 kV ,250MVA in statia noua 400/110kV Horodniceni . Etapa I (inainte de realizarea LEA 400kV Suceava-Gadalin) Racordare la RET prin intermediul a 2 transformatoare 400/110 kV ,250MVA in statia noua 400/110kV Horodniceni . Etapa I (inainte de realizarea LEA 400kV Suceava-Gadalin) Racordare la RET prin intermediul a 2 transformatoare 400/110 kV ,250MVA in statia noua 400/110kV Horodniceni . Etapa I (inainte de realizarea LEA 400kV Suceava-Gadalin) Racordare la RET prin intermediul a 2 transformatoare 400/110 kV ,250MVA in statia noua 400/110kV Horodniceni . Etapa I (inainte de realizarea LEA 400kV Suceava-Gadalin) Racordare la RET prin intermediul a 2 transformatoare 400/110 kV ,250MVA in statia noua 400/110kV Horodniceni . Etapa I (inainte de realizarea LEA 400kV Suceava-Gadalin) Racordare la RET prin intermediul a 2 transformatoare 400/110 kV ,250MVA in statia noua 400/110kV Horodniceni . Etapa I (inainte de realizarea LEA 400kV Suceava-Gadalin) Racordare la RET prin intermediul a 2 transformatoare 400/110 kV ,250MVA in statia noua 400/110kV Horodniceni . Etapa I (inainte de realizarea LEA 400kV Suceava-Gadalin) Racordare la RET prin intermediul a 2 transformatoare 400/110 kV ,250MVA in statia noua 400/110kV Horodniceni . Etapa I (inainte de realizarea LEA 400kV Suceava-Gadalin)

400 400 400 400 400 400 400 400 400 400 400 400 400

Stupina Stupina Stupina Statie noua 400kV Horodniceni Horodniceni Horodniceni Horodniceni Horodniceni Horodniceni Horodniceni Horodniceni Horodniceni

400 400 400 400 220 220 400 400 400 400 400 20 110 110 400 400 400 400 400 400 400 400 400 400

Horodniceni Horodniceni Statie noua 400kV Statie noua 400kV Paroseni Paroseni Statie noua 400kV Statie noua 400kV Stalpu Gura Ialomitei Suceava Tulcea Vest Tulcea Vest Tulcea Vest Garoafa Garoafa Ciocile Ciocile Ciocile Ciocile Ciocile Ciocile Stupina Statie noua 400kV

Racordare la RET prin intermediul a 2 transformatoare 400/110 kV ,250MVA in statia noua 400/110kV Horodniceni . Etapa I (inainte de realizarea LEA 400kV Suceava-Gadalin) Racordare la RET prin intermediul a 2 transformatoare 400/110 kV ,250MVA in statia noua 400/110kV Horodniceni . Etapa I (inainte de realizarea LEA 400kV Suceava-Gadalin) Racordare la RET prin statie noua 400/110 5x250MVA, i/e in LEA 400kV Isaccea-Stupina prin LEA 400 kV d.c.0,5 km Racordare la RET prin statie noua 400/110 5x250MVA, i/e in LEA 400kV Isaccea-Stupina prin LEA 400 kV d.c.0,5 km Racordare la RET prin LEA 220 kV in statia 220/110 kV Paroseni Racordare la RET prin LEA 220 kV in statia 220/110 kV Paroseni Racordare la RET prin statie noua 400/110 5x250MVA, i/e in LEA 400kV Isaccea-Stupina prin LEA 400 kV d.c.0,5 km. CEE 249 MW SCANTEIESTI se racordeaz la reeaua electric de transport prin intermediul unei LEA 400 kV simplu circuit lungime de 11 km, 2x450mmp in statie noua 400 kV. Racord LEA in 400kV s.c., sectiune Ol-Al in lungime totala de aprox. 15km in statia 400/110kV Stalpu si trecerea la 400kV a tronsonului Lucrarile de de CEE 300 MW FACAENIStalpu-Teleajen-Brazi. se racordeaz la reeaua electric transport a energiei electrice in statia 400/110 kV Gura Ialomitei, transformator 110/400 la kV 300 MVA bloc CEE 471 printr-un MW VIISOARA se racordeaz reeaua electric de transport in statia 400/220/110 kV Suceava, printr-o LES kV in lungime de cca. 3 km. in bara 20kV se racordeaz400 la reeaua electric de transport, a statiei 110/20 kV Tulcea Vest prin LES 20kV, in lungime 7,3 km Se racordeaza la RET printr-o LES 110kV in lungime de cca.9,2km la bara 110kV a statiei 400/110/20 kV Tulcea Vest Se racordeaza la RET printr-o LES 110kV in lungime de cca.9,2km la bara 110kV a statiei 400/110/20 kV Tulcea Vest Racordare la RET prin intermediul unui transformator 110/400 kV -250 MVA ,in noua statie electrica de 400kV Garoafa,ce urmeaza a la fi construita in zona localitatii Garoafa,incadrata in Racordare RET prin intermediul unui transformator 110/400 kV -250 MVA ,in noua statie electrica de 400kV Garoafa,ce urmeaza a fi construita in zona localitatii Garoafa,incadrata in Statia 400 kV Ciocile se racordeaza la RET in doua etape, dupa cum urmeaza: Etapa 1 inainte de se punerea in functiune ain LEA 400 kV Statia 400 kV Ciocile racordeaza la RET doua etape, dupa cum urmeaza: Etapa 1 inainte de punerea in functiune ain LEA 400 kV Statia 400 kV Ciocile se racordeaza la RET doua etape, dupa cum urmeaza: Etapa 1 inainte de se punerea in functiune ain LEA 400 kV Statia 400 kV Ciocile racordeaza la RET doua etape, dupa cum urmeaza: Etapa 1 inainte de punerea in functiune ain LEA 400 kV Statia 400 kV Ciocile se racordeaza la RET doua etape, dupa cum urmeaza: Etapa 1 inainte de punerea in functiune ain LEA 400 kV Statia 400 kV Ciocile se racordeaza la RET doua etape, dupa cum urmeaza: Etapa 1 inainte de punerea in functiune a LEA 400 kV se racordeaza la RET prin intermediul unui LES 400kV de la transformatorul 250MVA, 400/110 kV la celula noua 400 kV GIS din noua statie 400kV Stupina incadrata intrare -iesire in Racordare intrare -iesire intr-o noua LEA 400kV Medgidia Sud-statie noua 400kV- Constanta Nord

400 400 400 110 400 400 400 400 400 110

Statie noua 400kV Statie noua 400kV Ciocile Gura Ialomitei Gura Ialomitei Gura Ialomitei Gura Ialomitei Gura Ialomitei

Racordare intrare -iesire intr-o noua LEA 400kV Medgidia Sud-statie noua 400kV- Constanta Nord Racordare intrare -iesire intr-o noua LEA 400kV Medgidia Sud-statie noua 400kV- Constanta Nord Statia 400 kV Ciocile se racordeaza la RET in doua etape, dupa cum urmeaza: Etapa 1 inainte de in110 functiune LEA 400 kV Se racordeaza la RET punerea pe barele kV alea statiei 400/110 kV,prin extinderea statiei 110kV cu o celula 110kV,aferenta LEA 110kV in lung. de 5km, de la statia 110kV/MT proprie. Se racordeaza la RET in extinderea statiei 400/110kV Gura Ialomitei. Se racordeaza la RET in extinderea statiei 400/110kV Gura Ialomitei. Se racordeaza la RET in extinderea statiei 400/110kV Gura Ialomitei.

110

20 20 110 110

Se racordeaza la RET in extinderea statiei 400/110kV Gura Ialomitei. Racordare in statie noua 400kV Baraganu racordata intrare Baraganu iesire intr-o noua LEA 400kV d.c Medgidia Sud - Constanta Nord realizare LEA 110 kV dublu circuit de 0,5 km pentru Gura Ialomitei incadrarea statiei de conexiune intrare - iesire in LEA 110 Bordusani kV Gura Ialomitei - Bordusani, echipata cu fibra optica; statie de transf. noua proprie CEE 40 MW, 110/20 kV la 3 km Statia 110 kV de st. Harsova cu extindere bara 110 kV in afara statiei Harsova Harsova racord derivatie scurt in cablu, racordat in statia de 110/20/10 kV Neptun transformare 110/20/10 kV Neptun si amplasarea unui punct de conexiune la limita incintei statiei de transformare. racord derivatie scurt in cablu, racordat in statia de 110/20 kV Tataru transformare 110/20 kV Tataru si amplasarea unui punct de conexiune la limita incintei statiei de transformare 110/20 kV Medgidia Statie de conexiune conectata intrare-iesire in LEA 110 kV Sud / 110/20kV Medgidia Sud Baneasa. 110/6 kV Medgidia Racordarea CEE Satu Nou - 9 MW se va face la medie Nord tensiune la 20 kV n staia 110/6 kV Medgidia Nord printr-un Racordarea CEE Mircea Voda - 9 MW se va face la medie tensiune la 20 kV n staia 110/6 kV Medgidia Nord printr-un LES 20 kV, 3x185 mmp in lungime de 500 m. 110/6 kV Medgidia Nord

110

110

110/20 kV Topolog

realizare LEA 110 kV dublu circuit pentru ncadrarea statiei de conexiune intrare - iesire in LEA 110 kV Topolog derivatia Cismeaua Noua Harsova, echipata cu fibra optica in lungime de maxim 0,5 km; realizare staie electrica de conexiune 110 kV conectata intrare - ieire in LEA 110 kV Topolog derivatia Cismeaua Noua Harsova, integrata in sistemul de telecontrol existent la Enel Distributie Dobrogea;

110

Galbiori

Racordarea in statia 110 kV Galbiori prin LEA 110 kV s.c.

110

Statia 400/110 kV Gura Ialomitei ; Statia 110/20 kV Stefan cel Mare

Racordarea, CEE Platonesti 45 MW limitata la 40 MW, la 110 kV printr-o statie de conexiune intrare iesire, conectata in LEA 110 kV Gura Ialomitei Stefan cel Mare

110

*realizare LEA 110 kV dublu circuit pentru ncadrarea statiei 110/20 kV Baia de conexiune intrare - iesire in LEA 110 kV Baia Babadag; 110/20 kV Babadag *realizare staie electrica de conexiune 110 kV conectata intrare - ieire in LEA 110 kV Baia Babadag Racordarea CEE Pecineaga 77,5 MW se va realiza in statia 110/20 kV Tataru prin montare celula 110 kV (cu intrerupator cu comanda uni-tripolara si RAR monofazat) racord Pecineaga 77,5 MW in statia Tataru.

110 110/20 kV Tataru

110 110/20 kV Harsova ; 110/20 kV Medgidia Nord

Racordarea CEE Dorobantu printr-o LEA 110 kV dublu circuit pentru incadrarea statiei de conexiune intrare-iesire in LEA 110 kV Medgidia Nord-Harsova.

20 110/20 KV Rasova 110/20 kV Nicolae Balcescu

20

racord derivatie scurt in cablu, racordat in statia de transformare 110/20 kV Rasova si amplasarea unui punct de conexiune la limita incintei statiei de transformare, montare grup celule 20 KV in statia Rasova Racordarea in Statia 110/20 kV Nicolae Balcescu printr-o linie de cca 16 km.

20 110/20kV Tataru

echipare punct de conexiune amplasat in apropierea punctului de racordare (1 celula de linie si o celula de masura ) si realizare racord 20 kV intre punctul de racordare (st. nr. 13 al derivatiei PTA 3 Topraisar LEA 20 kV 1702)si punctul de conexiune realizare LEA 110 kV dublu circuit pentru ncadrarea statiei de conexiune intrare - iesire in LEA 110 kV Basarabi Lumina, echipata cu fibra optica in lungime de maxim 0,5 km; realizare staie electrica de conexiune 110 kV conectata intrare - ieire in LEA 110 kV Basarabi Lumina, integrata in sistemul de telecontrol existent la SC Enel Distributie Dobrogea SA; Echipare compartiment de racordare din punctul de conexiune, amplasat in apropierea LEA 20 kV 1703 - o celula de linie si o celula de masura; realizare racord 20 kV intre punctul de racordare (stalpul nr. 316 al LEA 20 kV 1703) si punctul de conexiune; montare grup de masura in punctul de conexiune. Echipare compartiment de racordare din punctul de conexiune, amplasat in apropierea LEA 20 kV 4400 derivatiei PTA 1650 - o celula de linie si o celula de masura; realizare racord 20 kV intre punctul de racordare (stalpul nr. 6 al derivatiei PTA 1650 LEA 20 kV 4400) si punctul de conexiune; montare grup de masura in punctul de conexiune.

110

110/20 kV Basarabi 110/20 kV Lumina

20

Tataru

20

Sacele

110

extinderea barei colectoare si montarea unei celule noi LEA 110/20 kV Gheorghe 110 kV in statia 110/20 kV Gheorghe Doja aferenta CEE Doja Gheorghe Doja 54 MW; - contor masura energie produsa, montat in instalatia Utilizatorului. Inlocuire BMPT existent cu BMPT din policarbonat (opac), antivandal, cu ntreruptor diferenial, dispozitiv de protecie la supratensiuni (DPST), dispozitiv de protecie la tensiune pe conductorul de nul;Inlocuire contor existent pentru decontare energie electric, cu un contor electronic trifazat dublu sens, clasa de precizie 0,5, montaj indirect, curb sarcin, etc. Contorul va fi pus la dispoziie de ctre Enel Distribuie Dobrogea, iar costurile pentru achiziionare i montare vor fi cuprinse n tariful de racordare. *montare grup de celule 20 kV in statia 110/20 kV Zebil (extindere sistem bare 20 kV cu o celula de adaptare si o celula de linie); *echipare punct de conexiune; *realizare racord 20 kV intre celula de linie nou montata in statia 110/20 kV Zebil si punctul de conexiune; *montare grup de masura in punctul de conexiune; *montare transformator de putere 16 MVA 110/20 kV (trafo 2) in statia 110/20 kV Zebil. realizare staie electrica de conexiune 110 kV conectata intrare - ieire in LEA 110 kV Medgidia Sud Basarabi, integrata in sistemul de telecontrol existent la SC ENEL Distributie Dobrogea SA

0.4

110

110/20 kV Zebil

110

110/20 kV Medgidia Sud si Basarabi

20

20

Echipare compartiment de racordare din punctul de conexiune, amplasat in apropierea LEA 20 kV 1220 derivatiei PTA 224 o celula de linie si o celula de masura; Realizare racord 20 kV intre 110/20 Eforie Nord punctul de racordare (stalpul nr. 7 al derivatiei PTA 224 LEA 20 kV 1220) si punctul de conexiune; Montare grup de masura in punctul de conexiune. Echipare compartiment de racordare din punctul de conexiune, amplasat in apropierea LEA 20 kV 6401 doua celule de linie si o celula de masura; Realizare racord 20 kV, in sistem intrare - iesire, 110/20 kV Baneasa intre punctul de racordare (stalpul nr. 531 al LEA 20 kV 6401) si punctul de conexiune; Montare grup de masura in punctul de conexiune.
110/20 kV Petrol Sud Echipare compartiment de racordare din punctul de conexiune, amplasat in apropierea LEA 20 kV 0723 derivatie PTA 645 o celula de linie si o celula de masura; Realizare racord 20 kV intre punctul de racordare ( stalpul nr. 25 al derivatiei PTA 645 LEA 20 kV 0723) si punctul de conexiune; Montare grup de masura in punctul de conexiune.

20

110

Maneciu-Olteni

racord intrare-iesire in LEA 110 kV Olteni - Maneciu

110

Beresti

racord 110 kV in statia Beresti

20

Mizil

racord 20 kV din stalpul nr. 363 al LEA 20 kV Ax Fantanele

20

Sahateni

derivatia 20 kV PTA 559 Prosca, din LEA 20 kV Naeni

110

Pechea

racord 110 kV in statia de transformare Pechea

20

Romanu

celula 20 kV in statia de transformare Romanu

110

Gutinas-Focsani Nord

racord 110 kV in LEA 110 kV Gutinas - Focsani Nord

20

Pechea

celula 20 kV in statia de transformare Pechea

20

Frumusita

racord 20 kV din stalpul 18 al LEA 20 kV Frumusita - SPP 10 in statia 110kV Scobinti, racordata intrare-iesire in circuitul 1 LEA 110 kV Pascani-Harlau in statia 110kV Scobinti, racordata intrare-iesire in circuitul 1 LEA 110 kV Pascani-Harlau racord in circuitul 1 al LEA 110 kV Munteni - Husi

110 110 110

Scobinti Scobinti Munteni

Barlad 110 Husi 110 Tg.Frumos 110 20 110 Podu Iloaiei Pascani racord in LEA 110kV Tg.Frumos-Vatra prin modul hibrid racord 20kV in St.110/20kV Podu Iloaiei racord LEA 110 kV Pascani-CFR Halaucesti LEA 110 KV Vanju Mare - Banovita.;Se va rac. o Statie de Transformare 110/20 KV intrare - iesire in LEA 110 KV Vanju Mare - Banovita, la aprox. 10 km fata de st. 110 KV Vanju Mare. racord in LEA 110kV Barlad-Rosiesti racord in statia Husi prin echiparea circ.2 al LEA 110kV Falciu-Vetrisoaia-Husi (de la CEE la st. Husi, fara a intra in st. Falciu si Vetrisoaia)

110

statie proprie 110/20 kV intrareiesire in LEA 110 kV Banovita-Vj.Mare

110

Moldova NouaOravita

const ntr-o staie 110 kV n schem intrare-ieire n LEA 110 kV Moldova Noua - Oravita, circuitul 2.

0.4

Fantanele

BMPT-63 A racordat la tabloul de distribuie 0,4 kV al PTAb 3645 si montat pe peretele exterior al acestuia

110

0.4

*realizare bara colectoare 110 kV si montarea unei celule noi LEA 110 kV in statia 110/20 kV Cucuruzu aferenta CEE 110/20 kV Cucuruzu Rasuceni; 110/20 kV *montare celula 110 kV noua in statia Draganesti Vlasca, Draganesti Vlasca aferenta LEA 110 kV Ghizdaru - derivatia Cucuruzu Draganesti Vlasca; Lucrari comune (fotovoltaic+eolian) langa BMPT-16A existent se monteza o cutie de distributie echipata cu clema cu 4 cai. LEA GREACA Se demonteza racordul aerian de la LEA jt Greaca, din aferenta PT3951 BMPT16A existent si se monteza in cutia de distributie nou proiectata. Se realizeaza o legatura intre cutia d edistributie si BMPT 16A existent. Lucrari specifice eoliana: langa BMPT

110

Racordarea la RED a centralei electrice eoliene se va face in LEA 110 kV Dumbrava-Sadu V.- Realizare statie de conexiuni 110 kV echipata cu: un modul hibrid cu doua intreruptoare (PASS MO DCB) conectat spre LEA Dumbrava-Sadu V, un separator tripolar de tip exterior 110 kV, un modul LEA 110 kV Dumbrava - hibrid cu un intreruptor (PASS MO SBB) conectat spre cablu (apartine Sadu V (in apropierea producatorului si va fi realizat din fonduri proprii), dulapuri de protectii statiei Sadu V), intre necesare actionarii intreruptoarelor din schema celor doua module hibrid, stalpii nr. 1 si nr. 2. dulapul pentru sistemul SCADA si dulapuri pentru serviciile interne de c.a. si Statia 110 kV Dumbrava; c.c. (pentru climatizare, armare dispozitive, de actionat, iluminat, alimentare Statia 110 kV protectii, comanda, semnalizare, masurare); - Racordarea statiei de conexiuni Sadu V la LEA 110 kV Dumbrava-Sadu V se va face prin intermediul a doua separatoare tripolare 110 kV inseriate cu cele doua ramuri ale modulului hibrid cu doua intreruptoare;

20

Baita

Racord subteran 2xLES 20 KV din statia Baita

20

Salonta

Racord subteran LES 20 KV din statia Salonta

Emitent

Nr. ATR

Data Emiterii/ Prelungirii

Obs.

Legislatia

Transelectrica

146

20.09.2012

inlocuieste ATR 93/15.06.2012

90/2008

Transelectrica

65

07.05.2012

prelungire ATR 109/07.11.2011

90/2008

Transelectrica

66

10.05.2012

ATR nou

90/2008

Transelectrica

99

11.07.2012

Prelungire ATR 02/11.01.2012

90/2008

Transelectrica

68

10.05.2012

ATR nou

90/2008

Transelectrica

70

10.05.2012

Prelungire ATR 110/10.11.2011 Prelungire ATR 111/10.11.2011

90/2008

Transelectrica

71

10.05.2012

90/2008

Transelectrica

72

14.05.2012

ATR nou

90/2008

Transelectrica

73

14.05.2012

ATR nou

90/2008

Transelectrica

74

14.05.2012

ATR nou

90/2008

Transelectrica

75

14.05.2012

ATR nou

90/2008

Transelectrica

76

14.05.2012

ATR nou

90/2008

Transelectrica

77

14.05.2012

ATR nou

90/2008

Transelectrica

92

12.06.2012

ATR nou

90/2008

Transelectrica

47

25.04.2012

prelungire ATR 102/25.10.2011

90/2008

Transelectrica

98

21.06.2012

Prelungire 78/15.05.2012

90/2008

Transelectrica

120

13.08.2012

prelungire ATR 88/08.06.2012

90/2008

Transelectrica

121

13.08.2012

prelungire ATR 89/08.06.2012

90/2008

Transelectrica

122

13.08.2012

prelungire ATR 90/08.06.2012

90/2008

Transelectrica

123

13.08.2012

prelungire ATR 91/08.06.2012

90/2008

Transelectrica

138

30.08.2012

prelungire ATR 30/01.03.2012

90/2008

Transelectrica

136

28.08.2012

prelungire ATR 29/28.02.2012

90/2008

Transelectrica

135

24.08.2012

prelungire ATR 28/24.02.2012

90/2008

Transelectrica

152

05.10.2012

prelungire ATR 37/09.04.2012

90/2008

Transelectrica

151

05.10.2012

prelungire ATR 38/09.04.2012

90/2008

Transelectrica Transelectrica Transelectrica Transelectrica Transelectrica Transelectrica Transelectrica Transelectrica Transelectrica Transelectrica Transelectrica Transelectrica Transelectrica

156 155 154 159 160 50 51 52 53 54 55 56 57

09.10.2012 09.10.2012 09.10.2012 11.10.2012 11.10.2012 25.04.2012 25.04.2012 25.04.2012 25.04.2012 25.04.2012 25.04.2012 25.04.2012 25.04.2012

inlocuieste ATR 39/09.04.2012 inlocuieste ATR 40/09.04.2012 inlocuieste ATR 41/09.04.2012 prelungire ATR 43/11.04.2012 prelungire ATR 44/11.04.2012 ATR nou ATR nou ATR nou ATR nou ATR nou ATR nou ATR nou ATR nou

90/2008 90/2008 90/2008 90/2008 90/2008 90/2008 90/2008 90/2008 90/2008 90/2008 90/2008 90/2008 90/2008

Transelectrica Transelectrica Transelectrica Transelectrica Transelectrica Transelectrica Transelectrica Transelectrica Transelectrica Transelectrica Transelectrica Transelectrica Transelectrica Transelectrica Transelectrica Transelectrica Transelectrica Transelectrica Transelectrica Transelectrica Transelectrica Transelectrica Transelectrica Transelectrica

58 49 59 60 63 64 81 103 104 105 106 107 108 109 110 111 124 125 126 127 128 129 134 142

25.04.2012 25.04.2012 25.04.2012 25.04.2012 04.05.2012 04.05.2012 16.05.2012 17.07.2012 17.07.2012 25.07.2012 27.07.2012 31.07.2012 02.08.2012 02.08.2012 02.08.2012 02.08.2012 20.08.2012 20.08.2012 20.08.2012 20.08.2012 20.08.2012 20.08.2012 22.08.2012 11.09.2012

ATR nou ATR nou ATR nou ATR nou ATR nou ATR nou ATR nou ATR nou Prelungire ATR 13/17.01.2012 ATR nou ATR nou Prelungire 69/10.05.2012 Prelungire 18/06.02.2012 Prelungire 19/06.02.2012 Prelungire 17/06.02.2012 Prelungire 16/03.02.2012 ATR nou ATR nou ATR nou ATR nou ATR nou ATR nou ATR nou ATR nou

90/2008 90/2008 90/2008 90/2008 90/2008 90/2008 90/2008 90/2008 90/2008 90/2008 90/2008 90/2008 90/2008 90/2008 90/2008 90/2008 90/2008 90/2008 90/2008 90/2008 90/2008 90/2008 90/2008 90/2008

Transelectrica Transelectrica Transelectrica Transelectrica Transelectrica Transelectrica Transelectrica Transelectrica Transelectrica Enel Distributie Dobrogea ENEL Distributie Dobrogea ENEL Distributie Dobrogea Enel Distributie Dobrogea Enel Distributie Dobrogea Enel Distributie Dobrogea

143 144 145 139 147 148 149 150 161 10028001

11.09.2012 11.09.2012 14.09.2012 07.09.2012 04.10.2012 04.10.2012 04.10.2012 04.10.2012 12.10.2012 18.01.2011/10.06.20 11 27.07.2011/10.01.20 12 05.09.2011/05.12.20 11 17.10.2011/10.01.20 12 20.10.2011/10.04.20 12 31.10.2011/ 04.04.2012

ATR nou ATR nou ATR nou ATR nou ATR nou ATR nou ATR nou ATR nou ATR nou

90/2008 90/2008 90/2008 90/2008 90/2008 90/2008 90/2008 90/2008 90/2008

ATR prelungit

90/2008 90/2008

10028015

ATR prelungit 90/2008 ATR prelungit ATR prelungit ATR prelungit ATR prelungit 90/2008 90/2008 90/2008

10028020 10028023 10 12

Enel Distributie Dobrogea

13

31-102011/04.04.2012

ATR prelungit

90/2008

Enel Distributie Dobrogea

14

13.12.2011/11.05.20 12

ATR prelungit

90/2008

Enel Distributie Dobrogea

10028012

13.05.2011/11.11.20 11

ATR prelungit

90/2008

ENEL Distributie Dobrogea

11

11.01.2012/05.07.20 12

ATR prelungit

90/2008

ENEL Distributie Dobrogea

16

23.01.2012/03.07.20 12

ATR prelungit

90/2008

Enel Distributie Dobrogea

17

22.03.2012/20.07.20 12

ATR prelungit

90/2008

Enel Distributie Dobrogea

21

14.06.2012

90/2008

Enel Distributie Dobrogea Enel Distributie Dobrogea

6936

22.06.2012/25.08.20 12 21.06.2012/10.09.20 12

ATR prelungit

90/2008

10028027

ATR prelungit

90/2008

Enel Distributie Dobrogea

6935

17.05.2012/16.08.20 12

ATR prelungit

90/2008

Enel Distributie Dobrogea

22

11.06.2012

90/2008

Enel Distributie Dobrogea

10028029

04.07.2012/04.10.20 12

ATR prelungit

90/2008

Enel Distributie Dobrogea

10028028

04.07.2012/04.10.20 12

ATR prelungit

90/2008

Enel Distributie Dobrogea

30

20.08.2012

90/2008

Enel Distributie Dobrogea

10028031

04.09.2012

90/2008

Enel Distributie Dobrogea

26

10/2/2012

90/2008

Enel Distributie Dobrogea

32

9/20/2012

90/2008

Enel Distributie Dobrogea

10028036

15.10.2012

90/2008

Enel Distributie Dobrogea

10028035

10.10.2012

90/2008

Enel Distributie Dobrogea FDEE Electrica Distributie Muntenia Nord FDEE Electrica Distributie Muntenia Nord

10028034

26.09.2012

90/2008

30101230073

7/16/2012

6 luni

HG 90/2008

30501215791

7/3/2012

6 luni

HG 90/2008

FDEE Electrica Distributie Muntenia Nord

30101233446

10/4/2012

3 luni

HG 90/2008

FDEE Electrica Distributie Muntenia Nord FDEE Electrica Distributie Muntenia Nord

30301207410

10/4/2012

3 luni

HG 90/2008

30501111424

12/19/2011

6 luni+prelungire 6 luni HG 90/2008

FDEE Electrica Distributie Muntenia Nord

30201207047

7/5/2012

3 luni+prelungire 3 luni HG 90/2008

FDEE Electrica Distributie Muntenia Nord FDEE Electrica Distributie Muntenia Nord

30401216172

6/15/2012

6 luni

HG 90/2008

30501216429

7/23/2012

3 luni+prelungire 3 luni HG 90/2008

FDEE Electrica Distributie Muntenia Nord E.ON Moldova Distributie E.ON Moldova Distributie E.ON Moldova Distributie E.ON Moldova Distributie E.ON Moldova Distributie E.ON Moldova Distributie E.ON Moldova Distributie E.ON Moldova Distributie

30501218519

9/13/2012

3 luni

HG 90/2008

1000220461 1000214991 1000086284

25.05.2012 16.05.2012 25.02.2012

6 luni 6 luni 6 luni

90/2008 90/2008 90/2008

1000110650 1000124078

06.04.2012 01.05.2012

6 luni 6 luni

90/2008 90/2009

1000199659 1000238071 1000296789

06.04.2012 28.09.2012 02.10.2012

6 luni 3 luni 6 luni

90/2008 90/2008 90/2008

CEZ DISTRIBUTIE

1400000007

01.10.2012

6 luni

90/2008

Enel Distributie Banat

19.08.2011/02.02.2012 ATR prelungit

90/2008

Enel Distributie Banat

1193

21.05.2012/21.08.2012 ATR prelungit

90/2008

Enel Distributie Muntenia

34

10/25/2012

90/2008

ENEL Distributie Muntenia

376

10/19/2012

90/2008

FDEE - EDTS

SR70201119105 / 15.12.2011

12.01.2012 /

HG 90/2008

FDEE-EDTN

60101223378

06.07.2012

HG 90/2008

FDEE-EDTN

60201212520

18.06.2012

HG 90/2008

Data expirarii ATR

Stare ATR

Data estimata PIF

16.12.2012

Valabil

2014

07.11.2012

VALABIL

2013

10.11.2012

VALABIL

2014

11.01.2013

VALABIL

2014-2016

10.11.2012

VALABIL

2013-2014

10.11.2012

VALABIL

2012

10.11.2012

VALABIL

2012

14.11.2012

VALABIL 2013

14.11.2012

VALABIL 2013

14.11.2012

VALABIL 2013

14.11.2012

VALABIL

2013

14.11.2012

VALABIL

2013 14.11.2012 VALABIL 2013 12.12.2012 Valabil 2014

25.10.2012

Valabil

2013

21.12.2012

VALABIL

2012

15.02.2013

Valabil

2013-2014

15.02.2013

Valabil

2013-2014

15.02.2013

Valabil

2013-2014

15.02.2013

Valabil

2013

01.03.2013

Valabil

2014-2016

28.02.2013

Valabil

2014

24.02.2013

Valabil

2013-2014

09.04.2013

Valabil

2013

09.04.2013

Valabil

2013

09.04.2013 09.04.2013 09.04.2013 11.04.2013 11.04.2013 25.10.2012 25.10.2012 25.10.2012 25.10.2012 25.10.2012 25.10.2012 25.10.2012 25.10.2012

Valabil Valabil Valabil Valabil Valabil Valabil Valabil Valabil Valabil Valabil Valabil Valabil Valabil

2014 2014 2014 2013 2015 2015 2015 2015 2015 2017 2017 2017 2017

25.10.2012 25.10.2012 25.10.2012 25.10.2012 04.11.2012 04.11.2012 16.11.2012 17.01.2013 17.01.2013 25.01.2013 27.01.2013 10.11.2012 06.02.2013 06.02.2013 06.02.2013 03.02.2013 20.02.2013 20.02.2013 20.02.2013 20.02.2013 20.02.2013 20.02.2013 22.02.2013 11.03.2012

Valabil Valabil Valabil Valabil Valabil Valabil Valabil VALABIL Valabil Valabil Valabil VALABIL Valabil Valabil Valabil Valabil Valabil Valabil Valabil Valabil Valabil Valabil Valabil Valabil

2017 2015

2015 2015 2014 2015 2014 2014-2015 2013-2014 2014 2013-2014 2013 2013 2013 2013 2013 2015 2015 2015 2015 2015 2015 2013 2015

11.03.2012 11.03.2012 14.03.2013 07.03.2013 04.04.2013 04.04.2013 04.04.2013 04.04.2013 12.04.2013 18.01.2012

Valabil Valabil Valabil Valabil Valabil Valabil Valabil Valabil Valabil

2015 2015 2015 2013 2013 2013 2013 2013 2014-2015

VALABIL 27.07.2012 VALABIL octombrie 2012

3/5/2012 17.04.2012 10/20/2012 31.10.2012

VALABIL VALABIL VALABIL VALABIL Mai 2013 trimestrul III - 2013 Trim IV 2012

31.10.2012

VALABIL

Trim IV 2012

13.12.2012

VALABIL

2013

13.05.2012

VALABIL

11.01.2013

VALABIL

2014

23.01.2013

VALABIL

2013

22.03.2013

VALABIL

trim IV 2012

14.12.2012

VALABIL

2012

1/4/2013

VALABIL

2013

12/21/2012

VALABIL

Trim IV 2013

17.11.2012

VALABIL

2012

11.12.2012

VALABIL

2014

1/4/2013

VALABIL

2013

1/4/2013

VALABIL

2013

20.02.2013

VALABIL

trim III 2014

04.12.2012

VALABIL

2013

4/2/2013

VALABIL

2013

3/20/2013

VALABIL

2013

15.01.2013

VALABIL

2013

10.01.2013

VALABIL

2013

12/26/2012

VALABIL

2013

1/16/2013

VALABIL

1/3/2013

VALABIL

1/4/2013

VALABIL

1/4/2013

VALABIL

12/19/2012

VALABIL, adresa prelungire nr. 1732/18.06.2012

1/5/2013

VALABIL, adresa prelungire valabilitate nr. 2988/03.10.2012

12/15/2012

VALABIL

1/23/2013

VALABIL, adresa prelungire valabilitate nr. 3024/05.10.2012

12/13/2012

VALABIL

25.11.2012 16.11.2012 25.08.2012

VALABIL VALABIL VALABIL -In curs de actualizare

2012 2013 2012

06.10.2012 01.11.2012

VALABIL VALABIL

2012-2013 2012

06.10.2012 28.12.2012 02.04.2012

VALABIL VALABIL VALABIL

2013 2012 2013

01.04.2012

VALABIL

PIF 2013

19.08.2012

VALABIL

2012

21.11.2012

VALABIL

trimestrul III 2012

4/25/2013

VALABIL

Jun-13

1/19/2013

VALABIL

2013

7/12/2012

VALABIL

2015

06.01.2013

VALABIL

18.12.2012

VALABIL

Data: Codul culorilor

05.11.2012 ATR emise de: Transelectrica Enel Dobrogea E.ON Moldova Electrica Transilvania Nord Electrica Transilvania sud CEZ Electrica Muntenia Nord Enel Muntenia Enel Banat ATR Expirate ATR Noi Denumire centrale electrice Tip SRE Judetul

Nr. crt

Denumire investitor Racordare la RED MHC Boia Mica I, com.Caineni, jud.Valcea;Racordare la RED MHC Racordare la RED MHC Boia Mica II, com.Caineni, jud.Valcea;Racordare la RED MHC Boia Mare I, com.Caineni, Racordare la RED MHC Pascoaia 2 MHC Pascoaia 3 Racordare la RED MHC Pascoaia 4 = 2,080MW MHC Prioboasa 1 = 1,328MW SC CORPAD SRL

SC HIDRO-ESTE SRL hidro SC HIDRO-ESTE SRL hidro SC HIDRO-ESTE SRL hidro SC HIDRO-ESTE SRL hidro MHC TARCAU MHC

Valcea

Valcea

Valcea

Valcea Neamt

4 5

SC HIDROELECTRICA SA SUCURSALA HIDROCENTRALE BISTRITA 6 SC HIDROELECTRICA SA SUCURSALA HIDROCENTRALE BISTRITA 7 SC HIDROELECTRICA SA SUCURSALA HIDROCENTRALE BISTRITA 8 SC HIDROELECTRICA SA SUCURSALA HIDROCENTRALE BISTRITA 9 SC Water Energy System SRL 10 11
SC GV ENERGY SRL

MHC GURA HAITII-2

MHC

Suceava

MHC HAITA

MHC

Suceava

MHC BAUCA

MHC

Suceava

MHC SARU DORNEI-1

MHC

Suceava

CHEAP Frasin-Pangarati

CHEAP

Neamt

MHC loc. Poiana

hidro

Bihor

12

SC ELECTRICO AQUA SRL SC ALESIS SRL

MHC Budeti 1 MHC Ruscova, Socolau

hidro

Maramures Maramures

13
SC HYDROTECH ELECTRIC SRL MHC Suciu Minghet

hidro
Maramures

14 15
SC AURORA HIDROENERGETICA SRL SC HIDRO CLEAR SRL MHC Lapus

hidro hidro
Maramures

VISTISOARA

BRASOV

16

hidro

SC ELCATA MHC SRL

HARSENI

BRASOV

17

hidro

SC ELCATA MHC SRL

HARSENI

BRASOV

18

hidro

SC ELCATA MHC SRL

DEJANI

BRASOV

19
SC HIDROELECTRICA SA BUCURESTI SUCURSALA HIDROCENTRALE SIBIU

hidro

RACOVITA

SIBIU

20

hidro

SC NIRAJ

ENERGY SRL

NIRAJUL MARE-CHIHERU DE JOS

MURES

21

hidro

SC HYDRO POWER ENERGY SRL

FANCEL

MURES

22

hidro

SC ATS ENERGY SRL

ARIESUL MIC - VIDRISOARA

ALBA

23

hidro

AGIL GROUP S.R.L.

CASOAIA

ALBA

24

hidro

SC ATS ENERGY SRL

ARIESUL MIC

ALBA

25

hidro

SC H2O ENERGY SRL

MARTINIS

HARGHITA

26

hidro

SC H2O ENERGY SRL

LUETA

HARGHITA

27

hidro

SC HR ENERGY SRL

TOPLITA

HARGHITA

28 SC HIDROELECTRICA SA BUCURESTI -SUCURSALA HIDROCENTRALE BUZAU 29 30 SC ELSID SA SC HIDROELECTRICA SA BUCURESTI -SUCURSALA HIDROCENTRALE BISTRITA ELSID SA CHEMP COMARNIC SI BREAZA CHE COSMESTI CHEMP BUZAU-1 PALTINENI

hidro

NEHOIASU

hidro

Buzau

hidro hidro hidro

Prahova Galati Buzau

31 32

33 34

ELSID SA ELSID SA

CHEMP BUZAU-2 Mlajet CHEMP Faget

hidro hidro

Buzau Prahova

ECOWATT INVEST

CERNAVODA

hidro

Constanta

35

36

HIDROELECTRICA SASUC. HIDROCENTRALE CARANSEBES

Herculane

hidro

CarasSeverin

37

VIALTERO ENERGY SRL Obreja

hidro

CarasSeverin

38

RENEWABLES INVEST SRL

Baru

hidro

Hunedoara

HALMAGEL ENERGY SRL


39

Sarbi

hidro

Arad

40

GRAZY PRICE MEDICAL IMPORT Efrimie EXPORT Murgu SRL

hidro

CarasSeverin

MEIR CONSULTING SRL CarasSeverin

41 TOTAL

Berzasca

hidro

Putere instalata (MW) 5.635

U(kV)

Staia de racord

Comentariu

20

SIT 110/20kVBrezoi

6.127

20

SIT 110/20kVBrezoi

6.121

3.112 2.6

0.615

statia 110 / Celula 20 Kv proiectata 20 kV Celula 20 Kv proiectata in statia 110/20 Kv in statia 110/20 Kv Brezoi Brezoi-circuit 2 Brezoi-circuit 2 SIT statia 110 / Celula 20 Kv proiectata 20 kV Celula 20 Kv proiectata in statia 110/20 Kv in statia 110/20 Kv Brezoi Brezoi-circuit 1 Brezoi-circuit 1 SIT racord in derivatia 20 kV Bolovanis a 20 Dodeni LEA 20 kV Dodeni-Stejaru racord 20kV din stalpul nr. 138 al LEA 20kV Negoiul Romanesc (racord de baza) si din stalpul nr. 248 al LEA 20 Vatra Dornei 20kV Saru Dornei-Calimani (racord de rezerva), printr-o linie electrica aeriana 20kV care formeaza o bucla intre cele 2 linii. 20 Vatra Dornei racord 20kV din LEA 20 kV Vatra Dornei Negoiul Romanesc, stalpul 117 racord 20kV din LEA 20 kV Vatra Dornei Negoiul Romanesc, stalpul 105 racord 20kV din stalpul nr.6 al LEA Saru Dornei Paltinis, alimentata din PA Saru Dornei racordare la RET in statie noua 220kV conectata intrare-iesire in Lea 220kV Stejaru-Gheorgheni printr-un racord LEA 220kV d.c. aprox.7km.
Racord aerian din LEA 20 KV Baita - Avram Iancu

LEA 20kV Brezoi-Gura Lotrului, Derivatia Salatruc;celula de linie cu intreruptor in vid sosire din MHC Grup I Boia; celula de LEA 20kV Brezoi-Caineni de linie cu intreruptor in vid sosire din MHC Grup I Boia; celula de linie cu intreruptor in vid

0.615

0.375

20

Vatra Dornei

2.6

20

Vatra Dornei

300

220

statie noua

20

Baita

0.94 2.1

20 20

Sighet Viseu

Racord aerian din LEA 20 KV Sighet - Budesti, racord PTA 6 Manastirea Rosia Racord aerian din LEA 20 KV PA4(7) Leordina - Poieni, racord statie Tratare Apa Racord aerian din LEA 20 KV Targu Lapus Lapusu Romanesc, derivatia Grosii Tiblesului, racord PTA 2 Greble Racord aerian din LEA 20 KV Somcuta - Mina, derivatia Hovrila Construirea unui punct de conexiune PC 20 kV in anvelopa din metal / beton, amplasat langa PT MHC Vistisoara. Racordarea PC 20 kV proiectat prin LES 20 kV la derivatia 20 kV Vistisoara. Construirea unui punct de conexiune PC 20 kV in anvelopa din metal / beton, amplasat in incinta ingradita a MHC Sebes 3. Racordarea PC 20 kV se face prin LEA + LES 20 kV la LEA 20 kV Sebes inainte de recloserul R19FS. La una din cele 3 celule de racord MHC-uri se va racorda prin LES 20 kV ca instalatie de utilizare PT MHC2; Construirea unui punct de conexiune PC 20 kV in anvelopa din metal / beton, amplasat in incinta ingradita a MHC Sebes 3. PC 20 kV proiectat se va racorda la RED in LEA 20 kV Sebes, inainte de recloserul R19FS Sebes, printr-un circuit LEA+LES 20 kV. La una din cele 3 celule de racord MHC-uri se va racorda prin LES 20 kV ca instalatie de utilizare PT MHC1.

1.03 6.38

20 20

Targu Lapus Somcuta Derivatia LEA 20 kV Vistisoara, Statia 110 / 20 kV Ucea

1.240

20

0.891

20

LEA 20 kV Sebes - Statia Fagaras - Sebes

1.196

20

LEA 20 kV Sebes - Statia Fagaras - Sebes

2.440

20

36.720

110

Construirea unui punct de conexiune PC 20 kV, amplasat in vecinatatea PT MHC pe domeniul public. Pentru racordarea la RED a MHC-ului se va realiza un LES 20 kV intre PC proiectat si LEA 20 kV PTA 3 Dejani. Pentru racordarea la RED a CHE Racovita, se va LEA 110 kV Cisnadie - realiza pe fondurile utilizatorului o statie de 110 kV. Marsa, Statia 110 / MT Racordarea statiei proiectate se va face printr-un kV CHE Racovita racord aerian in LEA 110 kV existenta Cisnadie Marsa. LEA 20 kV Harseni 1 derivatia PTA 3 Dejani, Statia Fagaras 110 / 20 Kv

1.748

20

Construirea unui punct de conexiune si transformare PCT 20 kV in anvelopa din metal/beton cu exploatare din interior, amplasat pe domeniul public, in zona PTA 2 Cimpul Cetatii, dimensionat pentru trafo 20/0,4 kV 630 kVA. PCT 20 kV proiectat se va racorda la stalpul existent nr. 140 echipat cu separator din LEA 20 kV Stalpul nr. 140 al Derivatie Campul Cetatii printr-un LES 20 kV cu Derivatiei Cimpul Cetatii cablu de tip A2XS2Y 3x1x150/25 mmp in lungime din LEA 20 kV Miercurea de cca 10 ml si montarea pe stalp a unui cadru cu Nirajului descarcatori ZnO si finale de 20 kV de exterior; Prezizare: in celula de linie cu intreruptor din PCT 20 kV proiectat se va racorda prin LES 20 kV PT MHC N2. Din PT MHC N2 se va racorda printr-un LES 20 kV PT MHC N1. Cele doua PT-uri (MHC N1 si MHC N2) precum si LES 20 kV de racord aferente reprez. instal. de utiliz. apartinand producatorului.

1.252

20

Racord LEA 20 kV (in lungime de 25 m) al MHC FANCEL, la LEA 20 kV REGHIN - LAPUSNA, Derivatia PT 1 FANCEL la stalpul nr. 11 proiectat, realizat cu 3 stalpi de beton, echipati dupa cum urmeaza : stalp echipat cu separator in montaj orizontal, CLP ; stalp echipat cu reanclansator 20 LEA 20 kV REGHIN kV (telecomandat cu protectii), care se va integra in LAPUSNA, Derivatia PT 1 SAD al FDEE Electrica Distributie Transilvania FANCEL, stalpul nr. 11 Sud ; stalp echipat cu grup de masura aerian 20 kV proiectat tip exterior, cu 3 TT, 3 TC, analizor clasa A pentru monitorizarea calitatii energiei electrice in punctul de delimitare si contor electronic in montaj indirect. Precizare: La bornele de legatura ale LES 20 kV iesire din grupul de masura aerian, plecare PT producator, urmeaza a se racorda ca instalatie de utilizare prin LES 20 kV, un post trafo 0,4 /20 kV 1600 kVA, proprietatea utilizatorului.

0.623

20

La distribuitorul LEA 20 kV, St. 110/20 kV Campeni-Avram Iancu, stalpul 218

Construirea unui Punct de Conexiuni ( PC 20 kV) in constructie independenta cu actionare din interior, amplasat langa MHC 2, cu echipament de comutatie in SF 6 pentru separatoare si in vid pentru intreruptoare. Racordarea PC proiectat prin LES 20 kV (L= 50m) la distribuitorul LEA 20 kV St. 110/20 Campeni-Avram Iancu, stalpul 218 care se va echipa cu un separator in montaj vertical, descarcatori cu ZnO si capete terminale. Precizare : la celula trafo se va racorda prin LES 20 kV un trafo ridicator de 0,4/20 kV- 800 kVA ca instalatie de utilizare ;

0.950

20

Construirea unui punct de conexiune PC 20 kV in anvelopa din metal / beton, amplasat in apropierea Derivatia LEA 20 kV PTA stalpului de racord a MHC la derivatia PTA Casoaia Casoaia, Statia 110 / a LEA 20 kV Avram Iancu. Racordarea PC 20 kV 20 kV Cimpeni proiectat la derivatia PTA Casoaia se va realiza prin LES 20 kV. Construirea unui Punct de Conexiuni ( PC 20 kV) in constructie zidita cu actionare din interior, amplasat langa MHC 1, cu echipament de comutatie in SF 6 pentru separatoare si in vid pentru intreruptoare. Racordarea PC proiectat prin LES 20 kV (L= 85m) la distribuitorul LEA 20 kV St. 110/20 Campeni-Avram Iancu, stalpul 282 care se va inlocui cu un stalp tip 15014 si se va echipa cu separator in montaj vertical, descarcatori cu ZnO si capete terminale; Precizare : la celula trafo se va racorda prin LES 20 kV un trafo ridicator de 0,4/20 kV- 1250 kVA ca instalatie de utilizare.

1.103

20

La distribuitorul LEA 20 kV, St. 110/20 kV Campeni-Avram Iancu, stalpul 282

1.238

Racord subteran 20 kV pentru PT al MHC-2 in lungime de Lp=1300m, realizat prin plantarea unui stalp in aliniamentul racordului PTA nr.1 Comanesti, si pozarea cablului intre stalpul nou plantat si PT al MHC-2. Construirea unui post de LEA 20 kV Racord, PTA transformare (ridicator) 0,4/20/KV-de800kVA la 1 Comanesti MHC-2. Construirea unei linii electrice subterane de 20 kV intre MHC-2 si MHC-1, in lungime de Lp=4275m. Construirea unui post de transformare (ridicator) 0,4/20/KV-de800kVA la MHC-1.

0.934

20

Derivatia LEA 20 kV, Chirui Selters

Construirea unui post de transformare (ridicator) 0,4 / 20 kV -1250kVA la MHC. Construirea unei linii electrice subterane intre MHC si LEA 20 kV ORAS, in lungime profil de Lp= 45m. Conectarea retelei 20 kV proiectate la derivatia 20 kV Chirui + Selters se face la stalpul nr.157 al derivatiei. Construirea unui punct de alimentare PA 20 kV in anvelopa din metal / beton, amplasat in vecinatatea PT MHC - T4. Se va racorda PA 20 kV proiectat prin LES 20 kV si LEA 20 kV la LEA 20 kV derivatia Bilbor.

4.896

20

LEA 20 kV derivatia Bilbor, Statia 110 / 20 kV Toplita spre Galautas si Statia 110 / 20 kV Borsec

97

110+20

Nehoiasu

extinderea sistemului de bare 110 kV din statia 110 kV Nehoiasu

5.066 39.3 9.52

20 110 20

Comarnic Marasesti Patarlagele

celula 20 kV in statia de transformare 110/20 kV Comarnic racord 110 kV in statia de transformare 110/20 kV Marasesti racord 20 kV in statia de transformare 110/20 kV Patarlagele

9.12 0.124

20 20

Patarlagele Valeni

racord 20 kV in statia de transformare 110/20 kV Patarlagele racord 20 kV din stalpul 77 bis al LEA 20 kV Faget construirea unui punct de conexiune amplasat cat mai aproape de punctul de racordare, racordat in sistem intrare iesire in LEA 20 kV nr. 5604-stalpul 49, alimentat din staia 110/20 kV CERNAVODA

20

110/20 KV CERNAVODA

21.852

110

110/20 kV Crusovat

consta n linie mixta LEA / LES 110 kV pentru racordarea in antena a CHE Herculane in statia 110/20 kV Crusovat

0.5

20

110/20 kV Otelu Rosu

Punct de conexiune de 20 kV cu dou compartimente (de racordare i utilizator) racordat la LEA 20kV Iaz Muntele Mic.

0.99

20

110/20 KV Baru Mare

110/20 kV Varfuri

Punct de conexiune de 20 kV cu acionare din interior, cu dou compartimente (de racordare i utilizator) racordat prin LES 20 kV la LEA 20 kV Petrila derivatia Baru Mare - PTA 232, stalp nr 7. Punct de conexiune de 20 kV cu acionare din interior, cu dou compartimente (de racordare i utilizator) racordat prin LES 20 kV si LEA 20 kV la LEA 20 kV Varfuri - Harlagiu racord 20 kV Sarbi ,

0.32

20
LEA 20 kV cu conductoare 50/8 mmp AlOl, n lungime de cca. 5 m, de la stalpul nr 440/57 al LEA 20 kV existente si cu echiparea stalpului special proiectat SC 15014 cu separator 24 kV, set descrctoare cu ZnO cu disconector, terminale de exterior pentru LES 20 kV si Rp< 4ohmi.

1.12

20

110/20 kV Ponor

0.003
583.396

bransament electric trifazat in lungime de 10 m din SE10, al LEA JT aferent PTA 7516, 20/0.4 KV, 250 KVA, montarea unei cutii de 110/20/6 kV Moldova trecere LEA/LES pe stalpul nr.78 (prevazut cu priza de pamant de 10 ohmi) si cablu de tip Noua ACYAbY 3x25+16 mmp in lungime de 10 m, protejat in tub flexibil din polietilena si montarea unui distribuitor la baza stalpului. -distribuitorul E1+2 va fi din policarbonat

Emitent

Nr. ATR

Data Emiterii/ Prelungirii

Obs.

Legislatia

CEZ DISTRIBUTIE

6320

18.05.2012

6 luni

90/2008

CEZ DISTRIBUTIE

6321

18.05.2012

6 luni

90/2008

CEZ DISTRIBUTIE

1300000012

29.05.2012

6 luni

90/2008

CEZ DISTRIBUTIE E.ON Moldova Distributie

1300000011 1000218363

29.05.2012
30.05.2012

6 luni 3 luni

90/2008 90/2008

E.ON Moldova Distributie

1000237461

27.06.2012

3 luni

90/2008

E.ON Moldova Distributie

1000237437

27.06.2012

3 luni

90/2008

E.ON Moldova Distributie

1000237466

27.06.2012

3 luni

90/2008

E.ON Moldova Distributie

1000237447

27.06.2012

3 luni

90/2008

Transelectrica

153

08.10.2012

ATR nou

90/2008

FDEE-EDTN

60201211157

30.03.2012

HG 90/2008

FDEE-EDTN FDEE-EDTN

60301217640 60301216411

24.09.2012 12.06.2012

HG 90/2008 HG 90/2008

FDEE-EDTN FDEE-EDTN

60301217796 60301217784

13.07.2012 28.08.2012

HG 90/2008 HG 90/2008

FDEE - EDTS

70101224190

3/29/2012

Inlocuieste ATR 70101004172 / 07.10.2010

HG 90/2008

FDEE - EDTS

70101226311

4/27/2012

Inlocuieste ATR 70101114966 / 05.10.2011

HG 90/2008

FDEE - EDTS

70101226312

5/2/2012

Inlocuieste ATR 70101114969 / 05.10.2011

HG 90/2008

FDEE - EDTS

70101226658

5/8/2012

Inlocuieste ATR 70101121078 / 16.11.2011

HG 90/2008

FDEE - EDTS

70201117716

27.10.2011 /

HG 90/2008

FDEE - EDTS

70301223052

04.07.2012 /

Inlocuieste ATR 70301116385 / 10.01.2012

HG 90/2008

FDEE - EDTS

70301223661

01.10.2012 /

HG 90/2008

FDEE - EDTS

70401005816

11.07.2012 /

HG 90/2008

FDEE - EDTS

70401215381

10.05.2012 /

Inlocuieste ATR 70401110132 / 11.11.2011

HG 90/2008

FDEE - EDTS

70401217572

03.09.2012 /

Inlocuieste ATR 70401005815 / 11.07.2012

HG 90/2008

SDEE - HARGHITA

70501214765

26.09.2012 /

Inlocuieste ATR 70501211217 / 13.02.2012

HG 90/2008

SDEE - HARGHITA

70501214768

26.09.2012 /

Inlocuieste ATR 70501211216 / 13.02.2012

HG 90/2008

FDEE - EDTS

70501214998

12.10.2012 /

Inlocuieste ATR 70501212131 / 12.04.2012

HG 90/2008

FDEE-EDMN

30301104104

11/8/2011

6 luni + prelungire 6 luni

HG 90/2008

FDEE-EDMN FDEE-EDMN FDEE-EDMN

30101227602 30401217194 30301206946

5/24/2012 7/10/2012 8/27/2012

3 luni 6 luni 3 luni

HG 90/2008 HG 90/2008 HG 90/2008

FDEE-EDMN FDEE-EDMN

30301206947 30101231736

8/27/2012 8/30/2012

3 luni 3 luni

HG 90/2008 HG 90/2008

Enel Distributie Dobrogea

6921

29.12.2011

90/2008

Enel Distributie Banat 15-092011/07.03.20 12

ATR prelungit

235118

90/2008

Enel Distributie Banat

1294

08.08.2012

90/2008

Enel Distributie Banat 01.06.2012/24. 08.2012

ATR prelungit

1198

90/2008

Enel Distributie Banat 1312

27/08/2012

90/2008

Enel Distributie Banat 1243

28/09/2012

90/2008

Enel Distributie Banat 1366

27/09/2012

90/2008

Data expirarii ATR 18.11.2012

Stare ATR

Data estimata PIF

VALABIL

PIF 2012

18.11.2012

VALABIL

PIF 2012

29.11.2012

VALABIL

PIF 2012

29.11.2012 11/30/2012

VALABIL VALABIL

PIF 2012
2013

27.09.2012

VALABIL

2012

27.09.2012

VALABIL

2015

27.09.2012

VALABIL

2015

27.09.2012

VALABIL

2015

08.04.2013

Valabil

2017

30.09.2012

VALABIL

24.03.2013 12.12.2012

VALABIL VALABIL

13.01.2013 28.11.2012

VALABIL VALABIL

29.09.2012

VALABIL

2013

27.10.2012

VALABIL

2013

11/2/2012

VALABIL

2013

11/8/2012

VALABIL

2013

10/27/2012

VALABIL

2013

1/4/2013

VALABIL

2013

4/1/2013

VALABIL

2013

1/11/2013

VALABIL

2013

11/10/2012

VALABIL

2013

3/3/2013

VALABIL

2013

3/26/2013

VALABIL

2013

3/26/2013

VALABIL

2013

4/12/2013

VALABIL

2013

11/8/2012

VALABIL, adresa prelungire valabilitate nr. 1195/04.05.2012 VALABIL VALABIL VALABIL

8/24/2012 1/10/2013 11/27/2012

11/27/2012 11/30/2012

VALABIL VALABIL

29.03.2012

valabil

VALABIL

15/09/2012

LEA 110 kV Balta Sarata Armenis, 23,76 km, 585 mmp, 850 A LEA 110

VALABIL

nu

08.11.2012

30.09.2013

VALABIL

nu

01.12.2012

trim III 2012

VALABIL

nu

27/11/2012

sem II 2013

VALABIL

nu

28/12/2012

6/30/2013

VALABIL

nu

27/12/2012

12/31/2012

Data: Codul culorilor

05.11.2012 ATR emise de: Transelectrica Enel Dobrogea E.ON Moldova Electrica Transilvania Electrica Transilvania CEZ Electrica Muntenia Nord Enel Muntenia Enel Banat ATR Expirate ATR Noi Denumire centrale electrice
Centrala electrica pe biomasa loc. Gherla Centrala electrica pe biomasa loc. Rascruci Centr. el. pe biomasa Carei Centr. el. pe biomas Anie

Nr. crt 1 2 3 4

Denumire investitor
SC SORTILEMN SA SC ROMITA ENERGIE VERDE SRL SC SANA RA SRL SC M.I.S-GRUP SRL

Judetul
Cluj Cluj Satu Mare BistriaNsud

Putere instalata (MW)


1.40 11.00 1.6 5.5

U(kV)
20 20 20 20

SC GENERA AVANTE SRL

Satu Mare

HARGHITA

7.500

20

SC AGRO ITAL SRL

sat Gara Cilibia, comuna Cilibia

Buzau

2.1

20

ELECTRAWINDS - R SA Harsova

Constanta

20

110

SC EGGER ROMANIA SRL

Centrala termoelectrica biomasa 10MW HOLZINDUSTRIE

Suceava

10

110

10

INSTALATII DE PRODUCERE A ENERGIEI ELECTRICE DIN DESEURI SC ENOL GRUP SA MENAJERE CENTRALA ELECTRICA SC ELECTRAWINDS BIOMASA 3,4 MW , GENCO BIOMASS SRL Alexandru cel Bun, jud. Neamt Total

Neamt

3.73

20

Neamt

3.4 66.230

20

Staia de racord
Gherla Jucu Carei-1 Rodna Distribuitorul LEA 20 kV Vlahita - Odorhei, Statia 110 / 20 / 6 kV Vlahita si Statia 110 / 20 kV Odorhei

Comentariu

Emitent

Nr. ATR
60101221587 60101225430 60401206301 60501207019

Racordarea unui grup generator asincron in instalatia de utilizare FDEE - EDTN Racord LES 20 KV din statia Jucu Racord LES 20 KV din statia Carei 1 Racord LES 20 KV din statia Rodna

FDEE - EDTN
FDEE-EDTN FDEE-EDTN

Construirea unui punct de conexiune PC 20 kV in anvelopa din metal / beton, amplasat in apropierea LEA 20 kV Vlahita - Odorhei. Racordarea PC 20 kV proiectat se va realiza prin 2 x LES 20 kV racordate la distribuitorul LEA 20 kV Vlahita - Odorhei.

FDEE - EDTS

70501106073

Pogoanele

racord 20 kV din stalpul nr. 192 al LEA 20 kV Caragele FDEE EDMN

30301205596

Montarea unei celule noi LEA 110 kV echipata complet in 110/20 kV statia Harsova Oras ( cu intrerupator cu comanda uniHarsova Oras tripolara si RAR monofazat)

Enel Distributie Dobrogea

18

E.ON Moldova Distributie Egger Statia Egger 1000299969

E.ON Moldova Distributie I.M.Roman(IM R) LEA 20 kV nou proiectata E.ON Moldova Distributie Sarata racord in LEA 20 kV Sarata Vaduri, stalpul 93 1000294841 1000203831

Data Emiterii/ Prelungirii


27.04.2012 27.09.2012 11.04.2012 17.09.2012

Obs.

Legislatia
HG 90/2008 HG 90/2008 HG 90/2008 HG 90/2008

Data expirarii ATR


Nu e cazul 27.03.2013

Stare ATR
Realizat PIF
VALABIL

Data estimata PIF

11.10.2012 17.03.2013

VALABIL VALABIL

13.10.2011 /

HG 90/2008

4/13/2012

VALABIL

2012

6/6/2012

3 luni+prelungire 3 luniHG 90/2008

12/6/2012

VALABIL, adresa prelungire nr. 2584/04.09.201 2

03.05.2012

90/2008 03.11.2012

VALABIL

Trim IV 2013

05.10.2012

6 luni

90/2008

05.04.2013

VALABIL

2012

25.07.2012

3 luni

90/2008

25.10.2012

VALABIL

2013

02.10.2012

3 luni

90/2008

02.01.2013

VALABIL

2014

Data: Codul culorilor

05.11.2012 ATR emise de: Transelectrica Enel Dobrogea E.ON Moldova Electrica Transilvania Electrica Transilvania CEZ Electrica Muntenia Nord Enel Muntenia Enel Banat ATR Expirate ATR Noi

Nr. crt

Denumire investitor

Denumire centrale electrice

Judetul

Putere instalata U(kV) (MW)

1 2

SC LUCA ENERGY SRL SC FORVILA SRL

Centr. el. pe biogaz Tinca CE pe biogaz, loc. Cauaceu

Bihor Bihor

2.1 0.637

20 20

MODLIFT

Tufesti

Braila

0.5

20

MAREX SA

Tufesti

Braila

20

PROD IMPORT CDC

Frecatei

Tulcea

0.5

20

6 Total

ECOBIOGAZ SRL

Vidra

Ilfov

14 19.737

110

Staia de racord

Comentariu

Emitent

Nr. ATR

Salonta PTab Ferma Pasari Cauaceu

Racord aerian din LEA 20 KV Salonta - Beius Racord subteran LES 20 KV din PTab Ferma Pasari Cauaceu

FDEE-EDTN FDEE-EDTN

60201214146 60201213641

CUZA VODA

racord aerian 20 kV din stalpul nr. 62 al buclei 20 kV Cuza Voda - Tufesti cu LEA 20 kV Gropeni - KM. 209

FDEE EDMN

30201205306

GROPENI

racord aerian 20 kV din stalpul nr. 64 al LEA 20 kV Gropeni - SP 1A

FDEE EDMN

30201207123

110/20 kV Tulcea Vest

110/20kV Jilava ; 110/20kV Colibasi

racordarea CEBiogaz Frecatei - 0,5 MW se va realiza prin construirea unui punct de conexiune, racordat la stalpul nr.19 al LEA 20 kV 93.04 derivatie PT 94 Frecatei, alimentat din staia de transformare Tulcea Vest. realizare LEA 110 kV dublu circuit pentru ncadrarea statiei de conexiune intrare - iesire in LEA 110 kV Jilava - Colibasi, echipata cu fibra optica, in lungime de maxim 0,5 km; realizare staie electrica de conexiune 110 kV

ENEL Distributie Dobrogea

6922

ENEL Distributie Muntenia

15

Data Emiterii/ Prelungirii

Obs.

Legislatia

Data expirarii Stare ATR ATR

Data estimata PIF

10.08.2012 04.09.2012

HG 90/2008 HG 90/2008

10.02.2013 04.03.2013

VALABIL VALABIL

2/1/2012 3 luni+prelungire 3 luni HG 90/2008

5/1/2012

VALABIL, adresa prelungire nr. 1165/02.05.2012 VALABIL

7/13/2012

3 luni

HG 90/2008

10/13/2012

22.12.2011

90/2008

22.03.2012

VALABIL

2012

09.01.2012 90/2008

09.07.2012

VALABIL

decembrie 2012

Data: Codul culorilor

05.11.2012 ATR emise de: Transelectrica Enel Dobrogea E.ON Moldova Electrica Transilvania Nord Electrica Transilvania sud CEZ Electrica Muntenia Nord Enel Muntenia Enel Banat ATR Expirate ATR Noi

Nr. crt

Denumire investitor

Denumire centrale electrice

Judetul

Putere instalata (MW)

PRO AIR CLEAN

Slobozia

Ialomita

0.6

UZINA TERMOELECTRICA GIURGIU SA

Giurgiu

Giurgiu

17.604

SOHIPI SRL

Codlea

BRASOV

1.413

SOCERAM SA

Doicesti

Dambovita

1.063

MAREX SA

Braila

Braila

SC ELECTRA BIO ENERGY SRL

Centr. termo n cogen. Aled, str. Arena Sportiv

Bihor

0.125

SC ELECTRA BIO ENERGY SRL

Centr. termo n cogen. Aled, str. E. Palade

Bihor

0.125

S.C. AGRO TRUST S.R.L.

Centrala bio regenerabile, Segarcea Vale, jud. Teleorman

Teleorman

0.50

SC PRODCHIM BALS

Centrala de producere energie electrica si termica din BIOGAZ ,In BALS,str.N.BALCESCU,nr192

0.99

Olt
25.42

Total

U(kV)

Staia de racord

Comentariu

Emitent

Nr. ATR

Data Emiterii/ Prelungirii

20

110/20 kV Slobozia Nord

montare celula de masura / utilizator UT in compartimentul de racordare Enel ENEL Distributie aferent punctului de conexiune 8646 Dobrogea existent si montare contor cu kit

27384

8/1/2012

110

110 kV CET Giurgiu

montare contor masura energie produsa, ENEL Distributie montat in instalatiile utilizatorului Muntenia

23

29.06.2012

20

LEA 20 kV Avicola Codlea, Statia 110 / 20 kV Codlea si Statia 110 / 20 kV

Construirea unui punct de conexiune PC 20 kV in anvelopa din metal / beton, amplasat la limita de proprietate. Racordarea PC 20 kV proiectat la RED se va realiza prin 2 x LES 20 kV intre celulele de linie din PC si LEA 20 kV Avicola Codlea (intrare - iesire). Pe fonduri de beneficiar se va realiza un post de transformare ridicator 0,4 / 20 kV in anvelopa de metal / beton.

FDEE - EDTS

70101122865

23.12.2011 /

20

celula Ceramica 1 si Ceramica 2 din Aninoasa statia de transformare 110/20 kV Aninoasa

FDEE EDMN

30601211807

9/26/2012

20

Lacu Sarat si Braila Sud

PC 20 kV nou racordat prin LEA+LES din LEA 20 kV Lacu Sarat - Statiunea Lacu Sarat si din LEA 20 kV RedresorBraila Sud

FDEE EDMN

30201208256

9/25/2012

0.4

PTab New Peco Alesd

Bransamnet trifazat subteran

FDEE-EDTN

60201211931

09.04.2012

0.4

PTA Epurare Alesd

Bransamnet trifazat subteran

FDEE-EDTN

60201211932

10.04.2012

statia110/ Stalpul nr.39 A,tip SC 15014,proiectat in SC CEZ 20 kV axul LEA 20 Kv Segarcea-Putineiu; DISTRIBUTIE Segarcea 20 Statia LES 20 KV PT Anvelopa Rompetrol PTCZ 110/20 Kv Uzina de Reparatii (din LEA 20 KV Bals SC CEZ Bals Branet) 20 DISTRIBUTIE

1300000018 02.10.2012

1300000010 23.05.2012

Obs.

Legislatia

Data expirarii ATR

Stare ATR

Data estimata PIF

90/2008

11/1/2012

VALABIL

2012

90/2008 29.12.2012

VALABIL

2012

HG 90/2008

6/23/2012

VALABIL

3 luni

HG 90/2008 12/26/2012

VALABIL

Nu sunt prevazute

3 luni

HG 90/2008 12/25/2012

VALABIL

Nu sunt prevazute

HG 90/2008

09.10.2012

VALABIL

HG 90/2008

10.10.2012

VALABIL

3 luni

90/2008

02.01.2012

VALABIL

PIF 2012

3 luni

90/2008

23.08.2012

VALABIL

PIF 2012

nu este cazul

Data: Codul culorilor

05.11.2012 ATR emise de: Transelectrica Enel Dobrogea E.ON Moldova Electrica Transilvania Electrica Transilvania CEZ Electrica Muntenia Nord Enel Muntenia Enel Banat ATR Expirate ATR Noi Denumire centrale electrice Judetul Putere instalata (MW) U(kV)

Nr. crt

Denumire investitor

ELECTRAWINDS-R SA 1

Fierbinti

Ialomita

10

20

TERRA MUNTENIA SRL

Modelu

Calarasi

7.4

20

PRIMARIA MUNICIPIULUI MEDGIDIA

Medgidia

Constanta

20

Comuna Agigea

Agigea

Constanta

0.975

20

4 HAPPY SUN ENERGY SRL 5 BARUCH SRL 6 Nuci Calarasi 5.8 20

Facaeni

Ialomita

20

SUNFIELDS NORD SRL 7

Slobozia

Ialomita

20

ELECTRA BIO ENERGY SRL 8

Calarasi

Calarasi

20

NEW CALORIC SISTEM SRL

Randunica

Tulcea

110

VOLTAIC AVANGARD SRL

Randunica

Tulcea

110

10 ICPE SA 11 12 13 14 SC SOLAR ELECTRIC Frasinet-2 Frasinet SRL SC Solar Electric Frasinet-3 Mostistea SRL SC Long Bridge Milenium Stanesti SRL Calarasi Calarasi Giurgiu 8.3 4.6 7.5 20 20 20 Agigea Constanta 0.5 20

SC SOLAR ELECTRIC CALARASI SRL 15 SC TERRA MUNTENIA SRL 16 SC Metalluk SRL 17 SC VIMETCO POWER ROMANIA SRL

Frasinet-1

Calarasi

9.9

110

Modelu

Calarasi

84

110

Iaz

Caras-Severin

48

110

CCC Alum

Tulcea

430

400

18

Consiliul Local Mogosoaia 19

Mogosoaia

Ilfov

1.995

20

SYK ASSET SRL

Colibasi-2

Giurgiu

2.000

20

20

HERMES BUSSINES CENTER SRL

Colibasi-1

Giurgiu

0.990

20

21 SUN GARDEN COLIBASI SRL 22

CFV Camp 1+2

Giurgiu

50.000

110

SUN GARDEN COLIBASI SRL 23 LEMAR GRUP SRL 24

CFV Camp 3

Giurgiu

50.000

110

Chiriacu

Giurgiu

6.400

20

25

COVASNA ESTIVAL 2002 Slobozia SRL CDG SRL Slobozia

Giurgiu

1.000

20

Giurgiu

1.500

20

26 TURBO CONSULT SRL 27 INTERACTIVE TECHNICAL SERVICES SA Mironesti Giurgiu 1.56050 20 Vidra Ilfov 0.35000 20

28

BORRA ENERGY PLANT SRL Izvoarele

Giurgiu

38.00

110

29

GAMA ENERGOTOTAL SRL

Obedeni-Bucsani

Giurgiu

2.00

20

30

MAR-TIN SRL

Uiesti-Bucsani

Giurgiu

8.50

20

31 32 SOLAR PARTNERS SRL sat Izvoru, comuna Visina Dambovita 1 20

SOLAR UNIQUE ENERGY sat Brosteni, PARTNERS SRL comuna Visina 33

Dambovita

20

N&H E COMMERCE SRL 34

Buzau

Buzau

20

VH-EP SOLAR SRL 35

Tintesti

Buzau

2.5

20

V-RO CENT GROUP SRL Ciorani 36

Prahova

2.5

20

L.C.T. SOLAR SRL 37 ELECTRASOL PROIECT SRL 38 SOCOMIZO ENERGY INVESTMENT SRL 39

Faurei

Braila

20

Gura Ocnitei 1

Targoviste

20

Sahateni

Buzau

10

20

NORTH SOLAR SRL 40 GAVRILA RAMONACRISTINA 41

Pietrosu-Costesti

Buzau

20

Satu Nou-Panciu

Vrancea

0.006

0.4

COMUNA RACOVITENI 42

Racoviteni

Buzau

0.98

20

MONTANA RES ENERGY Stancuta - Cuza SRL Voda 43

Braila

20

RUNCU ENERGIA SRL 44

Baraganul

Braila

2.5

20

LOVRIN 2 ENERGIA SRL Baraganul 45

Braila

2.5

20

ALPHA METAL SA 46

Ianca

Braila

2.5

20

ORAS MIZIL 47 TOPLICENI GREEN ENERGY SRL 48

Mizil

Prahova

1.7

20

Zaplazi-Topliceni

Buzau

2.5

20

LESMONTAJ SRL 49 ENERGO NATUR IMPEX SRL 50 BORRA ENERGY DANUBE SRL 51 ENERGREEN DISTRIBUTION SRL 52 ALLIANSO PARK MANAGEMENT SRL (VAROKUB ENERGY SRL) FLORESCENT ENERGY SRL 54

Brebu

Prahova

0.11

0.4

Jugureni-Uliesti

Dambovita

1.72

20

Balteni-Contesti

Dambovita

48

110

Berlesti-Ianca

Braila

20

Aricestii Rahtivani

Prahova

8.356

20

53

sat Catina, comuna Floresti

Prahova

2.9

20

FUTURE ENERGY CLEAN Ciorani SRL 55

Prahova

2.9

20

SOLVAL ENERGY SRL 56 ENERGO NATUR RASCAIETI SRL 57

Baicoi

Prahova

2.5

20

Rascaeti

Dambovita

2.5

20

ENERGO NATUR VISINA Visina SRL 58

Dambovita

2.5

20

AGRO BIO CODRU SRL 59 GREEN ENERGY SYSTEMS SRL 60

Galbenu

Braila

2.4

20

Brezoia

Dambovita

2.45

20

DANIELLI DESIGN SRL 61

Brezoia

Dambovita

0.95

20

KENTAX ENERGY SRL 62

Butimanu

Dambovita

7.5

20

ENERGIAFOTO SRL 63

Cuza Voda (Stancuta)

Braila

2.9

20

ENERGIAFOTO SRL 64

Stancuta

Braila

2.9

20

ENERGIAFOTO SRL 65

Stancuta

Braila

2.9

20

GREEN ENERGY INVESTMENT SRL 66 B&B AGRO HOLDING SRL 67

C.A. Rosetti

Buzau

10

20

Costache Negri

Galati

0.5

20

EWE MAGURELE SOLAR Magurele SRL 68 MOBILE TEAM SOLAR GROUP SRL 69

Prahova

2.9

20

Crangurile

Dambovita

2.98

20

UNIQUE SOLAR SRL 70

Butimanu

Dambovita

2.98

20

DECRIS INDUSTRY SRL 71

Cocorastii Colt

Prahova

2.98

20

ATT DEVELOPMENT SRL Filipestii de Targ 72 VRANCEA ENERGY INVESTMENT SRL 73 KEY FACILITY SOLUTION Tataranu SRL 74 KEY FACILITY SOLUTION Tataranu SRL 75 BOOKING ENERGY DEVELOPMENT SRL 76

Prahova

20

Vulturu

Vrancea

9.5

20

Vrancea

2.9

20

Vrancea

2.7

20

Tataranu

Vrancea

2.5

20

M&D CONS INVESTITII SRL 77

sat Pitaru, comuna Potlogi

Dambovita

0.656

20

SORSTE SA 78 COMUNA ARICESTII RAHTIVANI 79

Focsani

Vrancea

0.4

20

Aricestii Rahtivani

Prahova

0.0045

0.4

NITO SOLAR SRL 80 CONSILIUL JUDETEAN PRAHOVA 81

sat Colacu, comuna Racari

Dambovita

20

Ploiesti

Prahova

0.2625

20

GREEN POWER ENERGY Ciocanesti MARKET SRL 82 FRAN ENERGY GREEN SRL 83 VIR COMPANY INTERNATIONAL SRL 84 Darvari, Valea Calugareasca

Dambovita

2.5

20

Produlesti

Dambovita

2.5

20

Prahova

20

TOMA CALIN-VALENTIN 85

Aricestii Rahtivani

Prahova

20

MAYA GIA PROD SRL 86 FOTOVOLTAIC ENERGY SRL 87

Ciocanesti

Dambovita

20

Urlati

Prahova

20

SIMDAN GREEN LIGHT SRL 88 VALENERGY PROD INSTANT SRL 89 VARO FUTURE DEVELOPMENT SRL 90 VARO GREEN DEVELOPMENT SRL 91 SOLAR FUTURE ENERGY SRL 92 FORT GREEN ENERGY SRL 93

Urlati

Prahova

20

Urlati

Prahova

20

DN 72 PloiestiTargoviste

Prahova

20

DN 72 PloiestiTargoviste

Prahova

20

Aricestii Rahtivani

Prahova

9.5

20

Aricestii Rahtivani

Prahova

8.5

20

CASA CRANG SRL 94

Aricestii Rahtivani

Prahova

20

SOLAR GREEN ENERGY Gura Ocnitei SRL 95

Dambovita

20

SUN ENGINEERING SRL Tartasesti 96

Dambovita

2.8

20

EOL ENERGY SRL 97 ELECTRASOL PROIECT SRL 98 99

Mizil, zona Aerodrom

Prahova

2.9

20

Gura Ocnitei

Dambovita

10

20

SC POTELU SOLAR SRL

Dabuleni

Dolj

7.5

20

100

101 102 103 104 105

Racordarea la RED centrala electrica fotovoltaica in zona CILIENI 1 , JUD OLT Racordarea la RED centrala electrica fotovoltaica in zona CILIENI 2 , JUD OLT

SC CAPMAN INTERNATIONAL SRL BUCURESTI SC CAPMAN INTERNATIONAL SRL BUCURESTI

Olt

9.9

110

Olt

9.9

110

Racordare centrala fotovoltaica Fotovoltaic Filiasi Prod&Distribution SRL Racordare centrala fotovoltaica Power Regenerabil Energy Filiasi SRL Racordare la SEN a CEF SC SOLARIA GREEN Urzicuta,7 MW ENERGY SRL Racordare la SEN a CEF SC SUN ENERGHES SRL Urzicuta,4 MW Racordare la RED a CEF situata in Bailesti,str.Eroilor,2.9 MW SC GEKO FAIRY LAND SRL

Mehedinti Mehedinti Dolj Dolj Dolj

7.4 9.9 7 4 2.9

20 20 20 20 20

106

RACORDAREA LA RED A CENTRALEI FOTOVOltAICE 1.5 SC NIDE COM SERV SRL CRAIOVA MW IN COM.LEU SAT JIANCA, 107 JUDETUL DOLJ Racordare la RED a CEF situata SC SOLPRIM SRL in com.Simnicu de Sus 108 T85/P1,P2 Racordare la RED centrala fotovoltaica Iancu Jianu T64/4, judetul Olt Racordare la RED fotovoltaica Iancu Jianu T63/3, judetul Olt 110 Racordare la RED centrala fotovoltaica Iancu Jianu, T 63/2, 111 judetul Olt 112 113 SC FOTON EPSILON SRL SC BIOENERGY Green Podari SRL SC SOLAR REGENERABIL SRLBOTOSANI Racordare centrala fotovoltaica Burila Mica Racordare la RED a CEF situata in Podari T77 /P2 SC VIABLE ENERGYSRL BOTOSANI

Dolj

9.8

20

Dolj

7.95

20

Olt

9.92

20

109

SC ALFA GREEN ENERGY SRL

Olt

4.92

20

Olt Mehedinti Dolj Dolj

7.02 7.5 4.98 9.97

20 20 20 20

114

SC MANAGEMENT BUILDYNG Racordare la RED a CEF SRL situata in Podari T77/P3,P4 SC SOLAR KING SRL Parc fotovoltaic Poiana 1, sat Poiana, com.Turburea, jud.Gorj Parc fotovoltaic Poiana 2, sat Poiana, com.Turburea, jud.Gorj Centrala fotovoltaica, Zimnicea, jud. Teleorman

Gorj

3.69

20

115 SC SIGTEX SRL 116 117 S.C. PHOTEIS ENERGIE SOLARA

Gorj Teleorman

4.92 6.05

20 20

SC EYE MALL SRL 118

Racordarea la SEN a centralei fotovoltaice - Parc 1, localitatea Carbunesti, jud.Gorj

Gorj

9.99

20

SC PLENITA SOLAR GAMA SRL Panouri fotovoltaice Plenita 119 SC PLENITA SOLAR 1 SRL 120 SC VEROSOL SRL Timisoara 121 SC PIAN DEL SOL SRL 122 SC LUMINA SOLAR SRL 123 124 SC Country Projects SRL SC SMILY TOURS SRL 125 SC VERTICAL ENERGY VOLT SRL , PITEST 126 Panouri fotovoltaice Vanatori Racordarea la RED a centralei fotovoltaice IANCA TARLAUA 20 Racordare la RED centrala fotovoltaica Comuna DOMNESTI, str. DOMNESTI, FN , judetul Arges Alimentare cu energie electrica si racordare la RED Centrala fotovoltaica in oras Topoloveni, jud. Arges Racordare la RED centrala fotovoltaica Comuna GOLESTI, FN , judetul Arges Producere energie electrica in OARJA,OARJA TARLA 6 Parc fotovoltaic Cateasca,Coseru Racordarea la RED CENTRALA TOTOVOLTAICA SCORNICESTI-PISCANI Racordare la RED Centrala electrica fotovoltaica,Bailesti Racordare la RED a CEF situata in localitatea Bailesti Racordare la RED a CEF situata in localitatea Bailesti Panouri fotovoltaice

Mehedinti

20

Mehedinti

20

Dolj

20

Dolj

20

Dolj

3.50

20

Mehedinti OLT

2.5 8.18

20 20

Arges

5.97

20

Consiliul Local Topoloveni 127 SC SOLEK PROJECT ALPHA SRL 128 WDP DEVELOPMENT RO SRL 129 130 SC ASIST PRODUCTION HYGRO SRL-D SC PARC SOLAR MOLDOVENI 131

Arges

3.00

20

ARGES

1.23

20

Arges Arges

0.63 2

20 20

Olt

2.68

20

SC CORABIA SOLAR SRL 132

Racordare la RED centrala fotovoltaica CORABIA

Olt

7.00

20

133

134

135

136

Racordarea la RED SC PAV GREEN ENERGY SRL centrala fotovoltaica Piatra Olt , Racordare la RED centrala SC FOTON DELTA SRL fotovoltaica ORAS BAILESTI, JUD DJ Racordare la RED centrala SC JRD SOLAR SRL fotovoltaica in localitatea Mereni Centrala fotovoltaica, S.C. EUROSILOZ S.A. Draganesti Vlasca, jud. Teleorman SC AVICARVIL SRL Racordare la RED centrala electrica fotovoltaica in satul Francesti Racordare la RED centrala fotovoltaica MARUNTEI , judetul Olt Racordare la RED centrala fotovoltaica MARUNTEI , judetul Olt Racordare la RED centrala fotovoltaica Bobicesti Racordare centrala fotovoltaica Filiasi Racordarea la SEN a centralei fotovoltaice - Parc 2, localitatea Carbunesti, jud.Gorj Panouri fotovoltaice Gruia

Olt

0.99

20

Dolj

4.1

20

Teleorman

9.7

20

Teleorman

0.99

20

Valcea

0.20

0.4

137 SC SOLAR ELECTRIC MARUNTEI SRL URZICENI SC SOLAR ELECTRIC COTEANA SRL URZICENI SC GREEN SOLAR POWER SRL Fotovoltaic Prod&Distribution SRL SC EYE MALL SRL 142 SC Foton Teta SRL 143 SC CARACAL SOLAR ALPHA SRL SC NEW CONCEPT SRL 145 SOLAR ENERGY TRITON 146 SC ECO DINAM GROUP SRL 147 148 RC DEVELOPMENT DVA RO SRL SC ROMKUMULO SRL 149

Olt

9.49

20

138

Olt

9.49

20

139

Olt Mehedinti

8.25 7.40

20 20

140 141

Gorj

9.99

20

Mehedinti

7.50

20

144

Racordare la RED centrala fotovoltaica Caracal T122 Racordarea la RED Centrala fotovoltaica IANCA TARLAUA 19 i Centrala electrica cu panouri fotovoltaice in com.Iancu Jianu,jud.Olt Racordare la RED Centrala electrica fotovoltaica,Cetate Parc fotovoltaic in com. Bobicesti Racordare la RED centrala fotovoltaica Bobicesti

Olt

7.00

20

Olt

7.49

20

Olt

23.76

110

Dolj Olt Olt

1.95 1.66 9.98

20 20 20

SC REINVEST URZICENI SRL 150 151 152 DELTA FOTOVOLTAIC ENERGY SRL SC SOLAR RESOURCES SRL

Racordare la RED centrala fotovoltaica Bobicesti MICESTI -PANOURI FOTOVOLTAICE Centrala fotovoltaica, Tr. Magurele, jud. Teleorman Centrala fotovoltaica in localitatea isalnita,jud.Dolj

Olt Arges Teleorman

3.35 3.8 1.5

20 20 20

SC OMV PETROM SA 153

Dolj

13.24

110

SC SUN& WIND ENERGY SRL 154 155 156 157 158 159 160 161 162 163 164 165 166 167 168 169 170 171 172 173 174 175 176
SC LIGHT ENERGY ONE SRL SC IRROM INDUSTRIE SRL SC LIGHT ENERGY FIVE SRL SC ENERGY ECO SUN SRL SC SUN GAL PRO SRL SC LIGHT ENERGY FOUR SRL SC LIGHT POWER FIVE SRL SC KUERYO IMPORT EXPORT SRL SC MEGASOL DELTA POWER SRL SC ACV SOLAR ENERGY SRL SC 9E INDUSTRY SRL SC F&B RO SRL SC PRODUCTIE ENERGIE VERDE SRL SC CERTINVEST SRL SC DELALINA SRL SC SEZ TRADE SRL SC HTM DEVELOPMENT SRL SC KRYPTON ENRGY ALFA SRL SC WIND KONTOR SRL SC FINAS PROJECT SRL SC ENERGY DENSIT SRL SC ELBA SOLAR SRL

Racordare parc fotovoltaic Recea

Mehedinti

5.00

20

CEF Bia 1 CEF IRROM CEF Stejeri CEF Iclod 2 CEF Manasturel CEF Bia 2 CEF Bia 3 MCEF Cluj-Napoca CEF Borsa CEF Geaca CEF Badeni CEF Tureni 1 CEF Tureni 2 CEF Oradea CEF Gepiu CEF Voivozi CEF Voivozi CEF Avram Iancu CEF Tomnatic CEF, loc. Chiribis CEF Berchez CEF Vadu Izei

Cluj Cluj Cluj Cluj Cluj Cluj Cluj Cluj Cluj Cluj Cluj Cluj Cluj Bihor Bihor Bihor Bihor Bihor Bihor Bihor Maramures Maramures

5.00 6 5 1.1 3 5 4 0.134 2.35 3.53 4 0.77 0.202 1 2.74 2.99 2.99 5 10 5.4 2.98 2.9

20 20 20 20 20 20 20 0.4 20 20 20 20 20 20 20 20 20 20 20 20 20 20

177 178 179 180 181 182 183 184 185 186 187 188 189 190 191 192 193

SC ENERGY DENSIT SRL SC NEW SOLAR TCV SRL SC NORD SOLAR DOBA SRL SC BSPG 5MW SRL SC GPSB SOLARIS 48 SRL SC WEST SOLAR ENERGY SRL SC LIGOVIG SUN SRL SC LDC COMPANY INTERNATIONAL SRL SC SPITZ SOLAR SRL SC PRIBISUN ENERGY SRL SC OSTRA SOLR SRL SC SOL ELECTRO BIS SRL SC PHOTOVOLTAIK FARM DOMNESTI SRL SC PHOTOVOLTAIK FARM LIVEZILE SRL SC PHOTOVOLTAIK FARM LIVEZILE SRL SC SOLAR FIELD UNU SRL SC SOLAR FIELD DOI SRL

CEF ENERGY DENSIT 2 CEF Botiz CEF Doba CEF Ciuperceni CEF Ciuperceni CEF Tasnad CEF Ac MCEF Certeze MCEF, Carei CEF Babasesti CEF Domneti CEF Sintereag CEF Domnesti CEF LIVEZILE CEF, loc LIVEZILE CEF Somes Odorhei 1 CEF Somes Odorhei 2

Maramures Satu Mare Satu Mare Satu Mare Satu Mare Satu Mare Satu Mare Satu Mare Satu Mare Satu Mare Bistrita-Nasaud Bistrita-Nasaud Bistrita-Nasaud Bistrita-Nasaud Bistrita-Nasaud Salaj Salaj

1.19 10 5.5 5 48 9.65 3.5 0.099 0.063 3.53 15.97 2.8 3.78 3.78 50 3.6 3.6

20 6 20 20 110 20 20 0.4 0,4 20 110 20 20 20 20 20 20

CAPATINA OCTAVIAN DAN

BRASOV

BRASOV

1.500

20

194

SC GREEN VISION SEVEN SRL

UCEA DE SUS

BRASOV

34.500

110

195

SC TRUCHA SRL

PODEROSA

FELDIOARA

BRASOV

2.500

20

196

SC ENERGY FUND SRL

FELDIOARA

BRASOV

2.500

20

197

SC ENERGY FUND SRL

HARMAN

BRASOV

3.625

20

198

SC METHEXIS SRL

CODLEA

BRASOV

2.100

20

199

SC ENERGY FUND SRL

HRMAN - (2)

BRASOV

1.500

20

200

SC ENERGY FUND SRL

HRMAN - (3)

BRASOV

1.700

20

201

SC ENERGY FUND SRL

HRMAN - (4)

BRASOV

3.700

20

202

SC RES OMNES SRL

FELDIOARA

BRASOV

5.450

20

203

SC BREM COMPANY SA

ZARNESTI

BRASOV

0.968

20

204

SC ECOSUN EXPERT SRL

PODU OLT

BRASOV

2.500

20

205

SC SOLAR PARK BRASOV SRL

GRID (PARAU)

BRASOV

61.828

110

206

SC GREEN VISION SIX SRL

UCEA DE SUS

BRASOV

34.500

110

207

SC COVMIH PERFORMANCE SRL

CODLEA

BRASOV

1.075

20

208

SC GREEN VISION GROUP SRL

DUMBRAVENI

SIBIU

2.500

20

209

SC XPV SRL

MIERCUREA SIBIULUI

SIBIU

25.725

110

210

SC AS MANAGEMENT SRL

PAUCEA

SIBIU

1.000

20

211

SC PHOTOVOLTAIC SIB ENERGY SRL

AXENTE SEVER

SIBIU

2.978

20

212

SC ORION AGRICULTURA SRL

RACOVITA

SIBIU

1.000

20

213

SC SIFEE PV SRL

ENERGY

HOSMAN

SIBIU

3.000

20

214

SC KRONOS SOLAR PROJECTS ANTINORI SRL

AVRIG SUD

SIBIU

7.520

20

215

SC GREEN VISION SRL

THREE

HOSMAN

SIBIU

1.200

20

216

DURABIL SRL

SAROS PE TARNAVE

SIBIU

2.970

20

217

SC PRO FARM CONSULT SRL BRUIU

SIBIU

3.000

20

218

SC YELLOW POWER SRL

COPSA MICA

SIBIU

2.622

20

219

SC FRAMO ROMANIA SRL

GURGHIU

MURES

3.535

20

220

SC CAPIDAVA PRODCOM SRL

GHINDARI

MURES

2.300

20

221
SC ROYAL ENERGY INVEST SRL

TARGU MURES

MURES

7.000

20

222

SC SOL STARK POWER SRL

TRNVENI

MURES

45.000

110

223

SC SOLAR ENERGO PARC SRL

STEJERIS

MURES

4.900

20

224

SC LAS ALTERNATIV ENERGY SRL

MIHESU DE CAMPIE

MURES

0.919

20

225

ASOCIATIA DE DEZVOLTARE INTERCOMUNITARA BLAJ

BLAJ

ALBA

2.000

20

226

SC EKOTRICITY SRL

PLAIESII DE JOS

HARGHITA

35.000

110

227

AIC SOLARSYSTEMS COMPANY SRL

LAZAREA

HARGHITA

35.328

110

228

SC BART SRL

CRISTURU SECUIESC (4,33 MW)

HARGHITA

4.804

20

229

SC BART SRL

CRISTURU SECUIESC (4,06 MW)

HARGHITA

4.498

20

230

SC ENERGY FUND SRL

RECI

COVASNA

1.656

20

231

MUNICIPIUL SF.GHEORGHE

SF.GHEORGHE

COVASNA

2.488

20

232 SC COD ENTERPRISE 233 GRUP SRL S.C. REGDIVERS 234 ENERGY S.R.L. 235 SC COSELI SA TRAIAN TRAIAN IEPURENI Bacau Bacau Iasi 2 3 2 20 20 20

PARC SC SONY TEKH ENERGY FOTOFOLTAIC 236 SRL Filipesti

Bacau

20

SC MONTANA ENDLESS Tg. Frumos 237 ENERGY PARC FOTOVOLTAIC 238 APOSTOL ROMEO Zimbrul SOLAR ENERGY CRISTAL SRL 239

Iasi

0.999

20

Neamt

0.94

20

Sannicolau Mare

Timis

7.04

20

ENERGY DETA SRL

Deta

Timis

4.023

20

240

QUANTUM SOLAR SRL 241 BERRY ENERGIA SRL 242

Bazos

Timis

5.098

20

Pischia

Timis

20

Urdel Energy SRL 243

Izvin

Timis

20

BERSIM ENERGIA SRL 244

Urseni

Timis

0.875

20

GAMA & DELTA ENERGY Sebis-Prunisor SRL 245

Arad

7.5

20

DELTA & ZETA ENERGY SRL 246

Sebis-Prunisor

Arad

7.5

20

Force Electric 2011 SRL 247

Tormac

Timis

2.05

20

PIRAMIDA SOARELUI 248

Frumuseni

Arad

2.99

20

MUNICIPIUL CARANSEBES

Caransebes

Caras-Severin

3.234

20

249 VETA ENERGIE RENOVATIE SRL 250 Satchinez Timis 1.244 20

Comuna Bethausen 251 MP SCRIPT SRL 252

Bethausen

Timis

0.42328

20

Beregsau Mic

Timis

3.306

20

FORCESOLAR 2 SRL 253

Cenei

Timis

20

FORCESOLAR 3 SRL

Sandra

Timis

20

254

EMS'TECH SRL 255

Parta

Timis

1.996

20

THIROM PRECISION & ENGINEERING SRL

Bocsa

Caras-Severin

1.3

20

256

KOVACS & HEGYES SRL Nadlac

Arad

2.5

20

257

GUIDANO ORLANDO SRL Manastiur 258

Timis

2.042

20

GUIDANO IMPIANTI SRL 259

Mosnita Noua

Timis

20

BIRTA GROUP SRL 260 RIOS RENOVABLES SOLAR POWER S.R.L. 261 RIOS RENOVABLES SOLAR ENERGY S.R.L. 262

Calan

Hunedoara

20

Lovrin-2

Timis

3.9

20

Lovrin-1

Timis

3.9

20

CRE CARAS RENEWABLE ENERGY SRL

Salbagelu Nou

Caras-Severin

1.99584

20

263

CRE CARAS RENEWABLE ENERGY SRL

Salbagelu Nou

Caras-Severin

1.67376

20

264

ESPAROM SOLAR ENERGY SRL

Prunisor

Arad

50

110

265 ELLEAERRE ENERGY SRL 266 Satchinez Timis 2.57 20

INNOVATIVE PACK PRODUCTION Jimbolia SRL

Timis

2.5

20

267 Total 2179.07838

Staia de racord

Comentariu

Emitent

Nr. ATR

in statia 110/20 kV Hagiesti, cu montare grup de celule ( celula de linie si celula de ENEL Distributie Dobrogea adaptare), LES 20 kV intre statie si punctul 110/20 kV Hagiesti de conexiune la limita statiei punct de conexiune de 20kV cu doua compartimente: un compartiment de racordare, pentru instalatiile din gestiunea operatorului de distributie (o celula de linie , ENEL Distributie o celula de masura) si un compartiment Dobrogea pentru instalatiile electrice ale producatorului, racordat in LEA 20kV Modelu 2 in portiunea de sectiune 120 mm2 s.c. inainte de stalpul nr. 85. 110/20 Calarasi Realizare racord din LEA 20 kV L5724 prin montarea unui stalp SC 15007 nou la aprox. 10 ml de primul stalp de trecere L5724 20 kV din LES in LEA, De pe stalpul nou montat realizare LES 20 kV in lungime de ENEL Distributie Dobrogea 1150 ml pana la punctul de conexiune (amplasat in dreptul Putului nr. 11 apartinand Primariei Medgidia), Echipare compartiment Enel aferent punctului de conexiune cu o celula de linie si o celula de masura 20 kV. Medgidia 1

27381

392

10028030

110/20/10 kV Eforie Nord


110/20 kV Bordusani

punct de conexiune conectat radial prin racord 20 kV cu o lungime de 0.5 km la LEA 20 kV 1224 derivatie PTA 268 Moara Agigea; punctul de conexiune va fi amplasat in imediata apropiere a punctului de racordare si va fi prevazut un compartiment ENEL Distributie Dobrogea pentru instalatia de racordare-utilizat exclusiv de ENEL echipat cu o celula de linie si o celula de masura, un compartiment (nisa) pentru instalatia de masurare, in care se monteaza contorul + kitul de telecitire si un compartiment pentru instalatia de utilizare.
echipare punct de conexiune amplasat in apropierea punctului de racordare, realizare ENEL Distributie LEA/LES 20 kV intre punctul de racordare si Dobrogea punctul de conexiune, montare grup de masura in PC

6937

27382

racordarea se realizeaza printr-un racord de 4,5 ENEL Distributie 110/20 KV Budesti km intrare -iesire in LEA 20 kV Postavari, inainte Dobrogea de stalp racord derivatie PTA 2698 Gruiu realizare racord LEA/LES 20 kV intre punctul de racordare (st 12 al LEA 20 kV Irigatii 2) si punctul de conexiune, echipare punct de conexiune ENEL Distributie amplasat in apropierea LEA 20 kV Irigarii 2 Dobrogea echipat cu o celula de linie si o celula de masura, montare grup de masura

393

110/20 kV Slobozia Sud

27387

realizare racord LEA/LES 20 kV intre punctul de racordare (intre st 9 si 10 ai LEA 20 kVAvicola) si punctul de conexiune, echipare punct de ENEL Distributie conexiune amplasat in apropierea LEA 20 kV Dobrogea Avicola echipat cu doua celule de linie si o celula de masura, montare grup de masura 110/20 kv Mircea Voda *Montare grup celule 20 kV in statia 110/20 kV Zebil (extindere sistem bare 20kV cu o celula de adaptare si o celula de linie); *Echipare punct de conexiune; *Realizare racord 20 kV intre celula linie nou ENEL Distributie montata in statia Zebil si punctul de conexiune; Dobrogea *Montare grup de masura in punctul de conexiune; *Montare transformator de putere 16 MVA 110/20 kV (trafo 2) in statia 110/20 kV Zebil. 110/20 kv Zebil

395

28

*Montare grup celule 20 kV in statia 110/20 kV Zebil (extindere sistem bare 20kV cu o celula de adaptare si o celula de linie); *Echipare punct de conexiune; *Realizare racord 20 kV intre celula linie nou ENEL Distributie montata in statia Zebil si punctul de conexiune; Dobrogea *Montare grup de masura in punctul de conexiune; *Montare transformator de putere 16 MVA 110/20 kV (trafo 2) in statia 110/20 kV Zebil. 110/20 kv Zebil punct de conexiune 20 kVconectat intrare - iesire ENEL Distributie in LES 20 kV 1223 ( inainte de iesirea in aerian) Dobrogea 110/20/10 kV Eforie Nord Transelectrica-ST Mostistea se racordeaza la RET in statia 20kV Mostistea Bucuresti Transelectrica Mostistea se racordeaza la RET in statia 20kV Mostistea ST Bucuresti Transelectrica-ST Ghizdaru se racordeaza in statia 20kV Ghizdaru Bucuresti CFE 9.9 MW Frasinet-1 se racordeaz la reeaua electric de transport la 110 kV, in staia 220/110/20 kV Mostistea, prin extinderea statiei cu o celula 110 kV aferenta LES 110 kV (L=4 km) de la statia de transformare 110/20 kV CFE 84 MW Modelu se racordeaz la reeaua electric de transport la 110 kV, in staia 400/110 kV Pelicanu, prin utilizarea unei LES 110 kV (L=13 km) Racordare la RET printr-o celula noua 110kV in statia 220/110kV Iaz printr-un LES 110kV aprox.0,8km. racordarea CCC Alum 430MW in statia Tulcea Vest,prin racord s.c. 400kV,in lung.totala de aproximativ 4,5km

27

10028033 2 3 1

Mostistea

Transelectrica

102

Pelicanu

Transelectrica

100

Iaz

Transelectrica

162

Tulcea Vest

Transelectrica

48

Chitila

Montare punct de conexiune nou, racordat astfel: cu cablu 20kv, 3x(1x185) mmp intre stalpul ENEL Distributie existent nr.7 si PC , si cu cablu 20kv, 3x(1x185) Muntenia mmp intre stalpul proiectat nr.1 si PC Lucrare coordonata pentru 4 utilizatori (3 producatori+1 consumator).Echipare Punct de Conexiune(prevazut cu doua sectii de bare), racordat prin cablu 20kV dintr-o celula noua de linie ce se va monta in postul existent PT588, realizare legatura cu linia Varasti 20kV pe una din sectii, iar pe cealalta sectie de bare se va introduce prin intrare-iesire LEA 20kV Dobreni.Lucrare specifica:montare celula de masura in punctul de conexiuni echipata cu 2TC100/5A si 2TT20/0.1kV

950

Colibasi

ENEL Distributie Muntenia

156

Colibasi

Giurgiu Nord

Lucrare coordonata pentru 4 utilizatori (3 producatori+1 consumator).Echipare Punct de Conexiune(prevazut cu doua sectii de bare), racordat prin cablu 20kV dintr-o celula noua de linie ce se va monta in postul existent PT588, realizare legatura cu linia Varasti 20kV pe una din sectii, iar pe cealalta sectie de bare se va introduce prin intrare-iesire LEA 20kV Dobreni.Lucrare specifica:montare celula de masura in punctul de conexiuni echipata cu 2TC100/5A si 2TT20/0.1kV montarea unei celule noi LEA 110 kV in statia 110/20 kV Giurgiu Nord aferenta CFV Colibasi Camp 1+2 50 MW echipata complet cu intreruptor cu comanda uni-tripolara si RAR monofazat, lucrari anexe aferente

ENEL Distributie Muntenia

157

ENEL Distributie Muntenia

19

Giurgiu Nord

montarea unei celule noi LEA 110 kV in statia 110/20 kV Giurgiu Nord aferenta CEF SUN ENEL Distributie GARDEN COLIBASI CAMP 3 50 MW echipata Muntenia complet cu intreruptor cu comanda uni-tripolara si RAR monofazat, lucrari anexe aferente; montare punct de conexiune racordat in L 20KV SPPA23 , prin racord medie tensiune 3x1X185mmp. Racord 20 KV de tip LES din LEA 20KV Mahiru pana la un punct de conexiune nou suprateran, prefabricat Racord 20 KV de tip LES din LEA 20KV Mahiru pana la un punct de conexiune nou suprateran, prefabricat LES de la un stalp de beton sc15006(nr.28) existent in axul liniei 20kv Cretesti , pana la un post de transformare 800kVA 20/0.4kV, in anvelopa de beton, la limita de proprietate echipare punct de conexiuni 20kV racordat la ST140 din LEA 20kV Arges 2. ENEL Distributie Muntenia ENEL Distributie Muntenia ENEL Distributie Muntenia ENEL Distributie Muntenia ENEL Distributie Muntenia

20

Cucuruzu

366

Giurgiu Vest

365

Giurgiu Vest

364

Copaceni

319

Hotarele

422

Ghizdaru CucuruzuDraganesti Vlasca

*realizare LEA 110 kV dublu circuit pentru ncadrarea statiei de conexiune intrare - iesire in LEA 110 kV Ghizdaru derivatia Cucuruzu - Draganesti Vlasca, echipata cu fibra optica in lungime de cca. 0,2 km; *statia de conexiuni 110 kV conectata intrare - ieire in LEA 110 kV Ghizdaru - derivatia Cucuruzu - Draganesti Vlasca, se va integra in sistemul de telecontrol si va fi prevazuta cu: - doua celule de inalta tensiune echipate complet (fiecare cu cate un intrerupator cu comanda uni-tripolara si RAR monofazat); - bara colectoare 110 kV simpla rigida; - separator tripolar 110 kV montat intre barele colectoare 110 kV si plecarea spre utilizator, care asigura atat separarea instalatiei de racordare de instalatia de utilizare, cat si punctul de delimitare; - protectii adecvate in celulele de linie plecare spre statiile adiacente; - servicii interne c.c. si c.a.; serviciile interne de c.c. se vor asigura printr-o statie de energie, iar serviciile interne de c.a. 0,4 kV se vor asigura din instalatia utilizatorului; - contor masura energie produsa; - instalatie de legare la pamant; - gard de imprejmuire si drum de acces. * adaptare protecii existente in statiile Ghizdaru, Cucuruzu si Draganesti Vlasca, in celulele aferente LEA 110 kV Ghizdaru derivatia Cucuruzu - Draganesti Vlasca; n vederea asigurrii condiiilor de funcionare pentru CEF Izvoarele; * realizare suport de transmisie pentru telecontrolul staiei electrice de conexiune 110 kV intrare ieire, sistem de supraveghere antiefractie. * nlocuire ntreruptor existent in statia Ghizdaru, aferent LEA 110 kV Ghizdaru - derivatia Cucuruzu - Draganesti Vlasca cu ntreruptor cu comanda uni-tripolara si RAR monofazat; * montare celula noua 110 kV in statia Draganesti Vlasca, aferenta LEA 110 kV Ghizdaru - derivatia Cucuruzu Draganesti Vlasca, cu ntreruptor cu comanda uni-tripolara si RAR monofazat; * montare protectie diferentiala si fibra optica pe LEA 110 kV Ghizdaru CEF Izvoarele (9 km);

ENEL Distributie Muntenia

29

Marsa

Racord LES 20kV AL 185mmp, in lungime de 4 km, derivatie din LEA 20kV situata intre PTA1231 si ST 87, foarte aproape de PTA1231. La randul ei, acesta linie este derivatie din LEA 20kV MarsaGoleasaca, ST 87 fiind situat la 6.6km de statia ENEL Distributie Marsa. Punct de conexiune nou amplasat in zona Muntenia de realizare a derivatiei si cablu 20kV LES (aproximativ 50m din cei 4 km, in functie de amplasarea PC fata de derivatia dintre PTA 1231 si ST87) realizare centru satelit in incinta statiei 110/20kV Marsa, racordat in containerul de medie tensiune din statie prin LES 20kV 240mmp. Din centrul ENEL Distributie satelit, LES 20kV 240mmp pana la un punct de Muntenia conexiune nou amplasat in afara statiei pe domeniu public/privat.. racord aerian din stalpul nr. 194 al LEA 20 kV Petresti FDEE EDMN

714

Marsa

709

Crovu

30601209589

Crovu

racord aerian din stalpul nr. 17 al LEA 20 kV Derivatie PT 87 Izvoru din LEA 20 kV Petresti

FDEE EDMN

30601209588

Maxenu

racord aerian din stalpul nr. 2 al LEA 20 kV Derivatie PT 0030 si PT 9172, din LEA 20 kV Tintesti

FDEE EDMN

30301205815

Maxenu

racord 20 kV in statia de transformare Maxenu FDEE EDMN

30301206108

Mizil

racord 20 kV din Derivatia PT 1074 CRR Ciorani, din LEA 20 kV Ciorani

FDEE EDMN

30101230517

Faurei

racord 20 kV in statia de transformare 110/20 kV Faurei

FDEE EDMN

30201207324

Gura Ocnitei

racord 20 kV in statia de transformare 110/20 kV Gura Ocnitei

FDEE EDMN

30601212221

Sahateni

racord 20 kV in statia de transformare 110/20 kV Sahateni

FDEE EDMN

30301206295

Stalpu

un racord 20 kV din stalpul nr. 40 al LEA 20 kV Stalpu-Gheraseni si un racord aerian din FDEE EDMN stalpul nr. 37 al LEA 20 kV d.c. StalpuSmeeni+Stalpu-Frasinu bransament electric monofazat din reteaua electrica j.t. stradala alimentata din PT 5016 Sat Nou

30301206927

Sat Nou

FDEE EDMN

30401212590

Ramnicu Sarat

racord 20 kV din stalpul nr. 378 al LEA 20 kV Racoviteni

FDEE EDMN

30301207169

Cuza Voda

celula noua 20 kV in statia de transformare 110/20 kV Cuza Voda

FDEE EDMN

30201207647

Baraganu

racord 20 kV din stalpul nr. 14 al LEA 20 kV Baraganu - SRPA 5

FDEE EDMN

30201208049

Baraganu

racord 20 kV din stalpul nr. 57 al LEA 20 kV Baraganu - SPE 1C1

FDEE EDMN

30201208051

Ianca

racord 20 kV din stalpul nr. 85 al LEA 20 kV Ianca-Sutesti

FDEE EDMN

30201205895

Mizil

racord 20 kV din stalpul nr. 22 bis al LEA 20 kV Tohani

FDEE EDMN

30101233927

Ramnicu Sarat

derivaia 20 kV PTA 217 Zaplazi, din LEA 20 kV Racoviteni

FDEE EDMN

30301233485

racord 0,4 kV din CD a PTA 204 Camp Brebu FDEE EDMN 20/0,4 kV - 160 kVA

30101225007

Crovu

racord 20 kV din st. nr. 6 al LEA 20 kV Derivatie PTA 0116 Jugureni, LEA 20 kV Petresti

FDEE EDMN

30601107574

Mavrodin

celula 110 kV in statia de transformare 110/20 FDEE EDMN kV Mavrodin

30601209865

Ianca

racord 20 kV din stalpul nr. 54 al LEA 20 kV Derivatie SPP 7 ISG, din LEA Ianca - SPP 15

FDEE EDMN

30201206672

Movila Vulpii

racord 20 kV in PC 2 Ploiesti West Park

FDEE EDMN

30101228258

Floresti

racord 20 kV din stalpul nr. 42 b al LEA 20 kV Moreni 1

FDEE EDMN

30101233248

Mizil

racord 20 kV din stalpul nr. 6 al LEA 20 kV Ciorani Derivatie PT 1117 Plafar

FDEE EDMN

30101233260

Baicoi

racord 20 kV din LEA 20 kV Derivatie PTA FDEE EDMN 2001 Pompe Apa Tufeni din LEA 20 kV Mislea

30101228351

Mozaceni

racord 20 kV din stalpul nr. 15 al LEA 20 kV Derivatie PTA Vultureanca, din Derivatia Mozacu, din LEA 20 kV Visina racord 20 kV din stalpul nr. 333 bis al Derivatiei 20 kV Fierbinti, din LEA 20 kV Visina

FDEE EDMN

30601208995

Mozaceni

FDEE EDMN

30601208996

Jirlau

racord 20 kV din stalpul nr. 279 al LEA 20 kV Jirlau - Galbenu

FDEE EDMN

30201207030

Potlogi

stalpul nr. 245 bis al LEA 20 kV Derivatie Brezoaiele, din LEA 20 kV Avicola 4

FDEE EDMN

30601210554

Potlogi

stalpul nr. 245 bis al LEA 20 kV Derivatie Brezoaiele, din LEA 20 kV Avicola 4

FDEE EDMN

30601210568

Butimanu

celula 20 kV in statia de transformare 110/20 kV Butimanu

FDEE EDMN

30601210602

Cuza Voda

racord 20 kV din stalpul 149 al LEA 20 kV Cuza Voda - Petrol

FDEE EDMN

30201207079

Cuza Voda

racord 20 kV din stalpul 148 al LEA 20 kV Cuza Voda - SPP 1+2

FDEE EDMN

30201207081

Cuza Voda

racord 20 kV din stalpul 111 al LEA 20 kV Cuza Voda - SPP 1+2

FDEE EDMN

30201207083

Faurei

celua 20 kV in statia de transformare Faurei

FDEE EDMN

30201208123

Pechea

racord 20 kV din Derivatia PTA 5227 C. Negri F. Vaci, din Derivatia PTA 5223 C. Negri CAP, FDEE EDMN din LEA 20 kV Pechea - Cudalbi 1

30501216332

Baltesti

racord 20 kV din Derivatia Magurele, din bucla FDEE EDMN Podeni - Magurele

30101230369

Patroaia

racord 20 kV din stalpul nr. 31 al LEA 20 kV Ionesti

FDEE EDMN

30601210979

Buftea

racord 20 kV din stalpul nr. 5 al Derivatiei PT 0224 Sterianu, din LEA 20 kV Compresoare

FDEE EDMN

30601210980

Pastarnacu

racord 20 kV din stalpul nr. 33 bis (SC15014 nou) al LEA 20 kV Manesti

FDEE EDMN

30101230530

Floresti

racord 20 kV din LEA 20 kV racord PT 2038 Filipestii de Targ din LEA 20 kV Moreni 2

FDEE EDMN

30101230930

Vulturul

celula 20 kV in statia de transformare 110/20 kV Vulturul

FDEE EDMN

30401218598

Tataranu

racord 20 kV din stalpul nr. 34 bis (SC15014 nou) al LEA 20 kV Tataranu-Ciorasti

FDEE EDMN

30401220168

Tataranu

PC 20 kV proiectat racordat in LEA 20 kV Ramniceni

FDEE EDMN

30401220162

Tataranu

PC 20 kV proiectat racordat in LEA 20 kV Tataru

FDEE EDMN

30401219796

Crovu

racord 20 kV din LEA 20 kV Odobesti

FDEE EDMN

30601211500

CEIL Focsani

racord 20 kV din PA 2900 Filatura

FDEE EDMN

30401219294

PTA 2097 Aricesti bransament trifazat

FDEE EDMN

30101231175

Mavrodin

celula 20 kV in statia de transformare 110/20 kV Mavrodin

FDEE EDMN

30601211966

Ploiesti Crang

PT 20/0,4 kV - 2 x630 kVA amplasat in subsolul cladirii Centrului de Afaceri

FDEE EDMN

30101232236

Mavrodin

racord 20 kV din stalpul nr. 12 al Derivatiei PT FDEE EDMN 6189 Decindea, din LEA 20 kV Ghimpati

30601212180

Titu

racord 20 kV din stalpul nr. 162 al LEA 20 kV Produlesti

FDEE EDMN

30601212269

Valea Calugareasca

PC 20 kV racordat prin LEA+LES 20 kV Combinat 1 in statia Valea Calugareasca

FDEE EDMN

30101233037

Ploiesti Crang

PC 20 kV racordat prin LEA+LES 20 kV din stalpul nr. 57 bis al LEA 20 kV Crang

FDEE EDMN

30101233189

Mavrodin

PC 20 kV racordat prin LEA+LES 20 kV din stalpul nr. 285 al LEA 20 kV Ghimpati

FDEE EDMN

30601211926

Urlati

PC 20 kV racordat prin LEA+LES 20 kV din stalpul nr. 15 al LEA 20 kV Scorus

FDEE EDMN

30101233478

Urlati

PC 20 kV racordat prin LEA+LES 20 kV din stalpul nr. 15 al LEA 20 kV Scorus

FDEE EDMN

30101233480

Urlati

PC 20 kV racordat prin LEA+LES 20 kV din stalpul nr. 6 al Derivatiei PT 2095 SMA din LEA 20 kV Scorus

FDEE EDMN

30101233481

Ploiesti Crang

PC 20 kV racordat prin LEA+LES 20 kV din stalpul nr. 10 bis al LEA 20 kV Pompe

FDEE EDMN

30101233482

Ploiesti Crang

PC 20 kV racordat prin LEA+LES 20 kV din stalpul nr. 10 bis LEA 20 kV Pompe

FDEE EDMN

30101233483

Ploiesti Crang

celula 20 kV in statia de transformare 110/20 kV Ploiesti Crang

FDEE EDMN

30101233484

Ploiesti Crang

celula 20 kV in statia de transformare 110/20 kV Ploiesti Crang

FDEE EDMN

30101233485

Ploiesti Crang

celula 20 kV in statia de transformare 110/20 kV Ploiesti Crang

FDEE EDMN

30101233486

Gura Ocnitei

Celula 20 kV (Q20K) in statia de transformare FDEE EDMN Gura Ocnitei

30101212624

Mavrodin

PC 20 kV racordat prin LEA+LES 20 kV din stalpul nr. 150 al LEA 20 kV Zahar II

FDEE EDMN

30601211901

Mizil

PC 20 kV racordat prin LEA+LES 20 kV din stalpul nr. 23 LEA 20 kV Tohani

FDEE EDMN

30101233602

Gura Ocnitei

celula 20 kV in statia de transformare Gura Ocnitei, amplificare trafo 2 la 25 MVA, amplificare ansamblu TSI 2+BS 2

FDEE EDMN

30601212654

Ocolna

celula de linie in statia Ocolna, LES 20 KV, 400m si PC cu 7 celule trafo

CEZ DISTRIBUTIE

1500000065

Studina- Corabia

Racordare statie 110/20Kv proiectata la LEA CEZ 110 Kv Studina -Corabia DISTRIBUTIE

7472

statie 110/20 kV nou proiectata 110/20 kV Filiasi 110/20 kV Filiasi statia 110/20 Kv Galicea Mare statia 110/20 Kv Bailesti statia 110/20 Kv Bailesti STATIA 110/20 KV LEU

Racordare statie 110/20Kv proiectata la LEA CEZ 110 Kv Studina -Corabia DISTRIBUTIE
la 20 kV in celula de rezerva care va fi echipata in statia Filiasi la 20 kV in celula de rezerva care va fi echipata in statia Filiasi Stalpul nr.407,SE8,aferent LEA 20 Kv Galicea SRP 12-16 LEA 20 Kv Bailesti-Segarcea Celula 20 Kv in statia 110/20 Kv Bailesti CEZ DISTRIBUTIE CEZ DISTRIBUTIE CEZ DISTRIBUTIE CEZ DISTRIBUTIE CEZ DISTRIBUTIE

7473

1500000012 1500000073 1500000087 1500000086 1500000088

LEA 20 KV LEU- ZANOAGA

CEZ DISTRIBUTIE

1500000023

110/20 Kv Ghercesti

Celula 20 Kv in statia 110/20 Kv Ghercesti

CEZ DISTRIBUTIE

1500000026

statia Iancu Jianu

statia Iancu Jianu

Se va echipa o celula 20 Kv de rezerva in statia 110/20Kv Iancu Jianu.Se vor inlocui trans.de forta 110/20 Kv,10MVA CEZ DISTRIBUTIE cu 110/20 Kv,25 MVA.LES 20 Kv intre PC proiectat si Statia Iancu Jianu 110/20 KVA. Se va echipa o celula 20 Kv de rezerva in statia 110/20Kv Iancu Jianu.Se vor inlocui trans.de forta 110/20 Kv,10MVA CEZ DISTRIBUTIE cu 110/20 Kv,25 MVA.LES 20 Kv intre PC proiectat si Statia Iancu Jianu 110/20 KVA. celula 20 kv in statia 110/20 Kv Iancu Jianu celula 20 kV nou montata in statia 110/20 KV Burila CEZ DISTRIBUTIE CEZ DISTRIBUTIE

1500000031

1500000030

statia 110/20 Kv Iancu Jianu Statia Burila Statia 110/20 Kv Plenita Statia 110/20 Kv Podari bara 20KV statia Filiasi

1500000032 1500000029 1500000041 1500000040

Stalpul nr.83A,SC15014,intre stalpii nr.83 si 84 ai racordului CEZ DISTRIBUTIE 20 Kv Ferma Greaca Celula 20 Kv Management Buildings in statia 110/20 Kv podari stalpul nr.105A al LEA 20KV Turburea -Filiasi CEZ DISTRIBUTIE

CEZ DISTRIBUTIE

1500000042

bara 20KV statia Filiasi Statia110/20 KV Zimnicea

stalpul nr.52A al LEA 20KV Filiasi - Petrol 2 Celula existenta 20 Kv Ruptoare

CEZ DISTRIBUTIE CEZ DISTRIBUTIE

1500000043 1500000044

bara 20KV statie TgCarbunesti

celula de linie 20KV

CEZ DISTRIBUTIE

1500000051

110/20 kV Plenita

Celula 20 Kv proiectata in statia 110/20 Kv Plenita;

CEZ DISTRIBUTIE

1500000062

110/20 kV Plenita

Stalpul nr.44,SC 15014,al LEA 20 Kv Plenita-Breasta;

CEZ DISTRIBUTIE

1500000063

110/20/6 Kv Ocolna.

Celula de statie 20 Kv echipata cu intreruptor debrosabil in vid 24 Kv/630 A/16(25) kA-proiectata

CEZ DISTRIBUTIE

1500000050

statia 110/20/6 Kv Ocolna;

Celula 20 Kv in sala de conexiuni din statia 110/20/6 Kv Ocolna;

CEZ DISTRIBUTIE

1500000056

statia 110/20 Kv Bailesti 110/20 kV Cujmir

Celula 20 Kv proiectata in statia 110/20 Kv Bailesti Stalpul nr.6 existent al derivatiei 20 Kv Vinatori aferent LEA 20 Kv Cujmir-Vanju Mare;

CEZ DISTRIBUTIE

1500000061

CEZ DISTRIBUTIE CEZ DISTRIBUTIE

1500000064 1500000055

statia 110/20 Kv Potelu stalpul nr. 66 tip SC 15007 al LEA 20 KV Potelu - Irigatii 1.

statia 110/20 Kv Musetesti

stalp de racord proiectat nr.43 A tip SC 15014 in LEA 20 KV CEZ DISTRIBUTIE Musetesti Schitu la 5 m de stalpul existent nr. 43.

1500000060

Statia 110 / 20 kV Topoloveni

celula 20 KV proiectata din statia de transformare 110/20 KV Topoloveni.

CEZ DISTRIBUTIE

1500000049

statia 110/20 Kv FMEP

stalpul nr. 119 al Derivatiei 20 KV Balastiera Golesti din LEA 20 KV FMEP CHE Prundu.

CEZ DISTRIBUTIE

1500000066

statia 110/20 Kv Pitesti in PCT existent, in celula de masura (la iesirea din celula de CEZ DISTRIBUTIE Sud masura). statia 110/20 Kv Pitesti Sud statia 110/20 Kv Scornicesti stalpul nr. 150 (tip SE8) al LEA 20 KV Pitesti Sud Cateasca. stalpul nr. 7 tip SC 15014 aferent LEA 20 KV Scornicesti Avicola Potcoava. CEZ DISTRIBUTIE

1500000046 1500000053

CEZ DISTRIBUTIE

1500000069

statia 110/20 Kv Corabia Statia 110/20 Kv Bals Statia 110/20 Kv Bailesti statia 110/20 kV Videle statia110/20 kV Draganesti Vlasca

stalpul nr. 25 existent al LEA 20 kV Corabia - Studina.

CEZ DISTRIBUTIE

1500000045

stalpul nr. 50 tip SE1 al Racordului 20 KV PTA Bistrita Noua CEZ DISTRIBUTIE din LEA 20 KV Gradiste SPP 13 Stalpul nr.14 bis proiectat,SC15014,IN AXUL lea 20 Kv FNC CEZ DISTRIBUTIE 1 Celula 20 Kv in statia 110/20 Kv Videle Stalpul nr.19 al racordului 20 Kv PTA 2145 din LEA 20 Kv Stejaru CEZ DISTRIBUTIE

1500000047

1500000027

1500000097

CEZ DISTRIBUTIE

1500000068

Bornele 0.4 Kv ale trafo 1 si trafo 2 PTCZ Ferma Pui

CEZ DISTRIBUTIE

1500000071

statia 110/20 kV Coteana statia 110/20 kV Coteana statia 110/20 kV Bals 110/20 kV Filiasi statia 110/20 kV TgCarbunesti

Celula 20 Kv in statia 110/20 Kv Coteana

CEZ DISTRIBUTIE

1500000075

Celula 20 Kv in statia 110/20 Kv Coteana

CEZ DISTRIBUTIE

1500000076

Celula din statia 110/20 Kv Bals la 20 kV in celula de rezerva care va fi echipata in statia Filiasi celula de linie parc fotovoltaic 2 20KV in statia 110/20 Kv Tg.Carbunesti

CEZ DISTRIBUTIE CEZ DISTRIBUTIE

1500000070 1500000072

CEZ DISTRIBUTIE

1500000074

110/20 kV Gruia

celula 20 KV proiectata in Statia de Transformare 110/20 KV Gruia. celula 20 KV proiectata in Statia de Transformare 110/20 KV Caracal Sud. stalpul nr. 66 tip SC 15007 al LEA 20 KV Potelu - Irigatii 2.

CEZ DISTRIBUTIE

1500000080

Statia 110/20 kV Caracal Sud 110/20 Kv Potelu Statia 110/20 kV Iancu Jianu Statia 110/20 kV Cetate Statia 110/20 kV Bals Satia 110/20 kV Bals

CEZ DISTRIBUTIE

1500000084

CEZ DISTRIBUTIE

1500000054

Stalpul nr.110 al LEA 20 kV Iancu Jianu-Dragasani

CEZ DISTRIBUTIE

7505

Stalpul nr.46 al LEA 20 Kv SPA 1 stalpul nr. 44 al LEA 20 KV Bals Piatra Olt. celula 20 KV proiectata in Statia de Transformare 110/20 KV Bals

CEZ DISTRIBUTIE CEZ DISTRIBUTIE CEZ DISTRIBUTIE

1500000085 1500000089 1500000096

Statia 110/20 kV Bals Statia 110/20 kV Mioveni Pitesti Nord Statia 220/110/20 kV Turnu Magurele

stalpul nr. 46A proiectat tip SC 15014 al LEA 20 KV Bals Piatra Olt. stalpul existent nr.12 tip SE 8 al Derivatiei 20 KV Irigatii Micesti. Stalpul nr.67 al LEA 20 Kv Irigatii 2

CEZ DISTRIBUTIE CEZ DISTRIBUTIE CEZ DISTRIBUTIE

1500000095 1500000094 1500000067

clemele de legatura ale conductoarelor LEA 110 kV Craiova Statia 110 kV Craiova Nord-CCh 4(circuitul 4 CN) la bornele izolatorilor de trecere CEZ DISTRIBUTIE Nord tip exterior-interior a SRA-ului 4.

1500000090

Statia 110/20 kV Cujmir

Stalpul nr.144 A,tip 15014,proiectat intre stalpii nr.144 si nr.145 ai LEA 20 kV Cujmir-Vanju Mare;

CEZ DISTRIBUTIE

1500000091

Dej Sud Gherla Mihai Viteazu Gherla Dej Gherla Dej Sud PTZ Byron Baciu Jucu Mihai Viteazu Mihai Viteazu Mihai Viteazu Oradea Centru Salonta Voivozi Voivozi Salonta Suncuius Marghita Somcuta Sighet 1

Racord aerian din LEA 20 KV Dej Sud - Gherla Racord aerian din LEA 20 KV Gherla - Bontida Racord aerian din LEA 20 KV Mihai Viteazu - Irigatii Racord aerian din LEA 20 KV Gherla - Bontida Racord aerian din LEA 20 KV Dej - Beclean, derivatia Garboului Racord aerian din LEA 20 KV Gherla - Manastirea Racord aerian din LEA 20 KV Dej Sud - Gherla Bransament trifazat subteran Racord aerian din LEA 20 KV Baciu - Fodora, semiaxa Fodora - Borsa Racord aerian din LEA 20 KV Jucu - Geaca Racord aerian din LEA 20 KV Mihai Viteazu - Ocna Mures Racord aerian din LEA 20 KV Mihai Viteazu - TV Racord aerian din LEA 20 KV Mihai Viteazu - TV Intercalare PTAB pe distribuitorul LES 20 KV PA Spital Racord aerian din LEA 20 KV Salonta - Oradea Sud, derivatia CAP Gepiu Racord aerian din LEA 20 KV Voivozi - Derna Racord aerian din LEA 20 KV Voivozi - Marghita Racord aerian din LEA 20 KV Salonta - ANT Racord subteran LES 20 KV din statia Suncuius Racord aerian din LEA 20 KV Marghita - Voivozi Racord aerian din LEA 20 KV Somcuta - Baia Mare 5, racord PTA 1 Remetea Chioar Racord aerian din LEA 20 KV Sighet 1 - Radio Vad

FDEE - EDTN FDEE - EDTN FDEE - EDTN FDEE-EDTN FDEE-EDTN FDEE-EDTN FDEE-EDTN FDEE-EDTN FDEE-EDTN FDEE-EDTN FDEE-EDTN FDEE-EDTN FDEE-EDTN FDEE-EDTN FDEE-EDTN FDEE-EDTN FDEE-EDTN FDEE-EDTN FDEE-EDTN FDEE-EDTN FDEE-EDTN FDEE-EDTN

60101225348 60101221381 60101225348 60101221795 60101224063 60101224064 60101224980 60101223215 60101225346 60101223162 60101221362 60101223202 60101223204 60201211420 60201213545 60201212747 60201212746 60201214278 60201215011 60201213388 60301216331 60301217197

Somcuta Abator Vetis Carpati Abator Tasnad Tasnad PTab nr. 4449 Certeze III PTA nr. 2216 Industrial Moftin Carpati Viisoara Beclean Bistrita Bistrita Unirea Jibou Jibou

Racord aerian din LEA 20 KV racord Energy Densit 1 Racord subteran LES 20 KV din statia Abator Racord aerian din LEA 20 KV Vetis - Puturi Doba Racord aerian din LEA 20 KV Carpati - Livada, derivatia Ciuperceni 2 Racord subteran din LEA 110 KV Abator- Turt Racord subteran LES 20 KV din statia Tasnad Racord aerian din LEA 20 KV Tasnad - CIG Bransament trifazat subteran Bransament trifazat subteran Racord aerian din LEA 20 KV Carpati - Livada, racord PT nr. 5020 SP Eteni Racord subteran din LEA 110 KV Viisoara - CFR Sarata Racord aerian din LEA 20 KV Beclean - Bistrita, racord UM Sintereag Racord aerian din LEA 20 KV Bistrita - Sieut Racord aerian din LEA 20 KV Bistrita - Prundu Bargaului 3, derivatia Cusma (Dealu Negru) Racord aerian din LEA 110 KV Unirea - Prundu Bargaului Racord aerian din LEA 20 KV Jibou - Cehu Silvaniei Racord aerian din LEA 20 KV Jibou - Cehu Silvaniei

FDEE-EDTN FDEE-EDTN FDEE-EDTN FDEE-EDTN FDEE-EDTN FDEE-EDTN FDEE-EDTN FDEE-EDTN FDEE-EDTN FDEE-EDTN FDEE-EDTN FDEE-EDTN FDEE-EDTN FDEE-EDTN FDEE-EDTN FDEE-EDTN FDEE-EDTN

60301219323 60401206550 60401206470 60401206685 60101223561 60401208152 60401207696 60401207961 60401208225 60401208151 60501205296 60501205638 60501205864 60501205863 60501206963 60601207308 60601207310

Construirea unui punct de conexiuni (PC 20 kV) in anvelopa amplasat la utilizator la limita de proprietate cu domeniul public, cu exploatare din interior, cu La distribuitorul echipamente de comutatie in SF6 pentru separatoare si LEA 20 kV, PT in vid pentru intreruptoare. Racordarea PC proiectat se 8080 Avicola va realiza prin LES 20 kV tip A2XS(FL)2Y 3x150 Stupini C PCT mmp, intrare-iesire la distribuitorul LEA 20 kV PT 8034 Bravalis, intre 8080 Avicola Stupini C PCT 8034 Bravalis, intre SS SS 36 aferent LEA 36 aferent LEA si PT 8018. La celula tip PT + Masura si PT 8018 din PC proiectat se va racorda prin LES 20 kV ca instalatie de utilizare un PT producator echipat cu trei unitati trafo ridicatoare 0,4/20 kV C 630 kVA.

FDEE - EDTS

70101115979

Ucea

Echiparea unei celule de linie 110 kV in Statia Ucea, echipata cu: doua separatoare de bare in montaj in linie, din care unul cu CLP; intreruptor in SF6; trei transformatoare de curent; trei transformatoare de tensiune; separator de linie cu doua CLP-uri si releu digital de protectie-comanda-control. Instalatia de utilizare consta intr-o statie 110/20 kV 40 MVA racordata printr-un LES 110 kV in Statia Ucea. Pentru conversia energiei obtinuta de panourile fotovoltaice, producatorul va folosi 48 de invertoare de 1000 kW conectate cate unul in 48 de posturi de transformare 0,4/20 kV 1000 kVA. Posturile de transformare vor fi conectate intrare-iesire la 4 bucle pe partea de m.t. (6xPT/bucla) si se vor racorda in conexiunea 20 kV din statia de transformare prin intermediul a 8 circuite. Pentru calea de transmisie SCADA se va prevedea fibra optica ADSS care insoteste LES 110 kV.

FDEE - EDTS

70101121943

La stalpul nr. 63 al LEA 20 kV Stupini Feldioara

Pentru evacuarea energiei produse si alimentarea serviciilor proprii, parcul fotovoltaic Feldioara se va racorda la stalpul nr. 63 al LEA 20 kV Stupini-Feldioara, printr-o LEA 20 kV, in lungime de 30 m, si alcatuit din 3 stalpi TC15014 echipati astfel: stalpul nr. 1 cu reanclansator automat telecomandat, protectie digitala; stalpul nr. 2 cu celula aeriana de masura si analizor de calitate a energiei electrice ; stalpul nr. 3, pe care se va face trecerea LEA 20 kV in LES 20 kV, echipat cu set descarcatoare cu ZnO cu disconector si terminale de exterior pentru LES 20 kV. De la acest stalp, utilizatorul isi va realiza racordul in LES 20 kV pana la parcul fotovoltaic. Pe stalpul de racord nr. 63 al LEA 20 kV Stupini-Feldioara se va monta un separator vertical cu CLP. Precizare: la stalpul nr. 3 proiectat se va racorda prin LES 20 kV (L= 2 km) ca instalatie de utilizare doua PT-uri ( 0,4/20 kV - 2x400 kVA respectiv 0,4/20 kV - 2x630 kVA ) in anvelopa.

FDEE - EDTS

70101223937

Constr. unui punct de conexiuni (PC 20 kV) in anvelopa metal/beton amplasat pe terenul utilizat., la limita de proprietate cu acces direct din domeniul public, cu echipamente de comutatie in SF6 pentru separatoare si in vid pentru intreruptoare. Racordare PC proiectat se va realiza prin LES 20 kV tip A2XS(FL)2Y 3x150 mm - sistem radial pe distribuitorul L 20 kV Statia Stupini - Feldioara, cu executarea urmatoarelor lucrari : Plantare stalp nr. 47A (tip Radial pe Distribuitorul SC15015) proiectat in axul tronsonului LEA 20 kV SST102 LEA 20 kV Statia FA - Statia Feldioara ; Stalpul nr. 47A se va echipa cu Stupini - Feldioara :separator tripolar de exterior cu montaj vertical tip STEPn 24 kV, cu 2 manete de actionare si CLP inclus ;descarcatoare ZnO ;capete terminale de exterior cu izolatie compozita pentru LES 20 kV ;priza de pamant cu Rp < 6,6 ohm; Montarea unui tronson nou LES 20 kV cu o lungime de aprox. 2,600 km, realizat cu cablu de tip A2XS(FL)2Y 3x1x150/25 mmp, intre stalpul nr. 47A (tip SC15015) pr. si PCT pr. La celula tip PT + Masura din PC pr. se va racorda prin LES 20 kV ca instal. de utiliz. un PT prod. echipat cu 2 unitati trafo ridic. 0,4/20 kV - 1250 kVA;

FDEE - EDTS

70101224707

Construire PCT 20/0,40 kV in anvelopa beton / metal, amplasat pe terenul utilizatorului, la limita de proprietate cu acces direct din domeniul public, cu echipament de comutatie in SF6 pentru separatoare si in vid pentru intreruptoare. Racordare PC proiectat se va realiza in LES 20 kV- sistem radial pe distribuitorul L 20 kV Statia Harman - PT 26 Harman, cu executarea urmatoarelor lucrari :Plantare stalp nr. 30B (tip SC15015) proiectat in axul tronsonului LEA 20 kV Radial pe Distribuitorul SS121 - SST103 PR ; Stalpul nr. 30B (tip SC15015) LEA 20 kV Statia proiectat se va echipa cu : separator tripolar de exterior cu Harman - PT 26 montaj vertical tip STEPn 24 kV 400 A, cu 2 manete de Harman actionare si CLP inclus ; descarcatoare ZnO; capete terminale de exterior ; priza de pamant cu Rp < 6,6 ohm; Montarea unui tronson nou LES 20 kV cu o lungime de aprox. 0,600 km, realizat cu cablu de tip A2XS(FL)2Y 3x1x150/25 mmp, intre stalpul nr. 30B (tip SC15015) proiectat si PCT proiectat. La celula tip PT + Masura din PC proiectat se va racorda prin LES 20 kV ca instalatie de utilizare trei PT-uri producator echipate fiecare cu cate o unitate trafo ridicatoare de 0,4/20 kV - 1250 kVA;

FDEE - EDTS

70101225815

La Distribuitorul LEA 20 kV Statia Codlea - Porcine Codlea si la Distribuitorul LEA 20 kV Statia Codlea - Avicola Codlea

Construire PCT 20/0,40 kV in anvelopa beton / metal, cu bare 20 kV sectionate, amplasat pe terenul utilizatorului, la limita de proprietate cu acces direct din domeniul public, cu echipament de comutatie in SF6 pentru separatoare si in vid pentru intreruptoare. Racordare PC proiectat se va realiza in LES 20 kV cu inchidere bucla intre distribuitorul L 20 kV Statia Codlea - Porcine Codlea si distribuitorul L 20 kV Statia Codlea - Avicola Codlea. Precizare: la celulele tip PT + Masura din PC proiectat se va racorda prin LES 20 kV ca instalatie de utilizare cate un PT producator echipat cu un trafo ridicator 0,4/20 kV - 1250 kVA;

FDEE - EDTS

70101226200

Conexiunea 20 kV Statia Harman si la distribuitorul LEA 20 kV Statia Zizin Prejmer, stalpul 40A proiectat.

Construire PCT 20/0,40 kV in anvelopa beton / metal, cu bare 20 kV sectionate, amplasat pe terenul utilizatorului, la limita de proprietate cu acces direct din domeniul public, cu echipament de comutatie in SF6 pentru separatoare si in vid pentru intreruptoare, prevazut cu : Sectia 1 de bare (ordinea amplasarii celulelor 20 kV de la stanga la dreapta) ; Sectia 2 de bare (ordinea amplasarii celulelor 20 kV de la stanga la dreapta); Echiparea celulelor din PCT proiectat : celulele de linie pentru racordare la RED 20 kV, celulele de linie pentru realizare cupla 20 kV , celula de servicii interne , celulele tip PT+Masura (racorduri parc fotovoltaic) . Racordare PCT proiectat se va realiza in LES 20 kV inchidere bucla intre Statia Harman si distribuitorul L 20 kV Statia Zizin - Prejmer.

FDEE - EDTS

70101226611

Conexiunea 20 kV Statia Harman si la distribuitorul LEA 20 kV Statia Zizin Prejmer, stalpul 40A proiectat.

Construire PCT 20/0,40 kV in anvelopa beton / metal, cu bare 20 kV sectionate, amplasat pe terenul utilizatorului, la limita de proprietate cu acces direct din domeniul public, cu echipament de comutatie in SF6 pentru separatoare si in vid pentru intreruptoare, prevazut cu : Sectia 1 de bare (ordinea amplasarii celulelor 20 kV de la stanga la dreapta) ; Sectia 2 de bare (ordinea amplasarii celulelor 20 kV de la stanga la dreapta); Echiparea celulelor din PCT proiectat : celulele de linie pentru racordare la RED 20 kV, celulele de linie pentru realizare cupla 20 kV , celula de servicii interne , celulele tip PT+Masura (racorduri parc fotovoltaic) . Racordare PCT proiectat se va realiza in LES 20 kV inchidere bucla intre Statia Harman si distribuitorul L 20 kV Statia Zizin - Prejmer.

FDEE - EDTS

70101226613

Conexiunea 20 kV Statia Harman si la distribuitorul LEA 20 kV Statia Zizin Prejmer, stalpul 40A proiectat.

Construire PCT 20/0,40 kV in anvelopa beton / metal, cu bare 20 kV sectionate, amplasat pe terenul utilizatorului, la limita de proprietate cu acces direct din domeniul public, cu echipament de comutatie in SF6 pentru separatoare si in vid pentru intreruptoare, prevazut cu : Sectia 1 de bare (ordinea amplasarii celulelor 20 kV de la stanga la dreapta) ; Sectia 2 de bare (ordinea amplasarii celulelor 20 kV de la stanga la dreapta); Echiparea celulelor din PCT proiectat : celulele de linie pentru racordare la RED 20 kV, celulele de linie pentru realizare cupla 20 kV , celula de servicii interne , celulele tip PT+Masura (racorduri parc fotovoltaic) . Racordare PCT proiectat se va realiza in LES 20 kV inchidere bucla intre Statia Harman si distribuitorul L 20 kV Statia Zizin - Prejmer.

FDEE - EDTS

70101226615

Distribuitorul LES 20 kV existent intre PCT Logcenter si PCT Karpat Frigo, Statia 35 / 20 kV Feldioara, barele 20 kV Statia Bod si Statia 110 / 20 kV Stupini.

Construirea unui punct de conexiune si transformare PCT 20 / 0,4 kV - 40kVA in anvelopa din metal / beton, amplasat pe terenul utilizatorului, la limita de proprietate. Racordarea PCT proiectat la RED 20 kV se va realiza radial prin 2 x LES 20 kV intrare - iesire la distribuitorul LES 20 kV existent intre PCT Logcenter si PCT Karpat Frigo.

FDEE - EDTS

70101226716

Tohan

Racordarea la RED a parcului fotovoltaic se va realiza in conexiunea 20 kV a Statiei 110/20/6 kV Tohan. Se va monta o celula de linie 20 kV in statia Tohan, identica cu cele existente, telecomandata, prefabricata, tip ABB. Precizare: In celula 20 kV proiectata in Statia Tohan se va racorda ca si instalatie de utilizare un PT utilizator prin intermediul unui LES 20 kV tip A2XS(FL)2Y 150 mmp, cu izolatie de polietilena reticulata (XLPE), cu ecran din Cu 25 mmp, cu protectie longitudinala si transversala impotriva patrunderii apei, cu manta exterioara din PE. Echipamentul electric aferent centralei fotovoltaice va realiza sincronizarea automata la conectarea acesteia, in paralel cu sistemul. Centrala va fi dotata cu automatizari care vor asigura deconectatarea automata de la retea in momentul cand se produc modificari ale parametrilor de intrare, ce afecteaza calitatea energiei livrate (tensiune, frecventa).

FDEE - EDTS

70101227703

Construirea unui punct de conexiune (PC 20 kV) in anvelopa de metal / beton amplasat in incinta Centralei Fotovoltaice, la limita de proprietate, cu acces liber din strada, si cu exploatare din interior. Echipare PC 20 kV proiectat : 1 celula de linie sosire PT CFv ; 1 celula de linie de racord in LEA 20 kV HARMAN - BOD, Radial prin LES 20 kV derivatia Podu Olt; 1 celula de servicii interne; transformator de la stalpul nr. 43 servicii proprii 20/0,4 kV - 25 kVA; tablou servicii proprii existent, al LEA 20 kV (c.a.) TDRI 0,4 kV . Racordul PC 20 kV HARMAN - BOD, proiectat - se va face radial prin LES 20 kV (in lungime de derivatia Podu Olt. 900 m), de la stalpul nr. 43 existent, al LEA 20 kV HARMAN - BOD, derivatia Podu Olt. Precizare: La celula de plecare PT producator, se vor racorda ca instalatie de utilizare prin LES 20 kV, doua posturi trafo ridicatoare PT 1 - 0,4/20 kV - 1600 kVA si PT 2 - 0,4/20 kV - 1600 kVA, proprietatea utilizatorului.

FDEE - EDTS

70101227868

Staia 20/110 kV Parau, Staia 110/20 kV Fagaras, Staia 110/20 kV Hoghiz

a) Realizare Statie 110/20 kV, in configuratie H extinsa pentru 3 Trafo pe partea de 110 kV: conexiunea 110 kV; conexiunea 20 kV; container destinat protectiilor-comenzilorcontrolului si serviciilor proprii de curent continuu si curent alternativ; se vor utiliza echipamente digitale cu functii complexe (protectia-comnda-control) in vederea functionarii statiei fara personal, integrata in sistemul de teleconducere operativa SCADA al FDEE Electrica Distributie Transilvania Sud S.A.; automatizari la nivelul statiei: RATT, DASf, AAR 20 kV (cupla + trafo), AAR 0,4 kV si echipament de reglaj automat al bobinei de compensare; b) Racordarea statiei la RED 110 kV: se va realiza intrareiesire in LEA 110 kV Hoghiz-Fagaras printr-un LES 110 kV d.c., c) Realizare LES 20 kV A2XS(FL)2Y 3x1x150/25 mmp de la Statia 20/110 kV Parau la PT utilizator 20/0,4 kV 100 kVA, pentru alim. principala a serv. proprii ale centralei.

FDEE - EDTS

70101228171

Ucea

Echiparea unei celule de linie 110 kV in Statia Ucea, echipata cu: doua separatoare de bare in montaj in linie, din care unul cu CLP; intreruptor in SF6; trei transformatoare de curent; trei transformatoare de tensiune; separator de linie cu doua CLP-uri si releu digital de protectie-comanda-control. Instalatia de utilizare consta intr-o statie 110/20 kV 40 MVA racordata printr-un LES 110 kV in Statia Ucea. Pentru conversia energiei obtinuta de panourile fotovoltaice, producatorul va folosi 48 de invertoare de 1000 kW conectate cate unul in 48 de posturi de transformare 0,4/20 kV 1000 kVA. Posturile de transformare vor fi conectate intrare-iesire la 4 bucle pe partea de m.t. (6xPT/bucla) si se vor racorda in conexiunea 20 kV din statia de transformare prin intermediul a 8 circuite. Pentru calea de transmisie SCADA se va prevedea fibra optica ADSS care insoteste LES 110 kV.

FDEE - EDTS

70101229031

LEA 20 kV Statia Codlea - Avicola Codlea (stalpul 68) si LEA 20 kV Statia Codlea - Porcine Codlea (stalpul 83)

Construirea unui punct de conexiune si transformare PCT in anvelopa din metal / beton, amplasat pe terenul utilizatorului, la limita de proprietate. Racordarea PCT proiectat se va realiza prin LES 20 kVcu inchidere bucla intre distribuitorul LEA 20 kV Statia Codlea - Avicola Codlea si LEA 20 kV Statia Codlea - Porcine Codlea . Se va construi un Punct de Conexiuni (PC 20 kV ) in anvelopa de metal / beton, cu doua compartimente separate (un compartiment pentru SDEE: 4 celule de m.t. si trafo servicii interne si un compartiment pentru PRODUCATOR: 2 celule de linie m.t.), amplasat pe terenul privat al orasului DUMBRAVENI, la limita de proprietate. PC proiectat se va racorda prin 2x LES 20 kV intrare -iesire la LEA 20 kV ERNEA (stalpul nr. 33 existent - Circ. nr.1) si la LEA 20kV PT 2 AVICOLA (stalpul nr. 34 existent).

SDEE - BRASOV

70101231803

LEA 20 kV Ernea si LEA 20 kV PT 2 Avicola

SDEE - SIBIU

70201118848

1) Realizarea unei statii de transformare 110/20 kV, cu bara simpla sectionata, pe teren amplasat in axul LEA 110 kV Orlat-Petresti pus la dispozitie de beneficiar, echipata cu: doua celule de linie 110 kV, una celula de cupla 110 kV , un transformator de putere 110/20 kV de 40 MVA, un transformator 1200/120 kVA pentru creere nul si servicii interne si o bobina de stingere 100 A, un sistem 20 kV cu LEA 110 kV Orlatbara simpla sectionata. Petresti, ntre stlpii nr. 2) Racordarea statiei se va face intrare-iesire la LEA 110 kV 133 si nr. 134 Orlat-Petresti. Instalatia de utilizare - consta in panouri fotovoltaice 245 W si invertoare. Energia produsa va fi colectata prin intermediul unor posturi de transformare 20/0,4 kV racordate in cele patru celule de linie din Statia 110/20 kV proiectata prin intermediul a doua bucle formate din 4 LES 20 kV.

FDEE - EDTS

70201220488

Construirea unui punct de conexiune (PC 20 kV) in anvelopa de metal/beton,(amplasat pe teren ce apartine investitorului S.C. AS MANAGEMENT S.R.L.). Realizare LES 20 kV cu conductor tip A2XS(FL)2Y 3x150 mm2 (Ltraseu=200m), intre stalpul nr. 57A proiectat si PC proiectat (celula J04), in Derivatia LEA 20kV apropiera Centralei Fotovoltaice; PT Paucea, stalpul nr. La celula de racord J01 (CR1) din PC proiectat se va racorda 57A; prin LES 20 kV, cu conductor tip A2XS(FL)2Y 3x150 mm2 in lungime de aprox. 0,12 km, un PT 0,4/20 kV - 1250 kVA echipat cu un transformator de putere ridicator, ca instalatie de utilizare;

FDEE - EDTS

70201220900

LEA 20 kV Copsa Mica - Blaj

Construirea unui punct de conexiune (PC 20 kV) proiectat, in anvelopa de metal / beton echipat cu: 2 celule de racord centrala fotovoltaica (J01 si J02) ; 1 celula de masura (J03) ; 1 celula trafo servicii interne (J04) ; 2 celule de linie 20 kV (J05 si J06). Comutatia secundara : DSIc.a. + c.c., cu redresor 230Vc.a. / 24 Vc.c. si o baterie de acumulatori 24V, 75Ah. In PC proiectat se va monta UCMT, iar PC va fi integrat in SAD - PA/PT al SC FDEE Electrica Distributie Transilvania SUD SA + integrare in sitemul de telegestiune al SDEE Sibiu Se va monta analizor de clasa A, pentru monitorizarea calitatii energiei electrice in punctul de delimitare; Racordul PC proiectat se va face in sistem intrare - iesire prin LES 20 kV, la stalpii proiectati 5A, 5B (plantati la o distanta de 5 m unul fata de celalalt), in axul LEA 20 kV Copsa Mica Blaj. La celula de plecare PT producator, se vor racorda ca instalatie de utilizare prin LES 20 kV, doua posturi de transformare ridicatoare ( 2 x PT 0,4/20 kV - 1600 kVA ).

FDEE - EDTS

70201221617

PT5 Racovita, Statia 110 / 20 kV Marsa

Racordarea centralei fotovoltaice la RED se va realiza prin derivatie 20 kV proiectata din PT5 Racovita , care presupune LES 20 kV proiectata din compartimentul MT pana la postul de transformare ridicator 0,4 kV/20 kV. Se impun lucrari de modernizare a postului de transformare. Construirea unui punct de conexiune (PC 20 kV) in anvelopa metal / beton, amplasat in incinta parcului fotovoltaic la limita de proprietate. Racordul 20 kV se va face la LEA 20 kV Agnita - Hosman. Construirea a doua LES 20 kV cu cablu nou 20 kV intre stalpii nr. 397 si 397A si celulele de linie din PC 20 kV proiectat.

FDEE - EDTS

70201221893

LEA 20 kV Agnita - Hosman, Statia 110 / 20 kV Agnita

FDEE - EDTS

70201222011

Racordarea la retea a producatorului se va realiza in conexiunea 20 kV din Statia 110/20 kV Marsa, prin realizarea urmatoarelor lucrari in regim de tarif de racordare: - Echiparea unei celule de rezerva 20 kV, existenta in Statia Marsa, cu separatoare, intreruptor cu mediul de stingere a Conexiunea 20 kV din arcului electric in vid, transformatoare de curent si tensiune, Statia 110/20 kV CLP spre linie, releu de protecie digital; Marsa - Datorita aparitiei acestui producator de energie si a lungimii racordului la statia electrica, se impune inlocuirea bobinei de stingere nr. 1 existenta, cu una noua, avand posibilitea de reglaj a acesteia. De asemenea se va monta un dulap de automatizare a acestei bobine de detectie si declansare a punerilor la pamant la liniile cu defect. LEA 20 kV Agnita - Hosman, Statia 110 / 20 kV Agnita, Statia 110 / 20 kV Sibiu Nord si Sud Construirea unui punct de conexiune (PC 20 kV) in anvelopa metal / beton amplasat in apropierea centralei fotovoltaice. Realizarea unui racord in LEA 20 kV cu cablu torsadat de m.t. de la stalpul existent nr. 400 al LEA 20 kV Agnita Hosman, pana la stalpul nr. 1 proiectat si in LES 20 kV pana la PC 20 kV proiectat. Racordarea la retea a parcului fotovoltaic se va realiza in LEA 20 kV Statia Dumbraveni - Aurel Vlaicu. Realizare stalp nr. 1 proiectat, intre stalpii nr. 194 si 195, in axul LEA 20 kV Dumbraveni - A.Vlaicu. Realizare stalp nr. 2 proiectat, pe derivatia 20 kV proiectata. Realizare stalp nr. 3 proiectat, pe derivatia 20 kV proiectata si se va racorda ca si instalatie de utilizare un PC 20 kV in anvelopa prin intermediul unui LES 20 kV.

FDEE - EDTS

70201222108

FDEE - EDTS

70201222891

LEA 20 kV Statia Dumbraveni - Aurel Vlaicu

FDEE - EDTS

70201224336

Echiparea stalpului nr. 349 pr. in locul celui ex., in axul LEA 20 kV Agnita - Bruiu: stalp SC 15015; console CIT 140 - 2 buc ; LDI si izolatie tip compozit - 6 buc ; leg. de intindere in colt pt. conductor torsadat - 2 buc ; separator STEPnv 24 kV, 400A cu CLP ; priza de pamant (Rp max. 4 ohmi). Echiparea stalpului nr. 1, pe deriv. 20 kV : leg. de intindere in colt - 2 buc ; reanclansator 20 kV, care se va integra in SAD; releul de protectie cu functii: PMCR, PMCT, PMCD, PMC LEA 20 kV Agnita nedirectionata(2 trepte), PHCD, Umin/max, fmin/max, si Bruiu, derivatia 20 kV conect. intreruptor numai la lipsa tensiune pe linie. Celula din proiectata - stalpul nr. instalatia de evacuare a consumatorului : conectare 349 proiectat intreruptor numai in conditii de sincronism ; priza de pamant cu (Rp max. 4 ohmi); stalp SC 15014, in fundatie turnata. Echiparea stalpului nr. 2, pe derivatia 20 kV pr. : leg. de intindere in colt ; set de descarcatori cu ZnO, inclusi in cadrul separatorului STEPnv ; grup de masura 20 kV tip ext.; analizor clasa A, pentru monitoriz. calitatii en. el. in punctul de delimitare; priza de pamant (Rp max. 4 ohmi); stalp SC 15014.

FDEE - EDTS

70201224445

LEA 20 kV Mica,

Construirea unui punct de conexiune (PC 20 kV) in anvelopa metal / beton, amplasat la utilizator, la limita de proprietate. Copsa Racordarea PC 20 kV proiectat in bucla (intrare - iesire) prin PT 14 LES 20 kV tip A2XS(FL)2Y 1x150mmp - 480 m), la LEA 20 kV Copsa Mica - PT 14la stalpii nr. 116A si 116B proiectati in axul LEA 20 kV existente.

FDEE - EDTS

70201226255

Construirea unui punct de conexiune (PC 20 kV) in anvelopa de metal / beton amplasat in incinta Parcului Fotovoltaic, dimensionat pentru exploatare din interior. Echipare PC 20 kV : 2 celule de linie; 1 celula de masura ; 1 celula servicii interne cu transformator 20/0,23 kV - 4 kVA; 1 celula de linie, plecare spre utilizator ; LEA 20 kV AVICOLA Celulele vor fi cu motorizare la 24 Vc.c.; DSIc.c. echipat cu 1 la stalpul nr. 1A pr., redresor automat 230Vc.a./24Vc.c. si baterie de acumulatori respectiv LEA 20 kV 24 Vc.c.; Anvelopa va avea spatiu de rezerva pentru 1 celula AVICOLA 2 la stalpul cu intreruptor; nr. 1A pr. Racordul PC proiectat se va face prin LES 20 kV, in sistem intrare-iesire, la stalpul nr. 1A proiectat, din LEA 20 kV AVICOLA 1, respectiv la stalpul nr. 1A proiectat, din LEA 20 kV - AVICOLA 2. Precizare: La celula de plecare PT producator, se va racorda ca instalatie de utilizare prin LES 20 kV, un post trafo PT 20/0,4 kV - 3 x 1250 kVA + 100 kVA. Realizarea unui racord in LEA 20kV FANTANELE SOVATA, derivatia GHINDARI - BIRA, prin LES 20kV, in sistem intrare-iesire, la stalpii nr. 6A si 6B proiectati, pana la PCT proiectat.Construirea unui punct de conexiune si transformare (PCT 20 kV)in anvelopa de metal / beton amplasat in incinta SC CAPIDAVA PRODCOM SRL, la limita de proprietate, cu acces liber din strada, dimensionat pentru exploatare din interior, echipat cu celule 24 kV modulare, cu mediu de izolatie a barelor in aer, cu echipament de comutatie in SF6 pentru separatoare, respectiv in vid pentru intreruptor. La celula de plecare spre producator din PCT proiectat, se va racorda ca instalatie de utilizare prin LES 20 kV,un post trafo PT 20/0,4 kV - 2 x 1250 kVA, proprietatea utilizatorului; La BMPT adiacent PCT 20 kV proiectat urmeaza a se racorda, ca instalatie de utilizare, printr-un cablu 1 kV, un TD 0,4 kV, proprietatea utilizatorului. Realizare Punct de Conexiune (PC) 20 kV in anvelopa din metal / beton, cu exploatare din interior, amplasat in incinta utilizatorului la limita de proprietate. Racordul se va face prin LES 20 kV in bucla, in Statia 110/20 kV Livezeni si in PT 499.

FDEE - EDTS

70301118699

LEA 20 kV Fantanele-Sovata, derivatia GhindariBira, si in LES 20 kV prin sistem intrare-iesire, la stalpii nr. 6A si 6B proiectati

FDEE - EDTS

70301219782

Livezeni

FDEE - EDTS

70301220781

Tarnaveni

In statia Tarnaveni, celula 110 kV retrasa definitiv din exploatare (fosta Carbid 6) se va echipa cu: un set de descarcatoare; trei transformatoare de tensiune; separator de linie cu 2 CLP-uri; separator de bara de transfer; intreruptor cu mediu de stingere a arcului electric in SF6; trei transformatoare de curent; doua separatore de bara cu 1CLP; Pe partea de circuite secundare se vor inlocui cutia de cleme si cablurile de comanda control cu altele noi si se va monta protectie diferntiala longitudinala; Instalatia de utilizare este formata dintr-o statie 110/20 kV 1x63 MVA si LES 110 kV de racord in Statia 110/20 kV Tarnaveni. Parcul fotovoltaic va fi compus din 6 grupuri de productie. Pentru conversia energiei obtinuta de panourile fotovoltaice se vor folosi invertoare cc/ca de cca 250-500 kW care vor alimenta panourile de j.t. ale unor posturi de transformare 0,4/20 kV 1000 kVA. Posturile de transformare vor fi racordate la barele de 20 kV ale Statiei 110/20 kV 1x63 MVA apartinand producatorului;

FDEE - EDTS

70301221138

Punct de conexiune (PC) 20 kV in anvelopa cu exploatare din interior, amplasat in incinta utilizatorului la limita de proprietate, cu acces liber din strada, echipat cu celule modulare dispuse pe 2 sectii de bara astfel : 2 celule de linie; 2 celule trafo; 2 celule de masura;1 celula sevicii interne; 1 celula de cupla ( 2 module ); AAR intre cele 2 celule de linie; LEA 20 kV Livezeni - Celulele vor fi prevazute cu protectii digitale, vor fi Fintinele, derivatia PC telecomandate, integrate in SAD PA-PT ( motorizare 12 Acatari 24Vc.c., indicatoare de prezenta tensiune cu contacte ( ROMCAB ) si LEA auxiliare, dulap servicii interne, echipat cu redresor automat 20 kV Ungheni 230 Vca/24 Vcc si baterie de acumulatori 24 Vcc, dulap Miercurea Niraj UCMT ).Protectii minime in celulele plecare spre producator : PMCR, PMCT in 2 trepte; PMCD; PHCD; Umin/max; fmin/max si conectare intrerupator numai la lipsa tensiune pe linie. Racord 20 kV din LEA 20 kV Livezeni - Fininele, derivatia PC 12 Acatari ( ROMCAB ), stilpul nr. 29, in lungime de cca. 3 km. Racord 20 kV la LEA 20 kV Ungheni Miercurea Niraj, in lungime de cca. 1,5 km, cu traseu pe strazile din localitatea Stejaris .

FDEE - EDTS

70301225267

LEA 20 kV Ludus Sarmas, stalpul nr. 330A

Racord 20 kV in lungime de cca. 25 m, din LEA 20 kV Ludus - Sarmas, realizat pe stilpi de beton tip SC, cu montarea unui separator tripolar de exterior cu clp pe primul stilp al racordului, a unui reanclansator automat telecomandat cu protectii, integrat in SAD, pe cel de-al doilea stilp, respectiv a unui grup de masura 20 kV, echipat cu 3 TT si 3 TC, pe ultimul stilp. Racordul se va realiza de la stilpul nr.330A, stilp special proiectat, intercalat in axul liniei. Se va monta analizor clasa A pentru monitorizarea calitatii energiei electrice in punctul de delimitare. Releul de protectie incorporat in in dulapul de comada al reanclansatorului va avea minim urmatoarele functii de protectie : PMCR, PMCT in 2 trepte PMCD ; PHCD, Umin/max, fmin/max si conectare intrerupator numai la lipsa tensiune pe linie. Precizare : La stilpul cu grupul de masura se va racorda prin LES 20 kV un PT - 20/0,4kV - 1000kVA, ca instalatie de utilizare, prin grija producatorului. Functia de control sincronism se va realiza la producator.

FDEE - EDTS

70301225458

Centrala Solara se va racorda in Statia 110/20/6 kV Blaj. Montarea unei celule de 20 kV in Statia 110/20/6 kV Blaj, intr-o carcasa de celula identica cu cele existente.Celula de 20 Conexiunea 20 kV din kV noua se va racorda la conexiunea 20 kV prin prelungirea Statia 110/20/6 kV Blaj barelor de 20 kV existente si prin izolatori de trecere la barele de 20 kV. Ca instalatie de utilizare, la celula 20 kV proiectata in Statia Blaj se va racorda un PT utilizator (2x1600 kVA), in anvelopa de beton, prin intermediul unui LES 20 kV.

FDEE - EDTS

70401217780

Realizarea unei statii de conexiuni 110 kV amplasata langa stalpul nr. 108 al LEA 110 kV Miercurea Ciuc-Tusnad, aflat langa DN 12, avand sistem simplu de bare colectoare nesectionat, echipata cu trei celule de linie realizate cu echipamente clasice. Statia de conexiuni proiectata se va racorda intrare-iesire in LEA 110 kV Miercurea CiucTusnad. Instalatia de utilizare este formata din Statia 110/20 LEA 110 kV Miercurea kV FOTO 1x40 MVA si LES 110 kV de racord in statia de Ciuc-Tusnad conexiuni 110 kV proiectata. Parcul fotovoltaic va fi compus din 6 grupuri de productie. Pentru conversia energiei obtinuta de panourile fotovoltaice se vor folosi invertoare cc/ca de cca 10-15 kW care vor alimenta panourile de j.t. ale unor posturi de transformare 0,4/20 kV. Posturile de transformare vor fi racordate la barele de 20 kV ale Statiei 110/20 kV FOTO.

FDEE - EDTS

70501109889

Realiz. unei statii de conexiuni 110 kV cu echipam. clasice, sistem simplu de bare colectoare simplu sectionat; Statia de conex. 110 kV pr. se va integra in SCADA FDEE Transilvania Sud. Racordarea la RED a statiei de conexiuni 110 kV pr. se va realiza intrare-iesire in LEA 110 kV Gheorgheni-Toplita prin montarea in axul LEA, intre stalpii nr. 37 si 38, a unui stalp special din otel zincat bulonat, tip Itn-Tr, in fundatie cvadribloc. Conductoarele existente se Stalpii nr. 37 si 38 din remonteaza cu lanturi de izolatoare duble compozite, iar LEA 110 kV conductorul de protectie se leaga la priza statiei prin doua Gheorgheni - Toplita conductoare 240/40 mmp ALOl, legate intre varful stalpului si cadrele metalice ale statiei. La stalpul pr. se va prevedea priza de pamant; Alim. principala a SI ale statiei de conexiuni 110 kV se va asigura printr-un Trafo 20/0,4 kV 100 kVA. Alim. de rezerva se va asigura din TSICN din statia de transf. 110/20 kV apartinand producatorului. Instalatia de utilizare este formata din statie 110/20 kV 2x31,5 MVA si 2xLES 110 kV de racord in statia de conexiuni 110 kV pr.

FDEE - EDTS

70501110029

Construirea unui (PC 20 kV) in anvelopa din metal / beton, amplasat pe terenul Parcului Fotovoltaic, la limita de proprietate, cu exploatare din interior. Echipare PC 20 kV proiectat : 1 celula de linie sosire PT CFv (cu masura 20 kV inglobata), (releul de protectie va asigura minim urmatoarele functii de protectie): PMCR/D,PMCT/D,PMCT/N,PHCD,Umin/max, fmin/max, si conectare intreruptor numai la lipsa tensiune pe linie (spre producator); 1 celula de linie de racord la LEA 20 kV LEA 20 kV Sighisoara, Sighisoara, 1 celula de servicii interne ; transformator servicii la stalpul nr.66A interne 20/0,4 kV - 25 kVA ; tablou servicii proprii c.a. 0,4 proiectat ; kV ; (DSI c.c.) echipat cu redresor automat 230Vc.a./24Vc.c., 16A si baterie de acumulatori 24 Vc.c., 100Ah ; UCMT pentru integrarea PC 20 kV in SAD - PA/PT ; analizor de calitate a energiei electrice clasa A ; Racordul PC 20 kV proiectat se va face radial din LEA 20 kV Sighisoara, de la stalpul nr. 66A proiectat. Precizare: La celula de plecare PT producator, se va racorda ca instalatie de utilizare prin LES 20 kV, patru posturi trafo (3 x PT 0,4/20 kV - 1000 kVA si 1 x PT 0,4/20 kV - 1250 kVA).

FDEE - EDTS

70501212739

Construirea unui (PC 20 kV) in anvelopa din metal / beton, amplasat pe terenul Parcului Fotovoltaic, la limita de proprietate, cu exploatare din interior. Echipare PC 20 kV proiectat : 1 celula de linie sosire PT CFv (cu masura 20 kV inglobata), (releul de protectie va asigura minim urmatoarele functii de protectie): PMCR/D,PMCT/D,PMCT/N,PHCD,Umin/max, fmin/max, si conectare intreruptor numai la lipsa tensiune pe linie (spre producator); 1 celula de linie de racord la LEA 20 kV LEA 20 kV Avicola, la Avicola, 1 celula de servicii interne ; transformator servicii stalpul nr. 57A interne 20/0,4 kV - 25 kVA ; tablou servicii proprii c.a. 0,4 proiectat ; kV ; (DSI c.c.) echipat cu redresor automat 230Vc.a./24Vc.c., 16A si baterie de acumulatori 24 Vc.c., 100Ah ; UCMT pentru integrarea PC 20 kV in SAD - PA/PT ; analizor de calitate a energiei electrice clasa A ; Racordul PC 20 kV proiectat se va face radial din LEA 20 kV Avicola, de la stalpul nr. 57A proiectat. Precizare: La celula de plecare PT producator, se va racorda ca instalatie de utilizare prin LES 20 kV, patru posturi trafo (4 x PT 0,4/20 kV - 1000 kVA).

FDEE - EDTS

70501212740

Montarea unui stalp LEA MT de tip SC 15014 in axul LEA 20kV Statia 110/20KV Campu Frumos-Irigatii pe pozitia 61A, pe marginea drumului de acces la CES si echiparea stalpului cu un separator de sarcina MT vertical cu CLP. Montarea celui de al doilea stalp (nr.1) SC 15014 la 10 m de la stalpul cu separator proiectat spre CES, pe marginea drumului de camp si echiparea acestuia cu un reanclansator de 20kV, masura la 20kV si protectie digitala, montare LEA 20kV Statia conductor OL-AL 50/8mmp. pe deschiderea de 10m. 110/20KV Campu Reanclansatorul va fi echipat cu UCMT, necesara pentru Frumos-Irigatii, stalpul integrarea in SAD, asigurand si transmiterea online a 61A informatiilor minime:P,Q,U,f. si pozitie intrerupator . Se va prevedea in punctul de delimitare analizor de calitate a energiei electrice. Precizare : la stilpul cu grupul de masura , se va racorda prin LES 20 kV, ca instalatie de utilizare un PT producator . Releul numeric va fi prevazut cu functii de protectie, cu codurile ANSI aferente. Pentru celula din instalatia de evacuare a consumatorului : - conectare intrerupator numai in conditii de sincronism .

70601209731

LEA 20 kV Valcele, Statia 110 / 20 kV Valea Crisului, si Statia 110 / 20 kV Sf. Gheorghe

Se va realiza un racord prin LEA 20 kV din LEA 20 kV Valcele cu montarea a trei stalpi, primul se va echipa cu un separator tripolar STEPno, al doilea cu reanclansator automat (recloser) si al treilea cu grup de masura pe 20 kV in montaj pe stalp, dupa care se continua in LEA 20 kV pana la PT producator.

FDEE - EDTS

70601210945

Filipesti Milcov FAI Filipesti

racord in LEA 20kV Milcov-Bijghir racord in LEA 20kV Milcov-Bijghir racord in LEA 20kV FAI-Ursoaia racord in LEA 20kV Filipesti-Irigatii Damienesti

E.ON Moldova Distributie E.ON Moldova Distributie E.ON Moldova Distributie EON Moldova Distributie

1000285987 1000285936 1000203807

1000228387

Tg.Frumos Tg.Neamt

racord 20kV in LEA 20kV Targu Frumos Hodora racord in LEA 20kV Tg. Neamt-Pluton, derivatia Nemtisor Manastirea Neamt punct de conexiune 20 kV cu acionare din interior, cu dou compartimente (de racordare i utilizator) racordat n anten la staia 110/20 kV Snnicolau Mare i amplasat n exteriorul staiei (la limita de proprietate) LEA 20 kV cu conductoare 95/15 mmp Al-Ol, n lungime de cca. 5 m, de la stalpul nr.46 al LEA 20 kV existente i cu echiparea stlpului special proiectat cu separator 24 kV, set descrctoare cu ZnO cu disconector, terminale de exterior pentru LES 20 kV si Rp< 4 ohmi. - LES 20 kV n lungime de cca. 100 m cu cablu de Al cu izolaie din polietilen reticulat (XLPE) de grosime redus, 3x185 mmp, montat n tub din polietilen; - Echiparea compartimentului de racordare al punctului de conexiune, astfel: * 1 buc. celula modulara de linie de 24kV, 400A, 12,5 kA(1s), cu separator de sarcin n SF6 i CLP, cu motorizare, loc pentru nca o celula de linie; * 1 buc. celul de msur cu separator de sarcin, cu dou transformatoare de tensiune 20/0,1 kV, clasa de precizie 0,5 i trei transformatoare de curent de 200/5A, clasa de precizie 0,5 - Grupul de masurare de decontare. punct de conexiune de 20 kV, cu dou compartimente (de racordare i utilizator) racordat la LES 20 kV Remetea ntre PT 12353 si PT 12347, din staia 110/20 kV Padurea Verde punct de conexiune de 20 kV, cu dou compartimente (de racordare i utilizator) racordat la LEA 20 kV Avicola Giarmata stalp 275, din staia 110/20 kV Padurea Verde

EON Moldova Distributie EON Moldova Distributie

1000286307

1000293346

Sannicolau Mare

Enel Distributie Banat

1057

Deta

Enel Distributie Banat

1083

Padurea Verde

Enel Distributie Banat

1085

Padurea Verde

Enel Distributie Banat

1123

Padurea Verde

const ntr-un punct de conexiune de 20 kV cu Enel Distributie acionare din interior, cu dou compartimente (de Banat racordare i utilizator) racordat la LEA 20 kV Ghiroda din staia 110/20 Padurea Verde const ntr-un punct de conexiune de 20 kV cu acionare din interior, cu dou compartimente (de Enel Distributie racordare i utilizator) racordat la LEA 20 kV Banat Urseni din staia 110/20/10 kV Fratelia

1126

Fratelia

1163

Sebis

Sebis

Gataia

Fantanele

Otelu Rosu

Satchinez

Faget

Carpinis

Carpinis

LES 20kV intre punctul de conexiune proiectat si celula libera existenta de 20 kV a st. 110/20 kV Sebis in lungime de cca. 50 m. Punctul de conexiune va avea doua compartimente, unul de racordare si un compartiment al utilizatorului. LES 20kV intre punctul de conexiune proiectat si celula libera existenta de 20 kV a st. 110/20 kV Sebis in lungime de cca. 50 m. Punctul de conexiune va avea doua compartimente, unul de racordare si un compartiment al utilizatorului. punct de conexiune de 20 kV cu acionare din interior, cu dou compartimente (de racordare i utilizator) racordat la LEA 20 kV Tormac din staia 110/20 Gataia punct de conexiune de 20 kV cu acionare din interior, cu dou compartimente (de racordare i utilizator) racordat la LEA 20 kV Alunis din staia 110/20 Fantanele punct de conexiune de 20kV cu doua compartimente: un compartiment de racordare, pentru instalatiile din gestiunea operatorului de distributie (2 celule de linie , o celula de masura) si un compartiment pentru instalatiile electrice ale producatorului, racordat in LEA 20kV Iaz Muntele Mic intre stalpii 89 si 90. punct de conexiune de 20kV racordat la LEA 20kV Carpinis Petrol , din statia 110/20 kV Satchinez punct de conexiune 20 kVcu doua compartimente , racord scurt LEA 20 kV in lungime de cca.65 m si LES 20 kV in lungime traseu de cca.20 m de la stalpul nr.213 al LEA 20kV Manastur Punct de conexiune de 20 kV racordat la LEA 20 kV Beregsau II din staia 110/20 kV Carpinis. Punct de conexiune 20 kV la LEA 20 kV Pompe Cenei, stalp 331/3 , LES 20kV intre punctul de conexiune si statia colectoare a parcului fotovoltaic de cca. 200 m

Enel Distributie Banat

1164

Enel Distributie Banat

1165

Enel Distributie Banat

1162

Enel Distributie Banat

1194

Enel Distributie Banat

11614559

Enel Distributie Banat

1260

Enel Distributie Banat

1257

Enel Distributie Banat

1264

Enel Distributie Banat

1246

Lovrin

Lovrin

Bocsa

Punct de conexiune la 20 kV cu doua compartimente, unul pentru inst.el. din gestiunea EDB si unul pentru inst.el. ale producatorului, post trafo 20/0,4 kV in functie de puterea obiectivului, LES 20kV intre punctul de conexiune si statia colectoare a parcului fotovoltaic de cca. 300m . Punct de conexiune de 20 kV cu doua compartimente (de racordare si utilizator) racordat la LEA 20 kV Peciu Nou din statia 110/20 kV Lovrin. LEA 20 kV cu conductoare 50/8 mmp Al-Ol, n lungime de cca. 6 m, de la stalpul nr 55/26/9 al LEA 20kV FNC, echiparea stalpului special proiectat SC 15014 cu separator 24 kV, set descrctoare cu ZnO cu disconector, terminale de exterior pentru LES 20 kV si Rp< 4ohmi. - LES 20 kV n lungime de cca. 10 m; - Echiparea compartimentului de racordare al punctului de conexiune, astfel: * 1 buc. celul modular de linie de 24kV, 400A, 12,5 kA(1s), cu separator de sarcin n SF6 i CLP, cu motorizare, loc pentru inca o celula de linie; * 1 buc. celul de msur - Grupul de masurare de decontare .

Enel Distributie Banat

1247

Enel Distributie Banat

1259

Enel Distributie Banat

1275

Semlac

punct de conexiune de 20 kVcu acionare din interior, cu dou compartimente (de Enel Distributie racordare si utilizator) racordat n LEA 20 Banat kV Semlac-Ndlac (n derivaia din ax spre PT 2160 Ndlac Peco) n dreptul st. 210/9 Punct de conexiune de 20 kV cu doua compartimente (de racordare si utilizator) racordat in LEA 20 kV Faget , ntre stalpii nr. 104 i 105. Punct de conexiune de 20 kV cu doua compartimente (de racordare si utilizator) racordat in LEA 20 kV Faget , ntre stalpii nr. 129 i 130.
Enel Distributie Banat

1285

Faget

1310

Faget

Enel Distributie Banat

1311

Calan

Lovrin

Lovrin

Punct de conexiune de 20 kV cu acionare din interior, cu dou compartimente (de racordare i utilizator) racordat prin LES 20 kV si celula de linie 20kV la barele de medie tensiune ale statia 110/20kV Calan Punct de conexiune de 20kV cu actionare din interior, cu doua compartimente (de racordare si utilizator) racordat la barele de MT din statia 110/20 kV Lovrin . Punct de conexiune de 20kV cu actionare din interior, cu doua compartimente (de racordare si utilizator) racordat la barele de MT din statia 110/20 kV Lovrin .

Enel Distributie Banat

1197

Enel Distributie Banat

1328

Enel Distributie Banat

1322

Lugoj

montare 1 buc. celul de linie prefabricat, 24 kV, extensibil, n anvelop metalic, cu inere la arc intern i separator de sarcin cu SF6 i CLP in compartimentul de racordare al PC proiectat pentru PFVSN2; - LES 20 kV traseu n lungime de cca. 100 m cu cablu de Al cu izolaie din polietilen reticular (XLPE) de grosime redus, 3x185 mmp, montat n tub de polietilen intre PC proiectat pentru PFVSN2 si PC proiectat pentru PFVSN1; - Echiparea punctului de conexiune proiectat pentru PFVSN1, astfel: * 1 buc. celul de linie prefabricat, 24 kV, Enel Distributie extensibil, n anvelop metalic, cu inere la arc Banat intern i separator de sarcin cu SF6 i CLP; * 1 buc. celul de msura prefabricat, 24 kV, n anvelop metalic, cu inere la arc intern i separator de sarcin n SF6 i CLP, cu dou transformatoare de tensiune 20/0,1 kV i trei transformatoare de curent de 100/5 A, clasa de precizie 0,5. * grup de msurare de decontare; - montare pe stlpul de reea JT existent n imediata apropiere a PFVSN2 a unui BMP trifazat 16 A, cablu 3x25+16 mmp n lungime de 6 m., contor electronic trifazat Imax = (5 80) A;

1319

Lugoj

LEA 20 kV cu conductoare 50/8 mmp Ol-Al, n lungime de cca. 10 m de la stlpul nr 26/147/74/19 al LEA 20 kV Dezeti, cu echiparea stlpului de racord proiectat cu separator 24 kV, set descrctoare cu ZnO cu disconector, terminale de exterior pentru LES 20 kV i Rp < 4 ohmi, consol ntindere CITI 140, legturi de ntindere cu izolaie compozit; - LES 20 kV traseu n lungime de cca. 100 m cu cablu de Al cu izolaie din polietilen reticular (XLPE) de grosime redus, 3x185 mmp, montat n tub de polietilen; - Echiparea punctului de conexiune proiectat, astfel: * 1 buc. celul de linie prefabricat, 24 kV, extensibil, n anvelop metalic, cu inere la arc intern i separator de sarcin cu SF6 i CLP; * 1 buc. celul de msura prefabricat, 24 kV, n Enel Distributie Banat anvelop metalic, cu inere la arc intern i separator de sarcin n SF6 i CLP, cu dou transformatoare de tensiune 20/0,1 kV i trei transformatoare de curent de 100/5 A, clasa de precizie 0,5. * grup de msurare de decontare; - montare pe stlpul de reea JT existent n imediata apropiere a PFVSN2 a unui BMP trifazat 16 A, cablu 3x25+16 mmp n lungime de 6 m., contor electronic trifazat Imax = (5 80) A; - procurare i montare protecie maximal de curent direcional pe plecarea 20 kV LEA din staia 110/20 kV Lugoj.

1320

Sebis

*extinderea barei colectoare 110 kV in statia Sebis; *montarea unei celule noi 110 kV in extinderea statiei Sebis aferenta CFV Sebis echipata complet cu intrerupator (cu comanda uni-tripolara si RAR monofazat) si protectii, lucrari anexe aferente; *echipare celula cu intrerupator in statia 110/20 kV Enel Distributie Sebis aferenta LEA 110 kV plecare spre Varfuri, Banat inclusiv protectii specifice LEA 110 kV; *integrarea celulelor 110 kV noi in sistemul de telecontrol existent la Enel Distributie Banat; *contor masura energie produsa, montat in instalatia Utilizatorului; *completare instalatie de legare la pamant. Punct de conexiune de 20kV cu actionare din interior, cu doua compartimente (de racordare si Enel Distributie utilizator) racordat la LEA 20 kV Carpinis Petrol, Banat din statia 110/20 kV Satchinez .

25

Satchinez

1295

Jimbolia

I. Lucrri pe tarif de racordare, conform HG 90/2008: - Demontarea LEA 20 kV Comlos intre stalpii nr 33 si 34. - Rentregire circuit LEA 20 kV cu conductoare 120/21 mmp Ol-Al, n lungime de cca. 65 m ntre stlpul nr. 33 al LEA 20 kV Comlos i stlpul proiectat nr.1, i ntre stlpul proiectat nr.2 i stlpul nr.34 al LEA 20 kV Comlos si echiparea stlpilor proiectai cu separator 24 kV, set descrctoare cu ZnO cu disconector, consola de intindere CIT 1400, legaturi duble de intindere, izolatie compozit, terminale de exterior pentru LES 20 kV i Rp < 4 ohmi. - LES 20 kV n lungime de cca. 2x15 m cu cablu de Al cu izolaie din polietilen reticular (XLPE) Enel Distributie de grosmine redus, 3x185 mmp, montat n tub Banat de polietilen, in canalizare separata. - Echiparea punctului de conexiune proiectat, astfel: * 2 buc. celule de linie (fr mentenan) extensibile, cu echipament de comutaie n SF6, echipate cu separator de sarcin i CLP, indicator de sc i de defect la pmnt i indicator capacitiv de prezen a tensiunii, motorizat, alimentarea motorizrii 24 Vcc; * 1 buc. celul de msura echipat cu separator de sarcin i CLP, cu dou transformatoare de tensiune 20/0,1 kV i trei transformatoare de curent de 100/5A, clasa de precizie 0,5. - Grup de masurare de decontare, contor dublu sens. - Montare protecie maximal de curent

1321

Data Emiterii/ Prelungirii

Obs.

Legislatia

Data expirarii ATR

Stare ATR

17.05.2012/03.08. 2012 ATR prelungit

90/2008

17.11.2012

VALABIL

18.05.2012/16.08. 2012

90/2008

18.11.2012

VALABIL

ATR prelungit

13.08.2012

90/2008

13.11.2012

VALABIL

06.08.2012

90/2008

06.11.2012

VALABIL

29.05.2012/07.08. 2012 ATR prelungit 25.05.2012/06.08. 2012 ATR prelungit

90/2008

11/29/2012

VALABIL

90/2008

11/25/2012

VALABIL

10/3/2012

90/2008

1/3/2013

VALABIL

9/25/2012

90/2008

12/25/2012

VALABIL

10/2/2012

90/2008

4/2/2013

VALABIL

10/2/2012

90/2008

4/2/2013

VALABIL

9/26/2012 01.06.2012 01.06.2012 25.05.2012 ATR nou ATR nou ATR nou

90/2008 90/2008 90/2008 90/2008

12/26/2012 01.09.2012 01.09.2012 25.08.2012

VALABIL Valabil Valabil Valabil

13.07.2012

ATR nou

90/2008

13.01.2013

VALABIL

12.07.2012

ATR nou

90/2008

12.01.2013

VALABIL

15.10.2012

ATR nou Prelungire ATR 108/07.11.2011

90/2008

15.04.2012

Valabil

25.04.2012

90/2008

07.11.2012

Valabil

05.01.2012/05.04. 2012

ATR prelungit

90/2008

05.07.2012

VALABIL

03.04.2012

90/2008

03.07.2012

VALABIL

03.04.2013

90/2008

03.07.2012

VALABIL

19.04.2012

90/2008

19.10.2012

VALABIL

23.04.2012

90/2008

23.10.2012

VALABIL

01.06.2012/30.08. 2012 18.05.2012/02.08. 2012 18.05.2012/02.08. 2012 20.06.2012/16.08. 2012

ATR prelungit

90/2008

12/1/2012

VALABIL

ATR prelungit

90/2008

11/18/2012

VALABIL

ATR prelungit

90/2008

11/18/2012

VALABIL

ATR prelungit

90/2008

11/30/2012

VALABIL

27.08.2012

90/2008

11/27/2012

VALABIL

11.09.2012

90/2008

3/11/2013

VALABIL

11.09.2012

90/2008

12/11/2012

VALABIL

10.09.2012

90/2008

12/10/2012

VALABIL

5/16/2012

3 luni+prelungire 3 luni

HG 90/2008

11/16/2012

VALABIL, adresa prelungire valabilitate nr.

5/16/2012

3 luni+prelungire 3 luni

HG 90/2008

11/16/2012

VALABIL, adresa prelungire valabilitate nr. 2348/14.08.2012 VALABIL, adresa prelungire valabilitate nr. 2411/20.08.2012 VALABIL, adresa prelungire valabilitate nr. 2807/20.09.2012

5/21/2012

3 luni+prelungire 3 luni

HG 90/2008

11/21/2012

6/20/2012

3 luni+prelungire 3 luni

HG 90/2008

12/20/2012

7/27/2012

3 luni

HG 90/2008

10/27/2012

VALABIL

7/27/2012

3 luni

HG 90/2008

10/27/2012

VALABIL

9/20/2012

3 luni

HG 90/2008

12/20/2012

VALABIL

7/9/2012

3 luni+prelungire 3 luni

HG 90/2008

1/9/2013

VALABIL, adresa prelungire valabilitate nr. 3014/05.10.2012

8/23/2012

3 luni

HG 90/2008

11/23/2012

VALABIL

3/7/2012

3 luni+prelungire 3 luni

HG 90/2008

9/7/2012

VALABIL, adresa prelungire nr. 1613/07.06.2012

9/13/2012

3 luni

HG 90/2008

12/13/2012

VALABIL

8/21/2012

3 luni

HG 90/2008

11/21/2012

VALABIL

9/13/2012

3 luni

HG 90/2008

12/13/2012

VALABIL

9/13/2012

3 luni

HG 90/2008

12/13/2012

VALABIL, adresa prelungire nr. 1708/15.06.2012 VALABIL, adresa prelungire nr. 1875/28.06.2012

3/28/2012

3 luni+prelungire 3 luni

HG 90/2008

9/28/2012

10/12/2012

3 luni

HG 90/2008

1/12/2013

VALABIL

10/5/2012

3 luni

HG 90/2008

1/5/2013

VALABIL

4/13/2012

3 luni+prelungire 3 luni

HG 90/2008

10/13/2012

VALABIL, adresa prelungire nr. 2023/13.07.2012 VALABIL, adresa prelungire nr. 1969/06.07.2012

4/13/2012

3 luni+prelungire 3 luni

HG 90/2008

10/13/2012

5/29/2012

6 luni

HG 90/2008

11/29/2012

VALABIL

6/1/2012

3 luni+prelungire 3 luni

HG 90/2008

12/1/2012

VALABIL, adresa prelungire valabilitate nr. 2558/31.08.2012 VALABIL, adresa prelungire valabilitate nr. 2636/07.09.2012

6/8/2012

3 luni+prelungire 3 luni

HG 90/2008

12/8/2012

10/2/2012

3 luni

HG 90/2008

1/2/2013

VALABIL

10/2/2012

3 luni

HG 90/2008

1/2/2013

VALABIL

6/11/2012

3 luni+prelungire 3 luni

HG 90/2008

12/11/2012

VALABIL, adresa prelungire valabilitate nr. 2672/11.09.2012 VALABIL, ATR in curs de actualizare

7/3/2012

3 luni

HG 90/2008

10/3/2012

7/3/2012

3 luni

HG 90/2008

10/3/2012

VALABIL, ATR in curs de actualizare VALABIL, adresa prelungire valabilitate nr. 2940/01.10.2012 VALABIL, adresa prelungire valabilitate nr. 2921/28.09.2012 VALABIL, adresa prelungire valabilitate nr. 2922/28.09.2012 VALABIL, adresa prelungire valabilitate nr. 2950/02.10.2012 VALABIL, adresa prelungire valabilitate nr. 2934/01.10.2012 VALABIL, adresa prelungire valabilitate nr. 2936/01.10.2012 VALABIL, adresa prelungire valabilitate nr. 2938/01.10.2012

7/4/2012

3 luni+prelungire 3 luni

HG 90/2008

1/4/2013

7/5/2012

3 luni+prelungire 3 luni

HG 90/2008

1/5/2013

7/5/2012

3 luni+prelungire 3 luni

HG 90/2008

1/5/2013

7/6/2012

3 luni+prelungire 3 luni

HG 90/2008

1/6/2013

7/9/2012

3 luni+prelungire 3 luni

HG 90/2008

1/9/2013

7/9/2012

3 luni+prelungire 3 luni

HG 90/2008

1/9/2013

7/9/2012

3 luni+prelungire 3 luni

HG 90/2008

1/9/2013

9/17/2012

3 luni

HG 90/2008

12/17/2012

VALABIL

7/19/2012

3 luni

HG 90/2008

10/19/2012

VALABIL

7/3/2012

3 luni+prelungire 3 luni

HG 90/2008

1/3/2013

VALABIL, adresa prelungire valabilitate nr. 2943/01.10.2012

7/26/2012

3 luni

HG 90/2008

10/26/2012

VALABIL

7/26/2012

3 luni

HG 90/2008

10/26/2012

VALABIL

7/27/2012

3 luni

HG 90/2008

10/27/2012

VALABIL

8/8/2012

3 luni

HG 90/2008

11/8/2012

VALABIL

8/14/2012

3 luni

HG 90/2008

11/14/2012

VALABIL

10/1/2012

3 luni

HG 90/2008

1/1/2013

VALABIL

10/1/2012

3 luni

HG 90/2008

1/1/2013

VALABIL

9/18/2012

3 luni

HG 90/2008

12/18/2012

VALABIL

8/21/2012

3 luni

HG 90/2008

11/21/2012

VALABIL

9/3/2012

3 luni

HG 90/2008

12/3/2012

VALABIL

9/5/2012

3 luni

HG 90/2008

12/5/2012

VALABIL

9/5/2012

3 luni

HG 90/2008

12/5/2012

VALABIL

9/11/2012

3 luni

HG 90/2008

12/11/2012

VALABIL

9/14/2012

3 luni

HG 90/2008

12/14/2012

VALABIL

9/19/2012

3 luni

HG 90/2008

12/19/2012

VALABIL

9/28/2012

3 luni

HG 90/2008

12/28/2012

VALABIL

10/1/2012

3 luni

HG 90/2008

1/1/2013

VALABIL

10/4/2012

3 luni

HG 90/2008

1/4/2013

10/5/2012

3 luni

HG 90/2008

1/5/2013

VALABIL

10/5/2012

3 luni

HG 90/2008

1/5/2013

VALABIL

10/5/2012

3 luni

HG 90/2008

1/5/2013

VALABIL

10/5/2012

3 luni

HG 90/2008

1/5/2013

VALABIL

10/5/2012

3 luni

HG 90/2008

1/5/2013

VALABIL

10/5/2012

3 luni

HG 90/2008

1/5/2013

VALABIL

10/5/2012

3 luni

HG 90/2008

1/5/2013

VALABIL

10/5/2012

3 luni

HG 90/2008

1/5/2013

VALABIL

10/5/2012

3 luni

HG 90/2008

1/5/2013

VALABIL

10/5/2012

3 luni

HG 90/2008

1/5/2013

10/8/2012

3 luni

HG 90/2008

1/8/2012

VALABIL

10/8/2012

3 luni

HG 90/2008

1/8/2013

VALABIL

10.09.2012

3 luni

90/2008

10.12.2012

VALABIL

08.12.2011

12 luni

90/2008

08.12.2012

VALABIL

08.12.2011

12 luni

90/2008

08.12.2012

VALABIL

23.02.2012 10.09.2012 02.10.2012 02.10.2012 02.10.2012

6 luni 3 luni 3 luni 3 luni 3 luni

90/2008 90/2008 90/2008 90/2008 90/2008

23.08.2012 10.12.2012 02.01.2012 02.01.2012 02.01.2012

VALABIL VALABIL VALABIL VALABIL VALABIL

24.05.2012

6 luni

90/2008

24.11.2012

VALABIL

13.06.2012

6 luni

90/2008

13.12.2012

VALABIL

22.06.2012

6 luni

90/2008

22.12.2012

VALABIL

22.06.2012

6 luni

90/2008

22.12.2012

VALABIL

22.06.2012 21.06.2012 18.07.2012 18.07.2012

6 luni 6 luni 6 luni 6 luni

90/2008 90/2008 90/2008 90/2008

22.12.2012 21.12.2012 18.01.2013 18.01.2013

VALABIL VALABIL VALABIL VALABIL

26.07.2012

6 luni

90/2008

26.01.2013

VALABIL

23.07.2012 09.08.2012

6 luni 3 luni

90/2008 90/2008

23.01.2013 09.11.2012

VALABIL VALABIL

10.08.2012

3 luni

90/2008

10.11.2012

VALABIL

10.09.2012

3 luni

90/2008

10.12.2012

VALABIL

10.09.2012

3 luni

90/2008

10.12.2012

VALABIL

22.08.2012

3 luni

90/2008

22.11.2012

VALABIL

22.08.2012

3 luni

90/2008

22.11.2012

VALABIL

22.08.2012

3 luni

90/2008

22.11.2012

VALABIL

10.09.2012 17.08.2012

3 luni 3 luni

90/2008 90/2008

10.12.2012 17.11.2012

VALABIL VALABIL

18.08.2012

3 luni

90/2008

18.11.2012

VALABIL

09.08.2012

3 luni

90/2008

09.11.2012

VALABIL

10.09.2012

3 luni

90/2008

10.12.2012

VALABIL

08.08.2012 15.08.2012

3 luni 3 luni

90/2008 90/2008

08.11.2012 15.11.2012

VALABIL VALABIL

10.09.2012

3 luni

90/2008

10.12.2012

VALABIL

08.08.2012

3 luni

90/2008

08.11.2012

VALABIL

08.08.2012

3 luni

90/2008

08.11.2012

VALABIL

13.06.2012

6 luni

90/2008

13.12.2012

VALABIL

17.10.2012

3 luni

90/2008

17.01.2012

VALABIL

10.09.2012

3 luni

90/2008

10.12.2012

VALABIL

10.09.2012

3 luni

90/2008

10.12.2012

VALABIL

11.09.2012

3 luni

90/2008

11.12.2012

VALABIL

11.09.2012

3 luni

90/2008

11.12.2012

VALABIL

10.09.2012 10.09.2012

3 luni 3 luni

90/2008 90/2008

10.12.2012 10.12.2012

VALABIL VALABIL

11.09.2012

3 luni

90/2008

11.12.2012

VALABIL

19.09.2012

3 luni

90/2008

19.12.2012

VALABIL

25.09.2012

3 luni

90/2008

25.12.2012

VALABIL

17.08.2012

3 luni

90/2008

17.11.2012

VALABIL

01.10.2012

6 luni

90/2008

01.04.2012

VALABIL

01.10.2012 02.10.2012 11.10.2012

3 luni 3 luni 3 luni

90/2008 90/2008 90/2008

01.01.2013 02.01.2013 11.01.2013

VALABIL VALABIL VALABIL

11.10.2012 10.10.2012 10.09.2012

3 luni 3 luni 3 luni

90/2008 90/2008 90/2008

11.01.2013 10.01.2013 10.12.2012

VALABIL VALABIL VALABIL

10.10.2012

6 luni

90/2008

10.04.2012

VALABIL

17.10.2012

3 luni

90/2008

17.01.2013

VALABIL

17.08.2012 24.04.2012 17.08.2012 25.04.2012 09.07.2012 16.07.2012 18.07.2012 20.08.2012 24.08.2012 28.08.2012 04.09.2012 12.09.2012 21.09.2012 11.04.2012 25.06.2012 25.06.2012 25.06.2012 17.07.2012 10.09.2012 14.09.2012 10.05.2012 29.06.2012

HG 90/2008 HG 90/2008 HG 90/2008 HG 90/2008 HG 90/2008 HG 90/2008 HG 90/2008 HG 90/2008 HG 90/2008 HG 90/2008 HG 90/2008 HG 90/2008 HG 90/2008 HG 90/2008 HG 90/2008 HG 90/2008 HG 90/2008 HG 90/2008 HG 90/2008 HG 90/2008 HG 90/2008 HG 90/2008

17.02.2013 24.10.2012 17.02.2013 25.10.2012 09.01.2013 16.01.2013 18.01.2013 20.02.2013 24.02.2013 20.02.2013 04.03.2013 12.03.2013 21.03.2013 11.10.2012 25.12.2012 25.12.2012 25.12.2012 17.01.2013 10.03.2013 14.12.2012 10.11.2012 29.12.2012

VALABIL VALABIL VALABIL VALABIL VALABIL VALABIL VALABIL VALABIL VALABIL VALABIL VALABIL VALABIL VALABIL VALABIL VALABIL VALABIL VALABIL VALABIL VALABIL VALABIL VALABIL VALABIL

18.09.2012 22.05.2012 25.05.2012 18.06.2012 22.06.2012 21.08.2012 28.08.2012 27.08.2012 05.09.2012 21.09.2012 24.04.2012 25.05.2012 18.06.2012 18.06.2012 14.09.2012 24.09.2012 24.09.2012

HG 90/2008 HG 90/2008 HG 90/2008 HG 90/2008 HG 90/2008 HG 90/2008 HG 90/2008 HG 90/2008 HG 90/2008 HG 90/2008 HG 90/2008 HG 90/2008 HG 90/2008 HG 90/2008 HG 90/2008 HG 90/2008 HG 90/2008

18.03.2013 22.11.2012 25.11.2012 18.12.2012 22.12.2012 21.02.2013 28.11.2012 27.02.2013 05.03.2013 21.03.2012 24.10.2012 25.11.2012 18.12.2012 18.12.2012 14.03.2012 24.03.2013 24.03.2013

VALABIL VALABIL VALABIL VALABIL VALABIL VALABIL VALABIL VALABIL VALABIL VALABIL VALABIL VALABIL VALABIL VALABIL VALABIL VALABIL VALABIL

29.05.2012 /

HG 90/2008

11/29/2012

VALABIL

16.05.2012 /

HG 90/2008

5/16/2013

VALABIL

11.07.2012 /

Inlocuieste HG 90/2008 ATR 70101226500 / 10.05.2012

1/11/2013

VALABIL

12.07.2012 /

HG 90/2008

1/12/2013

VALABIL

12.07.2012 /

HG 90/2008

1/12/2013

VALABIL

12.07.2012 /

HG 90/2008

1/12/2013

VALABIL

22.08.2012 /

HG 90/2008

22.02.2013 /

VALABIL

20.08.2012 /

HG 90/2008

20.02.2013 /

VALABIL

20.08.2012 /

HG 90/2008

20.02.2013 /

VALABIL

02.05.2012 /

Inlocuieste HG 90/2008 ATR 70101120932 / 02.11.2011

11/2/2012

VALABIL

05.07.2012 /

Inlocuieste HG 90/2008 ATR 70101113404 / 17.08.2011

1/5/2013

VALABIL

29.08.2012 /

HG 90/2008

29.02.2013

VALABIL

05.06.2012 /

Inlocuieste HG 90/2008 ATR 70101226197 / 20.04.2011

6/5/2013

VALABIL

05.07.2012 /

Inlocuieste HG 90/2008 ATR 70101226590 / 16.05.2012

7/5/2013

VALABIL

11.09.2012 /

Inlocuieste HG 90/2008 ATR 70101223169 / 23.01.2012

3/11/2013

VALABIL

12.12.2011 /

Inlocuieste ATR 70201002139 / 08.04.2010

HG 90/2008

6/12/2012

VALABIL

27.08.2012 /

HG 90/2008

8/27/2013

VALABIL

21.05.2012 /

HG 90/2008

11/21/2012

VALABIL

13.09.2012 /

HG 90/2008

3/13/2013

VALABIL

18.04.2012 /

Inlocuieste HG 90/2008 ATR 70201115102 / 06.10.2011

10/18/2012

VALABIL

26.04.2012 /

Inlocuieste HG 90/2008 ATR 70201118774 /06.12.2011

10/26/2012

VALABIL

11.07.2012 /

HG 90/2008

1/11/2013

VALABIL

29.05.2012 /

Inlocuieste HG 90/2008 ATR 70201115259 / 24.11.2011

11/29/2012

VALABIL

24.07.2012 /

Inlocuieste HG 90/2008 ATR 70201220372 / 13.02.2012

1/24/2013

VALABIL

19.09.2012 /

HG 90/2008

3/19/2013

VALABIL

05.10.2012 /

Inlocuieste ATR 70201118912 / 06.04.2012

HG 90/2008

4/5/2013

VALABIL

01.10.2012 /

HG 90/2008

4/1/2013

VALABIL

29.05.2012 /

HG 90/2008

11/29/2012

VALABIL

28.03.2012 /

Inlocuieste HG 90/2008 ATR 70301110659 / 01.06.2011

9/28/2012

VALABIL

20.08.2012 /

HG 90/2008

8/20/2013

VALABIL

04.10.2012 /

Inlocuieste ATR 70301220623 / 16.03.2012

HG 90/2008

4/4/2013

VALABIL

04.10.2012 /

HG 90/2008

4/4/2013

VALABIL

12.10.2012 /

Inlocuieste ATR 70401109111 / 01.09.2011

HG 90/2008

4/12/2013

VALABIL

21.05.2012 /

HG 90/2008

5/21/2013

VALABIL

09.05.2012 /

HG 90/2008

11/9/2012

VALABIL

09.10.2012 /

HG 90/2008

4/9/2013

VALABIL

09.10.2012 /

HG 90/2008

4/9/2013

VALABIL

01.10.2012 /

HG 90/2008

4/1/2013

VALABIL

20.09.2012 /

Inlocuieste HG 90/2008 ATR 70601210386 / 27.07.2012

3/20/2013

VALABIL

18.09.2012 18.09.2012 25.07.2012

3 luni 3 luni 3 luni

90/2008 90/2008 90/2008

18.12.2012 18.12.2012 25.10.2012

VALABIL VALABIL VALABIL

9/11/2012

3 luni

90/2008

11.12.2012

VALABIL

9/19/2012

3 luni

90/2008

19.12.2012

VALABIL

28.09.2012 10.02.2012/08.05. 2012

3 luni

90/2008

28.12.2012

VALABIL

ATR prelungit

90/2008

07.09.2012

VALABIL

05.03.2012/17.05. 2012

ATR prelungit

90/2008

05.09.2012

VALABIL

06.03.2012/17.05. 2012

ATR prelungit

90/2008

06.09.2012

VALABIL

06.04.2012/26.06. 2012

ATR prelungit

90/2008

06.10.2012

VALABIL

10.04.2012/27.06. 2012

ATR prelungit

90/2008

10.10.2012

VALABIL

04.05.2012/05.07. 2012

ATR prelungit

90/2008

04/11/2012

VALABIL

04.05.2012/19.07. 2012

ATR prelungit

90/2008

04/11/2012

VALABIL

04.05.2012/19.07. 2012

ATR prelungit

90/2008

04/11/2012

VALABIL

10.05.2012/21.08. 2012

ATR prelungit

90/2008

10/11/2012

VALABIL

23.05.2012/17.08. 2012

ATR prelungit

90/2008

23/11/2012

VALABIL

29.05.2012/21.08. 2012

ATR prelungit

90/2008

29.11.2012

VALABIL

16.07.2012

90/2008

16.10.2012

VALABIL

13.07.2012

90/2008

13.10.2012

VALABIL

18.07.2012

90/2008

18.10.2012

VALABIL

13.07.2012

90/2008

13.10.2012

VALABIL

13.07.2012

90/2008

13.10.2012

VALABIL

13.07.2012

90/2008

13.10.2012

VALABIL

26.07.2012

90/2008

26.10.2012

VALABIL

31.07.2012

90/2008

31.10.2012

VALABIL

27.08.2012

90/2008

27.11.2012

VALABIL

27.08.2012

90/2008

27.11.2012

VALABIL

18.06.2012/10.08. 2012

ATR prelungit

90/2008

18.12.2012

VALABIL

29.08.2012

90/2008

29.11.2012

VALABIL

28.08.2012

90/2008

28.11.2012

VALABIL

28.08.2012

90/2008

28/11/2012

VALABIL

28.08.2012

90/2008

28/11/2012

VALABIL

08/08/2012

90/2008

08/02/2013

VALABIL

09/08/2012

90/2008

09/11/2012

VALABIL

28/08/2012

90/2008

28/11/2012

VALABIL

Data estimata PIF

2013

oct. 2012

2013

2012

2012

12.2012

iunie 2013

2013

2013

2013

2013 2012 2012 2014

2012

2012,2014, 2016

2013

2014

2012

30.06.2012

30.06.2013

2013

2013

2012 0.5 in 2012; 1.0MW in 2013 0.5 in 2012; 1.5MW in 2013

2012

2013

2013

2013

2013

PIF 2012

PIF 2012

PIF 2012

PIF 2012 PIF 2012 PIF 2013 PIF 2013 PIF 2013

PIF 2012

PIF 2012

PIF 2013

PIF 2013

PIF 2012 PIF 2011 PIF 2013 PIF 2013

PIF 2013

PIF 2013 PIF 2012

PIF 2012

PIF 2012

PIF 2012

PIF 2012

PIF 2012

PIF 2012

PIF 2012 PIF 2012

PIF 2012

PIF 2012

PIF 2012

PIF 2012 PIF 2012

PIF 2012

PIF 2012

PIF 2012

PIF 2012

PIF 2013

PIF 2012

PIF 2012

PIF 2012

PIF 2012

PIF 2012 PIF 2012

PIF 2012

PIF 2012

PIF 2012

PIF 2012

PIF 2013

PIF 2013 PIF 2013 PIF 2013

PIF 2013 PIF 2013 PIF 2013

PIF 2013

PIF 2013

2013

2014

2013

2013

2013

2013

2013

2013

2013

2013

2013

2013

2013

2014

2013

2013

2013

2013

2013

2013

2013

2013

2013

2013

2013

2013

2013

2013

2013

2013

2013

2013

2013

2013

2013

2013

2013

2013

2012 2012 2013

2012

2013

2012

2013

15.12. 2012

15.12.2012

30.12.2012

2013

trim. I 2013

trim III 2012

trim III 2012

2012

trim 3.2012

31.01.2013

octombrie 2012

decembrie 2012

Trimestrul 3 2012

sem.II 2012

sem.II 2012

sem.II 2012

trim II 2013

trim IV 2012

octom. 2014

octom. 2014

trim.I 2013

septembrie 2013

septembrie 2013

31.11.2012

31.11.2012

septembrie 2013

octombrie 2014

01.06.2013

Data: Codul culorilor

05.11.2012 ATR emise de: Transelectrica Enel Dobrogea E.ON Moldova Electrica Transilvania Nord Electrica Transilvania sud CEZ Electrica Muntenia Nord Enel Muntenia Enel Banat ATR Expirate ATR Noi

Nr. crt

Denumire investitor

Denumire centrale electrice eoliene

Judetul

SC Termoelectrica SA

CTE

Braila

Total

Putere instalata (MW)

U(kV)

Staia de racord

Comentariu racordare la RET in statia electrica 400kV Lacul Sarat prin LEA 400kV s.c.de racordare a fostului grup G4 din CTE Braila

Emitent

Nr. ATR

880

400

Lacu Sarat

CN Transelectrica SA

95

Data Emiterii/ Prelungirii

Obs.

Legislatia

Data expirarii ATR

Stare ATR

Data estimata PIF

11.10.2011

Prelungire ATR 35/11.04.2011

11.04.2012

Expirat

Anda mungkin juga menyukai